- CN102819621B CN102819621B CN201110156325.5A CN201110156325A CN102819621B CN 102819621 B CN102819621 B CN 102819621B CN 201110156325 A CN201110156325 A CN 201110156325A CN 102819621 B CN102819621 B CN 102819621B
- Authority
- CN
- China
- Prior art keywords
- construction
- bim
- simulation
- data base
- display
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 73
- 238000004088 simulation Methods 0.000 title claims abstract description 19
- 238000000034 method Methods 0.000 claims description 22
- 238000013461 design Methods 0.000 claims description 6
- 239000000463 material Substances 0.000 claims description 6
- 238000012544 monitoring process Methods 0.000 claims description 4
- 238000011835 investigation Methods 0.000 claims description 2
- 230000000007 visual effect Effects 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000003860 storage Methods 0.000 abstract description 3
- 238000007726 management method Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 5
- 238000012913 prioritisation Methods 0.000 description 5
- 238000011960 computer-aided design Methods 0.000 description 4
- 238000013459 approach Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005662 electromechanics Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110156325.5A CN102819621B (zh) | 2011-06-10 | 2011-06-10 | 一种通过bim进行施工模拟的装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110156325.5A CN102819621B (zh) | 2011-06-10 | 2011-06-10 | 一种通过bim进行施工模拟的装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102819621A CN102819621A (zh) | 2012-12-12 |
CN102819621B true CN102819621B (zh) | 2015-04-01 |
Family
ID=47303732
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110156325.5A Active CN102819621B (zh) | 2011-06-10 | 2011-06-10 | 一种通过bim进行施工模拟的装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102819621B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104850709A (zh) * | 2015-05-25 | 2015-08-19 | 苏州金螳螂建筑装饰股份有限公司 | 建筑装饰工程施工三维模拟方法 |
Families Citing this family (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103440600A (zh) * | 2013-09-13 | 2013-12-11 | 成都中铁隆工程集团有限公司 | 一种多层次4d模型的bim风险监控***及方法 |
CN104951582B (zh) * | 2014-03-31 | 2018-07-13 | 中国石油天然气股份有限公司 | 基于cam平台的设备安装方案模拟开发方法及装置 |
CN104484524B (zh) * | 2014-12-09 | 2017-08-01 | 张家驰 | 一种基于bim仿真模型与现场施工交互的方法和*** |
CN104966154A (zh) * | 2015-06-09 | 2015-10-07 | 广州市水电设备安装有限公司 | 一种基于bim技术的临水临电管理方法及*** |
CN105155461B (zh) * | 2015-09-24 | 2017-10-17 | 武汉英思工程科技股份有限公司 | 基于bim的高边坡施工动态模拟方法 |
CN105259783A (zh) * | 2015-10-16 | 2016-01-20 | 中国葛洲坝集团三峡建设工程有限公司 | 一种水电工程施工过程可视化预演*** |
CN105512730A (zh) * | 2015-12-02 | 2016-04-20 | 中国南方电网有限责任公司 | 基于bim模型的数据中心运维*** |
CN105424078B (zh) * | 2015-12-08 | 2018-03-09 | 中国一冶集团有限公司 | 一种吊杆碰撞测试仪以及基于该吊杆碰撞测试仪辅助bim技术在吊装工艺的模拟方法 |
CN105695650A (zh) * | 2016-04-27 | 2016-06-22 | 中国十九冶集团有限公司 | 一种高炉五通球安装方法 |
CN106682373A (zh) * | 2017-03-17 | 2017-05-17 | 江苏省建筑科学研究院有限公司 | 一种通过bim进行的施工模拟装置 |
CN107357950B (zh) * | 2017-05-19 | 2020-09-15 | 中国电建集团河北省电力勘测设计研究院有限公司 | 装配式结构三维仿真设计方法 |
CN107215779B (zh) * | 2017-07-13 | 2018-09-07 | 中联重科股份有限公司 | 装配式建筑构件吊装方法、装置以及*** |
CN107908905A (zh) * | 2017-12-12 | 2018-04-13 | 东华理工大学 | 一种通过bim进行施工模拟的装置 |
CN108269069B (zh) * | 2018-02-14 | 2021-03-02 | 安徽工大信息技术有限公司 | 一种基于除湿防渗设备的施工现场的模拟平台及模拟方法 |
CN109292637A (zh) * | 2018-07-21 | 2019-02-01 | 中铁十八局集团有限公司 | 一种基于bim的大型缆索智慧吊装*** |
CN110200402B (zh) * | 2019-06-20 | 2024-05-10 | 四川省劲腾环保建材有限公司 | 一种基于bim平台施工场地布置模拟装置 |
CN110298629A (zh) * | 2019-06-20 | 2019-10-01 | 四川省劲腾环保建材有限公司 | 一种bim实施整合方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1162155A (zh) * | 1996-04-08 | 1997-10-15 | 狄宗楷 | 一种高效的动态工程管理***和方法 |
CN101016728A (zh) * | 2007-02-06 | 2007-08-15 | 同济大学 | 中、下承式拱桥吊杆更换过程中的施工监控方法 |
CN201594263U (zh) * | 2010-03-30 | 2010-09-29 | 中十冶集团有限公司 | 管线安装动态仿真装置 |
CN201654582U (zh) * | 2010-04-30 | 2010-11-24 | 北京乐福能节能技术有限公司 | 一种无线温度控制装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1784787A4 (en) * | 2004-08-23 | 2007-10-17 | Gamecaster Inc | APPARATUS, METHODS AND SYSTEMS FOR VISUALIZING AND HANDLING A VIRTUAL ENVIRONMENT |
-
2011
- 2011-06-10 CN CN201110156325.5A patent/CN102819621B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1162155A (zh) * | 1996-04-08 | 1997-10-15 | 狄宗楷 | 一种高效的动态工程管理***和方法 |
CN101016728A (zh) * | 2007-02-06 | 2007-08-15 | 同济大学 | 中、下承式拱桥吊杆更换过程中的施工监控方法 |
CN201594263U (zh) * | 2010-03-30 | 2010-09-29 | 中十冶集团有限公司 | 管线安装动态仿真装置 |
CN201654582U (zh) * | 2010-04-30 | 2010-11-24 | 北京乐福能节能技术有限公司 | 一种无线温度控制装置 |
Non-Patent Citations (1)
Title |
---|
BIM在建设项目中应用模式研究;李恒,等.;《工程管理学报》;20101031;第24卷(第5期);525-529 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104850709A (zh) * | 2015-05-25 | 2015-08-19 | 苏州金螳螂建筑装饰股份有限公司 | 建筑装饰工程施工三维模拟方法 |
CN104850709B (zh) * | 2015-05-25 | 2018-05-25 | 苏州金螳螂建筑装饰股份有限公司 | 建筑装饰工程施工三维模拟方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102819621A (zh) | 2012-12-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102819621B (zh) | 一种通过bim进行施工模拟的装置 | |
CN102411764B (zh) | 电网设备的数据管理***及管理方法 | |
CN102819623A (zh) | 一种通过bim检测碰撞位置的方法 | |
CN204303029U (zh) | 用于地铁管线碰撞检测及后期运营维护的bim数据库*** | |
CN103093061A (zh) | 一种地铁机电工程综合管线碰撞优化方法 | |
CN202167019U (zh) | 一种通过bim进行施工模拟的装置 | |
CN103065513A (zh) | 变电设备三维虚拟培训*** | |
Jung et al. | Energy operation management for Smart city using 3D building energy information modeling | |
CN202167021U (zh) | 一种建立bim模型的***装置 | |
CN102819622A (zh) | 一种建立bim模型的***装置 | |
CN103839476B (zh) | 一种变压器装配监造三维仿真*** | |
CN102819619A (zh) | 一种通过bim进行人流模拟的装置 | |
Zhang | Intelligent building planning system based on BIM and artificial intelligence | |
CN202120257U (zh) | 一种通过bim进行人流模拟的装置 | |
Li et al. | Application of BIM technology in green building engineering construction | |
Xiaolei | Research on the Application of BIM Concept and BIM Software in Architectural Design | |
BENSALAH et al. | Building information modeling & sustainability in railway | |
Chen et al. | The application of BIM technology in a comprehensive experimental building project | |
Li et al. | Application research on construction management of urban underground utility tunnel based on BIM | |
Li et al. | Smart City Construction Visual Simulation Application Based on Intelligent BIM Technology | |
Chaisuparasmikul | Bidirectional interoperability between CAD and energy performance simulation through virtual model system framework | |
Tang et al. | A conceptual workflow for BIM based prefabrication design visualization with augmented reality | |
Peng et al. | Application of Building Information Modeling (BIM) technology in the quality management of prefabricated buildings | |
CN202167022U (zh) | 一种检测bim模型的碰撞位置的装置 | |
Zhu et al. | BIM digital technology in the construction industry in the field of application |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA SHANGHAI ELECTRIC Free format text: FORMER OWNER: SHANGHAI JIULONG ELECTRIC POWER SCIENCE + TECHNOLOGY CO., LTD. Effective date: 20121219 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20121219 Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant after: Shanghai Electric Power Corporation Applicant after: State Grid Corporation of China Applicant after: Shanghai Electric Power Communication Co., Ltd. Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122 Applicant before: Shanghai Electric Power Corporation Applicant before: Shanghai Jiulong Electric Power Co., Ltd. |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |