CN103039147A - Reclamation method for sunk paddy field caused by mining in mountainous regions - Google Patents

Reclamation method for sunk paddy field caused by mining in mountainous regions Download PDF

Info

Publication number
CN103039147A
CN103039147A CN2013100037143A CN201310003714A CN103039147A CN 103039147 A CN103039147 A CN 103039147A CN 2013100037143 A CN2013100037143 A CN 2013100037143A CN 201310003714 A CN201310003714 A CN 201310003714A CN 103039147 A CN103039147 A CN 103039147A
Authority
CN
China
Prior art keywords
soil
paddy field
mound
crack
field
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100037143A
Other languages
Chinese (zh)
Other versions
CN103039147B (en
Inventor
胡振琪
李晓静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201310003714.3A priority Critical patent/CN103039147B/en
Publication of CN103039147A publication Critical patent/CN103039147A/en
Application granted granted Critical
Publication of CN103039147B publication Critical patent/CN103039147B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The invention relates to a reclamation method for a sunk paddy field caused by mining in mountainous regions and belongs to the technical field of improvement and utilization of environment, ecology and damaged fields. The method includes: performing topsoil stripping to fissured positions where fissures are created by mining sinking and lead to water leakage of the paddy field; covering water holding materials on fissured areas after topsoil stripping; compacting the covered water holding materials, pouring slurry and standing; performing topsoil backfilling and grinding to the fissured areas after slurry pouring and standing, and flattening to enable the fissured areas to be a whole with pieces of the paddy field around the fissured areas; and irrigating, nourishing and improving the paddy field after backfilling and grinding. By the method, the cultivation land where the fissures are created by mining sinking and lead to water leakage of the paddy field can restore the paddy field utilization mode and reach production level of a normal paddy field as soon as possible, a stable self-maintaining farmland ecological system can be formed, a paddy field protecting system can be formed, soil microbial content can be increased, physicochemical property of soil can be improved, and benign farmland ecological system circulation can be formed.

