KR20040102272A - Prestressed concrete double-t beam bridge & formwork applying incremental launching method - Google Patents

Prestressed concrete double-t beam bridge & formwork applying incremental launching method Download PDF

Info

Publication number
KR20040102272A
KR20040102272A KR1020030033644A KR20030033644A KR20040102272A KR 20040102272 A KR20040102272 A KR 20040102272A KR 1020030033644 A KR1020030033644 A KR 1020030033644A KR 20030033644 A KR20030033644 A KR 20030033644A KR 20040102272 A KR20040102272 A KR 20040102272A
Authority
KR
South Korea
Prior art keywords
formwork
hydraulic jack
support
bridge
coupled
Prior art date
Application number
KR1020030033644A
Other languages
Korean (ko)
Inventor
김석기
김동권
김경호
김기현
Original Assignee
(주)씨씨엘 코리아
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)씨씨엘 코리아 filed Critical (주)씨씨엘 코리아
Priority to KR1020030033644A priority Critical patent/KR20040102272A/en
Publication of KR20040102272A publication Critical patent/KR20040102272A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A prestressed concrete double-T bridge slab by incremental launching method and a form thereof are provided to improve working efficiency, and to construct the bridge easily by assembling the steel beam and the sheath pipe in advance and integrally installing the bridge slab. CONSTITUTION: A lower form(200), an inner form(300) and an outer form(400) are installed on a floor concrete support bar(100). Concrete is poured and hardened in the lower form, the inner form and the outer form to manufacture a bridge slab. The lower form, the inner form and the outer form are separated from the bridge slab by operating plural hydraulic jacks. The inner form is disassembled from the side of the slab by actuating the second hydraulic jack of the inner form, and the first hydraulic jack of the inner form is moved down. The forms are separated from the slab by moving the sixth hydraulic jack of the lower form, and the prestressed concrete double-T bridge is launched and extruded.

Description

연속압출공법을 적용한 프리스트레스트 콘크리트 더블-티이 교량 상판 및 그 거푸집{PRESTRESSED CONCRETE DOUBLE-T BEAM BRIDGE & FORMWORK APPLYING INCREMENTAL LAUNCHING METHOD}Prestressed Concrete Double-Ti Bridges and Formwork Applying Continuous Extrusion Method {PRESTRESSED CONCRETE DOUBLE-T BEAM BRIDGE & FORMWORK APPLYING INCREMENTAL LAUNCHING METHOD}

본 발명은 연속압출공법을 적용한 프리스트레스트 콘크리트 더블-티이 빔 상판 거푸집 구조에 관한 것으로서, 더욱 상세하게는, 작업의 원활화 및 시공의 용이성을 가지는 연속압출공법을 적용한 프리스트레스트 콘크리트 더블-티이 교량 상판 및 그 거푸집에 관한 것이다.The present invention relates to a prestressed concrete double-tee beam formwork structure applied to the continuous extrusion method, and more particularly, to a prestressed concrete double-tied bridge deck applied to the continuous extrusion method having smooth operation and ease of construction. It's about that formwork.

일반적으로 연속압출공법(ILM : INCREMENTAL LAUNCHING METHOD)이란 교량의 상부 구조물을 교대 후방에 설치한 주형 제작장에서 1세그먼트(SEGMENT)씩 제작하여 교량의 경간을 통과할 수 있는 평형 압축력을 포스트텐션 방식에 의하여 제작된 세그먼트에 도입시켜 기 제작된 주형과 일체화 시킨 후, 압출 장치에 의해 주형을 교축 방향으로 밀어내는 공법을 말한다.In general, the continuous extrusion method (ILM: INCREMENTAL LAUNCHING METHOD) is used for the post-tensioning to provide the equilibrium compression force that can pass the span of the bridge by making one segment at the mold fabrication site where the upper structure of the bridge is installed at the rear of the bridge. It refers to a method of injecting the mold in the axial direction by the extrusion apparatus after being introduced into the manufactured segment to be integrated with the previously produced mold.

상기 연속압출공법은 동바리가 거의 필요없고 제작장에서 세그먼트를 순차적으로 타설하여 교체를 완성하여 나가므로 안전성이 높으며, 세그먼트를 제작하는 장소와 시공장소가 일정하여 시공관리가 용이하고, 작업장에 보온 설비가 갖추어져 있어 외부 기후조건에 관계없이 진행시킬 수 있는 장점을 가져 교량의 가설공법으로 널리 쓰이고 있는 실정이라 할 수 있다.The continuous extrusion method requires almost no swivel, and the sequential casting is completed in the workshop to complete the replacement, and thus the safety is high. It is equipped with the advantage of being able to proceed regardless of external climatic conditions, and it can be said that it is widely used as a temporary construction method for bridges.

상술한 바와 같이, 프리스트레스트 콘크리트(PSC : PRESTRESSED CONCRETE)로 된 교량 상판을 압출시킬 때, 압출되는 교량 상판의 낙교를 방지하고 교각 상면과의 마찰을 최소화하기 위하여 교각의 일측에 구비되는 횡방향 가이드와 교각 상면에 구비되는 가설받침, 미끄럼 받침 등의 가이드 장치를 설치하게 된다.As described above, when extruding the bridge deck of prestressed concrete (PSC), the transverse guide provided on one side of the bridge to prevent falling of the bridge deck to be extruded and to minimize friction with the top of the bridge And to install a guide device such as a temporary support, a sliding support provided on the upper surface of the bridge.

상기 교량 상판은 도 1에 도시된 바와 유사한 박스(BOX)단면 형태로 제작된 교량 상판이 이용되는 경우가 많다.The bridge deck is often used in the form of a box (BOX) cross section similar to that shown in FIG. 1.

그러나, 상술한 구성을 가지는 교량 상판을 제작장에서 제작하는 경우에는, 교량 상판을 분리하여 콘크리트 타설 및 양생을 하여야 하고, 철근 및 쉬즈관 조립이 복잡하게 이루어지는 단점을 갖는다.However, in the case of manufacturing the bridge top plate having the above-described configuration at the production site, it is necessary to separate the bridge top plate for concrete placing and curing, and the rebar and sheath pipe assembly are complicated.

본 발명은 상술한 종래의 문제점을 해결하기 위하여, 본 발명은, 교량 상판을 지지하는 거푸집 구조를 유압 잭을 이용한 구조를 사용하는 관계로 장착 및 탈착이 용이하고, 교량 상판을 일괄 타설하고 철근 및 쉬즈관을 미리 조립하여 시공하기 때문에 그로 인한 시공의 용이성을 갖으며, 특히 제작장에서 교량 상판을 제작시 작업자들은 원활한 작업을 수행할 수 있도록 하는 연속압출공법을 적용한 더블-티이 교량 상판 및 그 거푸집을 제공함을 그 목적으로 한다.The present invention, in order to solve the above-mentioned conventional problems, the present invention is easy to install and detach, since the structure using the hydraulic jack to the formwork structure for supporting the bridge top plate, the bridge top plate is placed in a batch and reinforcement and Since the sheath pipe is pre-assembled and constructed, it has the ease of construction. Especially, when manufacturing the bridge deck at the workshop, the double-tee bridge deck and the formwork are applied by applying the continuous extrusion method that enables the workers to perform smooth work. To provide that purpose.

도 1은 본 발명의 거푸집이 일반 구간에 설치된 상태를 나타내는 상세도.1 is a detailed view showing the formwork of the present invention installed in a general section.

도 2는 본 발명의 거푸집이 중앙부 격벽 및 교각 지점부 격벽에 설치된 상태를 나타내는 상세도.Figure 2 is a detailed view showing a state in which the formwork of the present invention is installed on the central partition wall and pier point partition wall.

도 3은 본 발명의 교량 상판 단면도.3 is a cross-sectional view of the bridge deck of the present invention.

도 4는 본 발명의 내부 거푸집을 일반 구간에 사용되는 상태를 나타내는 도면.Figure 4 is a view showing a state used in the general form the inner formwork of the present invention.

도 5는 본 발명의 내부 거푸집을 중앙부 격벽 및 교각 지점부 격벽에 사용되는 상태를 나타내는 도면.5 is a view showing a state in which the internal formwork of the present invention is used in the central partition wall and pier point partition wall.

도 6은 본 발명의 내부 거푸집을 일반 구간 및 중앙부 격벽, 교각 지점부 격벽에 사용하는 사용 측면 상세도.Figure 6 is a detailed side view of the use of the internal formwork of the present invention in the general section, the central partition wall, pier point partition wall.

도 7은 본 발명의 외부 거푸집을 나타내는 상세도.7 is a detailed view of the external formwork of the present invention.

도 8은 본 발명의 바닥 거푸집을 나타내는 상세도.8 is a detailed view showing the floor formwork of the present invention.

도 9a~9f는 본 발명의 거푸집이 일반 구간에 설치되는 시공순서를 나타내는 도면으로서, (a)는 거푸집 설치 단계, (b)는 콘크리트 타설단계, (c)는 거푸집 해체 단계로 외부 거푸집 해체, 내부 거푸집 하단부 및 상부 해체, 및 바닥 거푸집 해체하는 단계, (d)는 거푸집 해체 단계로 내부 거푸집 측면부 해체하는 단계, (e)는 거푸집 해체 단계로 내부 거푸집이 하강하는 단계, (f)는 거푸집 해체 단계로 바닥 거푸집 하강 및 P.S.C 더블-이티 교량이 런칭압출되는 단계.9a to 9f is a view showing the construction sequence in which the formwork of the present invention is installed in a general section, (a) the formwork installation step, (b) the concrete placing step, (c) the formwork dismantling step to dismantle the external formwork, Dismantling the inner formwork lower part and upper part, and dismantling the bottom formwork, (d) dismantling the inner formwork side with the dismantling step, (e) dismantling the inner formwork with the dismantling step, and (f) dismantling the formwork. Lowering the stage formwork and launching and extruding the PSC double-tee bridge.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

100: 바닥 콘크리트 지지판 200: 바닥 거푸집100: floor concrete support plate 200: floor formwork

210: 유압 잭6 220: 상부판210: hydraulic jack 6 220: top panel

230: 하부 지지대 240: 지지 가대2230: lower supporter 240: support mount 2

250: 유압 잭7 270: 내측 폼3250: Hydraulic jack 7 270: Inner foam 3

300: 내부 거푸집 310: 유압 잭1300: internal formwork 310: hydraulic jack 1

320: 수평 받침대 330: 수직대1320: horizontal support 330: vertical stand 1

340: 경사 가대 350: 수직대2340: slope mount 350: vertical stand 2

360: 상부 수평대 370: 유압 잭2360: upper level 370: hydraulic jack 2

380: 유압 잭3 385: 유압 잭4380: Hydraulic Jack 3 385: Hydraulic Jack 4

390: 내측 폼 400: 외부 거푸집390: inner foam 400: outer formwork

410: 거푸집 몸체 420: 유압 잭5410: formwork body 420: hydraulic jack 5

430: 지지 기둥 440: H 형강430: support column 440: H section steel

470: 외측 폼2 490: 상부 측면대470: outer form 2 490: upper side stand

500: 교량 상판500: bridge tops

이하, 첨부 도면을 참조하여 본 발명의 구성을 설명한다.EMBODIMENT OF THE INVENTION Hereinafter, the structure of this invention is demonstrated with reference to an accompanying drawing.

도 1은 본 발명의 거푸집이 일반 구간에 설치된 상태를 나타내는 상세도이고, 도 2는 본 발명의 거푸집이 중앙부 격벽 및 교각 지점부 격벽에 설치된 상태를 나타내는 상세도이다.1 is a detailed view showing a state in which the formwork of the present invention is installed in a general section, Figure 2 is a detailed view showing a state in which the formwork of the present invention is installed on the central partition wall and pier point partition wall.

바닥 콘크리트 지지대(100)에는, 정중앙에 바닥 거푸집(200)이 설치되고 그 바닥 거푸집(200)의 상부에 내부 거푸집(300)이 설치되며, 그 내부 거푸집(300)이 설치된 양측, 즉 바닥 콘크리트 지지대(100)의 폭 방향 양측에 외부 거푸집(400)이설치된다.In the bottom concrete support 100, the bottom formwork 200 is installed at the center, and the inner formwork 300 is installed on the top of the bottom formwork 200, that is, both sides of the inner formwork 300 is installed, that is, the bottom concrete supporter External formwork 400 is installed on both sides in the width direction of 100.

도 3은 본 발명의 교량 상판 단면도로서, 교량 상판(500)은, 그 형태가 더블-티이 형태로 제작된다.3 is a cross-sectional view of the bridge top plate of the present invention, wherein the bridge top plate 500 is manufactured in a double-tied form.

상기 교량 상판(500)은 내측 하단부가 오픈된 형태, 즉 더블-티이(DOUBLE-T)의 형태로 제작되는데, 그 이유는 오픈된 위치에 바닥 거푸집이 설치되어 승,하강됨과 아울러 그 바닥 거푸집의 상부에 내부 거푸집을 설치하여 원활한 제작이 용이하도록 제작된다.The bridge top plate 500 is manufactured in the form of an inner lower end, that is, in the form of a double-tee (DOUBLE-T), because the bottom formwork is installed in the open position is raised and lowered as well as the bottom formwork The inner formwork is installed at the top to make it easy to manufacture.

도 4는 본 발명의 내부 거푸집을 일반 구간에 사용되는 상태를 나타내는 도면이고, 도 5는 본 발명의 내부 거푸집을 중앙부 격벽 및 교각 지점부 격벽에 사용되는 상태를 나타내는 도면이다.4 is a view showing a state in which the internal formwork of the present invention is used in the general section, Figure 5 is a view showing a state in which the inner formwork of the present invention is used in the central partition wall and pier point partition wall.

상기 내부 거푸집(300)은, 수평 받침대(320)를 기준으로 하부에 유압 잭1(310), 수직대1(330), 경사 가대(340)가 결합되고, 그 수직대1(330)에 수직대2(350)가 결합됨과 아울러, 상기 수평 받침대(320)의 상부에 위치한 상부 수평대(360)가 수직대2(350)에 결합되고, 그 상부 수평대(360)의 하부에 유압 잭2(370)가 수평하게 설치된다.The inner formwork 300, the hydraulic jack 1 310, the vertical stand 1 330, the inclined mount 340 is coupled to the lower portion based on the horizontal pedestal 320, the vertical stand 1 (330) In addition to the two 350 is coupled, the upper horizontal stage 360 located above the horizontal pedestal 320 is coupled to the vertical stage 2 350, the hydraulic jack 2 in the lower portion of the upper horizontal stage 360 370 is installed horizontally.

또한, 상기 내부 거푸집(300)은, 상부 수평대(360)에 사선 방향으로 2개의 유압 잭3(380)가 설치되는 한편, 상기 수직대2(350), 상부 수평대(360), 유압 잭2(370), 유압 잭3(380)은 외측 폼(390)에 체결된다.In addition, the inner formwork 300, the two hydraulic jacks 3 (380) are installed in the oblique direction to the upper horizontal belt 360, while the vertical rack 2 (350), the upper horizontal belt 360, the hydraulic jack 2 370, hydraulic jack 3 380 is fastened to the outer form 390.

상기 내부 거푸집(300)의 내측 폼(390)은, 교량 상판(500)을 내측 하부에서 지지할 수 있는 구조로 판넬을 이용하여 제작되고, 그 내측 폼(390)의 하부에 유압잭4(385)가 다수개 설치된다.The inner form 390 of the inner formwork 300 is manufactured by using a panel in a structure capable of supporting the bridge top plate 500 from the inner lower side, the hydraulic jack 4 (385) in the lower portion of the inner form (390) A plurality of are installed.

도 4에서는 교량 상판(500)을 제작하기 위해 내부 거푸집(300)이 지지하는 상태를 도시한다.4 illustrates a state in which the inner formwork 300 is supported to manufacture the bridge top plate 500.

도 6은 본 발명의 내부 거푸집을 일반 구간 및 중앙부 격벽, 교각 지점부 격벽에 사용하는 사용 측면 상세도로서, 상기 내부 거푸집(300)이, 교량 상판의 하부에 설치되는 상태를 잘 나타내고 있다.FIG. 6 is a detailed side view of using the inner formwork of the present invention in a general section, a central partition wall, and a pier point partition wall, and shows the state in which the inner formwork 300 is installed at the lower portion of the bridge deck.

도 7은 본 발명의 외부 거푸집을 나타내는 상세도로서, 상기 외부 거푸집(400)은, 종래의 일반적인 외부 거푸집과 유사한 형태로, 바닥 콘크리트 지지대(100)의 폭 방향 양측에 외부 거푸집(400)이 설치된다.Figure 7 is a detailed view showing the outer formwork of the present invention, the outer formwork 400 is similar to the conventional formwork in general, the outer formwork 400 is installed on both sides in the width direction of the floor concrete support 100. do.

상기 외부 거푸집(400)은, 거푸집 몸체(410)를 중심으로, 하부에 유압 잭5(420)이 설치되어 바닥 콘크리트 지지대(100)와 결합되고, 그 거푸집 몸체(410)의 상부에 다수개의 지지 기둥(430)이 설치되어 외측 폼2(470)와 고정된다.The outer formwork 400, the hydraulic jack 5 (420) is installed at the bottom around the formwork body 410, coupled with the floor concrete support 100, a plurality of supports on the upper formwork body 410 The pillar 430 is installed and fixed to the outer form 2 470.

상기 외부 거푸집(400)은, 외측 폼2(470)의 외측에 H 형강(440)이 설치되어 스크류 잭(450)과 결합되고, 그 외측 폼2(470)의 상부에 상부 측면대(490)가 설치된다.The outer formwork 400, the H-shaped steel 440 is installed on the outside of the outer form 2 (470) is coupled to the screw jack 450, the upper side stand 490 on the upper side of the outer form 2 (470) Is installed.

상기 외부 거푸집(400)은, 유압 잭5(420)의 작동에 의하여 외측 폼2(470)가 교량 상판과 분리되도록 동작하게 된다.The outer formwork 400 is operated so that the outer form 2 (470) is separated from the bridge top plate by the operation of the hydraulic jack 5 (420).

도 8은 본 발명의 바닥 거푸집을 나타내는 상세도로서, 상기 바닥 거푸집(200)은, 바닥 콘크리트 지지대(100)의 상부에 유압 잭6(210)가 위치되고, 그 유압 잭6(210)에 상부판(220)을 지지하는 하부 지지대(230)가 결합된다.8 is a detailed view showing the floor formwork of the present invention, the floor formwork 200, the hydraulic jack 6 (210) is located on the top of the floor concrete support 100, the hydraulic jack 6 (210) is upper The lower support 230 supporting the plate 220 is coupled.

상기 바닥 거푸집(200)은, 하부 지지대(230)에 다수개의 지지 가대2(240)가 수평 및 사선 방향으로 결합되는 구조로, 그 하부 지지대(230)의 상부에 상부판(220)이 결합됨과 아울러, 상기 하부 지지대(230)에 유압 잭7(250)이 결합되고 그 유압 잭7(250)이 내측 폼3(270)와 결합되어 유압 잭7(250)의 작동에 의하여 교량 상판의 하부 측면을 지지하는 내측 폼3(270)를 해체하게 된다.The bottom formwork 200 has a structure in which a plurality of support mounts 2 240 are coupled to the lower support 230 in horizontal and oblique directions, and the upper plate 220 is coupled to an upper portion of the lower support 230. In addition, the hydraulic jack 7 250 is coupled to the lower support 230 and the hydraulic jack 7 250 is coupled to the inner form 3 270 so that the lower side of the bridge upper plate by the operation of the hydraulic jack 7 250. To dismantle the inner form 3 (270) supporting the.

도 9a~9f는 본 발명의 거푸집이 일반 구간에 설치되는 시공순서를 나타내는 도면으로서, (a)는 거푸집 설치 단계, (b)는 콘크리트 타설단계, (c)는 거푸집 해체 단계로 외부 거푸집 해체, 내부 거푸집 하단부 및 상부 해체, 및 바닥 거푸집 해체하는 단계, (d)는 거푸집 해체 단계로 내부 거푸집 측면부 해체하는 단계, (e)는 거푸집 해체 단계로 내부 거푸집이 하강하는 단계, (f)는 거푸집 해체 단계로 바닥 거푸집 하강 및 P.S.C 더블-티이 교량이 런칭압출되는 단계를 나타내는 도면이다.9a to 9f is a view showing the construction sequence in which the formwork of the present invention is installed in a general section, (a) the formwork installation step, (b) the concrete placing step, (c) the formwork dismantling step to dismantle the external formwork, Dismantling the inner formwork lower part and upper part, and dismantling the bottom formwork, (d) dismantling the inner formwork side with the dismantling step, (e) dismantling the inner formwork with the dismantling step, and (f) dismantling the formwork. The drawing shows the step of lowering the floor formwork and the launch extrusion of the PSC double-tee bridge.

도 9a에서 알 수 있듯이, 상기 바닥 콘크리트 지지대(100)에는, 바닥 거푸집(200), 내부 거푸집(300) 및 외부 거푸집(400)이 설치되는 단계이다.As can be seen in Figure 9a, the floor concrete support 100, the floor formwork 200, the inner formwork 300 and the outer formwork 400 is a step of being installed.

즉, 상기 바닥 거푸집(200), 내부 거푸집(300) 및 외부 거푸집(400)이 설치되면, 그 거푸집에 콘크리트를 타설하여 교량 상판을 제작하게 된다.That is, when the floor formwork 200, the inner formwork 300 and the outer formwork 400 are installed, concrete is poured into the formwork to produce a bridge deck.

도 9b에서 알 수 있듯이, 상기 바닥 거푸집(200), 내부 거푸집(300) 및 외부 거푸집(400)의 내측 폼(390), 외측 폼2(470), 내측 폼3(270)에 밀착되도록 콘크리트를 타설하는 단계이다.As can be seen in Figure 9b, the concrete to be in close contact with the inner form 390, outer form 2 (470), inner form 3 (270) of the bottom formwork 200, the inner formwork 300 and the outer formwork 400. It is the step of pouring.

즉, 상기 바닥 거푸집(200), 내부 거푸집(300) 및 외부 거푸집(400)의 내측폼(390), 외측 폼2(470), 내측 폼3(270)에 콘크리트가 타설된 후 일정기간 동안 양생시켜 교량 상판을 제작하게 된다.That is, the concrete is poured into the inner form 390, the outer form 2 (470), the inner form 3 (270) of the bottom formwork 200, the inner formwork 300 and the outer formwork 400 for curing for a predetermined period of time. To make a bridge deck.

도 9c에서 알 수 있듯이, 상기 바닥 거푸집(200), 내측 거푸집(300) 및 외측 거푸집(400)의 다수개의 유압 잭3(380), 유압 잭4(385), 유압 잭5(420) 및 유압 잭7(250)을 화살표 방향으로 작동하여 교량 상판(500)과 각각의 내측 및 외측 폼이 분리되도록 하는 단계이다.As can be seen in Figure 9c, a plurality of hydraulic jacks 3 (380), hydraulic jacks 4 (385), hydraulic jacks 5 (420) and hydraulic pressure of the bottom formwork 200, the inner formwork 300 and the outer formwork 400 The jack 7 250 is operated in the direction of the arrow so that the bridge top plate 500 and the respective inner and outer foams are separated.

도 9d에서 알 수 있듯이, 상기 내부 거푸집(300)의 유압 잭2(370)을 화살표 방향으로 작동하여 내측으로 내측 폼이 당겨져 교량 상판(500)의 측면부에서 해체되는 단계이다.As shown in FIG. 9D, the hydraulic jack 2 370 of the inner formwork 300 is operated in the direction of the arrow to pull the inner form inward to dismantle the side surface of the bridge top plate 500.

도 9e에서 알 수 있듯이, 상기 내부 거푸집(300)의 유압 잭1(310)을 하측으로 하강시키는 단계이다.As can be seen in Figure 9e, the step of lowering the hydraulic jack 1 (310) of the inner formwork 300.

상기 도 9d 및 도 9e에서는, 내부 거푸집(300)이 해체되는 경우, 고정핀(도면상 미도시됨)이 제거되게 된다.9D and 9E, when the internal formwork 300 is dismantled, the fixing pin (not shown) is removed.

도 9f에서 알 수 있듯이, 상기 바닥 거푸집(200)의 유압 잭6(210)이 하강되어 교량 상판(500)을 지지하던 모든 거푸집이 해체됨과 아울러, P.S.C 더블-티이 교량이 런칭압출되는 단계이다.As can be seen in Figure 9f, the hydraulic jack 6 (210) of the bottom formwork 200 is lowered to dismantle all the formwork supporting the bridge top plate 500, and the P.S.C double-tee bridge is a step of launch extrusion.

상술한 바와 같이, 상기 더블-티이 형태로 제작되는 교량 상판(500)을 지지하기 위하여 설치되는 바닥 거푸집(200), 내부 거푸집(300) 및 외부 거푸집(400)이 모두 유압 잭으로 승,하강되는 구조로 제작되는 관계로, 교량 상판(500)을 제작시 수월한 제작이 가능함과 아울러, 그 바닥 거푸집(200), 내부 거푸집(300) 및 외부거푸집(400)에 대한 작동이 원활하여 시공비 및 작업 시간을 대폭적으로 줄일 수 있게 된다.As described above, the bottom formwork 200, the inner formwork 300 and the outer formwork 400, which are installed to support the bridge top plate 500 manufactured in the double-tee form, are lifted and lowered by a hydraulic jack. As it is manufactured in a structure, it is possible to easily manufacture the bridge top plate 500, and the operation of the floor formwork 200, the inner formwork 300 and the outer formwork 400, the construction cost and work time smoothly Can be greatly reduced.

상술한 본 발명의 구성에 의한 효과를 설명한다.The effect by the structure of this invention mentioned above is demonstrated.

본 발명의 연속압출공법을 적용한 프리스트레스트 콘크리트 더블-티이 교량 상판 및 그 거푸집은, 더블-티이 형태로 제작되는 교량 상판을 지지하기 위하여 설치되는 바닥 거푸집, 내부 거푸집 및 외부 거푸집이 모두 유압 잭으로 승,하강되는 구조로 제작되는 관계로, 교량 상판에 대한 수월한 제작이 가능한 효과를 갖는다.Prestressed concrete double-tied bridge deck and its formwork to which the continuous extrusion method of the present invention is applied, the bottom formwork, the internal formwork and the external formwork, which are installed to support the bridge deck manufactured in the form of a double-tie, all win the hydraulic jack Since it is manufactured in a descending structure, it is possible to easily manufacture the bridge deck.

또한, 상기 바닥 거푸집, 내부 거푸집 및 외부 거푸집에 대한 작동이 원활하여 시공비 및 작업 시간을 대폭적으로 줄일 수 있는 효과를 갖는다.In addition, the operation on the floor formwork, the inner formwork and the external formwork is smoothly has an effect that can significantly reduce the construction cost and work time.

또한, 상기 교량 상판이 더블-티이 형태로 제작되는 관계로, 사용되는 철근 및 텐던 정착구의 양을 감소시킬 수 있음은 물론, 제작장에서 사용되는 부재를 재사용할 수 있어 폐기물의 발생을 억제시키는 효과를 갖는다.In addition, since the bridge deck is manufactured in the form of a double-tee, it is possible to reduce the amount of reinforcing bars and tendon anchorages used, as well as to reuse the members used in the manufacturing site, thereby suppressing the generation of waste. Has

Claims (3)

바닥 콘크리트 지지대, 횡방향 가이드, 가설 받침, 미끄럼 받침 및 추진코 등을 포함하는 연속압출공법(ILM : INCREMENTAL LAUNCHING METHOD)에 있어서,In continuous extrusion method (ILM: INCREMENTAL LAUNCHING METHOD) including floor concrete support, transverse guide, temporary support, sliding support and propulsion nose, 상기 바닥 콘크리트 지지대(100)에는, 상부에 바닥 거푸집(200), 내부 거푸집(300) 및 외부 거푸집(400)이 설치되는 단계;On the bottom concrete support 100, the bottom formwork 200, the inner formwork 300 and the outer formwork 400 is installed on the top; 상기 바닥 거푸집(200), 내부 거푸집(300) 및 외부 거푸집(400)의 내측 폼(390), 외측 폼2(470), 내측 폼3(270)에 콘크리트를 타설되어 교량 상판(500)이 제작됨과 아울러 양생되는 단계;Concrete is poured into the inner form 390, the outer form 2 470, and the inner form 3 270 of the bottom formwork 200, the inner formwork 300 and the outer formwork 400, and the bridge top plate 500 is manufactured. As well as curing; 상기 바닥 거푸집(200), 내부 거푸집(300) 및 외부 거푸집(400)의 다수개의 유압 잭3(380), 유압 잭4(385), 유압 잭5(420) 및 유압 잭7(250)을 화살표 방향으로 작동하여 교량 상판(500)과 분리시키는 단계;Arrows of the plurality of hydraulic jack 3 (380), hydraulic jack 4 (385), hydraulic jack 5 (420) and hydraulic jack 7 (250) of the bottom formwork 200, the inner formwork 300 and the outer formwork 400 Operating in a direction to separate the bridge deck 500; 상기 내측 거푸집(300)의 유압 잭2(370)을 화살표 방향으로 작동하여 내측으로 내측 폼이 당겨져 교량 상판(500)의 측면부에서 해체되는 단계;Operating the hydraulic jack 2 (370) of the inner formwork (300) in the direction of the arrow to pull the inner form inward to dismantle it from the side of the bridge top plate (500); 상기 내측 거푸집(300)의 유압 잭1(310)을 하측으로 하강시키는 단계; 및Lowering the hydraulic jack 1 310 of the inner formwork 300 downward; And 상기 바닥 거푸집(200)의 유압 잭6(210)가 하강되어 교량 상판(500)을 지지하던 모든 거푸집이 해체됨과 아울러, P.S.C 더블-티이 교량이 런칭압출되는 단계;로 제작됨을 특징으로 하는 연속압출공법을 적용한 프리스트레스트 콘크리트 더블-티이형 교량 상판.The hydraulic jack 6 (210) of the bottom formwork 200 is lowered to dismantle all the formwork that was supporting the bridge top plate 500, and the PSC double-tee bridge launching extrusion step; characterized in that the continuous extrusion Prestressed concrete double-tee type bridge deck using construction method. 제 1 항에 있어서,The method of claim 1, 상기 교량 상판(500)은, 프리스트레스트 콘크리트 더블-티이 형태로 제작되는 한편, 그 하부가 오픈된 형태로 제작됨을 특징으로 하는 연속압출공법을 적용한 프리스트레스트 콘크리트 더블-티이형 교량 상판.The bridge top plate 500, the prestressed concrete double-tee type bridge top plate is applied to the continuous extrusion method, characterized in that while being manufactured in the form of pre-stressed concrete double-tied open. 바닥 콘크리트 지지대, 횡방향 가이드, 가설 받침, 미끄럼 받침 및 추진코 등을 포함하는 연속압출공법에 있어서,In the continuous extrusion method including a floor concrete support, a transverse guide, a temporary support, a sliding support and a propulsion nose, 상기 바닥 콘크리트 지지대(100)의 직상부에 설치되어 상부로 설치되는 내부 거푸집(300)을 지지함과 아울러,In addition to supporting the inner formwork 300 which is installed on the upper portion of the bottom concrete support 100 is installed to the top, 상기 바닥 콘크리트 지지대(100)의 상부에 유압 잭6(210)이 위치되고, 그 유압 잭6(210)에 상부판(220)을 지지하는 하부 지지대(230)가 결합되며, 그 하부 지지대(230)에 다수개의 지지 가대2(240)가 수평 및 사선 방향으로 결합되고, 그 하부 지지대(230)의 상부에 상부판(220)이 결합되며, 그 하부 지지대(230)에 유압 잭7(250)이 결합되고 그 유압 잭7(250)이 내측 폼3(270)과 결합되어 유압 잭7(250)의 작동에 의하여 교량 상판의 하부 측면을 지지하는 내측 폼3(270)를 해체되도록 설치되는 바닥 거푸집(200);Hydraulic jack 6 (210) is located on the top of the bottom concrete support 100, the lower support 230 for supporting the upper plate 220 is coupled to the hydraulic jack 6 (210), the lower support 230 A plurality of support mounts 2 240 are coupled to the horizontal and oblique directions, the upper plate 220 is coupled to the upper portion of the lower support 230, the hydraulic jack 7 (250) to the lower support 230 Is coupled and the hydraulic jack 7 250 is coupled to the inner form 3 270 and is installed to dismantle the inner form 3 270 supporting the lower side of the bridge top plate by the operation of the hydraulic jack 7 250. Formwork 200; 상기 바닥 거푸집(200)의 상부판(220) 상부에 유압 잭1(310)과 수직대1(330)이 안착되어 지지되는 한편,While the hydraulic jack 1 310 and the vertical stand 1 330 are seated and supported on the top plate 220 of the bottom formwork 200, 수평 받침대(320)의 하부에 유압 잭1(310), 수직대1(330), 경사 가대(340)가 결합되고, 그 수직대1(330)에 수직대2(350)가 결합되며, 그 수평 받침대(230)의 상부에 위치한 상부 수평대(360)가 수직대2(350)에 결합되고, 그 상부 수평대(360)의 하부에 유압 잭2(370)가 설치되며, 상부 수평대(360)에 사선 방향으로 2개의 유압 잭3(380)가 설치되는 한편, 그 수직대2(350), 상부 수평대(360), 유압 잭2(370), 유압 잭3(380)는 내측 폼(390)에 체결되고, 그내외측 폼(390)의 하부에 유압 잭4(385)가 다수개 설치된 내부 거푸집(300); 및Hydraulic jack 1 310, vertical stand 1 (330), the inclined mount 340 is coupled to the lower portion of the horizontal pedestal 320, vertical stand 2 (350) is coupled to the vertical stand 1 (330), The upper horizontal belt 360 located on the upper portion of the horizontal pedestal 230 is coupled to the vertical belt 2 350, the hydraulic jack 2 370 is installed at the lower portion of the upper horizontal belt 360, and the upper horizontal belt ( Two hydraulic jacks 3 380 are installed in an oblique direction at 360, while the vertical stand 2 350, the upper horizontal stand 360, the hydraulic jack 2 370, and the hydraulic jack 3 380 are formed in the inner form. An internal formwork 300 fastened to the 390 and provided with a plurality of hydraulic jacks 485 disposed at a lower portion of the inner and outer foams 390; And 상기 바닥 콘크리트 지지판(100)의 폭 방향 양측에 설치됨과 아울러,In addition to being installed on both sides in the width direction of the bottom concrete support plate 100, 거푸집 몸체(410)의 하부에 유압 잭5(420)이 설치되고, 그 거푸집 몸체(410)의 상부에 다수개의 지지 기둥(430)이 설치되어 외측 폼2(470)와 고정되며, 그 외측 폼2(470)의 외측에 H 형강(440)이 설치되어 스크류 잭(450)과 결합되고, 그 외측 폼2(470)의 상부에 상부 측면대(490)가 설치되며, 그 유압 잭5(420)의 작동에 의하여 외측 폼2(470)가 교량 상판과 분리되도록 동작되는 외부 거푸집(400);으로 구성된 연속압출공법을 적용한 프리스트레스트 콘크리트 더블-티이형 교량 상판용 거푸집.Hydraulic jack 5 (420) is installed in the lower portion of the formwork body 410, a plurality of support pillars 430 is installed on the upper portion of the formwork body 410 is fixed to the outer form 2 (470), the outer form H-shaped steel 440 is installed on the outside of the second (470) is coupled to the screw jack 450, the upper side stand 490 is installed on the upper portion of the outer form 2 (470), the hydraulic jack 5 (420) Prestressed concrete double-tee type bridge deck formwork applied to the continuous extrusion method consisting of; outer formwork 400 is operated to be separated from the bridge deck by the operation of the outer form 2 (470).
KR1020030033644A 2003-05-27 2003-05-27 Prestressed concrete double-t beam bridge & formwork applying incremental launching method KR20040102272A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030033644A KR20040102272A (en) 2003-05-27 2003-05-27 Prestressed concrete double-t beam bridge & formwork applying incremental launching method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030033644A KR20040102272A (en) 2003-05-27 2003-05-27 Prestressed concrete double-t beam bridge & formwork applying incremental launching method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0013846U Division KR200357934Y1 (en) 2004-05-19 2004-05-19 Prestressed concrete double-t beam bridge & formwork applying incremental launching method

Publications (1)

Publication Number Publication Date
KR20040102272A true KR20040102272A (en) 2004-12-04

Family

ID=37378588

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030033644A KR20040102272A (en) 2003-05-27 2003-05-27 Prestressed concrete double-t beam bridge & formwork applying incremental launching method

Country Status (1)

Country Link
KR (1) KR20040102272A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824799B (en) * 2010-02-09 2012-07-04 衡水橡胶股份有限公司 Construction method for transverse connection of T-shaped concrete simply supported combined bridge
CN103510475A (en) * 2013-09-27 2014-01-15 中铁大桥局股份有限公司 Long-distance pushing construction method of thee-main-truss steel truss beam in single-connection and double-span modes without guide beam
CN108130863A (en) * 2018-02-12 2018-06-08 中国建筑第七工程局有限公司 Precast T-Beam hydraulic self-traveling integral mold plate and its construction method
CN108284506A (en) * 2017-12-22 2018-07-17 安徽伟宏钢结构集团股份有限公司 A kind of beam prefabricated equipment of T
CN108890865A (en) * 2018-06-14 2018-11-27 中交第三航务工程勘察设计院有限公司 Prefabricated torsion king block demoulding method
CN113250094A (en) * 2021-06-03 2021-08-13 孙海宁 Method for erecting designed steel box girder in highway bridge
CN114382018A (en) * 2022-01-20 2022-04-22 浙江交工集团股份有限公司 Cast-in-place box girder 0# block and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824799B (en) * 2010-02-09 2012-07-04 衡水橡胶股份有限公司 Construction method for transverse connection of T-shaped concrete simply supported combined bridge
CN103510475A (en) * 2013-09-27 2014-01-15 中铁大桥局股份有限公司 Long-distance pushing construction method of thee-main-truss steel truss beam in single-connection and double-span modes without guide beam
CN108284506A (en) * 2017-12-22 2018-07-17 安徽伟宏钢结构集团股份有限公司 A kind of beam prefabricated equipment of T
CN108130863A (en) * 2018-02-12 2018-06-08 中国建筑第七工程局有限公司 Precast T-Beam hydraulic self-traveling integral mold plate and its construction method
CN108890865A (en) * 2018-06-14 2018-11-27 中交第三航务工程勘察设计院有限公司 Prefabricated torsion king block demoulding method
CN113250094A (en) * 2021-06-03 2021-08-13 孙海宁 Method for erecting designed steel box girder in highway bridge
CN114382018A (en) * 2022-01-20 2022-04-22 浙江交工集团股份有限公司 Cast-in-place box girder 0# block and construction method thereof

Similar Documents

Publication Publication Date Title
KR100634848B1 (en) Bridge construction method using main girder launching system with temporary scaffolding
US20100199597A1 (en) Multi-horizontal structure member forming method
KR100738410B1 (en) Support system for Flying form and Concreate slab construction method using the same
CN110863507A (en) Integrated prefabricated base component additionally provided with elevator, forming die and using method
JP2007315077A (en) Construction method for corrugated steel web bridge using girder wagon
JP5221474B2 (en) Extruder beam rear support device and extrusion installation method
JP2007092313A (en) Construction method for precast concrete corrugated steel plate web box girder
KR20040102272A (en) Prestressed concrete double-t beam bridge &amp; formwork applying incremental launching method
KR100734418B1 (en) The upper girder segment making yard of bridge using launching wall, and the incremental launching method of bridge with typical section and widen section using that
KR100963488B1 (en) Negative moment floor slab prestress introduction method for which precast concrete pc wire anchorage block and this were used
KR200357934Y1 (en) Prestressed concrete double-t beam bridge &amp; formwork applying incremental launching method
KR200231051Y1 (en) inner formwork for pre-stressed bridge box girder
KR101200246B1 (en) Toggle link means steel-fram assembly jig system
JP2829363B2 (en) Formwork equipment for pillar construction
KR200391232Y1 (en) Main Girder Launching System with Temporary Scaffolding
JP3063548B2 (en) Formwork method and equipment
KR20080020727A (en) Costruction die for steel reinforcing
KR200357937Y1 (en) Box girder molding system for incremental launching method
JPH10252016A (en) Method for replacing bearing device
JP3831499B2 (en) Construction method of column head of PC cantilever bridge
KR20180049533A (en) Manufacturing method of precast P.S composite girder using support devices with ability of height adjustment
CN219315516U (en) Cast-in-situ box girder prestress tensioning support
JPH08105240A (en) Mold frame of tower concrete structure and its construction method
KR19980083704A (en) Temporary device of mobile scaffolding
KR200151563Y1 (en) Supporting device for concrete slab forms