WO2017013694A1 - 架構構造及びその構築方法 - Google Patents

架構構造及びその構築方法 Download PDF

Info

Publication number
WO2017013694A1
WO2017013694A1 PCT/JP2015/006047 JP2015006047W WO2017013694A1 WO 2017013694 A1 WO2017013694 A1 WO 2017013694A1 JP 2015006047 W JP2015006047 W JP 2015006047W WO 2017013694 A1 WO2017013694 A1 WO 2017013694A1
Authority
WO
WIPO (PCT)
Prior art keywords
hole
columns
pair
column
joint
Prior art date
Application number
PCT/JP2015/006047
Other languages
English (en)
French (fr)
Inventor
菅谷 和人
正博 中島
浩 新上
蓮尾 孝一
潤治 佐古
Original Assignee
三井住友建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三井住友建設株式会社 filed Critical 三井住友建設株式会社
Priority to ES15898856T priority Critical patent/ES2794126T3/es
Priority to BR112018000785-4A priority patent/BR112018000785B1/pt
Priority to JP2016546868A priority patent/JP6030274B1/ja
Priority to SG11201710668WA priority patent/SG11201710668WA/en
Priority to MX2018000633A priority patent/MX2018000633A/es
Priority to MYPI2017700774A priority patent/MY187292A/en
Priority to EP15898856.8A priority patent/EP3327214B1/en
Priority to US15/573,995 priority patent/US10465374B2/en
Publication of WO2017013694A1 publication Critical patent/WO2017013694A1/ja
Priority to PH12018500126A priority patent/PH12018500126A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • E04B1/5825Connections for building structures in general of bar-shaped building elements with a closed cross-section
    • E04B1/5837Connections for building structures in general of bar-shaped building elements with a closed cross-section of substantially circular form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2103/00Material constitution of slabs, sheets or the like
    • E04B2103/02Material constitution of slabs, sheets or the like of ceramics, concrete or other stone-like material

Definitions

  • the present invention relates to a frame structure having a PC column and a PC beam, and a method of constructing the frame structure.
  • RC reinforced concrete
  • PC precast concrete
  • the PC member can be assembled without placing concrete at the joint between PC members, such as a joint (a joint between a column and a beam), etc.
  • Various methods have been proposed (see, for example, Patent Documents 1 and 2).
  • a PC member having a through hole for inserting a column main bar or a beam main bar, or a PC member having a mechanical joint member for reinforcing bar connection embedded in a joint surface is prepared, and the PC member is at a predetermined position. After being arranged in the above, the distal end of the relay muscle inserted into the through hole of the PC member is connected to the mechanical joint member of the adjacent PC member.
  • the PC beam in order to suppress an increase in the number of joints, is configured such that the main beam of the beam projecting horizontally from the end face in the member axial direction forms a relay. Therefore, when arranging PC members such as PC beams and PC connection parts, it is necessary to move the PC members in the horizontal direction, and advanced crane operation technology and skilled workers are necessary for arranging the PC members. become. In addition, the procedure is limited because, for example, the PC pillar member, the PC connection member, and the PC beam member must be alternately arranged, and an efficient construction procedure can not be taken.
  • the present invention has an object of providing a frame structure and a method of constructing the frame structure, in which a PC member can be easily assembled.
  • the present invention has a plurality of PC (precast concrete) pillars (10) arranged in the first direction (X) in plan view, and upper end bars extending in the axial direction of the member. And at least one first PC beam (11) bridged to the pair of PC columns (10) adjacent to each other in the first direction (X), and having a first beam main bar (24) including lower end bars And the first PC beam (11) has a first joint (33) at an end portion of the first beam main bar (24) so as to open to both end surfaces in a member axial direction. , 72) are formed, and the pair of PC pillars (10) are opened at a position facing the corresponding first bottomed hole (26).
  • PC precast concrete
  • a first through hole (31) is formed, and a member axis of the first PC beam (11)
  • the opposite end portions are inserted into the first bottomed holes (26) and joined to the first beam main bars (24) via the first joints (33, 72) and the first through holes (31).
  • the configuration is
  • the first PC beam can be arranged between the pair of PC columns before the first reinforcing bar is arranged, the arranging operation of the PC column and the first PC beam can be facilitated, and the efficiency is improved.
  • the placement operation of the PC column and the first PC beam can proceed in a good procedure.
  • the first bottomed hole (26) is formed to extend along the first beam main bar (24) adjacent to the first beam main bar (24),
  • the first reinforcing bar (32) has a length in which the main beam bar (24) overlaps the first reinforcing bar (32) over a predetermined joint length, and the first joint overlaps the first main beam bar (24) Joint consisting of a lap portion inserted in the first bottomed hole (26) and a grout filled around the first reinforcing bar (32) in the first bottomed hole (26). It is good that it is (33).
  • the PC pillar and the first PC beam can be rigidly connected without using a mechanical joint member. Therefore, material costs can be reduced.
  • the first bottomed hole (26) is formed by a cylindrical member (71) holding an axial end of the first beam main bar (24), and the first joint is
  • the mechanical joint (72) may be configured to hold the axial end of the first beam main bar (24) by a cylindrical member (71).
  • the first reinforcing bar (32) has a fixing portion (32a) which bulges in a radial direction inside the first through hole (31).
  • the first reinforcing bar can be reliably fixed to the PC column. Moreover, even if the cross-sectional dimension of the PC column is less than the dimension necessary for fixing the first reinforcing bar, the first reinforcing bar can be fixed to the PC column.
  • the PC pillar (10) is provided with a support portion (13) for supporting the first PC beam (11).
  • the first PC beam can be joined to the PC column in a stable state in which the first PC beam is supported by the PC column without providing a temporary facility such as a gantry for supporting the first PC beam. . Therefore, the assembling operation of the PC column and the PC beam can be made easier.
  • the upper ends of the PC pillars (10) are arranged in a plurality of rows in a second direction (Y) intersecting the first direction (X) in plan view, and extend in the member axial direction.
  • at least one second PC beam (12) bridged to the pair of PC columns (10) adjacent to each other in the second direction (Y), having a second beam main bar (41) including lower end bars
  • the second PC beam (12) further includes a second joint (45) for forming a second joint (45) at an end portion of the second beam main bar (41) so as to open at both end surfaces in a member axial direction.
  • a bottom hole (42) is formed, and the pair of PC columns (10) adjacent to each other in the second direction (Y) is opened at a position facing the second bottomed hole (42).
  • a second through hole (43) is formed, and both axial ends of the second PC beam (12)
  • a second reinforcing bar (44) inserted into the bottomed hole (43) and joined to the second beam main bar (41) via the second joint (45) and disposed in the second through hole (43)
  • the grout filled around the second reinforcing bar (44) in the second through hole (43) may be rigidly connected to the pair of the PC columns (10).
  • the arrangement operation of the PC column and the second PC beam can be facilitated not only in the first direction but also in the second direction, and the arrangement operation of the PC column and the second PC beam in an efficient procedure Can proceed.
  • first PC beam (11) and the second PC beam (12) be rigidly joined to the PC column (10) at different heights.
  • the first through holes and the second through holes are disposed in a dispersed manner, whereby the filling failure of concrete due to the concentrated arrangement of the first through holes and the second through holes at the time of manufacture of the PC column It is possible to prevent the quality deterioration of Moreover, it can prevent that a member dimension becomes large for quality ensuring.
  • the PC pillars (10) are arranged in at least three rows in the first direction (X), and both ends of the first PC beam (11) are adjacent to each other in the first direction (X).
  • Both end fixed beams (11A) rigidly joined to a pair of the PC columns (10), and a pair of the PC columns (10) whose both ends of the first PC beam (11) are adjacent to each other in the first direction (X)
  • the simple beams (11B) to be pin-joined may be disposed adjacent to each other in the first direction (X).
  • the first PC beams (11) are bridged in a plurality of stages at positions different in the height direction with respect to the pair of PC columns (10) adjacent to each other in the first direction (X).
  • the PC pillar (10) is formed to have a length supporting the plurality of first PC beams (11).
  • the number of PC columns can be reduced, the overall manufacturing cost of the PC columns can be reduced, and the assembly operation can be made easier.
  • the first PC beams (11) are bridged in a plurality of stages at positions different in the height direction with respect to the pair of PC columns (10) adjacent to each other in the first direction (X) And both end fixing beams (11A) rigidly joined to the pair of PC columns (10) in which both ends of the first PC beam (11) are adjacent to each other in the first direction (X), and the first PC beam (11)
  • simple beams (11B) whose both ends are pin-joined to a pair of the PC columns (10) adjacent to each other in the first direction (X) are arranged adjacent to each other in the vertical direction.
  • the present invention comprises a plurality of PC columns (10) and at least one first PC beam (11) rigidly joined to a pair of the PC columns (10) adjacent to each other.
  • a method of constructing a frame structure (1) comprising: a first beam main bar (24) including an upper end bar and a lower end bar extending respectively in a member axial direction, and an end of the first beam main bar (24) Preparing the first PC beam (11) in which the first bottomed holes (26) for forming the first joints (33, 72) are formed in the member axial direction both end faces in the first part, and the first through holes (31) preparing the PC pillar (10) formed so as to open to the side, and building a pair of the PC pillar (10) so as to align in the first direction (X) in plan view And the first bottomed hole (26) faces the first through hole (31) And disposing the first PC beam (11) between the pair of PC columns (10), and the first rebar (32) in the first through hole (31) and the first bottomed
  • the arrangement operation of the PC column and the first PC beam can be facilitated, and the efficiency is high.
  • the placement work of the PC pillar and the first PC beam can be advanced according to the procedure.
  • FIG. 1 Front view of frame structure seen in II direction in FIG. 1
  • An enlarged cross-sectional view of part III in FIG. 1 Sectional view along line IV-IV in FIG. 3 Sectional view along the line V-V in FIG. 3 Sectional view along the line VI-VI in FIG. 3
  • An enlarged sectional view showing the construction state of the part III in FIG. 1 Enlarged sectional view of the part IX in FIG. 2
  • An enlarged sectional view showing the construction state of the X portion in FIG. 1 Explanatory drawing of the construction procedure which shows the (A1-C1) side surface of a frame structure and the (A2-C2) front.
  • FIG. 1 schematically shows a side view of the frame structure 1
  • FIG. 2 schematically shows a front view of the frame structure 1.
  • the frame structure 1 according to the present embodiment constitutes one unit of a pipe rack used for a plant facility, and a plurality of units are provided continuously or intersected in a plant site.
  • the frame structure 1 of one unit will be described with the left-right direction of the paper surface of FIG. 1 as the first direction X and the left-right direction of the paper surface of FIG.
  • the frame structure 1 includes a plurality of (at least four) columns 2 arranged in a plurality of rows in the first direction X and in a plurality of rows in the second direction Y.
  • the frame structure 1 includes a total of 12 columns 2 in six rows in the first direction X and in two rows in the second direction Y.
  • the angle between the first direction X and the second direction Y is 90 ° in the present embodiment. That is, the columns 2 are arranged in a lattice in the first direction X and the second direction Y which are orthogonal to each other in plan view.
  • the arrangement direction of the columns 2 is not limited to this.
  • the columns of the columns 2 arranged in the first direction X shown in FIG. 1 are referred to as the first to sixth columns in order from the left, and the columns of the columns 2 arranged in the second direction Y shown in FIG.
  • the explanation will be given as Column A and Column B sequentially from the left.
  • the frame structure 1 includes a first beam 3 bridged between a pair of columns 2 adjacent to each other in the first direction X shown in FIG. 1 and a pair of columns 2 adjacent to each other in the second direction Y shown in FIG. And a second beam 4 mounted on the The first beam 3 extends in the first direction X, and the second beam 4 extends in the second direction Y.
  • the columns 2 are all the same length.
  • the distance between pillars in the first to fifth rows is substantially the same, and the distance between pillars in the fifth and sixth rows is shorter than the distance between the pillars in the first to fifth rows .
  • the inter-pillar distance between the A and B rows is longer than the inter-pillar distance from the first to fifth rows.
  • All the columns 2 are supported by footings 5 constructed to be able to transmit loads to the ground G.
  • the first and second rows of footings 5, the third and fourth rows of footings 5, and the fifth and sixth rows of footings 5 are connected to each other by underground beams 6, respectively.
  • underground beams 6 are not provided between the footings 5 of the second and third rows, between the footings 5 of the fourth and fifth rows, and between the footings 5 of the A and B rows.
  • Each footing 5 has a peripheral wall 5 a surrounding the lower end of the column 2 so that the column 2 can stand.
  • Each pillar 2 is composed of a lower PC pillar 10L which is a PC member erected on the footing 5 and an upper PC pillar 10U which is a PC member erected on the lower PC pillar 10L.
  • the PC pillars 10 when it is not necessary to distinguish between the lower side and the upper side, they are simply referred to as the PC pillars 10.
  • the first beam 3 is bridged in five stages (five layers) at different positions in the height direction with respect to a pair of columns 2 adjacent to each other in the first direction X.
  • the steps of the first beam 3 arranged in the vertical direction will be described as the first to fifth steps in order from the bottom.
  • the first beams 3 of each step are arranged at the same height on all five structural surfaces formed between a pair of columns 2 adjacent to each other in the first direction X, and form a straight continuous beam doing.
  • the distance between beams in the vertical direction of the first beam 3 is substantially the same.
  • the first beam 3 of the first to third stages is bridged to the lower PC column 10L, and the first beam 3 of the fourth and fifth stages is bridged to the upper PC column 10U.
  • Each of the first beams 3 provided between a pair of columns 2 adjacent to each other in the first direction X is configured by a first PC beam 11 (11A or 11B) which is a single PC member.
  • each of the first beams 3 may be constituted by a plurality of PC members joined to each other in the axial direction of the member after being carried into the site.
  • some of the first beams 3 may be configured of PC members and cast-in-place concrete.
  • the first PC beams 11 arranged in the first, third and fifth steps are a first rebar 32 and a detail described later. Both ends are fixedly connected to the PC column 10 by grout as fixed-end fixed beams.
  • the other first PC beams 11 are simple beams whose both ends are pin-bonded to the PC column 10.
  • the 1st PC beam 11 which makes a both-ends fixed beam is called the 1st PC fixed beam 11A
  • the 1st PC beam 11 which makes a simple beam is called the 1st PC simple beam 11B.
  • the same reference numerals are also shown in the drawings.
  • the structural surface of the frame structure 1 in the first direction X has a portion where the first PC fixed beam 11A and the first PC simple beam 11B are arranged adjacent to each other in the first direction X, and the first PC fixed beam 11A and the first PC fixed beam It has a portion in which the 1PC simple beam 11B is disposed adjacent to each other in the vertical direction.
  • the first PC fixed beam 11A and the first PC simple beam 11B are alternately arranged in the first direction X between the first column to the fifth column.
  • the first PC fixed beam 11A and the first PC simple beam 11B are alternately arranged in the vertical direction between the first and second rows and between the third and fourth rows.
  • the first PC simple beam 11B has a small cross section in which both the beam width and the beam formation are smaller than the first PC fixed beam 11A.
  • the second beams 4 are bridged in five stages at different positions in the height direction with respect to a pair of columns 2 adjacent to each other in the second direction Y.
  • the distance between the beams in the vertical direction of the second beam 4 is substantially the same. Further, the distance between the beams in the vertical direction of the second beam 4 is substantially the same as the distance between the beams in the vertical direction of the first beam 3.
  • the second beam 4 of each step is disposed at a position higher than the first beam 3 of the corresponding step. That is, the first beam 3 and the second beam 4 are bridged across the pair of columns 2 at different heights.
  • the second beams 4 of the first and second stages are bridged to the lower PC column 10L, and the second beams 4 of the third to fifth stages are bridged to the upper PC column 10U.
  • Each of the second beams 4 bridged between a pair of columns 2 adjacent to each other in the second direction Y is constituted by a second PC beam 12 (12A or 12B) which is a single PC member.
  • the second PC beams 12 arranged in the first, third and fifth stages are fixed at both ends fixedly connected to the PC column 10 by the second reinforcing bars 44 and grout which will be described in detail later.
  • the other second PC beams 12 are simple beams whose both ends are pin-bonded to the PC column 10.
  • 2nd PC fixed beam 12A the 2nd PC beam 12 which makes a both-ends fixed beam
  • 2nd PC simple beam 12B the 2nd PC beam 12 which makes a simple beam
  • the second PC fixed beams 12A and the second PC simple beams 12B are alternately arranged in the vertical direction.
  • the second PC simple beam 12B has a small cross section in which both the beam width and the beam formation are smaller than the second PC fixed beam 12A.
  • FIG. 2 shows the structure of the first row, as shown by a broken line in FIG. 1, the joint structure or support structure of the second PC beam 12 is also the first row and also in the second to sixth rows. It is the same arrangement.
  • FIG. 3 is an enlarged cross-sectional view of a portion III in FIG. 1 and shows a joint structure of the first PC fixed beam 11A and the PC column 10 and a joint structure of the first PC simple beam 11B and the PC column 10. Although only one end of each of the first PC fixed beam 11A and the first PC simple beam 11B is shown in FIG. 3, the other ends are symmetrical with these.
  • the PC pillar 10 is provided with a first support portion 13 for supporting the first PC fixed beam 11A.
  • the first support portion 13 is an angle 14 detachably provided on the PC pillar 10 so as to extend horizontally below the joint portion between the first PC fixed beam 11A and the PC pillar 10; It comprises an unshown insert nut and bolt 15 embedded in the PC post 10 to attach the angle 14 or an insert bolt and nut.
  • the first support portion 13 is used for positioning when arranging the first PC fixing beam 11A at a predetermined position, and until the positioned first PC fixing beam 11A is rigidly connected to the PC pillar 10, Used to support the load. Therefore, after the first PC fixing beam 11A is rigidly connected to the PC column 10, the angle 14 may be removed.
  • the PC pillar 10 is provided with a second support portion 16 for supporting the first PC simple beam 11B.
  • the second support portion 16 is an RC bracket integrally formed on the PC post 10 so as to protrude from the side surface of the PC post 10 immediately below the joint with the first PC simple beam 11B.
  • the second support portion 16 is used for positioning when disposing the first PC simple beam 11B at a predetermined position, and is also used to pin-join the positioned first PC simple beam 11B to the PC column 10.
  • the first PC simple beam 11B has a small cross section in which both the beam width and the beam formation are smaller than the first PC fixed beam 11A.
  • the first PC simple beam 11B is disposed coaxially with the first PC fixed beam 11A in the beam width direction so that the height of the upper surface is the same. Therefore, the second support portion 16 is formed at a position lower than the lower surface of the first PC simple beam 11B so as not to interfere with the first through holes 31 described later, and is provided at both axial end portions of the first PC simple beam 11B.
  • a raised portion 17 is integrally formed to project downward from the lower surface.
  • the joint structure of the first PC simple beam 11B and the PC column 10, which is pin-joined, is fixed to the PC column 10 to such an extent that the first PC simple beam 11B is not detached when it is used (pipe laying and pipe supporting). As long as it is done, there is no need to actually use a pin.
  • positioning holes 18 extending in the vertical direction are formed to penetrate in the axial direction both end portions of the first PC simple beam 11B in which the raised portions 17 are formed.
  • anti-slip bars 19 are provided in the second support portion 16 of the PC column 10 so as to protrude from the upper surface.
  • the first PC simple beam 11B is pin-joined to the PC pillar 10 by being placed on the second support 16 so that the positioning holes 18 receive the anti-slip bars 19.
  • the positioning hole 18 has a dimension larger than the anti-displacement rebar 19 in the member axial direction of the first PC simple beam 11B, and the end of the first PC simple beam 11B can slide in the member axial direction.
  • FIG. 4 is a cross-sectional view taken along line IV-IV in FIG. 3, and FIGS. 5 and 6 are cross-sectional views of the first PC fixed beam 11A shown along the lines VV and VI-VI in FIG. is there.
  • the PC column 10 has a generally square rectangular cross section, and is disposed outside the plurality of column main bars 21 extending in the axial direction of the member near the outer edge of the inner side or the column main bars 21. It has a rectangular strip 22 or the like.
  • the column main bars 21 are arranged at substantially equal intervals in the circumferential direction in the cross section of the PC column 10.
  • the first PC fixing beam 11A has a vertically long rectangular cross section, and is arranged near the outer edge of the inside and extends in the member axial direction, the plurality of first beam main bars 24, or the first It has a beard muscle 25 (star wrap) or the like disposed on the outside of the main beam bar 24.
  • the first beam main reinforcement 24 has an upper end reinforcement disposed in the vicinity of the upper surface in the second step and a lower end reinforcement disposed in the vicinity of the lower surface in the vicinity of the lower surface in the cross section of the first PC fixed beam 11A.
  • the first beam main bars 24 are arranged at substantially equal intervals near the outer edge of the first PC fixed beam 11A at the middle portion in the member axial direction and extend in the member axial direction There is.
  • the first beam main bar 24 is bent inward in the width direction or inward in the height direction from the middle to the end in the axial direction of the member and extends obliquely with respect to the axial direction of the member, and then bent again It extends in the axial direction of the member and extends from the end surface in the member axial direction of the first PC fixing beam 11A to a position for securing a predetermined covering thickness.
  • the first bottomed hole 26 is a hollow formed by the sheath 27 disposed in the mold along the first main beam bar 24 when the first PC fixed beam 11A is manufactured (before concrete placement). That is, the first bottomed hole 26 extends along the first main beam bar 24 adjacent to the first main beam bar 24.
  • the sheath 27 may be shaped to have irregularities, for example, by a spiral tube so that the adhesive force of the grout filled after the first reinforcing bar 32 is inserted into the first bottomed hole 26 is increased.
  • a plurality of first through holes 31 are formed in the PC pillar 10 so as to open at positions facing the first bottomed holes 26.
  • the first through hole 31 extends from the position facing the first bottomed hole 26 in the axial direction of the first PC fixed beam 11A, and is linearly continuous with the first bottomed hole 26.
  • the first through hole 31 has an enlarged diameter portion 31 a that is enlarged at the end opposite to the first bottomed hole 26.
  • the enlarged diameter portions 31 a of the plurality of first bottomed holes 26 are independent so that air does not remain at the time of injection of grout described later into the first bottomed holes 26.
  • FIG. 7 is an enlarged view of a part VII in FIG. As shown in FIG. 3, FIG. 4 and FIG. 7, in the first through holes 31 and the first bottomed holes 26 arranged to be continuous in a straight line, the first reinforcing bars 32 from the first through holes 31 side. Is inserted.
  • the first reinforcing bar 32 is formed of a deformed bar, and has a conically shaped head 32a radially bulging at the rear end in the insertion direction.
  • the first reinforcing bar 32 has a portion inserted in the first bottomed hole 26 in a state in which the head 32a is disposed in the enlarged diameter portion 31a of the first through hole 31 and the first beam main bar 24 over a predetermined joint length L1. It is considered to be a length that overlaps the
  • the first through holes 31 and the first bottomed holes 26 are filled with grout injected after the first reinforcing bars 32 are inserted.
  • the lap portion overlapping the first beam main bar 24 is joined to the first beam main bar 24 by forming the first lap joint 33 (deep lap joint), and the head 32a fixes the fixing portion Therefore, it is fixed to the PC column 10 with a sufficient fixing power.
  • the cross-sectional dimension of the PC column 10 is sufficiently large, and the portion of the first reinforcing bar 32 disposed inside the first through hole 31 has a length that can exhibit a sufficient fixing power, the first reinforcing bar 32 is It is not necessary to have the head 32a.
  • the head 32a supplements the fixing force of the first reinforcing bar 32 to the PC column 10 (mainly, the resistance to the tensile force from the first PC fixed beam 11A side), and is not limited to the conical shape.
  • the head 32 a may be a disc shape or a hook formed by bending the end of the first reinforcing bar 32.
  • FIG. 8 is an enlarged cross-sectional view of a portion III in FIG. 1 corresponding to FIG. 3, and shows the installed state in order to explain the installation method of fixing the first PC fixed beam 11A to the PC column 10.
  • the first PC fixed beams 11A are spaced apart from each other with respect to the PC column 10, and are also adjacent to each other in the first direction X with some gaps between them. It is disposed between a pair of embedded PC columns 10.
  • the first PC fixing beam 11A is supported by the level adjusting plate 34 disposed on the angle 14 until it is rigidly connected to the PC column 10. In this state, the first bottomed hole 26 faces the first through hole 31.
  • the first reinforcing bar 32 is inserted into the first through hole 31 and the first bottomed hole 26 from the first through hole 31 side, and a predetermined joint length in the first bottomed hole 26
  • the first main bars 24 are overlapped over the length L1.
  • the first PC simple beam 11B and the raised portion 17 which are disposed on the left side with respect to the PC column 10 in FIG. 8 and are to be pin-bonded to the PC column 10 are not disposed.
  • a gap between the first PC fixing beam 11A and the PC column 10 is provided to facilitate the operation of arranging the first PC fixing beam 11A between the pair of PC columns 10 built.
  • the grout form 35 filled in the gap between the PC column 10 and the first PC fixing beam 11A can be disposed along the lower surface of the first PC fixing beam 11A. It is provided to do so.
  • the formwork 35 is annularly provided at an axial end of the first PC fixing beam 11A so as to close a gap with the PC column 10.
  • the first PC fixing beam 11A is formed with a grout injection passage 36 having an upstream end opening in the upper surface and a downstream end opening in the axial end surface. Further, the first PC fixing beam 11A is formed with a plurality of air venting passages 37 having an upstream end opening in the vicinity of the bottom of each first bottomed hole 26 and a downstream end opening on the upper surface of the first PC fixing beam 11A. It is done.
  • the grout injection passage 36 and the air removal passage 37 are formed by a tube embedded in the first PC fixed beam 11A.
  • the PC pillar 10 is provided with a plurality of air venting passages 38 having an upstream end opened to the upper part of the enlarged diameter portion 31 a of each first through hole 31 and a downstream end disposed above it. .
  • the tube forming the air vent passage 38 is attached to a not shown form provided so as to close the enlarged diameter portion 31 a of the first through hole 31.
  • the grout is pressed into from the grout injection passage 36, whereby the grout is inserted into the first bottomed holes 26 and the first through holes 31 from the gap between the first PC fixed beam 11A and the PC column 10.
  • the air flows into the first bottomed hole 26 and the first through hole 31 while discharging the air from the air venting passages 37 and 38 connected thereto.
  • the air venting passages 37, 38 from which the grout has flowed are closed, and when the grout flows into all the air venting passages 37, 38, the grout injection is finished.
  • the first PC fixed beam 11A is rigidly connected to the PC column 10 by the filled grout.
  • FIG. 9 is an enlarged cross-sectional view of a portion IX in FIG.
  • the joint structure of the second PC fixed beam 12A and the PC column 10 shown in FIG. 2 and the joint structure of the second PC simple beam 12B and the PC column 10 are the first PC beam 11 and the PC column shown in FIGS. It is similar to the joint structure with 10.
  • the PC pillar 10 is provided with a first support portion 13 for supporting the second PC fixed beam 12A slightly below the joint with the second PC fixed beam 12A.
  • the second support portion 16 for supporting the second PC simple beam 12B is provided immediately below the joint with the second PC simple beam 12B.
  • the second PC fixed beam 12A is provided with a plurality of second beam main bars 41 extending in the member axial direction, and extends along the second beam main bars 41 adjacent to the second beam main bars 41, and is an end face in the member axial direction
  • the second bottomed hole 42 is formed in the opening.
  • a second through hole 43 is formed in the PC pillar 10 so as to open at a position facing the second bottomed hole 42.
  • a second reinforcing bar 44 similar to the first reinforcing bar 32 is inserted into the continuous second through hole 43 and the second bottomed hole 42 from the second through hole 43 side, and the second beam main bar is extended over a predetermined joint length L1. It is superimposed on 41.
  • the second through holes 43 and the second bottomed holes 42 are filled with grout injected after the second reinforcing bars 44 are inserted.
  • the lap portion overlapping the second beam main bar 41 is joined to the second beam main bar 41 by forming a second lap joint 45 (deep lap joint), and the head 44a does not have a fixing portion.
  • the second PC fixed beam 12A is rigidly joined to the PC column 10 by the second reinforcing bar 44 and the grout filled around the second reinforcing bar 44 in the second through hole 43 and the second bottomed hole 42.
  • the joint structure of the second PC simple beam 12B to the PC column 10 is also substantially the same as that of the first PC simple beam 11B.
  • the second PC simple beam 12B and the second PC fixed beam 12A are not arranged adjacent to each other in the second direction Y. Therefore, the second support portion 16 does not interfere with the second through hole 43, and the second support portion 16 does not have to be formed at a lower position than the lower surface of the second PC simple beam 12B.
  • the second PC simple beam 12B does not include the raised portion 17 like the first PC simple beam 11B (FIG. 3), and the lower surface is a flat surface.
  • the other joint structure is the same as that of the first PC simple beam 11B, so the description will be omitted.
  • FIG. 10 is an enlarged cross-sectional view of a portion X in FIG. 1 and shows a state of the installation in order to explain a method of fixing the upper PC pillar 10U to the lower PC pillar 10L.
  • the column main bars 21 of the lower PC column 10L are provided in a straight line so as to project further upward from the top surface of the concrete.
  • a vertical bottomed hole 51 opened on the lower surface is provided at a position corresponding to the column main reinforcement 21 of the lower PC column 10L.
  • the column main reinforcement 21 of the upper PC column 10U is bent above the vertical bottomed hole 51 so as to avoid the vertical bottomed hole 51 in the same manner as the first beam main reinforcement 24 (FIGS. 3 and 4) of the first PC fixed beam 11A. Then, it is bent again and extends vertically along the vertical bottomed hole 51 adjacent to the vertical bottomed hole 51.
  • the upper PC column 10U is suspended from above by a crane and disposed on the lower PC column 10L, so that the column main bars 21 of the lower PC column 10L are received inside the vertically bottomed hole 51, the lower side
  • the column main bars 21 of the PC column 10L overlap the column main bars 21 of the upper PC column 10U over a predetermined joint length L2.
  • a spacer (not shown) is arranged on the upper surface of the lower PC pillar 10L, and the upper PC pillar 10U is arranged to form a gap with the lower PC pillar 10L.
  • the upper PC pillar 10U is formed with a grout injection passage 52 communicating with the gap between the upper PC pillar 10U and the lower PC pillar 10L via the lower part of one vertical bottomed hole 51, and each vertical bottomed hole A plurality of air venting passages 53 opening at the top of 51 are formed.
  • a grate injection form 54 is disposed around the gap between the upper PC column 10U and the lower PC column 10L.
  • the grout injected from the grout injection passage 52 is filled in the insides of the respective vertical bottomed holes 51 through the gap between the upper PC pillar 10U and the lower PC pillar 10L.
  • the lap portion where the column main reinforcement 21 of the lower PC column 10L and the column main reinforcement 21 of the upper PC column 10U overlap forms the third lap joint 55 (open lap joint), and the lower PC column 10L
  • the column main bars 21 and the column main bars 21 of the upper PC column 10U are joined together.
  • FIG. 11 to FIG. 13 show the frame structure 1 under construction in the order of construction, and figures (A1, B1 to I1) to which "1" is added after the alphabets Shows a side view of the frame structure 1 corresponding to FIG. 1, and a figure (A2, B2... I2) with “2” appended after the alphabet shows a front view of the frame structure 1 corresponding to FIG. It shows.
  • FIG. 11 (A) shows the side view and the front view.
  • the lower PC pillar 10L is erected on the footing 5 in all of the rows A and B in the first to sixth rows. After the lower PC column 10L is built, a fall prevention measure 60 is applied as appropriate.
  • the first PC beam 11 of the first stage is the first PC fixed beam 11A
  • the first PC beam 11 of the second stage is the first PC simple beam 11B
  • the first PC beam 11 of the third stage is the first PC fixed beam 11A.
  • the second PC beam 12 of the first stage is a second PC fixed beam 12A
  • the second PC beam 12 of the second stage is a second PC simple beam 12B.
  • the first PC beams 11 of the first to third stages are sequentially arranged in pairs from the lower side to the lower side PC Cross over to pillar 10L. All of these first PC beams 11 are first PC simple beams 11B.
  • the upper PC pillar 10U is built on the lower PC pillar 10L, and the lower PC pillar 10L is Bond to
  • the first PC beam 11 of the fourth stage is the first PC simple beam 11B
  • the first PC beam 11 of the fifth stage is the first PC fixed beam 11A
  • the second PC beam 12 of the third stage is the second PC fixed beam 12A
  • the second PC beam 12 of the fourth stage is the second PC simple beam 12B
  • the second PC beam 12 of the fifth stage is the second PC fixed beam 12A. It is.
  • the first PC beams 11 of the fourth and fifth stages are sequentially arranged from the lower side to a pair of upper PC pillars. Cross over to 10U. All of these first PC beams 11 are first PC simple beams 11B.
  • the first PC beams of the first stage to the third stage are arranged in the A and B rows between the fourth and fifth rows and between the fifth and sixth rows. 11. Cross over the pair of lower PC columns 10L in order from the lower side. All of these first PC beams 11 are first PC simple beams 11B.
  • the upper PC pillar 10U is built on the lower PC pillar 10L, and the lower PC pillar 10L is Join.
  • the first PC beams of the fourth and fifth steps are used. 11, and the second PC beams 12 of the third to fifth stages in the fifth row and the sixth row between row A and row B in order from the lower row Cross over the upper PC column 10U.
  • the first PC beams 11 are all the first PC simple beams 11B.
  • the second PC beam 12 of the third stage is the second PC fixed beam 12A
  • the second PC beam 12 of the fourth stage is the second PC simple beam 12B
  • the second PC beam 12 of the third stage is the second PC fixed beam 12A. It is.
  • both axial end portions of the first PC fixed beam 11A are inserted into the first bottomed hole 26 and jointed to the first main beam 24 via the first lap joint 33.
  • it is rigidly connected to the pair of PC columns 10 by the first reinforcing bars 32 disposed in the first through holes 31 and the grout filled around the first reinforcing bars 32 in the first through holes 31. Therefore, the first PC fixed beam 11A can be arranged between the pair of PC columns 10 before the first reinforcing bar 32 is arranged, and the PC column 10 and the first PC fixed beam 11A can be arranged without horizontal movement along the main beam bars. It can be easily arranged. Further, as shown in FIGS. 11 to 13, the arrangement operation of the PC pillar 10 and the first PC fixed beam 11A can be advanced in an efficient procedure.
  • the first bottomed hole 26 is formed adjacent to the first beam main bar 24 and extends along the first beam main bar 24, and the first beam main bar 24 is formed inside the first bottomed hole 26.
  • a first lap joint 33 is constituted by the grout filled around the first reinforcing bar 32 at 26.
  • the first support portion 13 for supporting the first PC fixing beam 11A is provided in the PC pillar 10, the first PC can be provided without providing temporary equipment such as a gantry for supporting the first PC fixing beam 11A.
  • the work of joining the fixed beam 11A to the PC column 10 can be performed, and the work is easy.
  • the first reinforcing bar 32 since the first reinforcing bar 32 has the head 32 a that bulges in the radial direction inside the first through hole 31, the cross-sectional dimension of the PC column 10 satisfies the dimension necessary for fixing the first reinforcing bar 32. Even if not, the first reinforcing bar 32 can be fixed to the PC column 10.
  • both axial ends of the second PC fixed beam 12A are inserted into the second bottomed hole 42 and joined to the second beam main bar 41 through the second lap joint 45. It is rigidly connected to the pair of PC columns 10 by the second reinforcing bars 44 arranged in the second through holes 43 and the grout filled around the second reinforcing bars 44 in the second through holes 43. Therefore, not only in the first direction X but also in the second direction Y, the work of arranging the PC pillar 10 and the second PC fixed beam 12A can be facilitated, and the PC pillar 10 and the second PC fixed beam in an efficient procedure. 12A placement can proceed.
  • the first PC fixing beam 11A and the second PC fixing beam 12A are rigidly connected to the PC column 10 at different heights. Therefore, the first through holes 31 and the second through holes 43 are disposed in a dispersed manner, and the deterioration in quality due to the filling failure of concrete or the like at the time of manufacturing the PC column 10 is prevented. In addition, it is possible to prevent the member dimensions from becoming large for securing the quality.
  • the first PC fixed beam 11A and the first PC simple beam 11B are disposed adjacent to each other in the first direction X and in the vertical direction. Therefore, it is not necessary to make the beam-to-beam joint rigid connection for all of the first PC beams 11 aligned in the first direction X, and the material cost is further reduced, and the connection between the first reinforcing bars 32 and the first beam main bars 24 The assembling work is reduced and the assembling work is easier.
  • the lower PC column 10L and the upper PC column 10U are each formed to have a length for supporting the plurality of first PC beams 11. Therefore, the number of PC pillars 10 is reduced, the overall manufacturing cost of the PC pillars 10 is reduced, and the assembling operation becomes easier.
  • (1) Reinforcement 32 is inserted into the first through hole 31 and the first bottomed hole 26, and the lap portion disposed in the first bottomed hole 26 of the first reinforcement 32 is extended over the predetermined joint length L1 to the first beam main bar And grouting the first through hole 31 and the first bottomed hole 26 and joining the first reinforcing bar 32 to the first PC fixed beam 11A and fixing it to the PC pillar 10 .
  • the PC column 10 and the first PC fixed beam 11A can be rigidly joined without using a mechanical joint member.
  • the first PC fixing beam 11A can be arranged between the pair of PC columns 10 before the first reinforcing bar 32 is arranged, the arranging operation of the PC column 10 and the first PC fixing beam 11A is easy and efficient.
  • the placement work of the PC pillar 10 and the first PC fixed beam 11A can be advanced in the procedure.
  • FIG. 14 and 15 a second embodiment of the present invention will be described with reference to FIGS. 14 and 15.
  • FIG. 14 and 15 The same members and portions as those in the first embodiment are denoted by the same reference numerals, and overlapping descriptions will be appropriately omitted.
  • FIG. 14 is an enlarged side sectional view of the frame structure 1 and corresponds to FIG. 3 of the first embodiment.
  • FIG. 15 is an enlarged plan sectional view of the frame structure 1 shown along the line XV-XV in FIG. 14, and corresponds to FIG. 4 of the first embodiment.
  • the first beam main bars 24 linearly extend in parallel with the member axial direction of the first PC fixed beam 11A over the entire length in the axial direction, and the sleeve 71 is attached to the end thereof.
  • the sleeve 71 has an axially extending inner hole, and a first beam main bar 24 inserted in approximately one half of the axial direction in the inner hole, and a first beam generally inserted in the other generally half of the inner hole It is a cylindrical member made of steel which constitutes a mechanical joint 72 joining together the 1 rebar 32.
  • the sleeve 71 includes the first main beam bars 24 and the first reinforcing bars 32 respectively formed of deformed rebars in the inner hole, more specifically, around the first main beam bars 24 and the first reinforcing bars 32 in the inner holes. Hold by filled grout.
  • a female screw is formed in the inner hole of the sleeve 71, and the male screw formed on each end of the first beam main reinforcement 24 and the first reinforcing bar 32 is screwed to the female screw, whereby the sleeve 71 is The main beam bar 24 and the first reinforcing bar 32 may be held, and further, the grout and the fixing nut may be used in combination, and the sleeve 71 may hold the first main beam bar 24 and the first reinforcing bar 32.
  • the sleeve 71 is an axial end portion of the first beam main bar 24 on one side in the axial direction of the inner hole.
  • the first PC fixing beam 11A On the other side in the axial direction of the inner hole, and the first bottomed hole 26 opened at the end face in the axial direction of the member is formed.
  • the first PC fixing beam 11A is disposed between the pair of PC columns 10 such that the first bottomed hole 26 faces the first through hole 31.
  • the first reinforcing bar 32 is inserted into the first through hole 31 and the first bottomed hole 26 from the first through hole 31 side, and the first PC fixed beam Grout is injected into the gap between the 11A and the PC column 10, whereby the first bottomed holes 26 and the first through holes 31 are filled with the grout.
  • the same function and effect as those of the first embodiment can be obtained. That is, since the first PC fixed beam 11A can be arranged between the pair of PC columns 10 before the first reinforcing bar 32 is arranged, the PC column 10 and the first PC fixed beam 11A can be provided without horizontal movement along the main beam bars. Can be easily placed. Further, the work of arranging the PC pillar 10 and the first PC fixed beam 11A can be advanced in an efficient procedure as shown in FIGS. 11 to 13.
  • the first bottomed hole 26 is formed by the sleeve 71 which holds the axial end of the first beam main bar 24, and the machine holds the axial end of the first beam main bar 24 by the sleeve 71.
  • Formula joint 72 is configured. Therefore, the first reinforcing bar 32 is securely joined to the first beam main bar 24 by the mechanical joint 72.
  • the present invention can be widely modified and implemented without being limited to the above embodiment.
  • the frame structure 1 is applied to a pipe rack as an example, but it is naturally possible to apply to other structures.
  • specific configurations and arrangements of each member and part, quantity, angle, construction procedure, and the like can be appropriately changed without departing from the scope of the present invention.
  • not all of the components shown in the above embodiment are necessarily essential, and can be selected as appropriate.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

PC部材を容易に組み立てることができる架構構造を提供する。 軸方向両端面に開口するように第1PC梁11に第1有底孔26が形成され、第1有底孔26に対向する位置に開口するように一対のPC柱10に第1貫通孔31が形成され、第1有底孔26に挿入されて第1重ね継手33を介して第1梁主筋24に継ぎ合わされると共に第1貫通孔31に配置された第1鉄筋32と、第1貫通孔31における第1鉄筋32の周囲に充填されたグラウトとにより、第1PC梁11がPC柱10に剛接合された構成とする。

Description

架構構造及びその構築方法
 本発明は、PC柱とPC梁とを有する架構構造及び当該架構構造の構築方法に関する。
 ラーメン構造に代表される鉄筋コンクリート(以下、RCと記す)造の架構構造では、現場で鉄筋組立や型枠組立、コンクリート打設を行うと、工期が長くなる上、品質管理が煩雑になること等から、工場等で製作したプレキャストコンクリート(以下、PCと記す)部材を現場で組み立てる方法が採用されることがある。
 このようなPC部材を用いたラーメン構造の構築方法として、仕口部(柱と梁との接合部)等、PC部材同士の接合部に現場でコンクリートを打設することなくPC部材を組立可能にした方法が種々提案されている(例えば、特許文献1、2参照)。これらの方法では、柱主筋や梁主筋を挿通させる貫通孔が形成されたPC部材や、接合面に鉄筋接続用の機械式継手部材が埋設されたPC部材が用意され、PC部材が所定の位置に配置された後に、このPC部材の貫通孔に挿入される中継筋の先端が隣接配置されたPC部材の機械式継手部材に接続されるようになっている。
特許第3837390号公報 特許第4496023号公報
 しかしながら、従来のラーメン構造の構築方法では、継手の数が増えることを抑制するために、部材軸方向端面から水平方向に突出した梁主筋が中継筋をなすようにPC梁が構成されている。そのため、PC梁やPC仕口部等のPC部材を配置する際には、PC部材を水平方向に移動させる必要があり、PC部材の配置作業に高度なクレーン操縦技術や作業員の熟練が必要になる。また、PC柱部材やPC仕口部材とPC梁部材とを交互に配置しなければならない等、手順に制限があり、効率の良い施工手順をとることができない。
 本発明は、このような背景に鑑み、PC部材を容易に組み立てることができる架構構造及び架構構造の構築方法を提供することを課題とする。
 このような課題を解決するために、本発明は、平面視において第1方向(X)に並べられた複数のPC(プレキャストコンクリート)柱(10)と、部材軸方向にそれぞれ延在する上端筋及び下端筋を含む第1梁主筋(24)を有し、前記第1方向(X)に互いに隣接する一対の前記PC柱(10)に架け渡された少なくとも1つの第1PC梁(11)とを備えた架構構造(1)であって、前記第1PC梁(11)には、部材軸方向両端面に開口するように、前記第1梁主筋(24)の端部に第1継手(33、72)を形成するための第1有底孔(26)が形成され、前記一対の前記PC柱(10)には、対応する前記第1有底孔(26)に対向する位置に開口するように第1貫通孔(31)が形成され、前記第1PC梁(11)の部材軸方向両端部が、前記第1有底孔(26)に挿入されて前記第1継手(33、72)を介して前記第1梁主筋(24)に継ぎ合わされると共に前記第1貫通孔(31)に配置された第1鉄筋(32)と、前記第1貫通孔(31)における前記第1鉄筋(32)の周囲に充填されたグラウトとによって前記一対の前記PC柱(10)に剛接合された構成とする。
 この構成によれば、第1鉄筋を配置する前に第1PC梁を一対のPC柱の間に配置可能であるため、PC柱及び第1PC梁の配置作業を容易にすることができ、かつ効率の良い手順でPC柱及び第1PC梁の配置作業を進めることができる。
 また、上記の発明において、前記第1有底孔(26)が、前記第1梁主筋(24)に隣接して当該第1梁主筋(24)に沿って延びるように形成され、前記第1梁主筋(24)が、所定の継手長さにわたって前記第1鉄筋(32)と重なる長さを有し、前記第1継手が、前記第1梁主筋(24)と重なる前記第1鉄筋(32)の前記第1有底孔(26)に挿入されたラップ部分と、前記第1有底孔(26)における前記第1鉄筋(32)の周囲に充填されたグラウトとにより構成される重ね継手(33)であるとよい。
 この構成によれば、機械式継手部材を用いることなくPC柱と第1PC梁とを剛接合することができる。そのため、資材コストを削減することができる。
 また、上記の発明において、前記第1有底孔(26)が、前記第1梁主筋(24)の軸方向端部を保持する筒部材(71)によって形成され、前記第1継手は、前記筒部材(71)によって前記第1梁主筋(24)の軸方向端部を保持するように構成された機械式継手(72)であるとよい。
 この構成によれば、第1鉄筋を第1梁主筋に確実に継ぎ合わせることができる。
 また、上記の発明において、前記第1鉄筋(32)が、前記第1貫通孔(31)の内部において径方向に膨出する定着部(32a)を有する構成とするとよい。
 この構成によれば、第1鉄筋をPC柱に確実に定着させることができる。また、PC柱の断面寸法が第1鉄筋の定着に必要な寸法に満たない場合であっても、第1鉄筋をPC柱に定着させることができる。
 また、上記の発明において、前記PC柱(10)には、前記第1PC梁(11)を支持するための支持部(13)が設けられた構成とするとよい。
 この構成によれば、第1PC梁を支持する架台等の仮設備を設けることなく、第1PC梁をPC柱に支持させた安定状態で第1PC梁のPC柱への接合作業を行うことができる。従って、PC柱及びPC梁の組立作業をより容易にすることができる。
 また、上記の発明において、前記PC柱(10)が平面視で前記第1方向(X)に交差する第2方向(Y)に複数列に並べられ、部材軸方向にそれぞれ延在する上端筋及び下端筋を含む第2梁主筋(41)を有し、前記第2方向(Y)に互いに隣接する一対の前記PC柱(10)に架け渡された少なくとも1つの第2PC梁(12)を更に備え、前記第2PC梁(12)には、部材軸方向両端面に開口するように、前記第2梁主筋(41)の端部に第2継手(45)を形成するための第2有底孔(42)が形成され、前記第2方向(Y)に互いに隣接する前記一対の前記PC柱(10)には、前記第2有底孔(42)に対向する位置に開口するように第2貫通孔(43)が形成され、前記第2PC梁(12)の部材軸方向両端部が、前記第2有底孔(43)に挿入され、前記第2継手(45)を介して前記第2梁主筋(41)に継ぎ合わされると共に前記第2貫通孔(43)に配置された第2鉄筋(44)と、前記第2貫通孔(43)における前記第2鉄筋(44)の周囲に充填されたグラウトとによって前記一対の前記PC柱(10)に剛接合された構成とするとよい。
 この構成によれば、第1方向だけでなく第2方向についても、PC柱及び第2PC梁の配置作業を容易にすることができ、かつ効率の良い手順でPC柱及び第2PC梁の配置作業を進めることができる。
 また、上記の発明において、前記第1PC梁(11)と前記第2PC梁(12)とが互いに異なる高さで前記PC柱(10)に剛接合された構成とするとよい。
 この構成によれば、第1貫通孔及び第2貫通孔が分散して配置されることにより、PC柱の製造時に、第1貫通孔及び第2貫通孔の集中配置に起因するコンクリートの充填不良等の品質低下を防止できる。また、品質確保のために部材寸法が大きくなることを防止できる。
 また、上記の発明において、前記PC柱(10)が前記第1方向(X)において少なくとも3列に並べられ、前記第1PC梁(11)の両端が前記第1方向(X)に互いに隣接する一対の前記PC柱(10)に剛接合する両端固定梁(11A)と、前記第1PC梁(11)の両端が前記第1方向(X)に互いに隣接する一対の前記PC柱(10)にピン接合される単純梁(11B)とが、前記第1方向(X)に互いに隣接して配置された構成とするとよい。
 この構成によれば、第1方向に並ぶ梁の全てについて柱梁接合部を剛接合にする必要がないため、資材コストをより削減できると共に、第1鉄筋と第1梁主筋との継ぎ合わせ作業を減らして組立作業をより容易にすることができる。
 また、上記の発明において、前記第1PC梁(11)が、前記第1方向(X)に互いに隣接する一対の前記PC柱(10)に対して高さ方向に異なる位置に複数段に架け渡され、前記PC柱(10)が、複数段の前記第1PC梁(11)を支持する長さに形成された構成とするとよい。
 この構成によれば、PC柱の本数が少なくなり、PC柱の総合的な製造コストを削減できる上、組立作業をより容易にすることができる。
 また、上記の発明において、前記第1PC梁(11)が、前記第1方向(X)に互いに隣接する一対の前記PC柱(10)に対して高さ方向に異なる位置に複数段に架け渡され、前記第1PC梁(11)の両端が前記第1方向(X)に互いに隣接する一対の前記PC柱(10)に剛接合する両端固定梁(11A)と、前記第1PC梁(11)の両端が前記第1方向(X)に互いに隣接する一対の前記PC柱(10)にピン接合される単純梁(11B)とが、上下方向に互いに隣接して配置された構成とするとよい。
 この構成によれば、上下方向に並ぶ梁の全てについて柱梁接合部を剛接合にする必要がないため、資材コストをより削減できると共に、第1鉄筋と第1梁主筋との継ぎ合わせ作業を減らして組立作業をより容易にすることができる。
 また、上記課題を解決するために、本発明は、複数のPC柱(10)と、互いに隣接する一対の前記PC柱(10)に剛接合される少なくとも1つの第1PC梁(11)とを備えた架構構造(1)の構築方法であって、部材軸方向にそれぞれ延在する上端筋及び下端筋を含む第1梁主筋(24)を有し、前記第1梁主筋(24)の端部に第1継手(33、72)を形成するための第1有底孔(26)が部材軸方向両端面に形成された前記第1PC梁(11)を用意するステップと、第1貫通孔(31)が側面に開口するように形成された前記PC柱(10)を用意するステップと、平面視における第1方向(X)に並ぶように一対の前記PC柱(10)を建て込むステップと、前記第1有底孔(26)が前記第1貫通孔(31)に対向するように、前記第1PC梁(11)を一対の前記PC柱(10)の間に配置するステップと、第1鉄筋(32)を前記第1貫通孔(31)及び前記第1有底孔(26)に挿入し、前記第1継手(33、72)を介して前記第1梁主筋(24)に継ぎ合わせるステップと、前記第1貫通孔(31)にグラウトを注入し、前記第1鉄筋(32)を前記PC柱(10)に定着させるステップとを含む構成とする。
 この構成によれば、第1鉄筋を配置する前に第1PC梁を一対のPC柱の間に配置するため、PC柱及び第1PC梁の配置作業を容易にすることができ、かつ効率の良い手順でPC柱及び第1PC梁の配置作業を進めることができる。
 このように本発明によれば、PC部材を容易に組み立てることができる架構構造及び架構構造の構築方法を提供することができる。
第1実施形態に係る架構構造の側面図 図1中のII方向に見た架構構造の正面図 図1中のIII部の拡大断面図 図3中のIV-IV線に沿う断面図 図3中V-V線に沿う断面図 図3中のVI-VI線に沿う断面図 図3中のVII部の拡大図 図1中のIII部の施工状態を示す拡大断面図 図2中のIX部の拡大断面図 図1中のX部の施工状態を示す拡大断面図 架構構造の(A1~C1)側面及び(A2~C2)正面を示す構築手順の説明図 架構構造の(D1~F1)側面及び(D2~F2)正面を示す構築手順の説明図 架構構造の(G1~I1)側面及び(G2~I2)正面を示す構築手順の説明図 第2実施形態に係る架構構造の図3に対応する拡大断面図 図14中のXV-XV線に沿う断面図
 以下、図面を参照して、本発明の実施形態について詳細に説明する。なお、図が煩雑になるのを避けるため、各図においては鉄筋を適宜省略している。また、側面図や正面図において、構造体の内部に配置され見えるべきでない部材が示されることや、断面図において、断面に現れない部材や部位が示されることがあることに注意されたい。
≪第1実施形態≫
 まず、図1~図13を参照して本発明の第1実施形態について説明する。図1は架構構造1の側面図を、図2は架構構造1の正面図をそれぞれ模式的に示している。本実施形態に係る架構構造1は、プラント施設に用いられるパイプラックの1ユニットを構成するものであり、プラント敷地内に複数のユニットが連続的に或いは交差するように設けられる。以下では、図1の紙面の左右方向を第1方向Xとし、図2の紙面の左右方向を第2方向Yとして、1ユニットの架構構造1について説明する。
 架構構造1は、第1方向Xに複数列、第2方向Yに複数列に並べられた複数本(少なくとも4本)の柱2を備える。本実施形態では、架構構造1は、第1方向Xに6列、第2方向Yに2列の合計12本の柱2を備えている。第1方向Xと第2方向Yとがなす角度は、本実施形態では90°である。即ち、柱2は、平面視で互いに直交する第1方向X及び第2方向Yに格子状に配置されている。但し、柱2の配列方向はこれに限られるものではない。以下、図1に示される第1方向Xに並べられた柱2の列を左から順に第1列~第6列とし、図2に示される第2方向Yに並べられた柱2の列を左から順にA列、B列として説明する。
 架構構造1は、図1に示される第1方向Xに互いに隣接する一対の柱2に架け渡された第1梁3と、図2に示される第2方向Yに互いに隣接する一対の柱2に架け渡された第2梁4とを備えている。第1梁3は第1方向Xに延在し、第2梁4は第2方向Yに延在している。
 柱2は全て同じ長さとされている。第1列から第5列までの柱間距離は概ね同一であり、第5列及び第6列間の柱間距離は、第1列から第5列までの柱間距離よりも短くなっている。また、A列及びB列間の柱間距離は、第1列から第5列までの柱間距離よりも長くなっている。
 全ての柱2は、荷重を地盤Gに伝達可能に構築されたフーチング5により支持されている。第1列及び第2列のフーチング5、第3列及び第4列のフーチング5、並びに第5列及び第6列のフーチング5は、それぞれ地中梁6によって互いに連結されている。一方、第2列及び第3列のフーチング5間、第4列及び第5列のフーチング5間、並びにA列及びB列のフーチング5間には地中梁6は設けられていない。各フーチング5は、柱2の下端部を取り囲む周壁5aを有しており、これにより、柱2が自立できるようになっている。各柱2は、フーチング5上に建て込まれるPC部材である下側PC柱10Lと、下側PC柱10Lの上に建て込まれるPC部材である上側PC柱10Uとにより構成されている。以下では、下側と上側とを区別する必要がない場合には、単にPC柱10と称する。
 図1に示されるように、第1梁3は、第1方向Xに互いに隣接する一対の柱2に対して高さ方向に異なる位置に5段(5層)に架け渡されている。以下、上下方向に並べられた第1梁3の各段を下から順に第1段~第5段として説明する。各段の第1梁3は、第1方向Xに互いに隣接する一対の柱2間に形成される5つの構面の全てにおいて同一高さに配置されており、直線状の連続した梁を構成している。第1梁3の上下方向の梁間距離は概ね同一になっている。第1段~第3段の第1梁3は下側PC柱10Lに架け渡され、第4段及び第5段の第1梁3は上側PC柱10Uに架け渡されている。
 第1方向Xに互いに隣接する一対の柱2間に設けられる第1梁3のそれぞれは、単一のPC部材である第1PC梁11(11A又は11B)により構成されている。他の実施形態では、第1梁3のそれぞれが、現場への搬入後等に部材軸方向に互いに接合された複数のPC部材により構成されてもよい。或いは、一部の第1梁3が、PC部材と現場打ちコンクリートとにより構成されてもよい。
 第1列及び第2列間、並びに第3列及び第4列間において、第1段、第3段及び第5段に配置された第1PC梁11は、詳細を後述する第1鉄筋32及びグラウトにより両端をPC柱10に剛接合された両端固定梁とされている。それ以外の第1PC梁11は、両端をPC柱10にピン接合された単純梁とされている。以下、これらを区別するため、両端固定梁をなす第1PC梁11を第1PC固定梁11Aと称し、単純梁をなす第1PC梁11を第1PC単純梁11Bと称する。図中においても同様に符号を示している。
 架構構造1の第1方向Xの構面は、第1PC固定梁11Aと第1PC単純梁11Bとが第1方向Xに互いに隣接して配置される部分を有すると共に、第1PC固定梁11Aと第1PC単純梁11Bとが上下方向に互いに隣接して配置される部分を有している。特に、第1段、第3段及び第5段では、第1列~第5列間において、第1PC固定梁11Aと第1PC単純梁11Bとが第1方向Xに交互に配置されている。また、第1列及び第2列間、並びに第3列及び第4列間では、第1PC固定梁11Aと第1PC単純梁11Bとが上下方向に交互に配置されている。本実施形態では、第1PC単純梁11Bは、第1PC固定梁11Aに比べ、梁幅及び梁成が共に小さい小断面とされている。
 図2に示されるように、第2梁4は、第2方向Yに互いに隣接する一対の柱2に対して高さ方向に異なる位置に5段に架け渡されている。第2梁4の上下方向の梁間距離は概ね同一になっている。また、第2梁4の上下方向の梁間距離は、第1梁3の上下方向の梁間距離と概ね同一となっている。一方、各段の第2梁4は、対応する段の第1梁3よりも高い位置に配置されている。即ち、第1梁3と第2梁4とが互いに異なる高さで一対の柱2に架け渡されている。第1段及び第2段の第2梁4は下側PC柱10Lに架け渡され、第3段~第5段の第2梁4は上側PC柱10Uに架け渡されている。第2方向Yに互いに隣接する一対の柱2に架け渡される第2梁4のそれぞれは、単一のPC部材である第2PC梁12(12A又は12B)により構成されている。
 第1段、第3段及び第5段に配置された第2PC梁12は、詳細を後述する第2鉄筋44及びグラウトにより両端をPC柱10に剛接合された両端固定梁とされている。それ以外の第2PC梁12は、両端をPC柱10にピン接合された単純梁とされている。以下、これらを区別するため、両端固定梁をなす第2PC梁12を第2PC固定梁12Aと称し、単純梁をなす第2PC梁12を第2PC単純梁12Bと称する。図中においても同様に符号を示している。
 架構構造1の第2方向Yの構面では、第2PC固定梁12Aと第2PC単純梁12Bとが上下方向に交互に配置されている。本実施形態では、第2PC単純梁12Bは、第2PC固定梁12Aに比べ、梁幅及び梁成が共に小さい小断面とされている。図2は、第1列の架構を示しているが、図1に破線で示されるように、第2列~第6列においても、第2PC梁12の接合構造或いは支持構造は第1列と同じ配置になっている。
 図3は、図1中のIII部の拡大断面図であり、第1PC固定梁11AとPC柱10との接合構造、及び第1PC単純梁11BとPC柱10との接合構造を示している。図3では、第1PC固定梁11A及び第1PC単純梁11Bについてそれぞれの一端のみが示されているが、それぞれの他端はこれらと左右対称の構造になっている。
 図1及び図3に示されるように、PC柱10には、第1PC固定梁11Aを支持するための第1支持部13が設けられている。本実施形態では、第1支持部13は、第1PC固定梁11AとPC柱10との接合部の下方に水平方向に延在するようにPC柱10に着脱自在に設けられたアングル14と、アングル14を取り付けるためにPC柱10に埋め込まれた図示しないインサートナット及びボルト15、又はインサートボルト及びナットとにより構成されている。第1支持部13は、第1PC固定梁11Aを所定の位置に配置する際の位置決めに用いられると共に、位置決めされた第1PC固定梁11AがPC柱10に剛接合されるまでの間、これらの荷重を支持するために用いられる。従って、第1PC固定梁11AがPC柱10に剛接合された後には、アングル14は取り外されてもよい。
 また、PC柱10には、第1PC単純梁11Bを支持するための第2支持部16が設けられている。第2支持部16は、第1PC単純梁11Bとの接合部の直下においてPC柱10の側面から突出するようにPC柱10に一体に形成されたRCブラケットである。第2支持部16は、第1PC単純梁11Bを所定の位置に配置する際に位置決めに用いられると共に、位置決めされた第1PC単純梁11BをPC柱10にピン接合するために用いられる。
 上記の通り本実施形態では、第1PC単純梁11Bが、第1PC固定梁11Aに比べ、梁幅及び梁成が共に小さい小断面となっている。第1PC単純梁11Bは、第1PC固定梁11Aに対し、梁幅方向について同軸に、かつ上面の高さが一致するように配置されている。そのため、第2支持部16は、後述する第1貫通孔31と干渉しないように、第1PC単純梁11Bの下面よりも低い位置に形成され、第1PC単純梁11Bの軸方向の両端部には、下面から下方に突出するように嵩上げ部17が一体に形成されている。
 ピン接合される第1PC単純梁11BとPC柱10との接合構造は、第1PC単純梁11Bが使用に供される際(パイプ敷設時及びパイプ支持時)に外れない程度にPC柱10に固定されていればよく、実際にピンが用いられる必要はない。本実施形態では、第1PC単純梁11Bにおける嵩上げ部17が形成された軸方向両端部に、鉛直方向に延びる位置決め孔18が貫通形成されている。一方、PC柱10の第2支持部16には、上面から突出するようにずれ止め鉄筋19が設けられている。第1PC単純梁11Bは、位置決め孔18がずれ止め鉄筋19を受容するように第2支持部16上に載置されることにより、PC柱10にピン接合される。位置決め孔18は、第1PC単純梁11Bの部材軸方向においてずれ止め鉄筋19よりも大きな寸法を有しており、第1PC単純梁11Bの端部は部材軸方向に摺動可能である。
 図4は、図3中のIV-IV断面図であり、図5及び図6は、それぞれ図3中のV-V線及びVI-VI線に沿って示す第1PC固定梁11Aの断面図である。図4に示されるように、PC柱10は、概ね正方形の矩形断面を呈しており、内部の外縁近傍に部材軸方向に延在する複数の柱主筋21や、柱主筋21の外側に配置された矩形状の帯筋22等を有している。柱主筋21は、PC柱10の断面において周方向に概ね等間隔に配置されている。
 図5に示されるように、第1PC固定梁11Aは、縦長の矩形断面を呈しており、内部の外縁近傍に配置されて部材軸方向に延在する複数の第1梁主筋24や、第1梁主筋24の外側に配置された肋筋25(スターラップ)等を有している。第1梁主筋24は、第1PC固定梁11Aの断面において上面近傍に2段に配置された上端筋と下面近傍に2段に配置された下端筋とを有している。
 図3、図4及び図5に示されるように、第1梁主筋24は、部材軸方向の中間部において第1PC固定梁11Aの外縁近傍に略等間隔に配置され、部材軸方向に延びている。第1梁主筋24は、部材軸方向の中間部から端部に向けて、幅方向の内側又は高さ方向の内側に向けて屈曲して部材軸方向に対して斜めに延びた後、再び屈曲して部材軸方向に延び、第1PC固定梁11Aの部材軸方向端面から所定の被り厚を確保する位置まで延びている。
 図3、図4及び図6に示されるように、第1PC固定梁11Aの部材軸方向の端部における、第1梁主筋24の部材軸方向中間部の延長線上には、部材軸方向端面に開口する複数の第1有底孔26が形成されている。第1有底孔26は、第1PC固定梁11Aの製作時(コンクリート打設前)に第1梁主筋24に沿って型枠内に配置されたシース27により形成された空洞である。つまり、第1有底孔26は、第1梁主筋24に隣接して第1梁主筋24に沿って延びている。シース27は、第1有底孔26内に第1鉄筋32が挿入された後に充填されるグラウトの付着力が大きくなるように、例えばスパイラル管により凹凸を有する形状にされるとよい。
 図3及び図4に示されるように、PC柱10には、第1有底孔26に対向する位置に開口するように複数の第1貫通孔31が形成されている。第1貫通孔31は、第1有底孔26に対向する位置から第1PC固定梁11Aの部材軸方向に延在しており、第1有底孔26に直線状に連続している。第1貫通孔31は、第1有底孔26と相反する側の端部において拡径した拡径部31aを有している。複数の第1有底孔26の拡径部31aは、第1有底孔26への後述するグラウトの注入時にエアが残ることがないように、それぞれ独立している。
 図7は、図3中のVII部拡大図である。図3、図4及び図7に示されるように、直線状に連続するように配置された第1貫通孔31及び第1有底孔26には、第1貫通孔31側から第1鉄筋32が挿入されている。第1鉄筋32は、異形棒鋼により構成され、挿入方向の後端部に径方向に膨出する円錐形状のヘッド32aを有している。第1鉄筋32は、ヘッド32aが第1貫通孔31の拡径部31aに配置された状態で、第1有底孔26に挿入された部分が所定の継手長さL1にわたって第1梁主筋24に重なる長さとされている。第1貫通孔31及び第1有底孔26には、第1鉄筋32が挿入された後に注入されたグラウトが充填されている。
 この構成により、第1鉄筋32は、第1梁主筋24に重なるラップ部分が第1重ね継手33(あき重ね継手)をなして第1梁主筋24に継ぎ合わされると共に、ヘッド32aが定着部をなしてPC柱10に十分な定着力をもって定着される。PC柱10の断面寸法が十分に大きく、第1鉄筋32の第1貫通孔31の内部に配置される部分が十分な定着力を発揮し得る長さを有する場合には、第1鉄筋32がヘッド32aを有していなくてもよい。また、ヘッド32aは、第1鉄筋32のPC柱10に対する定着力(主に第1PC固定梁11A側からの引張力に対する抵抗)を補うものであり、円錐形状に限られない。例えば、ヘッド32aは、円板形状や、第1鉄筋32の端部に折り曲げて形成されたフックであってもよい。
 図8は、図3に対応する図1中のIII部の拡大断面図であり、第1PC固定梁11AをPC柱10に固定する施工方法を説明するために、その施工状態を示している。図示されるように、第1PC固定梁11Aは、PC柱10に対して若干の隙間を空けると共に、アングル14に対しても若干の隙間を空けて、第1方向Xに互いに隣接する位置に建て込まれた一対のPC柱10の間に配置される。第1PC固定梁11Aは、PC柱10に剛接合されるまで、アングル14上に配置されたレベル調整プレート34により支持される。この状態で、第1有底孔26は第1貫通孔31に対向している。第1PC固定梁11Aの位置決め後、第1鉄筋32が第1貫通孔31側から第1貫通孔31及び第1有底孔26に挿入され、第1有底孔26の内部で所定の継手長さL1にわたって第1梁主筋24に重ねられる。この状態では、図8のPC柱10に対して左側に配置されてPC柱10にピン接合されるべき第1PC単純梁11B及び嵩上げ部17は配置されていない。
 第1PC固定梁11AとPC柱10との間の隙間は、建て込まれた一対のPC柱10の間に第1PC固定梁11Aを配置する作業を容易にするために設けられる。第1PC固定梁11Aとアングル14との間の隙間は、PC柱10と第1PC固定梁11Aとの隙間に充填されるグラウト用の型枠35を第1PC固定梁11Aの下面に沿って配置できるようにするために設けられる。型枠35は、第1PC固定梁11Aの軸方向端部に、PC柱10との隙間を塞ぐように環状に設けられる。
 第1PC固定梁11Aには、上面に開口する上流端と、軸方向端面に開口する下流端とを有するグラウト注入通路36が形成されている。また、第1PC固定梁11Aには、各第1有底孔26の底部近傍に開口する上流端と、第1PC固定梁11Aの上面に開口する下流端とを有する複数のエア抜き通路37が形成されている。グラウト注入通路36及びエア抜き通路37は、第1PC固定梁11Aに埋設されたチューブにより形成される。一方、PC柱10には、各第1貫通孔31の拡径部31aの上部に開口する上流端と、それよりも上方に配置される下流端とを有する複数のエア抜き通路38が設けられる。エア抜き通路38を形成するチューブは、第1貫通孔31の拡径部31aを塞ぐように設けられる図示しない型枠に取り付けられる。
 このような状態で、グラウト注入通路36からグラウトが圧入されることにより、グラウトが、第1PC固定梁11AとPC柱10との隙間から各第1有底孔26及び各第1貫通孔31に流れ込み、それぞれに接続されたエア抜き通路37、38からエアを排出させながら第1有底孔26及び第1貫通孔31に充填される。グラウトが流れ出たエア抜き通路37、38は閉じられ、全てのエア抜き通路37、38にグラウトが流れ込むと、グラウトの注入が終了する。グラウトが硬化することにより、第1重ね継手33を介して第1梁主筋24に継ぎ合わされた第1鉄筋32と、第1貫通孔31及び第1有底孔26における第1鉄筋32の周囲に充填されたグラウトとにより、第1PC固定梁11AがPC柱10に剛接合される。
 図9は、図2中のIX部の拡大断面図である。図2に示される第2PC固定梁12AとPC柱10との接合構造、及び第2PC単純梁12BとPC柱10との接合構造は、図1及び図3に示される第1PC梁11とPC柱10との接合構造と同様になっている。図2及び図9に示されるように、PC柱10には、第2PC固定梁12Aとの接合部の若干下方に、第2PC固定梁12Aを支持するための第1支持部13が設けられており、第2PC単純梁12Bとの接合部の直下に、第2PC単純梁12Bを支持するための第2支持部16が設けられている。
 第2PC固定梁12Aには、部材軸方向に延在する複数の第2梁主筋41が設けられると共に、第2梁主筋41に隣接して第2梁主筋41に沿って延び、部材軸方向端面に開口する第2有底孔42が形成されている。PC柱10には、第2有底孔42に対向する位置に開口するように第2貫通孔43が形成されている。連続する第2貫通孔43及び第2有底孔42には、第2貫通孔43側から第1鉄筋32と同様の第2鉄筋44が挿入され、所定の継手長さL1にわたって第2梁主筋41に重ねられる。第2貫通孔43及び第2有底孔42には、第2鉄筋44が挿入された後に注入されたグラウトが充填されている。これにより、第2鉄筋44は、第2梁主筋41に重なるラップ部分が第2重ね継手45(あき重ね継手)をなして第2梁主筋41に継ぎ合わされると共に、ヘッド44aが定着部をなしてPC柱10に十分な定着力をもって定着される。そして、第2鉄筋44と、第2貫通孔43及び第2有底孔42における第2鉄筋44の周囲に充填されたグラウトとにより、第2PC固定梁12AがPC柱10に剛接合される。
 第2PC単純梁12BのPC柱10に対する接合構造も、第1PC単純梁11Bのものと概ね同様である。但し、第2方向Yにおいては、第2PC単純梁12Bと第2PC固定梁12Aとが第2方向Yに互いに隣接して配置されることはない。そのため、第2支持部16が第2貫通孔43に干渉することはなく、第2支持部16が第2PC単純梁12Bの下面よりも低い位置に形成される必要はない。本実施形態では、第2PC単純梁12Bは、第1PC単純梁11B(図3)のように嵩上げ部17を備えておらず、その下面が平坦面になっている。その他の接合構造は、第1PC単純梁11Bのものと同様であるため、説明を省略する。
