CN207616844U - Foundation platform precast concrete side form and molding machine - Google Patents

Foundation platform precast concrete side form and molding machine Download PDF

Info

Publication number
CN207616844U
CN207616844U CN201721792142.1U CN201721792142U CN207616844U CN 207616844 U CN207616844 U CN 207616844U CN 201721792142 U CN201721792142 U CN 201721792142U CN 207616844 U CN207616844 U CN 207616844U
Authority
CN
China
Prior art keywords
precast concrete
concrete side
lateral
steel bar
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721792142.1U
Other languages
Chinese (zh)
Inventor
赵若宸
石兴良
程继胜
郭新兵
曾秋博
李峰
吴燮
张炜
王剑波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 22 Construction Co Ltd
Original Assignee
China Nuclear Industry 22 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 22 Construction Co Ltd filed Critical China Nuclear Industry 22 Construction Co Ltd
Priority to CN201721792142.1U priority Critical patent/CN207616844U/en
Application granted granted Critical
Publication of CN207616844U publication Critical patent/CN207616844U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model provides the foundation bearing platform prefabrication concrete side, it includes four blocks of precast concrete side plates, quadrilateral frame structure is assembled by the welding of lateral reserved steel bar between the precast concrete side plate, and collectively forms the precast concrete side form of foundation platform;The precast concrete side plate is formed using fine sand concreting, and iron wire mesh sheet, lateral stiffener, lateral reserved steel bar and longitudinal reserved steel bar have been poured in the middle layer of fine sand concrete.The construction efficiency that foundation platform can be greatly improved by using this precast concrete side form, ensure that construction quality, effectively reduces construction cost, improve business efficiency.

Description

Foundation platform precast concrete side form and molding machine
Technical field
The utility model is related to concrete blinding field more particularly to foundation platform precast concrete side form and molding dresses It sets.
Background technology
The form of construction work of existing basement cushion cap foundation brick fetal membrane mainly uses autoclave aerated concrete building block, cooperation Mortar is stirred, is constructed in such a way that traditional wall is manually built by laying bricks or stones, it is desirable that after the completion of cushion cap earth excavation, by building materials It is transported to scene using vertical transportation machinery, and brick fetal membrane is built by laying bricks or stones by cap design of pile size, certain journey is risen in masonry strength Degree simultaneously, then carries out reinforced concrete construction, in conclusion traditional brick fetal membrane form of construction work mainly has following defect:
(1)Working procedure is various, it is longer to complete required time, occupies foundation construction critical process influences subsequent construction;
(2)Intensity rises brick fetal membrane when slow, intensity is low, dimension of platform is larger and is susceptible to the risk that collapses;
(3)Construction cost height, economic and social benefits unobvious.
Utility model content
The technical problem to be solved by the utility model is to provide foundation platform precast concrete side form and molding machines, lead to The construction efficiency of foundation platform can be greatly improved using this precast concrete side form by crossing, and ensure that construction quality, effectively Construction cost is reduced, business efficiency is improved.
In order to realize above-mentioned technical characteristic, what the purpose of this utility model was realized in:Foundation platform concrete Native side form, it includes four blocks of precast concrete side plates, is welded and is spelled by lateral reserved steel bar between the precast concrete side plate Quadrilateral frame structure is dressed up, and collectively forms the precast concrete side form of foundation platform;The precast concrete side plate uses Fine sand concreting forms, and iron wire mesh sheet, lateral stiffener, laterally reserved steel have been poured in the middle layer of fine sand concrete Muscle and longitudinal reserved steel bar.
The transverse direction reserved steel bar at least three, and uniformly distributed be arranged in the inside of precast concrete side plate;It is described The length that lateral reserved steel bar stretches out precast concrete side plate is 90-120mm.
The length and height of the precast concrete side plate are determined according to the length and height of designed foundation platform.
The molding machine of foundation platform precast concrete side form, it includes lateral frame and longitudinal frame, two cross To assembled to pull rod, longitudinal reserved steel bar and lateral reserved steel bar by more longitudinal directions between the longitudinal frame of frame and two Rectangular frame structure.
The longitudinal direction matches two ends of pull rod by the first nut with the outer end face of lateral frame.
Two ends of the transverse direction reserved steel bar are matched by the second nut with the outer end face of longitudinal frame.
Two ends of the longitudinal direction reserved steel bar are matched by third nut with the outer end face of longitudinal frame.
The utility model has the advantages that:
1, by the foundation platform precast concrete side form of the utility model, it is by four blocks of precast concrete side plates by basis Size assembles outside cushion cap, forms a metastable form bracing system, can both meet foundation platform waterproof and apply The procedures such as work, reinforcing bar binding, concreting, while it being also highly resistant to the earth lateral pressure on cushion cap hole side, it prevents out Existing partial collapse or side slope soil enter in cushion cap, and under the premise of meeting construction requirement, reaching does not influence the duration, saves and be produced into This purpose.
2, need to be installed in advance by using the side form of the utility model, when changing previous cushion cap backfilling of earthwork plank sheathing or The problem of building brick fetal membrane by laying bricks or stones, occupying material time;The cushion cap side form can directly produce installation in batches inside, not only increase Working efficiency is greatly saved cost, while not accounting for critical process because prefabricated in field, effectively shortens the construction time.
3, simple in structure and easy to make by using above-mentioned precast concrete side plate, by pouring inside it Iron wire mesh sheet, lateral stiffener, lateral reserved steel bar and longitudinal reserved steel bar have been built, and then has improved its intensity.
Description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 the utility model overall structure diagrams.
Fig. 2 the utility model precast concrete side plate sectional views.
Fig. 3 the utility model precast concrete side plate vertical views.
Fig. 4 the utility model precast concrete side plate left views.
Fig. 5 the utility model forming device structure schematic diagrames.
In figure:Lateral frame 1, lateral stiffener 2, iron wire mesh sheet 3, third nut 4, the first nut 5, longitudinal direction are to pull rod 6, longitudinal frame 7, the second nut 8, lateral reserved steel bar 9, precast concrete side plate 10, fine sand concrete 11, longitudinal reserved steel Muscle 12.
Specific implementation mode
The embodiment of the utility model is described further below in conjunction with the accompanying drawings.
Embodiment 1:
Referring to Fig. 1-4, foundation platform precast concrete side form, it includes four blocks of precast concrete side plates 10, described prefabricated Quadrilateral frame structure is assembled by the welding of lateral reserved steel bar 9 between concrete side plate 10, and collectively forms foundation platform Precast concrete side form;The precast concrete side plate 10 is poured using fine sand concrete 11, in fine sand concrete 11 Middle layer poured iron wire mesh sheet 3, lateral stiffener 2, lateral reserved steel bar 9 and longitudinal reserved steel bar 12.
Further, the lateral reserved steel bar 9 at least three, and uniformly distributed setting is in precast concrete side plate 10 Inside;The length that the transverse direction reserved steel bar 9 stretches out precast concrete side plate 10 is 90-120mm.
Further, the length of the precast concrete side plate 10 and height according to the length of designed foundation platform and Height determines.
Embodiment 2:
Such as Fig. 5, the molding machine of foundation platform precast concrete side form, it includes lateral frame 1 and longitudinal frame 7, and two By more longitudinal directions to pull rod 6, longitudinal reserved steel bar 12 and cross between lateral frame 1 described in root and two longitudinal frames 7 It is assembled into rectangular frame structure to reserved steel bar 9.Precast concrete side plate can be easily poured by above-mentioned molding machine 10。
Further, the longitudinal direction matches to two ends of pull rod 6 by the outer end face of the first nut 5 and lateral frame 1 It closes.The assembly between lateral frame 1 and longitudinal frame 7 is realized to pull rod 6 by longitudinal direction, and then forms it into frame structure, The intensity of precast concrete side plate 10 is also enhanced simultaneously.
Further, the outer end face phase that two ends of the lateral reserved steel bar 9 pass through the second nut 8 and longitudinal frame 7 Cooperation.The assembled welding of follow-up contiguous prefabricated concrete side plate 10 is facilitated by lateral reserved steel bar 9, while being also enhanced pre- The intensity of concrete side plate 10 processed.
Further, the outer end face phase that two ends of longitudinal reserved steel bar 12 pass through third nut 4 and longitudinal frame 7 Cooperation.The intensity of precast concrete side plate 10 is enhanced by longitudinal reserved steel bar 12.
The operation principle of the utility model is:
Foundation platform precast concrete side form is assembled by 4 blocks of precast concrete side plates 10, precast concrete side plate 10 Between connected in such a way that lateral reserved steel bar 9 welds, the thickness of every block of precast concrete side plate 10 is 40mm, length, Height is according to the determination of foundation platform size, formation base cushion cap outline border shape.All precast concrete side plates 10 can be prefabricated Batch flat moulded prefabricated, when use, can directly be transferred to the placement of cushion cap foundation pit using tower crane, do not influence critical process and construct, reach To the purpose for accelerating construction progress, reducing construction cost, improving construction efficiency.
The specific manufacturing process of precast concrete side plate 10 is:
First, precast concrete side plate 10 is made.As shown in figure 5, using the side of 4 model 40mm*40mm*2.5mm Pipe combines pull rod 6, longitudinal reserved steel bar 12 and lateral reserved steel bar 9 by longitudinal direction by the appearance and size of prefabricated components rectangular Frame structure keeps flat this rectangular frame structure to common templates surface, to ensure the group of prefabricated board overall stiffness and prefabricated board It is firm to fill, with lateral reserved steel bar 9 in every piece of prefabricated board, wherein assembled lateral reserved steel bar 9 is welded between being used for plate, two End need to stretch out square tube 100mm.
Secondly, prefabricated board concrete is poured:Using matching iron wire mesh sheet 3 in C20 fine sands concrete 11, wherein steel wire diameter D= 1mm, pouring molding are simultaneously conserved, reach side form remove condition when, unclamp frame fastening nut remove respectively surrounding square tube and Split bolt.
Again, assembled cushion cap side form:Maintenance erect prefabricated board after 7 days, as shown in Figure 1 by welding precast concrete side The lateral reserved steel bar 9 that 10 left and right ends of plate are stretched out is assembled fixed by size progress outside cushion cap by prefabricated board, makes cushion cap side Mould.
Finally, prefabricated board is moved integrally:After the completion of cushion cap pit earthwork excavates, directly by assembled good cushion cap side form, profit With being placed in live tower crane or other transporting equipments directly allocation and transportation to foundation pit, so far cushion cap side form construction is completed.
The above embodiments are only the optimal technical scheme of the utility model, and are not construed as the limit for the utility model System, the technical solution that the scope of protection of the utility model should be recorded with claim include the technical solution of claim record The equivalents of middle technical characteristic are protection domain.Equivalent replacement i.e. within this range is improved, also in the utility model Protection domain within.

Claims (7)

1. foundation platform precast concrete side form, it is characterised in that:It includes four blocks of precast concrete side plates(10), described prefabricated Concrete side plate(10)Between pass through lateral reserved steel bar(9)Welding is assembled into quadrilateral frame structure, and collectively forms basis The precast concrete side form of cushion cap;The precast concrete side plate(10)Using fine sand concrete(11)It pours, in fine sand Concrete(11)Middle layer poured iron wire mesh sheet(3), lateral stiffener(2), lateral reserved steel bar(9)It is reserved with longitudinal Reinforcing bar(12).
2. foundation platform precast concrete side form according to claim 1, it is characterised in that:The transverse direction reserved steel bar (9)At least three, and uniformly distributed setting is in precast concrete side plate(10)Inside;The transverse direction reserved steel bar(9)It stretches Go out precast concrete side plate(10)Length be 90-120mm.
3. foundation platform precast concrete side form according to claim 1, it is characterised in that:The precast concrete side plate (10)Length and height according to the length and height of designed foundation platform determine.
4. the molding machine of foundation platform precast concrete side form described in claim 1-3 any one, it is characterised in that:It is wrapped Include lateral frame(1)With longitudinal frame(7), two lateral frames(1)With two longitudinal frames(7)Between by more Root is longitudinal to pull rod(6), longitudinal reserved steel bar(12)With lateral reserved steel bar(9)It is assembled into rectangular frame structure.
5. the molding machine of foundation platform precast concrete side form according to claim 4, it is characterised in that:The longitudinal direction is right Pull rod(6)Two ends pass through the first nut(5)With lateral frame(1)Outer end face match.
6. the molding machine of foundation platform precast concrete side form according to claim 4, it is characterised in that:The transverse direction is pre- Stay reinforcing bar(9)Two ends pass through the second nut(8)With longitudinal frame(7)Outer end face match.
7. the molding machine of foundation platform precast concrete side form according to claim 4, it is characterised in that:The longitudinal direction is pre- Stay reinforcing bar(12)Two ends pass through third nut(4)With longitudinal frame(7)Outer end face match.
CN201721792142.1U 2017-12-20 2017-12-20 Foundation platform precast concrete side form and molding machine Active CN207616844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721792142.1U CN207616844U (en) 2017-12-20 2017-12-20 Foundation platform precast concrete side form and molding machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721792142.1U CN207616844U (en) 2017-12-20 2017-12-20 Foundation platform precast concrete side form and molding machine

Publications (1)

Publication Number Publication Date
CN207616844U true CN207616844U (en) 2018-07-17

Family

ID=62821233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721792142.1U Active CN207616844U (en) 2017-12-20 2017-12-20 Foundation platform precast concrete side form and molding machine

Country Status (1)

Country Link
CN (1) CN207616844U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894242A (en) * 2018-07-27 2018-11-27 上海中锦建设集团股份有限公司 Prefabricated board and its cushion cap foundation fetal membrane construction method for cushion cap foundation fetal membrane
CN109183846A (en) * 2018-11-02 2019-01-11 广东省水利水电第三工程局有限公司 A kind of concrete prefabricated formwork structure and production method applied to basement cushion cap
CN109252676A (en) * 2018-11-02 2019-01-22 广东省水利水电第三工程局有限公司 A kind of production technology and its safe construction method of basement cushion cap
CN109267749A (en) * 2018-11-02 2019-01-25 广东省水利水电第三工程局有限公司 A kind of concrete prefabricated template construction technique applied to thick mud layer
CN109763508A (en) * 2019-01-26 2019-05-17 中煤地建设工程有限公司 A kind of domatic isolated footing structure
CN115652905A (en) * 2022-11-04 2023-01-31 中建八局第二建设有限公司 Novel brick moulding bed construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894242A (en) * 2018-07-27 2018-11-27 上海中锦建设集团股份有限公司 Prefabricated board and its cushion cap foundation fetal membrane construction method for cushion cap foundation fetal membrane
CN109183846A (en) * 2018-11-02 2019-01-11 广东省水利水电第三工程局有限公司 A kind of concrete prefabricated formwork structure and production method applied to basement cushion cap
CN109252676A (en) * 2018-11-02 2019-01-22 广东省水利水电第三工程局有限公司 A kind of production technology and its safe construction method of basement cushion cap
CN109267749A (en) * 2018-11-02 2019-01-25 广东省水利水电第三工程局有限公司 A kind of concrete prefabricated template construction technique applied to thick mud layer
CN109183846B (en) * 2018-11-02 2023-12-22 广东省水利水电第三工程局有限公司 Concrete prefabricated formwork structure applied to basement bearing platform and manufacturing method
CN109763508A (en) * 2019-01-26 2019-05-17 中煤地建设工程有限公司 A kind of domatic isolated footing structure
CN115652905A (en) * 2022-11-04 2023-01-31 中建八局第二建设有限公司 Novel brick moulding bed construction method

Similar Documents

Publication Publication Date Title
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN105926803B (en) A kind of 3D printing reinforced masonry shear wall structure with concave convex texture
CN104859049A (en) Pre-stressed concrete solid square pile production device
CN208884783U (en) Assembled architecture PCF plate and connection component
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
CN101487293A (en) Concreting method with different intensity grades for beam column nodes
CN104074314A (en) Pre-buried shear key connector box for precast facade panel and machining method of pre-buried shear key connector box
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN104532990A (en) Truss steel bar double-layer gypsum fiberboard, disassembly-free formwork wall structure and construction method
CN101318350A (en) Concrete cavity die component forming method
CN102409848A (en) Construction molding methods for light-weight ribbed floorslab and light-weight ribbed floor
CN102936953B (en) Construction method of a bridging-arm stiffened steel structure template
CN204435616U (en) Truss bars double layer fibre gypsum plank, non-dismantling formwork wall body structure
CN208023601U (en) A kind of prefabricated pile foundation support table side form of mutual buckle type
CN106836559A (en) A kind of reinforced concrete wall structure and its construction method for preventing from ftractureing
CN106272921A (en) The prefabricated pile mould that energy is steam-cured
CN108130889B (en) Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer
CN206448272U (en) Roadbed side slope arched framework one-time-shaped mould
CN202214982U (en) One-shot forming ground beam template
CN107859192A (en) A kind of warming plate, bearing wall, non-bearing wall body and assembled walling system
CN210507502U (en) Prefabricated assembled concrete slab bed structure
CN106930307A (en) The foundation beam prefabricated board and its assembly construction method of a kind of replacement brick fetal membrane
CN105839824B (en) Shed deckhead construction method
CN208917859U (en) Prefabricated board for cushion cap foundation fetal membrane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant