CN105040973B - Construction method of external decorative layer template of conical column of comprehensive gymnasium - Google Patents

Construction method of external decorative layer template of conical column of comprehensive gymnasium Download PDF

Info

Publication number
CN105040973B
CN105040973B CN201510470894.5A CN201510470894A CN105040973B CN 105040973 B CN105040973 B CN 105040973B CN 201510470894 A CN201510470894 A CN 201510470894A CN 105040973 B CN105040973 B CN 105040973B
Authority
CN
China
Prior art keywords
template
decorative layer
construction method
perforating
place
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510470894.5A
Other languages
Chinese (zh)
Other versions
CN105040973A (en
Inventor
高飞
李树成
王全逵
姜斌
刘坤
胡杭
高李军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, Fourth Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltc filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201510470894.5A priority Critical patent/CN105040973B/en
Publication of CN105040973A publication Critical patent/CN105040973A/en
Application granted granted Critical
Publication of CN105040973B publication Critical patent/CN105040973B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a cast-in-place concrete pouring device, in particular to a construction method of an external decorative layer template of a conical column of a comprehensive gymnasium. The outside decorative layer template is located the outside of outside decorative layer, and outside decorative layer template includes: the panel is a double-layer thick wood template, one surface of the panel facing the decorative layer is lined with a three-ply board, and one end of the counter-pulling screw rod is anchored on the conical concrete column to fix the panel and the back edge. The construction method of the template comprises the following steps: rechecking the structural size of the poured conical column, determining a template processing detailed diagram, manufacturing and assembling the template, drilling a template bolt, positioning the template for the first time, drilling the structural column along the reserved bolt hole of the template, retreating the template, implanting a sectional type screw rod, positioning the template for the second time, dismantling the template and the like. The plank sheathing panel and shaped steel fossil fragments mutually support, easily assemble, are fit for the changeable structural component of molding, and under the reasonable effectual condition of reinforcement and support, the shaping effect of component satisfies the designing requirement.

Description

The construction method of comprehensive gymnasium tapered pole outer decorative layer template
Technical field
The present invention relates to the device that a kind of cast-in-place concrete is poured, specially comprehensive gymnasium tapered pole outer decorative layer mould The construction method of plate.
Background technology
In the face of the special-shaped component of large space, often select to design and produce typified form by professional template producer, it is such as fixed Steel form, specialized factory's design advantage are that template system is more accurate, Stability Analysis of Structures, are constructed also more convenient, but construction costs It is higher, while typified form also has its limitation, irregular structure component is run into, on a production line also just cannot mechanical metaplasia Produce, professional template processing and fabricating occurs as soon as very big difficulty, it is impossible to solve problem, and the fabrication cycle of typified form is longer in addition, Can typically take certain duration, typified form can not repeating property, will also result in data waste.Therefore, how to find suitable Tapered pole outer decorative layer template and its construction method are closed, in becoming building engineering construction, is badly in need of the technical problem for solving.
The content of the invention
The present invention is directed to problem above, devises a kind of construction party of the template for the construction of tapered pole outer decorative layer Method.
Specifically solution is:Comprehensive gymnasium tapered pole outer decorative layer template, outer decorative layer template are externally-located On the outside of decorative layer, the outer decorative layer template includes cylinder template and cone template, the circular top surface of cylinder template For the bottom surface of cone template;Outer decorative layer template includes:Double-layer back plate, main joist channel-section steel back cord, secondary joist channel-section steel, a few words Beam back cord, square steel tube and Screw arbor with nut at both-ends, double-layer back plate are lined with three-ply board, one end anchoring of Screw arbor with nut at both-ends towards the one side of decorative layer On taper concrete column, respectively by main joist channel-section steel back cord, secondary joist channel-section steel, a few word beam back cords, square steel tube and double-layer back plate It is fixed on taper concrete column.
Further, the double-layer back plate of the outer decorative layer template is bilayer 15mm thickness plank sheathings, and double-layer back plate is towards dress Decorations are laminated to be lined with the thick three-ply boards of 3mm, forms the lines with wood grain effect;The plank sheathing of double-layer back plate is that thin-walled wood grain is clear Water coagulation clay model plate, vertical 40 × 60 × more than the 2 words beam back cord of double-layer back plate backing, horizontally arranged 8# channel-section steels@500 is used as water Flat secondary joist, back cord is using double 14# channel-section steels as main joist;Screw arbor with nut at both-ends is three-stage screw.
The invention also discloses the construction method of comprehensive gymnasium tapered pole outer decorative layer template, comprises the steps:
1)Check the physical dimension for pouring tapered pole:Must be simulated by entity, and after field measurement actual quantities is errorless, side The in-depth and processing of template can be carried out;
2) with reference to drawing and check size and determine template shop detail drawing:According to the field data for having determined, with reference to drawing, Digitization setting-out is carried out, it is determined that final template shop detail drawing;
3)Template construct and assembly:Template construct should be constructed in strict accordance with the material required by scheme, to ensure to have enough Intensity.
4)Template bolt perforating:Bolt pitch of holes is complex-shaped due to tapered pole, it is impossible to accurately draw expanded view, so must The arrangement of palpus field lofting bolt hole, setting-out layout viewing can carry out punching work Jing after each side's confirmation.Punching diameter control exists 25mm, the angle in order to adjust segmented screw are attached reinforcing.
5)Template is in place for the first time:Scene puts sample well according to reinforcement location, and line alignment in template highest and lowest portion is carried out Template is fixed temporarily, and temporary support bar is arranged on pillar, it is ensured that template is not moved.And interim fixing point is protected, It is in place for the second time to ensure;
6)Along template prepared screw-bolt hole to structural column perforating:Along template bolt hole to pillar perforating, perforating depth 300mm, arranges labelling, it is ensured that perforating depth is accurate on drill bit during perforating;
7)Template is given up the throne:Template is withdrawn from using the movable pulley and crane of template itself, must be utilized when noting handling Suspension hook position in template, and lifted by special messenger commander, forbid template to collide outrigger and building;
8)Implantation stagewise screw rod:Implantation stagewise screw rod before note cleaning out bolt hole after can bar planting, bar planting Xoncrete structure post-anchoring technology requirement should be met;
9)Template is in place for the second time:Template is in place for the second time, it is ensured that primary template contral point does not change, really Protect in place twice identical.
10)Form removable:After the completion of concreting, two days form removals, are removed from top to bottom, and crane hangs up properly suspension hook → carry out temporary support → dismounting primary and secondary skeletal frame → dismounting temporary support → lifting demoulding.
Further, in the step 3)In, after form surfacing assembly is complete, before patch three-ply board, it is necessary in template entity Upper measurement quadrat sampling, setting-out result must be obtained, and management, school side, design and construction over contract side can carry out three-ply board after confirming Splicing, after the completion of three-ply board splicing, is confirmed by management, school side, design and total bag jointly, after getting the nod, can put into scene Carry out subsequent construction.
Further, in the step 4)In, template perforating is using target drill from the outside perforating in three-ply board side, it is to avoid three Plywood is damaged.
Further, in the step 9)In, should check all templates before concreting in advance, have space to all Position foamed glue closing avoids running pulp.
Further, in the step 10)In, during form removal, operator should stand in safe place, to avoid security incident; Should trying not during form removal, it is too urgent to overexert, and forbids to be pounded with sledgehammer and crowbar firmly and strikes firmly, in case concrete surface or template are received To damage.
Further, in the step 10)In, the template pulled down and its accessory are forbidden disorderly to throw and are thrown out without care, should have special messenger to scoop out biography Pass, stack by appointed place, and cleaning in time, maintenance and brush interleaving agent, in case being used in turn.
Further, in the step 10)In, during form removal, such as find that concrete has an impact the quality of structure safety During problem, should stop removing, after treatment, can just continue to remove.
Beneficial effect:Plank sheathing panel is cooperated with shaped steel Os Draconis, it is easy to assembled, is adapted to the changeable structure structure of moulding Part, under the conditions of reinforcing and support is rationally effective, stiffness by itself disclosure satisfy that fixed needs, and the molding effect of component meets Design requirement, and plate body system is relatively low relative to typified form cost.
Description of the drawings
Fig. 1 is the horizontal first time formwork figure of tapered pole outer decorative layer template;
Fig. 2 is the horizontal second formwork figure of tapered pole outer decorative layer template;
Fig. 3 is the vertical first time formwork figure of tapered pole outer decorative layer template;
Fig. 4 is the vertical second formwork figure of tapered pole outer decorative layer template;
Fig. 5 is tapered pole outer decorative layer template formwork part plan enlarged drawing;
In figure, 11- double-layer back plates;12- channel-section steel back cords;13- Screw arbor with nut at both-ends;131- high-strength bolt silks end;The high-strength cones of 132- Forming head;The high-strength pre-embedded bolts of 133-;14- secondary joist channel-section steels;2- outer decorative layers;3- taper concrete columns;4- back cords;5 square steel Pipe;More than 6 word beam back cords.
Specific embodiment
Below in conjunction with the accompanying drawings, the specific embodiment of the present invention is illustrated.
As Figure 1-Figure 2,:Comprehensive gymnasium tapered pole outer decorative layer template, outer decorative layer template are externally-located On the outside of decorative layer 2, the outer decorative layer template includes cylinder template and cone template, the circular top surface of cylinder template For the bottom surface of cone template;Outer decorative layer template includes:Double-layer back plate 11, main joist channel-section steel back cord 12, secondary joist channel-section steel 14th, a few word beam back cords 6, square steel tube 5 and Screw arbor with nut at both-ends 13, double-layer back plate 11 are lined with three-ply board towards the one side of decorative layer, to drawing One end of screw rod 13 is anchored on taper concrete column 3, respectively by main joist channel-section steel back cord 12, secondary joist channel-section steel 14, a few word beams Back cord 6, square steel tube 5 and double-layer back plate 11 are fixed on taper concrete column 3.
Further, the double-layer back plate 11 of the outer decorative layer template is bilayer 15mm thickness plank sheathings, 11 face of double-layer back plate To the laminated three-ply board for being lined with 3mm thickness is decorated, the lines with wood grain effect is formed;The plank sheathing of double-layer back plate 11 is thin-walled Ascast finish concrete template with wood grain, vertical 40 × 60 × more than the 2 words beam back cord 6 of 11 backing of double-layer back plate, horizontally arranged 8# channel-section steels According to interval 500mm arrangements as horizontal secondary joist, back cord 12 is using double 14# channel-section steels as main joist;Screw arbor with nut at both-ends 13 is three Segmentation screw rod.
The construction method of tapered pole outer decorative layer template, comprises the steps:
1)Check the physical dimension for pouring tapered pole:Must be simulated by BIM entities, and field measurement actual quantities is errorless Afterwards, the in-depth and processing of template can be carried out;
2) with reference to drawing and check size and determine template shop detail drawing:According to the field data for having determined, with reference to drawing, Digitization setting-out is carried out using BIM technology and cad, it is determined that final template shop detail drawing;
3)Template construct and assembly:Template construct should be constructed in strict accordance with the material required by scheme, to ensure to have enough Intensity.Form surfacing it is assembled it is complete after, before patch three-ply board, it is necessary to which, in template physically surveying and locating, setting-out result must be levied , management, school side, design and construction over contract side can carry out the splicing of three-ply board after confirming, after the completion of three-ply board splicing, by Management, school side, design and the common confirmation of total bag, after getting the nod, can put into scene carries out subsequent construction.
4)Template bolt perforating:Bolt pitch of holes is complex-shaped due to tapered pole, it is impossible to accurately draw expanded view, so must The arrangement of palpus field lofting bolt hole, setting-out layout viewing can carry out punching work Jing after each side's confirmation.Punching diameter control exists 25mm, the angle in order to adjust segmented screw are attached reinforcing.Template perforating is lateral from three-ply board one using target drill Outer perforating, it is to avoid three-ply board is damaged.
5)Template is in place for the first time:Scene puts sample well according to reinforcement location, and line alignment in template highest and lowest portion is carried out Template is fixed temporarily, and temporary support bar is arranged on pillar, it is ensured that template is not moved.And interim fixing point is protected, It is in place for the second time to ensure;
6)Along template prepared screw-bolt hole to structural column perforating:Along template bolt hole to pillar perforating, perforating depth 300mm, arranges labelling, it is ensured that perforating depth is accurate on drill bit during perforating;
7)Template is given up the throne:Template is withdrawn from using the movable pulley and crane of template itself, must be utilized when noting handling Suspension hook position in template, and lifted by special messenger commander, forbid template to collide outrigger and building;
8)Implantation stagewise screw rod:Implantation stagewise screw rod before note cleaning out bolt hole after can bar planting, bar planting It is required to meet the requirement of specification xoncrete structure post-anchoring technology code JGJ145-2013;
9)Template is in place for the second time:Template is in place for the second time, it is ensured that primary template contral point does not change, really Protect in place twice identical.All templates should be checked before concreting in advance, all positions for having space are sealed with foamed glue Close and avoid running pulp.
10)Form removable:After the completion of concreting, two days form removals, are removed from top to bottom, and crane hangs up properly suspension hook → carry out temporary support → dismounting primary and secondary skeletal frame → dismounting temporary support → lifting demoulding.During form removal, operator should stand in peace It is complete to locate, to avoid security incident;Should trying not during form removal, it is too urgent to overexert, and forbids to be pounded with sledgehammer and crowbar firmly and strikes firmly, In case concrete surface or template are damaged.The template pulled down and its accessory, forbid disorderly to throw and throw out without care, should have special messenger to scoop out biography Pass, stack by appointed place, and cleaning in time, maintenance and brush interleaving agent, in case being used in turn.During form removal, such as find When concrete has an impact the quality problems of structure safety, should stop removing, after treatment, can just continue to remove.

Claims (7)

1. the construction method of comprehensive gymnasium tapered pole outer decorative layer template, it is characterised in that comprise the steps:
1)Check the physical dimension for pouring tapered pole:Must be simulated by entity, and after field measurement actual quantities is errorless, Fang Kejin The in-depth and processing of row template;
2) with reference to drawing and check size and determine template shop detail drawing:According to the field data for having determined, with reference to drawing, carry out Digitization setting-out, it is determined that final template shop detail drawing;
3)Template construct and assembly:Template construct should be constructed in strict accordance with the material required by scheme, to ensure to have enough strong Degree;
4)Template bolt perforating:Bolt pitch of holes is complex-shaped due to tapered pole, it is impossible to accurately draw expanded view, so must show The arrangement of field setting-out bolt hole, setting-out layout viewing can carry out punching work Jing after each side's confirmation;
In 25mm, the angle in order to adjust segmented screw is attached reinforcing to punching diameter control;
5)Template is in place for the first time:Scene puts sample well according to reinforcement location, and line alignment in template highest and lowest portion is carried out template It is interim fixed, and temporary support bar is set on pillar, it is ensured that template is not moved;
And interim fixing point is protected, it is in place for the second time to ensure;
6)Along template prepared screw-bolt hole to structural column perforating:Along template bolt hole to pillar perforating, perforating depth 300mm, beat Labelling is at the moment set on drill bit, it is ensured that perforating depth is accurate;
7)Template is given up the throne:Template is withdrawn from using the movable pulley and crane of template itself, template when noting handling, must be utilized On suspension hook position, and by special messenger commander lift, forbid template to collide outrigger and building;
8)Implantation stagewise screw rod:After noting cleaning out bolt hole before implantation stagewise screw rod can bar planting, bar planting should expire Sufficient xoncrete structure post-anchoring technology is required;
9)Template is in place for the second time:Template is in place for the second time, it is ensured that primary template contral point does not change, it is ensured that two It is secondary in place identical;
10)Form removable:After the completion of concreting, two days form removals, are removed from top to bottom, and crane hangs up properly suspension hook → do Good temporary support → dismounting primary and secondary skeletal frame → dismounting temporary support → lifting demoulding.
2. construction method according to claim 1, it is characterised in that in the step 3)In, after form surfacing assembly is complete, Before patch three-ply board, it is necessary to physically measure quadrat sampling in template, setting-out result must be obtained, and management, school side, design and construction are total Contractor can carry out the splicing of three-ply board after confirming, after the completion of three-ply board splicing, common by management, school side, design and total bag Confirm, after getting the nod, can put into scene carries out subsequent construction.
3. construction method according to claim 1, it is characterised in that in the step 4)In, template perforating is using special Drill bit is from the outside perforating in three-ply board side, it is to avoid three-ply board is damaged.
4. construction method according to claim 1, it is characterised in that in the step 9)In, should before concreting All templates are checked in advance, and running pulp is avoided to all position foamed glue closings for having space.
5. construction method according to claim 1, it is characterised in that in the step 10)In, during form removal, operator Should stand in safe place, to avoid security incident;Should trying not during form removal, it is too urgent to overexert, and forbids hard with sledgehammer and crowbar Pound and strike firmly, in case concrete surface or template are damaged.
6. construction method according to claim 1, it is characterised in that in the step 10)In, the template pulled down and its match somebody with somebody Part, forbids disorderly to throw and throws out without care, should have special messenger to scoop out transmission, stack by appointed place, and cleaning in time, maintenance and brush interleaving agent, with It is standby to be used in turn.
7. construction method according to claim 1, it is characterised in that in the step 10)In, during form removal, such as It was found that when concrete has an impact the quality problems of structure safety, should stop removing, after treatment, can just continue to remove.
CN201510470894.5A 2015-08-05 2015-08-05 Construction method of external decorative layer template of conical column of comprehensive gymnasium Expired - Fee Related CN105040973B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510470894.5A CN105040973B (en) 2015-08-05 2015-08-05 Construction method of external decorative layer template of conical column of comprehensive gymnasium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510470894.5A CN105040973B (en) 2015-08-05 2015-08-05 Construction method of external decorative layer template of conical column of comprehensive gymnasium

Publications (2)

Publication Number Publication Date
CN105040973A CN105040973A (en) 2015-11-11
CN105040973B true CN105040973B (en) 2017-04-26

Family

ID=54447914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510470894.5A Expired - Fee Related CN105040973B (en) 2015-08-05 2015-08-05 Construction method of external decorative layer template of conical column of comprehensive gymnasium

Country Status (1)

Country Link
CN (1) CN105040973B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370037A (en) * 2015-11-24 2016-03-02 上海市安装工程集团有限公司 Large steel die and manufacturing and use method thereof
CN105464401B (en) * 2016-01-06 2018-09-04 中国建筑第八工程局有限公司 Unilateral formwork supporting structure and construction method for enlarging section strengthening construction
CN109184196B (en) * 2018-10-09 2023-10-13 中国五冶集团有限公司 Formwork structure and method for concrete pouring of oblique arch surface structure
CN113482326A (en) * 2021-06-01 2021-10-08 上海宝冶集团有限公司 Method for erecting arc formwork of bare concrete diaphragm wall

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2119460U (en) * 1991-09-28 1992-10-21 福建省第二建筑工程公司 Assembled permanent reinforced concrete form
CN2537780Y (en) * 2002-04-04 2003-02-26 权县民 Adjustable building garden formwork
CN102787716B (en) * 2012-08-22 2014-07-23 中建一局华江建设有限公司 European hollow-out plate pinnacle modeling structure template system and construction method
CN203213591U (en) * 2012-12-27 2013-09-25 上海建工七建集团有限公司 Beam-free turbinate column cap structure template system
CN103276895B (en) * 2013-06-06 2015-06-10 金陵科技学院 Die supporting method of reversed-cone-shaped column cap die
CN205012621U (en) * 2015-08-05 2016-02-03 中国建筑第二工程局有限公司 Template is pour to outside decorative layer of toper post

Also Published As

Publication number Publication date
CN105040973A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN105040973B (en) Construction method of external decorative layer template of conical column of comprehensive gymnasium
CN209585294U (en) A kind of tower crane attachment pre-embedded device based on aluminum dipping form construction
CN109208790B (en) Single-side formwork erecting construction method for arc shear wall
CN104631706A (en) Form-removal-free concrete column and constructing method thereof
CN102619152A (en) Split mounting type prefabricated reinforced concrete construction temporary road
CN108756291B (en) Large-tonnage concrete column replacement reinforcement structure and reinforcement method
CN103469806A (en) Construction method for replacing brick forming die with prefabricated concrete foundation bearing platform side die
CN108894488A (en) A kind of construction method of Novel section steel keel steel and wood composite template
CN102383433A (en) Design method for large deep foundation pit of super high-rise building
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN204571288U (en) Floor slab preformed hole mould
CN209855277U (en) Conversion layer structure for underground added layer of existing building
CN205934713U (en) Prefabricated pin -connected panel anticollision wall
CN104675112A (en) Steel stair formwork and constructing method for once pouring forming of building staircase
CN106285002A (en) Cast-in-place walls difference of height tool-type hoisting die construction method
CN103590599A (en) Self-compaction mode locking device and using method
CN205012621U (en) Template is pour to outside decorative layer of toper post
CN109372003B (en) Deep cup rim template of bearing platform foundation and construction method for removing cup rim template
CN106522544A (en) Root-rotting-preventing compensating device for formwork
CN111519623A (en) Prefabricated pile cap for detecting bearing capacity of pile body and construction method
CN106836198A (en) Positioner combined steel formwork bored concrete pile and construction method
CN204626965U (en) For the steel stair template of poured up at a time between architectural stair
CN205975995U (en) Cast -in -place concrete floor indent steel tube frame
CN210685368U (en) Convenient reinforcing complete die set for concrete wall formworks on two sides of deformation joint
JP2016003444A (en) Parting member and pile head treatment method for on-site constructed pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant