CN107736100A - A kind of fast and effective construction method for forming farming plough sole - Google Patents

A kind of fast and effective construction method for forming farming plough sole Download PDF

Info

Publication number
CN107736100A
CN107736100A CN201711026895.6A CN201711026895A CN107736100A CN 107736100 A CN107736100 A CN 107736100A CN 201711026895 A CN201711026895 A CN 201711026895A CN 107736100 A CN107736100 A CN 107736100A
Authority
CN
China
Prior art keywords
soil
plough sole
construction method
rolling
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711026895.6A
Other languages
Chinese (zh)
Inventor
余华杰
刘通
蒋新宇
程炯
刘平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Institute of Eco Environment and Soil Sciences
Guangdong Institute of Eco Environmental Science and Technology
Original Assignee
Guangdong Institute of Eco Environmental Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Institute of Eco Environmental Science and Technology filed Critical Guangdong Institute of Eco Environmental Science and Technology
Priority to CN201711026895.6A priority Critical patent/CN107736100A/en
Publication of CN107736100A publication Critical patent/CN107736100A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Agricultural Machines (AREA)

Abstract

The invention discloses a kind of fast and effective construction method for forming farming plough sole, it comprises the following steps:Prepartion of land simultaneously removes table soil debris;Soil top layer is pushed away and removed;To be ploughed for constructing the lower soil of plough sole, hack, leveling, remove impurity;Adjust the moisture of soil to be rolled;Carry out cal rolling;After the completion of rolling, and sampled measurement soil density or on-site measurement soil hardness, confirm after reaching target, then the topsoil for posting soil is uniformly replied into leveling.The construction method can reduce the cost for the plough sole constructed, and help to have rapidly reached retain water and nutrients effect.

