WO2014024456A1 - エネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法 - Google Patents

エネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法 Download PDF

Info

Publication number
WO2014024456A1
WO2014024456A1 PCT/JP2013/004709 JP2013004709W WO2014024456A1 WO 2014024456 A1 WO2014024456 A1 WO 2014024456A1 JP 2013004709 W JP2013004709 W JP 2013004709W WO 2014024456 A1 WO2014024456 A1 WO 2014024456A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
energy management
power supply
communication terminal
information
Prior art date
Application number
PCT/JP2013/004709
Other languages
English (en)
French (fr)
Inventor
毅史 山根
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Priority to US14/419,823 priority Critical patent/US20150229130A1/en
Publication of WO2014024456A1 publication Critical patent/WO2014024456A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/14Energy storage units
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/248UPS systems or standby or emergency generators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment

Definitions

  • the present invention relates to an energy management device, an energy management system, and a control method for the energy management system.
  • the power supply to the energy management device and the load equipment stops during a power failure.
  • a distributed power source is provided in the energy management system, it is also considered that control is performed so that power is supplied by the distributed power source even during a power failure.
  • an appropriate measure at the time of a power failure is desired.
  • formed in view of the above subjects is providing the control method of the energy management apparatus which can take an appropriate measure at the time of a power failure, an energy management system, and an energy management system. .
  • an energy management device provides: An energy management device that is installed in a consumer and manages the power state of the load equipment or distributed power source in the consumer, A power input section for receiving power supply; A control unit that notifies the communication terminal of power failure information when there is no power supply from a commercial power source in the power input unit.
  • the energy management apparatus includes: When the power input unit loses power supply from the commercial power source in the power input unit, receives power supply from a distributed power source, The said control part notifies the said power failure information to the said communication terminal after the electric power supply from the said distributed power supply is performed.
  • the energy management apparatus includes: The power input unit receives power supply from a distributed power source, The control unit shuts down the energy management device when power supply from the commercial power supply in the power input unit is lost, and then causes the energy management device to operate again by power supply from the distributed power supply. To do.
  • the energy management apparatus includes: It further comprises a capacitor that is charged by power supply from the commercial power source and has a capacity capable of supplying power during at least the shutdown process.
  • the energy management apparatus includes: The power input unit receives power supply from a distributed power source, The said control part notifies the said power failure information to the said communication terminal based on the power failure state information from the said distributed power supply.
  • the energy management apparatus includes: The control unit further notifies the communication terminal of power recovery information based on the power failure state information.
  • the energy management apparatus includes: The control unit shuts down the energy management device when power supply from the commercial power supply in the power input unit is lost, and notifies the communication terminal of the power failure information after power recovery.
  • the energy management apparatus includes: A storage unit;
  • the control unit stores a power failure flag in the storage unit in the shutdown process, and notifies the communication terminal of the power failure information based on the power failure flag after power recovery.
  • the energy management apparatus includes: It further comprises a capacitor that is charged by power supply from the commercial power source and has a capacity capable of supplying power during at least the shutdown process.
  • the energy management system includes: An energy management system comprising an energy management device that is installed in a consumer and manages a power state of a load device or a distributed power source in the consumer, and a communication terminal, When there is no power supply from a commercial power source, the energy management device transmits power outage information to a communication terminal, When the communication terminal receives power outage information, the communication terminal performs display based on the power outage information.
  • the control method of the energy management system includes: An energy management system that includes a communication terminal and an energy management device that is installed in a consumer and manages the power state of a load device or a distributed power source in the consumer, The energy management device, when there is no power supply from a commercial power supply, transmitting power outage information to a communication terminal;
  • the communication terminal includes a step of performing display based on the power outage information when the power outage information is received.
  • the power failure information can be notified to the communication terminal as an appropriate measure at the time of power failure.
  • FIG. 1 is a functional block diagram illustrating a schematic configuration of an energy management device according to a first embodiment.
  • 3 is a functional block diagram illustrating a schematic configuration of a communication terminal according to Embodiment 1.
  • FIG. 3 is a flowchart illustrating an operation of the energy management system according to the first embodiment.
  • It is a block diagram which shows schematic structure of the energy management system of Embodiment 2.
  • FIG. 6 is a flowchart illustrating an operation of the energy management system according to the second embodiment.
  • the energy management system according to the present embodiment includes a distributed power supply in addition to the power supplied from the power system (commercial power supply).
  • a distributed power supply for example, a storage battery system capable of charging and discharging electric power is provided.
  • an electrical storage part as a storage battery system is demonstrated.
  • FIG. 1 is a block diagram showing a schematic configuration of an energy management system 10 according to Embodiment 1 of the present invention.
  • the energy management system 10 according to Embodiment 1 of the present invention includes an energy management device 11, a communication terminal 12, a smart meter 13, a power conditioner 14, a power storage unit 15, a distribution board 16, and a load device. 17.
  • the solid line connecting the functional blocks represents the flow of power.
  • the broken line which connects each functional block represents the flow of the control signal or the information communicated.
  • the communication indicated by the broken line may be wired communication or wireless communication.
  • communication is performed via a wireless router.
  • the wireless router may be built in the energy management apparatus 11 or may be provided separately from the energy management apparatus 11.
  • Various methods including physical layer and logical layer can be adopted for communication of control signals and information.
  • a short-range communication method such as ZigBee (registered trademark) can be employed.
  • various transmission media such as infrared communication and power line communication (PLC) can be used.
  • various communication protocols such as ZigBee SEP2.0 (Smart Energy Profile2.0) and ECHONET Lite (registered trademark) are operated on the physical layer suitable for each communication, Good.
  • ECHONET Lite registered trademark
  • the energy management system 10 can supply, to the load device 17 and the energy management device 11, the discharged power among the power charged in the power storage unit 15 in addition to the power supplied from the commercial power supply 50.
  • the energy management device 11 controls and manages the power of each device in the energy management system 10 shown in FIG. Details of the configuration of the energy management apparatus 11 will be described later.
  • the communication terminal 12 displays information transmitted from the energy management device 11. For example, the communication terminal 12 displays information related to power consumption. As will be described later, when a notification of power failure information or power recovery information is received from the energy management device 11, an icon indicating that a power failure has occurred or that there has been a power failure (hereinafter referred to as a power failure icon) or power recovery, respectively. An icon indicating that this has occurred (hereinafter referred to as a power recovery icon) is displayed. Details of the configuration of the communication terminal 12 will be described later. Of course, it may be displayed by other expression methods such as a character string instead of an icon.
  • the smart meter 13 is connected to the commercial power source 50 and measures the power supplied from the commercial power source 50.
  • the smart meter 13 can receive information such as prediction about power from a system EMS (Energy Management System) 60, for example.
  • the system EMS 60 is a facility that performs various predictions and controls related to electric power, and is generally installed in an electric power company, for example.
  • the system EMS 60 for example, one constituting an MDMS (meter data management system) can be adopted.
  • the system EMS 60 includes a database 61 that stores information on various types of power, and can collect and accumulate information on results measured by the smart meter 13.
  • the system EMS 60 can be connected to an external network 70 such as the Internet.
  • the power conditioner 14 converts the DC power supplied from the power storage unit 15 into AC power. In addition, the power conditioner 14 supplies the converted AC power to each load device 17 via a branch branched into a plurality by the distribution board 16. Further, the power conditioner 14 can convert AC power supplied from the commercial power supply 50 into DC power for charging the power storage unit 15.
  • the power storage unit 15 includes a storage battery, and can supply power by discharging the power charged in the storage battery.
  • the power storage unit 15 can charge power supplied from the commercial power supply 50. As shown in FIG. 1, the electric power discharged from the power storage unit 15 can also be supplied to each load device 17 and the energy management device 11. When power discharged from the power storage unit 15 is supplied to the energy management device 11 and each load device 17, the power supplied from the commercial power supply 50 is switched to power discharged from the power storage unit 15.
  • the power storage unit 15 determines whether or not the power supply from the commercial power supply 50 is stopped, that is, whether or not the power is in a power failure state, and information indicating whether or not the power is in a power outage (hereinafter referred to as a power failure state). Information). In addition, the power storage unit 15 transmits the power failure state information to the energy management device 11.
  • Distribution board 16 divides the supplied power into a plurality of branches and distributes them to each load device 17.
  • each branch has a typical load device 17 that consumes a large amount of power and a group that is grouped for each room.
  • the former load device 17 is, for example, an air conditioner, a refrigerator, an IH cooking heater, or the like.
  • the load device 17 in the latter is a load device connected to several outlets provided in each room, and it is uncertain what load device is connected to the outlet.
  • the number of load devices 17 connected to the energy management system 10 can be any number.
  • These load devices 17 are various electric appliances, such as a television, an air conditioner, and a refrigerator, for example. These load devices 17 are connected to the power conditioner 14 via the distribution board 16 and supplied with electric power.
  • FIG. 2 is a functional block diagram showing a schematic configuration of the energy management apparatus 11 according to the present embodiment.
  • the energy management device 11 is, for example, a HEMS, and includes a communication unit 111, a power input unit 112, a capacitor 113, and a control unit 114.
  • the communication unit 111 is, for example, an interface, and transmits and receives control signals and various information from the control unit 114 to and from the communication terminal 12, the smart meter 13, the power conditioner 14, and the load device 17.
  • the communication unit 111 can acquire power for purchasing power and / or power for selling from the smart meter 13. Furthermore, the communication unit 111 can acquire demand response (Demand Response: DR) information from an electric power company or the like via the smart meter 13.
  • the communication unit 111 supplies power to the load device 17 from the power conditioner 14 to the load device 17 via the power storage unit 15 and the branch branched from the commercial power supply 50 by the distribution board 16 to each branch. It can be acquired through the provided sensor. Further, the communication unit 111 can directly acquire the amount of power (that is, charging power) charged in the power storage unit 15 from the power conditioner 14. In addition, the communication unit 111 can directly acquire power consumption from each load device 17.
  • the communication unit 111 can acquire various information from the network 70.
  • the communication unit 111 can acquire a control signal from the communication terminal 12, and the communication unit 111 notifies the communication terminal 12 of information indicating the state of power control and management in the energy management system 10.
  • ECHONET Lite registered trademark
  • the power input unit 112 receives power supply from the commercial power supply 50 and the power storage unit 15 via the smart meter 13 and the distribution board 16.
  • the capacitor 113 is formed of, for example, a super capacitor, and is charged by power supply received by the power input unit 112 (that is, power supply from the commercial power supply 50). Then, when the power input unit 112 stops power supply from the commercial power supply 50 due to a power failure, the capacitor 113 discharges the charged power and substitutes the commercial power supply 50 for power supply to the energy management apparatus 11. That is, the capacitor 113 is a backup power supply that temporarily replaces the power supply in the event of a power failure. With the capacitor 113, the energy management apparatus 11 can continue the operation for a predetermined time within the range of the electric power charged in the capacitor 113 even during a power failure. That is, as will be described later, the energy management device 11 performs a shutdown process within the range of the power charged in the capacitor 113.
  • the control unit 114 generates a control signal for controlling the power of each device in the energy management system 10 and / or information to be notified to the communication terminal 12 based on various information acquired by the communication unit 111.
  • control unit 114 accumulates information acquired by the communication unit 111 in order to manage the power of each device in the energy management system 10.
  • the control unit 114 has a database 25 for storing various collected information.
  • the database 25 can be configured by an arbitrary memory device or the like, and may be connected to the outside of the energy management device 11 or may be built in the energy management device 11.
  • control unit 114 monitors the power supply from the commercial power supply 50 in the power input unit 112 and determines the presence or absence of power supply. When there is no power supply, the control unit 114 notifies the communication terminal 12 of information relating to a power failure (hereinafter referred to as power failure information) via the communication unit 111.
  • power failure information information relating to a power failure
  • the control unit 114 determines that there is a power failure when there is no power supply from the commercial power supply 50 in the power input unit 112.
  • the energy management apparatus 11 operates by supplying power from the capacitor 113 and first performs a shutdown process of the energy management apparatus 11.
  • the energy management apparatus 11 switches the power supply from the commercial power supply 50 to the power storage unit 15.
  • a specific code for instructing to switch the power supply from the commercial power supply 50 to the power storage unit 15 Send.
  • the control unit 114 resumes the operation of the energy management apparatus 11 by power supply from the power storage unit 15 after shutdown, that is, performs a restart process. After the restart process, the control unit 114 acquires a power failure state information code from the power storage unit 15 using ECHONET Lite (registered trademark). And the control part 114 determines whether it is a power failure state based on the code
  • power recovery information power failure information or information related to power recovery
  • the power failure information may be the power failure state information itself or may be information obtained by processing the power failure state information.
  • the control unit 114 may hold information related to the time when the power failure state information is acquired, and include information related to the time in the power failure information.
  • the power recovery information may be the power failure state information itself, or may be information obtained by processing the power failure state information.
  • the control unit 114 may hold information related to the time when the power failure state information is acquired, and include information related to the time in the power recovery information.
  • the control unit 114 when notifying the communication terminal 12 by wireless communication via the communication unit 111, the control unit 114 cannot perform communication immediately after the power failure because the wireless router cannot operate due to the power failure. However, after the power supply is switched from the commercial power supply 50 to the power storage unit 15, that is, after the energy management device 11 is restarted, the wireless router can be operated by the power supply from the power storage unit 15 and can communicate.
  • the control unit 114 preferably notifies the communication terminal 12 of a notification based on a code based on the abnormal content code assignment defined in the ECHONET Lite (registered trademark) standard.
  • the control unit 114 preferably multicasts the notification.
  • various codes are assigned for various statuses such as abnormalities.
  • category of the abnormality which can be reset is used.
  • the power failure information a code in which the lower 1 byte of the abnormality content code is “0x09” and the upper 1 byte of the abnormality content code is “0x00” is assigned.
  • power recovery information a code in which the lower 1 byte of the error content code is “0x09” and the upper 1 byte of the error content code is “0x04” is assigned.
  • FIG. 3 is a functional block diagram illustrating a schematic configuration of the communication terminal 12 according to the first embodiment.
  • the communication terminal 12 can be various terminals such as a terminal designed for exclusive use, and a mobile terminal, a personal computer (PC), a notebook personal computer, or a tablet PC installed with application software.
  • the communication terminal 12 includes a display unit 121, an input detection unit 122, a control unit 123, and a communication unit 124.
  • the display unit 121 can be configured by, for example, a liquid crystal display (LCD) or an organic EL display. Further, in the present embodiment, the display unit 121 can use a single color display or a gray scale display. However, in order to perform display in a manner that a general user can easily grasp at a glance, It is preferable to use one corresponding to the display.
  • LCD liquid crystal display
  • organic EL display organic EL display
  • the display unit 121 displays information related to power consumption received from the energy management apparatus 11.
  • the display unit 121 displays a power failure icon or a power recovery icon, respectively.
  • the display unit 121 can display images for receiving various inputs for executing the functions of the energy management apparatus 11.
  • the input detection unit 122 detects an input corresponding to the display on the display unit 121.
  • the input detection unit 122 is a touch panel, for example, and can detect an operation that a user directly touches with a finger or the like. Further, the input detection unit 122 can detect multi-touch, that is, contact with a plurality of locations on the contact detection surface of the input detection unit 122.
  • the touch panel is formed of a transmissive member and is placed on the front surface of the display unit 121. With such a configuration, contact of an icon displayed on the display unit 121 with an object or the like can be detected. Therefore, the input detection unit 122 using the touch panel having such a configuration can provide intuitive operability to the user.
  • an operation means having a physical key may be adopted as the input detection unit 122.
  • the control unit 123 controls and manages the entire communication terminal 12 by controlling each functional unit constituting the communication terminal 12.
  • the communication unit 124 is an interface, for example, and performs wired communication or wireless communication with the energy management apparatus 11. That is, the communication unit 124 transmits a control signal and / or information to the energy management apparatus 11 and receives a control signal and / or information from the energy management apparatus 11.
  • the communication unit 124 can be a connector receptacle for connecting the cable connected to the energy management apparatus 11 to the communication terminal 12.
  • control unit 114 of the energy management apparatus 11 monitors the power supply from the commercial power supply 50 in the power input unit 112 and determines the presence or absence of the power supply (step S11). If there is no power supply, the process proceeds to step S12. On the other hand, if there is power supply, step S11 is repeated.
  • the control unit 114 determines that there is a power failure. At this time, the energy management apparatus 11 operates by supplying power from the capacitor 113, and the control unit 114 performs a shutdown process of the energy management apparatus 11 (step S12). At this time, the energy management apparatus 11 switches the power supply from the commercial power supply 50 to the power storage unit 15.
  • control unit 114 resumes the operation of the energy management apparatus 11 by power supply from the power storage unit 15 after shutdown, that is, performs a restart process (step S13).
  • control unit 114 acquires power outage state information from the power storage unit 15 and determines whether or not a power outage is occurring (step S14). If it is determined that a power failure is occurring, the process proceeds to step S15. On the other hand, when it is determined that a power failure is not occurring (when it is determined that power has been restored), the process proceeds to step S17.
  • step S14 If it is determined in step S14 that there is a power failure, the control unit 114 notifies the communication terminal 12 of the power failure information via the communication unit 111 (step S15). Specifically, the control unit 114 notifies the communication terminal 12 that there is a power outage as power outage information.
  • the control unit 123 of the communication terminal 12 displays the power failure icon on the display unit 121 (step S16). Then, the process returns to step S14.
  • step S14 If it is determined in step S14 that there is no power failure, the control unit 114 notifies the communication terminal 12 of power recovery information (step S17). At this time, the energy management apparatus 11 switches the power supply from the power storage unit 15 to the commercial power supply 50. Upon receiving notification of power recovery information via the communication unit 124, the control unit 123 of the communication terminal 12 displays a power recovery icon on the display unit 121 (step S18). Here, when the power failure icon is displayed, the control unit 123 deletes the power failure icon and displays the power recovery icon.
  • Embodiment 1 of this invention since the energy management apparatus 11 detects a power failure and notifies the communication terminal 12 of the power failure information, the power failure information is notified to the communication terminal 12 as an appropriate measure at the time of the power failure. can do.
  • the notification of the power failure information allows the user to recognize that the power supply is received from the power storage unit 15 instead of the commercial power source 50, and power consumption during the power failure can be suppressed.
  • step S16 when the power failure icon is displayed, the control unit 123 of the communication terminal 12 deletes the power failure icon and displays the power recovery icon.
  • the present invention is not limited to this.
  • the control unit 123 may display the power recovery icon while leaving the power failure icon. In this way, the user can recognize that a power outage has occurred in the past. For example, the user can reconfirm whether the timer setting of the video deck or the reservation setting of the air conditioner has been reset due to the power outage. be able to.
  • FIG. 5 is a block diagram showing the configuration of the energy management system 10b according to the second embodiment of the present invention.
  • the same components as those in the first embodiment are denoted by the same reference numerals and description thereof is omitted.
  • the energy management system 10b according to the second embodiment is different from the configuration according to the first embodiment in that the power storage unit 15 is not provided and the configuration of the energy management device 11b is different.
  • FIG. 6 is a functional block diagram illustrating a schematic configuration of the energy management apparatus 11b according to the second embodiment.
  • the same components as those in the first embodiment are denoted by the same reference numerals and description thereof is omitted.
  • the energy management device 11b according to the second embodiment is different from the configuration according to the first embodiment in that the storage unit 115 is provided and the control performed by the control unit 114b.
  • the energy management device 11b is, for example, a HEMS, and includes a communication unit 111, a power input unit 112, a capacitor 113, a control unit 114b, and a storage unit 115.
  • the control unit 114b monitors the power supply from the commercial power supply 50 in the power input unit 112, and determines the presence or absence of power supply. And the control part 114b determines with it being a power failure, when there is no electric power supply from the commercial power source 50 in the power input part 112.
  • the energy management device 11b operates by supplying power from the capacitor 113, and performs a shutdown process of the energy management device 11b.
  • the control unit 114b stores a flag indicating a power failure (hereinafter referred to as a power failure flag) in the storage unit 115 in the shutdown process.
  • control unit 114b refers to the storage unit 115 after starting the energy management apparatus 11b. And the energy management apparatus 11b notifies the communication terminal 12 of the power failure information by the past power failure based on the power failure flag.
  • step S11 If there is no power supply in step S11, the energy management system 10b of the second embodiment proceeds to step S21. On the other hand, if there is power supply, step S11 is repeated.
  • step S11 If there is no power supply in step S11, the control unit 114b of the energy management apparatus 11b determines that there is a power failure, and stores a power failure flag in the storage unit 115 (step S22). At this time, the energy management device 11 operates by supplying power from the capacitor 113, and the control unit 114 performs a shutdown process of the energy management device 11 (step S23).
  • the control unit 114b activates the energy management device 11b (step S24). And the control part 114b acquires the power failure flag with reference to the memory
  • the control unit 123 of the communication terminal 12 displays the power failure icon on the display unit 121 (step S27).
  • the energy management device 11 detects a power failure based on the presence or absence of power supply to the power input unit 112, and notifies the communication terminal 12 of the power failure information after power recovery.
  • the power outage information can be notified to the communication terminal 12 as an appropriate measure after the power outage.
  • the timer setting of the video deck and the reservation setting of the air conditioner device are reconfirmed whether or not the reset is caused by the power outage. be able to.
  • the energy management apparatus 11b includes the storage unit 115 and stores the power failure flag in the storage unit 115, but is not limited thereto. Instead of providing the storage unit 115, the energy management device 11 b may store a power failure flag in the database 25.
  • the energy management device 11b may store information indicating the time when power supply is stopped in the storage unit 115 in association with the power failure flag. In this case, the time information is included in the power failure information. And the communication terminal 12 displays the said time information with a power failure icon. By doing in this way, the user can recognize that a power failure has occurred at a certain past time.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Power Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Emergency Management (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Tourism & Hospitality (AREA)
  • Public Health (AREA)
  • General Business, Economics & Management (AREA)
  • General Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Stand-By Power Supply Arrangements (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

 停電時において適切な措置をとることができるエネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法を提供する。 商用電源50からの電力供給を受ける電源入力部112と、電源入力部112における商用電源50からの電力供給が無い場合に、停電情報を通信端末12に通知する制御部114と、を備えることを特徴とする。

Description

エネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法 関連出願へのクロスリファレンス
 本出願は、日本国特許出願2012-174054号(2012年8月6日出願)の優先権を主張するものであり、当該出願の開示全体を、ここに参照のために取り込む。
 本発明は、エネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法に関する。
 近年、電力需要家ごとに設けられるエネルギー管理装置(例えば、HEMS:Home Energy Management System)によって、電力需要家に設けられる負荷機器や電力需要家に設けられる分散電源などを制御する技術が知られている(特許文献1参照)。
特開2003-309928号公報
 ここで停電時にはエネルギー管理装置や負荷機器への電力供給が停止してしまう。エネルギー管理システムにおいて分散電源が備えられている場合、当該分散電源により停電時にも電力供給が行われるように制御することも考えられている。しかし、停電時の措置としては単に分散電源からの電源供給だけではまだまだ不十分な点があるため、停電時における適切な措置が望まれている。
 従って、上記のような課題に鑑みてなされた本発明の目的は、停電時において適切な措置をとることができるエネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法を提供することにある。
 上記課題を解決するために本発明に係るエネルギー管理装置は、
 需要家に設けられ、需要家内の負荷機器あるいは分散電源の電力状態を管理するエネルギー管理装置であって、
 電力供給を受ける電源入力部と、
 前記電源入力部における商用電源からの電力供給が無い場合に、停電情報を通信端末に通知する制御部と、を備えることを特徴とする。
 また本発明に係るエネルギー管理装置は、
 前記電源入力部が前記電源入力部における前記商用電源からの電力供給が無くなった場合に、分散電源からの電力供給を受け、
 前記制御部は、前記分散電源からの電力供給が行われてから前記停電情報を前記通信端末に通知することを特徴とする。
 また本発明に係るエネルギー管理装置は、
 前記電源入力部が、分散電源からの電力供給を受け、
 前記制御部は、前記電源入力部における前記商用電源からの電力供給が無くなると前記エネルギー管理装置をシャットダウンさせ、その後、前記分散電源からの電力供給により前記エネルギー管理装置を再度動作させることを特徴とする。
 また本発明に係るエネルギー管理装置は、
 前記商用電源からの電力供給により充電され、少なくとも前記シャットダウンの処理の間の電源供給を可能な容量を有するキャパシタをさらに備えることを特徴とする。
 また本発明に係るエネルギー管理装置は、
 前記電源入力部が、分散電源からの電力供給を受け、
 前記制御部は、前記分散電源からの停電状態情報に基づき、前記停電情報を前記通信端末に通知することを特徴とする。
 また本発明に係るエネルギー管理装置は、
 前記制御部がさらに、前記停電状態情報に基づき、復電情報を前記通信端末に通知することを特徴とする。
 また本発明に係るエネルギー管理装置は、
 前記制御部が、前記電源入力部における前記商用電源からの電力供給が無くなると前記エネルギー管理装置をシャットダウンさせ、復電後に前記停電情報を前記通信端末に通知することを特徴とする。
 また本発明に係るエネルギー管理装置は、
 記憶部をさらに備え、
 前記制御部は、前記シャットダウンの処理において停電フラグを前記記憶部に格納し、復電後に前記停電フラグに基づき前記停電情報を前記通信端末に通知することを特徴とする。
 また本発明に係るエネルギー管理装置は、
 前記商用電源からの電力供給により充電され、少なくとも前記シャットダウンの処理の間の電源供給を可能な容量を有するキャパシタをさらに備えることを特徴とする。
 また本発明に係るエネルギー管理システムは、
 需要家に設けられて需要家内の負荷機器あるいは分散電源の電力状態を管理するエネルギー管理装置と、通信端末とを備えるエネルギー管理システムであって、
 前記エネルギー管理装置は、商用電源からの電力供給が無い場合、停電情報を通信端末に送信し、
 前記通信端末は、停電情報を受信した場合、停電情報に基づく表示を行うことを特徴とする。
 また本発明に係るエネルギー管理システムの制御方法は、
 需要家に設けられて需要家内の負荷機器あるいは分散電源の電力状態を管理するエネルギー管理装置と、通信端末とを備えるエネルギー管理システムの制御方法であって、
 前記エネルギー管理装置は、商用電源からの電力供給が無い場合、停電情報を通信端末に送信するステップと、
 前記通信端末は、停電情報を受信した場合、停電情報に基づく表示を行うステップと、を含むことを特徴とする。
 本発明におけるエネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法によれば、停電時における適切な措置として停電情報を通信端末に通知することができる。
実施の形態1のエネルギー管理システムの概略構成を示すブロック図である。 実施の形態1のエネルギー管理装置の概略構成を示す機能ブロック図である。 実施の形態1の通信端末の概略構成を示す機能ブロック図である。 実施の形態1のエネルギー管理システムの動作を示すフローチャートである。 実施の形態2のエネルギー管理システムの概略構成を示すブロック図である。 実施の形態2のエネルギー管理装置の概略構成を示す機能ブロック図である。 実施の形態2のエネルギー管理システムの動作を示すフローチャートである。
 以下、本発明の実施の形態について説明する。
(実施の形態1)
 まず、第1の実施形態に係るエネルギー管理システムについて説明する。本実施形態に係るエネルギー管理システムは、電力系統(商用電源)から供給される電力の他に、分散電源を備える。分散電源としては、例えば電力を充放電することができる蓄電池システムを備える。以下、本実施形態においては、蓄電池システムとして蓄電部を備える例について説明する。
 図1は本発明の実施の形態1に係るエネルギー管理システム10の概略構成を示すブロック図である。本発明の実施の形態1に係るエネルギー管理システム10は、エネルギー管理装置11と、通信端末12と、スマートメータ13と、パワーコンディショナ14と、蓄電部15と、分電盤16と、負荷機器17とを備える。
 図1において、各機能ブロックを結ぶ実線は、電力の流れを表す。また、図1において、各機能ブロックを結ぶ破線は、制御信号または通信される情報の流れを表す。当該破線が示す通信は有線通信としてもよいし、無線通信としてもよい。無線通信をする場合、無線ルータを介して通信が行われる。無線ルータはエネルギー管理装置11に内蔵されていてもよく、またエネルギー管理装置11とは別に備えられてもよい。
 制御信号および情報の通信には、物理層、論理層含め、様々な方式を採用可能である。例えば、エネルギー管理装置11と、通信端末12、スマートメータ13、およびパワーコンディショナ14との通信には、ZigBee(登録商標)などの近距離通信方式による通信を採用することができる。また、エネルギー管理装置11と負荷機器17との通信には、赤外線通信、電力線搬送通信(PLC:PowerLine Communication)など、様々な伝送メディアを使用することができる。またそれぞれの通信に適した物理層の上で、各種プロトコルZigBee SEP2.0(Smart Energy Profile2.0)、ECHONET Lite(登録商標)などのような論理層だけ規定される通信プロトコルを動作させてもよい。以下、ECHONET Lite(登録商標)を、エネルギー管理装置11が、通信端末12、スマートメータ13、パワーコンディショナ14、および負荷機器17との通信を行う場合に採用するケースを例に説明を行う。
 エネルギー管理システム10は、商用電源50から供給される電力の他、蓄電部15に充電された電力のうち放電された電力を、負荷機器17及びエネルギー管理装置11に供給可能である。
 エネルギー管理装置11は、図1に示すエネルギー管理システム10における各機器の電力を制御および管理する。エネルギー管理装置11の構成についての詳細は後述する。
 通信端末12は、エネルギー管理装置11が送信する情報を表示する。例えば通信端末12は、消費電力に関する情報等を表示する。また後述するようにエネルギー管理装置11から停電情報または復電情報の通知を受けると、それぞれ停電中であること又は停電があったことを示すアイコン(以下、停電アイコンという。)、又は、復電したことを示すアイコン(以下、復電アイコンという。)を表示する。通信端末12の構成についての詳細は後述する。もちろん、アイコンでなくとも文字列等、他の表現方法で表示してもよい。
 スマートメータ13は、商用電源50に接続されて、商用電源50から供給される電力を計測する。また、スマートメータ13は、系統EMS(EnergyManagement System)60から、例えば電力に関する予測などの情報を受信可能である。ここで、系統EMS60は、電力に関する各種の予測および制御などを行う設備であり、一般的には、例えば電力会社などに設置される。系統EMS60は、例えばMDMS(メータデータマネジメントシステム)を構成するものを採用可能である。この系統EMS60は、各種の電力に関する情報を記憶するデータベース61を有しており、スマートメータ13が計測した結果の情報を収集して蓄積することもできる。また、系統EMS60は、インターネットなどの外部ネットワーク70に接続可能である。
 パワーコンディショナ14は、蓄電部15から供給される直流の電力を、交流の電力に変換する。また、パワーコンディショナ14は、変換した交流の電力を、分電盤16で複数に分岐した支幹を介して各負荷機器17に供給する。また、パワーコンディショナ14は、商用電源50から供給される交流の電力を、蓄電部15に充電するための直流の電力に変換可能である。
 蓄電部15は、蓄電池を備えており、この蓄電池に充電された電力を放電することにより、電力を供給可能である。また蓄電部15は、商用電源50から供給される電力を充電可能である。図1に示すように、蓄電部15から放電される電力も、各負荷機器17及びエネルギー管理装置11に供給可能である。蓄電部15から放電される電力をエネルギー管理装置11及び各負荷機器17に供給する場合、商用電源50により供給される電力から、蓄電部15により放電される電力に切り替える。
 また蓄電部15は、商用電源50からの電力供給が停止しているか否か、すなわち停電状態であるか否かを判定し、停電中の状態であるか否かを示す情報(以下、停電状態情報という。)を生成する。また蓄電部15は、停電状態情報を、エネルギー管理装置11に送信する。
 分電盤16は、供給される電力を複数の支幹に分岐させて各負荷機器17に分配する。ここで、各支幹には、消費電力の大きい代表的な負荷機器17が直接接続されるものと、部屋ごとにまとめられたものとがある。前者における負荷機器17は、例えばエアコン、冷蔵庫、IHクッキングヒータなどである。後者における負荷機器17は、各部屋にいくつか設けられているコンセントに接続される負荷機器であり、どのような負荷機器がコンセントに接続されるかは不定である。
 図1において、エネルギー管理システム10に接続される負荷機器17は、任意の数とすることができる。これらの負荷機器17は、例えば、テレビ、エアコン、冷蔵庫など、種々の電化製品である。これらの負荷機器17は分電盤16を介してパワーコンディショナ14に接続されて、電力が供給される。
 次に、実施形態1に係るエネルギー管理装置11について、さらに説明する。
 図2は、本実施形態に係るエネルギー管理装置11の概略構成を示す機能ブロック図である。エネルギー管理装置11は、例えばHEMSであって、通信部111と、電源入力部112と、キャパシタ113と、制御部114とを備える。
 通信部111は、例えばインターフェースであり、通信端末12、スマートメータ13、パワーコンディショナ14、および負荷機器17との間における制御部114からの制御信号および様々な情報を送受信する。
 例えば、通信部111は、スマートメータ13から、商用電源50の買電の電力および/または売電の電力を取得可能である。さらに、通信部111は、スマートメータ13を介して例えば電力会社などから需要応答(DemandResponse:DR)の情報を取得可能である。また、通信部111は、パワーコンディショナ14から、蓄電部15、および商用電源50から分電盤16で複数に分岐した支幹を介して負荷機器17に供給される電力について、各支幹に設けたセンサを介して取得可能である。また、通信部111は、パワーコンディショナ14から、蓄電部15に充電される電力(つまり充電電力)量についても直接取得可能である。また、通信部111は、各負荷機器17から消費電力についても直接取得可能である。また、通信部111は、ネットワーク70から多様な情報を取得可能である。
 さらに、通信部111は通信端末12から制御信号を取得可能であり、また通信部111は通信端末12にエネルギー管理システム10における電力の制御および管理の状態を示す情報を通知する。一例として、ECHONET Lite(登録商標)を採用するケースを例に説明を行う。
 電源入力部112は、スマートメータ13及び分電盤16を介して商用電源50及び蓄電部15からの電力供給を受ける。
 キャパシタ113は、例えばスーパキャパシタにより構成され、電源入力部112が受けた電力供給(つまり商用電源50からの電力供給など)により充電される。そしてキャパシタ113は、停電により電源入力部112が商用電源50からの電力供給が停止した場合、充電した電力を放電し、エネルギー管理装置11の電力供給を商用電源50に代替して行う。すなわちキャパシタ113は、停電時において臨時的に電力供給を代替するバックアップ電源である。当該キャパシタ113により、エネルギー管理装置11は、停電時においても、キャパシタ113に充電された電力の範囲内で所定時間、動作を継続することができる。すなわち後述するように、エネルギー管理装置11は、キャパシタ113に充電された電力の範囲内でシャットダウン処理を行う。
 制御部114は、通信部111が取得する様々な情報に基づいて、エネルギー管理システム10における各機器の電力を制御する制御信号および/または通信端末12に通知する情報を生成する。
 また制御部114は、エネルギー管理システム10における各機器の電力を管理するために、通信部111が取得する情報を蓄積する。制御部114は収集した各種の情報を蓄積するために、データベース25を有している。データベース25は、任意のメモリ装置などにより構成することができ、エネルギー管理装置11の外部に接続されるようにしてもよいし、エネルギー管理装置11に内蔵されるようにしてもよい。
 また制御部114は、電源入力部112における商用電源50からの電力供給を監視し、電力供給の有無を判定する。制御部114は、当該電力供給が無い場合、通信部111を介して停電に係る情報(以下、停電情報という。)を通信端末12に通知する。
 具体的には制御部114は、電源入力部112における商用電源50からの電力供給が無い場合、停電であると判定する。このときエネルギー管理装置11は、キャパシタ113からの電力供給により動作し、まずエネルギー管理装置11のシャットダウン処理を行う。またこのときエネルギー管理装置11は、電力供給を商用電源50から蓄電部15に切り替える。すなわち、ECHONET Lite(登録商標)により、停電中であることを通知する特定のコードを蓄電部15に対して送信し、さらに電力供給を商用電源50から蓄電部15に切り替えるよう指示する特定のコードを送信する。
 制御部114は、シャットダウン後に蓄電部15からの電力供給によりエネルギー管理装置11の動作を再開、すなわち再起動処理を行う。再起動処理後、制御部114は、蓄電部15から、ECHONET Lite(登録商標)により、停電状態情報のコードを取得する。そして制御部114は、当該停電状態情報のコードに基づき、停電状態であるか否かを判定する。制御部114は、当該判定により通信部111を介して通信端末12に停電情報又は復電に係る情報(以下、復電情報という。)をECHONET Lite(登録商標)上で規定した特定のコードにより、通知する。ここで停電情報とは、停電状態情報そのものであってもよく、また、停電状態情報を加工した情報であってもよい。例えば制御部114は、停電状態情報を取得した時刻に係る情報を保持し、停電情報に当該時刻に係る情報を含めるようにしてもよい。同様に復電情報とは、停電状態情報そのものであってもよく、また、停電状態情報を加工した情報であってもよい。例えば制御部114は、停電状態情報を取得した時刻に係る情報を保持し、復電情報に当該時刻に係る情報を含めるようにしてもよい。
 ここで制御部114は、通信部111を介して無線通信により通信端末12に通知を行う場合、停電直後には無線ルータが停電により動作できないため通信を行うことができない。しかしながら電力供給が商用電源50から蓄電部15に切り替わった後、すなわちエネルギー管理装置11の再起動後には、無線ルータは蓄電部15からの電力供給により動作可能であり、通信を行うことができる。
 制御部114は、好適には通信端末12に対する通知を、ECHONET Lite(登録商標)の規格で定められる異常内容コード割り当てに基づくコードにより通知する。また制御部114は、好適には当該通知をマルチキャスト送信する。ECHONETLite(登録商標)においては、例えば異常についてなど、色々なステータスについて各種のコードが割当てられている。そして停電情報及び復電情報としては、復帰可能な異常の分類に含まれるユーザ定義領域のコードを用いる。例えば停電情報として、異常内容コードの下位1バイトを“0x09”とし、異常内容コードの上位1バイトを“0x00”としたコードを割当てる。一方、復電情報として、異常内容コードの下位1バイトを“0x09”とし、異常内容コードの上位1バイトを“0x04”としたコードを割当てる。
 図3は、実施形態1に係る通信端末12の概略構成を示す機能ブロック図である。通信端末12は、専用に設計された端末とする他、モバイル端末、パソコン(PC)、ノートパソコン、またはタブレットPCなどにアプリケーションソフトウェアをインストールしたものとするなど、各種の端末とすることができる。通信端末12は、表示部121、入力検出部122、制御部123、および通信部124を含んで構成される。
 表示部121は、例えば液晶ディスプレイ(LCD)または有機ELディスプレイ等により構成することができる。また、本実施形態において、表示部121は、単色表示またはグレイスケールによって表示するものを用いることもできるが、一般のユーザが一見して容易に把握できるような態様で表示を行うために、カラー表示に対応したものを用いるのが好適である。
 表示部121は、エネルギー管理装置11から受信した消費電力に関する情報等を表示する。表示部121は、制御部123の制御により、エネルギー管理装置11から停電情報または復電情報の通知を、通信部124を介して受けると、それぞれ停電アイコンまたは復電アイコンを表示する。また、表示部121は、エネルギー管理装置11の有する機能を実行させるための様々な入力を受付けるための画像を表示可能である。
 入力検出部122は、表示部121における表示に対応する入力を検出する。入力検出部122は、例えばタッチパネルであり、ユーザが指などにより直接触れる操作を検出可能である。また、入力検出部122は、マルチタッチ、すなわち、入力検出部122の接触検出面上の複数の箇所への接触を検出可能である。
 タッチパネルは透過性の部材により形成され、表示部121の前面に重ねて配置される。このような構成により、表示部121に表示したアイコンのオブジェクトなどへの接触を検出可能である。したがって、このような構成のタッチパネルによる入力検出部122は、ユーザに直感的な操作性を提供可能である。また、もちろんタッチパネルではなく、物理キーを有するタイプの操作手段を入力検出部122として採用してもよい。
 制御部123は、通信端末12を構成する各機能部を制御することにより、通信端末12全体を制御および管理する。
 通信部124は、例えばインターフェースであり、エネルギー管理装置11と有線通信又は無線通信を行う。すなわち、通信部124はエネルギー管理装置11に制御信号および/または情報を送信するとともに、エネルギー管理装置11からの制御信号および/または情報を受信する。通信部124は、通信端末12が有線通信でエネルギー管理装置11と通信する場合は、エネルギー管理装置11に接続されたケーブルを通信端末12に接続するためのコネクタのレセプタクルとすることができる。
 次に、実施の形態1のエネルギー管理システム10について、図4に示すフローチャートによりその動作を説明する。
 はじめにエネルギー管理装置11の制御部114は、電源入力部112における商用電源50からの電力供給を監視し、電力供給の有無を判定する(ステップS11)。電力供給が無い場合ステップS12に進む。一方電力供給がある場合、ステップS11を繰り返し行う。
 電力供給が無い場合、制御部114は、停電であると判定する。このときエネルギー管理装置11はキャパシタ113からの電力供給により動作し、制御部114は、エネルギー管理装置11のシャットダウン処理を行う(ステップS12)。またこのときエネルギー管理装置11は、電力供給を商用電源50から蓄電部15に切り替える。
 続いて制御部114は、シャットダウン後に蓄電部15からの電力供給によりエネルギー管理装置11の動作を再開、すなわち再起動処理を行う(ステップS13)。
 続いて制御部114は、蓄電部15から、停電状態情報を取得し、停電中であるか否かを判定する(ステップS14)。停電中であると判定した場合、ステップS15に進む。一方停電中ではないと判定した場合(復電したと判定した場合)、ステップS17に進む。
 ステップS14において停電中であると判定した場合、制御部114は、通信部111を介して通信端末12に停電情報を通知する(ステップS15)。具体的には制御部114は、停電情報として、現在停電中であることを通信端末12に通知する。通信端末12の制御部123は、通信部124を介して停電情報の通知を受けると、表示部121に停電アイコンを表示させる(ステップS16)。そしてステップS14に戻る。
 ステップS14において停電中ではないと判定した場合、制御部114は、通信端末12に復電情報を通知する(ステップS17)。このときエネルギー管理装置11は、電力供給を蓄電部15から商用電源50に切り替える。通信端末12の制御部123は、通信部124を介して復電情報の通知を受けると、表示部121に復電アイコンを表示させる(ステップS18)。ここで制御部123は、停電アイコンが表示されていた場合、当該停電アイコンを消去して復電アイコンを表示する。
 このように本発明の実施の形態1によれば、エネルギー管理装置11が停電を検知して通信端末12に停電情報を通知するため、停電時における適切な措置として停電情報を通信端末12に通知することができる。また当該停電情報の通知により、商用電源50ではなく蓄電部15により電力供給を受けていることをユーザに認知させることができ、停電中における電力消費を抑制させることができる。
 ステップS16において通信端末12の制御部123は、停電アイコンが表示されていた場合、当該停電アイコンを消去して復電アイコンを表示するようにしたがこれに限られない。制御部123は、停電アイコンが表示されていた場合、当該停電アイコンを残したまま、復電アイコンを表示してもよい。このようにすることで、ユーザは過去に停電が生じたことを認知できるため、例えばビデオデッキのタイマー設定やエアコン機器の予約設定が停電によりリセット等されていないか否か、ユーザに再確認させることができる。
(実施の形態2)
 以下に、本発明の実施の形態2について説明をする。図5は本発明の実施の形態2のエネルギー管理システム10bの構成を示すブロック図である。実施の形態1と同一の構成については同一の符号を付し、説明は省略する。実施の形態2に係るエネルギー管理システム10bは、実施の形態1にかかる構成と比較して、蓄電部15を備えない点、及びエネルギー管理装置11bの構成が相違する。
 図6は、実施形態2に係るエネルギー管理装置11bの概略構成を示す機能ブロック図である。実施の形態1と同一の構成については同一の符号を付し、説明は省略する。実施の形態2に係るエネルギー管理装置11bは、実施の形態1にかかる構成と比較して、記憶部115を備える点及び制御部114bの行う制御が相違する。
 エネルギー管理装置11bは、例えばHEMSであって、通信部111と、電源入力部112と、キャパシタ113と、制御部114bと、記憶部115とを備える。
 制御部114bは、電源入力部112における商用電源50からの電力供給を監視し、電力供給の有無を判定する。そして制御部114bは、電源入力部112における商用電源50からの電力供給が無い場合、停電であると判定する。このときエネルギー管理装置11bは、キャパシタ113からの電力供給により動作し、エネルギー管理装置11bのシャットダウン処理を行う。また、制御部114bはシャットダウン処理において、停電であることを示すフラグ(以下、停電フラグという。)を記憶部115に格納する。
 また制御部114bは、復電した場合、エネルギー管理装置11bを起動した後に記憶部115を参照する。そしてエネルギー管理装置11bは、停電フラグに基づき過去の停電による停電情報を通信端末12に通知する。
 次に、実施の形態2のエネルギー管理システム10bについて、図7に示すフローチャートによりその動作を説明する。実施の形態1と同一の動作については同一の符号を付し、説明は省略する。
 実施の形態2のエネルギー管理システム10bは、ステップS11において電力供給が無い場合、ステップS21に進む。一方電力供給がある場合、ステップS11を繰り返して行う。
 ステップS11において電力供給が無い場合、エネルギー管理装置11bの制御部114bは停電であると判定し、停電フラグを記憶部115に格納する(ステップS22)。このときエネルギー管理装置11はキャパシタ113からの電力供給により動作し、制御部114は、エネルギー管理装置11のシャットダウン処理を行う(ステップS23)。
 続いて復電した場合、制御部114bは、エネルギー管理装置11bを起動する(ステップS24)。そして制御部114bは、起動後に記憶部115を参照して停電フラグを取得する(ステップS25)。そしてエネルギー管理装置11bは、停電フラグに基づき過去の停電による停電情報をECHONET Lite(登録商標)における特定のコードを送信することにより、通信端末12に通知する(ステップS26)。通信端末12の制御部123は、通信部124を介して停電情報の通知を受けると、表示部121に停電アイコンを表示させる(ステップS27)。
 このように本発明の実施の形態2によれば、エネルギー管理装置11が電源入力部112への電力供給の有無に基づき停電を検知し、復電後に通信端末12に停電情報を通知するため、停電後における適切な措置として停電情報を通信端末12に通知することができる。また当該停電情報の通知により、ユーザは過去に停電が生じたことを認知できるため、例えばビデオデッキのタイマー設定やエアコン機器の予約設定が、停電によりリセット等されていないか否か、再確認させることができる。
 実施の形態2においてエネルギー管理装置11bは記憶部115を備え、記憶部115に停電フラグを格納するものとしたがこれに限られない。エネルギー管理装置11bは、記憶部115を備える替わりに、停電フラグをデータベース25に格納するようにしてもよい。
またエネルギー管理装置11bは、停電フラグに対応付けて、電力供給が無くなった時刻を示す情報を記憶部115に格納してもよい。この場合、停電情報に当該時刻情報を含む。そして通信端末12は、停電アイコンとともに、当該時刻情報を表示する。このようにすることで、ユーザは、過去のある時刻に停電が発生したことを認知することができる。
 本発明を諸図面や実施例に基づき説明してきたが、当業者であれば本開示に基づき種々の変形や修正を行うことが容易であることに注意されたい。従って、これらの変形や修正は本発明の範囲に含まれることに留意されたい。例えば、各手段、各ステップ等に含まれる機能等は論理的に矛盾しないように再配置可能であり、複数の手段やステップ等を1つに組み合わせたり、或いは分割したりすることが可能である。
 10、10b エネルギー管理システム
 11、11b エネルギー管理装置
 12 通信端末
 13 スマートメータ
 14 パワーコンディショナ
 15 蓄電部
 16 分電盤
 17 負荷機器
 25 データベース
 50 商用電源
 60 系統EMS
 61 データベース
 70 ネットワーク
 111 通信部
 112 電源入力部
 113 キャパシタ
 114、114b 制御部
 115 記憶部
 121 表示部
 122 入力検出部
 123 制御部
 124 通信部