 図10は、図1中のX部の拡大断面図であり、上側PC柱10Uを下側PC柱10Lに固定する施工方法を説明するために、その施工状態を示している。図示されるように、下側PC柱10Lの柱主筋21は、コンクリート上面から更に上方に突出するように直線状に設けられている。一方、上側PC柱10Uには、下側PC柱10Lの柱主筋21に対応する位置に、下面に開口する鉛直有底孔51が設けられている。上側PC柱10Uの柱主筋21は、第1PC固定梁11Aの第1梁主筋24(図3、図4)と同様に、鉛直有底孔51を避けるように鉛直有底孔51の上方で屈曲して斜め下方に延びた後、再び屈曲して鉛直有底孔51に隣接して鉛直有底孔51に沿って鉛直に延びている。
 上側PC柱10Uがクレーンによって上方から吊り下ろされ、下側PC柱10Lの上に配置されることにより、鉛直有底孔51の内部に下側PC柱10Lの柱主筋21が受容され、下側PC柱10Lの柱主筋21が所定の継手長さL2にわたって上側PC柱10Uの柱主筋21に重なる。下側PC柱10Lの上面には、図示しないスペーサが配置されており、上側PC柱10Uは、下側PC柱10Lとの間に隙間を形成するように配置される。
 上側PC柱10Uには、1つの鉛直有底孔51の下部を介して上側PC柱10Uと下側PC柱10Lとの隙間に連通するグラウト注入通路52が形成されると共に、各鉛直有底孔51の上部に開口する複数のエア抜き通路53が形成されている。上側PC柱10Uが下側PC柱10Lの上方に配置された後、上側PC柱10Uと下側PC柱10Lとの隙間の周囲には、グラウト注入用の型枠54が配置される。
 このような状態で、グラウト注入通路52から注入されたグラウトが、上側PC柱10Uと下側PC柱10Lとの隙間を通って各鉛直有底孔51の内部に充填される。グラウトが硬化することにより、下側PC柱10Lの柱主筋21と上側PC柱10Uの柱主筋21とが重なるラップ部分が第3重ね継手55(あき重ね継手)をなし、下側PC柱10Lの柱主筋21と上側PC柱10Uの柱主筋21とが互いに継ぎ合わされる。
 次に、以上のように構成された架構構造1の構築手順について、図11~図13を参照しながら説明する。但し、以下に示す手順は一例であって、これに限定される必要はない。図11~図13に示されるアルファベット(A~I)は、構築中の架構構造1を、施工順に示しており、アルファベットの後に「1」が付された図(A1、B1・・・I1)は、図1に対応する架構構造1の側面図を示し、アルファベットの後に「2」が付された図(A2、B2・・・I2)は、図2に対応する架構構造1の正面図を示している。以下では、側面図と正面図とを合わせて引用する際に、例えば、「図11(A)」のようにアルファベットのみを記す。
 図11(A)に示されるように、第1列~第6列のA列及びB列の全てにおいて、下側PC柱10Lをフーチング5上に建て込む。下側PC柱10Lの建て込み後、適宜転倒防止策60を施す。
 次に、図11(B)に示されるように、第1列及び第2列間並びに第3列及び第4列間のA列及びB列において、第1段~第3段の第1PC梁11を下段から順に一対の下側PC柱10Lに架け渡すと共に、A列及びB列間の第1列~第6列の全てにおいて、第1段及び第2段の第2PC梁12を下段から順に一対の下側PC柱10Lに架け渡す。なお、第1段の第1PC梁11は第1PC固定梁11Aであり、第2段の第1PC梁11は第1PC単純梁11Bであり、第3段の第1PC梁11は第1PC固定梁11Aである。また、第1段の第2PC梁12は第2PC固定梁12Aであり、第2段の第2PC梁12は第2PC単純梁12Bである。
 その後、図11(C)に示されるように、第2列及び第3列間のA列及びB列において、第1段~第3段の第1PC梁11を下段から順に一対の下側PC柱10Lに架け渡す。これらの第1PC梁11は全て第1PC単純梁11Bである。
 次に、図12(D)に示されるように、第1列~第4列のA列及びB列において、上側PC柱10Uを下側PC柱10Lの上に建て込み、下側PC柱10Lに接合する。
 続いて、図12(E)に示されるように、第1列及び第2列間並びに第3列及び第4列間のA列及びB列において、第4段及び第5段の第1PC梁11を下段から順に一対の上側PC柱10Uに架け渡すと共に、A列及びB列間の第1列~第4列において、第3段~第5段の第2PC梁12を下段から順に一対の上側PC柱10Uに架け渡す。なお、第4段の第1PC梁11は第1PC単純梁11Bであり、第5段の第1PC梁11は第1PC固定梁11Aである。また、第3段の第2PC梁12は第2PC固定梁12Aであり、第4段の第2PC梁12は第2PC単純梁12Bであり、第5段の第2PC梁12は第2PC固定梁12Aである。
 その後、図12(F)に示されるように、第2列及び第3列間のA列及びB列において、第4段及び第5段の第1PC梁11を下段から順に一対の上側PC柱10Uに架け渡す。これらの第1PC梁11は全て第1PC単純梁11Bである。
 続いて、図13(G)に示されるように、第4列及び第5列間並びに第5列及び第6列間のA列及びB列において、第1段~第3段の第1PC梁11を下段から順に一対の下側PC柱10Lに架け渡す。これらの第1PC梁11は全て第1PC単純梁11Bである。
 その後、図13(H)に示されるように、第5列及び第6列のA列及びB列において、上側PC柱10Uを下側PC柱10Lの上に建て込み、下側PC柱10Lに接合する。
 最後に、図13(I)に示されるように、第4列及び第5列間並びに第5列及び第6列間のA列及びB列において、第4段及び第5段の第1PC梁11を下段から順に一対の上側PC柱10Uに架け渡すと共に、A列及びB列間の第5列及び第6列において、第3段~第5段の第2PC梁12を下段から順に一対の上側PC柱10Uに架け渡す。これにより、架構構造1の構築が完了する。なお、第1PC梁11は全て第1PC単純梁11Bである。一方、第3段の第2PC梁12は第2PC固定梁12Aであり、第4段の第2PC梁12は第2PC単純梁12Bであり、第3段の第2PC梁12は第2PC固定梁12Aである。
 以上のように構築される本実施形態の架構構造1の作用効果を以下に説明する。
 図3及び図8に示されるように、第1PC固定梁11Aの部材軸方向両端部は、第1有底孔26に挿入されて第1重ね継手33を介して第1梁主筋24に継ぎ合わされると共に第1貫通孔31に配置された第1鉄筋32と、第1貫通孔31における第1鉄筋32の周囲に充填されたグラウトとによって一対のPC柱10に剛接合される。そのため、第1鉄筋32を配置する前に第1PC固定梁11Aを一対のPC柱10の間に配置でき、梁主筋に沿った水平移動を伴うことなく、PC柱10及び第1PC固定梁11Aを容易に配置することができる。また、図11~図13に示されるように、効率の良い手順でPC柱10及び第1PC固定梁11Aの配置作業を進めることができる。
 本実施形態では、第1有底孔26が第1梁主筋24に隣接して第1梁主筋24に沿って延びるように形成され、第1梁主筋24が第1有底孔26の内部で所定の継手長さL1にわたって第1鉄筋32と重なる長さを有し、第1梁主筋24と重なる第1鉄筋32の第1有底孔26に挿入されたラップ部分と、第1有底孔26における第1鉄筋32の周囲に充填されたグラウトとにより第1重ね継手33が構成される。これにより、機械式継手部材を用いることなくPC柱10と第1PC固定梁11Aとを剛接合することができ、資材コストの削減が可能である。
 また、PC柱10には、第1PC固定梁11Aを支持するための第1支持部13が設けられているため、第1PC固定梁11Aを支持する架台等の仮設備を設けることなく、第1PC固定梁11AのPC柱10への接合作業を行うことができ、作業が容易である。
 本実施形態では、第1鉄筋32が、第1貫通孔31の内部において径方向に膨出するヘッド32aを有するため、PC柱10の断面寸法が第1鉄筋32の定着に必要な寸法に満たない場合であっても、第1鉄筋32をPC柱10に定着させることができる。
 図2及び図9に示されるように、第2PC固定梁12Aの部材軸方向両端部は、第2有底孔42に挿入されて第2重ね継手45を介して第2梁主筋41に継ぎ合わされると共に第2貫通孔43に配置された第2鉄筋44と、第2貫通孔43における第2鉄筋44の周囲に充填されたグラウトとによって一対のPC柱10に剛接合される。そのため、第1方向Xだけでなく第2方向Yについても、PC柱10及び第2PC固定梁12Aの配置作業を容易にすることができ、かつ効率の良い手順でPC柱10及び第2PC固定梁12Aの配置作業を進めることができる。
 図1及び図2に示されるように、第1PC固定梁11Aと第2PC固定梁12Aとは、互いに異なる高さでPC柱10に剛接合されている。そのため、第1貫通孔31及び第2貫通孔43が分散して配置され、PC柱10の製造時におけるコンクリートの充填不良等による品質低下が防止される。また、品質確保のために部材寸法が大きくなることが防止される。
 図1に示されるように、第1PC固定梁11Aと第1PC単純梁11Bとは、第1方向X及び上下方向のそれぞれに互いに隣接して配置されている。そのため、第1方向Xに並ぶ第1PC梁11の全てについて柱梁接合部を剛接合にする必要がなく、資材コストがより削減されると共に、第1鉄筋32と第1梁主筋24との継ぎ合わせ作業が減って組立作業がより容易になる。
 また、下側PC柱10L及び上側PC柱10Uは、それぞれ複数段の第1PC梁11を支持する長さに形成されている。そのため、PC柱10の本数が少なくなり、PC柱10の総合的な製造コストが削減される上、組立作業がより容易になる。
 加えて、架構構造1の構築手順は、図11(A)に示されるように第1方向Xに並ぶように一対のPC柱10を建て込むステップと、図11(B)及び図8に示されるように、第1有底孔26が第1貫通孔31に対向するように、第1PC固定梁11Aを一対のPC柱10の間に配置するステップと、図8に示されるように、第1鉄筋32を第1貫通孔31及び第1有底孔26に挿入し、第1鉄筋32の第1有底孔26内に配置されたラップ部分を所定の継手長さL1にわたって第1梁主筋24に重ねるステップと、第1貫通孔31及び第1有底孔26にグラウトを注入し、第1鉄筋32を第1PC固定梁11Aに継ぎ合わせると共にPC柱10に定着させるステップとを含んでいる。これにより、機械式継手部材を用いることなくPC柱10と第1PC固定梁11Aとを剛接合することができる。また、第1鉄筋32を配置する前に第1PC固定梁11Aを一対のPC柱10の間に配置できるため、PC柱10及び第1PC固定梁11Aの配置作業が容易である上、効率の良い手順でPC柱10及び第1PC固定梁11Aの配置作業を進めることができる。
≪第2実施形態≫
 次に、図14及び図15を参照して本発明の第2実施形態について説明する。第1実施形態と同様の部材や部位には同一の符号を付し、重複する説明は適宜省略する。
 図14は、架構構造1の拡大側断面図であり、第1実施形態の図3に相当する。図15は、図14中のXV-XV線に沿って示す架構構造1の拡大平断面図であり、第1実施形態の図4に相当する。本実施形態では、第1梁主筋24は、軸方向の全長にわたって第1PC固定梁11Aの部材軸方向と平行に直線状に延びており、その端部にスリーブ71が取り付けられている。スリーブ71は、軸方向に延びる内孔を有し、内孔における軸方向の一方の概ね半分に挿入された第1梁主筋24と、内孔における軸方向の他方の概ね半分に挿入された第1鉄筋32とを継ぎ合わせる機械式継手72を構成する鋼製の筒部材である。
 スリーブ71は、本実施形態では、それぞれ異形鉄筋により構成された第1梁主筋24及び第1鉄筋32を、内孔、より詳しくは内孔における第1梁主筋24及び第1鉄筋32の周囲に充填されたグラウトにより保持する。他の実施形態では、スリーブ71の内孔に雌ねじが形成され、第1梁主筋24及び第1鉄筋32の端部にそれぞれ形成された雄ねじが雌ねじに螺合することにより、スリーブ71が第1梁主筋24及び第1鉄筋32を保持してもよく、更にグラウトや固定ナットが併用されて、スリーブ71が第1梁主筋24及び第1鉄筋32を保持してもよい。
 即ち、第1PC固定梁11Aが一対のPC柱10に剛接合される前のPC部材である状態では、スリーブ71は、内孔の軸方向の一側において第1梁主筋24の軸方向端部を保持すると共に、内孔の軸方向の他側において第1PC固定梁11Aに部材軸方向端面に開口する第1有底孔26を形成する。そして、第1PC固定梁11Aは、第1有底孔26が第1貫通孔31に対向するように一対のPC柱10の間に配置される。その後、図8を参照して説明した第1実施形態と同様に、第1鉄筋32が第1貫通孔31側から第1貫通孔31及び第1有底孔26に挿入され、第1PC固定梁11AとPC柱10との隙間にグラウトが注入されることにより、各第1有底孔26及び各第1貫通孔31にグラウトが充填される。充填されたグラウトが硬化することにより、PC柱10と第1PC固定梁11Aとが、機械式継手72を介して第1梁主筋24に継ぎ合わされた第1鉄筋32と、第1貫通孔31における第1鉄筋32の周囲に充填されたグラウトとにより剛接合される。
 第1PC固定梁11AとPC柱10とが、このようにして接合される図示の構造とされていても、第1実施形態と同様の作用効果を得ることができる。即ち、第1鉄筋32を配置する前に第1PC固定梁11Aを一対のPC柱10の間に配置できるため、梁主筋に沿った水平移動を伴うことなく、PC柱10及び第1PC固定梁11Aを容易に配置することができる。また、図11~図13に示されるような効率の良い手順でPC柱10及び第1PC固定梁11Aの配置作業を進めることができる。
 本実施形態では、第1有底孔26が第1梁主筋24の軸方向端部を保持するスリーブ71によって形成され、スリーブ71によって第1梁主筋24の軸方向端部を保持するように機械式継手72が構成される。そのため、機械式継手72によって第1鉄筋32が第1梁主筋24に確実に継ぎ合わされる。
 以上で具体的実施形態の説明を終えるが、本発明は上記実施形態に限定されることなく幅広く変形実施することができる。例えば、上記実施形態では、一例としてパイプラックに架構構造1を適用したが、他の構造物に適用することも当然に可能である。また、各部材や部位の具体的構成や配置、数量、角度、施工手順など、本発明の趣旨を逸脱しない範囲であれば適宜変更可能である。一方、上記実施形態に示した各構成要素は必ずしも全てが必須ではなく、適宜選択することができる。
 1   架構構造
 2   柱
 3   第1梁
 4   第2梁
 10  PC柱
 10L 下側PC柱
 10U 上側PC柱
 11  第1PC梁
 11A 第1PC固定梁(両端固定梁)
 11B 第1PC単純梁(単純梁)
 12  第2PC梁
 12A 第2PC固定梁
 12B 第2PC単純梁
 13  第1支持部(支持部)
 24  第1梁主筋
 26  第1有底孔
 31  第1貫通孔
 32  第1鉄筋
 32a ヘッド(定着部)
 33  第1重ね継手(第1継手)
 41  第2梁主筋
 42  第2有底孔
 43  第2貫通孔
 44  第2鉄筋
 45  第2重ね継手(第2継手)
 71  スリーブ(筒部材)
 72  機械式継手(第1継手)
 X   第1方向
 Y   第2方向

Claims (11)

  1.  平面視において第1方向に並べられた複数のPC(プレキャストコンクリート)柱と、部材軸方向にそれぞれ延在する上端筋及び下端筋を含む第1梁主筋を有し、前記第1方向に互いに隣接する一対の前記PC柱に架け渡された少なくとも1つの第1PC梁とを備えた架構構造であって、
     前記第1PC梁には、部材軸方向両端面に開口するように、前記第1梁主筋の端部に第1継手を形成するための第1有底孔が形成され、
     前記一対の前記PC柱には、対応する前記第1有底孔に対向する位置に開口するように第1貫通孔が形成され、
     前記第1PC梁の部材軸方向両端部が、前記第1有底孔に挿入され、前記第1継手を介して前記第1梁主筋に継ぎ合わされると共に前記第1貫通孔に配置された第1鉄筋と、前記第1貫通孔における前記第1鉄筋の周囲に充填されたグラウトとによって前記一対の前記PC柱に剛接合されたことを特徴とする架構構造。
  2.  前記第1有底孔が、前記第1梁主筋に隣接して当該第1梁主筋に沿って延びるように形成され、
     前記第1梁主筋が、所定の継手長さにわたって前記第1鉄筋と重なる長さを有し、
     前記第1継手が、前記第1鉄筋と重なる前記第1梁主筋の前記第1有底孔に挿入されたラップ部分と、前記第1有底孔における前記第1鉄筋の周囲に充填されたグラウトとにより構成される重ね継手であることを特徴とする請求項1に記載の架構構造。
  3.  前記第1有底孔が、前記第1梁主筋の軸方向端部を保持する筒部材によって形成され、
     前記第1継手は、前記筒部材によって前記第1鉄筋の軸方向端部を保持するように構成された機械式継手であることを特徴とする請求項1に記載の架構構造。
  4.  前記第1鉄筋が、前記第1貫通孔の内部において径方向に膨出する定着部を有することを特徴とする請求項1~請求項3のいずれかに記載の架構構造。
  5.  前記PC柱には、前記第1PC梁を支持するための支持部が設けられたことを特徴とする請求項1~請求項4のいずれかに記載の架構構造。
  6.  前記PC柱が平面視で前記第1方向に交差する第2方向に複数列に並べられ、
     部材軸方向にそれぞれ延在する上端筋及び下端筋を含む第2梁主筋を有し、前記第2方向に互いに隣接する一対の前記PC柱に架け渡された少なくとも1つの第2PC梁を更に備え、
     前記第2PC梁には、部材軸方向両端面に開口するように、前記第2梁主筋の端部に第2継手を形成するための第2有底孔が形成され、
     前記第2方向に互いに隣接する前記一対の前記PC柱には、前記第2有底孔に対向する位置に開口するように第2貫通孔が形成され、
     前記第2PC梁の部材軸方向両端部が、前記第2有底孔に挿入され、前記第2継手を介して前記第2梁主筋に継ぎ合わされると共に前記第2貫通孔に配置された第2鉄筋と、前記第2貫通孔における前記第2鉄筋の周囲に充填されたグラウトとによって前記一対の前記PC柱に剛接合されたことを特徴とする請求項1~請求項5のいずれかに記載の架構構造。
  7.  前記第1PC梁と前記第2PC梁とが互いに異なる高さで前記PC柱に剛接合されたことを特徴とする請求項6に記載の架構構造。
  8.  前記PC柱が前記第1方向において少なくとも3列に並べられ、
     前記第1PC梁の両端が前記第1方向に互いに隣接する一対の前記PC柱に剛接合する両端固定梁と、前記第1PC梁の両端が前記第1方向に互いに隣接する一対の前記PC柱にピン接合される単純梁とが、前記第1方向に互いに隣接して配置されたことを特徴とする請求項1~請求項7のいずれかに記載の架構構造。
  9.  前記第1PC梁が、前記第1方向に互いに隣接する一対の前記PC柱に対して高さ方向に異なる位置に複数段に架け渡され、
     前記PC柱が、複数段の前記第1PC梁を支持する長さに形成されたことを特徴とする請求項1~請求項8のいずれかに記載の架構構造。
  10.  前記第1PC梁が、前記第1方向に互いに隣接する一対の前記PC柱に対して高さ方向に異なる位置に複数段に架け渡され、
     前記第1PC梁の両端が前記第1方向に互いに隣接する一対の前記PC柱に剛接合する両端固定梁と、前記第1PC梁の両端が前記第1方向に互いに隣接する一対の前記PC柱にピン接合される単純梁とが、上下方向に互いに隣接して配置されたことを特徴とする請求項1~請求項9のいずれかに記載の架構構造。
  11.  複数のPC柱と、互いに隣接する一対の前記PC柱に剛接合される少なくとも1つの第1PC梁とを備えた架構構造の構築方法であって、
     部材軸方向にそれぞれ延在する上端筋及び下端筋を含む第1梁主筋を有し、前記第1梁主筋の端部に第1継手を形成するための第1有底孔が部材軸方向両端面に開口するように形成された前記第1PC梁を用意するステップと、
     第1貫通孔が側面に開口するように形成された前記PC柱を用意するステップと、
     平面視における第1方向に並ぶように一対の前記PC柱を建て込むステップと、
     前記第1有底孔が前記第1貫通孔に対向するように、前記第1PC梁を一対の前記PC柱の間に配置するステップと、
     第1鉄筋を前記第1貫通孔及び前記第1有底孔に挿入し、前記第1継手を介して前記第1梁主筋に継ぎ合わせるステップと、
     前記第1貫通孔にグラウトを注入し、前記第1鉄筋を前記PC柱に定着させるステップと
    を含むことを特徴とする架構構造の構築方法。
PCT/JP2015/006047 2015-07-17 2015-12-04 架構構造及びその構築方法 WO2017013694A1 (ja)

Priority Applications (9)

Application Number Priority Date Filing Date Title
ES15898856T ES2794126T3 (es) 2015-07-17 2015-12-04 Estructura de armazón y método de construcción de la misma
BR112018000785-4A BR112018000785B1 (pt) 2015-07-17 2015-12-04 Estrutura de quadro e método de construção de estrutura de quadro
JP2016546868A JP6030274B1 (ja) 2015-07-17 2015-12-04 架構構造及びその構築方法
SG11201710668WA SG11201710668WA (en) 2015-07-17 2015-12-04 Frame structure and method of constructing frame structure
MX2018000633A MX2018000633A (es) 2015-07-17 2015-12-04 Estructura de armazon y metodo para construir la estructura de armazon.
MYPI2017700774A MY187292A (en) 2015-07-17 2015-12-04 Frame structure and method of constructing frame structure
EP15898856.8A EP3327214B1 (en) 2015-07-17 2015-12-04 Framework structure and construction method for same
US15/573,995 US10465374B2 (en) 2015-07-17 2015-12-04 Frame structure and method of constructing frame structure
PH12018500126A PH12018500126A1 (en) 2015-07-17 2018-01-16 Frame structure and method of constructing frame structure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015142982 2015-07-17
JP2015-142982 2015-07-17

Publications (1)

Publication Number Publication Date
WO2017013694A1 true WO2017013694A1 (ja) 2017-01-26

Family

ID=57834875

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/006047 WO2017013694A1 (ja) 2015-07-17 2015-12-04 架構構造及びその構築方法

Country Status (10)

Country Link
US (1) US10465374B2 (ja)
EP (1) EP3327214B1 (ja)
BR (1) BR112018000785B1 (ja)
ES (1) ES2794126T3 (ja)
MX (1) MX2018000633A (ja)
PH (1) PH12018500126A1 (ja)
PT (1) PT3327214T (ja)
SG (1) SG11201710668WA (ja)
TW (1) TWI592546B (ja)
WO (1) WO2017013694A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906984A (zh) * 2017-04-18 2017-06-30 江苏瑞永建设工程技术有限公司 一种预制装配式钢混框架电梯井结构及其施工方法
JP2019002214A (ja) * 2017-06-16 2019-01-10 株式会社安藤・間 プレキャストコンクリート部材の接合方法および接合構造
CN114922364A (zh) * 2022-04-24 2022-08-19 中建三局集团有限公司 一种可周转式悬挑防护棚

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015131334A1 (zh) * 2014-03-04 2015-09-11 东莞市石西智能机器制造有限公司 一种建筑结构及其施工方法
MX2019009636A (es) 2017-02-15 2019-11-08 Tindall Corp Metodos y aparatos para construir una estructura de concreto.
US10781582B2 (en) * 2017-09-14 2020-09-22 South Dakota Board Of Regents Apparatus, systems and methods for repairable precast moment-resisting buildings
TWI674345B (zh) * 2018-01-23 2019-10-11 潤弘精密工程事業股份有限公司 梁柱接頭結構及其施工方法
JP6644324B1 (ja) * 2019-09-13 2020-02-12 黒沢建設株式会社 3軸圧縮柱梁接合部のプレストレス導入法
CN111236423A (zh) * 2020-01-06 2020-06-05 三箭建设工程集团有限公司 一种框架梁与柱的半干式连接节点及其施工方法
US11951652B2 (en) 2020-01-21 2024-04-09 Tindall Corporation Grout vacuum systems and methods
CN112095781B (zh) * 2020-07-28 2022-02-25 浙江鸿翔远大建筑科技有限公司 节能型预制梁连接结构
CN113006272B (zh) * 2021-02-01 2022-06-07 中建科技集团有限公司 一种装配式预应力混凝土框架***及施工方法
CN117324822B (zh) * 2023-12-01 2024-03-22 山东科技职业学院 用于建筑桩基钢筋笼焊接的机械设备

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06173339A (ja) * 1992-12-10 1994-06-21 Kajima Corp 柱・梁接合部の施工方法
JPH0893049A (ja) * 1994-09-28 1996-04-09 Taisei Corp 建築構造物の架構
JP2009293192A (ja) * 2008-06-02 2009-12-17 Ohbayashi Corp Pc部材とコンクリート部材とが接合されてなるコンクリート構造体を構築する方法、仕口部と梁とからなる構造体の構築方法
JP4496023B2 (ja) * 2004-07-06 2010-07-07 株式会社大林組 プレキャストコンクリート柱梁の接合構造、この接合構造を含んだ柱梁架構構造、およびプレキャストコンクリート柱梁の接合方法

Family Cites Families (73)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US938458A (en) * 1909-04-08 1909-11-02 Carl E Brockhausen Concrete construction.
US1031043A (en) * 1910-02-17 1912-07-02 Unit Construction Co Concrete cosntruction.
US1031048A (en) * 1910-04-14 1912-07-02 Unit Construction Co Concrete construction.
FR645900A (fr) * 1927-12-19 1928-11-03 Perfectionnements apportés dans l'édification des constructions en béton armé aumoyen d'éléments moulés à l'avance
FR708726A (fr) * 1930-04-08 1931-07-28 Procédé d'assemblage ou de jonction de pièces en béton armé
US2150982A (en) * 1936-06-26 1939-03-21 Sheffield Steel Corp Expansion and contraction joint
US2569669A (en) * 1946-02-27 1951-10-02 Peoples First Nat Bank & Trust Beam connection for precast concrete members
GB696144A (en) * 1950-12-13 1953-08-26 Cecil Brian Hugh Colquhoun Improvements in and relating to joining pre-cast concrete members
CH376258A (de) * 1958-08-16 1964-03-31 Pforzheim Metallschlauch Hüllrohr
US3971179A (en) * 1969-08-13 1976-07-27 Andrew Bodocsi Non-bonded framing system
US3712008A (en) * 1970-10-16 1973-01-23 T Georgiev Modular building construction system
US3762115A (en) * 1971-04-26 1973-10-02 Schokbeton Products Corp Multilevel concrete building of precast modular units
US3708933A (en) * 1971-07-16 1973-01-09 Y Yang Demountable garage building
US3744196A (en) * 1971-09-20 1973-07-10 H Weese Hinged slab system of building
CH576049A5 (ja) * 1973-11-26 1976-05-31 Hochtief Ag Hoch Tiefbauten
GB1524252A (en) * 1975-05-13 1978-09-06 Ccl Systems Ltd Joining concrete members in buildings
CH598433A5 (ja) * 1976-07-28 1978-04-28 Camazet Ag
DE2641403A1 (de) * 1976-09-15 1978-03-16 Heinz Dipl Ing Borsdorf Biegesteifer fertigteilanschluss
US4211045A (en) * 1977-01-20 1980-07-08 Kajima Kensetsu Kabushiki Kaisha Building structure
FR2438126A1 (fr) * 1978-10-06 1980-04-30 Auxil Entreprises Soc Ossature pour plate-forme, notamment pour toiture de batiment
FR2438719A1 (fr) * 1978-10-10 1980-05-09 Klein Bernard Liaison en tete de poteaux
US4302915A (en) * 1979-04-30 1981-12-01 Apcoa, Inc. Parking garage construction
US4269384A (en) * 1979-05-07 1981-05-26 Daf Indal Ltd. Collapsible structures employing frangible connections
US4330970A (en) * 1979-10-23 1982-05-25 Copreal S.A. Building structure and steel parts for same
US4437272A (en) * 1982-01-28 1984-03-20 Johnson Delp W Insert for foldable concrete building construction with pivot connections, integral lifting bar, and building height control bar
US4630412A (en) * 1983-05-30 1986-12-23 Engstroem Bjoern M H Collapse preventing connection device for building structures
US4603522A (en) * 1983-08-12 1986-08-05 Johnson Delp W Hingeable connection device for thru the slab connections in foldable building construction
US4781006A (en) * 1986-11-10 1988-11-01 Haynes Harvey H Bolted chord bar connector for concrete construction
CH676615A5 (ja) * 1988-04-22 1991-02-15 Bau Box Ewiag
JPH02252815A (ja) * 1989-03-27 1990-10-11 Kajima Corp 地盤アンカー頭部の定着方法
GB2252142B (en) * 1990-12-12 1994-11-09 Kajima Corp Junction structure between a steel beam and a column
US5123220A (en) * 1991-01-16 1992-06-23 George Simenoff Column assembly
JPH06185108A (ja) * 1992-11-04 1994-07-05 Shimizu Corp 小梁の構築方法
US5366672A (en) * 1993-03-18 1994-11-22 Erico International Corporation Method of forming concrete structures with a grout splice sleeve which has a threaded connection to a reinforcing bar
CN1096535C (zh) * 1997-06-27 2002-12-18 株式会社皆荣技术 混凝土砌块的连接结构及其所用的连接器
EP1021630B1 (de) * 1997-07-03 2001-11-21 Pfeifer Seil- und Hebetechnik GmbH & Co. Vorrichtung zum verbinden von armierten betonteilen
JP2909451B1 (ja) * 1997-12-16 1999-06-23 黒沢建設株式会社 プレストレストコンクリート構造物における柱と梁の接合構造
GB9800861D0 (en) * 1998-01-15 1998-03-11 Amorntatkul Noppadol Forging of workpieces
US6052964A (en) * 1998-03-16 2000-04-25 Ferm; Carl A. Method for restoring load transfer capability
JP3916336B2 (ja) * 1999-02-02 2007-05-16 株式会社竹中工務店 免震建物構造
US6681545B1 (en) * 1999-09-07 2004-01-27 Peter James Building reinforcements
US6651394B2 (en) * 2000-04-24 2003-11-25 Bill Hughes Apparatus for use in the construction of precast, moment-resisting frame buildings
US7444786B2 (en) * 2001-09-15 2008-11-04 Concrete Log Systems, Inc. Cast log structure
JP3837390B2 (ja) 2003-03-19 2006-10-25 株式会社大林組 プレキャストコンクリート柱梁の接合構造およびこの接合構造を含んだ架構構造、プレキャストコンクリート柱梁の接合方法
US7171787B2 (en) * 2003-06-24 2007-02-06 Ch2M Hill Inc. Rectangular tilt-up concrete tank construction
JP3776918B2 (ja) * 2004-06-24 2006-05-24 三男 佐々木 立体構築物
CN101111647B (zh) * 2004-12-03 2015-05-13 布卢斯科普钢铁有限公司 墙板、墙、建筑物以及建造墙和屋顶的方法
JP4833591B2 (ja) * 2005-06-17 2011-12-07 株式会社竹中工務店 プレキャストコンクリート製柱・梁部材の連結工法
US7765764B2 (en) * 2005-08-08 2010-08-03 Sergio Zambelli Device for connecting beams and pillars or similar structural elements
US20090025307A1 (en) * 2006-06-15 2009-01-29 Crichlow Henry B Severe storm shelter
US7934347B2 (en) * 2006-07-28 2011-05-03 Paul Brienen Coupling beam and method of use in building construction
FI125954B (fi) * 2008-01-21 2016-04-29 Peikko Finland Oy Betonilaataston liikuntasaumajärjestelmä
US20090263185A1 (en) * 2008-04-17 2009-10-22 Yee Alfred A Rebar splice sleeve and method of splicing
US8667754B2 (en) * 2008-08-26 2014-03-11 The Boeing Company Composite tie rod and method for making the same
US8490363B2 (en) * 2008-12-31 2013-07-23 The Spancrete Group, Inc. Modular concrete building
US8381485B2 (en) * 2010-05-04 2013-02-26 Plattforms, Inc. Precast composite structural floor system
US8162569B2 (en) * 2010-06-08 2012-04-24 Kennedy Metal Products & Buildings, Inc. High-strength anchor system, safe room bulkhead, and method of anchoring a support to mine strata
DE102010027661B4 (de) * 2010-07-19 2012-08-02 Schöck Bauteile GmbH Schalungsvorrichtung und Verfahren zum Schaffen einer Aussparung beim Gießen eines Gebäudebauteils
US8844223B2 (en) * 2010-08-24 2014-09-30 Empire Technology Development Llc Prefabricated wall panels
WO2012024814A1 (en) * 2010-08-24 2012-03-01 Empire Technology Development Llc Reinforced concrete dense column structure systems
US8959867B2 (en) * 2011-03-16 2015-02-24 John A. Schold Systems and methods for constructing a building structure
US20130028658A1 (en) * 2011-07-27 2013-01-31 Yee Alfred A Splice sleeve with elliptical or compound curve cross section
JP2014051798A (ja) * 2012-09-06 2014-03-20 Splice Sleeve Japan Ltd 鉄筋の継手工法
IN2014DE00849A (ja) * 2013-05-08 2015-06-19 Kt India Llc
US9217248B2 (en) * 2013-06-20 2015-12-22 Morton Buildings, Inc. Column assembly for use in building foundation systems and methods of assembling same
US20150135615A1 (en) * 2013-11-08 2015-05-21 Cupples International Inc. Perimeter wall
US9410316B2 (en) * 2013-12-24 2016-08-09 Reigstad & Associates, Inc. Post-tension concrete leave out splicing system and method
US9644369B2 (en) * 2013-12-24 2017-05-09 Reigstad & Associates, Inc. Post-tension concrete leave out splicing system and method
JP5612231B1 (ja) * 2014-05-16 2014-10-22 黒沢建設株式会社 Pc圧着関節工法による耐震設計法
US9388562B2 (en) * 2014-05-29 2016-07-12 Rocky Mountain Prestress, LLC Building system using modular precast concrete components
JP6514856B2 (ja) * 2014-05-30 2019-05-15 高周波熱錬株式会社 鉄筋コンクリート構造物及び鉄筋コンクリート構造物の設計方法
EP2966232B8 (en) * 2014-07-07 2017-08-02 Fundacíon Tecnalia Research & Innovation Dry joint joining device between columns and beams of precast reinforced concrete
US9506266B2 (en) * 2014-09-11 2016-11-29 Aditazz, Inc. Concrete deck with lateral force resisting system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06173339A (ja) * 1992-12-10 1994-06-21 Kajima Corp 柱・梁接合部の施工方法
JPH0893049A (ja) * 1994-09-28 1996-04-09 Taisei Corp 建築構造物の架構
JP4496023B2 (ja) * 2004-07-06 2010-07-07 株式会社大林組 プレキャストコンクリート柱梁の接合構造、この接合構造を含んだ柱梁架構構造、およびプレキャストコンクリート柱梁の接合方法
JP2009293192A (ja) * 2008-06-02 2009-12-17 Ohbayashi Corp Pc部材とコンクリート部材とが接合されてなるコンクリート構造体を構築する方法、仕口部と梁とからなる構造体の構築方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3327214A4 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106906984A (zh) * 2017-04-18 2017-06-30 江苏瑞永建设工程技术有限公司 一种预制装配式钢混框架电梯井结构及其施工方法
JP2019002214A (ja) * 2017-06-16 2019-01-10 株式会社安藤・間 プレキャストコンクリート部材の接合方法および接合構造
JP6999294B2 (ja) 2017-06-16 2022-01-18 株式会社安藤・間 プレキャストコンクリート部材の接合方法および接合構造
CN114922364A (zh) * 2022-04-24 2022-08-19 中建三局集团有限公司 一种可周转式悬挑防护棚
CN114922364B (zh) * 2022-04-24 2023-09-08 中建三局集团有限公司 一种可周转式悬挑防护棚

Also Published As

Publication number Publication date
US10465374B2 (en) 2019-11-05
PT3327214T (pt) 2020-06-08
BR112018000785B1 (pt) 2023-02-07
EP3327214A4 (en) 2019-03-27
EP3327214A1 (en) 2018-05-30
US20180291611A1 (en) 2018-10-11
MX2018000633A (es) 2018-09-06
ES2794126T3 (es) 2020-11-17
PH12018500126A1 (en) 2018-07-23
EP3327214B1 (en) 2020-04-29
TW201704603A (zh) 2017-02-01
SG11201710668WA (en) 2018-02-27
TWI592546B (zh) 2017-07-21
BR112018000785A2 (ja) 2018-09-04

Similar Documents

Publication Publication Date Title
WO2017013694A1 (ja) 架構構造及びその構築方法
CN105804241A (zh) 一种单层预制装配式钢筋混凝土梁柱节点
CN103850363B (zh) 预制通孔装配式钢筋混凝土剪力墙的施工方法
KR101325245B1 (ko) 강관과 콘크리트 합성된 조립식 교각 및 그 시공방법
JP6792329B2 (ja) プレキャストコンクリート柱を用いた柱梁架構の施工方法
KR20160130625A (ko) 삼각망 배근에 의한 psc구조 및 이의 시공방법
JP2014005652A (ja) 杭式桟橋の施工方法
JP6030274B1 (ja) 架構構造及びその構築方法
KR20120060015A (ko) 창틀용 내진 보강 접합구조의 pc 부재 및 이를 이용한 건물 내진 시공 방법
JP3690437B2 (ja) 既存建築物の耐震補強構造
JP2010261270A (ja) 複合構造および複合構造建築物の施工方法
JP6266246B2 (ja) 鋼製柱とフーチングの接合構造及びその施工方法
JP6414679B2 (ja) 柱梁架構構造、柱梁架構構造の構築方法
JP4996370B2 (ja) 架構組立方法および建物の架構
JP6849491B2 (ja) 鉄骨柱の露出型柱脚構造及びその施工方法
CN104453013A (zh) 预制墙体构件以及装配式钢筋混凝土剪力墙
JP6340467B1 (ja) 袖壁を用いるラーメン構造及びその接合方法
JP6720761B2 (ja) ラーメン構造の構築方法
JP4449595B2 (ja) 柱梁接合構造、柱梁接合構造の構築方法、地下構造物の建設方法、および建物
JP6496464B2 (ja) 既製柱とフーチングの接合構造
JP7442268B2 (ja) 地下躯体構造
JP7317571B2 (ja) 建物の建築方法
KR20120037222A (ko) 내진 보강 접합구조를 갖는 pc 부재 및 이를 이용한 건물 내진 시공 방법
KR20130051183A (ko) 내진 보강 구조물 및 이를 이용한 내진 보강 방법
JP7264766B2 (ja) 接合部材、杭部材と柱部材との接合構造、及び、杭部材と柱部材との接合方法

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2016546868

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15898856

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 15573995

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: MX/A/2018/000633

Country of ref document: MX

WWE Wipo information: entry into national phase

Ref document number: 12018500126

Country of ref document: PH

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 11201710668W

Country of ref document: SG

WWE Wipo information: entry into national phase

Ref document number: 2015898856

Country of ref document: EP

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112018000785

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112018000785

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20180115