CN102819622A - 一种建立bim模型的***装置 - Google Patents

一种建立bim模型的***装置 Download PDF

Info

Publication number
CN102819622A
CN102819622A CN2011101563486A CN201110156348A CN102819622A CN 102819622 A CN102819622 A CN 102819622A CN 2011101563486 A CN2011101563486 A CN 2011101563486A CN 201110156348 A CN201110156348 A CN 201110156348A CN 102819622 A CN102819622 A CN 102819622A
Authority
CN
China
Prior art keywords
processor
bim
system device
display
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101563486A
Other languages
English (en)
Inventor
黄蓓琦
张斌
季彤天
何真珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
Shanghai Jiulong Electric Power Technology Co Ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiulong Electric Power Technology Co Ltd, Shanghai Municipal Electric Power Co filed Critical Shanghai Jiulong Electric Power Technology Co Ltd
Priority to CN2011101563486A priority Critical patent/CN102819622A/zh
Publication of CN102819622A publication Critical patent/CN102819622A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及一种建立BIM模型的***装置,该装置包括数据采集模块、处理器、存储器、电源模块、显示器,所述的数据采集模块与处理器连接,所述的处理器与存储器连接,所述的电源模块与处理器连接,所述的显示器与处理器连接。与现有技术相比,本发明具有结构简单、制造成本低,能帮助工程建设项目提高效率、降低风险和提高项目施工及运维管理水平等优点。

Description

一种建立BIM模型的***装置
技术领域
本发明涉及一种建立模型的装置,尤其是涉及一种建立BIM模型的***装置。
背景技术
BIM(Building Information Modeling,即建筑信息模型)是继CAD(计算机辅助设计)技术后出现在工程建设行业又一重要的计算机应用技术,正在引发建筑行业一次史无前例的彻底革命。该技术利用数字建模软件,提高项目设计、建造和管理的效率,并给采用该技术的建筑企业带来极大的新增价值。
上海容灾中心是国家电网公司在全国范围内建设的三个集中式信息***容灾中心之一。本项目涉及专业众多、设备***复杂、工期紧、对材料、人工等成本控制要求高。项目在建设过程中主要存在以下问题:
(一)容灾中心设备众多,***复杂,在有限的空间管线走向非常复杂,传统的CAD图纸由于使用二维方式做设计、出图,不可避免存在设备、管线、结构直接的碰撞冲突,过去这些工作需要在施工现场由施工企业和设计单位综合协调,对项目进度和成本控制都有负面影响。
(二)容灾中心工期非常紧,参与项目的团队组成复杂。这需要对施工现场的施工进度计划、施工***设计、人员交叉施工有很强的管理和控制。
(三)容灾中心投资有严格控制,但由于设备众多、***复杂,在工程造价中占重要比例的设备、材料工程量统计往往参考设计单位和施工单位提供的概预算数据,作为业主缺乏有效的管理手段。
(四)容灾中心作为一个数据中心,其相关基础设施的可靠性直接关系到IT服务***能否正常、持续、稳定运行。任何一部分的效率降低或者故障,都将导致IT服务的可用性降低,轻则造成信息访问不畅,重则带来各种不可预估的重大损失。作为保障数据中心可用性的第一道防线——“集中监控”可以快速帮助容灾中心达成“高可用性”的目标。
针对以上存在的主要问题,亟需开展针对性的研究,以提高工程管理水平和效能化监测能力,解决建设中存在的难题。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种结构简单、制造成本低,能帮助工程建设项目提高效率、降低风险和提高项目施工及运维管理水平的建立BIM模型的***装置。
本发明的目的可以通过以下技术方案来实现:一种建立BIM模型的***装置,其特征在于,该装置包括数据采集模块、处理器、存储器、电源模块、显示器,所述的数据采集模块与处理器连接,所述的处理器与存储器连接,所述的电源模块与处理器连接,所述的显示器与处理器连接。
所述的显示器为液晶显示器或纯平显示器。
与现有技术相比,本发明具有以下优点:
1、结构简单、制造成本低;
2、通过BIM的应用,帮助工程建设项目提高效率、降低风险;
3、提高项目施工及运维管理水平。
附图说明
图1为本发明的结构示意图。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
实施例
如图1所示,一种建立BIM模型的***装置,该装置包括数据采集模块1、处理器2、存储器5、电源模块4、显示器3。数据采集模块1与处理器2连接,处理器2与存储器5连接,电源模块4与处理器2连接,显示器3与处理器2连接。显示器为液晶显示器或纯平显示器。通过BIM技术为上海容灾中心搭建建筑、结构、水、暖、电等专业的全真模型,对各种设备、管道输入信息。建模型时,为了保证模型与施工一致,每日有专人进行现场拍摄,并在模型中进行比对。整理每日变更,并反映在模型当中,对模型进行维护。

Claims (2)

1.一种建立BIM模型的***装置,其特征在于,该装置包括数据采集模块、处理器、存储器、电源模块、显示器,所述的数据采集模块与处理器连接,所述的处理器与存储器连接,所述的电源模块与处理器连接,所述的显示器与处理器连接。
2.根据权利要求1所述的一种建立BIM模型的***装置,其特征在于,所述的显示器为液晶显示器或纯平显示器。
CN2011101563486A 2011-06-10 2011-06-10 一种建立bim模型的***装置 Pending CN102819622A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101563486A CN102819622A (zh) 2011-06-10 2011-06-10 一种建立bim模型的***装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101563486A CN102819622A (zh) 2011-06-10 2011-06-10 一种建立bim模型的***装置

Publications (1)

Publication Number Publication Date
CN102819622A true CN102819622A (zh) 2012-12-12

Family

ID=47303733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101563486A Pending CN102819622A (zh) 2011-06-10 2011-06-10 一种建立bim模型的***装置

Country Status (1)

Country Link
CN (1) CN102819622A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103218492A (zh) * 2013-04-16 2013-07-24 上海上安机电设计事务所有限公司 一种基于bim的管道预制方法
CN103256923A (zh) * 2013-04-16 2013-08-21 上海上安机电设计事务所有限公司 基于bim的测绘放样***
CN104484524A (zh) * 2014-12-09 2015-04-01 张家驰 一种基于bim仿真模型与现场施工交互的方法和***

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202167021U (zh) * 2011-06-10 2012-03-14 上海市电力公司 一种建立bim模型的***装置

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202167021U (zh) * 2011-06-10 2012-03-14 上海市电力公司 一种建立bim模型的***装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙宝林: "《大学计算机基础》", 31 January 2009, 电子科技大学出版社 *
张斌,季彤天,张永炼: "国家电网公司上海容灾中心建设概述", 《供用电》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103218492A (zh) * 2013-04-16 2013-07-24 上海上安机电设计事务所有限公司 一种基于bim的管道预制方法
CN103256923A (zh) * 2013-04-16 2013-08-21 上海上安机电设计事务所有限公司 基于bim的测绘放样***
CN104484524A (zh) * 2014-12-09 2015-04-01 张家驰 一种基于bim仿真模型与现场施工交互的方法和***
CN104484524B (zh) * 2014-12-09 2017-08-01 张家驰 一种基于bim仿真模型与现场施工交互的方法和***

Similar Documents

Publication Publication Date Title
CN102819621B (zh) 一种通过bim进行施工模拟的装置
CN103092316B (zh) 一种基于数据挖掘的服务器功耗管理***
CN103955777A (zh) 光伏发电接入配电网方案设计与分析评估辅助***
CN102194018B (zh) 基于云计算的建筑物能耗预测分析***及方法
CN102819623A (zh) 一种通过bim检测碰撞位置的方法
KR101569144B1 (ko) 분산전원관리 장치 및 방법
CN103020360A (zh) 基于三维设计平台和专业软件的智能变电站集成设计方法
CN103679545A (zh) 一种配电网可靠性理论评估***
CN202167021U (zh) 一种建立bim模型的***装置
CN102867079A (zh) 一种构建和归档电网实时运行方式的简约方法及***
CN102646144A (zh) 基于ObjectARX的农网工程标准化智能化设计方法
CN202167019U (zh) 一种通过bim进行施工模拟的装置
CN102819622A (zh) 一种建立bim模型的***装置
CN111950061A (zh) 基于bim模型的空间照明设计方法、***、装置及介质
CN103345952A (zh) 一种基于模型的操纵员辅助计算***
Lu et al. BIM architecture design from the perspective of smart city and its application in traditional residential design
CN102819619A (zh) 一种通过bim进行人流模拟的装置
CN102592251B (zh) 地球***模式的通用模块化并行耦合***
CN103870363A (zh) 一种数据库数据远程备份方法
Zhang Intelligent building planning system based on BIM and artificial intelligence
CN202120257U (zh) 一种通过bim进行人流模拟的装置
CN201955704U (zh) 基于云计算服务的桌面终端
CN103020869B (zh) 电网模型云分布式版本管理***
CN105956346A (zh) 一种铝合金模板设计***和方法
CN203813518U (zh) 一体化电源设备的监控***的硬件平台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA SHANGHAI ELECTRIC

Free format text: FORMER OWNER: SHANGHAI JIULONG ELECTRIC POWER SCIENCE + TECHNOLOGY CO., LTD.

Effective date: 20121220

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121220

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Shanghai Electric Power Communication Co., Ltd.

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant before: Shanghai Electric Power Corporation

Applicant before: Shanghai Jiulong Electric Power Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121212