Description

Coal-mining subsidence paddy field, a kind of mountain region reclamation method
Technical field
The invention belongs to environment, ecology and abandoned land and administer and utilize technical field, particularly crack, mountain region coal-mining subsidence paddy field reclamation method.
Background technology
China coal resource distribution mainly be distributed in, east, the west area, the coal resources important distribution of its southwest and center area in Yunnan, the ground such as Guizhou, Chongqing, Sichuan, the southwest is the most widely one of area of rice in China distribution simultaneously, is the larger coal of Chinese area-grain recombination region.Taking, damage a large amount of arable lands in the progress of coal mining has been undisputable fact.National economic development and human survival unavoidably display in each coal-grain recombination region area the contradiction of the requirement of grain-production.Coordinate contradiction between the two, in the short economic development of coal mining, guarantee grain-production on the ground normally carry out most important.
Mountain Area of Southwests such as Chongqing, Yunnan-Guizhou, the infringement of coal-mining subsidence ground causes that a large amount of soils are destroyed, such as surface subsidence hole, crack etc., wherein coal-mining subsidence ground causes the crack, paddy field, and it is comparatively general to cause the normal grain-production function of destruction of leaking, and damage area, the automatic recovery ability of dependence farmland system can't be realized its reparation.Think that the major part paddy field leakage cause that leaks is that the crack causes under the earth's surface, because coal-mining subsidence affects the paddy field topsoil and the crack occurs, causes the moisture holding capacity of paddy field topsoil destroyed through initial analysis, the paddy field leaks.Determine to leak under the prerequisite of position, consider the factor kept of environment and field ecosystem, the crack, coal-mining subsidence paddy field of reclaiming is crucial.At present in the theoretical research in this field and actual repair, all do not have good conclusion or way, thus crack, paddy field, coal-mining subsidence ground, mountain area reclaim be present coal-mining subsidence the emphasis of reclaiming, also be a job highly significant.
The applicant for the seimic arable land that subsides, invents a kind of reclamation method of subsided farm land after earthquake disaster, and patented power, and the method for this patent disclosure comprises: topsoil stripping is carried out in the seimic arable land that subsides; The zone that subsides after peeling off is filled and preliminary shaping; Isolated material is carried out in the zone that subsides after the preliminary shaping to be covered and rolls; To the regional earthing that subsides behind the covering isolated material, further shaping; The biological modification engineering is carried out in the zone that subsides after the earthing shaping.This invention can make the arable land that is subjected to eaerthquake damage recover to utilize and reach as early as possible the higher level level of production, form the stable field ecosystem of certainly keeping, improve edaphon content, the physicochemical property of improvement soil, form the advantages such as optimum field ecosystem circulation, but be applied in obvious deficiency is arranged in the coal mining subsidence area paddy field: aspect reclaiming in the paddy field that leaks, do not relate to; Detailed not etc. aspect the native protection at table.
Summary of the invention
The objective of the invention is for solving an above-mentioned difficult problem, a kind of Mountain Area of Southwest coal-mining subsidence paddy field reclamation method is proposed, being intended to administer coal-mining subsidence causes the crack and causes the arable land that the paddy field leaks, and rebuild paddy field, depression ground stable certainly keep field ecosystem, form the paddy field water retention system, improve edaphon content, the physicochemical property of improvement soil forms optimum field ecosystem circulation.
Crack, a kind of Mountain Area of Southwest coal-mining subsidence paddy field reclamation method that the present invention proposes is characterized in that, may further comprise the steps:
1) leak crack place, coal-mining subsidence paddy field, mountain region is carried out topsoil stripping: peel off the leak table soil at top, crack and edge of paddy field, cover thickness is 40-80cm, choose table mound plot point stored table soil around in the topsoil stripping district, and be divided into 2 kinds of table of upper and lower layer mound according to the amount of cure of peeling off soil layer, upper strata table mound is deposited the mellow soil that cover thickness is 0-35cm; Lower floor's table mound is deposited the soil that cover thickness is 35-80cm; The table soil of peeling off is deposited in respectively corresponding table mound plot point place according to its degree of depth of peeling off, forms upper and lower layer table mound;
2) water-keeping material covers and compacting: water-keeping material is covered in the crack district after step 1) is processed form cover layer, water-keeping material is mainly mixed by bentonite and soil, bentonite: the volume ratio of soil is 1:(1-4); With the cover layer compacting, the thickness after the cover layer compacting is 10-30cm;
