CN105756341B - A kind of installation steps of hoistway formwork - Google Patents

A kind of installation steps of hoistway formwork Download PDF

Info

Publication number
CN105756341B
CN105756341B CN201610214544.7A CN201610214544A CN105756341B CN 105756341 B CN105756341 B CN 105756341B CN 201610214544 A CN201610214544 A CN 201610214544A CN 105756341 B CN105756341 B CN 105756341B
Authority
CN
China
Prior art keywords
elevator
strainer
concrete
case mould
elevator case
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610214544.7A
Other languages
Chinese (zh)
Other versions
CN105756341A (en
Inventor
欧阳帆
王波
***
陆春亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201610214544.7A priority Critical patent/CN105756341B/en
Publication of CN105756341A publication Critical patent/CN105756341A/en
Application granted granted Critical
Publication of CN105756341B publication Critical patent/CN105756341B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a kind of installation steps of hoistway formwork, first make strainer, and permeable bed die is processed into the size that length and width are 2200mm X 2200mm, and bores the hole of a 20mm diameter every 200mm on template face;Elevator case mould side form is combined into babinet with permeable bed die, and strainer is fixed with fixing glue 4 in the bottom of box, strainer 1 turns over 50mm, then elevator case mould is reinforced according to normal construction, last casting concrete, after concrete reaches intensity, elevator case mould is removed and is reused, simultaneously because lower concrete mortar has part to be lost to inside template, after form removal, elevator bottom starched with sharp sand and be repaired.Be not only simple in structure, be easy to use, can installation that is quick, being reliably completed hoistway formwork, improve elevator concrete one-pass molding rate, the Forming Quality of the concrete effectively improved reduces the construction time, reduces construction cost.

Description

A kind of installation steps of hoistway formwork
Technical field
The present invention relates to a kind of installation steps of hoistway formwork.
Background technology
Now, it is exactly in casting process, on hoistway formwork there are this phenomenon when cast in situs elevator concrete It is floating, cause elevator out of shape, usual method is the preloading above hoistway formwork, if carpenter does not prop up below template Support can cause the reinforcing bar basis of elevator surrounding impacted, cause elevator surrounding reinforcing bar recessed if template top pressure is excessive It falls into, to influence mass of foundation.Also it is exactly to weld wire drawing below template, is soldered on reinforcement foundation, the method is also possible to By the possibility of bottom reinforcement bars pull-up when causing Form floating, earth anchor is besides descended, the waterproof affirmative of infrastructure if lower earth anchor It is damaged, this does not allow.In face of these problems, here, having for hoistway formwork installation more optimal Method, i.e., a kind of Lift well mould board mounting assembly, the device construction method are a kind of easy, economic, the feasible method of comparison, institute It can be found at the construction field (site) with material, and it is extremely convenient to make template.The method is easy to operate, easy for construction, pours The floating that template is prevented when building concrete causes later stage a large amount of patch work, greatly improves elevator Forming Quality.
Invention content
The technical problem to be solved by the present invention is to overcome the defects of the prior art, provide a kind of installation step of hoistway formwork Suddenly, the problems in background technology can effectively be solved.
In order to solve the above technical problem, the present invention provides the following technical solutions:
A kind of installation steps of hoistway formwork of the present invention, first make strainer, and it is 2250mm X to be processed into length and width The size of 2250mm, permeable bed die be processed into length and width be 2200mm X 2200mm size, and on template face every 200mm bores the hole of a 20mm diameter;Elevator case mould side form with 15mm thickness plank sheathings make, elevator case mould side form with thoroughly Water-bed module synthesizes babinet, and is fixed strainer with fixing glue in the bottom of box, and strainer turns over 50mm, then according to normal construction Elevator case mould side form is reinforced, last casting concrete, after concrete reaches intensity, elevator case mould side form is torn open Except recycling, simultaneously because lower concrete mortar has part to be lost to inside template, it, be to elevator shaft bottom after form removal It is starched and is repaired with sharp sand in portion.
As a preferred technical solution of the present invention, strainer, strainer uses 3# steel fabric sheets.
As a preferred technical solution of the present invention, permeable bed die uses 15mm thickness plank sheathings.
As a preferred technical solution of the present invention, elevator case mould side form height is 2500mm, width 2200mm.
The advantageous effect that is reached of the present invention is:This system easily completes elevator using Lift well mould board mounting assembly Well concreting works, and avoids various mass defects caused by conventional construction method.It is not only simple in structure, user Just, can installation that is quick, being reliably completed hoistway formwork, improve elevator concrete one-pass molding rate, effectively carry The Forming Quality of high concrete, reduces the construction time, reduces construction cost.
Description of the drawings
Attached drawing is used to provide further understanding of the present invention, and a part for constitution instruction, the reality with the present invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the filter structure schematic diagram of the present invention.
Fig. 2 is the permeable die structure schematic diagram of the present invention.
Fig. 3 is the structural schematic diagram of the present invention.
In figure:1, strainer;2, permeable bed die;3, elevator case mould side form;4, fixing glue.
Specific implementation mode
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
Embodiment:As shown in Figs. 1-3, a kind of installation steps of hoistway formwork of the present invention first make strainer 1, by itself plus For work at the size that length and width are 2250mm X 2250mm, permeable bed die is processed into the ruler that length and width are 2200mm X 2200mm It is very little, and every the hole of 200mm one 20mm diameter of brill on template face;The 15mm thickness plank sheathing systems of elevator case mould side form 3 Make, elevator case mould side form is combined into babinet with permeable bed die, and is fixed strainer with fixing glue 4 in the bottom of box, on strainer 1 50mm is turned over, is then reinforced elevator case mould side form according to normal construction, last casting concrete waits for that concrete reaches strong After degree, elevator case mould side form is removed and is reused, simultaneously because lower concrete mortar has part to be lost to inside template, After form removal, elevator bottom starched with sharp sand and be repaired.
Further, strainer 1 uses 3# steel fabric sheets.Permeable bed die uses 15mm thickness plank sheathings.Elevator case mould side form Height is 2500mm, width 2200mm.
This system easily completes elevator concreting work using Lift well mould board mounting assembly, avoids biography Various mass defects caused by construction method of uniting.Be not only simple in structure, be easy to use, can it is quick, be reliably completed elevator The installation of well template, improves elevator concrete one-pass molding rate, and the Forming Quality of the concrete effectively improved reduces Construction time reduces construction cost.
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's Within protection domain.

Claims (4)

1. a kind of installation steps of hoistway formwork, first make strainer, it is processed into the ruler that length and width are 2250mmX2250mm Very little, permeable bed die is processed into the size that length and width are 2200mmX2200mm, and bores one every 200mm on template face The hole of 20mm diameters;Elevator case mould side form makes of 15mm thickness plank sheathings, and elevator case mould side form is combined with permeable bed die Strainer is fixed with fixing glue at babinet, and in the bottom of box, strainer turns over 50mm, then according to normal construction by elevator case Mould is reinforced, last casting concrete, after concrete reaches intensity, elevator case mould is removed and is reused, while by There is part to be lost to inside template in lower concrete mortar, after form removal, elevator bottom starched with sharp sand and be repaiied It mends.
2. a kind of installation steps of hoistway formwork according to claim 1, characterized in that strainer uses 3# steel fabric sheets.
3. a kind of installation steps of hoistway formwork according to claim 1, characterized in that permeable bed die is using the thick wood of 15mm Template.
4. a kind of installation steps of hoistway formwork according to claim 1, characterized in that elevator case mould side form height is 2500mm, width 2200mm.
CN201610214544.7A 2016-04-06 2016-04-06 A kind of installation steps of hoistway formwork Active CN105756341B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610214544.7A CN105756341B (en) 2016-04-06 2016-04-06 A kind of installation steps of hoistway formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610214544.7A CN105756341B (en) 2016-04-06 2016-04-06 A kind of installation steps of hoistway formwork

Publications (2)

Publication Number Publication Date
CN105756341A CN105756341A (en) 2016-07-13
CN105756341B true CN105756341B (en) 2018-10-26

Family

ID=56333564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610214544.7A Active CN105756341B (en) 2016-04-06 2016-04-06 A kind of installation steps of hoistway formwork

Country Status (1)

Country Link
CN (1) CN105756341B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107503365B (en) * 2017-09-11 2019-07-30 上海宝冶集团有限公司 Super High elevator high and big die plate installation engineering method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202954570U (en) * 2012-11-22 2013-05-29 中国建筑第二工程局有限公司 High-rise building construction sump pit template
US8733727B2 (en) * 2011-02-15 2014-05-27 Hy-Rise Scaffolding Ltd. Connector for connecting perpendicular formwork panels in a formwork assembly
CN104452786A (en) * 2014-11-14 2015-03-25 武汉一冶建筑安装工程有限责任公司 Deep foundation pit elevator shaft sump dewatering construction method
CN105317205A (en) * 2014-06-09 2016-02-10 中建四局第六建筑工程有限公司 Elevator shaft construction method and used device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8733727B2 (en) * 2011-02-15 2014-05-27 Hy-Rise Scaffolding Ltd. Connector for connecting perpendicular formwork panels in a formwork assembly
CN202954570U (en) * 2012-11-22 2013-05-29 中国建筑第二工程局有限公司 High-rise building construction sump pit template
CN105317205A (en) * 2014-06-09 2016-02-10 中建四局第六建筑工程有限公司 Elevator shaft construction method and used device
CN104452786A (en) * 2014-11-14 2015-03-25 武汉一冶建筑安装工程有限责任公司 Deep foundation pit elevator shaft sump dewatering construction method

Also Published As

Publication number Publication date
CN105756341A (en) 2016-07-13

Similar Documents

Publication Publication Date Title
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN206784951U (en) Concrete placement floor thickness control device
CN105952154B (en) A kind of concrete-pouring template stent
CN107587713A (en) A kind of concrete panel expansion joint uses the two-sided anti-deformation construction method of interior formwork
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN103556819A (en) Construction method for reserving constructional column holes in beam plate
CN107083804B (en) A kind of wall structure column joint bar construction method
CN105756341B (en) A kind of installation steps of hoistway formwork
CN205025078U (en) Be applied to drawknot system that outside support body and major structure are connected
CN207633740U (en) The novel anchor of builder's jack
CN206625553U (en) For pouring the formwork bracing system of high-low bay structure simultaneously
CN211113683U (en) High slope dismounting-free light steel mould net self-compacting concrete frame slope protection structure
CN102383598A (en) Method for section construction of building project constructional column
CN105804396B (en) A kind of non-type, template system precast stair bench and construction can be had enough to meet the need
CN203285056U (en) Stair formwork supporting base
CN109853948A (en) The integrated template system and mold method of the cast-in-place overhanging windowsill of secondary structure
CN204059940U (en) A kind of concrete floor aluminum alloy mould plate
CN205476468U (en) Non - design, can all rotary die plate bodys be prefabricated staircase bench template
CN206408924U (en) Reusable cantilever frame embedded ring
CN205677156U (en) Hang mould special utility supporting steel bar
CN204001713U (en) V-type cylinder oblique line section concrete is built mould
CN204753398U (en) Construction equipment of trompil template leaking stoppage
CN204081482U (en) V-type cylinder transposition section concreting mould
CN205875724U (en) Concrete placement formwork support
CN105369816A (en) Formwork structure of cushion course of oblique side face of well pit foundation and construction method of formwork structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant