CN107908905A - 一种通过bim进行施工模拟的装置 - Google Patents
一种通过bim进行施工模拟的装置 Download PDFInfo
- Publication number
- CN107908905A CN107908905A CN201711313741.5A CN201711313741A CN107908905A CN 107908905 A CN107908905 A CN 107908905A CN 201711313741 A CN201711313741 A CN 201711313741A CN 107908905 A CN107908905 A CN 107908905A
- Authority
- CN
- China
- Prior art keywords
- data
- construction
- module
- bim
- modeling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Civil Engineering (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Architecture (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了施工模拟装置技术领域的一种通过BIM进行施工模拟的装置,该通过BIM进行施工模拟的装置包括:数据采集端、数据转换模块、存储器、处理中心、数据库、建模***、数据填充模块、数据调控模块和显示器;所述数据采集端用于对施工现场的参数进行采集,采集的对象包括地理位置、施工点、施工进行图像,所述数据采集端的输出端与数据转换模块的输入端耦合;该通过BIM进行施工模拟的装置能够在不影响正常模拟的同时能够进行后续调整、输入操作,通过数据的调整、输入,使得其实时状态更加准确,能够预期工程工期,通过对物料的使用情况进行计量,使得其用量准确,并能够实时补仓。
Description
技术领域
本发明涉及施工模拟装置技术领域,具体为一种通过BIM进行施工模拟的装置。
背景技术
BIM(Building Information Modeling,即建筑信息模型)是继CAD(计算机辅助设计)技术后出现在工程建设行业又一重要的计算机应用技术,正在引发建筑行业一次史无前例的彻底革命。该技术利用数字建模软件,提高项目设计、建造和管理的效率,并给采用该技术的建筑企业带来极大的新增价值,原有的模拟方式对于原料的用量监控、工期和工程内的变化难以修改,导致其与实际情况有所偏差,为此,我们提出了一种通过BIM进行施工模拟的装置。
发明内容
本发明的目的在于提供一种通过BIM进行施工模拟的装置,以解决上述背景技术中提出的原有的模拟方式对于原料的用量监控、工期和工程内的变化难以修改,导致其与实际情况有所偏差的问题。
为实现上述目的,本发明提供如下技术方案:一种通过BIM进行施工模拟的装置,该通过BIM进行施工模拟的装置包括:数据采集端、数据转换模块、存储器、处理中心、数据库、建模***、数据填充模块、数据调控模块和显示器;
所述数据采集端用于对施工现场的参数进行采集,采集的对象包括地理位置、施工点、施工进行图像,所述数据采集端的输出端与数据转换模块的输入端耦合;
所述数据转换模块将数据采集端采集的数据转换为***识别的电信号,所述数据转换模块将电信号传输至存储器;
所述存储器的数据端通过数据线与处理中心的传输端口连接,所述处理中心通过对存储器的接收电信号进行获取并进行处理,所述处理中心通过将接收的电信号与数据库中的预存数据对比;
所述数据库内预存对该施工方案的信息,通过将获取的信息与预存的信息进行对照,找出与预存信息偏差的位置,并进行反馈调整;
所述建模***为BIM仿真软件,将采集的数据进行建设数据模型,并进行立体填充,所述建模***为实时运行***,所述数据采集端的信息发生变化时,建模***作出相应的调整;
所述数据填充模块根据需要对建模***的一些空间进行模块填充,填充对象为后期添加施工物或者删减未将进行的施工对象,添加施工对象后通过信息反馈的方式反馈至施工端;
所述数据调控模块包括施工进程数据计量端、用料量数据计量端和剩余工期提醒模块,所述数据调控模块对建模***的数据进行调控,增加建模***的显示方式或者根据现实进展情况微调其数据参数;
所述显示器将建模后的图样现实,并将其添加信息、修改信息和建设实样均显示。
优选的,所述数据采集端包括GPS定位模块、高清夜视摄像模块和通信模块。
优选的,所述处理中心为人工操作的控制端。
优选的,所述处理中心的输出端还连接有报警设备。
优选的,所述显示器为LED显示器。
与现有技术相比,本发明的有益效果是:该通过BIM进行施工模拟的装置能够在不影响正常模拟的同时能够进行后续调整、输入操作,通过数据的调整、输入,使得其实时状态更加准确,能够预期工程工期,通过对物料的使用情况进行计量,使得其用量准确,并能够实时补仓。
附图说明
图1为本发明***框图;
图2为本发明数据调控模块的***框图。
图中:1数据采集端、2数据转换模块、3存储器、4处理中心、5数据库、6建模***、7数据填充模块、8数据调控模块、81施工进程数据计量端、82用料量数据计量端、83剩余工期提醒模块、9显示器。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1-2,本发明提供一种技术方案:一种通过BIM进行施工模拟的装置,该通过BIM进行施工模拟的装置包括:数据采集端1、数据转换模块2、存储器3、处理中心4、数据库5、建模***6、数据填充模块7、数据调控模块8和显示器9;
数据采集端1用于对施工现场的参数进行采集,采集的对象包括地理位置、施工点、施工进行图像,数据采集端1的输出端与数据转换模块2的输入端耦合;
数据转换模块2将数据采集端1采集的数据转换为***识别的电信号,数据转换模块2将电信号传输至存储器3;
存储器3的数据端通过数据线与处理中心4的传输端口连接,处理中心4通过对存储器3的接收电信号进行获取并进行处理,处理中心4通过将接收的电信号与数据库5中的预存数据对比;
数据库5内预存对该施工方案的信息,通过将获取的信息与预存的信息进行对照,找出与预存信息偏差的位置,并进行反馈调整;
建模***6为BIM仿真软件,将采集的数据进行建设数据模型,并进行立体填充,建模***6为实时运行***,数据采集端1的信息发生变化时,建模***6作出相应的调整;
数据填充模块7根据需要对建模***6的一些空间进行模块填充,填充对象为后期添加施工物或者删减未将进行的施工对象,添加施工对象后通过信息反馈的方式反馈至施工端;
数据调控模块8包括施工进程数据计量端81、用料量数据计量端82和剩余工期提醒模块83,数据调控模块8对建模***6的数据进行调控,增加建模***6的显示方式或者根据现实进展情况微调其数据参数;
显示器9将建模后的图样现实,并将其添加信息、修改信息和建设实样均显示。
其中,数据采集端1包括GPS定位模块、高清夜视摄像模块和通信模块,能够进行定位、图像采集和数据的传输,处理中心4为人工操作的控制端,能够进行自行数据对照的同时还能够通过人工的控制、计算,处理中心4的输出端还连接有报警设备,显示器9为LED显示器。
工作原理:使用时,将数据采集端1安装在工程施工端,对工程施工点的位置信息、施工图像信息进行实时采集,将采集信息通过数据转换模块2转换为电信号,在数据库5内预存需要建造的位置信息,并将位置信息与采集的信息进行对照,若出现偏差则通过反馈的方式反馈到施工点进行修正,将获取的信息输出至建模***6进行建模,通过数据填充模块7、数据调控模块8和进行添加、删除和修正,从而达到与实际应用相同的效果,最后将建模后的模型通过显示器9显示,通过施工进程数据计量端81、用料量数据计量端82、剩余工期提醒模块83进行工时计算和原料用量计量,当出现原料用量过多的情况,处理中心4通过报警设备进行提醒,并对施工点进行要求。
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。
Claims (5)
1.一种通过BIM进行施工模拟的装置,其特征在于:该通过BIM进行施工模拟的装置包括:数据采集端(1)、数据转换模块(2)、存储器(3)、处理中心(4)、数据库(5)、建模***(6)、数据填充模块(7)、数据调控模块(8)和显示器(9);
所述数据采集端(1)用于对施工现场的参数进行采集,采集的对象包括地理位置、施工点、施工进行图像,所述数据采集端(1)的输出端与数据转换模块(2)的输入端耦合;
所述数据转换模块(2)将数据采集端(1)采集的数据转换为***识别的电信号,所述数据转换模块(2)将电信号传输至存储器(3);
所述存储器(3)的数据端通过数据线与处理中心(4)的传输端口连接,所述处理中心(4)通过对存储器(3)的接收电信号进行获取并进行处理,所述处理中心(4)通过将接收的电信号与数据库(5)中的预存数据对比;
所述数据库(5)内预存对该施工方案的信息,通过将获取的信息与预存的信息进行对照,找出与预存信息偏差的位置,并进行反馈调整;
所述建模***(6)为BIM仿真软件,将采集的数据进行建设数据模型,并进行立体填充,所述建模***(6)为实时运行***,所述数据采集端(1)的信息发生变化时,建模***(6)作出相应的调整;
所述数据填充模块(7)根据需要对建模***(6)的一些空间进行模块填充,填充对象为后期添加施工物或者删减未将进行的施工对象,添加施工对象后通过信息反馈的方式反馈至施工端;
所述数据调控模块(8)包括施工进程数据计量端(81)、用料量数据计量端(82)和剩余工期提醒模块(83),所述数据调控模块(8)对建模***(6)的数据进行调控,增加建模***(6)的显示方式或者根据现实进展情况微调其数据参数;
所述显示器(9)将建模后的图样现实,并将其添加信息、修改信息和建设实样均显示。
2.根据权利要求1所述的一种通过BIM进行施工模拟的装置,其特征在于:所述数据采集端(1)包括GPS定位模块、高清夜视摄像模块和通信模块。
3.根据权利要求1所述的一种通过BIM进行施工模拟的装置,其特征在于:所述处理中心(4)为人工操作的控制端。
4.根据权利要求1所述的一种通过BIM进行施工模拟的装置,其特征在于:所述处理中心(4)的输出端还连接有报警设备。
5.根据权利要求1所述的一种通过BIM进行施工模拟的装置,其特征在于:所述显示器(9)为LED显示器。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711313741.5A CN107908905A (zh) | 2017-12-12 | 2017-12-12 | 一种通过bim进行施工模拟的装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711313741.5A CN107908905A (zh) | 2017-12-12 | 2017-12-12 | 一种通过bim进行施工模拟的装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107908905A true CN107908905A (zh) | 2018-04-13 |
Family
ID=61865226
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711313741.5A Pending CN107908905A (zh) | 2017-12-12 | 2017-12-12 | 一种通过bim进行施工模拟的装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107908905A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109544102A (zh) * | 2018-10-26 | 2019-03-29 | 中交第航务工程局有限公司 | 一种基于bim模型的工程船舶施工管理***及应用方法 |
CN110200402A (zh) * | 2019-06-20 | 2019-09-06 | 四川省劲腾环保建材有限公司 | 一种基于bim平台施工场地布置模拟装置 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102819621A (zh) * | 2011-06-10 | 2012-12-12 | 上海市电力公司 | 一种通过bim进行施工模拟的装置 |
US20130335413A1 (en) * | 2012-06-13 | 2013-12-19 | National Chiao Tung University | System and method for estimating construction duration |
CN104766182A (zh) * | 2015-04-30 | 2015-07-08 | 北京宁晖兴业科技有限公司 | 一种基于bim的建筑设计施工智能监管*** |
CN106682373A (zh) * | 2017-03-17 | 2017-05-17 | 江苏省建筑科学研究院有限公司 | 一种通过bim进行的施工模拟装置 |
CN106886848A (zh) * | 2017-01-17 | 2017-06-23 | 中铁上海工程局集团有限公司 | 桥梁施工信息采集管理*** |
CN106920049A (zh) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | 一种基于bim网络技术的建筑工程管理***平台 |
CN106934852A (zh) * | 2017-02-16 | 2017-07-07 | 西安科技大学 | 一种基于bim网络技术的建筑工程管理***平台 |
CN107229802A (zh) * | 2017-06-14 | 2017-10-03 | 成都智建新业建筑设计咨询有限公司 | 基于bim的建筑施工方法 |
CN107423865A (zh) * | 2017-03-10 | 2017-12-01 | 中铁四局集团有限公司 | 基于bim的高速铁路信息化管理*** |
-
2017
- 2017-12-12 CN CN201711313741.5A patent/CN107908905A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102819621A (zh) * | 2011-06-10 | 2012-12-12 | 上海市电力公司 | 一种通过bim进行施工模拟的装置 |
US20130335413A1 (en) * | 2012-06-13 | 2013-12-19 | National Chiao Tung University | System and method for estimating construction duration |
CN104766182A (zh) * | 2015-04-30 | 2015-07-08 | 北京宁晖兴业科技有限公司 | 一种基于bim的建筑设计施工智能监管*** |
CN106886848A (zh) * | 2017-01-17 | 2017-06-23 | 中铁上海工程局集团有限公司 | 桥梁施工信息采集管理*** |
CN106934852A (zh) * | 2017-02-16 | 2017-07-07 | 西安科技大学 | 一种基于bim网络技术的建筑工程管理***平台 |
CN107423865A (zh) * | 2017-03-10 | 2017-12-01 | 中铁四局集团有限公司 | 基于bim的高速铁路信息化管理*** |
CN106682373A (zh) * | 2017-03-17 | 2017-05-17 | 江苏省建筑科学研究院有限公司 | 一种通过bim进行的施工模拟装置 |
CN106920049A (zh) * | 2017-03-28 | 2017-07-04 | 内蒙古科技大学 | 一种基于bim网络技术的建筑工程管理***平台 |
CN107229802A (zh) * | 2017-06-14 | 2017-10-03 | 成都智建新业建筑设计咨询有限公司 | 基于bim的建筑施工方法 |
Non-Patent Citations (4)
Title |
---|
夏贞勇: "基于BIM的实时施工模型应用实现", 《工业建筑》 * |
张康照: "基于BIM实时模型的施工进度监测***研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑(月刊)建筑科学与工程》 * |
杨永刚: "BIM 技术在建筑设计中的实际应用", 《工程设计》 * |
王雪青 等: "基于BIM实时施工模型的4D模拟", 《广西大学学报:自然科学版》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109544102A (zh) * | 2018-10-26 | 2019-03-29 | 中交第航务工程局有限公司 | 一种基于bim模型的工程船舶施工管理***及应用方法 |
CN110200402A (zh) * | 2019-06-20 | 2019-09-06 | 四川省劲腾环保建材有限公司 | 一种基于bim平台施工场地布置模拟装置 |
CN110200402B (zh) * | 2019-06-20 | 2024-05-10 | 四川省劲腾环保建材有限公司 | 一种基于bim平台施工场地布置模拟装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107870600B (zh) | 一种智能车间透明监控方法及*** | |
CN109412829A (zh) | 一种资源配置的预测方法及设备 | |
CN104572213B (zh) | 一种星载控制计算机的重构方法 | |
CN108596423A (zh) | 一种基于bim的轨道工程施工进度信息管理方法 | |
CN105807658B (zh) | 一种智能变电站与调度主站图模信息共享的方法 | |
CN102867091B (zh) | 一种电网潮流图增量化修正方法 | |
CN104537573A (zh) | 一种电网运行信息全景可视化展示*** | |
CN109557934A (zh) | 一种基于装配式建筑平台的无人机巡航的控制方法及装置 | |
CN107908905A (zh) | 一种通过bim进行施工模拟的装置 | |
CN110287567A (zh) | 基于参数化单元通过设计参数驱动的bim快速建模方法 | |
CN108052311A (zh) | 一种基于通用体系框架的计量信息*** | |
CN105893655A (zh) | 一种石油储层构型的物理模拟方法 | |
CN112417562A (zh) | 一种基于Dynamo的土方施工建模方法和装置 | |
CN104537168B (zh) | 面向设备功能的综合监控仿真培训***模型数据管理方法 | |
CN107368972A (zh) | 一种基于bim技术的派工平台及其使用方法 | |
CN110427392A (zh) | 一种基于云平台的配电网网格化管理信息*** | |
CN113128041A (zh) | 基于数字孪生虚拟技术的数字工厂mes***开发方法 | |
CN116030210A (zh) | 碳排放数据统计方法、电子设备及存储介质 | |
CN113705143B (zh) | 一种自动化仿真***和自动化仿真方法 | |
CN109344439A (zh) | 一种基于bim的建筑模块式建模及其模拟施工方法 | |
CN109766090B (zh) | 一种程序逻辑和二次回路一体化配置方法 | |
CN105679375A (zh) | 一种存储设备的自动化测试***及方法 | |
CN103473389B (zh) | 一种应用于hla分布式仿真技术的通用模型 | |
CN107608255A (zh) | 一种芯片架构重构方法和装置 | |
CN109214015B (zh) | 一种建筑构件管理方法、装置、终端设备及可读存储介质 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180413 |
|
RJ01 | Rejection of invention patent application after publication |