3) annotating mud at cover layer leaves standstill: in step 2) crack district cover surface after processing injects mud and leaves standstill, and depth of mud left standstill 10-20 days for flooding cover layer 3-10cm; The mud raw material is the soil of lower floor's table mound;
4) table earthen backfill and roll smooth: the crack district after step 3) processed, carry out the earthen backfill of twice table, the order of backfill is for successively fetching earth from lower floor's table mound and upper strata table mound; In the soil course of backfill lower floor table mound, every backfill 20cm carries out rolling for 1-3 time, the height distance crack district peripheral ground 20-40cm after backfill is rolled; In the mellow soil process of backfill upper strata table mound, integral body is carried out smooth and is rolled for 1 time; Recovery or newly-built destroyed drainage and irrigation project and the bank protection of field protect bank simultaneously;
5) improvement engineering: to the paddy field after the step 4) processing, carry out raised path through fields shutoff, reduce paddy field field moisture flow measurement; Secondly to the continuous 5-15 of field days flood irrigation, make the soil moisture content of field be tending towards saturated; Sow local rice varieties season in sowing, keep the 2-3 ploughing.
Characteristics of the present invention and beneficial effect:
1) by flood irrigation and ploughing in water-keeping material covering, cover surface perfusion mud, the improvement engineering, form 3 layers of water resisting protection layer in the soil, and the structure of water resisting protection layer utilizes original soil as far as possible and utilizes in right amount the bentonite that agricultural production is gained everything and lose nothing.The method applicability and operability have greatly been improved.
2) will show soil protection and be divided into upper strata table mound and the long-pending form of lower floor's table mound two kinds of tables mound, pile up for the convenience of Reclamation Engineering adopts nearby multiple spot in field simultaneously; The selection of time of simultaneously Reclamation Engineering enforcement can finish in the month at 1-3 according to design in farm slack season, reduced the long-pending time of table mound, the very big loss that reduces the native nutriment of table.
3) covering the water-keeping material position is topsoil stripping, and the following 30-80cm in earth's surface place is the rice root lower space, avoids affecting paddy rice as far as possible and normally produces.
4) with protection table soil, cover water-keeping material, the Developing method is optimized and organically blend, can have the efficient recovery depression to plough and recover to utilize and improvement field biological environment; And rebuild the depression paddy field stable certainly keep field ecosystem, Reasonable Protection land resources, society, economy and environment high efficiency;
5) for destroying rear the reparation, the growing environments aquatic, the semi-aquatic crop such as paddy rice provide a kind of practical and technical methods of being convenient to promote.
To sum up, the present invention is directed to the paddy field and leak, the water barrier in the emphasis reconstruct soil, next the present invention adopts layer in the protection of table soil, and top layer mellow soil protection is paid attention in table soil protection relatively before more.
Description of drawings
Fig. 1 is terraced fields topsoil stripping schematic diagram of the present invention.
Fig. 2 is Reclaimed Soil sectional structural map of the present invention.
Embodiment
The present invention proposes the specific embodiment of crack, coal-mining subsidence paddy field, a kind of Southwest China mountain region reclamation method, is described with reference to the accompanying drawings as follows:
The present invention the site inspection in the paddy field that leaks with at first carrying out depression before reclaiming.Determine to cause paddy field leak crack location and scope, and investigation plot of living in, crack environment, design table mound seated position is calculated the backfill amount of water-keeping material and soil, modulation mud, and the reparation of reclaiming.1-3 month carry out before for winter in evening or the early spring rice growing embodiment engineering repair time of crack, Mountain Area of Southwest coal-mining subsidence paddy field of the present invention reclamation method, utilizes afterwards the biological means ability that further improves and resume production.Concrete steps are as follows:
1) leak crack place, coal-mining subsidence paddy field, mountain region is carried out topsoil stripping: peel off the leak table soil at top, crack and edge of paddy field, cover thickness is 50-70cm, choose table mound plot point stored table soil around in the topsoil stripping district, the table mound is conical, be divided into 2 kinds of table mounds, be divided into upper strata table mound according to the amount of cure of peeling off soil layer, deposit the mellow soil that cover thickness is 0-35cm; Lower floor's table mound is deposited the soil that cover thickness is 35-70cm.The table soil of peeling off is deposited in respectively corresponding table mound plot point place according to its degree of depth of peeling off; Show the concrete stacking of soil as shown in Figure 1, the terraced fields of same level are as a unit in charge of construction, shown in the square frame of Fig. 1; Measure distribution situation in unit in charge of construction internal fissure district shown in 11 among Fig. 1,12,13,14,15,16,17,18, totally 8 cracks district, according to the crack zone position, select to stack point, the stacking point in crack 11 is upper strata table mound 111 and lower floor's table mound 112 as shown in Figure 1; The stacking point in crack 12 is upper strata table mound 121 and lower floor's table mound 122; The stacking point in crack 13 is upper strata table mound 131 and lower floor's table mound 132; It is upper strata table mound 141 and lower floor's table mound 142 that crack 14 and crack 15 share the stacking point; It is upper strata table mound 161 and lower floor's table mound 162 that crack 16 and crack 18 share the stacking point; The stacking point in crack 17 is upper strata table mound 171 and lower floor's table mound 172.
2) water-keeping material covers and compacting: water-keeping material is covered in the crack district after step 1) is processed form cover layer, water-keeping material mainly mixes bentonite by the soil of bentonite and lower floor's table mound: the volume ratio of soil is 1:(2-4); With the cover layer compacting, the thickness after the cover layer compacting is 20-30cm, and the unit weight of water-keeping material reaches 1.4-2.0g/cm after the compacting 3If the cover layer area is Scm 2, calculate to cover need thus soil amount 28Sg-60Sg, and according to the unit weight 1.3-1.4g/cm of filling soil 3, the thickness that calculates the water-keeping material before the compacting is 20-46cm, and stirs also compacting in order to save acting for the water-keeping material water distribution, water-keeping material: the volume ratio of water is 1:(0.3-2).Even for guaranteeing compacting, realizations that come into force of water-keeping material effect be left standstill 24-48 hour after the need water distribution, and to the compacting material compaction in layers.The acting amount of compacting is 200-600 kilojoule/m 3
This step can form lower floor's water resisting protection layer.
3) annotating mud at cover layer leaves standstill: in step 2) crack district cover surface after processing injects mud and leaves standstill, and depth of mud left standstill 10-20 days for flooding cover layer 3-10cm; The mud raw material is the soil of lower floor table mound, configure water-keeping material after, lower floor's table mound soil surplus is greater than 20%.Therefore the part residue of lower floor's table mound covered on the water-keeping material, and utilize giant to make its thorough stirring, can form mud.
The purpose that the soil water filling stir is formed mud be so that in the soil clay in the process of leaving standstill by the effect stratified sedimentation of moisture, glutinous grain interacts and forms an impermeable stratum.This step can form middle level water resisting protection layer.
4) table earthen backfill and roll smooth: the crack district after step 3) processed, carry out the earthen backfill of twice table, the order of backfill is for successively fetching earth from lower floor's table mound and upper strata table mound; In the soil course of backfill lower floor table mound, every backfill 20cm carries out rolling for 1-3 time, the height distance crack district peripheral ground 30cm after backfill rolls; In the mellow soil process of backfill upper strata table mound, integral body is carried out smooth and is rolled for 1 time; Recovery or newly-built destroyed drainage and irrigation project and the bank protection of field protect bank simultaneously;
5) improvement engineering: to the paddy field after the step 4) processing, carry out raised path through fields shutoff, reduce paddy field field moisture flow measurement; Secondly to the continuous 5-15 of field days flood irrigation, make the soil moisture content of field be tending towards saturated; Sow again and sow local rice varieties season, keep the 2-3 ploughing.Promote gradually migration downwards of the glutinous grain of soil in the field, and below rice root, form tillage pan, reduce the downward seepage flow of moisture in the paddy field.
This step forms upper strata water resisting protection layer carrying out the process that agricultural planting increases soil fertility, and strengthens the paddy field effect of reclaiming.
The Reclaimed Soil profile construction of the inventive method as shown in Figure 2; be that lower floor's water resisting protection layer 22, mud sediment formation middle level water resisting protection layer 23, the lower floor's table mound backfill that engineering does not relate to undisturbed soil 21, water-keeping material formation is lower floor's topsoil 24 from bottom to up; thickness is that 5-10cm and upper strata table mound backfill are upper strata topsoil 25, and thickness is 30cm.The improvement engineering forms the bottom that upper strata water resisting protection layer 251(is positioned at upper strata table soil, and after the improvement engineering, the underwater cultivation degree of depth is following 15-25cm place, earth's surface, ploughs through the ox of 2-3, and meeting is formation water resisting protection layer bottom plow layer, and namely 251).

