CN106682373A - 一种通过bim进行的施工模拟装置 - Google Patents
一种通过bim进行的施工模拟装置 Download PDFInfo
- Publication number
- CN106682373A CN106682373A CN201710159582.1A CN201710159582A CN106682373A CN 106682373 A CN106682373 A CN 106682373A CN 201710159582 A CN201710159582 A CN 201710159582A CN 106682373 A CN106682373 A CN 106682373A
- Authority
- CN
- China
- Prior art keywords
- bim
- processor
- construction
- simulation device
- construction simulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/30—Circuit design
- G06F30/36—Circuit design at the analogue level
- G06F30/367—Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods
Landscapes
- Engineering & Computer Science (AREA)
- Computer Hardware Design (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种通过BIM进行的施工模拟装置,包括施工方案数据存储器、BIM数据存储器、处理器和数据采集模块,所述施工方案数据存储器和BIM数据存储器均与处理器信号连接,所述数据采集模块通过输入设备与处理器信号连接,所述处理器电性连接有电源模块,所述处理器分别信号连接有比较器、网络适配器和图像处理模块。该通过BIM进行施工模拟装置,对多种方案以及采集的信号进行处理和进行比较,机选出优质的方案,结构简单、制造成本低,通过 BIM 的应用,帮助工程建设项目提高效率、降低风险,提高项目施工及运维管理水平。
Description
技术领域
本发明属于BIM模拟技术领域,具体涉及一种通过BIM进行的施工模拟装置。
背景技术
BIM(Building Information Modeling,即建筑信息模型 ) 是继 CAD( 计算机辅助设计) 技术后出现在工程建设行业又一重要的计算机应用技术,正在引发建筑行业一次史无前例的彻底革命。该技术利用数字建模软件,提高项目设计、建造和管理的效率,并给采用该技术的建筑企业带来极大的新增价值。
现有的BIM模拟装置采用多种设计需要进行比较,比较过程复杂,信号采集微弱,人工比较耗时长,准确性低。为此,我们提出一种通过BIM进行的施工模拟装置,以解决上述背景技术中提到的问题。
发明内容
本发明的目的在于提供一种通过BIM进行的施工模拟装置,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:一种通过BIM进行的施工模拟装置,包括施工方案数据存储器、BIM数据存储器、处理器和数据采集模块,所述施工方案数据存储器和BIM数据存储器均与处理器信号连接,所述数据采集模块通过输入设备与处理器信号连接,所述处理器电性连接有电源模块,所述处理器分别信号连接有比较器、网络适配器和图像处理模块。
优选的,所述网络适配器设置为数据总线。
优选的,所述处理器包括ARM单片机和芯片组。
优选的,所述比较器设置为模拟比较器。
优选的,所述显示屏设置为液晶显示屏或LED显示屏。
本发明的技术效果和优点:该通过BIM进行的施工模拟装置,对多种方案以及采集的信号进行处理和进行比较,机选出优质的方案,结构简单、制造成本低,通过 BIM 的应用,帮助工程建设项目提高效率、降低风险,提高项目施工及运维管理水平。
附图说明
图1为本发明的结构示意图。
具体实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
请参阅图1,本发明提供的一种技术方案:一种通过BIM进行的施工模拟装置,包括施工方案数据存储器、BIM数据存储器、处理器和数据采集模块,所述施工方案数据存储器和BIM数据存储器均与处理器信号连接,所述数据采集模块通过输入设备与处理器信号连接,所述处理器电性连接有电源模块,所述处理器分别信号连接有比较器、网络适配器和图像处理模块。
进一步的,所述网络适配器设置为数据总线,便于处理器与其他器件之间进行双向信号的传输,增加信号稳定性。
进一步的, 所述处理器包括ARM单片机和芯片组,能够很好的对数据进行分析和处理。
进一步的,所述比较器设置为模拟比较器,放大采集和处理后的信号,便于实施方案和信号进行比较和筛选。
进一步的,所述显示屏设置为液晶显示屏或LED显示屏,能够将数据信息进行模拟展示,提高 BIM 实体3D模型的制作效率和精度。
该通过BIM进行的施工模拟装置,对多种方案以及采集的信号进行处理和进行比较,机选出优质的方案,结构简单、制造成本低,通过 BIM 的应用,帮助工程建设项目提高效率、降低风险,提高项目施工及运维管理水平
最后应说明的是:以上所述仅为本发明的优选实施例而已,并不用于限制本发明,尽管参照前述实施例对本发明进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (5)
1.一种通过BIM进行的施工模拟装置,其特征在于:包括施工方案数据存储器、BIM数据存储器、处理器和数据采集模块,所述施工方案数据存储器和BIM数据存储器均与处理器信号连接,所述数据采集模块通过输入设备与处理器信号连接,所述处理器电性连接有电源模块,所述处理器分别信号连接有比较器、网络适配器和图像处理模块。
2.根据权利要求1所述的一种通过BIM进行的施工模拟装置,其特征在于: 所述网络适配器设置为数据总线。
3.根据权利要求1所述的一种通过BIM进行的施工模拟装置,其特征在于: 所述处理器包括ARM单片机和芯片组。
4.根据权利要求1所述的一种通过BIM进行的施工模拟装置,其特征在于:所述比较器设置为模拟比较器。
5.根据权利要求1所述的一种通过BIM进行的施工模拟装置,其特征在于:所述显示屏设置为液晶显示屏或LED显示屏。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710159582.1A CN106682373A (zh) | 2017-03-17 | 2017-03-17 | 一种通过bim进行的施工模拟装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710159582.1A CN106682373A (zh) | 2017-03-17 | 2017-03-17 | 一种通过bim进行的施工模拟装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106682373A true CN106682373A (zh) | 2017-05-17 |
Family
ID=58829003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710159582.1A Pending CN106682373A (zh) | 2017-03-17 | 2017-03-17 | 一种通过bim进行的施工模拟装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106682373A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107908905A (zh) * | 2017-12-12 | 2018-04-13 | 东华理工大学 | 一种通过bim进行施工模拟的装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202167020U (zh) * | 2011-06-10 | 2012-03-14 | 上海市电力公司 | 一种通过bim进行机房cfd模拟的装置 |
CN102819619A (zh) * | 2011-06-10 | 2012-12-12 | 上海市电力公司 | 一种通过bim进行人流模拟的装置 |
CN102819621A (zh) * | 2011-06-10 | 2012-12-12 | 上海市电力公司 | 一种通过bim进行施工模拟的装置 |
CN103400001A (zh) * | 2013-07-30 | 2013-11-20 | 中铁建设集团有限公司 | 一种配有固态硬盘的用于bim图形设计的装置 |
CN103692651A (zh) * | 2013-12-06 | 2014-04-02 | 中铁建设集团有限公司 | 一种具有3d输入和输出功能的bim模型设计装置 |
CN205486107U (zh) * | 2016-01-19 | 2016-08-17 | 黄世岩 | 一种通过bim进行绿色施工模拟的装置 |
-
2017
- 2017-03-17 CN CN201710159582.1A patent/CN106682373A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202167020U (zh) * | 2011-06-10 | 2012-03-14 | 上海市电力公司 | 一种通过bim进行机房cfd模拟的装置 |
CN102819619A (zh) * | 2011-06-10 | 2012-12-12 | 上海市电力公司 | 一种通过bim进行人流模拟的装置 |
CN102819621A (zh) * | 2011-06-10 | 2012-12-12 | 上海市电力公司 | 一种通过bim进行施工模拟的装置 |
CN103400001A (zh) * | 2013-07-30 | 2013-11-20 | 中铁建设集团有限公司 | 一种配有固态硬盘的用于bim图形设计的装置 |
CN103692651A (zh) * | 2013-12-06 | 2014-04-02 | 中铁建设集团有限公司 | 一种具有3d输入和输出功能的bim模型设计装置 |
CN205486107U (zh) * | 2016-01-19 | 2016-08-17 | 黄世岩 | 一种通过bim进行绿色施工模拟的装置 |
Non-Patent Citations (2)
Title |
---|
宣云干: "参数化建筑建模实例研究", 《江苏建筑》 * |
宣云干: "基于面向对象数据库的参数化建筑建模", 《江苏建筑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107908905A (zh) * | 2017-12-12 | 2018-04-13 | 东华理工大学 | 一种通过bim进行施工模拟的装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107193911B (zh) | 一种基于bim模型的三维可视化引擎及web应用程序调用方法 | |
CN104282040A (zh) | 一种用于三维实体模型重建的有限元前处理方法 | |
CN108388711A (zh) | 一种基于bim的工程设计与管理*** | |
CN103279846A (zh) | 一种基于bim模型的工程验收方法和*** | |
CN108717356B (zh) | 一种计量全息可视化展现方法及装置 | |
CN115686280A (zh) | 深度学习模型管理***、方法、计算机设备及存储介质 | |
CN109376153A (zh) | 一种基于NiFi的数据写入图数据库的***及方法 | |
CN115730605B (zh) | 基于多维信息的数据分析方法 | |
CN113378011A (zh) | 一种复杂产品总装数字孪生体的构建方法及*** | |
CN109213658A (zh) | 一种巡检方法和装置 | |
CN105574678A (zh) | 一种基于执行力指数的员工考评数据自动处理*** | |
CN114627239A (zh) | 包围盒生成方法、装置、设备及存储介质 | |
CN106682373A (zh) | 一种通过bim进行的施工模拟装置 | |
CN109063223A (zh) | Bim模型的轻量化方法和装置以及bim模型的处理方法和*** | |
CN112784001A (zh) | 基于全流程管控的不动产信息监视方法及*** | |
CN116863082A (zh) | 基于点云数据的变电站三维点云模型的建立方法和装置 | |
CN105574930B (zh) | 一种汉字立体化数据采集与处理*** | |
CN113064895B (zh) | 一种图谱的增量更新方法、装置及*** | |
CN114722624A (zh) | 一种基于数字孪生的视景仿真***及其应用 | |
CN110727667B (zh) | 一种电力设备一致性管理*** | |
CN102065315A (zh) | 一种用于电视台技术信息监测的三维可视化方法 | |
CN109933824A (zh) | 一种施工模拟的*** | |
US20230119741A1 (en) | Picture annotation method, apparatus, electronic device, and storage medium | |
CN116561393B (zh) | 基于用水量因素的万元gdp用水量可视化***及方法 | |
CN109377159A (zh) | 一种软件建模过程实体演进***及方法、处理器、终端 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170517 |