Description

A kind of fast and effective construction method for forming farming plough sole
Technical field
The present invention relates to the construction method of soil layer, more particularly to a kind of fast and effective side of constructing for forming farming plough sole Method.
Background technology
Plough sole refers to below the arable layer the more soil layer of consolidation, due to this layer of soil long-term cultivation be often subject to it is outer The extruding of power, and caused by sticking grain deposits downwards with rainfall.Typically from earth's surface 12-20cm, thickness about 10cm is most thick to can reach 20cm.Purpose existing for plough sole is the carrying in order to ensure the retain water and nutrients function in paddy field and to farm implements.Plough sole In the presence of can also hinder the stretching, extension of root system, therefore construct the demand that plough sole is also required to consider underwater cultivation and rice field-upland field rotation.Its Basic standard is:Plough sole soil density is in 1.45~1.55g/cm3Between, soil hardness is in 15~18g/cm2Between, thickness At least need to reach 10cm, water reduction of speed degree need to be less than 2cm/ days after water filling.
At present, the construction method of the layer that plows routinely used is mainly that water logging is raked the soil level method.Raked the soil level in waterflooding and rotary cultivator Under iterative cycles so that the sticky particle in soil constantly sinks, and gradually forms plough sole.But this method is more time-consuming to take Power, and can not directly determine whether plough sole reaches the standard of constructing.
The content of the invention
It is an object of the invention to it is quick, be effectively formed farming plough sole, it is ensured that the retain water and nutrients function in paddy field and to agriculture With the carrying of equipment, cultivated for unused land and make paddy field project scientific guidance is provided.
The technical solution used in the present invention is:
A kind of fast and effective construction method for forming farming plough sole, it comprises the following steps:Prepartion of land simultaneously removes table Native debris;Soil top layer is pushed away and removed;To be ploughed for constructing the lower soil of plough sole, hack, leveling, remove impurity;Regulation The moisture of soil to be rolled;Carry out cal rolling;After the completion of rolling, and sampled measurement soil density or on-site measurement soil Earth hardness, confirm after reaching target, then the topsoil for posting soil is uniformly replied into leveling.
Preferably, soil water content to be rolled is the 60~80% of field water capacity.
Preferably, the method for cal rolling is:With more than 11~15 tons crawler dozers, crawler belt width in 40-50cm, with 2.0~3.5 km/h of speed back and forth rolls 2~3 times.
Preferably, the method for cal rolling is:Using 3 tons of chaser mills as rolling compaction machine, 4 reciprocal soil need to be carried out and ground Pressure.
Preferably, soil density is 1.45~1.55g/cm3;Hardness is 15~18g/cm2
A kind of soil texture, it is arable layer, plough sole and original soil layer successively from top layer to bottom.
Preferably, arable layer is 15~20cm;Plough sole is 10~15cm.
The beneficial effects of the invention are as follows:Soil before transformation causes moisture and nutrient loss rapid, base because soil texture is poor Originally can not rice cultivation, it is also very low to plant other crop yields.Plough sole, meter are constructed by this patent methods described Calculate, plough sole soil density is 1.53g/cm3, soil hardness 17.8g/cm2, thickness 12.2cm, excluding rainfall and steaming After hair amount, water reduction of speed rate is respectively 1.1cm/ days.Compared with daily 1~2cm of traditional rice terrace water surface fall off rate, new structure The plough sole low cost built, has rapidly reached retain water and nutrients effect.
Brief description of the drawings
Fig. 1 is that soil layer constructs schematic diagram, wherein 1., 2., 3. representing arable layer, plough sole (clay) and original soil respectively Layer.
Embodiment
The specific steps that embodiment plough sole is constructed
The layer that plows is constructed according to following steps:
(1) prepartion of land and table soil debris is removed, divides field;
(2) soil top layer 20cm thickness soil is pushed into farmland while banking up;
(3) will be ploughed for the lower soil (about 15cm) for constructing plough sole, hack, leveling, if any impurity, plant residue Etc. should remove.It if argillic horizon or soil moved in improve the original need to be laid, should implement before this step, and be mixed together with subsoil.
(4) compactness of plough sole and soil water regime when rolling, the soil texture etc. have pole close relationship, construct When should keep constructing the appropriate moisture of soil, by roller compaction process soil can be made to reach most closely knit degree.To spray water, drench Water or irrigation method adjust rolling layers soil moisture to being adapted to the degree of rolling, suitable to roll moisture and estimate in advance, to reach Optimum efficiency.The moisture for suitably rolling soil is between the 60~80% of field water capacity, according to Texture Difference, rolling compaction machine Size and adjusting soil moisture content makes soil reach maximum compacted density.When rolling, to reach same effect, coarse textured soil contains Water should be less than clayey soil water content, and (water content about needs low 10~20%).The water content of fine textured suil is imitated for compacting Fruit influences maximum, and too dry or overly wet soil is all not easy to tamp.If it is overly wet to tamp layer soil, tool should be used to have soil in length and breadth Gash is staggeredly scratched, it is dried slightly in atmosphere;If it is too dry to tamp layer soil, soil should be sprayed using sprayer Wet to suitable moisture state.
(5) rolling compaction machine suitable according to the quality and structure choice of soil.Typically bulldozed using medium-and-large-sized crawler type Machine is back and forth rolled 2~3 times with the speed of the 1st or the 2nd fast (2.0~3.5 km/h).Light-duty roller (about 20 tons) is being rolled After several times, about 15cm soil can be tamped.(3 tons) are ground with rolling or crawler dozer rolls, it is particularly medium-and-large-sized Crawler dozer (more than 11~15 tons, crawler belt width is in 40~50cm), there is heavyweight crawler belt to roll efficiency highest (2.0~3.5 km/h of speed back and forth rolls 2~3 times).
If soil is soft medium-and-large-sized crawler dozer can not be supported to operate, be ground in advance using light-duty rolling roller Medium-and-large-sized Track Type bull-dozer is put into after pressure again and carries out grinding operation.If medium-and-large-sized crawler dozer cannot be introduced into operation Area, should be substituted with rolling roller or other traction machines, but need it is multiple it is reciprocal roll, while soil water content also needs more It is high.According to field empirical documentation, under appropriate moisture, using chaser mill (3 tons) as rolling compaction machine, need to carry out 4 times it is reciprocal Soil rolls.If using medium-and-large-sized crawler dozer as rolling compaction machine, with the 1st or the 2nd fast (2.0~3.5 km/h) Speed rolled by reciprocal 2~3 times and can reach the standard of requirement, but the effect of last compacting standard assert it is still closely knit with soil The measure of degree or soil hardness is defined.In roller compaction process, give special heed to Ji Tu areas, ridge contact zone, field four corners and with Whether roll really room building contact zone.
(6) after the completion of rolling, and sampled measurement soil density (1.45~1.55g/cm3) or on-site measurement soil hardness (15~18g/cm2), confirm after reaching target, then the topsoil for posting soil is uniformly replied into leveling.With uniformly dispensing soil Power improved materials simultaneously plough plough hack, carry out the improvement of soil biochemistry.The topsoil of soil is posted when uniformly replying leveling, should be noted The direction (ground level gradually reduces from water head site to drainage) of meaning water inlet and draining, (earth's surface gradient should be less than 1/ to elevation And ridge height (ridge height should be in 20~50cm) 2000).
(7) when expected foregoing construction method can not still reach raising water conservation purpose, then it is considered as applying one layer in plough sole Dilatancy clay (clay content should be greater than 50%) assists reduction water penetration, and (original soil is with soil moved in improve the original according to 1:1 ratio mixing), it is special It is not farmland of the subsoil for coarse texture or chad ground.
According to the method described above, in Leizhou East Liu Gecun, it have chosen the structure of a piece of 50 mu of nonirrigated farmland development paddy field plough sole Build experiment.2. processing method directly constructs plough sole using clay, specific process is as follows, and by arable layer, 1. 20cm soil is pushed into agriculture 2. clay is laid in plot (laying depth 15cm) while bank up by field, then made using medium-and-large-sized crawler dozer For rolling compaction machine, rolled with the speed of the 1st or the 2nd fast (2.0~3.5 km/h) by reciprocal 2~3 times.
After the completion of rolling, plough sole pedotheque measure plough sole soil density is gathered using cutting ring, and it is hard using soil Degree meter measure plough sole soil hardness.After testing, plough sole soil density is 1.53g/cm3, soil hardness 17.8g/cm2, it is thick Spend for 12.2cm, reach standard of the plough sole newly constructed on soil density, soil hardness and thickness.After rolling, injection Water deep 10cm, and scale is inserted, every 6 hour records, 1 water surface falling head.And rainfall pond and evaporation are set simultaneously Pond, the rainfall and evaporation capacity of corresponding determination experiment place position.Measured calculating, excluding rainfall and evaporation capacity Afterwards, water reduction of speed rate is respectively 1.1cm/ days, and the soil after being tested for antiseepage carries out section investigation, digs 50 × 50 × 80cm The section of (length and width is deep), observation infiltrate rear soil texture change, find Infiltration amount and not less than clay layer, also do not reach Soil layer below.Thus, it can be known that this kind of way can meet newly to construct standard of the plough sole in water reduction of speed rate.

Claims (7)

1. a kind of fast and effective construction method for forming farming plough sole, it comprises the following steps:Prepartion of land simultaneously removes table soil Debris;Soil top layer is pushed away and removed;To be ploughed for constructing the lower soil of plough sole, hack, leveling, remove impurity;Regulation is treated Roll the moisture of soil;Carry out cal rolling;After the completion of rolling, and sampled measurement soil density or on-site measurement soil Hardness, confirm after reaching target, then the topsoil for posting soil is uniformly replied into leveling.
2. construction method according to claim 1, it is characterised in that the soil water content to be rolled is field Rong Shui The 60~80% of amount.
3. construction method according to claim 1, it is characterised in that the method for the cal rolling is:With 11~15 tons Above crawler dozer, crawler belt width are back and forth rolled 2~3 times with 2.0~3.5 km/h of speed in 40-50cm.
4. construction method according to claim 1, it is characterised in that the method for the cal rolling is:With 3 tons of chaser mills As rolling compaction machine, 4 reciprocal soil need to be carried out and rolled.
5. construction method according to claim 1, it is characterised in that soil density is 1.45~1.55g/cm3;Hardness is 15~18g/cm2
6. a kind of soil texture, it is arable layer, plough sole and original soil layer successively from top layer to bottom;The plough sole is by weighing Profit requires the method structure described in 1~5.
7. unexpected structure according to claim 6, it is characterised in that arable layer is 15~20cm;Plough sole be 10~ 15cm。
CN201711026895.6A 2017-10-27 2017-10-27 A kind of fast and effective construction method for forming farming plough sole Pending CN107736100A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711026895.6A CN107736100A (en) 2017-10-27 2017-10-27 A kind of fast and effective construction method for forming farming plough sole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711026895.6A CN107736100A (en) 2017-10-27 2017-10-27 A kind of fast and effective construction method for forming farming plough sole

Publications (1)

Publication Number Publication Date
CN107736100A true CN107736100A (en) 2018-02-27

Family

ID=61238435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711026895.6A Pending CN107736100A (en) 2017-10-27 2017-10-27 A kind of fast and effective construction method for forming farming plough sole

Country Status (1)

Country Link
CN (1) CN107736100A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108391478A (en) * 2018-03-12 2018-08-14 贵州博锐生态技术有限公司 A method of paddy field is made using project slash
CN108496447A (en) * 2018-03-12 2018-09-07 贵州博锐生态技术有限公司 A kind of method of engineering Paddy Field Development
CN114503807A (en) * 2022-01-26 2022-05-17 广西壮族自治区农业科学院 Method for quickly manufacturing plough bottom layer in dry-land rice field
CN115529879A (en) * 2022-01-30 2022-12-30 昆明理工大学 Method for improving quality of laterite by fertilizing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103039147A (en) * 2013-01-06 2013-04-17 中国矿业大学(北京) Reclamation method for sunk paddy field caused by mining in mountainous regions
CN103081602A (en) * 2012-12-28 2013-05-08 中国矿业大学(北京) Method of soil reclamation project topsoil stripping
CN105900555A (en) * 2016-03-31 2016-08-31 陕西省土地工程建设集团有限责任公司 Land engineering design method
CN107211785A (en) * 2017-07-12 2017-09-29 魏生龙 It is a kind of that large area site preparation and the method for rice cultivation are carried out to desert area

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103081602A (en) * 2012-12-28 2013-05-08 中国矿业大学(北京) Method of soil reclamation project topsoil stripping
CN103039147A (en) * 2013-01-06 2013-04-17 中国矿业大学(北京) Reclamation method for sunk paddy field caused by mining in mountainous regions
CN105900555A (en) * 2016-03-31 2016-08-31 陕西省土地工程建设集团有限责任公司 Land engineering design method
CN107211785A (en) * 2017-07-12 2017-09-29 魏生龙 It is a kind of that large area site preparation and the method for rice cultivation are carried out to desert area

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邓书华: "谈丘陵区的土地平整", 《现代农业科技》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108391478A (en) * 2018-03-12 2018-08-14 贵州博锐生态技术有限公司 A method of paddy field is made using project slash
CN108496447A (en) * 2018-03-12 2018-09-07 贵州博锐生态技术有限公司 A kind of method of engineering Paddy Field Development
CN114503807A (en) * 2022-01-26 2022-05-17 广西壮族自治区农业科学院 Method for quickly manufacturing plough bottom layer in dry-land rice field
CN115529879A (en) * 2022-01-30 2022-12-30 昆明理工大学 Method for improving quality of laterite by fertilizing

Similar Documents

Publication Publication Date Title
Umurzakov et al. Exploration of tillage technologies in the Republic of Uzbekistan
CN104472049B (en) A kind of heavy salinized wasteland, inland quick improvement method
CN107736100A (en) A kind of fast and effective construction method for forming farming plough sole
CN104012361B (en) A kind of method preventing the soil liquid manure loss when gravel soil ground cultivating grape
CN104472293B (en) The high ridge cultivation that high yield and high quality kiwi fruit tree garden is set up
CN105052289B (en) A kind of saline and alkaline rice field desalinization of soil by flooding or leaching Salt discharge method
CN101779537A (en) Method for planting dryland crops by crashing soil
CN108738454A (en) A kind of improvement of soil fertility integrated approach reducing ratooning rice rice field greenhouse gas emission
Berhe et al. The effect of tillage practices on grain yield and water use efficiency
CN107182336A (en) Plastic film mulch hinders salt modification method under a kind of beach saline land topsoil
CN107211785A (en) It is a kind of that large area site preparation and the method for rice cultivation are carried out to desert area
Ishaq et al. Persistence of subsoil compaction effects on soil properties and growth of wheat and cotton in Pakistan
CN113196906B (en) In-situ quick curing method for raw soil
McGarry The effect of soil water content during land preparation on aspects of soil physical condition and cotton growth
Ebrahim et al. Yield Response of Squash
CN104067720B (en) The restorative procedure in the empty damage paddy field, depression stable region of Coal Exploitation
DeJong-Hughes et al. Tillage implements, purpose, and ideal use
CN104996022A (en) Secondary equal division and peeling construction method of field lifting cultivated soil layer of hydro-junction project reservoir region
Chaorakam et al. Field Evaluation of Subsoiling and Liquid Fertilizer Injection for Minimum Tillage of Sugarcane Planter (Part 1)-Effects of Subsoiling and Liquid Fertilizer Injection on Germination Test
CN110268933B (en) Method for changing dry land into paddy field in mountain yellow soil region
Oduma et al. Determination of the effect of tillage on soil resistance to penetration. A study of south-east agricultural soils
Rashid et al. Estimation of water loss from irrigated rice fields
CN106879433A (en) A kind of method that underground drip irrigation is set up with system field
Bulgakov et al. Implementation of simultaneous performance of two technological operations with different machine-and-tractor units
Ostonov et al. The value of a complex unit for the simultaneous use of a transverse surface and a longitudinal ridge when irrigating cotton

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180227

RJ01 Rejection of invention patent application after publication