CN105756341A - Installation process of elevator shaft formwork - Google Patents
Installation process of elevator shaft formwork Download PDFInfo
- Publication number
- CN105756341A CN105756341A CN201610214544.7A CN201610214544A CN105756341A CN 105756341 A CN105756341 A CN 105756341A CN 201610214544 A CN201610214544 A CN 201610214544A CN 105756341 A CN105756341 A CN 105756341A
- Authority
- CN
- China
- Prior art keywords
- elevator shaft
- formwork
- concrete
- filter screen
- elevator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses an installation process of an elevator shaft formwork, comprising: manufacturing a filter net first, sizing a water-permeable bottom form to 2200 mm * 2200 mm in length and width, and drilling holes 20 mm in diameter in the form at intervals of 200 mm; combining an elevator shaft box formwork side form and the water-permeable bottom form into a box body, fixing the filter net to the bottom of the box body through fixing nails 4, turning up the filter net by 50 mm, reinforcing the elevator shaft box formwork according to normal construction, pouring concrete finally, removing the elevator shaft box formwork for reuse after the concrete reaches certain strength, and repairing the bottom of an elevator shaft with pure mortar after the formwork is removed since part of the bottom concrete mortar flows into the formwork. The elevator shaft formwork is simple in structure and convenient to use and can be installed quickly and reliably, one-off forming rate of elevator shaft concrete is improved, forming quality of concrete is effectively improved, construction time is shortened, and construction cost is reduced.
Description
Technical field
The present invention relates to the installation steps of a kind of hoistway formwork.
Background technology
Now, this phenomenon is there is during cast in situs elevator concrete, being exactly in casting process, hoistway formwork floats, and causes elevator out of shape, usual method is preloading above hoistway formwork, if carpenter does not support below template, above template, pressure is excessive, and the reinforcing bar basis that can cause elevator surrounding is impacted, elevator surrounding reinforcing bar is caused to cave in, thus affecting mass of foundation.Also having be exactly welding wire drawing below template, is soldered on reinforcement foundation, by the possibility of bottom reinforcement bars pull-up when the method is also possible to cause Form floating, descends earth anchor besides, and the waterproof talking about infrastructure of lower earth anchor is damaged certainly, and this is unallowed.In the face of these problems, at this, more optimal method has been had for hoistway formwork installation, i.e. a kind of Lift well mould board mounting assembly, this device construction method is a kind of method that comparison is easy, economic, feasible, material therefor can find at the construction field (site), and field fabrication template extremely convenient.The method is easy and simple to handle, easy construction, prevents the floating of template during casting concrete, causes later stage substantial amounts of patch work, greatly improves elevator Forming Quality.
Summary of the invention summary of the invention
The technical problem to be solved in the present invention is the defect overcoming prior art, it is provided that the installation steps of a kind of hoistway formwork, it is possible to effectively solve the problem in background technology.
In order to solve above-mentioned technical problem, the invention provides following technical scheme:
The installation steps of a kind of hoistway formwork of the present invention, first make filter screen, being processed into the size that length and width are 2250mmX2250mm, permeable bed die is processed into the size that length and width are 2200mmX2200mm, and bores the hole of a 20mm diameter on template face every 200mm;Elevator case mould side form 15mm thickness plank sheathing makes, elevator case mould side form and permeable bed die are combined into casing, and filter screen is fixed with fixing nail at box bottom, filter screen turns over 50mm, then according to elevator case mould is reinforced by normal construction, last casting concrete, reach after intensity until concrete, elevator case mould is removed recycling, simultaneously because lower concrete mortar has part to be lost to inside template, after form removal, to repair with sharp sand slurry bottom elevator.
As a preferred technical solution of the present invention, filter screen, filter screen adopts 3# steel fabric sheet.
As a preferred technical solution of the present invention, permeable bed die adopts 15mm thickness plank sheathing.
As a preferred technical solution of the present invention, elevator case mould side form height is 2500mm, and width is 2200mm.
The present invention reaches to provide the benefit that: body series adopts Lift well mould board mounting assembly to complete elevator concreting work easily, it is to avoid the various mass defects that conventional construction method brings.Be not only simple in structure, easy to use, it is possible to quick, be reliably completed the installation of hoistway formwork, improve elevator concrete one-shot forming rate, the effective concrete Forming Quality improved, decrease the engineering time, reduce construction cost.
Accompanying drawing explanation
Accompanying drawing is for providing a further understanding of the present invention, and constitutes a part for description, is used for together with embodiments of the present invention explaining the present invention, is not intended that limitation of the present invention.In the accompanying drawings:
Fig. 1 is the filter structure schematic diagram of the present invention.
Fig. 2 is the permeable die structure schematic diagram of the present invention.
Fig. 3 is the structural representation of the present invention.
In figure: 1, filter screen;2, permeable bed die;3, elevator case mould;4, fixing nail.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are illustrated, it will be appreciated that preferred embodiment described herein is merely to illustrate and explains the present invention, is not intended to limit the present invention.
Embodiment: as Figure 1-3, the installation steps of a kind of hoistway formwork of the present invention, first make filter screen 1, it is processed into the size that length and width are 2250mmX2250mm, permeable bed die is processed into the size that length and width are 2200mmX2200mm, and bores the hole of a 20mm diameter on template face every 200mm;Elevator case mould side form 3 15mm thickness plank sheathing makes, elevator case mould side form and permeable bed die are combined into casing, and filter screen is fixed with fixing nail 4 at box bottom, filter screen 1 turns over 50mm, then according to elevator case mould is reinforced by normal construction, last casting concrete, reach after intensity until concrete, elevator case mould is removed recycling, simultaneously because lower concrete mortar has part to be lost to inside template, after form removal, to repair with sharp sand slurry bottom elevator.
Further, filter screen 1 adopts 3# steel fabric sheet.Permeable bed die adopts 15mm thickness plank sheathing.Elevator case mould side form height is 2500mm, and width is 2200mm.
Body series adopts Lift well mould board mounting assembly to complete elevator concreting work easily, it is to avoid the various mass defects that conventional construction method brings.Be not only simple in structure, easy to use, it is possible to quick, be reliably completed the installation of hoistway formwork, improve elevator concrete one-shot forming rate, the effective concrete Forming Quality improved, decrease the engineering time, reduce construction cost.
Last it is noted that the foregoing is only the preferred embodiments of the present invention, it is not limited to the present invention, although the present invention being described in detail with reference to previous embodiment, for a person skilled in the art, technical scheme described in foregoing embodiments still can be modified by it, or wherein portion of techniques feature carries out equivalent replacement.All within the spirit and principles in the present invention, any amendment of making, equivalent replacement, improvement etc., should be included within protection scope of the present invention.
Claims (4)
1. installation steps for hoistway formwork, first make filter screen, are processed into the size that length and width are 2250mmX2250mm, and permeable bed die is processed into the size that length and width are 2200mmX2200mm, and bores the hole of a 20mm diameter on template face every 200mm;Elevator case mould side form 15mm thickness plank sheathing makes, elevator case mould side form and permeable bed die are combined into casing, and filter screen is fixed with fixing nail at box bottom, filter screen turns over 50mm, then according to elevator case mould is reinforced by normal construction, last casting concrete, reach after intensity until concrete, elevator case mould is removed recycling, simultaneously because lower concrete mortar has part to be lost to inside template, after form removal, to repair with sharp sand slurry bottom elevator.
2. the installation steps of a kind of hoistway formwork according to claim 1, is characterized in that, filter screen, and filter screen adopts 3# steel fabric sheet.
3. the installation steps of a kind of hoistway formwork according to claim 1, is characterized in that, permeable bed die adopts 15mm thickness plank sheathing.
4. the installation steps of a kind of hoistway formwork according to claim 1, is characterized in that, elevator case mould side form height is 2500mm, and width is 2200mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610214544.7A CN105756341B (en) | 2016-04-06 | 2016-04-06 | A kind of installation steps of hoistway formwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610214544.7A CN105756341B (en) | 2016-04-06 | 2016-04-06 | A kind of installation steps of hoistway formwork |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105756341A true CN105756341A (en) | 2016-07-13 |
CN105756341B CN105756341B (en) | 2018-10-26 |
Family
ID=56333564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610214544.7A Active CN105756341B (en) | 2016-04-06 | 2016-04-06 | A kind of installation steps of hoistway formwork |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105756341B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107503365A (en) * | 2017-09-11 | 2017-12-22 | 上海宝冶集团有限公司 | Super High elevator high and big die plate installation engineering method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202954570U (en) * | 2012-11-22 | 2013-05-29 | 中国建筑第二工程局有限公司 | High-rise building construction sump template |
US8733727B2 (en) * | 2011-02-15 | 2014-05-27 | Hy-Rise Scaffolding Ltd. | Connector for connecting perpendicular formwork panels in a formwork assembly |
CN104452786A (en) * | 2014-11-14 | 2015-03-25 | 武汉一冶建筑安装工程有限责任公司 | Deep foundation pit elevator shaft sump dewatering construction method |
CN105317205A (en) * | 2014-06-09 | 2016-02-10 | 中建四局第六建筑工程有限公司 | Elevator shaft construction method and used device |
-
2016
- 2016-04-06 CN CN201610214544.7A patent/CN105756341B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8733727B2 (en) * | 2011-02-15 | 2014-05-27 | Hy-Rise Scaffolding Ltd. | Connector for connecting perpendicular formwork panels in a formwork assembly |
CN202954570U (en) * | 2012-11-22 | 2013-05-29 | 中国建筑第二工程局有限公司 | High-rise building construction sump template |
CN105317205A (en) * | 2014-06-09 | 2016-02-10 | 中建四局第六建筑工程有限公司 | Elevator shaft construction method and used device |
CN104452786A (en) * | 2014-11-14 | 2015-03-25 | 武汉一冶建筑安装工程有限责任公司 | Deep foundation pit elevator shaft sump dewatering construction method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107503365A (en) * | 2017-09-11 | 2017-12-22 | 上海宝冶集团有限公司 | Super High elevator high and big die plate installation engineering method |
CN107503365B (en) * | 2017-09-11 | 2019-07-30 | 上海宝冶集团有限公司 | Super High elevator high and big die plate installation engineering method |
Also Published As
Publication number | Publication date |
---|---|
CN105756341B (en) | 2018-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105256947B (en) | Method for constructing recycled mixed concrete beams and slabs | |
CN207616844U (en) | Foundation platform precast concrete side form and molding machine | |
CN108756291B (en) | Large-tonnage concrete column replacement reinforcement structure and reinforcement method | |
CN106113230B (en) | The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need | |
CN103556819A (en) | Construction method for reserving constructional column holes in beam plate | |
CN107191006B (en) | Dismantling and repairing method for refractory concrete layer of diversion trench | |
CN105696790A (en) | Double-layer coupling beam hole opening formwork system and construction method of double-layer coupling beam hole opening formwork system applied to double-layer coupling beam | |
CN105040973B (en) | Construction method of outer decorating layer formwork for conical columns of comprehensive gym | |
CN106337530B (en) | A kind of construction of frame beam seams stifled construction method | |
CN101705692A (en) | Molding construction method of large-scale equipment foundation deep reserved foundation bolt hole | |
CN105756341A (en) | Installation process of elevator shaft formwork | |
CN106930391B (en) | Cast-in-place drainage channel structure of top plate for formwork-free construction and construction method | |
CN105064500A (en) | Balcony beam slab inner side filling wall body and main body structure integral casting construction method | |
CN113021603A (en) | Construction method for prefabricated assembled diamond type bent cap | |
CN112431208A (en) | Construction method for deep foundation pit supporting by adopting component type force transmission belt | |
KR101120588B1 (en) | Vertical joint frame for improving monolithic concrete | |
CN109853948A (en) | The integrated template system and mold method of the cast-in-place overhanging windowsill of secondary structure | |
CN111441576A (en) | Method and structure for pouring concrete beam post-cast strip by adopting inflatable template | |
CN110761562A (en) | Auxiliary tool for pouring concrete and using method | |
CN203066101U (en) | Combined prefabricated column foundation core die | |
CN206448272U (en) | Roadbed side slope arched framework one-time-shaped mould | |
CN206329032U (en) | Template suitable for pouring section after assembled beam-column | |
CN114412168A (en) | Construction method of post-cast strip for supporting and settling reinforced concrete column | |
CN104908150B (en) | A kind of piping shaft making template and the method based on factorial praluction piping shaft | |
CN204001713U (en) | V-type cylinder oblique line section concrete is built mould |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |