CN202120257U - 一种通过bim进行人流模拟的装置 - Google Patents

一种通过bim进行人流模拟的装置 Download PDF

Info

Publication number
CN202120257U
CN202120257U CN201120195569XU CN201120195569U CN202120257U CN 202120257 U CN202120257 U CN 202120257U CN 201120195569X U CN201120195569X U CN 201120195569XU CN 201120195569 U CN201120195569 U CN 201120195569U CN 202120257 U CN202120257 U CN 202120257U
Authority
CN
China
Prior art keywords
bim
display
memorizer
module
image processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120195569XU
Other languages
English (en)
Inventor
黄蓓琦
张斌
季彤天
何真珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
Shanghai Jiulong Electric Power Technology Co Ltd
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiulong Electric Power Technology Co Ltd, Shanghai Municipal Electric Power Co filed Critical Shanghai Jiulong Electric Power Technology Co Ltd
Priority to CN201120195569XU priority Critical patent/CN202120257U/zh
Application granted granted Critical
Publication of CN202120257U publication Critical patent/CN202120257U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Devices For Indicating Variable Information By Combining Individual Elements (AREA)

Abstract

本实用新型涉及一种通过BIM进行人流模拟的装置,该装置包括处理器、数据采集模块、BIM模型数据库存储器、显示器、电源模块、图像处理模块、存储器,所述的处理器分别与数据采集模块、BIM模型数据库存储器、显示器、电源模块、图像处理模块、存储器连接。与现有技术相比,本实用新型具有结构简单、制造成本低,能帮助工程建设项目提高效率、降低风险和提高项目施工及运维管理水平等优点。

Description

一种通过BIM进行人流模拟的装置
技术领域
本实用新型涉及一种模拟装置,尤其是涉及一种通过BIM进行人流模拟的装置。
背景技术
BIM(Building Information Modeling,即建筑信息模型)是继CAD(计算机辅助设计)技术后出现在工程建设行业又一重要的计算机应用技术,正在引发建筑行业一次史无前例的彻底革命。该技术利用数字建模软件,提高项目设计、建造和管理的效率,并给采用该技术的建筑企业带来极大的新增价值。
上海容灾中心是国家电网公司在全国范围内建设的三个集中式信息***容灾中心之一。本项目涉及专业众多、设备***复杂、工期紧、对材料、人工等成本控制要求高。项目在建设过程中主要存在以下问题:
(一)容灾中心设备众多,***复杂,在有限的空间管线走向非常复杂,传统的CAD图纸由于使用二维方式做设计、出图,不可避免存在设备、管线、结构直接的碰撞冲突,过去这些工作需要在施工现场由施工企业和设计单位综合协调,对项目进度和成本控制都有负面影响。
(二)容灾中心工期非常紧,参与项目的团队组成复杂。这需要对施工现场的施工进度计划、施工***设计、人员交叉施工有很强的管理和控制。
(三)容灾中心投资有严格控制,但由于设备众多、***复杂,在工程造价中占重要比例的设备、材料工程量统计往往参考设计单位和施工单位提供的概预算数据,作为业主缺乏有效的管理手段。
(四)容灾中心作为一个数据中心,其相关基础设施的可靠性直接关系到IT服务***能否正常、持续、稳定运行。任何一部分的效率降低或者故障,都将导致IT服务的可用性降低,轻则造成信息访问不畅,重则带来各种不可预估的重大损失。作为保障数据中心可用性的第一道防线——“集中监控”可以快速帮助容灾中心达成“高可用性”的目标。
针对以上存在的主要问题,亟需开展针对性的研究,以提高工程管理水平和效能化监测能力,解决建设中存在的难题。
实用新型内容
本实用新型的目的就是为了克服上述现有技术存在的缺陷而提供一种结构简单、制造成本低,能帮助工程建设项目提高效率、降低风险和提高项目施工及运维管理水平的通过BIM进行人流模拟的装置。
本实用新型的目的可以通过以下技术方案来实现:一种通过BIM进行人流模拟的装置,其特征在于,该装置包括处理器、数据采集模块、BIM模型数据库存储器、显示器、电源模块、图像处理模块、存储器,所述的处理器分别与数据采集模块、BIM模型数据库存储器、显示器、电源模块、图像处理模块、存储器连接。
所述的显示器为LED显示器或者CRT显示器。
与现有技术相比,本实用新型具有以下优点:
1、结构简单、制造成本低;
2、通过BIM的应用,帮助工程建设项目提高效率、降低风险;
3、提高项目施工及运维管理水平。
附图说明
图1为本实用新型的结构示意图。
具体实施方式
下面结合附图和具体实施例对本实用新型进行详细说明。
实施例1
如图1所示,一种通过BIM进行人流模拟的装置,该装置包括处理器1、数据采集模块2、BIM模型数据库存储器3、显示器4、电源模块5、图像处理模块6、存储器7。处理器1分别与数据采集模块2、BIM模型数据库存储器3、显示器4、电源模块5、图像处理模块6、存储器7连接。显示器为LED显示器。电源模块提供220V电源。
通过本实用新型对施工现场进行人流模拟,可以找到最好的人员流动路线。避免了人员拥堵情况,从而可以大大提高施工效率。
实施例2
一种通过BIM进行人流模拟的装置,该装置包括处理器、数据采集模块、BIM模型数据库存储器、显示器、电源模块、图像处理模块、存储器。处理器分别与数据采集模块、BIM模型数据库存储器、显示器、电源模块、图像处理模块、存储器连接。显示器为CRT显示器。电源模块提供220V电源。

Claims (2)

1.一种通过BIM进行人流模拟的装置,其特征在于,该装置包括处理器、数据采集模块、BIM模型数据库存储器、显示器、电源模块、图像处理模块、存储器,所述的处理器分别与数据采集模块、BIM模型数据库存储器、显示器、电源模块、图像处理模块、存储器连接。
2.根据权利要求1所述的一种通过BIM进行人流模拟的装置,其特征在于,所述的显示器为LED显示器或者CRT显示器。
CN201120195569XU 2011-06-10 2011-06-10 一种通过bim进行人流模拟的装置 Expired - Fee Related CN202120257U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120195569XU CN202120257U (zh) 2011-06-10 2011-06-10 一种通过bim进行人流模拟的装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120195569XU CN202120257U (zh) 2011-06-10 2011-06-10 一种通过bim进行人流模拟的装置

Publications (1)

Publication Number Publication Date
CN202120257U true CN202120257U (zh) 2012-01-18

Family

ID=45461306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120195569XU Expired - Fee Related CN202120257U (zh) 2011-06-10 2011-06-10 一种通过bim进行人流模拟的装置

Country Status (1)

Country Link
CN (1) CN202120257U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102819619A (zh) * 2011-06-10 2012-12-12 上海市电力公司 一种通过bim进行人流模拟的装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102819619A (zh) * 2011-06-10 2012-12-12 上海市电力公司 一种通过bim进行人流模拟的装置

Similar Documents

Publication Publication Date Title
CN102819621B (zh) 一种通过bim进行施工模拟的装置
CN103092316B (zh) 一种基于数据挖掘的服务器功耗管理***
CN102194018B (zh) 基于云计算的建筑物能耗预测分析***及方法
CN103118114A (zh) 一种基于云服务器的bim协同设计***
CN102819623A (zh) 一种通过bim检测碰撞位置的方法
CN104599093A (zh) 一种基于gis图形化显示的配网停电范围可视化方法
CN103679545A (zh) 一种配电网可靠性理论评估***
CN202167019U (zh) 一种通过bim进行施工模拟的装置
Yuan et al. The theory and framework of integration design of building consumption efficiency based on BIM
CN202167021U (zh) 一种建立bim模型的***装置
CN102819619A (zh) 一种通过bim进行人流模拟的装置
CN114004000A (zh) 一种基于bim技术管线智能排布的***
CN202135167U (zh) 基于云计算架构的工业设计平台装置
CN202120257U (zh) 一种通过bim进行人流模拟的装置
CN102819622A (zh) 一种建立bim模型的***装置
CN103839476B (zh) 一种变压器装配监造三维仿真***
Zhang Intelligent building planning system based on BIM and artificial intelligence
CN102810211B (zh) 基于Flex的居住区配电房可维护全景3D建模方法
CN203930813U (zh) 一种基于龙芯平台的can总线冗余通信***
CN105956346A (zh) 一种铝合金模板设计***和方法
CN103020869B (zh) 电网模型云分布式版本管理***
CN203301527U (zh) 一种基于云服务器的bim协同设计装置
CN204256727U (zh) 一种多机远程调试精确同步***
CN102013061A (zh) 高炉大修工程进度三维实时监控装置和调度***
Xin et al. Visual Power System based on Artificial Fish Swarm Algorithm

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP. SHANGHAI ELECTRIC POWER C

Free format text: FORMER OWNER: SHANGHAI JIULONG ELECTRIC SCIENCE + TECHNOLOGY CO., LTD.

Effective date: 20130107

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130107

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Patentee after: Shanghai Electric Power Corporation

Patentee after: State Grid Corporation of China

Patentee after: Shanghai Electric Power Communication Co., Ltd.

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Patentee before: Shanghai Electric Power Corporation

Patentee before: Shanghai Jiulong Electric Power Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120118

Termination date: 20200610

CF01 Termination of patent right due to non-payment of annual fee