Claims (1)

1. coal-mining subsidence paddy field, mountain region reclamation method is characterized in that:
1) leak crack place, coal-mining subsidence paddy field, mountain region is carried out topsoil stripping: peel off the leak table soil at top, crack and edge of paddy field, cover thickness is 40-80cm, choose table mound plot point stored table soil around in the topsoil stripping district, and be divided into 2 kinds of table of upper and lower layer mound according to the amount of cure of peeling off soil layer, upper strata table mound is deposited the mellow soil that cover thickness is 0-35cm; Lower floor's table mound is deposited the soil that cover thickness is 35-80cm; The table soil of peeling off is deposited in respectively corresponding table mound plot point place according to its degree of depth of peeling off, forms upper and lower layer table mound;
2) water-keeping material covers and compacting: water-keeping material is covered in the crack district after step 1) is processed form cover layer, water-keeping material is mainly mixed by bentonite and soil, bentonite: the volume ratio of soil is 1:(1-4); With the cover layer compacting, the thickness after the cover layer compacting is 10-30cm;
3) annotating mud at cover layer leaves standstill: in step 2) crack district cover surface after processing injects mud and leaves standstill, and depth of mud left standstill 10-20 days for flooding cover layer 3-10cm; The mud raw material is the soil of lower floor's table mound;
4) table earthen backfill and roll smooth: the crack district after step 3) processed, carry out the earthen backfill of twice table, the order of backfill is for successively fetching earth from lower floor's table mound and upper strata table mound; In the soil course of backfill lower floor table mound, every backfill 20cm carries out rolling for 1-3 time, the height distance crack district peripheral ground 20-40cm after backfill is rolled; In the mellow soil process of backfill upper strata table mound, integral body is carried out smooth and is rolled for 1 time; Recovery or newly-built destroyed drainage and irrigation project and the bank protection of field protect bank simultaneously;
5) improvement engineering: to the paddy field after the step 4) processing, carry out raised path through fields shutoff, reduce paddy field field moisture flow measurement; Secondly to the continuous 5-15 of field days flood irrigation, make the soil moisture content of field be tending towards saturated; Sow local rice varieties season in sowing, keep the 2-3 ploughing.
CN201310003714.3A 2013-01-06 2013-01-06 Reclamation method for sunk paddy field caused by mining in mountainous regions Active CN103039147B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310003714.3A CN103039147B (en) 2013-01-06 2013-01-06 Reclamation method for sunk paddy field caused by mining in mountainous regions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310003714.3A CN103039147B (en) 2013-01-06 2013-01-06 Reclamation method for sunk paddy field caused by mining in mountainous regions

Publications (2)

Publication Number Publication Date
CN103039147A true CN103039147A (en) 2013-04-17
CN103039147B CN103039147B (en) 2014-12-31

Family

ID=48052199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310003714.3A Active CN103039147B (en) 2013-01-06 2013-01-06 Reclamation method for sunk paddy field caused by mining in mountainous regions

Country Status (1)

Country Link
CN (1) CN103039147B (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103283335A (en) * 2013-05-22 2013-09-11 中国矿业大学(北京) Filling reclamation method for reclaiming coal mining subsidence lands by Yellow River sediment
CN103741698A (en) * 2014-01-23 2014-04-23 西安科技大学 Loess hilly-and-gully area coal-mining subsidence and crevice treatment method
CN104499469A (en) * 2015-01-06 2015-04-08 西安科技大学 Novel method applicable to treatment of seasonal waterlogged coal-mining subsidence land
CN104652451A (en) * 2015-01-17 2015-05-27 西安科技大学 Coal mining subsidence area administration method for loess hilly-gully region
CN104686003A (en) * 2014-12-30 2015-06-10 中国矿业大学 Reconstruction method of reclaimed soil profile in coal mining subsidence area
CN105123004A (en) * 2015-07-29 2015-12-09 轻工业环境保护研究所 Soil configuration during waste land second ploughing and land reclamation method
CN105248007A (en) * 2015-11-06 2016-01-20 中国矿业大学(北京) Alternate, multilayer and repetitive filling soil reconstruction method by using Yellow River sediment in reclamation of coal mining subsidence land
CN105766118A (en) * 2016-03-31 2016-07-20 陕西省土地工程建设集团有限责任公司 Method for reconstructing shoal soil mass for rice planting
CN105900555A (en) * 2016-03-31 2016-08-31 陕西省土地工程建设集团有限责任公司 Land engineering design method
CN106034440A (en) * 2016-05-31 2016-10-26 黑龙江省农业科学院土壤肥料与环境资源研究所 Method for building plough layer of paddy field
CN106105470A (en) * 2016-07-26 2016-11-16 中国科学院地理科学与资源研究所 A kind of healthy soil body construction method of land control of giving up based on rural area sky
CN106489591A (en) * 2016-10-18 2017-03-15 中国矿业大学(北京) A kind of substitution tables soil material for open coal mine
CN107018698A (en) * 2016-02-02 2017-08-08 中国矿业大学(北京) The restorative procedure of coal mine small-sized Collapse Pit
CN107371435A (en) * 2017-06-07 2017-11-24 常州市天宁区鑫发织造有限公司 The reclamation method in arable land is collapsed after a kind of earthquake
CN107736100A (en) * 2017-10-27 2018-02-27 广东省生态环境技术研究所 A kind of fast and effective construction method for forming farming plough sole
CN110108244A (en) * 2019-04-30 2019-08-09 北部湾大学 A kind of soil stripping of demand orientation covers meter and engineering method for measuring and calculating
CN110140467A (en) * 2019-06-21 2019-08-20 中国地质大学(北京) A kind of reconstructing method of paddy fields in south china damage soil
CN110222468A (en) * 2019-06-20 2019-09-10 北部湾大学 A kind of surface soil stacks the construction method of scene long-pending projectional technique and topsoil stripping
CN110984119A (en) * 2019-12-17 2020-04-10 河南省地质环境规划设计院有限公司 Method for leveling fractured and subsided land
CN111642167A (en) * 2020-06-10 2020-09-11 海南瑞茗阁实业有限公司 Water-retention, water-saving, fertilizer-retention and fertilizer-saving treatment method for transforming dry land and sand land into paddy field
CN112685824A (en) * 2021-01-12 2021-04-20 西安科技大学 Terrace type reclamation parameter optimization method considering mining subsidence deformation
CN112970369A (en) * 2021-02-09 2021-06-18 中国矿业大学(北京) Ecological reconstructed sponge structure of strip mine refuse dump and application thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109854248B (en) * 2019-03-03 2020-07-03 煤炭科学研究总院 Water-retaining reclamation method for strip mine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101138287A (en) * 2007-10-25 2008-03-12 哈秋舲 Desert greening water and soil conservation method and structure
CN101422094A (en) * 2007-11-02 2009-05-06 煤炭科学研究总院唐山研究院 Thick-bed mining subsidence-land dynamic pre-reclamation method at plane mining-area
CN101953245A (en) * 2010-08-13 2011-01-26 中国矿业大学(北京) Reclamation method of subsided farm land after earthquake disaster
CN102177774A (en) * 2010-12-06 2011-09-14 西南大学 Method for enhancing evaporation resisting and water preserving ability of sandy soil
CN102656971A (en) * 2012-04-13 2012-09-12 郝国成 Production method and application of sandy land conditioner made from bentonite
CN102726187A (en) * 2012-06-25 2012-10-17 西北综合勘察设计研究院 Surface ecological management method for mining subsidence area of coal mine

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1507230A1 (en) * 1987-07-28 1989-09-15 Ленинградский горный институт им.Г.В.Плеханова Method of recultivation in opencast mining of deposits of mineral resources

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101138287A (en) * 2007-10-25 2008-03-12 哈秋舲 Desert greening water and soil conservation method and structure
CN101422094A (en) * 2007-11-02 2009-05-06 煤炭科学研究总院唐山研究院 Thick-bed mining subsidence-land dynamic pre-reclamation method at plane mining-area
CN101953245A (en) * 2010-08-13 2011-01-26 中国矿业大学(北京) Reclamation method of subsided farm land after earthquake disaster
CN102177774A (en) * 2010-12-06 2011-09-14 西南大学 Method for enhancing evaporation resisting and water preserving ability of sandy soil
CN102656971A (en) * 2012-04-13 2012-09-12 郝国成 Production method and application of sandy land conditioner made from bentonite
CN102726187A (en) * 2012-06-25 2012-10-17 西北综合勘察设计研究院 Surface ecological management method for mining subsidence area of coal mine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡振祺: "煤矿山复垦土壤剖面重构的基本原理与方法", 《煤炭学报》, vol. 22, no. 6, 25 December 1997 (1997-12-25), pages 617 - 622 *

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103283335B (en) * 2013-05-22 2015-05-06 中国矿业大学(北京) Filling reclamation method for reclaiming coal mining subsidence lands by Yellow River sediment
CN103283335A (en) * 2013-05-22 2013-09-11 中国矿业大学(北京) Filling reclamation method for reclaiming coal mining subsidence lands by Yellow River sediment
CN103741698A (en) * 2014-01-23 2014-04-23 西安科技大学 Loess hilly-and-gully area coal-mining subsidence and crevice treatment method
CN103741698B (en) * 2014-01-23 2015-01-07 西安科技大学 Loess hilly-and-gully area coal-mining subsidence and crevice treatment method
CN104686003A (en) * 2014-12-30 2015-06-10 中国矿业大学 Reconstruction method of reclaimed soil profile in coal mining subsidence area
CN104499469A (en) * 2015-01-06 2015-04-08 西安科技大学 Novel method applicable to treatment of seasonal waterlogged coal-mining subsidence land
CN104652451B (en) * 2015-01-17 2016-05-18 西安科技大学 Coal mining subsidence area ground, Gullied Rolling Loess Region improvement method
CN104652451A (en) * 2015-01-17 2015-05-27 西安科技大学 Coal mining subsidence area administration method for loess hilly-gully region
CN105123004A (en) * 2015-07-29 2015-12-09 轻工业环境保护研究所 Soil configuration during waste land second ploughing and land reclamation method
CN105248007A (en) * 2015-11-06 2016-01-20 中国矿业大学(北京) Alternate, multilayer and repetitive filling soil reconstruction method by using Yellow River sediment in reclamation of coal mining subsidence land
CN107018698A (en) * 2016-02-02 2017-08-08 中国矿业大学(北京) The restorative procedure of coal mine small-sized Collapse Pit
CN105766118A (en) * 2016-03-31 2016-07-20 陕西省土地工程建设集团有限责任公司 Method for reconstructing shoal soil mass for rice planting
CN105900555A (en) * 2016-03-31 2016-08-31 陕西省土地工程建设集团有限责任公司 Land engineering design method
CN105766118B (en) * 2016-03-31 2018-11-20 陕西省土地工程建设集团有限责任公司 A kind of shoal soil body reconstructing method for Rice Cropping
CN105900555B (en) * 2016-03-31 2018-05-25 陕西省土地工程建设集团有限责任公司 A kind of design method of land engineering
CN106034440A (en) * 2016-05-31 2016-10-26 黑龙江省农业科学院土壤肥料与环境资源研究所 Method for building plough layer of paddy field
CN106105470A (en) * 2016-07-26 2016-11-16 中国科学院地理科学与资源研究所 A kind of healthy soil body construction method of land control of giving up based on rural area sky
CN106105470B (en) * 2016-07-26 2019-09-03 中国科学院地理科学与资源研究所 A kind of healthy soil body construction method based on the useless land control of rural area sky
CN106489591A (en) * 2016-10-18 2017-03-15 中国矿业大学(北京) A kind of substitution tables soil material for open coal mine
CN107371435A (en) * 2017-06-07 2017-11-24 常州市天宁区鑫发织造有限公司 The reclamation method in arable land is collapsed after a kind of earthquake
CN107736100A (en) * 2017-10-27 2018-02-27 广东省生态环境技术研究所 A kind of fast and effective construction method for forming farming plough sole
CN110108244A (en) * 2019-04-30 2019-08-09 北部湾大学 A kind of soil stripping of demand orientation covers meter and engineering method for measuring and calculating
CN110222468A (en) * 2019-06-20 2019-09-10 北部湾大学 A kind of surface soil stacks the construction method of scene long-pending projectional technique and topsoil stripping
CN110222468B (en) * 2019-06-20 2022-06-07 北部湾大学 Calculation method of surface soil stacking field area and construction method for surface soil stripping
CN110140467A (en) * 2019-06-21 2019-08-20 中国地质大学(北京) A kind of reconstructing method of paddy fields in south china damage soil
CN110140467B (en) * 2019-06-21 2021-08-24 中国地质大学(北京) Reconstruction method of southern paddy field damaged soil
CN110984119B (en) * 2019-12-17 2022-03-04 河南省地质环境规划设计院有限公司 Method for leveling fractured and subsided land
CN110984119A (en) * 2019-12-17 2020-04-10 河南省地质环境规划设计院有限公司 Method for leveling fractured and subsided land
CN111642167A (en) * 2020-06-10 2020-09-11 海南瑞茗阁实业有限公司 Water-retention, water-saving, fertilizer-retention and fertilizer-saving treatment method for transforming dry land and sand land into paddy field
CN111642167B (en) * 2020-06-10 2022-05-03 海南瑞茗阁实业有限公司 Water-retention, water-saving, fertilizer-retention and fertilizer-saving treatment method for transforming dry land and sand land into paddy field
CN112685824A (en) * 2021-01-12 2021-04-20 西安科技大学 Terrace type reclamation parameter optimization method considering mining subsidence deformation
CN112685824B (en) * 2021-01-12 2022-01-04 西安科技大学 Terrace type reclamation parameter optimization method considering mining subsidence deformation
CN112970369A (en) * 2021-02-09 2021-06-18 中国矿业大学(北京) Ecological reconstructed sponge structure of strip mine refuse dump and application thereof

Also Published As

Publication number Publication date
CN103039147B (en) 2014-12-31

Similar Documents

Publication Publication Date Title
CN103039147B (en) Reclamation method for sunk paddy field caused by mining in mountainous regions
CN103262689B (en) Coastal saline-alkali soil terrace type afforesting method for improvement of dredger fill
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN101953245B (en) Reclamation method of subsided farm land after earthquake disaster
CN101849454B (en) Biological synthesis improvement method of salt-alkali shoaly land
CN102067753B (en) Long-term governance method for converting saline-alkali soil into fertile farmland
CN102733401B (en) Method for treating dump slope of surface mine
CN110832964A (en) Building aggregate mine in-situ soil improvement and greening method
CN105519274A (en) Integration method of large-scale coastal newly reclaimed beach agricultural land ecologicalization exploitation
CN104686003A (en) Reconstruction method of reclaimed soil profile in coal mining subsidence area
CN103688617B (en) A kind of method utilizing the waste rock patch of soil moved in improve the original regulation
CN114223344B (en) Frozen soil layer repairing method for alpine mining areas in plateau
CN103141176A (en) Method for improving saline soil in excavated grooves of border trees in coastal region
CN105248007B (en) Alternate, multilayer and repetitive filling soil reconstruction method by using Yellow River sediment in reclamation of coal mining subsidence land
CN107787634A (en) A kind of Honghe fault wetland salt-soda soil Suaeda heteroptera ecological restoring method
CN206599772U (en) A kind of cover type biological checkboard
CN104396494A (en) Method for greening original soil of heavy saline-alkali land
CN113875344A (en) Ecological restoration method for coal mine mountain geological environment
CN105594564A (en) Rainwater collecting and deep infiltrating method for economic forest in mountainous region
CN104294830A (en) Side slope ecological protection and recovery method and arrangement structure
CN105672198B (en) A kind of reservoir inundation submergence area restores abandoned land to cultivation structure and its construction method with making
CN109005722B (en) Comprehensive reclamation method for land reclamation of iron ore waste stone yard
CN104186178A (en) Economical seashore saline soil greening quick planting method
CN109328525A (en) Hilly area paddy field remodeling method
CN106688800A (en) Novel tailing pond moisture and fertilizer retention land reclamation process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant