WO2003027777A1 - Boîtier de montre et procédé de fabrication - Google Patents

Boîtier de montre et procédé de fabrication Download PDF

Info

Publication number
WO2003027777A1
WO2003027777A1 PCT/JP2002/009374 JP0209374W WO03027777A1 WO 2003027777 A1 WO2003027777 A1 WO 2003027777A1 JP 0209374 W JP0209374 W JP 0209374W WO 03027777 A1 WO03027777 A1 WO 03027777A1
Authority
WO
WIPO (PCT)
Prior art keywords
component
watch
watch exterior
watch case
exterior part
Prior art date
Application number
PCT/JP2002/009374
Other languages
English (en)
French (fr)
Inventor
Kouji Fujii
Junji Satoh
Hitoshi Uchida
Norio Hashimoto
Ryo Fujita
Original Assignee
Citizen Watch Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Citizen Watch Co., Ltd. filed Critical Citizen Watch Co., Ltd.
Priority to EP02799365A priority Critical patent/EP1439434B1/en
Priority to DE60221874T priority patent/DE60221874T2/de
Priority to JP2003531260A priority patent/JP4176636B2/ja
Priority to US10/490,288 priority patent/US6935774B2/en
Publication of WO2003027777A1 publication Critical patent/WO2003027777A1/ja

Links

Classifications

    • GPHYSICS
    • G04HOROLOGY
    • G04BMECHANICALLY-DRIVEN CLOCKS OR WATCHES; MECHANICAL PARTS OF CLOCKS OR WATCHES IN GENERAL; TIME PIECES USING THE POSITION OF THE SUN, MOON OR STARS
    • G04B37/00Cases
    • G04B37/14Suspending devices, supports or stands for time-pieces insofar as they form part of the case
    • G04B37/1486Arrangements for fixing to a bracelet
    • GPHYSICS
    • G04HOROLOGY
    • G04BMECHANICALLY-DRIVEN CLOCKS OR WATCHES; MECHANICAL PARTS OF CLOCKS OR WATCHES IN GENERAL; TIME PIECES USING THE POSITION OF THE SUN, MOON OR STARS
    • G04B37/00Cases
    • G04B37/08Hermetic sealing of openings, joints, passages or slits
    • G04B37/081Complete encasings for wrist or pocket watches also comprising means for hermetic sealing of the winding stem and crown
    • G04B37/082Complete encasings for wrist or pocket watches also comprising means for hermetic sealing of the winding stem and crown without special hermetic sealing pieces
    • GPHYSICS
    • G04HOROLOGY
    • G04BMECHANICALLY-DRIVEN CLOCKS OR WATCHES; MECHANICAL PARTS OF CLOCKS OR WATCHES IN GENERAL; TIME PIECES USING THE POSITION OF THE SUN, MOON OR STARS
    • G04B37/00Cases
    • G04B37/22Materials or processes of manufacturing pocket watch or wrist watch cases

Definitions

  • the present invention relates to a watch exterior part made of a metal such as titanium, a titanium alloy, and stainless steel, which is strong, has high corrosion resistance and waterproofness, and is rich in design variations, and a method of manufacturing the same.
  • Background technology a metal such as titanium, a titanium alloy, and stainless steel, which is strong, has high corrosion resistance and waterproofness, and is rich in design variations, and a method of manufacturing the same.
  • watch exterior parts such as watch cases are often made of titanium (hereinafter “titanium” includes pure titanium and titanium alloys) and stainless steel.
  • titanium includes pure titanium and titanium alloys
  • stainless steel has been.
  • titanium has been increasingly used for wristwatch components because it is strong, corrosion-resistant and lightweight, and has good biocompatibility that does not cause metal allergic reactions in the human body.
  • Titanium is widely used not only in wrist watches, but also in various industrial fields to take advantage of its excellent properties of light weight, high strength, and good corrosion resistance.
  • Pure titanium crystals have a hexagonal close-packed structure at room temperature, but have a body-centered cubic structure at temperatures above the transformation point (temperature at transformation) of 882 ° C. Therefore, if a temperature exceeding this temperature (ie, 882 ° C) is applied during the manufacturing process of a wristwatch component, the wristwatch component will change its surface state due to the transformation of the crystal, and must be polished again. No. It is considered that it is desirable to treat titanium at a temperature lower than its transformation point, because there is a possibility that extra steps may be added.
  • stainless steel has a moderate feeling of weight and good corrosion resistance, and is most widely used as a material for watch parts.
  • SUS304, SUS316L, etc. are used from the viewpoint of corrosion resistance.
  • -Austenitic stainless steel is widely used.
  • a watch case which is a watch component, is generally manufactured by integrally molding a watch case body and a leading can part (the leading can part is a member for connecting a watch band to the watch case body).
  • the forging method is more difficult to produce parts with a more complicated design than the forging method, but in recent years, wristwatch parts have been produced by forging methods such as hot forging or cold Iwao. Has become commonplace.
  • watch parts have a small overall size.
  • the watch case main body and the first can part are manufactured integrally from the beginning, then different surface processing and film forming processing will be performed for each part. It is extremely difficult to finish the surface cleanly (by changing the surface finish).
  • the watch case body and the leading can part are manufactured integrally from the beginning, then It becomes difficult to process the front can.
  • the watch case has a design called V, manufactured by changing the surface finish. If there is a strong demand on the design and the desire to create a design feature with a complicated shape of the front can, separate the timepiece case main body and the front can from the desired shape. Processing is performed, and then both are engaged or joined to integrate the two. In this way, the watch case can be subjected to desired processing for each part, so that a variety of design variations can be provided.
  • a method is as follows: a pin is pressed into between the watch case main body and the leading end: / part, and both are engaged via the pin.
  • this method has the disadvantage that it is difficult to maintain the engagement between the watch case body and the leading can for a long period of time, and the reliability of durability is low.
  • it is difficult to make the pin invisible from the outside because it is used for engaging both sides, and there is a disadvantage that the design of the watch case may be reduced due to the pin being visible from the outside.
  • brazing has a problem of brazing material flow, the surface finish can be made relatively good even after the case body and the leading end portion are joined.
  • corrosion resistance of the joined parts As described above, when titanium is used as the material for the case body and the leading end portion, if the joining is performed at a temperature lower than the transformation point of titanium, a very suitable brazing material is not found.
  • silver brazing for example, JIS standard: BAg-8 is appropriate.
  • the silver solder has extremely low corrosion resistance, discoloration or rust may occur in the joined portion over a long period of time after joining, and the appearance quality may be significantly impaired.
  • watch parts require high waterproofness. However, especially in the case of a watch case, it is difficult to maintain waterproofness for a long time when the watch case body and the crown pipe are joined, and the reliability in terms of eternal protection tends to be low. There is a title.
  • watch parts can be joined by welding each part. However, when welding is performed, burnt marks are left behind, and the decorativeness of the appearance is impaired. Some of them are projection welding, which melts small projections called projections. However, this welding is limited in the number of applicable parts because it changes the size (shape) of the parts to be welded. The relationship is that 'design constraints are imposed on wristwatch parts.
  • each part for example, a watch case main body, a front can part, a crown pipe, etc.
  • each part is separately formed, and each part is subjected to a desired processing, and then engaged or joined.
  • the present invention has been made to solve such a problem of the conventional watch exterior parts.
  • the watch exterior manufactured from two or more parts, such as a watch case including a watch case body and a front can part. In the parts and their manufacturing methods, they are robust enough to maintain the engaged or joined state of each part for a long period of time, have both corrosion resistance and waterproofness, maintain good decorative appearance, and have a wide variety of design variations
  • the purpose is to be Disclosure of the invention
  • a timepiece exterior component according to the present invention is a timepiece exterior component having a configuration in which a first component and a second component are fixed, wherein the second component is fixed to a close contact portion in close contact with the first component. It is characterized in that a phase diffusion bonding part and a mouth bonding part are formed.
  • the present invention is a watch exterior component having a configuration in which a first component and a second component are fixed, wherein a hole corresponding to the second component is formed in the first component, There is provided a timepiece exterior part in which a solid phase diffusion bonding part and a brazing part are formed in a portion where the second part fits into the hole and is in close contact with the hole.
  • the second part has a small diameter part
  • the hole has a small diameter part corresponding to the small diameter part
  • the small diameter part of the second part is the small diameter part.
  • the solid-phase diffusion bonding portion is formed in a portion that is in close contact with the small-diameter portion of the portion
  • the brazing connection portion is formed in a portion other than the portion that is in close contact.
  • the present invention is a watch exterior component having a configuration in which a first component and a second component are fixedly attached, wherein a recess is formed in the first component, and the second component has a recess.
  • This watch exterior part is provided with a third part that is in close contact with the recess and the protrusion, and the solid-phase diffusion bonding part is formed in a part where the third part is in close contact with the recess and the protrusion.
  • the joint portion is formed at a portion where the protruding portion is in close contact with the lower portion.
  • a metal film is formed on the surface of the protrusion, and the protrusion is in close contact with the recess through the metal film.
  • the material of the first component and the second component is stainless steel or titanium.
  • the first component is a watch case main body and the second component is a crown pipe
  • the first component is a watch case main body
  • the second component is a front can part Either may be used.
  • the above-mentioned joint portion is formed of a low melting point brazing material.
  • the brazing joint is formed of an opening material mainly containing palladium, platinum, nickel and phosphorus or a brazing material mainly containing palladium, copper, nickel and phosphorus. I'm sorry.
  • the brazed joint may be formed of an opening material containing gold, silver, copper, germanium, and palladium as main components.
  • the brazing joint may be formed of a brazing material containing gold, silver, copper, palladium, and nickel as main components and at least one of gallium, indium, and tin.
  • the present invention is a method for manufacturing a watch exterior part, in which a first part and a second part are fixedly attached to each other to manufacture a watch exterior part, the step of attaching a mouth material to the second part. And a step of forming a solid-phase diffusion bonding portion and an adhesive bonding portion in a contact portion where the second component is in close contact with the first component.
  • the present invention also relates to a method for manufacturing a watch exterior component for manufacturing a watch exterior component by fixing a first component and a second component, the method comprising: attaching a mouthpiece to the second component.
  • a method for producing a watch exterior part comprising: a facing step of facing a part; and a heat treatment step of heating the first part and the second part after the pressing step and the facing step.
  • the present invention relates to a method for manufacturing a watch exterior part, in which a first part and a second part are fixed to each other to manufacture a watch exterior part, wherein a brazing material is attached to the second part.
  • the present invention provides a method for manufacturing a watch exterior part.
  • the press-contacting step can be performed by press-fitting the second component into the first component. Further, the pressing step includes the step of combining the third component with the first component and the second component. It can also be performed by press fitting.
  • the step of attaching the mouth material is preferably performed by attaching a paste-like material with a dispenser.
  • the temperature at the time of heating in the heat treatment step is not less than about 600 ° C. and not more than about 850 ° C. Good.
  • the temperature at the time of heating in the heat treatment step is preferably about 600 ° C. or more and about 900 ° C. or less. No.
  • a step of forming a metal film on a portion of the second component other than the portion to which the filler material is attached may be included.
  • FIG. 1 is an exploded perspective view showing a watch case main body and a crown pipe in an exploded manner.
  • FIG. 2 is a cross-sectional view of the crown part pipe formed by closely contacting the watch case main body in FIG. 1 cut along line 2-2.
  • FIG. 3 is a perspective view of another watch case in which a watch case main body, a front can part, and a metal tube are exploded.
  • FIG. 4 is a cross-sectional view of FIG. 3, in which the contact portion formed by closely contacting the watch case main body through the metal tube is cut along line 4-14.
  • FIG. 5 is a perspective view of still another watch case in which a watch case main body and a front can part are exploded.
  • FIG. 6 is a cross-sectional view of FIG. 5, in which the contact portion formed by closely contacting the watch case main body is cut along line 6-6.
  • Fig. 7 shows the watch case body, the front can part and the metal tube in a disassembled state. It is a perspective view of a meter case.
  • FIG. 8 is a cross-sectional view taken along line 8-8 of FIG. 7, showing a contact portion formed by a force-applying portion contacting the watch case main body via a metal tube.
  • FIG. 9 is a cross-sectional view showing a part of the cross section taken along line 2-2 of FIG.
  • FIG. 10 is a cross-sectional view showing the cross section taken along line 4-4 in FIG. .
  • FIG. 11 is an exploded cross-sectional view of the front can part and the watch case main body of FIG. 6 together with a partially enlarged view of the front can part. '
  • FIG. 12 is a cross-sectional view showing a section taken along line 8-8 in FIG. 7 with the arrangement of each component partially changed.
  • FIG. 13 is a cross-sectional view showing a portion forming an intimate contact portion between the watch case main body and the leading can part shown in FIG. 7, cut along line 13-13 in FIG. BEST MODE FOR CARRYING OUT THE INVENTION
  • FIG. 1 is a perspective view of the watch case 11 in which the watch case body 1 and the crown pipe 3 are exploded.
  • FIG. 9 is a cross-sectional view showing a portion cut along line 2 — 2
  • FIG. 9 is a cross-sectional view showing a part of the cross section taken along line 2-2 in FIG.
  • the watch case main body 1 has a storage space for accommodating a movement, a dial and the like inside the side wall portion 1a, and a winding hole (stem hole) 2 is formed in the side wall portion la.
  • the winding hole 2 is formed in a shape corresponding to the crown pipe 3, and is formed so as to communicate from the storage space of the watch case main body 1 to the outside.
  • the winding hole 2 has a small-diameter portion 2a on the inner side, a large-diameter portion 2b on the outside thereof, and an annular contact surface 2c between the small-diameter portion 2a and the large-diameter portion 2a.
  • a hole corresponding to the outer shape of the crown pipe 3 is formed by the part 2b and the contact surface 2c.
  • the crown pipe 3 is a cylindrical part used for securing waterproofness when attaching the crown (not shown) to the watch case; the body 1 has a small-diameter portion 3 a and a large-diameter portion 3.
  • An annular contact surface 3c is formed between the small diameter portion 3a and the large diameter portion 3b.
  • the small-diameter portion 3a is formed in a shape corresponding to the small-diameter portion 2a of the winding true hole 2, but has a slightly larger diameter than the small-diameter portion 2a.
  • the watch case 11 is manufactured by adhering a suitable amount of paste-like low-melting-point material to the abutment surface 3c of the crown pipe 3 in advance and pushing it into the winding hole 2 from outside by a strong force. That is, the watch case 11 1 is manufactured by press-fitting the crown pipe 3 into the winding hole 2. Then, the outer peripheral surface of the small-diameter portion 3a comes into contact with the inner peripheral surface of the small-diameter portion 2a while stress is applied (presses), and the contact surface 3c and the contact surface 2c Are in contact with each other to form a contact portion 7.
  • the brazing material adhered to the contact surface 3 c is removed from the gap between the contact surface 3 c and the contact surface 2 c of the crown pipe 3 (partly, the gap between the large diameter portion 3 b and the large diameter portion 2 b). It is spread evenly to some extent. Then, in that state, the watch case 11 and the crown pipe 3 are placed in a vacuum device (not shown), placed in a vacuum atmosphere, and a heat treatment step of heating is performed therein. Then, the solid phase diffusion bonding and the attachment are performed simultaneously, and the watch case body 1 and the crown pie Step 3 is fixed and integrated.
  • the watch case 11 is formed with the solid-phase diffusion bonding portion 4a and the mouth-bonding bonding portion 5a by manufacturing as described above.
  • the solid-phase diffusion bonding portion 4a is formed at a portion where the small-diameter portion 2a and the small-diameter portion 3a are in contact with each other.
  • solid-phase diffusion bonding refers to joining objects to be welded together, applying pressure and heat to such an extent that plastic deformation hardly occurs, and using the diffusion of atoms generated between the joining surfaces to melt the objects to the melting point. It means joining below.
  • the small-diameter portion 2a and the small-diameter portion 3a come into contact with each other. Oxygen in the oxide film that originally existed diffused inside and was dissolved.
  • the brazing joint 5a is formed by pasting a low-melting brazing material adhered to the contact surface 3c and spreading into the gap between the crown pipe 3 and the winding hole 2 when the crown pipe 3 is press-fitted. ing.
  • the low melting point brazing material is melted in a heat treatment step of ripening the watch case body 1 and the crown pipe 3 so as to fill the minute gaps existing on the facing surfaces 2c and 3c by capillary action.
  • Spread (partly also spreads in the gap between the large diameter part 2b and the large diameter part 3b).
  • the connecting joint 5a surrounds the solid-phase diffusion joint 4a. It is formed. With this, the watch case 1 and the crown pipe 3 are joined.
  • low melting point brazing material is the transformation point or crystallization temperature of the material of the part to be brazed. This is a brazing material that has a lower melting point than the brazing material, and does not affect the finished state of the surface of the part to be welded even after joining by welding.
  • the watch case 1 1 Since the watch case 1 1 has the watch case body 1 and the crown pipe 3 fixedly provided with the solid-phase diffusion joint 4a, the internal waterproofness including hermeticity is maintained in a good state with a considerable probability. I'm dripping.
  • the portions to be bonded In order to provide the solid-phase diffusion bonding portion 4a, the portions to be bonded (the small-diameter portion 2a and the small-diameter portion 3a) must be in close contact with no gap. However, on rare occasions, the surface accuracy of the small diameter part 2a and the small diameter part 3a is poor, and the cross-sectional shape of both parts is not exactly a perfect circle, or the wound true hole 2 is drilled.
  • the inner peripheral surface of the small-diameter portion 2a may be roughened due to welding or the like that occurs during the formation. Then, even if the crown pipe 3 is pressed into the watch case body 1, the small-diameter portion 2a and the small-diameter portion 3a do not come into close fc contact, and the solid-phase diffusion bonding portion 4a is reliably formed. It may not be done. In this case, the watch case 11 may not be sufficiently waterproof.
  • the watch case 11 is formed so that the solid-phase diffusion bonding portion 4a is formed at the interface between the small-diameter portions 2a and 3a, and the solid-phase diffusion bonding portion 4a is surrounded outside. A brazing joint 5a is formed. Thus, even if the solid-state diffusion bonding portion 4a is not securely formed, the watch case 11 can be connected to the outside of the watch without any gaps to obtain robustness and complete waterproofness. ing.
  • the watch case 11 is manufactured by fixing a watch case body 1 made of pure titanium and a crown pipe 3 made of a titanium alloy (Ti_6A1-4V).
  • the winding hole 2 of the watch case body 1 has a small diameter part 2a with a hole diameter of about 1.8 mm ⁇ >, and the crown pipe 3 has a small diameter part 3a with an outside diameter of about 1.8 3 ⁇ ⁇ . Therefore, the crown pipe 3 is pressed into the winding hole 2.
  • the composition ratio of Pd: Pt: Ni: P is set to 34: 5.
  • 3: 8: 5 was used (weight 0/0) and a P d P t N i P based paste brazing material.
  • This brazing material is a low melting point brazing material whose melting point is lower than the transformation point of the material (titanium in this embodiment) of the watch case body 1 and the dragon-head pipe 3. C.
  • the brazing material may not be in the form of a paste, but it is preferable to use a brazing material in the form of a paste, since handling in the form of a paste is easy. About 2 parts of this brazing material were dripped onto the contact surface 2 of the winding true hole 2 (: the contact surface 3 c of the cauldron pipe 3 using a dispenser, and attached.
  • the watch case main body 1 was placed together with the crown pipe 3 in a vacuum device (not shown).
  • the pressure of vacuum instrumentation ⁇ 5 X 1 0- 6 T 0 rr ( about 6. 7 X 1 0- 4 P a) holds a degree to form a vacuum atmosphere, heat treatment was performed therein.
  • the temperature applied during this heat treatment (heat treatment temperature) was set at about 75 ° C., and the heat treatment time (heat treatment time) was about one hour.
  • the watch case main body 1 and the crown pipe 3 were fixed by forming two joints, namely, a solid-phase diffusion joint 4a and a brazing joint 5a.
  • the heat treatment temperature in the case of joining metal parts made of titanium be in the range of about 600 ° C to about 850 ° C. If the heat treatment temperature is lower than 600 ° C., the brazing filler metal used for welding is not sufficiently melted and may not be cut into the gap, which is not preferable.
  • the watch case body 1 and the crown pipe 3 were joined using a brazing material different from the brazing material used in Example 1.
  • a brazing material different from the brazing material used in Example 1.
  • This brazing material is also a low melting point brazing material whose melting point is lower than the transformation point of the material (titanium) of the watch case body 1 and the crown pipe 3, and its melting point is about 604 ° C.
  • the heat treatment temperature was changed to about 700 ° C, and the heat treatment time was set to about 1 hour.
  • the conditions of the heat treatment step are the same as in the first embodiment. Note that the watch case 11 manufactured in Example 2 was used as a sample ⁇ .
  • a comparative example of a watch case was prepared in a conventional manner.
  • the material is the same as in Examples 1 and 2 described above, but using a clock case body and a crown pipe having different dimensions, a paste-like silver mouth material (JIS standard: B Ag. 8, melting point 780 ° C), and the watch case body and the crown pipe were joined.
  • the brazing temperature was set at about 820 ° C, and the watch case body and the crown pipe were placed in a vacuum furnace for about 10 minutes to perform brazing. But, Since the welding temperature was close to the transformation point of titanium, the crystals on the surface were slightly coarsened and became cloudy, requiring repolishing.
  • the watch case body and the crown pipe have such dimensions that the crown pipe is not press-fitted (the contact surface between the watch case body and the crown pipe is not crimped), they are fixed as in Examples 1 and 2. No phase diffusion joint was formed.
  • the watch case manufactured in Comparative Example 1 was used as Sample A.
  • the "corrosion resistance” was evaluated by passing a sample which was immersed in a CASS test solution for 48 hours and showed no corrosion at all (according to ISO370).
  • the “waterproof reliability” was evaluated by performing a 10-atmosphere waterproof test using a waterproof tester, and setting a relative humidity of 90% under a temperature of about 4 Ot to perform a humidity resistance test.
  • “Fixing force” was measured by measuring the highest strength (joining strength) that can maintain the joined state by pulling the crown pipe using a tensile tester. “Appearance” was evaluated by visually checking the appearance of the part where the watch case main body and the crown pipe were joined (close contact part).
  • Sample A joined by silver brazing in Comparative Example 1 had good results in terms of waterproof reliability, fixing force, and appearance. However, the corrosion resistance is not good. In addition, the emission from the brazed joint was so bad that it was impossible to manufacture watches.
  • Example B which was joined by projection welding in Comparative Example 2, had poor waterproofing reliability and slightly failed waterproofing.
  • the outer diameter of the crown pipe was large, which resulted in poor decorativeness of the appearance.
  • the sample C of Example 1 has both the solid-phase diffusion joint 4a and the joint 5a, and is satisfactory in all of corrosion resistance, waterproof reliability, fixing force, and appearance. There was some good bonding. This is thought to be due to the following.
  • the use of a low melting point brazing material has significantly improved the corrosion resistance compared to conventional silver brazing materials and the like. It is considered that both of the wettability of the melting point material contributed. Further, it is considered that the fixing force contributes to the solid-state diffusion bonding portion 4a in which the contact surfaces are tightly bonded without any gap and the bonding strength is increased.
  • the watch case 11 is firmly joined to each other, the watch case 11 is strong enough to maintain the joined state for a long time, and also has good waterproofness.
  • the watch case 11 is joined by a low melting point brazing material, it also has good corrosion resistance, and has a good decorative appearance.
  • the watch case 1 1 is made by separately forming the watch case main body 1 and the crown pipe 3 and subjecting them to desired surface processing and film forming processing. After that, it can be manufactured by fixing both, so that the design barrier becomes rich.
  • FIG. 3 is an exploded perspective view of the watch case 21 showing the watch case main body 14, the leading end portion 15, and the metal tube 16.
  • FIG. 4 is a cross-sectional view of FIG. 3, in which the contact portion 17 formed by the leading can portion 15 being in close contact with the watch case body 14 via the metal tube 16 is cut along line 4-14
  • FIG. 10 is a cross-sectional view showing a section taken along line 4-1.4 of FIG.
  • the watch case body 14 differs from the watch case body 11 in that a notch recess 10 is formed, but has the same other configuration. In FIG. 3, illustration of the winding hole is omitted.
  • the notch recess 10 is formed to face a portion of the side wall 1 c of the watch case body 14 where the winding hole is not formed.
  • Each of the notched portions 10 has a contact surface 10a, and a fitting hole 9 is formed substantially at the center.
  • the fitting hole 9 is formed in a direction perpendicular to the contact surface 10a, and has a peripheral wall surface 9a and a bottom portion 9b. That is, the fitting hole 9 is not a through hole.
  • the leading can part 15 has a protruding part 20 formed on a side surface different from that of the band engaging part 15a.
  • the protruding portion 20 is formed so as to correspond to the notch concave portion 10, has a contact surface 20 a, and has a fitting hole 12 formed substantially at the center thereof.
  • This mating hole 1 2 is the contact surface 2 0 It is drilled in a direction perpendicular to a, and has a peripheral wall surface 12a and a bottom portion 12b. That is, the fitting holes 1 and 2 are not through holes.
  • the fitting hole 9 and the fitting hole 12 have the same hole diameter and the same depth, and are formed at positions facing each other when the protruding portion 20 is fitted into the notch four portion 10.
  • the metal tube 16 is a circular member having end surfaces 16a and 16b and a peripheral wall surface 16c.
  • the outer diameter of the metal tube 16 is slightly larger than the diameter of the fitting holes 9 and 12, and the length is slightly smaller than the sum of the depths of the fitting holes 9 and 12. It is formed in a short length. Therefore, the metal tube 16 is press-fitted into the fitting holes 9 and 12, and its peripheral wall surface 16 is formed. However, they are in contact with each other (pressure contact) with stress acting on the peripheral wall surfaces 9a and 12a. Further, the metal tube 16 is arranged such that the end surfaces 16a and 16b and the bottom portions 9b and 12b face each other, and completely fits over both the fitting holes 9 and 12.
  • the watch case 21 has a favorable external appearance and a preferable configuration.
  • the peripheral wall 16 c of the metal tube 16 and the peripheral walls 9 a, 12 a of the fitting holes 9, 12 are formed when the solid-phase diffusion bonding portion 4 b is in the contact portion 17. It is formed at the part in contact.
  • the contact surfaces of the peripheral wall surface 16c and the peripheral wall surfaces 9a and 12a are tightly and firmly joined without any gap.
  • the low melting point adhesive adhered to the contact surface 20a is melted in the heat treatment process and is brought into contact with the contact surface 20a and the contact surface 10a.
  • the end portion 15 and the watch case body 14 are joined together so as to fill the minute gap existing at the facing portion of the watch case.
  • the watch case main body 14 and the leading can part 15 are firmly joined by the solid-phase diffusion joining portion 4 b, so that the joining state of both can be maintained for a long time. It is strong. Also, a brazing joint 5b is formed with a low melting point brazing material. As a result, it has good corrosion resistance and is robust enough to maintain the bonded state for a long period of time even when solid-state diffusion bonding may not be performed reliably.
  • the watch case 21 is manufactured as follows. First, an appropriate amount of a paste-like low melting point brazing material is applied in advance to the contact surface 20a of the protrusion 20. Then, while fitting the metal tube 16 into the fitting holes 9 and 12, the protruding portion 20 is fitted into the notch concave portion 10, and the leading can portion 15 is pushed from the outside with a strong force. Then, the metal tube 16 is pressed into the fitting holes 9 and 12. In addition, the contact surface 20a and the contact surface 10a face each other. At this time, the porcelain adhered to the contact surface 20a is cut through the gap formed between the contact surface 10a and the entire gap formed between the concave portion 10 and the protrusion 20. It spreads to some extent evenly.
  • the watch case main body 14 the leading can part 15 and the metal tube 16 are placed in a hydrogen furnace (not shown), placed in a reducing atmosphere, and a heat treatment step of heating is performed therein. Then, solid-phase diffusion bonding and brazing are performed simultaneously, and the watch case main body 14 and the leading can part 15 are fixed via the metal tube 16, and these parts are integrated.
  • the watch case 21 is made of a stainless steel (SUS316L) watch case body 14 through a metal tube 16 made of free-cutting stainless steel (SUS316F). And the first can part 15 were fixed.
  • the total length of the metal tube 16 was about 4 mm, and the depths of the fitting holes 9 and 12 were both 2.lnini. Therefore, the sum of the depths of the fitting holes 9 and 12 is 4.2 mm.
  • Metal tube 1 6 is length Is slightly shorter than the sum of the depths, so that it completely fits inside the fitting holes 9 and 12.
  • the composition ratio of Au: Ag: Cu: Ge: Pd is mainly composed of gold, silver, copper, germanium, and palladium. 45.5: 3 2: 5: 1 2.5: 5 were used (weight 0/0) and a AuAg C uG e P d based pasty Lowe material.
  • This mouthpiece is a low melting point brazing material whose melting point is lower than the recrystallization temperature of the material of the watch case body 14 and the metal tube 16 (stainless steel in this embodiment), and its melting point is about 635 ° C. is there. .
  • the watch case 21 first, about 0.2 ⁇ 1 of the brazing material was dropped and attached to the contact surface 20 a using a dispenser. Next, while fitting the metal tube 16 into the fitting holes 9 and 12, press-fit the protruding portion 20 into the notch recess 10, and then set the watch case body 14, the front can 15 and the metal tube 16. 16 was subjected to a heat treatment in a high-temperature hydrogen gas atmosphere treatment furnace as a reducing atmosphere. At this time, the heat treatment temperature was set at about 850 ° C, and the heat treatment time was about 20 minutes. Then, the watch case main body 14, the leading can part 15 and the metal tube 16 were formed and fixed to two joints, that is, the solid-state diffusion joint 4b and the mouth joint 5b.
  • stainless steel SUS 3 16 L which is the material of the watch case body 14 and the tip can 15
  • stainless steel SU S 3 16 F which is the material of the metal tube 16 (That is, the interface between the peripheral wall 16c and the peripheral walls 9a and 12a) ', which are the constituent elements of stainless steel, F e, Cr, Ni Atomic level microdiffusion is occurring.
  • the brazing material melts during ripening at about 850 ° C, and a minute amount of fine particles existing between the contact surface 20a and the contact surface 10a due to a capillary phenomenon. Fill gaps Spread like this. Thereafter, when the watch case body 14, the leading can part 15 and the metal tube 16 are cooled, the contact surface 20a and the contact surface; 0a are joined.
  • the heat treatment temperature in the case of joining gold bird parts made of stainless steel be in the range of about 600 ° C. to about 900 ° C. If the heat treatment temperature is less than 600 ° C., the filler used for sealing is not sufficiently melted and may not be cut into the gap, which is not preferable. In addition, sufficient diffusion may not occur even at the solid-phase diffusion bonding portion 4b, and fine pores may remain at the boundary surface, resulting in insufficient strength. If the heat treatment temperature exceeds 900 ° C, the stainless steel structure approaches the recrystallization temperature of the stainless steel and the structure of the stainless steel becomes coarse, and the state of the surface may change, which is not preferable. .
  • FIG. 5 is an exploded perspective view of the watch case 31 showing the watch case main body 24 and the leading can part 25 disassembled.
  • Fig. 6 is a cross-sectional view of Fig.
  • FIG. 5 showing the contact portion formed by the leading can part 25 being in close contact with the watch case main body 24, taken along line 6-6.
  • Fig. 11 is Fig. 6;
  • FIG. 6 is a cross-sectional view showing the watch case main body 24 and the leading can part 25 together with a partially enlarged view of the leading can part.
  • the watch case main body 24 is different from the watch case main body 14 in that the fitting hole is not formed in the cutout recess 27, and the other has the same configuration.
  • the notch 27 has a contact surface 27a and side walls 27b, 27b on both sides thereof.
  • the shape of the protruding portion 26 of the leading can 25 is different from that of the leading can 15.
  • the protrusion 26 has a width slightly larger than that of the notch 27, and has a contact surface 26a and side walls 26, '26b on both sides thereof. I have.
  • a metal film 30 is formed on the side walls 26 b and 26 b.
  • the protruding portion 26 is press-fitted into the cutout recess 27, and the side wall surfaces 26b, 26b are applied with stress on the side wall surfaces 27b, 27b via the metal film 3.
  • the solid-phase diffusion bonding portion 4 c has the side wall surfaces 26 b, 26 of the protrusion 26 cut off through the metal films 30, 30, and the side wall surface 27 of the recess 27. It is formed at the part in contact with b and 27b.
  • the side wall surfaces 26b, 26b and the side wall surfaces 27b, 27b are in contact with and pressed against each other with the metal film 30 interposed therebetween. (That is, the side walls 26 1?
  • And 26 b are in contact with the side walls 27 b and 27 b via the metal film 30).
  • a diffusion layer of the components of the material (stainless steel component and the component (N i, P) of the metal film 30) is formed at the boundary surfaces that are in contact with each other, and the side wall surfaces 26 b and 26 b are formed side by side.
  • the wall surfaces 27 b, 27 b are tightly and firmly joined via the metal film 30 without any gap.
  • the low melting point adhesive adhered to the contact surface 26a is melted during the heat treatment, and is melted between the contact surface 26a and the contact surface 27a. It spreads so as to fill the minute gap existing in the facing portion, and thereby the leading can part 25 and the watch case main body 24 are joined.
  • the watch case main body 24 and the leading can part 25 are firmly joined to each other by the solid-phase diffusion joining portion 4 c, so that the joining state of the user is maintained for a long time. It has the strength to gain.
  • the brazing joint 5c is formed with a low melting point brazing material, it has good corrosion resistance and maintains the bonding state for a long time even if solid phase diffusion bonding may not be performed reliably. It is durable.
  • the solid-state diffusion joint 4c and the joint 5c are not visible from the outside, the decorativeness of the external appearance is good. I'm wearing
  • the side walls 26 b, 26 b are directly connected to the side walls 27 b, 27.
  • the solid-state diffusion at low temperatures is improved as compared with the case where the surface is in contact with b, and the temperature T at the interface between the two can be reduced.
  • the protrusion 26 and the watch case body 24 are made of titanium and the metal film 30 is formed of Cu
  • the protrusion 26 and the watch case body 24 are made of stainless steel
  • the metal film 30 is made of P.
  • the solid phase diffusibility at a lower temperature is improved as compared with the case where the metal film 30 is not formed.
  • the metal film 3Q is formed using a relatively soft metal (Pt, Cu, A11, etc.), plastic deformation occurs when the protrusion 26 is press-fitted, so that it may occur at the interface. The stress is relieved so that the stress is substantially uniform over the entire interface. Therefore, small gaps due to differences in roundness and the like are filled, making it easier to climb.
  • a relatively soft metal Pt, Cu, A11, etc.
  • the watch case 31 is manufactured as follows. First, a metal film 30 is formed on the surfaces of the side walls 26 b and 26 b of the protrusion 26. Next, a suitable amount of a paste-like low melting point brazing material is applied to the contact surface 26a. Then, the protrusion 26 is fitted into the cutout recess 27 from the outside, and the leading end 25 is pushed in with a strong force. Then, the protruding portion 26 is pressed into the notch portion 27. In addition, the contact surface 26a and the contact surface 27a face each other. At this time, the brazing material adhered to the contact surface 26a spreads evenly to a degree formed in the gap formed between the contact surface 27a and the brazing material.
  • the watch case main body 24 and the leading can part 25 are housed in a vacuum device (not shown), placed in a vacuum atmosphere, and subjected to a heat treatment step of heating. Then, the solid phase diffusion bonding and the brazing are performed simultaneously, and the watch case main body 24 and the leading can part 25 are fixedly integrated.
  • the watch case 31 is manufactured by fixing a watch case main body 24 made of stainless steel (SUS304) and the leading can part 25.
  • the width of the notch recess 27 is about 10 mm
  • a Ni—P plating film was previously formed as a metal film 30 by mask plating.
  • the film thickness was about 3: m.
  • the brazing joint 5c in this embodiment, gold, silver, copper, palladium and nickel are used as main components, and at least one element of gallium, indium, and tin is used.
  • the main element contains gallium and zinc, and the composition ratio of Au: Ag: Cu: Pd: Ni: Ga: In is 41: 30: 8: 1 0: 4: 4: 3 were used (weight 0/0) and a AuAg C u P d n i G a I n system pasty Lowe material.
  • This mouthpiece is a low melting point brazing material whose melting point is lower than the recrystallization temperature of the material (stainless steel) of the watch case body 24 and the tip end part 25, and its melting point is about 605 ° C.
  • the watch case 31 In order to manufacture the watch case 31, first, about 21 brazing materials were dropped and adhered to the contact surface 26 a using a dispenser. Then, after the protrusion 26 is press-fitted into the notch 27, the watch case body 24 and the leading can 25 are placed in a vacuum device, and the internal pressure is reduced to 5 ⁇ 10—5 Torr (about 6 . held in 7 X 1 0- 3 P a) extent and a vacuum atmosphere and was subjected to ripening process therein. At this time, the heat treatment temperature was set at about 800 ° C, and the heat treatment time was about 30 minutes. Then, the watch case main body 24 and the leading can part 25 were simultaneously fixed by the solid phase diffusion bonding part 4c and the mouth bonding part 5c.
  • the thus obtained watch case 31 has a honing exterior surface except for the vicinity of the contact portion 28 of the watch case body 24, and the front can 25 has a mirror-finished surface. In advance, both can be fixed and manufactured. Then, in the total case 31 manufactured as described above, the honing surface of the watch case main body 24 and the mirror surface of the front can 25 are adjacent to each other with a sharp interface, so that a new design can be obtained. It is possible to enrich design variations.
  • the heat treatment temperature is about 800 ° C.
  • the surface will not be roughened by recrystallization, so that the joining can be performed while maintaining the surface state. .
  • the CASS test was performed on the watch case 31 for 48 hours as an artificial sweat test to evaluate discoloration, development, and the like.
  • the test results were good. That is, the corrosion resistance of the contact portion 28 is good. This is because elements that particularly cause corrosion are not contained in the close contact portion 28 (the material of the watch case main body 24 ′ and the tip end portion 25 and the material of the metal film 30).
  • the metal film 30 is a Ni-P film, but may be a Pd, Pt, Cu, Ni, Au or alloy film thereof.
  • evaporation, IP (ion plating), sputtering, or CVD may be used.
  • a mask may be attached to other unnecessary portions and lift-off may be performed later, or the entire surface may be formed. Unnecessary portions (portions other than the side wall surfaces 26b and 26b) may be removed by etching later.
  • the same metal film as the metal film 30 may be formed on the contact surface 26a to form the brazing joint 5c.
  • the wettability of the brazing material is improved, and the flow of the brazing material (wax flow) can be reduced.
  • the wettability of the brazing material is generally affected by the heat treatment temperature (the higher the temperature, the better the wettability).
  • FIG. 7 is an exploded perspective view of the watch case 41 showing the watch case main body 34, the leading end portion 35 and the metal tube 16 in an exploded manner.
  • FIG. 8 is a cross-sectional view of FIG.
  • FIG. 3 is a cross-sectional view showing a portion forming a close contact portion between the watch case main body 34 and the leading can part 35 shown in FIG. 7, cut along the line 13-13 in FIG.
  • the watch case body 34 differs from the watch case body 14 in that a notch recess 37 is formed, and the other parts have the same configuration.
  • the notch recess 37 differs from the notch recess 10 in the position where the fitting hole 39 is formed, and has the same other configuration. Note that the winding hole is not shown in FIG.
  • the notch 37 has an abutment surface 37a, a side wall surface 37b, 37b and a back surface 37c, and the back surface thereof.
  • a fitting hole 39 is formed substantially at the center of 37c.
  • the fitting hole 39 is formed in a direction perpendicular to the rear surface 37c, and has a peripheral wall surface 39a and a bottom portion 39.
  • the protruding portion 36 is formed in the leading can portion 35.
  • the protrusion 36 has a width slightly larger than that of the notch 37. Therefore, the protruding portion 36 is press-fitted into the notch recess 37, and the side walls 3b, 36b come into contact with each other in a state where stress acts on the side walls 37b, 37b. .
  • the protruding portion 36 has an abutment surface 36a, a side wall surface 36b, 36b and a front surface 36c, and a fitting hole 42 is formed substantially at the center of the front surface 36c. Have been.
  • the fitting hole 42 is drilled in the direction perpendicular to the front 36 c
  • the fitting hole 39 and the fitting hole 42 have the same hole diameter and depth, and are formed at positions facing each other when the protrusion 36 is fitted into the notch 37.
  • the metal tube 16 Since the outer diameter of the metal tube 16 is slightly larger than the diameter of the fitting holes 39, 42, the metal tube 16 is press-fitted into the watch case main body 34 and the leading can part 35, and the peripheral wall surface 16c is formed around the circumference. The walls 39a and 42a are in contact with each other (pressure contact) while stress is applied. In addition, since the length of the metal tube 16 is shorter than the sum of the depths of the fitting holes 39, 42, the end faces 16a, 16 1) and the bottom portions 39, 13, 42'b Are arranged facing each other, and completely fit over both of the fitting holes 39 and 42.
  • a solid-phase diffusion bonding portion 4d is formed in the next part. That is, in the solid-phase diffusion bonding portion 4 d, the peripheral wall surface 16 c of the metal tube 16 and the peripheral wall surfaces 39 a and 42 a of the fitting holes 39 and 42 are connected in the contact portion 38. Facing portion, and a portion where the side wall surfaces 36 b, 36 b of the protruding portion 36 and the side wall surfaces 37 b, 37 b of the notch recess 37 are in contact with each other. . In the solid-phase diffusion bonding portion 4d, micro-diffusion at the atomic level constituting the material occurs at the interface, and the minute gaps are almost completely eliminated.
  • the watch case main body 34 and the leading can part 35 are firmly bonded by the solid-phase diffusion bonding portion 4d, the bonded state of both can be maintained for a long time. It is strong.
  • the brazing joint 5d is formed with a low melting point brazing material, it has good corrosion resistance and maintains the bonding state for a long time even when solid-phase diffusion bonding may not be performed reliably. It is durable. 2) Method of manufacturing watch exterior parts
  • the watch case 41 is manufactured as follows. First, an appropriate amount of a paste-like low melting point brazing material is applied in advance to the front surface 36c of the protrusion 36. Then, while fitting the metal tube 16 into the fitting holes 39, 42, the protruding portion 36 is fitted into the cutout recess 37, and the leading can portion 35 is pushed in from outside by a strong force. Then, the metal tube 16 is press-fitted into the watch case main body 34 and the leading end portion 35. Also, the front 36c and the rear 42c face each other. At this time, the brazing material adhered to the front surface 36c is spread to some extent evenly in the gap formed between the front surface 36c and the rear surface 42c.
  • the protrusion 36 is press-fitted into the notch 37. Then, in this state, the watch case body 34, the leading end portion 35, and the metal tube 16 are placed in a vacuum device (not shown), placed in a vacuum atmosphere, and a heat treatment step of heating is performed therein. Then, the solid phase diffusion bonding and the brazing bonding are performed simultaneously, and the watch case main body 34 and the leading can part 35 are fixed to each other via the metal tube 16, and these parts are integrated.
  • the watch case 41 is composed of a stainless steel (SUS 304) watch case 34 and a tip end 35, and a free-cutting stainless steel (SUS 31 6F) metal tube 16. It was manufactured by fixing.
  • the total length of the metal tube 16 was about 4 mm, and the depths of the fitting holes 39 and 42 were both 2.1 mm. Therefore, the sum of the depths of the fitting holes 39, 42 is 4.2 mm. Since the length of the metal tube 16 is slightly shorter than the sum of the depths, the metal tube 16 completely fits inside the fitting holes 39 and 42.
  • a brazing material mainly containing gold, silver, copper, palladium, and nickel and containing at least 1 ′ or more of gallium, indium, and tin is used.
  • the main element contains zinc and tin
  • the composition ratio of Au: Ag: Cu: Pd: Ni: In: Sn is 56: 18:
  • An AuAgCuPdNilnSn-based paste-like base material having a ratio of 8: 5: 5: 3: 5 (weight 0 /.) Was used.
  • This mouthpiece is a low melting point brazing material whose melting point is lower than the recrystallization temperature of the material (stainless steel) of the watch case body 34 and the tip end portion 35, and its melting point is about 660 ° C.
  • the watch case 41 first, about 21 brazing materials were dropped and attached to the front surface 36c using a dispenser. Then, while fitting the metal tube 16 into the fitting holes 39, 12, the protrusion 36 is cut out and pressed into the recess 37.After that, the watch case body 34, the leading can 35 are vacuumed. enjoyed in the apparatus, the internal pressure 5 X 1 0 - s T orr hold (about 6. 7 X 1 0 3 P a ) extent and a vacuum atmosphere, (ii) a person heat treatment therein. At this time, the temperature of the heat treatment was set at about 800 ° C., and the heat treatment time was about 30 minutes. Then, the watch case main body 34 and the leading can part 35 were formed and fixed by two joint parts, namely, a solid-phase diffusion joint part 4 d and a mouth joint part 5 d.
  • the watch case 41 thus obtained is manufactured by pre-housing the outer surface except for the periphery of the close-contact portion 38 of the watch case body 34, the mirror surface finish is applied to the front can 35, and then the two are fixedly manufactured. can do. Then, in the watch case 41 manufactured as described above, a new design can be obtained because the honing surface of the watch case body 34 and the mirror surface of the front can 25 are adjacent to each other with a sharp interface. Yes, You can enrich design variations.
  • the CASS test was performed on the watch case 41 in the same manner as in the third embodiment, but the test result was good. In particular, elements that cause corrosion are not included in the bonding interface.
  • thermo treatment temperature for joining stainless steels may be the same as in the third embodiment.
  • the watch exterior parts have been described by taking, as an example, a watch case main body and a crown pipe, and a watch case in which the watch case main body and the front can part are fixed. It is not limited to a simple watch case.
  • the present invention relates to a watch exterior component in which a watch case body and a back cover are fixed, a watch exterior component in which a watch case body and a bezel are fixed, a watch exterior component in which a back cover and a core (casingring) are fixed, and band components.
  • the present invention can be applied to watch exterior parts and the like to which is fixed.
  • PdPtNiP., PdCuNiP, AAgCuGePd, AuAgCuPdNiGaI are used as the low melting point filler.
  • AuAgCuPdNiInSn, a brazing filler metal was used, but the low melting point brazing filler metal is not limited to these.
  • PdCuPtNiP may be used, and AuAgCuPdNiGa may be obtained by adding one or more of Ga, In, and Sn to AuAgCuPdNi. S n may be used.
  • the contact surfaces of the components constituting the solid-phase diffusion bonding portion are tightly and firmly bonded without any gap, and since the components are bonded by the brazing bonding portion, It is possible to obtain a watch exterior part having good durability, good corrosion resistance, and good waterproofness that can maintain the joined state for a long time. Also, since each part can be formed separately and subjected to desired processing, and then both can be fixed to obtain a watch exterior part, not only can the decorativeness of the appearance be improved, but also the appearance can be improved. Design variations will be abundant.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)
  • Electric Clocks (AREA)

Description

明 細 書 時計外装部品及びその製造方法
技 術 分 野
この発明は、 チタン、 チタン合金、 ステンレス鋼等の金属からなり、 丈夫で耐蝕 性と防水性が高く、 デザィンバリエ——ンョンが豊富な時計外装部品及びその製造方 法に関する。 背 景 技 術
従来より、 時計ケース等の腕時計の時計外装部品 (以下 「腕時計部品」 ともい う) は、 その素材としてチタン (以下 「チタン」 には、 純チタン及びチタン合金を 含む) や、 ステンレス鋼が多く用いられている。 中でも最近では、 丈夫で耐蝕性が 高く軽量であり、 人体に金属アレルギ一反応を生じさせない良好な生体適合性を 有していることから、 腕時計部品にチタンを使用する割合が多くなつてきている。 また、 軽量、 高強度、 良好な耐蝕性という優れた特性を生かすため、 チタンは腕時 計だけではなく、 様々な産業分野で広く用いられている。
純チタンの結晶は、 常温では六方最密構造であるが、' 変態点 (変態時の温度) で ある 8 8 2 °C以上の温度では体心立方構造になる。 したがって、 腕時計部品の製造 過程でこの温度 (すなわち、 8 8 2 °C) を超える温度が加わると、 腕時計部品は、 結晶の変態に伴い表面状態が変化してしまうため、 再研磨等を行わねばならない。 その分、 余計な工程が増える恐れがあることから、 チタンはその変態点以下の温度 で処理することが望ましいとされている。
一方、 ステンレス鋼は適度な重量感があり、 耐蝕性も良好で、 腕時計部品の素材 として、 最も広く使用されている。 そのステンレス鋼には様々な種類があるが、 腕 時計部品の素材としては、 耐蝕性の観点から S U S 3 0 4, S U S 3 1 6 L等のォ ーステナイ ト系ステンレス鋼が多く用いられている。
ところで、 従来、 腕時計部品である時計ケースは、 一般に、 時計ケース本体と先 カン部とを一体成形で製造している (先カン部は、 時計ケース本体に時計パンドを 連結する部材である) 。 その場合、 鍛造法は、 錶造法と比較してデザインの複雑な 部品を製造することが困難ではあるが、 近年、 腕時計部品は熱間鍛造或いは冷間巌 造等、 鍛造法で製造するのが一般的となっている。
また、 最近では、 腕時計部品は、 ミラー面仕上げ、 ヘアーライン面仕上げ、 ホー ニング (h o n i n g ) 等の表面加工を部分ごとに施して、 表面の仕上がりに様々 な変化を与えたいというデザイン上の要望も強くなつてきている。 ここで、 ミラー 面仕上げとは光沢のある鏡面研磨仕上げであり、 ヘアーライン面仕上げと の毛 のように細かくて方向性の'あるラインを入れた表面仕上げをいう。 ホーニングとは メツキを避けて細かな凹凸を設けた表面仕上げをいい、 梨地 (m a t ) ともいう。 例えば、 時計ケースの場合、 時計ケース本体はホ ユング、 先カン部はミラー面仕 上げという組合わせの表面加工を施して、 部分ごとに表面の仕上がりを変化させ.た いという要望である。 また腕時計部品は、 表面加工を施すほか、 メツキ、 I P (ィ オンプレーティング) 或いはコーティング等の被膜形成加工を施して、 色違いゃ模 様違い等の様々な変化を出したいという要望もある。
しかし、 腕時計部品は、 全体の大きさが小さいため、 例えば時計ケースの場合、 時計ケース本体と先カン部とを当初から一体化して製造すると、 その後で部分ごと に異なる表面加工や被膜形成加工を施して表面をきれいに仕上げる (表面の仕上が りに変化を出す) ことが極めて困難である。 また、 時計ケースは、 先カン部を複雑 な形状にしてデザイン上の特徴を出したい場合もあり、 この場合も、 時計ケース本 体と先カン部とを当初から一体化して製造すると、 その後で先カン部を加工するこ とが難しくなる。
したがって、 時計ケースは、 表面の仕上がりを変化させて製造した V、というデザ ィン上の要望や、 先カン部を複雑な形状にしてデザィン上の特徴を出したいという 要望が強い場合は、 時-計ケース本体と先カン部とを別々に形成してそれぞれに所望 の加工を施し、 その後に係合するか又は接合するかして両者を一体化している。 こ うすれば、 時計ケースは、 各部品ごとに所望の加工を施せるから、 デザインバリエ ーシヨンが豊富になる。
時計ケ一ス本体と先カン部とを係合する場合、 その方法として、 時計ケース本体 と先力:/部との間にピンを圧入し、 そのピンを介して双方を係合するという方法が ある。 し力 し、 この方法の場合、 時計ケース本体と先カン部との係合状態を長期間 維持するのが難しく、 耐久性についての信頼性が.低いという欠点がある。 また、 双 方を係合するために用い ピンを外側から見えなくすることが困難であり、 ピンが 外側から見えることによって、 時計ケースのデザィン性を低下させるおそれがある という欠点もある。
また、 時計ケース本体と先カン部とを接合する場合、 その方法には、 ロウ材を用 いるロウ付けと溶接がある。 ロウ付けは、 ロウ材流れの問題があるものの、 ケース 本体と先力ン部とを接合した後も表面の仕上がりを比較的良好にすることができる。 しかし、 接合した部分の耐蝕性に難点がある。 上述したように、 ケース本体と先力 ン部の素材としてチタンを用いる場合、 チタンの変態点以下の温度で接合しようと 'すると、 あまり適切なロウ材は見当たらない。 その中では銀ロウ (例えば、 J I S 規格: B A g— 8等) が妥当である。 しかし、 この銀ロウは耐蝕性が極めて低いた め、 接合してから長期間経過すると、 接合した部分に変色やさび等が発生して外観 の品質を著しく損ねるおそれがある。
一方、 腕時計部品の中には高い防水性を要求されるものがある。 しかし、 特に、 時計ケースについては、 時計ケース本体と竜頭パイプとを接合したときに防水性を 長期間維持するのが難しく、 防永面での信頼性が低くなりやすいという構造上避け られない間題がある。 そして、 腕時計部品は、 ロウ付けのほか、 各部品を溶接して接合することもでき る。 しかし、 溶接して接合すると、 その後に焼けた様な跡が残ってしまい、 外観の 装飾性を損ねてしまう。 中には、 プロジヱクシヨンと呼ばれる微小な突起を溶かし て行うプロジェ.クシヨン溶接もあるが、 この溶接は、 その被溶接部品の大きさ (形 状) を変える等のため、 適用可能な部品が限'られ、 その関係 '腕時計部品にデザィ ン上の制約を生じてしまう。
このように、 従来の腕時計部品は、 各部品 (例えば、 時計ケース本体、 先カン部、 竜頭パイプ等) を別々に形成してそれぞれに所望の加工を施し、 その後に係合する か又は接合するかして一体化する場合は種々の問題があった。 すなわち、 この場合 には、 各部品を係合するか又は接合するかして一体化した状態を長期間維持し得る 丈夫さを備えるとともに、 耐蝕性と防水性を兼ね備え、 外観の装飾性を良好に保持 することが極めて困難であった。 . この発明は、 このような従来の時計外装部品の問題を解決するためになされたも ので、 時計ケース本体と先カン部からなる時計ケースのように 2つ以上の部品から 製造される時計外装部品及びその製造方法において、 各部品の係合又は接合状態を 長期間維持し得る丈夫さを備えるとともに、 耐蝕性と防水性を兼ね備え、 外観の装 飾性を良好に保持し、 デザィンバリエーションが豊富になるようにすることを目的 とする。 発明の開示
この発明による時計外装部品は、 第 1の部品と第 2の部品とが固着された構成を 有する時計外装部品であって、 上記第 2の部品が上記第 1の部品に密着した密着部 に固相拡散接合部と口ゥ付け接合部が形成されていることを特徴とする。
また、 この発明は、 第 1の部品と第 2の部品とが固着された構成を有する時計 外装部品であって、 上記第 2の部品に対応する孔部が上記第 1の部品に形成され、 上記第 2の部品が上記孔部に嵌合してその孔部に密着している部分に固相拡散接合 部とロウ付け接合部が形成されている時計外装部品を提供する。
この時計外装部品は、 上記第 2の部品が径小部を有し、 かつ上記孔部がその径 小部に対応する径小部を有し、 上記第 2の部品の径小部が上記孔部の径小部に密着 している部分に上記固相拡散接合部が形成され、 その密着している部分以外の部分 に上記ロウ付け接合部が形成されているとよい。
さらに、 この発明は、 第 1の部品と第 2の部品とが固着された構成を有する時 計外装部品であって、 上記第 1の部品に凹部が形成され、 かつ上記第 2の部品にそ の凹部に対応する突出部が形成され、 上記突出部が上記凹部に嵌合してその凹部に 密着している密着部に固相拡散接合部とロウ付け接合部が形成されている時計外装 部品を提供する。 '
この時計外装部品は、 上記凹部と上記突出部に密着する第 3の部品を設け、 .そ の第 3の部品が上記凹部及び突出部に密着している部分に上記固相拡散接合部が形 成され、 上記突出部が上記囬部に密着している部分に上記口ゥ付け接合部が形成さ れているとよい。
また、 上記突出部の表面に金属膜が形成され、 その金属膜を介して上記突出部が 上記凹部に密着しているとよい。
上記時計外装部品は、 第 1の部品及ぴ第 2の部品の材質がステンレス鋼又はチ タンであると-よい。
また、 上記第 1の部品が時計ケース本体であり、 上記第 2の部品が竜頭パイプで ある場合、 上記第 1の部品が時計ケース本体であり、 上記第 2の部品が先カン部で ある場合のいずれでもよい。
さらに、 上記口ゥ付け接合部が低融点ロウ材により形成されているとよい。 上記ロウ付け接合部がパラジウム、 白金、 ニッケル及びリンを主成分とする口 ゥ材又はパラジウム、 銅、 ニッケル及ぴリンを主成分とするロウ材により形成され ているとよレ、。
また、 ロウ付け接合部が金、 銀、 銅、 ゲルマニウム及びパラジウムを主成分とす る口ゥ材により形成されていてもよい。
ロウ付け接合部が金、 銀、 銅、 パラジウム及びニッケルを主成分とし、 ガリウム、 インジウム、 錫のうち、.少なくとも 1種類以上の元素を含有するロウ材により形成 されていてもよい。
そして、 この発明は、 第 1の部品と第 2の部品とを固着して時計外装部品を製 造する時計外装部品の製造方法であって、 上記第 2の部品に口ゥ材を付着する工程 と、 上記第 2の部品が上記第 1の部品に密着した密着部の中に固相拡散接合部と口 ゥ付け接合部を形成する工程とを有する時計外装部品の製造方法を提供する。
また、 この発明は、 第 1の部品と第 2の部品とを固着して時計外装部品を製造 する時計外装部品の製造方法であって、 上記第 2の部品に口ゥ材を付着する工程と、 上記第 2の部品の上記口ゥ材を付着した部分以外の部分を上記第 1の部品に圧接さ せる圧接工程と、 上記第 2の部品の上記口ゥ材を付着した部分 上記第 1の部品に 対面させる対面工程とを有し、 上記圧接工程及び対面工程の後に、 上記第 1の部品 と第 2の部品を加熱する熱処理工程を有する時計外装部品の製造方法を提供する。 さらに、 こ 発明は、 第 1の部品と第 2の部品とを固着して時計外装部品を製 造する時計外装部品の製造方法であって、 上記記第 2の部品にロウ材を付着するェ 程と、 上記第 2の部品の上記口ゥ材を付着した部分以外の部分と上記第 1の部品と に第 3の部品を圧接させる圧接工程と、 上記第 2の部品の上記ロウ材を付着した部 分を上記第 1の部品に対面させる対面工程とを有し、 上記圧接工程及ぴ対面工程の 後に、 上記第 1の部品、 第 2の部品及ぴ第 3の部品を加熱する熱処理工程を有する 時計外装部品の製造方法を提供する。
上記圧接工程は、 上記第 2の部品を上記第 1の部品に圧入して行うことができ る。 また、 上記圧接工程は、 上記第 3の部品を上記第 1の部品と上記第 2の部品 に圧入して行うこともできる。
上記口ゥ材を付着する工程は、 ペースト状ロゥ材をデイスペンサで付着して行 うとよい。
そして、 上記第 1の部品と第 2の部品の素材としてチタンを用いるときは、.上 記熱処理工程で加熱するときの温度が約 6 0 0 °C以上約 8 5 0 °C以下であるとよい。 また、 上記第 1の部品と第 2の部品の素材としてステンレス鋼を用いるときは、 上記熱処理工程で加熱するときの温度が約 6 0 0 °C以上約 9 0 0 °C以下であるとよ い。
上記第 2の部品にロウ材を付着する工程よりも前に、 その第 2の部品の口ゥ材 を付着する部分以外の部分に金属膜を形成する工程を有してもよい。 図面の簡単な説明
第 1図は時計ケース本体と竜頭パイプとを分解して示す時計ケースの斜視図であ る。
第 2図は第 1図で竜頭パイプが時計ケース本体に密着して形成される密着部を 2 — 2線で切断して示す断面図である。
第 3図は時計ケース本体、 先カン部及ぴ金属管を分解して示す別の時計ケースの 斜視図である。
第 4図は第 3図で先カン部が金属管を介して時計ケース本体に密着して形成され る密着部を 4一 4線で切断し'て示す断面図である。
第 5図は時計ケース本体と先カン部を分解して示すさらに別の時計ケースの斜視 図である。
第 6図は第 5図で先力ン部が時計ケース本体に密着して形成される密着部を 6— 6線で切断して示す断面図である。
第 7図は時計ケース本体、 先カン部及び金属管を分解して示すさらにまた別の時 計ケースの斜視図である。
第 8図は第 7図で先力ン部が金属管を介して時計ケース本体に密着して形成され る密着部を 8— 8線で切断して示す断面図である。
第 9図は第 1図の 2— 2線の切断面を一部省略して示す断面図である。
第 1 0図は第 3図の 4 _ 4線の切断面を一部省略して示す断面図である。.
第 1 1図は第 6図の先カン部と時計ケース本体を分解して、 先カン部の一部拡大 図とともに示す断面図である。 '
第 1 2図は、 第 7図の 8— 8線の切断面を各部品の配置を一部変更して示す断面 図である。
第 1 3図は第 7図に示す時計ケース本体と先カン部の密着部を形成する部分を第 8図の 1 3— 1 3線で切断して示す断面図である。 発明を実施するための最良の形態
以下、 この発明による時計外装部品及ぴその製造方法を実施するための最良の形 態について、 図面を用いて詳細に説明する。
(第 1の実施の形態:第 1図、 第 2図、 第 9図)
1 ) 時計外装部品の全体構造
まず、 この発明による時計外装部品及ぴその製造方法の第 1の実施の形態として、 第 1図に示す時計ケース 1 1について説明する。 時計ケース 1 1は、 腕時計用の時 計外装部品であって、 第 1の部品である時計ケース本体 1と、 第 2の部品である竜 頭パイプ 3とを固着して製造されている。 この時計ケース 1 1は、 その竜頭パイプ 3が時計ケース本体 1に密着した密着部 7に後述する固相拡散接合部 4 aとロウ付 け接合部 5 aの二つの接合部が形成されている点を特徴としている。 なお、 第 1図 は時計ケース本体 1と竜頭パイプ 3とを分解して示す時計ケース 1 1の斜視図であ る。 第 2図は第 1図で竜頭パイプ 3が時計ケース本体 1に密着して形成される密着 部を 2 _ 2線で切断して示す断面図、 第 9図は第 1図の 2— 2線の切断面を一部省 略して示す断面図である。
時計ケース本体 1は、 側壁部 1 aの内側にムーブメント、 文字盤等を収める収納 空間を有し、 側壁部 l aに卷真孔 (s t e m h o l e ) 2が形成されている。 こ の卷真孔 2は、 竜頭パイプ 3に対^する形状に穿設され、 時計ケース本体 1の収納 空間から外部に連通するように形成されている。 また、 卷真孔 2は内側に径小部 2 a、 その外側に径大部 2 bをそれぞれ有してその間に円環状の当接面 2 cを有し、 径小部 2 a、 径大部 2 b及ぴ当接面 2 cにより竜頭パイプ 3の外形に対応する孔部 を構成して 、る。
竜頭パイプ 3は、 図示しない竜頭を時計ケース;^体 1に取り付ける際に防水性を 確保するために使用する筒状の部品であって、 径小部 3 aと径大部 3 とを有し、 径小部 3 aと径大部 3 bとの間が円環状の当接面 3 cになっている。 径小部 3 aは 卷真孔 2の径小部 2 aに対応する形状に形成されているが、 径小部 2 aよりもごく わずかに径の大きさが大きくなつている。
2 ) 時計外装部品の製造方法
時計ケース 1 1は、 竜頭パイプ 3の当接面 3 cにペースト状の低融点口ゥ材を予 め適量付着させて卷真孔 2の中にその外側から強い力で押し込んで製造する。 すな わち、 時計ケース 1 1は、 竜頭パイプ 3を卷真孔 2に圧入して製造する。 すると、 径小部 3 aの外周面が径小部 2 aの内周面に応力が作用した状態で接面する (圧接 する) ととも'に、 当接面 3 cと当接面 2 cとが互いに対面する恰好になって密着部 7が形成される。 この時、 当接面 3 cに付着したロウ材は竜頭パイプ 3の当接面 3 cと当接面 2 cとの隙間 (一部は径大部 3 bと径大部 2 bとの隙間) にある程度均 一に広げられている。 そして、 その状態で時計ケース 1 1と竜頭パイプ 3どを図示 しない真空装置內に収めて真空雰囲気に置き、 その中で加熱する熱処理工程を行う。 すると、 固相拡散接合と口ゥ付けとが同時に行われて時計ケース本体 1と竜頭パイ プ 3とが固着して一体化する。
3 ) 時計外装部品の接合部の構造
時計ケース 1 1は、 上述のようにして製造することによって、 固相拡散接合部 4 aと口ゥ付け接合部 5 aが形成されている。
固相拡散接合部 4 aは、 径小部 2 aと径小部 3 aとが接面している部分に形成さ れている。 ここで、 固相拡散接合とは、 被接合物をつき合わせ、 塑性変形をほとん ど生じない程度の圧力と熱を加え、 接合面同士で生じる原子の拡散を利用して被接 合物を融点以下で接合することをいう。 この固相拡散接合部 4 aでは、 径小部 2 a と径小部 3 aとが互いに接面して、 その境界面において、 それぞれを構成する素材 (たとえばチタン) の原子レベルのミクロ拡散が起こり、 元々存在していた酸化膜 の酸素が内部に拡散して固溶されている。 たとえ、 接合する初期の段階で、.境界面 に微小な凹凸が存在し、 その凹凸に起因する微小な隙間が境界面にあっても、 その 隙間はミクロ拡散の進行につれて次第に小さくなり、 最終的にはほぼ消失してしま う。 こうなると、 その境界面はもはや水蒸気ぎ'えも通さなくなる。 こうして、 径小 部 2 aと径小部 3 aの接面部分が隙間無く緊密かつ強固に接合して固相拡散接合部 4 aとなっている。
ロウ付け接合部 5 aは、 当接面 3 cに付着したペース ト状の低融点ロウ材が、 竜 頭パイプ 3を圧入した際に竜頭パイプ 3と卷真孔 2の隙間に広がって形成されてい る。 この低融点ロウ材は、 時計ケース本体 1と竜頭パイプ 3を加熟する熱処理工程 で溶融して毛細管現象により当接面 2 c , 3 cの対面部分に存在する微小な隙間を 埋めるようにして広がる (一部は径大部 2 bと径大部 3 bとの隙間にも広がる) 。 すると、 当接面 2 c , 3 cが径小部 2 a , 3 aを取り囲むようにして形成されてい るので、 口ゥ付け接合部 5 aが固相拡散接合部 4 aを取り囲むようにして形成され る。 これをもって、 時計ケー 本 :1と竜頭パイプ 3とが接合されている。
ここで、 「低融点ロウ材」 とは、 被ロウ付け部品の素材の変態点又は結晶化温度 よりも融点が低い口ゥ材をいい、 口ゥ付けによる接合後も被口ゥ付け部品の表面の 仕上がり状態に影響を及ぼさないロウ材を意味している。
時計ケース 1 1は、 時計ケース本体 1と竜頭パイプ 3とを固相拡散接合部 4 aを 設けて固着しているため、 密閉性を含む内部の防水性がかなりの確率で良好な状態 に保たれている。 この固相拡散接合部 4 aを設けるには、 接合しょうとする部分 (径小部 2 aと径小 3 a ) .が隙間無く緊密に接しなくてはならない。 しかし、 ご くまれに何らかの事情で、 径小部 2 aや径小部 3 aの面精度が悪く、 双方の断面形 状が厳密な真円で無かったり、 卷真孔 2をドリルで穴開けして形成する際に発生す る溶着等により、 径小部 2 aの内周面が荒れている場合がある。 すると、 竜頭パイ プ 3を時計ケース本体 1に圧入しても、 径小部 2 aと径小部 3 aとが緊密 fc接しな くなつてしまい、 固相拡散接合部 4 aが確実に形成されないおそれがある。 こうな ると、 時計ケース 1 1の防水性は不十分になる可能性がある。
このことから、 時計ケース 1 1は、 径小部 2 a , 3 aの接面部分に固相拡散接合 部 4 aを形成するとともに、 その外側に固相拡散接合部 4 aを取り囲むようにして ロウ付け接合部 5 aを形成している。 こう して、 時計ケース 1 1は、 固相拡散接合 部 4 aが確実には形成されていない場合でも、 去の外側を口ゥ材により隙間無く接 合して丈夫さと完全な防水性を得ている。
4 ) 時計外装部品の実施例
この発明による時計外装部品として、 上述した構成を有する時計ケース 1 1の具 体的な実施例 (サンプル) を作製した。
(実施例 1 )
この実施例では、 時計ケース 1 1は、 純チタン製の時計ケース本体 1と、 チタン 合金製 (T i _ 6 A l— 4 V) の竜頭パイプ 3を固着して製造した。 時計ケース本 体 1の卷真孔 2は、 径小部 2 aの穴径を約 1 . 8 mm <ί>とし、 竜頭パイプ 3は、 径 小部 3 aの外径を約 1 . 8 3 πιπι φとした。 よって、 竜頭パイプ 3を卷真孔 2に圧 入する際の圧入代 (圧入に寄与する両者の寸法差) は、 1 . 8 3 πιιη φ— 1 . 8 m m φ = 0 . 0 3 mm φ、 すなわち 3 0 ί πιとなる。 こうして、 径小部 3 aの径を径 小部 2 aよりもごくわずかに大きく して竜頭パイプ 3が巻真孔 2に圧入できるよう にした。
また、 ロウ付け接合部 5 aを形成するため、 この実施例では、 パラジウム、 白金、 ニッケル及ぴリンを主成分とし、 P d : P t : N i : Pの組成比率が、 3 4 : 5 3 : 8 : 5 (重量0 /0) となる P d P t N i P系のペースト状ロウ材を使用した。 こ のロウ材は、 融点が時計ケース本体 1と竜-頭パイプ 3の素材 (この実施例ではチタ ン) の変態点よりも低い低融点ロウ材であり、 その融点は約. 6 9 9。Cである。 ロウ 材は、 ペースト状でなくてもよいが、 ペースト状にすると取り扱いが容易になるか ら、 ペースト状のロウ材を使用するのが好ましい。 このロウ材は、 卷真孔 2の当接 面 2 (:カ 竜頭パイプ 3の当接面 3 c にデイスペンサを用いて約 2 ほど滴下し て付着させた。 .
そして、 竜頭パイプ 3の径小部 3 aを卷真孔 2の径小部 2 aに圧入した後、 時計 ケース本体 1を竜頭パイプ 3とともに図示しない真空装置内に収めた。 この真空装 置内の圧力を 5 X 1 0— 6 T 0 r r (約 6 . 7 X 1 0— 4 P a ) 程度に保持して真空 雰囲気を形成し、 その中で熱処理を行った。 この熱処理を行う際に加える温度 (熱 処理温度) は約 7 5 0 °Cに設定し、 熱処理を行う時間 (熱処理時間) は約 1時間程 度にした。 この熱処理を行うことにより、 時計ケース本体 1と竜頭パイプ 3は、 固 相拡散接合部 4 aとロウ付け接合部 5 aという二つの接合部が形成されて固着した。 固相拡散接合部 4 aを形成するためには、 竜頭パイプ 3を卷真孔 2に圧入する際 の圧入代にある程度の大きさを確保するとともに、 熱処理温度もある程度の温度に しなければならない。 圧入代と熱処理温度は、 時計ケース 1 1及ぴ竜頭パイプ 3の 材質、 大きさによって異なるが、 固相拡散接合部 4 aが形成されるようにして双方 を調節する。 この実施例 1に示すように、 チタンからなる金属製の部品を接合する場合の熱処 理温度は、 約 600°Cから約 850°C程度の範囲であることが望ましい。 熱処理温 度が 600°C未満では、 口ゥ付けに使用するロウ材が十分に溶けずに隙間に回り切 らないおそれがあるから好ましくない。 また、 固相拡散接合部 4 aでも十分な拡散 が発生せず、 境界面に微小な空孔が残ってしまい、 強度が不十分になる場合がある。 —方、 熱処理温度が 850°Cを越えてしまうとチタンの変態点に接近して、 表面の 状態が変化する場合があるから好ましくない。 なお、 この実施例 1で製造した時計 ケース 1 1を試料 Cとした。
(実施例 2)
次に、 実施例 1で使用したロウ材とは別のロウ材を用いて時計ケース本体 1と竜 頭パイプ 3を接合した。 この実施例では、 パラジウム、 銅、 ニッケル及ぴリンを主 成分とし、 P d : C u : N i : Pの組成比率が、 78 : 4 : 1 1 : 7 (重量0 /0) と なる P d C uN i P系のペースト状ロゥ材を使用した。 このロウ材も、 融点が時計 ケース本体 1と竜頭パイプ 3の素材 (チタン) の変態点よりも低い低融点ロウ材で あり、 その融点は約 604°Cである。 また、 このロウ材を用いるため、 熱処理温度 を約 700°Cに変更し、 熱処理時間を約 1時間程度にした。 その他、 熱処理工程の 条件は実施例 1と同じにしている。 なお、 この実施例 2で製造した時計ケース 1 1 を試料 ϋとした。
(比較例 1 )
上述の実施例 1, 2と比較するため、 従来の要領で時計ケースの比較例を作製し た。 この比較例では、 上述の実施例 1, 2と素材は同じであるが、 寸法の異なる時 計ケース本体と竜頭パイプを用いて、 ペースト状の銀口ゥ材 ( J I S規格: B Ag . 一, 8, 融点 780°C) を用いた銀ロウ付けを行い、 その時計ケース本体と竜頭パイ プを接合した。 そのロウ付けでは、 ロウ付け温度を約 820°Cに設定し、 時計ケー ス本体と竜頭パイプを真空炉の中に 10分間程度置いてロウ付けを行った。 しかし、 口ゥ付け温度がチタンの変態点に近い温度であるため、 表面の結晶が若干粗大化し て白—濁したため再研磨が必要となった。 また、 時計ケース本体と竜頭パイプは、 そ の寸法が竜頭パイプの圧入されない (時計ケース本体と竜頭パイプの接面部分が圧 接されない) 大きさであるため、 実施例 1 , 2のように固相拡散接合部は形成され なかった。 なお、 この比較例 1で製造した時計ケースを試料 Aとした。
(比較例 2 )
また、 比較例 1と同じ時計ケース本体と竜頭パイプを用いて竜頭パイプにプロジ ェクシヨン (突起) を作製し、 プロジ クシヨン溶接を行った。 溶接を行うと、 一 般的に溶接跡が見えるが、 製造した時計ケースは、 ,時計ケース本体と竜頭パイプを 溶接した箇所が卷真孔の中に形成され、 外側から見えなくなった。 そのため、 溶接 跡の存在は肉眼で確認することはできない。 しかし、 竜頭パイプのような大きさの 非常に小さい部品に突起を設けると、 部品全体に占めるその突起の割合が高くなる から、 この比較例 2は、 外観の装飾性が良好ではないと考えられる。 なお、 この比 較例 2で製造した時計ケースを試料 Bとした。 '
(実施例と比較例の評価について)
' 上述の要領で作製した実施例 1、 2及ぴ比較例 1、 2の試料 Aから Dついて、 竜 頭パイプを時計ケース本体に密着した部分の評価を次の要領で行った。 ここでは、 そのための項目として、 「耐蝕性」 、 「防水信頼性」 、 「固定力」 、 「外観」 の 4 つを設定した。
「耐蝕性」 は、 C A S S試験溶液に 4 8時間浸漬を行って腐蝕が全く癸生しな いものを合格として ( I S O 3 7 7 0に準拠) 評価した。
「防水信頼性」 は、 防水試験機にて 1 0気圧防水試験を行うとともに、 約 4 O t の温度の下で相対湿度を 9 0 %に設定して耐湿試験を行い評価した。
「固定力」 は、 引っ張り試験機により竜頭パイプを引っ張り、 接合状態を保持で きる最も高い強度 (接合強度) を測定した。 「外観」 は、 時計ケース本体と竜頭パイプが接合している部分 (密着部) の外観 の状態を目視により確認して評価した。
これらの 4つの評価項目について、 実施例 1 , 2及ぴ比較例 1 , 2による各試料 Aから Dを相対的に評価し、 良好なものから順に、 〇, △, Xとする評価を行った。 その結果は、 表 1に示すとおりである。
表 1に示すとおり、 比較例 1で銀ロウ付けにより接合した試料 Aは、 防水信頼性、 固定力、 外観では良好な結果が得られている。 しかし、 耐蝕性は良好ではない。 ま た、 ロウ付けして接合した部分からの発鲭がひどく、 腕時計の製造は不可といえる 結果であった。
'比較例 2でプロジェクション溶接により接合した試料 Bは、 防水信頼性が低く、 わずかに防水不良が発生した。 また、 竜頭パイプの外径が大きくなつているため、 外観の装飾性が好ましくないという結果であった。
—方、 実施例 1の試料 Cは、 固相拡散接合部 4 aと口ゥ付け接合部 5 aの両方が 形成されており、 耐蝕性、 防水信頼性、 固定力、 外観のすべてについて満足のいく 十分な接合が行われていた。 これは、 次のことによると考えられる。 低融点ロウ材 を用いたため、 耐蝕性が従来の銀ロウ材等に比較して極めて良好になったこと、 防 水信頼性は、 固相拡散接合部 4 aにおける園相拡散接合の効果及び低融点口ゥ材の 濡れ性の両方が寄与したためと考えられる。 さらに、 固定力では、 固相拡散接合部 4 aにおいて接面部分が隙間無く緊密に接合して接合強度が大きくなつていること が寄与していると考えられる。
以上のように、 時計ケース 1 1は、 各部品が強固に接合しているため、 その接合 状態を長期間維持し得る丈夫さを備え、 良好な防水性も兼ね備えている。 また、 時 計ケース 1 1は、 低融点ロウ材により接合しているから良好な耐蝕性も備え、 外観 の装飾性が良好になっている。 さらに、 時計ケース 1 1は、 時計ケース本体 1と竜 頭パイプ 3を別々に形成してそれぞれに所望の表面加工や被膜形成加工を施し、 そ の後に両者を固着することによつて製造することができるから、 デザィンバリエ一 シヨンが豊富になる。
(第 2の実施の形態:第 3図、 第 4図、 第 1 0図)
1 ) 時計外装部品の全体構造 '
次に、.第 2の実施の形態として、 第 3図に示す時計ケース 2 1について説明する。 時訐ケース 2 1は、 第 1の部品である時計ケース本体 1 4と第 2の部品である先力 ン部 1 5とを、 第 3の部品であ 金属管 1 6を介して固着して製造されている。 こ の時計ケース 2 1は、 その先力ン部 1 5が金属管 1 6を介して時計ケース本体 1 4 に密着して密着部 1 7が形成され、 その密着部 1 7に固相拡散接合部 4 bとロウ付 け接合部 5 bの二つの接合部が形成されている。 なお、 第 3図は時計ケース本体 1 4、 先カン部 1 5及ぴ金属管 1 6を分解して示す時計ケース 2 1の斜視図である。 第 4図は第 3図で先カン部 1 5が金属管 1 6を介して時計ケース本体 1 4に密着し て形成される密着部 1 7を 4一 4線で切断して示す断面図、 第 1 0図は第 3図の 4 一.4線の切断面を一部省'略レて示す断面図である。
時計ケース本体 1 4は、 時計ケース本体 1 1と比較して、 切欠き凹部 1 0が形成 されている点で異なるが、 その他は同じ構成を有している。 なお、 第 3図では卷真 孔の図示を省略している。
切欠き凹部 1 0は、 時計ケース本体 1 4の側壁部 1 cの卷真孔の形成されない箇 所に対向して形成されている。 この切欠き回部 1 0はそれぞれ当接面 1 0 aを有し、 その略中央に嵌合穴 9が形成されている。 嵌合穴 9は、 当接面 1 0 aと垂直な方向 に穿設され、 周壁面 9 aと底部 9 bを有している。 すなわち、 嵌合穴 9は貫通孔で はない。
先カン部 1 5は、 パンド係合部 1 5 aと異なる側面に突出部 2 0が形成されてい る。 この突出部 2 0は、 切欠き凹部 1 0に対応して形成されていて、 当接面 2 0 a を有し、 その略中央に嵌合穴 1 2が形成されている。 この嵌合穴 1 2は当接面 2 0 aと垂直な方向に穿設され、 周壁面 1 2 aと底部 1 2 bを有している。 すなわち、 嵌合穴 1 2も貫通穴ではない。
嵌合穴 9と嵌合穴 1 2は、 互いに穴径の大きさと深さが等しく、 突出部 2 0を切 欠き四部 1 0に嵌め込んだ際に互いに対向する位置に形成されている。
金属管 1 6は、 端面 1 6 a, 1 6 b及ぴ周壁面 1 6 cを有する円简状の部材であ る。 金属管 1 6は、 外径の大きさが嵌合穴 9, 1 2の穴径よりもごくわずかに大き く形成され、 長さが嵌合穴 9, 1 2の深さの和よりも若干短い長さに形成されてい る。 そのため、 金属管 1 6は嵌合穴 9, 1 2に圧入され、 その周壁面 1 6。が—周壁 面 9 a, 1 2 aに応力が作用した状態で接面 (圧接) する。 また、 金属管 1 6は、 端面 1 6 a , 1 6 bと底部 9 b , 1 2 bとが対面する恰好で配置され、 嵌合穴 9 , 1 2の両方に跨って完全に収まる。
また、 嵌合穴 9, 1 2が底部 9 b , 1 2 bを有するから、 金属管 1 6は嵌合穴 9, 1 2に嵌め込まれると、 もはや外側からは視認することができない。 したがって、 時計ケース 2 1は、 外観の装飾性が良好であり、 好ましい構成である。
時計ケース 2 1は、 固相拡散接合部 4 bが密着部 1 7内において、 金属管 1 6の 周壁面 1 6 cと嵌合穴 9 , 1 2の周壁面 9 a, 1 2 aとが接面している部分に形成 されている。 この固相拡散接合部 4 bでは、 周壁面 1 6 cと周壁面 9 a, 1 2 aの 接面部分が隙間無く緊密かつ強固に接合している。
また、 口ゥ付け接合部 5 bでは、. 当接面 2 0 aに付着した低融点口ゥ材が、 熱処 理の過程で溶融して当接面 2 0 aと当接面 1 0 aの対面部分に存在する微小な隙間 を埋めるようにして広がっており、 これにより、 先カン部 1 5と時計ケース本体 1 4とが接合されている。 '一
このように、 時計ケース 2 1は、 固相拡散接合部 4 bにより、 時計ケース本体 1 4と先カン部 1 5とが強固に接合されているので、 両者の接合状態を長期間維持し 得る丈夫さを備えている。 また、 低融点ロウ材によりロウ付け接合部 5 bを形成し ているから良好な耐蝕性を備え、 固相拡散接合が確実には行われていない場合があ つても、 接合状態を長期間維持し得る丈夫さを備えている。
2) 時計外装部品の製造方法
時計ケース 2 1は、 次のようにして製造する。 まず、 ^出部 20の当接面 2 0 a にペースト状の低融点ロウ材を予め適量付着させる。 そして、 金属管 1 6を嵌合穴 9, 1 2に嵌め合わせつつ、 突出部 20を切欠き凹部 1 0,に嵌め込み、 先カン部 1 5を'外側から強い力で押し込む。 すると、 金属管 1 6が嵌合穴 9, 1 2に圧入され る。 また、 当接面 2 0 aと当接面 1 0 aとが互いに対面する恰好になる。 この時、 当接面 20 aに付着した口ゥ材は当接面 1 0 a との間に形成される隙間から切欠き 凹部 1 0と突出部 20との間に形成される隙間全体にわ ってある程度均一に広が つている。 そして、 その状態で時計ケース本体 1 4、 先カン部 1 5及ぴ金属管 1 6 を図示しない水素炉内に収めて還元雰囲気に置き、 その中で加熱する熱処理工程を 行う。 すると、 固相拡散接合とロウ付けとが同時に行われて時計ケース本体 1 4と 先カン部 1 5とが金属管 1 6を介して固着し、 これらの部品が一体化する。
3) 時計外装部品の実施例
次に、 .上述した構成を有する時計ケース 2 1の具体的な実施例 (サンプル) につ いて説明する。
この実施例では、 時計ケース 2 1は、 快削性ステンレス鋼 (SUS 3 1 6 F) か .らなる金属管 1 6を介して、 ステンレス鋼 (SUS 3 1 6 L) 製時計ケース本体 1 4と先カン部 1 5とを固着して製造した。 時計ケース本体 14と先カン部 1 5の嵌 合穴 9, 1 2は穴径を約 2 mm φとし、 金属管 1 6は外径を約 2. 0 5 mm φとし た。 よって、 金属管 1 6を嵌合穴 9 , 1 2'に圧入する際の圧入代は、 約 2. 0 5m m - 2 ram φ = 0. 05 ram φ、 すなわち 50 μ mとなる。
金属管 1 6は全長を約 4 mmとし、 嵌合穴 9 , 1 2の深さはともに 2. lniniと した。 よって、 嵌合穴 9, 1 2の深さの和は 4. 2 mmである。 金属管 1 6は長さ がこの深さの和よりも若干短いので、 嵌合穴 9, 1 2の.内部に完全に収まった。 また、 ロウ付け接合部 5 bを形成するため、 この実施例では、 金、 銀、 銅、 ゲル マニウム及ぴパラジウムを主成分とし、 Au : Ag : Cu : G e : P dの組成比率 が、 45. 5 : 3 2 : 5 : 1 2. 5 : 5 (重量0 /0) となる AuAg C uG e P d系 のペースト状ロゥ材を使用した。 この口ゥ材は融点が時計ケース本体 14及ぴ金属 管 1 6の素材 (この実施例ではステンレス) の再結晶温度よりも低い低融点ロウ材 であり、 その融点は約 6 3 5°Cである。 .
そして、 時計ケース 2 1を製造するため、 まず、 ロウ材をデイスペンサを用いて 当接面 20 aに約.2 μ 1ほど滴下して付着させた。 次に、 金属管 1 6を嵌合穴 9, 1 2に嵌め合わせつつ、 突出部 2 0を切欠き凹部 1 0に圧入した後、 時計ケース本 体 14、 先カン部 1 5及ぴ金属管 1 6に対し、 還元雰囲気である高温の水素ガス雰 囲気処理炉内で熱処理を行った。 このとき、 熱処理温度は約 8 50°Cに設定し、 熱 処理時間は約 2 0分程度にした。 すると、 時計ケース本体 1 4、 先カン部 1 5及ぴ 金属管 1 6は、. 固相拡散接合部 4 bと口ゥ付け接合部 5 bという二つの接合部が形 成されて固着した。
この固相拡散接合部 4 bでは、 時計ケース本体 1 4及ぴ先カン部 1 5の素材であ るステンレス SUS 3 1 6 Lと、 金属管 1 6の素材であるステンレス SU S 3 1 6 Fとが接面する境界面 (すなわち、 周壁面 1 6 cと、 周壁面 9 a , 1 2 aとの接面 部分) 'において、 互いにステンレス鋼の構成元素である F e , C r , N i等の原子 レベルのミクロ拡散が起こっている。 これにより、 接合する初期の段階で、 微小な 凹凸に起因する隙間が境界面にあっても、 その隙間はミク口拡散の進行につれて次 第に小さくなり、 最終的にはほぼ消失してしまう。 こうして、 周壁面 1 6 cと.、 周 壁面 9 a , 1 2 aとの接面部分が隙間無く緊密かつ強固に接合している。
また、 ロウ付け接合部 5 bでは、 ロウ材が約 8 5 0°Cの加熟中に溶融し、 毛細管 現象により当接面 20 aと当接面 1 0 aの対面部分に存在する微小な隙間を埋める ようにして広がる。 その後、 時計ケース本体 1 4、 先カン部 1 5及び金属管 1 6を 冷却した時に当接面 2 0 aと当接面; 0 aとが接合する。
この実施例に示すように、 ステンレス鋼からなる金鳥製の部品を接合する場合の 熱処理温度は、 約 6 0 0 °Cから約 9 0 0 C程度の範面であることが望ましい。 熱処 理温度が 6 0 0 °C未満では、 口ゥ付けに使用する口ゥ材が十分に溶けずに隙間に回 り切らないおそれがあるから好ましくない。 また、 固相拡散接合部 4 bでも十分な 拡散が発生せず、 境界面に微小な空孔が残ってしまい、 強度が不十分になる場合が ある。 ーガ、 熱処理温度が 9 0 0 °Cを越えてしまうと、 ステンレス鋼の再結晶温度 に接近してステンレス鋼の組織が粗大化し、 表面の状態が変化してしまう場合があ るから好ましくない。
(第 3の実施の形態:第 5図、 第 6図、 第 1 1図) ―
1 ) 時計外装部品の全体構造 ' 続いて、 第 3の実施の形態として、 第 5図に示す時計ケース 3 1について説明す る。 時計ケース 3 1は、 第 1の部品である時計ケース本体 2 4と、 第 2の部品であ る先カン部 2 5とを固着して製造されている。 この時計ケース 3 1は、 先カン部 2 5が時計ケース本体 2 4に密着して密着部 2 8が形成され、 その密着部 2 8に固相 拡散接合部 4 cとロウ付け接合部 5 cが形成されている。 なお、 第 5図は時計ケー ス本体 2 4と先カン部 2 5を分解して示す時計ケース 3 1の斜視図である。 第 6図 は第 5図で先カン部 2 5が時計ケース本体 2 4に密着して形成される密着部を 6— 6線で切断して示す断面図、 第 1 1図は第 6図で時計ケース本体 2 4と先カン部 2 5とを分解して先カン部の一部拡大図とともに示す断面図である。
時計ケ^ "ス本体 2 4は、 時計ケース本体 1 4と比較して、 切欠き凹部 2 7に嵌合 穴が形成されていない点で異なり、 その他は同じ構成を有している。 なお、 第 5図 でも卷真孔の図示を省略している。 切欠き凹部 2 7は、 当接面 2 7 aと、 その両側 に側壁面 2 7 b , 2 7 bを有している。 先カン部 2 5は、 先カン部 1 5と比較して、 突出部 2 6の形状が異なっている。 この突出部 2 6は、 横幅の寸法が切欠き凹部 2 7よりもわずかに大きく形成されて いて、 当接面 2 6 aと、 その両側に側壁面 2 6 , ' 2 6 bを有している。 この側壁 面 2 6 b , 2 6 bには、 金属膜 3 0が形成されている。 したがって、 突出部 2 6は、 切欠き凹部 2 7に圧入され、 側壁面 2 6 b , 2 6 bが金属膜 3ひを介して側壁面 2 7 b , 2 7 bに応力が作用した状態で接面 (圧接) される。 - 時計ケース 3 1は、 固相拡散接合部 4 cが、 突出部 2 6の側壁面 2 6 b, 2 6 が金属膜 3 0, 3 0を介して切欠き凹部 2 7の側壁面 2 7 b, 2 7 bに接面してい る部分に形成されている。 この固相拡散接合部 4 cでは、 側壁面 2 6 b., 2 6 bと、 側壁面 2 7 b , . 2 7 bとが金属膜 3 0を挟んで接 ®し、 かつ押し付けられた状態で 存在している (すなわち、 側壁面 2 6 1? , 2 6 bが金属膜 3 0を介して側壁面 2 7 b , 2 7 bに压接している) 。 また、 互いに接面する境界面において、 その素材の 成分 (ステンレス鋼成分及び金属膜 3 0の成分 (N i , P ) ) の拡散層が形成され、 側壁面 2 6 b , 2 6 bと側壁面 2 7 b , 2 7 bとが金属膜 3 0を介して隙間無く緊 密かつ強固に接合している。
また、 口ゥ付け接合部 5 cでは、 当接面 2 6 aに付着した低融点口ゥ材が、 熱処 理の過程で溶融して当接面 2 6 aと当接面 2 7 aの対面部分に存在する微小な隙間 を埋めるようにして広がっており、 これにより、 先カン部 2 5と時計ケース本体 2 4とが接合されている。
このように、 時計ケース 3 1は、 固相拡散接合部 4 cにより、 時計ケース本体 2 4と先カン部 2 5とが強固に接合されているので、 两者の接合状態を長期間維持し 得る丈夫さを備えている。 また、 低融点ロウ材によりロウ付け接合部 5 cを形成し ているから良好な耐蝕性を備え、 固相拡散接合が確実には行われていない場合があ つても、 接合状態を長期間維持し得る丈夫さを備えている。 また、 固相拡散接合部 4 cと口ゥ付け接合部 5 cとが外部からは見えないので、 外観の装飾性が良好とな つている。
特に、 時計ケース 3 1は、 固相摅散接合部 4 cが金属膜 3 0を介して形成されて いるので、 側壁面 2 6 b , 2 6 bが直に側壁面 2 7 b , 2 7 bに接面している場合 よりも、 低温での固相拡散性が向上しており、 両者の界面でのボ Tを少なくするこ とができる。 例えば、 突出部 2 6、 時計ケース本体 2 4をチタン製とし、 金属膜 3 0を C uで形成した場合、 突出部 2 6、 時計ケース本体 2 4をステンレス製とし、 金属膜 3 0を P dにした場合は、 金属膜 3 0を形成しない場合よりも低温での固相 拡散性が向上する。 また、 金属膜 3 Qを比較的軟質の金属 (P t、 C u、 A 11等) を用いて形成すると、 突出部 2 6を圧入した際に塑性変形が起こるため、 界面で発 生し得る応力が界面全体で略均等になるように緩和される。 したがって、 真円度の 差等による微小な隙間が埋まり、 攀合がされやすくなる。
2 ) 時計外装部品の製造方法
時計ケース 3 1は、 次のようにして製造する。 まず、 突出部 2 6の側壁面 2 6 b , 2 6 bの表面に金属膜 3 0を形成する。 次に、 当接面 2 6 aにペースト状の低融点 ロウ材を適量付着させる。 そして、 突出部 2 6を切欠き凹部 2 7に外側から嵌め込 み、 先カン部 2 5を強い力で押し込む。 すると、 突出部 2 6が切欠き囬部 2 7に圧 入される。 また、 当接面 2 6 aと当接面 2 7 aとが互いに対面する恰好になる。 こ の時、 当接面 2 6 aに付着したロウ材は当接面 2 7 aとの間に形成される隙間にあ る程度均一に広がっている。 そして、 その状態で時計ケース本体 2 4と先カン部 2 5を図示しない真空装置内に収めて真空雰囲気に置き、 その中で加熱する熱処理ェ 程を行う。 すると、 固相拡散接合とロウ付けとが同時に行われて時計ケース本体 2 4と先カン部 2 5とが固着して一体化する。
3 ) 時計外装部品の実施例
次に、 上述した構成を有する時計ケース 3 1の具体的な実施例 (サンプル) につ いて説明する。 この実施例では、 時計ケース 3 1は、 ステンレス鋼 (SUS 3 04) 製時計ケー ス本体 24と先カン部 25とを固着して製造した。 時計ケース本体 24は、 切欠き 凹部 2 7の横幅の寸法を約 1 0 mmとし、 先カン部 25は、 突出部 2 6の横幅の寸 法を約 1 0. 0 5mmとした。 よって、 突出部 26を切欠き凹.部 27に圧入する際 の圧入代は、 約 1 0. 05 mm— 1 0mm= 0 · 0 5 mm φ、 すなわち 5 0 mと なる。 '
突出部 2 6の側壁面 2 6 b, 2 6 bには、 予め金属膜 3 0として、 マスクメツキ により.、 N i—Pのメツキ膜を形成した。 その膜厚は約 3 : mとした。
また、 ロウ付け接合部 5 cを形成するため、 この実施例では、 金、 銀、 銅、 パラ ' ジゥム及ぴニッケルを主成分とし、 ガリウム、 インジウム、 錫のうち、 少なくとも 1種類以上の元素を含有するロウ材を使用する。 ここでは、 主成分となる元素にガ リゥム及ぴィンジゥムを含有し、 Au : Ag : C u : P d : N i : G a : I nの組 成比率が、 4 1 : 3 0 : 8 : 1 0 : 4 : 4 : 3 (重量0 /0) となる AuAg C u P d N i G a I n系のペースト状ロゥ材を使用した。 この口ゥ材は融点が時計ケース本 体 24及び先カン部 2 5の素材 (ステンレス) の再結晶温度よりも低い低融点ロウ 材であり、 その融点は約 6 05°Cである。
そして、 時計ケース 3 1を製造するため、 まず、 ロウ材をデイスペンサを用いて 約 2 1ほど当接面 2 6 aに滴下して付着させた。 そして、 突出部 2 6を切欠き凹 部 2 7に圧入した後、 時計ケース本体 24、 先カン部 25,を真空装置内に収めて、 内部圧力を 5 X 1 0— 5T o r r (約 6. 7 X 1 0— 3 P a ) 程度に保持して真空雰 囲気とし、 その中で熟処理を行った。 このとき、 熱処理温度は約 800°Cに設定し、 熱処理時間は約 3 0分程度にした。 すると、 時計ケース本体 24と先カン部 2 5は、 固相拡散接合部 4 cと口ゥ付け接合部 5 cが同時に形成されて固着した。
こうして得られる時計ケース 3 1は、 時計ケース本体 24の密着部 28周辺を除 く外観表面を予めホーニングとし、 先カン部 25はその表面をミラー面仕上げとし ておき、 それから両者を固着して製造することができる。 すると、 上述の要領で製 造した 計ケース 3 1は、 時計ケース本体 2 4のホーニング面と先カン部 2 5のミ ラー面がシャープな界面を持って隣接するため、 新規なデザィンを得ることが可能 であり、 デザィンバリエーションを豊富にすることができる。
この実施例のように、 ステンレス鋼同士を接合する場合、 熱処理温度が約 8 0 0 °C程度であれば、 再結晶による表面あれを起こさないので、 表面状態を維持した まま接合することができる。
また、 時計ケース 3 1に対し、 人工汗試験として C A S S試験を 4 8時間実施し て変色ゃ発鲭等の評価を行ったが、 試験の結果は良好であった。 つまり、 密着部 2 8の耐食性は良好である。 特に腐食を起こすような元素が密着部 2 8 (時計ケース 本体 2 4 'と先カン部 2 5の素材及ぴ金属膜 3 0の素材) の中に含まれていないため である。
なお、 以上の説明では、 金属膜 3 0は N i— P膜としているが、 その他に P d、 P t , C u、 N i、 A u或いはこれらの合金膜にしてもよい。 また、 その成膜方法 はメツキ法のほか、 蒸着、 I P (イオンプレーティング) 、 スパッタリング、 C V Dでもよい。 また、 側壁面 2 6 b , 2 6 bのみに金属膜 3 0を形成するとき fま、 そ れ以外の不要な部分にマスクを付着させて後にリフトオフしても良いし、 全面に成 膜した後で不要な部分 (側壁面 2 6 b, 2 6 b以外の部分) にエッチングを施して 除去してもよい。
また、 金属膜 3 0と同じ金属膜を当接面 2 6 aに形成して、 ロウ付け接合部 5 c を形成してもよい。 この場合、 ロウ材の濡れ性が改善され、 ロウ材の流れ (ロウ流 れ) を少なくすることができる。 なお、 ロウ材の濡れ性は一般的に熱処理温度によ つて影響される (高温ほど濡れ性がよくなる) 。
(第 4の実施の形態:第 7図、 第 8図、 第 1 2図、 第 1 3図)
1 ) 時計外装部品の全体構造 続いて、 第 4の実施の形態として、 第 7図に示す時計ケース 4 1について説明す る。 時計ケース 4 1は、 第 1の部品である時計ケース本体 3 4と、 第 2の部品であ る先カン部 3 5とを金属管 1 6を介して固着して製造されている。 この時計ケース 4 1は、 その先カン部 3 5が金属管 1 6を介して時計ケース本体 3 4に密着して密 着部 3 8が形成され、 その密着部 3 8に固相拡散接合部 4 dとロウ付け接合部 5 d の二つの接合部が形成されている。 なお、 第 7図は時計ケース本体 3 4、 先カン部 3 5及ぴ金属管 1 6を分解して示す時計ケース 4 1の斜視図である。 第 8図は第 7 図で先カン部 3 5が金属管 1 6を介して時計ケース本体 3 4に密着して形成される 密着部を 8— 8線で切断して示す断面図、 第 1 3図は第 7図に示す時計ケース本体 3 4と先カン部 3 5の密着部を形成する部分を第 8図の 1 3— 1 3線で切断して示 す断面図である。
時計ケース本体 3 4は、 時計ケース本体 1 4と比較して、 切欠き凹部 3 7が形成 されている点で異なり、 その他は同じ構成を有している。 その切欠き凹部 3 7は、 切欠き凹部 1 0と比較して、 嵌合穴 3 9の形成されている位置が異なり、 その他は 同じ構成を有している。 なお、 第 7図でも卷真孔の図示を省略している。 切欠き凹 部 3 7は、 当接面 3 7 a、 側壁面 3 7 b , 3 7 b及ぴ背面 3 7 cを有し、 その背面
3 7 cの略中央に嵌合穴 3 9が形成されている。 この嵌合穴 3 9は、 背面 3 7 cと' 垂直な方向に穿設され、 周壁面 3 9 aと底部 3 9 を有している。
先カン部 3 5は、 突出部 3 6が形成されている。 この突出部 3 6は、 横幅の寸法 が切欠き回部 3 7よりもわずかに大きく形成されている。 よって、 突出部 3 6は、 切欠き凹部 3 7に圧入され、 その側壁面 3 b, 3 6 bが側壁面 3 7 b , 3 7 bに 応力が作用した状態で接面する (圧接する) 。 また、 突出部 3 6は、 当接面 3 6 a、 側壁面 3 6 b , 3 6 b及ぴ正面 3 6 cを有し、 その正面 3 6 cの略中央に嵌合穴 4 2が形成されている。 嵌合穴 4 2は、 正面 3 6 cと垂直な方向に穿設され、 周壁面
4 2 aと底部 4 2 bを有している。 嵌合穴 3 9と嵌合穴 4 2は、 互いに穴径の大きさと深さが等しく、 突出部 3 6を 切欠き凹部 3 7に嵌め込んだ際に互いに対向する位置に形成されている。
金属管 1 6は、 外径が嵌合穴 3 9, 4 2の穴径よりも若干大きいので、 時計ケー ス本体 3 4と先カン部 3 5に圧入され、 その周壁面 1 6 cが周壁面 3 9 a, 4 2 a に応力が作用した状態で接面 (圧接) する。 また、 金属管 1 6は、 その長さが嵌合 穴 3 9 , 4 2の深さの和よりも短いから、 端面 1 6 a , 1 6 1)と底部3 9 13, 4 2 'bとが対面する恰好で配置され、 かつ嵌合穴 3 9 , 4 2の両方に跨って完全に収ま る。
時計ケース 4 1は、 固相拡散接合部 4 dが次の部分に形成されている。 すなわち、 固相拡散接合部 4 dは、 密着部 3 8内において、 金属管 1 6の周壁面 1 6 cと嵌合 穴 3 9 , 4 2の周壁面 3 9 a , 4 2 aとが接面している部分と、 突出部 3 6の側壁 面 3 6 b , 3 6 bと切欠き凹部 3 7の側壁面 3 7 b , 3 7 bとが接面している部分 に形成されている。 この固相拡散接合部 4 dでは、 その接面部分において、 素材を 構成する原子レベルのミクロ拡散が起こり微小な隙間がほぼ完全に消失している。 こうして、 側壁面 3 6 b , 3 6 bと側壁面 3 7 b , 3 7 bの'接面部分と、 周壁面 1 6 cと.周壁面 9 a , 1 2 aの接面部分とが隙間無く緊密かつ強固に接合している。 また、 ロウ付け接合部 5 bでは、 正面 3 6 cに付着した低融点ロウ材が、 熱処理 の過程で溶融して正面 3 6 cと背面 4 2 cの対面部分に存在する微小な隙間を埋め るように広がっており、 これにより、 先カン部 3 5と時計ケース本体 34とが接合 されている。
このように、 時計ケース 4 1は、 固相拡散接合部 4 dにより、 時計ケース本体 3 4と先カン部 3 5とが強固に接合されているので、 両者の接合状態を長期間維持し 得る丈夫さを備えている。 また、 低融点ロウ材によりロウ付け接合部 5 dを形成し ているから良好な耐蝕性を備え、 固相拡散接合が確実には行われていない場合があ つても、 接合状態を長期間維持し得る丈夫さを備えている。 2) 時計外装部品の製造方法
時計ケース 4 1は、 次のようにして製造する。 まず、 突出部 36の正面 3 6c に ペース ト状の低融点ロウ材を予め適量付着させる。 そして、 金属管 1 6を嵌合穴 3 9, 42に嵌め合わせつつ、 突出部 3 6を切欠き凹部 3 7に嵌め込み、 先カン部 3 5を外側から強い力で押し込む。 すると、 金属管 1 6は、 時計ケース本体 34と先 カン部 3 5に圧入される。 また、 正面 3 6 cと背面 42c とが互いに対面する格好 になる。 この時、 正面 3 6 cに付着したロウ材は背面 42c との間に形成される隙 間にある程度均一に広げられている。 また、 突出部 3 6が切欠き凹部 3 7に圧入さ れる。 そして、 その状態で時計ケース本体 34、 先カン部 3 5及び金属管 1 6を図 示しない真空装置内に収めて真空雰囲気に置き、 その中で加熱する熱処理工程を行 う。 すると、 固相拡散接合とロウ付け接合とが同時に行われて時計ケース本体 34 と先カン部 3 5とが金属管 1 6を介して固着し、 これらの部品が一体化する。
3) 時計外装部品の^実施例
次に、 上述した構成を有する時計ケース 4 1の具体的な実施例 (サンプル) につ いて説明する。
この実施例では、 時計ケース 4 1は、 ステンレス鋼 (SUS 304) 製時計ケー ス 34及ぴ先カン部 3 5と、 快削性ステンレス鋼 (SUS 3 1 6 F) 製金属管 1 6 とを固着して製造した。 時計ケース本体 34と先カン部 3 5の嵌合穴 3 9, 42は、 穴径を約 1. 8 ram φとし、 金属管 1 6は外径を約 1. 8 5 mm とした。 よって、 金属管 1 6を嵌合穴 3 9, 42に圧入する際の圧入代は、 約 1. 8 5mm<i>— 1. 8 mm φ = 0. 05 mm φ、 すなわち 5 0 A mとなる。
金属管 1 6は全長を約 4mmとし、 嵌合穴 3 9, 42の深さはともに 2. 1 mm どした。 よって、 嵌合穴 3 9, 4 2の深さの和は、 4. 2mmである。 金属管 1 6 は長さがこの深さの和よりも若干短いから、 嵌合穴 3 9, 42の内部に完全に収ま る。 また、 突出部 3 6の横幅の寸法を約 1 0. 0 5 mmとし、 切欠き凹部 37の横幅 の寸法を約 1 0 mmとした。 したがって、 突出部 3 6を切欠き凹部 3 7に圧入する 際の圧入代は、 約 1 0. 05 mm— 1 0 mm= 0. 05 mm φ、 すなわち 5 0 m となる。
ロウ付け接合部 5 成するため、 この実施例では、 金、 銀、 銅、 パラジウム 及ぴニッケルを主成分とし、 ガリウム、 インジウム、 錫のうち、 少なくとも 1'種類 以上の元素を含有するロウ材を使用する。. ここでは、 その主成分となる元素に、 ィ ンジゥム及ぴ錫を含有し、 Au : Ag : C u : P d : N i : I n : S nの組成比率 が、 5 6 : 1 8 : 8 : 5 : 5 : 3 : 5 (重量0 /。) となる AuAg Cu P dN i l n S n系のペースト状ロゥ材を使用した。 この口ゥ材は融点が時計ケース本体 34及 ぴ先カン部 3 5の素材 (ステンレス) の再結晶温度よりも低い低融点ロウ材であり、 その融点は約 6 6 0°Cである。
そして、 時計ケース 4 1を製造するため、 まず、 ロウ材をデイスペンサを用いて 約 2 1ほど正面 3 6 cに滴下して付着させた。 次いで、 金属管 1 6を嵌合穴 3 9, 1 2に嵌め合わせつつ、 突出部 3 6を切欠き凹部.3 7に圧入した後、 時計ケース本 体 3 4、 先カン部 3 5を真空装置内に収めて、 内部圧力を 5 X 1 0 - s T o r r (約 6. 7 X 1 0 3 P a) 程度に保持して真空雰囲気とし、 その中で熱処理を行 つた。 このとき、 熱処理の温度は約 8 0 0°Cに設定し、 熱処理時間は約 30分程度 にした。 すると、 時計ケース本体 34と先カン部 3 5は、 固相拡散接合部 4 dと口 ゥ付け接合部 5 dという二つの接合部が形成されて固着した。
こうして得られる時計ケース 41は、 時計ケース本体 3 4の密着部 38の周辺を 除く外観表面を予めホー二.ングとし、 先カン部 3 5はミラー面仕上げとしておき、 それから両者を固着して製造することができる。 すると、 上述の要領で製造した時 計ケース 4 1は、 時計ケース本体 34のホーニング面と先カン部 25のミラー面が シャープな界面を持って隣接するため、 新規なデザィンを得ることが可能であり、 デザインバリエーションを豊富にすることができる。
この時計ケース 4 1に対し、 第 3の実施の形態と同じ要領で CAS S試験を行つ たが、 試験の結果は良好であった。 特に腐食を起こすような元素を接合界面に含ん でいないためである。
なお、 この実施例のように、 ステンレス鋼同士を接合する場合の熱処理温度は、 第 3の実施の形態と同じでよい。
上述の各実施の形態では、 時計外装部品として、 時計ケース本体と竜頭パイプ、 時計ケース本体と先カン部を固着した時計ケースを例にとって説明したが、 この発 明による時計外装部品は、 このような時計ケースに限られない。 例えば、 この発明 は、 時計ケース本体と裏蓋を固着した時計外装部品、 時計ケース本体とベゼルを固 着した時計外装部品、 裏蓋と中子 (c a s i n g r i n g) を固着した時計外装 部品、 バンド部品同士を固着した時計外装部品等にも適用可能である。
また、 上述の各実施の形態では、 低融点口ゥ材として、 P d P t N i P., P d C u N i P , A Ag C uG e P d, AuAg Cu P dN i G a I n, A u A g C u P dN i I n S nからなるロウ材を使用したが、 低融点ロウ材はこれらに限られな レヽ。 例えば、 P d C u P t N i Pでもよく、 AuAg C u P dN iに、 Ga、 I n、 S nのうちのいずれか 1つ以上を添加したものとして、 AuAg Cu P dN i G a S nでもよい。
(表 1 ) 耐蝕性 防水信頼性 固定力. 比較例 1、試料 A
従来 f!l X 〇 . 〇
Agロウ付け 比較例 2、試料 B , .
従来例 〇 △ 〇 X プロジェクシヨン溶接 · 実施例 1、試料。
〇 〇 〇 〇 固相拡散接合 及ぴ
ロウ付け接合 実施例 2、試料。
〇 · 〇 O . 〇
• 固相拡散接合 及び .
ロウ付け接合
産業上の利用可能性
この発 S によれば、 固相拡散接合部を構成する各部品の接面部分が隙間無く緊密 かつ強固に接合しており、 また、 各部品がロウ付け接合部により接合されているた め、 その接合状態を長期間維持し得る'丈夫さとともに良好な耐蝕性を備え、 良好な .防水性を兼ね備えた時計外装部品を得ることができる。 また、 各部品を別々に形成 してそれぞれに所望の加工を施し、 その後に両者を固着して時計外装部品を得るこ とができるから、 外観の装飾性を良好にすることができるだけでなく、 デザインパ リエーシヨンが豊富になる。

Claims

請 求 の 範 囲 . 第 1の部品と第 2の部品とが固着された構成を有する時計外装部品であって、 前記第 2の部品が前記第 1の部品に密着した密着部に固相拡散接合部と口ゥ付 け接合部が形成されている とを特徴とする時計外装部品。
. 第 1の部品と第 2の部品とが固着された構成を有する時計外装部品であって、 前記第 2の部品に対応する孔部が前記第 1の部品に形成され、
前記第 2の部品が前記孔部に嵌合して該孔部に密着している部分に固相拡散接 合部と口ゥ付け接合部が形成されていることを特徴とする時計外装部品。
. 請求の範囲第 2項記載の時計外装部品において、
前記第 2の部品が径小部を有し、 かつ前記孔部が該径小部に対応する径小部を 有し、
前記第 2の部品の径小部が前記孔部の径小部に密着している部分に前記固相拡 散接合部が形成され、 その密着している部分以外の部分に前記口ゥ付け接合部が 形成されていることを特徴とする時計外装部品。
. 第 1の部品と第 2の部品とが固着された構成を有する時計外装部品であって、 . 前記第 1の部品に凹部が形成され、 かつ前記第 2の部品に該凹部に対応する突 出部が形成され、
前記突出部が前記凹部に嵌合して該凹部に密着している密着部に固相拡散接合 部とロウ付け接合部が形成されていることを特徴とする時計外装部品。
. 請求の範囲第 4項記載の時計外装部品において、
前記凹部と前記突出部に密着する第 3の部品を設け、 該第 3の部品が前記凹部 及び突出部に密着している部分に前記固相拡散接合部が形成され、 前記突出部が 前記凹部に密着している部分に前記口ゥ付け接合部が形成されていることを特徴 とする時計外装部品。
6 . 請求の範囲第 4項記載の時計外装部品において、
前記突出部の表面に金属膜が形成され、 該金属膜を介して前記突出部が前記凹 部に密着していることを特徴とする時計外装部品。
7 . 前記第 1の部品及ぴ第 2の部品の材質がステンレス鋼又はチタンであることを 特徴とする請求の範囲第 1項記載の時計外装部品。
8 . 前記第 1の部品及び第 2の部品の材質がステンレ 鋼又はチタンであることを 特徴とする請求の範囲第 2項記載の時計外装部品。
9 . 前記第 1の部品及ぴ第 2の部品の材質がステンレス鋼又はチタンであることを 特徴とする請求の範囲第 4項記載の時計外装部品。
1 0 . 前記第 1の部品が時計ケース本体であり、 前記第 2の部品が竜頭パイ であ • ることを特徴とする請求の範囲第 1項記載の時計外装部品。
1 1 . 前記第 1の部品が時計ケース本体であり、 前記第 2の部品が竜頭パイプであ ることを特徴とする請求の範囲第 2項 IB载の時計外装部品。
1 2 . 前記第 1の部品が時計ケース本体であり、 前記第 2の部品が先力ン部である ことを特徴とする請求の範囲第 1項記載の時計外装部品。
1 3 . 前記第 1の部品が時計ケース本体であり、 前記第 2の部品が先カン部である ことを特徴とする請求の範囲第 4項記載の時計外装部品。
1 4 . 前記口ゥ付け接合部が低融点口ゥ材により形成されていることを特徴とする 請求の範囲第 1項記載の時計外装部品。
1 5 . 前記ロウ付け接合部が低融点ロウ材により形成されていることを特徴とする 請求の範囲第 2項記載の時計外装部品。
1 6 . 前記ロウ付け接合部が低融点ロウ材により形成されていることを特徴とする ■ 請求の範囲第 4項記載の時計外装部品。
1 7 . 前記ロウ付け接合部がパラジウム、 白金、 ニッケル及ぴリンを主成分とする 口ゥ材又はパラジウム、 銅、 ニッケル及ぴリンを主成分とするロウ材により形成 されていることを特徵とする請求の範囲第 1項記載の時計外装部品。
8 . 前記ロウ付け接合部がパラジウム、 白金、 ニッケル及びリンを主成分とする ロウ材又はパラジウム、 銅、 ニッケル及びリンを主成分とするロウ材により形成 されていることを特徴とする請求の範囲第 2項記載の時計外装部品。
9 . 前記ロウ付け接合部が金、 銀、 銅、 ゲルマニウム及ぴパラジウムを主成分と するロウ材により形成されていることを特徴とする請求の範囲第 1項記載の時計 外装部品。
0 . 前記ロウ付け接合部が金、 銀、 銅、 ゲルマニウム及びパラジウムを主成分と するロウ材により形成されていることを特徴とする請求の範囲第 4填記載の時計 外装部品。
1 . 前記ロウ付け接合部が金、 銀、 銅、 パラジウム及びニッケルを主成分とし、 ガリウム、 インジウム、 錫のうち、 少なくとも 1種類以上の元素を含有するロウ 材により形成されていることを特徴とする請求の範囲第 1項記載の時計外装部品。 2 . 前記ロウ付け接合部が金、 銀、 銅、 パラジウム及ぴニッケルを主成分とし、 ガリゥム、 ィンジゥム、 錫のうち、 少なくとも 1種類以上の元素を含有する口ゥ 材により形成されていることを特徴とする請求の範囲第 4項記載の時計外装部品。
3 . 第 1の部品と第 2の部品とを固着して時計外装部品を製造する時計外装部品 の製造方法であって、 - 前記第 2の部品にロウ材を付着する工程と、
前記第 2の部品が前記第 1の部品に密着した密着部の中に固相拡散接合部と口 ゥ付け接合部を形成する工程とを有することを特徴とする時計外装部品の製造方 法。
4 . 第 1の部品と第 2の部品とを固着して時計外装部品を製造する時計外装部品 の製造方法であって、
前記第 2の部品にロウ材を付着する工程と、 前記第 2の部品の前記ロウ材を付着した部分以外の部分を前記第 1の部品に圧 接させる圧接工程と、
前記第 2の部品の前記口ゥ材を付着した部分を前記第 1の部品に対面させる対 面工程とを有し、
前記圧接工程及び対面工程の後に、 前記第 1の部品と第 2の部品を加熱する熱 処理工程を有することを特徴とする時計外装部品の製造方法。
5 . 第 1の部品と第 2の部品とを固着して時計外装部品を製造する時計外装部品 の製造方法であって、
前記第 2の部品にロウ材を付着する工程と、
前記第 2の部品の前記口ゥ材を付着した部分以外の部分と前記第 1の部品とに 第 3の部品を圧接させる圧接工程と、
- 前記第 2の部品の前記ロウ材を付着した部分を前記第 1の部品に对面させる対 面工程とを有し、
前記圧接工程及ぴ対面工程の後に、 前記第 1の部品、 第 2の部品及ぴ第 3の部 品を加熱する熱処理工程を有することを特徵とする時計外装部品の製造方法。 6 . 前記圧接工程を、 前記第 2の部品を前記第 1の部品に圧入して行うことを特 徴とする請求の範囲第 2 4項記載の時計外装部品の製造方法。
7 . 前記圧接工程を、 前記第 3の部品を前記第 1の部品と前記第 2の部品に圧入 して行うことを特徴とする請求の範囲第 2 5項記載の時計外装部品の製造方法。 8 . 前記ロウ材を付着する工程を、 ペース ト状ロウ材をデイスペンサで付着して 行うことを特徴とする請求の範囲第 2 3項記載の時計外装部品の製造方法。 9 . 前記ロウ材を付着する工程を、 ペース ト状ロウ材をデイスペンサで付着して 行うことを特徴とする請求の範囲第 2 4項記載の時計外装部品の製造方法。 0 . 前記ロウ材を付着する工程を、 ペース ト状ロウ材をデイスペンサで付着して 行うことを特徴とする請求の範囲第 2 5項記載の時計外装部品の製造方法。
1 . 前記第 1の部品と第 2の部品の素材としてチタンを用い、 前記熱処理工程で加熱するときの温度が約 6 0 0 °C以上釣 8 5 0 °C以下である ことを特徴とする請求の範囲第 2 3項記載の時計外装部品の製造方法。
2 . 前記第 1の部品と第 2の部品の素材としてチタンを用い、
前記熱処理工程で加熱するときの温度が約 6 0 0 °C以上約 8 5 0 °C以下である ことを特徴とする請求の範囲第 2 4項記載の時計外装部品の製造方法。
3 . 前記第 1の部品と第 2の部品の素材としてチタンを用い、
前記熱処理工程で加熱するとき 温度が約 6 0 0 °C以上約 8 5 0 °C以下である ことを特徴とする請求の範囲第 2 5項記載の時訐外装部品の製造方法。
4 . 前記第 1の部品と第 2の部品の素材としてステンレス鋼を用い、
前記熱処理工程で加熱するときの温度が約 6 0 0 °C以上約 9 0 0 °C以下である ことを特徴とする請求の範囲第 2 3項記載の時計外装部品の製造方法。
5 . 前記第 1の部品と第 2の部品の素材としてステンレス鋼を用い、
前記熱処理工程で加熱するときの温度が約 6 0 0 °C以上約 9 0 0 °C以下である ことを特徴とする請求の範囲第 2 4項記載の時計外装部品の製造方法。
6 . 前記第 1の部品と第 2の部品の素材としてステン,レス鋼を用い、
前記熱処理工程で加熱するときの温度が約 6 0 0 °C以上約 9 0 0 °C以下である ことを特徴とする請求の範囲第 2 5項記載の時計外装部品の製造方法。
7 . 請求の範囲第 2 4項記載の時計外装部品の製造方法において、
前記第 2の部品に口ゥ材を付着する工程よりも前に、 該第 2の部品のロウ材を 付着する部分以外の部分に金属膜を形成する工程を有することを特徴とする時計 外装部品の製造方法。
PCT/JP2002/009374 2001-09-21 2002-09-12 Boîtier de montre et procédé de fabrication WO2003027777A1 (fr)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP02799365A EP1439434B1 (en) 2001-09-21 2002-09-12 Timepiece external part and method of manufacturing the part
DE60221874T DE60221874T2 (de) 2001-09-21 2002-09-12 Externes teil einer uhr und verfahren zu herstellung des teils
JP2003531260A JP4176636B2 (ja) 2001-09-21 2002-09-12 時計外装部品及びその製造方法
US10/490,288 US6935774B2 (en) 2001-09-21 2002-09-12 Timepiece external part and method of manufacturing the part

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2001/288392 2001-09-21
JP2001288392 2001-09-21

Publications (1)

Publication Number Publication Date
WO2003027777A1 true WO2003027777A1 (fr) 2003-04-03

Family

ID=19111052

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2002/009374 WO2003027777A1 (fr) 2001-09-21 2002-09-12 Boîtier de montre et procédé de fabrication

Country Status (6)

Country Link
US (1) US6935774B2 (ja)
EP (1) EP1439434B1 (ja)
JP (1) JP4176636B2 (ja)
CN (1) CN100407078C (ja)
DE (1) DE60221874T2 (ja)
WO (1) WO2003027777A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012042675A1 (ja) * 2010-10-01 2012-04-05 パイオニア株式会社 スピーカ装置

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006022601A1 (de) * 2006-05-15 2007-11-22 Siemens Ag Verfahren zum Herstellen eines Körpers
CN100590552C (zh) * 2006-06-01 2010-02-17 杨带珍 具有独立表壳耳的人造水晶玻璃外表壳及其制造方法
US20100267361A1 (en) * 2009-03-20 2010-10-21 Guardianlion Wireless, LLC Monitoring device and system
EP2431825A1 (de) * 2010-09-16 2012-03-21 Thomas Gneuss Uhrengehäuse
CN102266993B (zh) * 2011-07-13 2013-07-17 中山源谥真空科技有限公司 一种钛或钛合金手表部件间接合的处理方法
EP2628607B1 (fr) * 2012-02-15 2016-08-03 Omega SA Dispositif d'ancrage d'une incrustation métallique
EP2667265A1 (fr) * 2012-05-22 2013-11-27 The Swatch Group Research and Development Ltd. Composant d'habillage d'horlogerie bi-métal brasé
EP2672337B1 (fr) * 2012-06-06 2019-08-07 Glashütter Uhrenbetrieb GmbH Dispositif de fixation amovible et pivotant pour bracelet
EP2728422A1 (fr) * 2012-11-06 2014-05-07 The Swatch Group Research and Development Ltd. Composant d'habillage d'horlogerie bi-métal soudé
CN103345140A (zh) * 2013-07-05 2013-10-09 长兴兰红手工艺绣品厂 一种竹编工艺挂钟
CN104407509A (zh) * 2014-01-24 2015-03-11 珠海罗西尼表业有限公司 手表及其制造方法
CN108135335B (zh) * 2016-09-22 2020-01-31 华为技术有限公司 表带连接件、表带及手表
CN106873351A (zh) * 2016-12-19 2017-06-20 深圳金王金技术开发有限公司 一种手表部件的制备方法及其制备的手表部件
EP3432084B1 (fr) * 2017-07-20 2020-09-16 Omega SA Soupape de sécurité pour montre
US10809666B2 (en) * 2018-05-22 2020-10-20 Fitbit, Inc. Low-profile band latch mechanism
JP6913306B2 (ja) * 2019-04-01 2021-08-04 カシオ計算機株式会社 外装部材、ケースおよび時計

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5520403A (en) * 1978-07-20 1980-02-13 Seiko Epson Corp Soldering material of armor part for portable watch
JPS55120803A (en) * 1979-03-10 1980-09-17 Citizen Watch Co Ltd Adhering of watch case and band
JPS55161293U (ja) * 1979-05-04 1980-11-19
JPS56103380A (en) * 1980-01-22 1981-08-18 Seiko Instr & Electronics Ltd Production of timepiece parts
JPS5975181A (ja) * 1982-10-22 1984-04-27 Citizen Watch Co Ltd 時計外装部品の接合方法
JPS63168585A (ja) * 1986-12-29 1988-07-12 Namiki Precision Jewel Co Ltd 時計枠用加工素材およびその製造方法
JPH0443288U (ja) * 1990-08-16 1992-04-13
JPH0523871A (ja) * 1991-07-22 1993-02-02 Seiko Instr Inc チタンまたはチタン合金と金合金の接合体と接合方法
JPH05220849A (ja) * 1992-02-17 1993-08-31 Seiko Instr Inc 接合体および接合方法
JP2000271675A (ja) * 1999-01-22 2000-10-03 Toyota Motor Corp 2部材の接合方法
WO2002023283A1 (fr) * 2000-09-13 2002-03-21 Citizen Watch Co., Ltd. Boitier de montre bracelet et procede de fixation de conduit de ce boitier

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2370545A1 (fr) * 1976-11-12 1978-06-09 Snecma Procede d'assemblage par brasage-diffusion et articles obtenus
JPS55161293A (en) 1979-06-01 1980-12-15 Nippon Musical Instruments Mfg Effect sound generator
GB2094034B (en) * 1981-02-20 1985-01-30 Citizen Watch Co Ltd Structure of watch case
JPS58160373U (ja) * 1982-04-20 1983-10-25 シチズン時計株式会社 防水時計ケ−スの裏蓋構造
JPS60228666A (ja) 1984-04-25 1985-11-13 Citizen Watch Co Ltd 時計外装部品の製造方法
DE3535541A1 (de) * 1984-10-08 1986-04-10 Nippon Gakki Seizo K.K., Hamamatsu, Shizuoka Plattiertes material fuer zieranwendungen und verfahren zu dessen herstellung
JPS61160685A (ja) 1985-01-08 1986-07-21 Katsunori Tanada 油圧ロツクバルブ
JPS61180685A (ja) * 1985-02-04 1986-08-13 Yamamoto Seisakusho:Kk 装飾用外装基体への付属部品の接合方法
JP2917423B2 (ja) 1990-06-11 1999-07-12 大同特殊鋼株式会社 真空溶解炉
JPH07231802A (ja) * 1993-12-27 1995-09-05 Citizen Watch Co Ltd 腕時計における連結構造
US6027575A (en) * 1997-10-27 2000-02-22 Ford Motor Company Metallic adhesive for forming electronic interconnects at low temperatures
KR20010043047A (ko) * 1999-02-26 2001-05-25 하루타 히로시 손목 시계 케이스
JP3493328B2 (ja) * 1999-11-19 2004-02-03 京セラ株式会社 時計枠

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5520403A (en) * 1978-07-20 1980-02-13 Seiko Epson Corp Soldering material of armor part for portable watch
JPS55120803A (en) * 1979-03-10 1980-09-17 Citizen Watch Co Ltd Adhering of watch case and band
JPS55161293U (ja) * 1979-05-04 1980-11-19
JPS56103380A (en) * 1980-01-22 1981-08-18 Seiko Instr & Electronics Ltd Production of timepiece parts
JPS5975181A (ja) * 1982-10-22 1984-04-27 Citizen Watch Co Ltd 時計外装部品の接合方法
JPS63168585A (ja) * 1986-12-29 1988-07-12 Namiki Precision Jewel Co Ltd 時計枠用加工素材およびその製造方法
JPH0443288U (ja) * 1990-08-16 1992-04-13
JPH0523871A (ja) * 1991-07-22 1993-02-02 Seiko Instr Inc チタンまたはチタン合金と金合金の接合体と接合方法
JPH05220849A (ja) * 1992-02-17 1993-08-31 Seiko Instr Inc 接合体および接合方法
JP2000271675A (ja) * 1999-01-22 2000-10-03 Toyota Motor Corp 2部材の接合方法
WO2002023283A1 (fr) * 2000-09-13 2002-03-21 Citizen Watch Co., Ltd. Boitier de montre bracelet et procede de fixation de conduit de ce boitier

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP1439434A4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012042675A1 (ja) * 2010-10-01 2012-04-05 パイオニア株式会社 スピーカ装置

Also Published As

Publication number Publication date
US20040233795A1 (en) 2004-11-25
CN100407078C (zh) 2008-07-30
JPWO2003027777A1 (ja) 2005-01-13
CN1556940A (zh) 2004-12-22
JP4176636B2 (ja) 2008-11-05
DE60221874D1 (de) 2007-09-27
EP1439434B1 (en) 2007-08-15
DE60221874T2 (de) 2008-01-17
US6935774B2 (en) 2005-08-30
EP1439434A4 (en) 2005-02-16
EP1439434A1 (en) 2004-07-21

Similar Documents

Publication Publication Date Title
WO2003027777A1 (fr) Boîtier de montre et procédé de fabrication
US7951444B2 (en) Multi-stage enamelled dial
EP0098795B1 (fr) Pièce d&#39;horlogerie et son procédé de fabrication
JP2015525338A (ja) 時計のろう付けバイメタル外装部品
US4433921A (en) Watch crystal bonded to watch case with low temperature solder material
EP3309624B1 (fr) Procédé d&#39;assemblage de composants horlogers
WO2020148626A1 (fr) Procédé de brasage de composants horlogers
JP6078161B2 (ja) 溶接バイメタル時計外部構成部品
KR20020060229A (ko) 손목시계 케이스 및 손목시계 케이스에 대한 파이프의고정 방법
JP4754122B2 (ja) 腕時計部品の製造方法
EP1538493B1 (fr) Cadran émaillé avec pieds chassés et son procédé de fabrication
JPH04122885A (ja) 時計ケース及びその製造方法
JP2956493B2 (ja) 時計用外装部品及びその製造方法
JP2006304956A (ja) 金属バンド
JPS61180685A (ja) 装飾用外装基体への付属部品の接合方法
JP2002010813A (ja) 装身具用ピンの取付構造
JPS63249085A (ja) 時計用ケ−スの構造
JPS5861268A (ja) 時計用ケ−ス
JPH0926485A (ja) 白金合金時計外装部品の製造方法
JPS5833457A (ja) 異質金属の複合金属板材
CH696987A5 (fr) Cadran émaillé avec pieds fixes et son procédé de fabrication
JPS6342375Y2 (ja)
JP3975785B2 (ja) 時計用白色系指針および時計
JP2018191754A (ja) 線芯材と装身具用飾り部品の一体化構造、指輪並びにブレスレット
JPH0442985B2 (ja)

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): CN JP

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FR GB GR IE IT LU MC NL PT SE SK TR

DFPE Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101)
121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2003531260

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 20028183673

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 10490288

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2002799365

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 2002799365

Country of ref document: EP

WWG Wipo information: grant in national office

Ref document number: 2002799365

Country of ref document: EP