KR100963488B1 - Negative moment floor slab prestress introduction method for which precast concrete pc wire anchorage block and this were used - Google Patents

Negative moment floor slab prestress introduction method for which precast concrete pc wire anchorage block and this were used Download PDF

Info

Publication number
KR100963488B1
KR100963488B1 KR1020090069331A KR20090069331A KR100963488B1 KR 100963488 B1 KR100963488 B1 KR 100963488B1 KR 1020090069331 A KR1020090069331 A KR 1020090069331A KR 20090069331 A KR20090069331 A KR 20090069331A KR 100963488 B1 KR100963488 B1 KR 100963488B1
Authority
KR
South Korea
Prior art keywords
steel wire
fixing block
steel
wire fixing
concrete
Prior art date
Application number
KR1020090069331A
Other languages
Korean (ko)
Inventor
노윤근
박근화
노경범
Original Assignee
노윤근
박근화
노경범
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 노윤근, 박근화, 노경범 filed Critical 노윤근
Priority to KR1020090069331A priority Critical patent/KR100963488B1/en
Application granted granted Critical
Publication of KR100963488B1 publication Critical patent/KR100963488B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • E04B1/06Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material the elements being prestressed
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A method for introducing a pre-stress to a negative moment bottom plate slab is provided to extend the common lifetime of a bridge. CONSTITUTION: A method for introducing a pre-stress to a negative moment bottom plate slab comprises: a step of manufacturing a precast concrete PC wire anchorage block(B); a step of manufacturing a steel girder(G) or a pre-stress concrete girder; a step of mounting the steel girder or pre-stress concrete girder on a bridge post; a step of connecting a PC wire anchorage block support fixing rope to a shear connector; a step of fixing a PC wire anchorage block support to the PC wire anchorage block support fixing rope; a step of mounting a PC wire anchorage block on the upper side of the PC wire anchorage block support; a step of mounting a PC wire(10) and connecting a sheath after arranging a bottom plate mold on a girder; a step of pouring floor slab concrete in the mold; and a step of inducing pre-stress in a floor slab by tensioning the PC steel wire which are mounted on the steel anchorage of a precast concrete pc steel wire anchor block.

Description

프리캐스트 콘크리트 PC강선 정착블록을 이용한 부모멘트 바닥판 슬래브에 프리스트레스를 도입하는 방법{Negative moment floor slab prestress introduction method for which precast concrete PC wire anchorage block and this were used}Negative moment floor slab prestress introduction method for which precast concrete PC wire anchorage block and this were used}

본 발명은 프리캐스트 콘크리트 PC강선 정착블록을 이용한 부모멘트 바닥판 슬래브에 프리스트레스를 도입하는 방법에 관한 것으로, 특히 부모멘트 구간 거더의 상면에 부착된 전단연결재에 다수개의 PC강선 정착블록 받침 고정로프를 연결하고, 상기 PC강선 정착블록 받침 고정로프에 PC강선 정착블록 받침을 고정 설치한 후, 프리캐스트 콘크리트 PC강선 정착블록을 PC강선 정착블록 받침 좌우 상면에 고정 설치한 후, 바닥판 슬래브 콘크리트를 타설한 후, 프리캐스트 콘크리트 PC강선 정착블록에 PC강선을 긴장하여 부모멘트구간 바닥판 슬래브에 프리스트레스를 도입하는 프리캐스트 콘크리트 PC강선 정착블록을 이용한 부모멘트 바닥판 슬래브 프리스트레스를 도입하는 방법에 관한 것이다.The present invention relates to a method of introducing prestress to a parent cement slab slab using precast concrete PC steel wire fixing blocks, and in particular, a plurality of PC steel wire fixing block support fixing ropes are attached to a shear connector attached to an upper surface of a parent cement section girder. Connect and fix the PC steel wire fixing block support to the PC steel wire fixing block support fixing rope, and then install the precast concrete PC steel wire fixing block to the PC steel wire fixing block support on the left and right upper sides, and then install the slab concrete. Then, the present invention relates to a method for introducing a parent cement slab prestress using a precast concrete PC steel wire fixing block, which introduces a prestress into the parent cement section slab slab by tensioning the PC steel wire to the precast concrete PC steel wire fixing block.

일반적으로 거더교에 있어서, 부모멘트부 바닥판 슬래브에 프리스트레스를 도입하면, 바닥판 슬래브의 인장균열을 제어하여 바닥판 슬래브의 공용수명을 대폭 적으로 연장할 수는 있으나, 바닥판 슬래브에 프리스트레스를 도입하는 방법이 까다롭고 번잡하여 널리 활용되지 못하고 있는 실정이다.In general, in the girder bridge, when the prestress is introduced into the bottom plate slab of the parent section, it is possible to control the tensile cracking of the bottom plate slab, thereby greatly extending the service life of the bottom plate slab, but introducing the prestress into the bottom plate slab. How to do it difficult and complicated to use the situation is not widely used.

즉, PC강선에 의한 바닥판 슬래브에 프리스트레스 도입은 바닥판 슬래브 하면에 위치하는 PC강선의 정착블록의 시공이 현실적으로 어려워 널리 사용되지 않고 있다.That is, the introduction of prestress into the bottom plate slab by PC steel wire is not widely used because the construction of the fixing block of the PC steel wire located on the bottom surface of the bottom plate slab is practically difficult.

이는 교각 또는 교대에 거더를 거치한 후, 바닥판 슬래브를 시공하기 위해서는 먼저 거더에 바닥판 거푸집을 설치하고, 상기 바닥판 거푸집에 바닥판 슬래브 철근을 배근하며, 이때 PC강선 정착블록의 배근과 쉬스 및 강재 정착구의 설치, 정착블록 형상의 합판 거푸집을 조립한 후, 바닥판 슬래브 콘크리트를 타설하기 전에 미리 정착블록에 고강도 콘크리트의 타설이 선행되어야 하는 관계로 현장시공이 매우 복잡하고 어려운 실정이다.After mounting the girder on the piers or shifts, in order to construct the bottom slab, first install the bottom plate formwork on the girder, and reinforce the bottom plate slab reinforcement to the bottom plate formwork, where the reinforcement and sheath of the PC steel wire fixing block And since the installation of steel anchorage, assembling the plywood formwork of the fixing block shape, before placing the slab slab concrete, the high-strength concrete is to be preceded by the fixing block in advance, the field construction is very complicated and difficult.

또한, 거더의 내측 지점부에서 유압잭에 의한 거더의 인상 후, 바닥판 슬래브를 타설하고, 거더를 하향시켜 부모멘트 바닥판에 프리스트레스를 도입하는 방법도 있으나, 이는 유압잭의 인상 및 인하시 정밀 시공관리가 이루어지지 않고, 바닥판 슬래브를 고강도 콘크리트를 사용해야 하며, 추후 유지관리가 쉽지 않아 잘 사용되지 않고 있다.In addition, after the girder is raised by the hydraulic jack at the inner point of the girder, the bottom slab is poured and the girder is lowered to introduce the prestress to the parent plate, but this is precise construction management during the lifting and lowering of the hydraulic jack. It is not made, and the slab slab must be used high-strength concrete, it is not used well because it is not easy to maintain afterwards.

따라서, 현재는 거더의 부모멘트 구간의 바닥판에 프리스트레스를 도입하는 방법은 거의 사용되지 않고 있으며, 단지 정모멘트 구간에 2차 긴장 또는 보강강재의 사용 등으로 정모멘트를 감소시켜 그 반사효과로 인하여 부모멘트를 감소시키는 방법들이 일반적으로 사용되고 있다.Therefore, at present, the method of introducing prestress to the bottom plate of the girder's parent moment section is rarely used, and the static moment is reduced only by the use of secondary tension or reinforcing steel in the constant moment section. Methods for reducing the parents are commonly used.

이는 부모멘트구간 바닥판 슬래브에 직접 프리스트레스를 도입하는 방법보다는 비용이 상당히 많이 소요되고, 또한 장기 공용시에 부모멘트 구간의 바닥판 슬래브의 인장균열에 대하여 근본적으로 대응할 수 없는 한계점이 있다.This is considerably more expensive than the method of directly prestressing the slab slabs of the parent section, and there is a limitation that it is not possible to fundamentally cope with the tensile cracking of the slab slabs of the parent section during long-term sharing.

이에, 본 발명은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로서, 부모멘트 구간 바닥판 슬래브에 프리스트레스를 도입하는 방법을 개선하여 시공이 아주 용이할 뿐만 아니라 부모멘트 구간 바닥판 슬래브의 인장균열을 제어하여 교량의 공용수명을 대폭 연장할 수 있도록 한 프리캐스트 콘크리트 PC강선 정착블록을 이용한 부모멘트 바닥판 슬래브에 프리스트레스를 도입하는 방법을 제공하는데 그 목적이 있다.Therefore, the present invention has been made to solve the problems described above, by improving the method of introducing the prestress to the slab slab slab not only the construction is very easy but also the tension crack of the slab slab slab The purpose of the present invention is to provide a method of introducing prestress to a parent cement slab slab using precast concrete PC steel wire fixing block, which can greatly extend the service life of the bridge by controlling the

상기한 목적을 달성하기 위한 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록은 PC강선을 삽입하기 위해 설치되는 쉬스와; 상기 쉬스에 삽입된 PC강선을 정착시키기 위해 쉬스의 선단에 일체로 형성된 강재정착구와; 상기 강재정착구로부터 쉬스간에 걸쳐 일정한 간격을 두고 다수개가 수직으로 고정 설치되는 전단연결철근과; 상기 쉬스와 강재정착구 및 전단연결철근을 고정시키도록 압축강도가 350㎏f/㎠ 이상의 고강도 콘크리트가 타설 양생된 콘크리트블록으로 구성됨을 특징으로 한다.Precast concrete PC steel wire fixing block according to the present invention for achieving the above object is a sheath installed to insert the PC steel wire; A steel anchoring hole formed integrally with the tip of the sheath to fix the PC steel wire inserted into the sheath; Shear connecting reinforcing bars and a plurality of fixed vertically installed at regular intervals from the steel anchoring hole to the sheath; It characterized in that the high-strength concrete with a compression strength of 350kgf / ㎠ or more to fix the sheath and the steel anchoring hole and the shear connection reinforcement is composed of a concrete block.

또한, 상기한 목적을 달성하기 위한 본 발명에 따른 프리캐스트 콘크리트 PC 강선 정착블록을 이용한 부모멘트 바닥판 슬래브에 프리스트레스를 도입하는 방법은 공장 또는 현장에서 프리캐스트 콘크리트 PC강선 정착블록을 제작하는 단계; 스틸거더 또는 프리스트레스 콘크리트 거더를 제작하는 단계; 상기 스틸거더 또는 프리스트레스 콘크리트 거더를 교대 또는 교각에 거치하는 단계; 상기 스틸거더 또는 프리스트레스 콘크리트 거더의 PC강선 정착블록 받침 상에 프리캐스트 콘크리트 PC강선 정착블록을 설치하는 단계; 상기 스틸거더 또는 프리스트레스 콘크리트 거더의 바닥판 슬래브 시공을 위해 거더에 바닥판 거푸집을 설치 및 철근배근 후, 쉬스를 연결하고, PC강선을 설치하는 단계; 상기 거푸집에 바닥판 슬래브 콘크리트를 타설 및 양생하는 단계; 상기 프리캐스트 콘크리트 PC강선 정착블록의 강재정착구에 정착된 PC강선을 긴장하여 바닥판 슬래브에 프리스트레스를 도입하는 단계로 이루어짐을 특징으로 한다.In addition, a method for introducing prestress into the parent cement slab slab using the precast concrete PC steel wire fixing block according to the present invention for achieving the above object comprises the steps of manufacturing a precast concrete PC steel wire fixing block in the factory or on the site; Manufacturing a steel girder or prestressed concrete girder; Mounting the steel girders or prestressed concrete girders on alternating or pier; Installing a precast concrete PC steel wire fixing block on the PC steel wire fixing block support of the steel girder or prestressed concrete girder; Installing the bottom plate formwork on the girder and reinforcing the bar for the construction of the bottom plate slab of the steel girder or prestressed concrete girder, connecting the sheath, and installing the PC steel wire; Placing and curing bottom plate slab concrete on the formwork; The precast concrete PC steel wire fixing block is made of a step of introducing the prestress to the slab slab by tensioning the PC steel wire settled in the steel fixture.