Claims (11)

  1.  需要家に設けられ、需要家内の負荷機器あるいは分散電源の電力状態を管理するエネルギー管理装置であって、
     電力供給を受ける電源入力部と、
     前記電源入力部における商用電源からの電力供給が無い場合に、停電情報を通信端末に通知する制御部と、
    を備えることを特徴とするエネルギー管理装置。
  2.  前記電源入力部は、前記電源入力部における前記商用電源からの電力供給が無くなった場合に、分散電源からの電力供給を受け、
     前記制御部は、前記分散電源からの電力供給が行われてから前記停電情報を前記通信端末に通知することを特徴とする、請求項1に記載のエネルギー管理装置。
  3.  前記電源入力部は、分散電源からの電力供給を受け、
     前記制御部は、前記電源入力部における前記商用電源からの電力供給が無くなると前記エネルギー管理装置をシャットダウンさせ、その後、前記分散電源からの電力供給により前記エネルギー管理装置を再度動作させることを特徴とする、請求項2に記載のエネルギー管理装置。
  4.  前記商用電源からの電力供給により充電され、少なくとも前記シャットダウンの処理の間の電源供給を可能な容量を有するキャパシタをさらに備えることを特徴とする、請求項3に記載のエネルギー管理装置。
  5.  前記電源入力部は、分散電源からの電力供給を受け、
     前記制御部は、前記分散電源からの停電状態情報に基づき、前記停電情報を前記通信端末に通知することを特徴とする、請求項2に記載のエネルギー管理装置。
  6.  前記制御部はさらに、前記停電状態情報に基づき、復電情報を前記通信端末に通知することを特徴とする、請求項1に記載のエネルギー管理装置。
  7.  前記制御部は、前記電源入力部における前記商用電源からの電力供給が無くなると前記エネルギー管理装置をシャットダウンさせ、復電後に前記停電情報を前記通信端末に通知することを特徴とする、請求項1に記載のエネルギー管理装置。
  8.  記憶部をさらに備え、
     前記制御部は、前記シャットダウンの処理において停電フラグを前記記憶部に格納し、復電後に前記停電フラグに基づき前記停電情報を前記通信端末に通知することを特徴とする、請求項6に記載のエネルギー管理装置。
  9.  前記商用電源からの電力供給により充電され、少なくとも前記シャットダウンの処理の間の電源供給を可能な容量を有するキャパシタをさらに備えることを特徴とする、請求項7に記載のエネルギー管理装置。
  10.  需要家に設けられて需要家内の負荷機器あるいは分散電源の電力状態を管理するエネルギー管理装置と、通信端末とを備えるエネルギー管理システムであって、
     前記エネルギー管理装置は、商用電源からの電力供給が無い場合、停電情報を通信端末に送信し、
     前記通信端末は、停電情報を受信した場合、停電情報に基づく表示を行うことを特徴とするエネルギー管理システム。
  11.  需要家に設けられて需要家内の負荷機器あるいは分散電源の電力状態を管理するエネルギー管理装置と、通信端末とを備えるエネルギー管理システムの制御方法であって、
     前記エネルギー管理装置は、商用電源からの電力供給が無い場合、停電情報を通信端末に送信するステップと、
     前記通信端末は、停電情報を受信した場合、停電情報に基づく表示を行うステップと、を含むことを特徴とするエネルギー管理システムの制御方法。
PCT/JP2013/004709 2012-08-06 2013-08-02 エネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法 WO2014024456A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/419,823 US20150229130A1 (en) 2012-08-06 2013-08-02 Energy management apparatus, energy management system, and method of controlling energy management system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-174054 2012-08-06
JP2012174054A JP5959982B2 (ja) 2012-08-06 2012-08-06 エネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法

Publications (1)

Publication Number Publication Date
WO2014024456A1 true WO2014024456A1 (ja) 2014-02-13

Family

ID=50067710

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/004709 WO2014024456A1 (ja) 2012-08-06 2013-08-02 エネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法

Country Status (3)

Country Link
US (1) US20150229130A1 (ja)
JP (4) JP5959982B2 (ja)
WO (1) WO2014024456A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016172283A1 (en) * 2015-04-22 2016-10-27 Siemens Aktiengesellschaft Systems, methods and apparatus for improved generation control of microgrid energy systems
CN108988484A (zh) * 2018-05-18 2018-12-11 广东电网有限责任公司电力科学研究院 基于计量自动化***的馈线及重要客户停电监测方法
US10488907B2 (en) 2014-12-19 2019-11-26 Kabushiki Kaisha Toshiba Electronic device and method for managing power failure occurrence

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5968719B2 (ja) * 2012-08-06 2016-08-10 京セラ株式会社 管理システム、管理方法、制御装置及び蓄電池装置
JP5959982B2 (ja) * 2012-08-06 2016-08-02 京セラ株式会社 エネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法
US20140324240A1 (en) * 2012-12-14 2014-10-30 Alcatel-Lucent Usa Inc. Method And System For Disaggregating Thermostatically Controlled Appliance Energy Usage From Other Energy Usage
JP2015162925A (ja) * 2014-02-26 2015-09-07 株式会社Nttファシリティーズ 電力管理システム
JP6161567B2 (ja) * 2014-04-21 2017-07-12 三菱電機株式会社 加熱調理器
JP6390315B2 (ja) * 2014-09-30 2018-09-19 アイシン精機株式会社 エネルギー管理システム
JP6640925B2 (ja) * 2017-05-29 2020-02-05 京セラ株式会社 管理システム、管理方法、制御装置及び蓄電池装置
US10958099B2 (en) * 2018-02-21 2021-03-23 General Electric Technology Gmbh Real-time electrical grid restoration
CN114189035B (zh) * 2020-08-24 2024-03-26 成都秦川物联网科技股份有限公司 一种物联网智能燃气表供电方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004023625A1 (ja) * 2002-09-04 2004-03-18 Hitachi, Ltd. 電力供給システムおよび停電時の電力供給方法
JP2005185028A (ja) * 2003-12-22 2005-07-07 Tm T & D Kk 低圧配電系統監視システム
JP2012196019A (ja) * 2011-03-15 2012-10-11 Tokyo Gas Co Ltd コージェネレーション・システム
WO2012165365A1 (ja) * 2011-05-31 2012-12-06 パナソニック株式会社 電力供給システム

Family Cites Families (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02309759A (ja) * 1989-05-24 1990-12-25 Sharp Corp 遠隔制御装置
JPH07160374A (ja) * 1993-12-08 1995-06-23 Casio Comput Co Ltd データ処理装置
JPH07288927A (ja) * 1994-04-15 1995-10-31 Takaoka Electric Mfg Co Ltd 電源装置監視制御ユニット
JP3171794B2 (ja) * 1996-09-24 2001-06-04 株式会社アイエスエイ 無停電電源装置およびその連動運転方法
WO1999034342A1 (en) * 1997-12-24 1999-07-08 Abb Power T & D Company Inc Method and apparatus for detecting and reporting a power outage
JPH11225438A (ja) * 1998-02-05 1999-08-17 Matsushita Electric Works Ltd 消費電力監視機能を備えた住宅監視システム
US7073075B2 (en) * 2001-11-27 2006-07-04 General Instrument Corporation Telephony end user interface in an HFC access network
JP2003244866A (ja) * 2002-02-15 2003-08-29 Toshiba Corp 電力線搬送通信システム及び集中制御装置並びに被制御装置
JP2003309928A (ja) * 2002-04-16 2003-10-31 Nippon Futo Soko Kk 電力管理システム
JP2004080919A (ja) * 2002-08-19 2004-03-11 Tamura Electric Works Ltd 電気機器の電源制御システム及び電源制御方法
AU2003272816A1 (en) * 2002-09-30 2004-04-19 Basic Resources, Inc. Outage notification device and method
CA2543311A1 (en) * 2003-10-24 2005-05-06 Square D Company Intelligent power management control system
US20070005192A1 (en) * 2005-06-17 2007-01-04 Optimal Licensing Corporation Fast acting distributed power system for transmission and distribution system load using energy storage units
JP5070717B2 (ja) * 2006-03-10 2012-11-14 オムロン株式会社 燃料電池コージェネレーションシステム
JP5199555B2 (ja) * 2006-08-02 2013-05-15 パナソニック株式会社 配電システム
JP2008206241A (ja) * 2007-02-19 2008-09-04 Sanyo Electric Co Ltd パワーコンディショナおよびそれを用いた分散型電源の単独運転防止システム
US7965195B2 (en) * 2008-01-20 2011-06-21 Current Technologies, Llc System, device and method for providing power outage and restoration notification
JP2011155711A (ja) * 2010-01-25 2011-08-11 Sony Corp 電力管理装置及びゲームコンテンツ提供方法
JP5015293B2 (ja) * 2010-07-23 2012-08-29 シャープ株式会社 電力制御ネットワークシステム、電力制御方法、および電力制御コントローラ
US20120046798A1 (en) * 2010-08-19 2012-02-23 Heat Assured Systems, Llc Systems and Methods for Power Demand Management
KR101193168B1 (ko) * 2010-08-20 2012-10-19 삼성에스디아이 주식회사 전력 저장 시스템, 그 제어방법 및 이를 실행시키기 위한 프로그램을 저장한 기록매체
US10381869B2 (en) * 2010-10-29 2019-08-13 Verizon Patent And Licensing Inc. Remote power outage and restoration notification
JP2013146115A (ja) * 2012-01-13 2013-07-25 Hitachi Ltd 自動検針システムを利用した停電検知システム
JP5959982B2 (ja) * 2012-08-06 2016-08-02 京セラ株式会社 エネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004023625A1 (ja) * 2002-09-04 2004-03-18 Hitachi, Ltd. 電力供給システムおよび停電時の電力供給方法
JP2005185028A (ja) * 2003-12-22 2005-07-07 Tm T & D Kk 低圧配電系統監視システム
JP2012196019A (ja) * 2011-03-15 2012-10-11 Tokyo Gas Co Ltd コージェネレーション・システム
WO2012165365A1 (ja) * 2011-05-31 2012-12-06 パナソニック株式会社 電力供給システム

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10488907B2 (en) 2014-12-19 2019-11-26 Kabushiki Kaisha Toshiba Electronic device and method for managing power failure occurrence
WO2016172283A1 (en) * 2015-04-22 2016-10-27 Siemens Aktiengesellschaft Systems, methods and apparatus for improved generation control of microgrid energy systems
US10642241B2 (en) 2015-04-22 2020-05-05 Siemens Aktiengesellschaft Systems, methods and apparatus for improved generation control of microgrid energy systems
CN108988484A (zh) * 2018-05-18 2018-12-11 广东电网有限责任公司电力科学研究院 基于计量自动化***的馈线及重要客户停电监测方法

Also Published As

Publication number Publication date
JP6159443B2 (ja) 2017-07-05
US20150229130A1 (en) 2015-08-13
JP2016146750A (ja) 2016-08-12
JP2017153368A (ja) 2017-08-31
JP6378400B2 (ja) 2018-08-22
JP6533609B2 (ja) 2019-06-19
JP5959982B2 (ja) 2016-08-02
JP2014033578A (ja) 2014-02-20
JP2018164403A (ja) 2018-10-18

Similar Documents

Publication Publication Date Title
JP6378400B2 (ja) エネルギー管理装置、エネルギー管理システム、及びエネルギー管理システムの制御方法
JP6013076B2 (ja) エネルギー管理装置、エネルギー管理システムおよびエネルギー管理方法
WO2001017053A1 (en) Battery management circuit
JP6192907B2 (ja) エネルギー管理装置、エネルギー管理システムおよびエネルギー管理方法
KR101183388B1 (ko) 전력량 모니터링 시스템 및 플러그 모듈
JP6000744B2 (ja) エネルギー管理装置、エネルギー管理方法、及びエネルギー管理システム
JP2015118035A (ja) 充放電試験システムおよび試験結果管理方法
KR101708762B1 (ko) 파워 모니터링 시스템 및 장치
JP6144784B2 (ja) 管理装置、表示装置、表示方法、および画像作成プログラム
KR101183884B1 (ko) 무선 전력 모니터링 콘센트 및 그의 전력 제어 방법
JP2016201127A (ja) 管理装置、表示装置、表示処理方法、および画像作成プログラム
KR20230133302A (ko) 애널리틱스를 사용하여 스마트 전기 스위치 및 관련장치를 원격으로 제어하는 방법 및 시스템
US10482053B2 (en) Information processing apparatus with connection terminal for connecting to electronic devices having different functions
JP5944253B2 (ja) 管理装置、表示装置、表示方法、および表示制御プログラム
JP2020056744A (ja) スマートタップ
JP2020058198A (ja) 管理装置
US9583961B2 (en) Intellectual power storing system and method for managing battery-array of the intellectual power storing system
JP6023380B2 (ja) 管理装置、表示装置、表示方法、および表示制御プログラム
JP6449828B2 (ja) 管理装置、表示装置、表示方法、および表示制御プログラム
WO2021241043A1 (ja) 蓄電池監視装置及び蓄電池監視装置の保守方法
JP2004070586A (ja) 製造/検査装置操作システム
JP6374568B2 (ja) 管理装置、表示装置、表示方法、および画像作成プログラム
JP2004070587A (ja) 製造/検査装置管理システム
JP2015149807A (ja) ヒューマンインターフェース端末およびディジタル形保護制御装置
KR101890679B1 (ko) 디지털 계측기 및 이를 포함하는 전력감시 시스템

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13827074

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14419823

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13827074

Country of ref document: EP

Kind code of ref document: A1