이상에서 설명한 바와 같이, 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 이용한 부모멘트 바닥판 슬래브에 프리스트레스를 도입하는 방법은 다음과 같은 효과가 있다.As described above, the method of introducing prestress into the parent cement slab slab using the precast concrete PC steel wire fixing block according to the present invention has the following effects.

첫째, 본 발명은 프리캐스트 콘크리트 PC강선 정착블록을 공장이나 현장에서 미리 프리캐스트로 제작하여 사용하면, 거더 거치 후, 콘크리트 PC강선 정착블록을 설치하기 위한 철근배근, 강재정착구 및 쉬스설치, 합판거푸집 조립, 고강도 콘크리트의 선행타설, 거푸집 해체 등의 복잡하고, 까다로운 작업공정을 대폭 생략할 수 있어 시공을 아주 간편하게 할 수 있다.First, in the present invention, if the precast concrete PC steel wire fixing block is produced by precast in a factory or on the site in advance, after the girder, reinforcement for installing the concrete PC steel wire fixing block, steel anchorage and sheath installation, plywood formwork Complex and difficult work processes such as assembly, preliminary casting of high-strength concrete, and dismantling of formwork can be largely omitted, making construction very simple.

둘째, 본 발명은 콘크리트 PC강선 정착블록을 프리캐스트로 제작하여 사용하면 부모멘트 구간의 필요한 위치에 수량에 구애받지 않고, 용이하게 설치할 수 있기 때문에 적용대상 교량을 확대할 수 있고, 추후 부모멘트 바닥판 슬래브의 유지관리를 위한 유지관리용 정착블록으로도 사용할 수 있는 이점도 있다.Second, the present invention can be used to make the concrete PC steel wire fixing block by precast, regardless of the quantity of the necessary position of the parent section, can be easily installed, so that the bridge to be applied can be expanded, and the floor of the parent later It also has the advantage that it can be used as a maintenance fixing block for the maintenance of plate slabs.

셋째, 본 발명의 프리캐스트 콘크리트 PC강선 정착블록에 강재를 합성 사용한 프리캐스트 강합성 콘크리트 PC강선 장착블록으로도 제작 사용할 수 있어, PC강선 정착블록의 큰 인장력을 도입하거나 정착블록의 규모를 적게할 수 있는 이점이 있다.Third, it can be produced and used as a precast composite concrete PC steel wire mounting block using a composite of steel to the precast concrete PC steel wire fixing block of the present invention, to introduce a large tensile force of the PC steel wire fixing block or to reduce the size of the fixing block There is an advantage to this.

넷째, 본 발명은 프리캐스트 콘크리트 PC강선 정착블록의 제작 및 설치를 단순화하여 부모멘트구간에 프리스트레스의 도입이 필요한 교량에 특별한 시공상의 어려움 없이 프리캐스트 콘크리트 PC강선 정착블록을 설치 및 시공할 수 있어서, 공사비를 절감하고, 공용수명을 대폭적으로 연장할 수 있는 장점이 있다.Fourth, the present invention can simplify the production and installation of precast concrete PC steel wire fixing block can be installed and constructed without pre-construction concrete PC steel wire fixing block in the bridge that requires the introduction of pre-stress in the parent section, It has the advantage of reducing the construction cost and significantly extending the service life.

이하, 본 발명을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.

도 1은 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 도시한 사시도이고, 도 2는 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 도시한 측면도이며, 도 3은 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 도시한 단면도이며, 도 4는 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 도시한 평면도이다.1 is a perspective view showing a precast concrete PC steel wire fixing block according to the present invention, Figure 2 is a side view showing a precast concrete PC steel wire fixing block according to the present invention, Figure 3 is a precast concrete according to the present invention 4 is a cross-sectional view showing a PC steel wire fixing block, Figure 4 is a plan view showing a precast concrete PC steel wire fixing block according to the present invention.

이들 도면에 도시된 바와 같이, 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록은 PC강선(10)을 삽입하기 위해 설치되는 쉬스(20)와; 상기 쉬스(20)에 삽입된 PC강선(10)을 정착시키기 위해 쉬스(20)의 선단에 일체로 형성된 강재정착구(30)와; 상기 강재정착구(30)로부터 쉬스(20)간에 걸쳐 일정한 간격을 두고 다수개가 수직으로 고정 설치되는 전단연결철근(40)과; 상기 쉬스(20)와 강재정착구(30) 및 전단연결철근(40)을 고정시키도록 압축강도가 350㎏f/㎠ 이상의 고강도 콘크리트가 타설 양생되어 사다리꼴 형상으로 형성된 콘크리트블록(50)으로 구성된다.As shown in these figures, the precast concrete PC steel wire fixing block according to the present invention is a sheath 20 is installed to insert the PC steel wire 10; A steel fixture 30 integrally formed at the tip of the sheath 20 to fix the PC steel wire 10 inserted into the sheath 20; Shear connecting reinforcing bars 40 are fixed to a plurality of vertically installed at regular intervals from the steel fixing port 30 to the sheath 20; The high strength concrete having a compressive strength of 350 kgf / cm 2 or more is cast and cured to fix the sheath 20, the steel fixing fixture 30, and the shear connecting rebar 40, and is formed of a concrete block 50 formed in a trapezoidal shape.

여기서, 상기 콘크리트블록(50)에는 도 5 내지 도 8에 도시된 바와 같이, 콘크리트블록(50)의 상면을 제외한 전체면에 강판(60)이 합성된 구조이다.Here, the concrete block 50 has a structure in which the steel plate 60 is synthesized on the entire surface except the upper surface of the concrete block 50, as shown in FIGS.

또한, 상기 콘크리트블록(50)에는 도 9 내지 도 12에 도시된 바와 같이, 콘크리트블록(50)의 상면을 제외한 일부면에 강판(60)이 부착된 구조이다.In addition, the concrete block 50 has a structure in which a steel plate 60 is attached to a portion of the concrete block 50 except for the upper surface of the concrete block 50 as shown in FIG.

이하, 상기한 바와 같은 구성으로 이루어진 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록의 제작에 대해 설명한다.Hereinafter, the production of the precast concrete PC steel wire fixing block according to the present invention having the configuration as described above.

본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록(B)은 공장 또는 현장에서 정착블록 형상으로 철근을 배근한 후, 강재정착구(30)와, 쉬스(20)를 삽입 설치하고, 상기 강재정착구(30)와 쉬스(20)의 상부에 일정한 간격을 두고 다수개의 전단연결철근(40)을 배근한 후, 거푸집을 조립하고, 상기 거푸집에 압축강도가 350㎏f/㎠ 이상의 고강도 콘크리트를 타설 및 양생시킨 후, 거푸집을 탈형하여 제작한 것이다. Precast concrete PC steel wire fixing block (B) according to the present invention after reinforcing the reinforcing bar in the shape of the fixing block in the factory or on the site, insert the steel fixture 30 and the sheath 20, the steel fixture 30 After placing a plurality of shear connecting reinforcing bars 40 at regular intervals on the upper part of the sheath 20 and the sheath 20, assembling formwork, and placing and curing high-strength concrete with a compressive strength of 350 kgf / ㎠ or more in the formwork. After that, it was produced by demolding the formwork.

특히, 상기한 프리캐스트 강합성 콘크리트 PC강선 정착블록(B)은 정착블록 형성철근과 PC강선 강재정착구(30)와 전단연결철근(40) 및 쉬스(20)를 미리 일체로 조립한 후, 고강도 콘크리트를 타설하여 제작하되, 상기 프리캐스트 콘크리트 PC강선 정착블록(B)에 콘크리트블록(50)의 상면을 제외한 전부를 강판(60)으로 합성하거나 일부만을 강판(60)으로 합성하여 제작한다.In particular, the precast rigid composite PC steel wire fixing block (B) is a high-strength after assembling the fixing block forming reinforcing bar and PC steel wire steel anchoring hole 30, the shear connecting reinforcing bar 40 and the sheath 20 in advance integrally The concrete is prepared by pouring, but all of the precast concrete PC steel wire fixing block (B) except the upper surface of the concrete block 50 is synthesized by the steel sheet 60 or only a portion of the steel sheet 60 is produced.

따라서, 상기 프리캐스트 콘크리트 PC강선 정착블록을 공장이나 현장에서 미리 프리캐스트로 제작하여 사용하면, 스틸거더 또는 프리스트레스 콘크리트 거더 거치 후 프리캐스트 콘크리트 PC강선 정착블록을 설치하기 위한 철근배근, 강재정착구 및 쉬스설치, 합판거푸집 조립, 고강도 콘크리트의 선행타설, 거푸집 해체 등의 복잡하고, 까다로운 작업공정을 대폭 생략할 수 있는 작용효과가 있다.Therefore, when the precast concrete PC steel wire fixing block is manufactured and used in advance in a factory or on the site, the rebar, steel anchorage and sheath for installing the precast concrete PC steel wire fixing block after the steel girder or the prestressed concrete girder are mounted. There is an effect that can greatly omit complicated and difficult work processes such as installation, plywood formwork assembly, high-strength concrete preliminary casting, formwork dismantling.

또한, 상기 프리캐스트 콘크리트 PC강선 정착블록을 프리캐스트로 제작하여 사용하면 시공이 간편하기 때문에 스틸거더 또는 프리스트레스 콘크리트 거더의 필요한 위치에 프리캐스트 콘크리트 PC강선 정착블록의 필요한 수량을 구애 받지않고, 다수개를 사용할 수 있어 모든 교량으로 사용범위를 확대할 수 있다.In addition, since the precast concrete PC steel wire fixing block is made of precast and used, it is easy to construct, so a large number of precast concrete PC steel wire fixing blocks are required regardless of the required number of steel casters or prestressed concrete girder blocks. It can be used to extend the range of use to all bridges.

그리고, 추후 유지관리를 위한 유지관리용 정착블록으로 상기 프리캐스트 콘크리트 PC강선 정착블록을 미리 정착 시공할 수도 있다.In addition, the precast concrete PC steel wire fixing block may be fixed in advance as a fixing block for maintenance for later maintenance.

또한, 상기 프리캐스트 콘크리트 PC강선 정착블록은 콘크리트 정착블록 이외에 강재를 보강 사용한 프리캐스트 강합성 콘크리트 PC강선 장착블록으로도 제작 사용할 수 있다. In addition, the precast concrete PC steel wire fixing block may be manufactured and used as a precast steel composite concrete PC steel wire mounting block using steel reinforcement in addition to the concrete fixing block.

이하, 상기한 바와 같은 구성으로 이루어진 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 이용한 부모멘트 바닥판 슬래브에 프리스트레스를 도입하 는 방법에 대해 설명한다.Hereinafter, a method of introducing prestress to the parent cement slab slab using the precast concrete PC steel wire fixing block according to the present invention having the configuration as described above.

도 16은 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록이 적용된 스틸 I거더를 도시한 횡단면도이고, 도 17은 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록이 적용된 PSC I거더를 도시한 종단면도이며, 도 18은 도 17의 "B"부분을 확대 도시한 종단면도이며, 도 19는 도 17의 "B"부분을 확대 도시한 횡단면도이며, 도 20은 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록이 적용된 PSC U거더를 도시한 횡단면도이다.16 is a cross sectional view showing a steel I girder to which a precast concrete PC steel wire fixing block is applied according to the present invention, and FIG. 17 is a longitudinal sectional view showing a PSC I girder to which a precast concrete PC steel wire fixing block according to the present invention is applied. FIG. 18 is an enlarged longitudinal cross-sectional view of part “B” of FIG. 17, FIG. 19 is a cross-sectional view showing an enlarged view of part “B” of FIG. 17, and FIG. 20 is a precast concrete PC steel wire fixing block according to the present invention. This is a cross-sectional view showing the applied PSC U girder.

이들 도면에 도시된 바와 같이, 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 이용한 부모멘트 바닥판 슬래브에 프리스트레스를 도입하는 방법은 공장 또는 현장에서 PC강선(10)을 삽입하기 위해 설치되는 쉬스(20)와; 상기 쉬스(20)에 삽입된 PC강선(10)을 정착시키기 위해 쉬스(20)의 선단에 일체로 형성된 강재정착구(30)와; 상기 강재정착구(30)로부터 쉬스(20)간에 걸쳐 일정한 간격을 두고 다수개가 수직으로 고정 설치되는 전단연결철근(40)과; 상기 쉬스(20)와 강재정착구(30) 및 전단연결철근(40)을 고정시키도록 압축강도가 350㎏f/㎠ 이상의 고강도 콘크리트가 타설 양생된 콘크리트블록(50)으로 구성되며, As shown in these figures, the method of introducing prestress to the parent cement slab slab using the precast concrete PC steel wire fixing block according to the present invention is a sheath (installed to insert the PC steel wire 10 in the factory or field) 20); A steel fixture 30 integrally formed at the tip of the sheath 20 to fix the PC steel wire 10 inserted into the sheath 20; Shear connecting reinforcing bars 40 are fixed to a plurality of vertically installed at regular intervals from the steel fixing port 30 to the sheath 20; Composed of a high-strength concrete of the cast strength of 350kgf / ㎠ or more to fix the sheath 20, the steel fittings 30 and the shear connection reinforcing bar 40 is composed of a concrete block 50,

이의 시공단계는 프리캐스트 콘크리트 PC강선 정착블록을 제작하는 단계; 스틸거더(G) 또는 프리스트레스 콘크리트 거더(H)를 제작하는 단계; 상기 스틸거더(G) 또는 프리스트레스 콘크리트 거더(H)를 교대 또는 교각에 거치하는 단계; 상기 스틸거더(G) 또는 프리캐스트 콘크리트 PC강선 정착블록(B)이 설치될 부분인 거더(H)의 부모멘트 구간에 상면에 부착된 전단연결재(70)에 다수개의 PC강선 정착블록 받침 고정로프(80)를 연결 설치하고, 상기 PC강선 정착블록 받침 고정로프(80)에 강재 또는 목재 또는 수지재질로 이루어진 PC강선 정착블록 받침(90)을 고정 설치하고, 상기 PC강선 정착블록 받침(90)의 좌우측 상면에 프리캐스트 콘크리트 PC강선 정착블록(B)을 거치하는 단계; 상기 스틸거더(G) 또는 프리스트레스 콘크리트 거더(H)의 바닥판 슬래브(S) 시공을 위해 거더(G, H)에 바닥판 거푸집을 설치 및 철근배근 후, 쉬스(20)를 연결하고, PC강선(10)을 설치하는 단계; 상기 거푸집에 바닥판 슬래브 콘크리트를 타설 및 양생하는 단계; 상기 프리캐스트 콘크리트 PC강선 정착블록(B)의 강재정착구(30)에 정착된 PC강선(10)을 긴장하여 바닥판 슬래브(S0에 프리스트레스를 도입하는 단계로 이루어진다.The construction step is to produce a precast concrete PC steel wire fixing block; Manufacturing a steel girder (G) or prestressed concrete girder (H); Mounting the steel girder (G) or prestressed concrete girder (H) on an alternating or pier; A plurality of PC steel wire fixing block support fixing ropes on the shear connection member 70 attached to the upper surface in the parent section of the girder (H), which is the portion where the steel girder (G) or precast concrete PC steel wire fixing block (B) is to be installed (80) is connected and installed, the PC steel wire fixing block support fixing rope 80 is fixed to the PC steel wire fixing block support (90) made of steel or wood or resin material, the PC steel wire fixing block support (90) Mounting the precast concrete PC steel wire fixing block (B) on the upper left and right sides of the; After installing the bottom plate formwork on the girders (G, H) and reinforcement for the construction of the bottom plate slab (S) of the steel girder (G) or pre-stressed concrete girder (H), the sheath 20 is connected, PC steel wire Installing 10; Placing and curing bottom plate slab concrete on the formwork; The precast concrete PC steel wire fixing block (B) is made of a step of introducing the pre-stress to the slab slab (S0) by tensioning the PC steel wire 10 is fixed to the steel fixture (30).

이어서, 상기 거더(G, H)의 바닥판 슬래브(S)에 프리스트레스를 도입한 후, 프리캐스트 콘크리트 PC강선 정착블록(B)이 거치된 PC강선 정착블록 받침 고정로프(80)를 절단하여 PC강선 정착블록 받침(90)을 해체하는 단계를 추가한다.Subsequently, after the prestress is introduced into the bottom plate slab S of the girders G and H, the PC steel wire fixing block supporting fixing rope 80 on which the precast concrete PC steel wire fixing block B is mounted is cut and the PC is cut. Add the step of dismantling the steel wire fixing block support (90).

즉, 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 이용한 부모멘트 바닥판 슬래브에 프리스트레스를 도입하는 방법은 사다리꼴 형상의 프리캐스트 콘크리트 PC강선 정착블록(B)을 제작하되, 강재정착구(30)와 쉬스(20)를 연결시키고, 전단연결철근(40)을 배근한 후, 고강도 콘크리트를 타설 및 양생하여 프리캐스트 콘크리트 PC강선 정착블록(B)을 제작한 후, 교대 또는 교각에 지상에서 제작된 거더(G, H)를 거치후, 상기 거더(G, H)의 부모멘트 구간의 상면에 부착된 전단연결재(70)에 다수개의 PC강선 정착블록 받침 고정로프(80)를 연결 설치한 후, 상기 PC강선 정착블록 받침 고정로프(80)에 PC강선 정착블록 받침(90)을 고정 설치하고, 상기 PC강선 정착블록 받침(90)의 좌우측 상면에 프리캐스트 콘크리트 PC강선 정착블록(B)을 거치하고, 거더(G, H)의 바닥판 슬래브(S) 시공을 위해 거더(G, H)에 바닥판 거푸집을 조립, 철근배근 후, 프리캐스트 콘크리트 PC강선 정착블록(B)간에 쉬스(20)를 연결하고, 상기 쉬스(20)에 PC강선(10)을 삽입 설치하고, 바닥판 슬래브 콘크리트를 타설 및 양생한 후, 프리캐스트 콘크리트 PC강선 정착블록(B)의 강재정착구(30)에서 PC강선(10)을 긴장하여 프리스트레스를 도입한 후, 상기 PC강선 정착블록 받침 고정로프(80)를 절단한 후, PC강선 정착블록 받침(90)을 해체한다.That is, a method of introducing prestress to the parent cement slab slab using the precast concrete PC steel wire fixing block according to the present invention is to produce a trapezoidal shape precast concrete PC steel wire fixing block (B), the steel fixture 30 and After connecting the sheath 20, reinforcing the shear connecting reinforcing bar 40, and after pouring and curing high-strength concrete to produce a precast concrete PC steel wire fixing block (B), the girder made on the ground on the alternating or pier After passing through the (G, H), after connecting a plurality of PC steel wire fixing block support fixing rope 80 to the shear connection member 70 attached to the upper surface of the parent section of the girder (G, H), the The PC steel wire fixing block support 90 is fixed to the PC steel wire fixing block support 90, and the PC steel wire fixing block support 90 is mounted on the left and right upper surface of the precast concrete PC steel wire fixing block (B) , Bottom of girder (G, H) Assemble the bottom plate formwork on the girders (G, H) for the slab (S) construction, reinforcement, then connect the sheath 20 between the precast concrete PC steel wire fixing block (B), PC to the sheath 20 After inserting and installing the steel wire 10, placing and curing the bottom slab concrete, and after pre-stressing the PC steel wire 10 in the steel anchoring hole 30 of the precast concrete PC steel wire fixing block (B) After cutting the PC steel wire fixing block base fixing rope 80, the PC steel wire fixing block base 90 is dismantled.

따라서, 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 이용한 부모멘트 바닥판 슬래브에 프리스트레스를 도입하는 방법은 프리캐스트 콘크리트 PC강선 정착블록(B)의 제작 및 설치를 단순화하여 부모멘트구간에 프리스트레스의 도입이 필요한 교량에 특별한 시공상의 어려움 없이 프리캐스트 콘크리트 PC강선 정착블록(B)을 설치 및 시공할 수 있어서, 교량의 공용수명을 대폭적으로 연장할 수 있는 장점이 있다.Therefore, the method of introducing prestress to the parent cement slab slab using the precast concrete PC steel wire fixing block according to the present invention simplifies the fabrication and installation of the precast concrete PC steel wire fixing block (B) by Precast concrete PC steel wire fixing block (B) can be installed and constructed without special construction difficulties in the bridge that needs to be introduced, there is an advantage that can significantly extend the common life of the bridge.

도 1은 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 도시한 사시도,1 is a perspective view showing a precast concrete PC steel wire fixing block according to the present invention,

도 2는 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 도시한 측면도,Figure 2 is a side view showing a precast concrete PC steel wire fixing block according to the present invention,

도 3은 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 도시한 단면도,3 is a cross-sectional view showing a precast concrete PC steel wire fixing block according to the present invention,

도 4는 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록을 도시한 평면도,Figure 4 is a plan view showing a precast concrete PC steel wire fixing block according to the present invention,

도 5는 본 발명에 따른 프리캐스트 강합성 콘크리트 PC강선 정착블록을 도시한 사시도,5 is a perspective view showing a precast composite steel PC steel wire fixing block according to the present invention,

도 6은 본 발명에 따른 프리캐스트 강합성 콘크리트 PC강선 정착블록을 도시한 측면도,Figure 6 is a side view showing a precast composite steel PC steel wire fixing block according to the present invention,

도 7은 본 발명에 따른 프리캐스트 강합성 콘크리트 PC강선 정착블록을 도시한 단면도,Figure 7 is a cross-sectional view showing a precast composite steel PC steel wire fixing block according to the present invention,

도 8은 본 발명에 따른 프리캐스트 강합성 콘크리트 PC강선 정착블록을 도시한 평면도,8 is a plan view showing a precast composite steel PC steel wire fixing block according to the present invention,

도 9는 본 발명에 따른 프리캐스트 일부 강합성 콘크리트 PC강선 정착블록을 도시한 사시도,9 is a perspective view showing a part of precast concrete composite PC steel wire fixing block according to the present invention,

도 10은 본 발명에 따른 프리캐스트 일부 강합성 콘크리트 PC강선 정착블록 을 도시한 측면도,10 is a side view showing a part of precast concrete composite PC steel wire fixing block according to the present invention,

도 11은 본 발명에 따른 프리캐스트 일부 강합성 콘크리트 PC강선 정착블록을 도시한 단면도,11 is a cross-sectional view showing a part of precast concrete composite PC steel wire fixing block according to the present invention,

도 12는 본 발명에 따른 프리캐스트 일부 강합성 콘크리트 PC강선 정착블록을 도시한 평면도,12 is a plan view showing a part of precast concrete composite PC steel wire fixing block according to the present invention,

도 13은 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록이 적용된 스틸 U거더를 도시한 종단면도,13 is a longitudinal sectional view showing a steel U girder to which a precast concrete PC steel wire fixing block according to the present invention is applied;

도 14는 도 13의 "A"부분을 확대 도시한 종단면도,FIG. 14 is an enlarged longitudinal sectional view of part “A” of FIG. 13;

도 15는 도 13의 "A"부분을 확대 도시한 횡단면도,FIG. 15 is an enlarged cross-sectional view of part “A” of FIG. 13;

도 16은 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록이 적용된 스틸 I거더를 도시한 횡단면도,16 is a cross-sectional view showing a steel I girder to which a precast concrete PC steel wire fixing block according to the present invention is applied;

도 17은 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록이 적용된 PSC I거더를 도시한 종단면도,17 is a longitudinal sectional view showing a PSC I girder to which a precast concrete PC steel wire fixing block according to the present invention is applied;

도 18은 도 17의 "B"부분을 확대 도시한 종단면도,18 is an enlarged vertical cross-sectional view of a portion “B” of FIG. 17;

도 19는 도 17의 "B"부분을 확대 도시한 횡단면도,FIG. 19 is an enlarged cross-sectional view of part “B” of FIG. 17;

도 20은 본 발명에 따른 프리캐스트 콘크리트 PC강선 정착블록이 적용된 PSC U거더를 도시한 횡단면도.20 is a cross-sectional view showing a PSC U girder to which a precast concrete PC steel wire fixing block according to the present invention is applied.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10: PC강선 20: 쉬스10: PC steel wire 20: Sheath

30: 강재정착구 40: 전단연결철근30: steel anchoring hole 40: shear connecting rebar

50: 콘크리트블록 60: 강판50: concrete block 60: steel sheet

70: 전단연결재 80: PC강선 정착블록 받침 고정로프70: shear connector 80: PC steel wire fixing block base fixed rope

90: PC강선 정착블록 받침 90: PC steel wire fixing block support

B: 프리캐스트 콘크리트 PC강선 정착블록B: precast concrete PC steel wire fixing block

G: 스틸거더 H: 프리스트레스 콘크리트 거더G: Steel girder H: Prestressed concrete girder

S: 슬래브 S: slab

Claims (6)

삭제delete 삭제delete 공장 또는 현장에서, PC강선(10)을 삽입하기 위해 설치되는 쉬스(20)와; 상기 쉬스(20)에 삽입된 PC강선(10)을 정착시키기 위해 쉬스(20)의 선단에 일체로 형성된 강재정착구(30)와; 상기 강재정착구(30)로부터 쉬스(20)간에 걸쳐 일정한 간격을 두고 다수개가 수직으로 고정 설치되는 전단연결철근(40)과; 상기 쉬스(20)와 강재정착구(30) 및 전단연결철근(40)을 고정시키도록 압축강도가 350㎏f/㎠ 이상의 고강도 콘크리트가 타설 양생되어 사다리꼴 형상으로 형성된 콘크리트블록(50)으로 구성된 프리캐스트 콘크리트 PC강선 정착블록(B)을 제작하는 단계; 스틸거더(G) 또는 프리스트레스 콘크리트 거더(H)를 제작하는 단계; 상기 스틸거더(G) 또는 프리스트레스 콘크리트 거더(H)를 교대 또는 교각에 거치하는 단계; 상기 스틸거더(G) 또는 프리스트레스 콘크리트 거더(H)에 프리캐스트 콘크리트 PC강선 정착블록(B)을 설치하는 단계; 상기 스틸거더(G) 또는 프리스트레스 콘크리트 거더(H)의 바닥판 슬래브(S) 시공을 위해 거더(G)에 바닥판 거푸집을 설치 및 철근배근 후, 쉬스(20)를 연결하고, PC강선(10)을 설치하는 단계; 상기 거푸집에 바닥판 슬래브 콘크리트를 타설 및 양생하는 단계; 상기 프리캐스트 콘크리트 PC강선 정착블록(B)의 강재정착구(30)에 정착된 PC강선(10)을 긴장하여 바닥판 슬래브(S)에 프리스트레스를 도입하는 단계로 이루어지고, Sheath 20 is installed in the factory or on the site, to insert the PC steel wire 10; A steel fixture 30 integrally formed at the tip of the sheath 20 to fix the PC steel wire 10 inserted into the sheath 20; Shear connecting reinforcing bars 40 are fixed to a plurality of vertically installed at regular intervals from the steel fixing port 30 to the sheath 20; Precast consisting of a concrete block 50 formed in a trapezoidal shape by curing the high-strength concrete with a compressive strength of 350kgf / ㎠ or more to fix the sheath 20, the steel fitting 30 and the shear connecting reinforcement 40 Manufacturing a concrete PC steel wire fixing block (B); Manufacturing a steel girder (G) or prestressed concrete girder (H); Mounting the steel girder (G) or prestressed concrete girder (H) on an alternating or pier; Installing a precast concrete PC steel wire fixing block (B) on the steel girder (G) or prestressed concrete girder (H); After installation and reinforcement of the bottom plate formwork on the girder (G) for the construction of the bottom plate slab (S) of the steel girder (G) or prestressed concrete girder (H), the sheath 20 is connected, PC steel wire (10) Installing); Placing and curing bottom plate slab concrete on the formwork; The precast concrete PC steel wire fixing block (B) is made of a step of introducing the prestress to the bottom plate slab (S) by tensioning the PC steel wire 10 is fixed to the steel fixture (30), 상기 프리캐스트 콘크리트 PC강선 정착블록(B)이 설치될 부분인 거더(G, H)의 부모멘트 구간의 상면에 부착된 전단연결재(70)에 다수개의 PC강선 정착블록 받침 고정로프(80)를 연결 설치하고, 상기 PC강선 정착블록 받침 고정로프(80)에 PC강선 정착블록 받침(90)을 고정 설치하고, 상기 PC강선 정착블록 받침(90)의 좌우측 상면에 프리캐스트 콘크리트 PC강선 정착블록(B)을 거치하며,A plurality of PC steel wire fixing block support fixing ropes 80 are attached to the shear connection member 70 attached to the upper surface of the parent section of the girders G and H, which is the part where the precast concrete PC steel wire fixing block B is to be installed. Connected installation, and fixed to the PC steel wire fixing block support fixing rope 80 PC steel wire fixing block support 90, and installed on the left and right upper surface of the PC steel wire fixing block support (90) precast concrete PC steel wire fixing block ( B) 상기 거더(G, H)의 바닥판 슬래브(S)에 프리스트레스를 도입한 후, 프리캐스트 콘크리트 PC강선 정착블록(B)이 거치된 PC강선 정착블록 받침 고정로프(80)를 절단하여 PC강선 정착블록 받침(90)을 해체하는 단계를 추가함을 특징으로 하는 프리캐스트 콘크리트 PC강선 정착블록을 이용한 부모멘트 바닥판 슬래브에 프리스트레스를 도입하는 방법.After pre-stress is introduced into the bottom plate slab (S) of the girder (G, H), PC steel wire fixing block support fixing rope 80 is mounted by precast concrete PC steel wire fixing block (B) is cut to fix PC steel wire A method for introducing prestress into a parent cement slab slab using a precast concrete PC steel wire fixing block, characterized in that the step of dismantling the block bearing 90 is added. 삭제delete 삭제delete 삭제delete
KR1020090069331A 2009-07-29 2009-07-29 Negative moment floor slab prestress introduction method for which precast concrete pc wire anchorage block and this were used KR100963488B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090069331A KR100963488B1 (en) 2009-07-29 2009-07-29 Negative moment floor slab prestress introduction method for which precast concrete pc wire anchorage block and this were used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090069331A KR100963488B1 (en) 2009-07-29 2009-07-29 Negative moment floor slab prestress introduction method for which precast concrete pc wire anchorage block and this were used

Publications (1)

Publication Number Publication Date
KR100963488B1 true KR100963488B1 (en) 2010-06-17

Family

ID=42370000

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090069331A KR100963488B1 (en) 2009-07-29 2009-07-29 Negative moment floor slab prestress introduction method for which precast concrete pc wire anchorage block and this were used

Country Status (1)

Country Link
KR (1) KR100963488B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101300553B1 (en) 2012-02-22 2013-09-03 우경기술주식회사 girder bridge which has psc tendon which can change pc strand
CN103758352A (en) * 2011-12-31 2014-04-30 常熟古建园林建设集团有限公司 Tensioning method for pre-stress steel strand
CN106049284A (en) * 2016-06-06 2016-10-26 浙江交工路桥建设有限公司 Hogging moment steel strand bundle penetrating tool and use method thereof
KR20190043273A (en) * 2017-10-18 2019-04-26 주식회사 포스코건설 Steel girder structure having reinforcing part for reducing moment of steel composite girder, bridge including the same, manufacturing method of the same, and construction method of bridge including the same

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200394787Y1 (en) 2005-04-29 2005-09-07 홍석희 continuous structure system type precast prestressed concrete single slab girder bridge connecting and supporting the same bridge with one point supporting structure or strongly coupled integrated structure
KR100582563B1 (en) 2004-08-24 2006-05-23 한국시설안전기술공단 Construction method for bridges and bridges production it
KR100854224B1 (en) 2007-05-18 2008-08-25 (주)한맥기술 Precast half depth cantilever deck and constructing method of such bridge deck

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100582563B1 (en) 2004-08-24 2006-05-23 한국시설안전기술공단 Construction method for bridges and bridges production it
KR200394787Y1 (en) 2005-04-29 2005-09-07 홍석희 continuous structure system type precast prestressed concrete single slab girder bridge connecting and supporting the same bridge with one point supporting structure or strongly coupled integrated structure
KR100854224B1 (en) 2007-05-18 2008-08-25 (주)한맥기술 Precast half depth cantilever deck and constructing method of such bridge deck

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758352A (en) * 2011-12-31 2014-04-30 常熟古建园林建设集团有限公司 Tensioning method for pre-stress steel strand
KR101300553B1 (en) 2012-02-22 2013-09-03 우경기술주식회사 girder bridge which has psc tendon which can change pc strand
CN106049284A (en) * 2016-06-06 2016-10-26 浙江交工路桥建设有限公司 Hogging moment steel strand bundle penetrating tool and use method thereof
CN106049284B (en) * 2016-06-06 2017-10-17 浙江交工路桥建设有限公司 Hogging moment steel stranded wire penetrating adapter instrument and its application method
KR20190043273A (en) * 2017-10-18 2019-04-26 주식회사 포스코건설 Steel girder structure having reinforcing part for reducing moment of steel composite girder, bridge including the same, manufacturing method of the same, and construction method of bridge including the same
KR101975561B1 (en) * 2017-10-18 2019-08-28 주식회사 포스코건설 Steel girder structure having reinforcing part for reducing moment of steel composite girder, bridge including the same, manufacturing method of the same, and construction method of bridge including the same

Similar Documents

Publication Publication Date Title
KR101765762B1 (en) Cantilever part for bridge and constructing method thereof
KR100836079B1 (en) Structure of precast half slab-girder unit and method constructing the slab of a bridge with it
KR101478131B1 (en) Construction Method of Precast Pier
CN110863507A (en) Integrated prefabricated base component additionally provided with elevator, forming die and using method
KR20140012805A (en) The bi-prestressed concrete u-type girder and its construction method
KR100963488B1 (en) Negative moment floor slab prestress introduction method for which precast concrete pc wire anchorage block and this were used
KR100974305B1 (en) Continuous beam bridge construction method using girder for multi-span
KR200407182Y1 (en) Precasted concrete plate
KR20130077191A (en) Prestressed concrete girder with half-depth cantilever and construction method using the same
KR100894650B1 (en) Rahmen bridge with preflexion load and manufacturing method the same
KR101067717B1 (en) Process for producing prestressed concrete girder and concrete girder structure
KR100860592B1 (en) Temporary system for vertical structure using precast concreat block
KR20100074741A (en) Bridge and its construction method using tide arch hybrid girders having precast slabs
KR20100121865A (en) Method for constructing building using prc integrating method
KR100631030B1 (en) Precasted concrete plate and bridge slab construction method using that
KR101057409B1 (en) Hollow prestressed concrete girder and method for manufacturing thereof
KR101274627B1 (en) The production system of the precast composite beam and the bridge construction method which uses this
KR101350797B1 (en) a precast slab with a pc strand holding apparatus, and the construction method thereof
KR101315946B1 (en) Rc construction method for concrete lining in parallel
CN215053872U (en) Assembled frame system
CN110847355A (en) Novel efficient mounting node assembly integral beam column and production design method thereof
KR200419013Y1 (en) Temporary bridge consruction system using composite slab girder
KR100650444B1 (en) Cantilever part construction method of bridge
KR100631031B1 (en) Precasted concrete plate and bridge slab construction method using that
KR102585728B1 (en) Prestressed precast module with integrated girder and column and construction method using the same

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
AMND Amendment
X701 Decision to grant (after re-examination)
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130604

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140605

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150603

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160607

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170517

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180521

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20190508

Year of fee payment: 10