WO2020149214A1 - 極低温冷凍機の起動方法、極低温冷凍機 - Google Patents

極低温冷凍機の起動方法、極低温冷凍機 Download PDF

Info

Publication number
WO2020149214A1
WO2020149214A1 PCT/JP2020/000516 JP2020000516W WO2020149214A1 WO 2020149214 A1 WO2020149214 A1 WO 2020149214A1 JP 2020000516 W JP2020000516 W JP 2020000516W WO 2020149214 A1 WO2020149214 A1 WO 2020149214A1
Authority
WO
WIPO (PCT)
Prior art keywords
pressure
pressure line
compressor
high pressure
cold head
Prior art date
Application number
PCT/JP2020/000516
Other languages
English (en)
French (fr)
Inventor
秀司 大山
Original Assignee
住友重機械工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 住友重機械工業株式会社 filed Critical 住友重機械工業株式会社
Priority to EP20741716.3A priority Critical patent/EP3913300A4/en
Priority to CN202080009088.7A priority patent/CN113302439B/zh
Publication of WO2020149214A1 publication Critical patent/WO2020149214A1/ja
Priority to US17/371,137 priority patent/US12007152B2/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • F25B49/022Compressor control arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B9/00Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point
    • F25B9/14Compression machines, plants or systems, in which the refrigerant is air or other gas of low boiling point characterised by the cycle used, e.g. Stirling cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2309/00Gas cycle refrigeration machines
    • F25B2309/14Compression machines, plants or systems characterised by the cycle used 
    • F25B2309/1427Control of a pulse tube
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2309/00Gas cycle refrigeration machines
    • F25B2309/14Compression machines, plants or systems characterised by the cycle used 
    • F25B2309/1428Control of a Stirling refrigeration machine
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/26Problems to be solved characterised by the startup of the refrigeration cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/021Inverters therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/024Compressor control by controlling the electric parameters, e.g. current or voltage
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/193Pressures of the compressor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/193Pressures of the compressor
    • F25B2700/1931Discharge pressures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/193Pressures of the compressor
    • F25B2700/1933Suction pressures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures
    • F25B2700/2104Temperatures of an indoor room or compartment

Definitions

  • the present invention relates to a method for starting a cryogenic refrigerator and a cryogenic refrigerator.
  • ⁇ Cryogenic refrigerators are used to cool various objects such as superconducting devices, measuring instruments, and samples used in cryogenic environments.
  • cryogenic refrigerator In order to cool an object with a cryogenic refrigerator, first, the cryogenic refrigerator must be started and the cryogenic refrigerator must be cooled from the initial temperature such as room temperature to the target cryogenic temperature. This is also referred to as cryogenic cooldown. Since the cooldown is just a preparation for starting the cooling of the object, it is desirable that the time required is as short as possible.
  • One of the exemplary purposes of an aspect of the present invention is to shorten the cooldown time of a cryogenic refrigerator.
  • a method for starting a cryogenic refrigerator includes a compressor, a cold head, a high pressure line that supplies a refrigerant gas from the compressor to the cold head, and a low pressure line that recovers the refrigerant gas from the cold head to the compressor.
  • This method involves increasing the volume of the high pressure line when the cold head is at room temperature, and after increasing the volume of the high pressure line, based on the pressure of the high pressure line or the differential pressure between the high pressure line and the low pressure line.
  • a cryogenic refrigerator includes a compressor, a cold head, a high pressure line for supplying a refrigerant gas from the compressor to the cold head, and a low pressure line for collecting the refrigerant gas from the cold head to the compressor. And a pressure sensor that measures the pressure in the high pressure line or the differential pressure between the high pressure line and the low pressure line, the compressor controller that controls the operating frequency of the compressor based on the pressure measured by the pressure sensor, and the cold head from room temperature.
  • a buffer volume connected to the high pressure line when cooled to a cryogenic temperature and disconnected from the high pressure line when the cold head is maintained at a cryogenic temperature.
  • a cryogenic refrigerator includes a compressor, a cold head, a high pressure line for supplying a refrigerant gas from the compressor to the cold head, and a low pressure line for collecting the refrigerant gas from the cold head to the compressor. And a pressure sensor for measuring the pressure of the high-pressure line or the differential pressure between the high-pressure line and the low-pressure line, and a compressor controller for controlling the operating frequency of the compressor based on the pressure measured by the pressure sensor.
  • the volume of the high pressure line is larger than the volume of the low pressure line.
  • the cool down time of the cryogenic refrigerator can be shortened.
  • FIGS. 1 and 2 are diagrams schematically showing a cryogenic refrigerator 10 according to the first embodiment.
  • FIG. 1 shows the cool-down operation of the cryogenic refrigerator 10
  • FIG. 2 shows the normal cooling operation of the cryogenic refrigerator 10.
  • the cryogenic refrigerator 10 shown in FIGS. 1 and 2 is the same, except that the high pressure side pipe of the cryogenic refrigerator 10 is replaced and the refrigerant gas volume on the high pressure side is different.
  • the cryogenic refrigerator 10 is rapidly cooled from the initial temperature at or near room temperature to the target cooling temperature.
  • the target cooling temperature is selected from a superconducting device such as a superconducting magnet or a desired cryogenic temperature for cooling other objects to be cooled.
  • the normal cooling operation is performed following the cool down operation so as to maintain the cryogenic refrigerator 10 at the target cooling temperature.
  • the object to be cooled can be operated.
  • cooldown operation is performed.
  • the refrigerant gas volume on the high pressure side in the cool-down operation is increased compared to the normal cooling operation.
  • the refrigerant gas volume on the high pressure side is increased as compared with that on the low pressure side.
  • the cryogenic refrigerator 10 includes a compressor 12 and a cold head 14.
  • the compressor 12 is configured to collect the working gas of the cryogenic refrigerator 10 from the cold head 14, pressurize the collected working gas, and supply the working gas to the cold head 14 again.
  • the cold head 14 is also called an expander, and has a room temperature part 14a and a low temperature part 14b also called a cooling stage.
  • the compressor 12 and the cold head 14 constitute a refrigeration cycle of the cryogenic refrigerator 10, whereby the low temperature portion 14b is cooled to a desired cryogenic temperature.
  • the working gas also referred to as the refrigerant gas, is typically helium gas, but any other suitable gas may be used. For the sake of understanding, the flow direction of the working gas is shown by an arrow in FIG.
  • the cryogenic refrigerator 10 is, for example, a single-stage or two-stage Gifford-McMahon (GM) refrigerator, but a pulse tube refrigerator, a Stirling refrigerator, or another type of cryogenic refrigerator. It may be a refrigerator.
  • the cold head 14 has different configurations depending on the type of the cryogenic refrigerator 10, but the compressor 12 can use the configuration described below regardless of the type of the cryogenic refrigerator 10.
  • the pressure of the working gas supplied from the compressor 12 to the cold head 14 and the pressure of the working gas recovered from the cold head 14 to the compressor 12 are both considerably higher than the atmospheric pressure, and the first high pressure and the high pressure, respectively. It can be called the second high pressure.
  • the first high pressure and the second high pressure are also simply referred to as high pressure and low pressure, respectively.
  • the high pressure is, for example, 2-3 MPa.
  • the low pressure is, for example, 0.5 to 1.5 MPa, and is, for example, about 0.8 MPa.
  • the compressor 12 includes a discharge port 18, a suction port 19, a high pressure passage 20, a low pressure passage 21, a first pressure sensor 22, a second pressure sensor 23, a compressor body 25, and a compressor housing 26.
  • the discharge port 18 is installed in the compressor housing 26 as a working gas discharge port of the compressor 12
  • the suction port 19 is installed in the compressor housing 26 as a working gas suction port of the compressor 12.
  • the high-pressure flow passage 20 connects the discharge port of the compressor body 25 to the discharge port 18, and the low-pressure flow passage 21 connects the suction port 19 to the suction port of the compressor body 25.
  • the compressor housing 26 houses the high pressure flow path 20, the low pressure flow path 21, the first pressure sensor 22, the second pressure sensor 23, and the compressor body 25.
  • the compressor 12 is also called a compressor unit.
  • the compressor body 25 is configured to internally compress the working gas sucked from its suction port and discharge it from the discharge port.
  • the compressor body 25 may be, for example, a scroll type, a rotary type, or another pump that pressurizes the working gas.
  • the compressor body 25 may be configured to discharge a fixed and constant working gas flow rate. Alternatively, the compressor body 25 may be configured to change the flow rate of the working gas to be discharged.
  • the compressor body 25 may be referred to as a compression capsule.
  • the first pressure sensor 22 is arranged in the high pressure flow passage 20 so as to measure the pressure of the working gas flowing in the high pressure flow passage 20.
  • the first pressure sensor 22 is configured to output a first measured pressure signal P1 representing the measured pressure.
  • the second pressure sensor 23 is arranged in the low pressure passage 21 so as to measure the pressure of the working gas flowing in the low pressure passage 21.
  • the second pressure sensor 23 is configured to output a second measured pressure signal P2 representing the measured pressure. Therefore, the first pressure sensor 22 and the second pressure sensor 23 can also be called a high pressure sensor and a low pressure sensor, respectively. Further, in this document, either the first pressure sensor 22 or the second pressure sensor 23, or both of them may be collectively referred to as “pressure sensor”.
  • the pressure sensor may include a differential pressure sensor.
  • the differential pressure sensor may be provided, for example, in a bypass line that connects the high-pressure flow passage 20 and the low-pressure flow passage 21 so as to bypass the compressor body 25.
  • the differential pressure sensor is configured to measure a high pressure and a low pressure differential of the working gas in the cryogenic refrigerator 10 and output a measured differential pressure signal representing the measured differential pressure.
  • the differential pressure sensor may be provided instead of or in addition to the high pressure sensor and the low pressure sensor.
  • the compressor 12 may have various other constituent elements.
  • the high pressure flow path 20 may be provided with an oil separator, an adsorber, or the like.
  • the low pressure flow path 21 may be provided with a storage tank and other components.
  • the compressor 12 may be provided with an oil circulation system for cooling the compressor body 25 with oil, a cooling system for cooling the oil, and the like.
  • the cryogenic refrigerator 10 includes a main switch 28.
  • the main switch 28 is provided with an operation tool such as an operation button or a switch that can be manually operated, and when operated, the cryogenic refrigerator 10 is started and its operation is started.
  • the main switch 28 may function not only as a start switch of the cryogenic refrigerator 10 but also as a stop switch of the cryogenic refrigerator 10.
  • the main switch 28 is installed in the compressor housing 26, for example.
  • the cold head 14 includes a cold head temperature sensor 30 attached to the low temperature part 14b.
  • the cold head temperature sensor 30 is configured to output a measured temperature signal T1 representing the measured temperature of the low temperature portion 14b.
  • the cryogenic refrigerator 10 also includes a piping system 34 that circulates a working gas between the compressor 12 and the cold head 14.
  • the piping system 34 includes a high pressure line 35 that supplies the working gas from the compressor 12 to the cold head 14, and a low pressure line 36 that recovers the working gas from the cold head 14 to the compressor 12.
  • the room temperature portion 14 a of the cold head 14 includes a high pressure port 37 and a low pressure port 38.
  • the high pressure port 37 is connected to the discharge port 18 by a first high pressure pipe 39a or a second high pressure pipe 39b.
  • the first high-pressure pipe 39a is used for cooldown operation.
  • the second high-pressure pipe 39b is used for normal cooling operation.
  • the first high-pressure pipe 39a and the second high-pressure pipe 39b may be collectively referred to as the high-pressure pipe 39.
  • the low pressure port 38 is connected to the suction port 19 by a low pressure pipe 40.
  • the working gas collected from the cold head 14 to the compressor 12 enters the suction port 19 of the compressor 12 from the low pressure port 38 of the cold head 14 through the low pressure pipe 40, and further returns to the compressor body 25 via the low pressure flow passage 21.
  • the compressor body 25 compresses and raises the pressure.
  • the working gas supplied from the compressor 12 to the cold head 14 exits from the discharge port 18 of the compressor 12 through the high pressure passage 20 from the compressor body 25, and further passes through the high pressure pipe 39 and the high pressure port 37 of the cold head 14. It is supplied to the cold head 14.
  • the high-pressure pipe 39 and the low-pressure pipe 40 are flexible pipes, but may be rigid pipes.
  • Detachable joints are provided at both ends of the high-pressure pipe 39 and the low-pressure pipe 40.
  • the discharge port 18 and the high pressure port 37 are provided with detachable joints at both ends of the high pressure pipe 39, and the suction port 19 and the low pressure port 38 are provided with detachable joints at both ends of the low pressure pipe 40.
  • the removable joint is, for example, a self-sealing coupling. Therefore, the high-pressure pipe 39 and the low-pressure pipe 40 are detachably attached to the compressor 12 and the cold head 14.
  • the volume of the high pressure line 35 in the cool down operation is larger than the volume of the high pressure line 35 in the normal cooling operation.
  • the volume of the first high-pressure pipe 39a is larger than the volume of the second high-pressure pipe 39b.
  • the first high pressure pipe 39a is thicker than the second high pressure pipe 39b.
  • the nominal diameter D1 of the first high-pressure pipe 39a is larger than the nominal diameter D2 of the second high-pressure pipe 39b.
  • the first high-pressure pipe 39a may be a pipe having a nominal diameter one or two larger than that of the second high-pressure pipe 39b.
  • the first high-pressure pipe 39a may be longer than the second high-pressure pipe 39b. 1 and 2, the length L1 of the first high-pressure pipe 39a is equal to the length L2 of the second high-pressure pipe 39b, but for example, the length L1 of the first high-pressure pipe 39a is equal to that of the second high-pressure pipe 39b. It may be in the range of 1 to 2 times the length L2.
  • the volume of the high pressure line 35 is larger than that of the low pressure line 36.
  • the volume of the first high-pressure pipe 39a is larger than the volume of the low-pressure pipe 40.
  • the first high-pressure pipe 39a is thicker than the low-pressure pipe 40.
  • the nominal diameter D1 of the first high-pressure pipe 39a is larger than the nominal diameter D3 of the low-pressure pipe 40.
  • the first high-pressure pipe 39a may be a pipe having a nominal diameter one or two larger than that of the low-pressure pipe 40.
  • the first high-pressure pipe 39a may be longer than the low-pressure pipe 40.
  • the first high-pressure pipe 39a and the low-pressure pipe 40 have the same length.
  • the length L1 of the first high-pressure pipe 39a is in the range of 1 to 2 times the length L3 of the low-pressure pipe 40. Good.
  • the high pressure line 35 and the low pressure line 36 have the same volume.
  • the second high-pressure pipe 39b has the same volume as the low-pressure pipe 40.
  • the second high-pressure pipe 39b has the same thickness and the same length as the low-pressure pipe 40.
  • the volume of the high pressure line 35 may be larger than the volume of the low pressure line 36 not only in the cool down operation but also in the normal cooling operation.
  • the first high-pressure pipe 39a may be used in both the cooldown operation and the normal cooling operation.
  • the volume of the high pressure line does not change according to the operating conditions.
  • the volume of the high pressure line is equal to the volume of the low pressure line.
  • the high-pressure side pipe and the low-pressure side pipe that connect the compressor and the cold head have the same dimensions (thickness, length, etc.).
  • the volume of the high pressure line 35 can be defined as the volume of piping from the discharge port 18 to the high pressure port 37.
  • the high-pressure flow passage 20 inside the compressor 12 and the internal flow passage of the cold head 14 are not included in the high-pressure line 35. Therefore, the volume of the high-pressure line 35 can substantially correspond to the volume of the high-pressure pipe 39 (that is, either the first high-pressure pipe 39a or the second high-pressure pipe 39b).
  • the volume of the low pressure line 36 can be defined as the piping volume from the suction port 19 to the low pressure port 38.
  • the low-pressure flow passage 21 inside the compressor 12 and the internal flow passage of the cold head 14 are not included in the low-pressure line 36. Therefore, the volume of the low-pressure line 36 can substantially correspond to the volume of the low-pressure pipe 40.
  • FIG. 3 is a block diagram of the cryogenic refrigerator 10.
  • the cryogenic refrigerator 10 includes a control device 50 that controls the cryogenic refrigerator 10.
  • the control device 50 includes a compressor controller 60 and a compressor inverter 62.
  • the control device 50 may be mounted on the compressor 12.
  • the compressor body 25 includes a compressor motor 64 that drives the compressor body 25.
  • the first pressure sensor 22 and the second pressure sensor 23 are communicatively connected to the control device 50, and output the first measurement pressure signal P1 and the second measurement pressure signal P2 to the control device 50.
  • Each cold head temperature sensor 30 is communicatively connected to the controller 50 and outputs a measured temperature signal T1 to the controller 50.
  • the compressor controller 60 controls the operating frequency of the compressor 12 based on the pressure measured by the first pressure sensor 22 or the differential pressure measured by the first pressure sensor 22 and the second pressure sensor 23.
  • the operating frequency of the compressor 12 corresponds to, for example, the frequency of the electric power supplied to the compressor motor 64, and indicates the operating frequency or the rotation speed of the compressor motor 64.
  • the compressor controller 60 determines the operating frequency of the compressor 12, and generates the inverter control signal S1 according to the determined operating frequency of the compressor 12.
  • the compressor inverter 62 generates a motor drive signal S2 from input power from an external power supply such as a commercial power supply according to the inverter control signal S1, and outputs the motor drive signal S2 to the compressor motor 64.
  • the compressor motor 64 is driven by the motor drive signal S2.
  • the compressor motor 64 is driven at the operating frequency determined by the compressor controller 60.
  • the main switch 28 is configured to output a start command signal S3 to the control device 50 when operated.
  • the compressor controller 60 receives the start command signal S3 and starts controlling the compressor 12.
  • the control device 50 is realized by an element or a circuit such as a CPU and a memory of a computer as a hardware configuration, and is realized by a computer program or the like as a software configuration.
  • FIG. It is drawn as a functional block. Those skilled in the art will understand that these functional blocks can be realized in various ways by combining hardware and software.
  • FIG. 4 is a flowchart illustrating a pressure control method for the cryogenic refrigerator 10.
  • the compressor controller 60 of the controller 50 is configured to perform the pressure control process of the piping system 34 described below.
  • the pressure control of the piping system 34 is repeatedly executed at a predetermined cycle during the operation of the cryogenic refrigerator 10.
  • the pressure of the piping system 34 is measured (S10).
  • the pressure in the piping system 34 is measured using a pressure sensor.
  • the compressor controller 60 acquires the measurement pressure PM of the piping system 34 from the first measurement pressure signal P1 and/or the second measurement pressure signal P2.
  • the measured pressure PM of the piping system 34 is compared with the target pressure PT (S12).
  • the target pressure PT of the piping system 34 is previously input to the control device 50 by the user of the cryogenic refrigerator 10 or is automatically set by the control device 50 and stored in the control device 50.
  • the compressor controller 60 compares the measured pressure PM with the target pressure PT, and outputs the magnitude relationship between the two as a comparison result. That is, the comparison result by the compressor controller 60 is as follows: (i) the measured pressure PM is larger than the target pressure PT, (ii) the measured pressure PM is smaller than the target pressure PT, and (iii) the measured pressure PM is Indicates one of the values equal to the target pressure PT.
  • the compressor controller 60 determines the operating frequency of the compressor 12 based on the comparison result of the measured pressure PM and the target pressure PT. As described above, the compressor motor 64 is operated at the determined operating frequency. As a result, the measured pressure PM of the piping system 34 changes so as to approach the target pressure PT. In this way, pressure control of the piping system 34 is provided and the measured pressure PM of the piping system 34 can be made to follow the target pressure PT.
  • the compressor controller 60 reduces the operating frequency of the compressor 12 (S14).
  • the compressor controller 60 increases the operating frequency of the compressor 12 (S16).
  • the measured pressure PM is equal to the target pressure PT, there is no need to increase or decrease the operating frequency, so the operating frequency is maintained.
  • the amount of change in the operating frequency of the compressor 12 may be determined (for example, by PID control) based on the deviation between the measured pressure PM and the target pressure PT.
  • the amount of change in the operating frequency of the compressor 12 may be a preset magnitude.
  • An example of pressure control of the piping system 34 is high pressure control that maintains the working gas pressure of the high pressure line 35 at a target value.
  • the measurement value of the first pressure sensor 22 is used as the measurement pressure PM.
  • the operating frequency of the compressor 12 is reduced (increased) to make the measured pressure PM smaller (larger) closer to the target pressure PT.
  • the value of the target pressure PT used for high pressure control may be a relatively large value in the allowable pressure range.
  • Such an allowable pressure range is typically a pressure range in which the compressor 12 can be operated, and is predetermined as a specification of the compressor 12.
  • the value of the target pressure PT may be, for example, 80% or more or 90% or more of the upper limit value of the allowable pressure range, and may be equal to the upper limit value.
  • differential pressure control of the piping system 34 is differential pressure control that maintains the pressure difference between the high pressure line 35 and the low pressure line 36 at a target value.
  • the differential pressure control is executed, the differential pressure measurement value obtained by subtracting the measurement value of the second pressure sensor 23 from the measurement value of the first pressure sensor 22 is used as the measurement pressure PM.
  • the operating frequency of the compressor 12 is reduced (increased) to make the measured pressure PM smaller (larger) closer to the target pressure PT.
  • FIG. 5 is a flowchart illustrating a method of starting the cryogenic refrigerator 10. This method is executed by the control device 50, for example, when the main switch 28 is operated.
  • the activation method comprises increasing the volume of the high pressure line 35 when the cold head 14 is at room temperature (S20, hereinafter also referred to as the first step).
  • the first step involves connecting the compressor 12 to the cold head 14 with a first high pressure line 39a.
  • one end of the first high-pressure pipe 39 a is connected to the discharge port 18 and the other end is connected to the high-pressure port 37. In this way, the volume of the high pressure line 35 is increased.
  • the low-pressure pipe 40 is already connected to the compressor 12 and the cold head 14.
  • the starting method is to increase the volume of the high pressure line 35, and then control the operating frequency of the compressor 12 based on the pressure of the high pressure line 35 or the differential pressure between the high pressure line 35 and the low pressure line 36, while keeping the cold head 14 at room temperature.
  • To cool to extremely low temperature S22, hereinafter also referred to as the second step).
  • the second step includes cooling the cold head 14 from room temperature to a cryogenic temperature and controlling the operating frequency of the compressor 12 so that the pressure in the high pressure line 35 follows the target pressure value.
  • the starting method includes cooling the cold head 14 to an extremely low temperature and then reducing the volume of the high-pressure line 35 (S24, hereinafter also referred to as a third step).
  • the third step involves connecting the compressor 12 to the cold head 14 with the second high pressure line 39b.
  • the first high-pressure pipe 39a is removed, and the second high-pressure pipe 39b is connected to the discharge port 18 and the high-pressure port 37 instead. Since the volume of the first high-pressure pipe 39a is larger than that of the second high-pressure pipe 39b as described above, the volume of the high-pressure line 35 is reduced.
  • the starting method includes maintaining the cold head 14 at an extremely low temperature after reducing the volume of the high-pressure line 35 (S26, hereinafter also referred to as the fourth step).
  • the fourth step includes controlling the operating frequency of the compressor 12 so that the differential pressure between the high pressure line 35 and the low pressure line 36 follows the differential pressure target value. After the fourth step, the normal cooling operation of the cryogenic refrigerator 10 is performed.
  • FIG. 6 is a flowchart showing an example of the second step of the activation method.
  • the compressor controller 60 compares the measured temperature of the low temperature portion 14b with the temperature threshold value based on the measured temperature signal T1 from the cold head temperature sensor 30 (S30).
  • the temperature threshold value is, for example, a target cooling temperature of the cold head 14 (eg, about 4K to about 50K).
  • high pressure control is executed (S32).
  • the compressor controller 60 sets the pressure of the high pressure line 35 measured by the pressure sensor to a pressure target value when the cold head 14 is cooled from room temperature to a very low temperature.
  • the operating frequency of the compressor 12 is controlled so as to follow it.
  • differential pressure control is executed (S34). Based on the temperature measured by the cold head temperature sensor 30, the compressor controller 60 makes a difference between the high pressure line 35 and the low pressure line 36 measured by the pressure sensor when the cold head 14 is maintained at an extremely low temperature. The operating frequency of the compressor 12 is controlled so as to follow the target pressure value.
  • the high pressure control is executed in the cool down operation and the differential pressure control is executed in the normal cooling operation.
  • the third step can be performed after shifting to the normal cooling operation. Alternatively, the third step may not be performed after shifting to the normal cooling operation.
  • the cryogenic refrigerator 10 starts the cool down operation.
  • high pressure control is performed in the compressor 12. Since the target pressure value for high pressure control is set to a relatively large value, the pressure in the high pressure line 35 is usually less than the target value. Therefore, the operating frequency of the compressor 12 is increased and the rotation speed of the compressor motor 64 is increased so that the pressure of the high-pressure line 35 is increased to the target value. In addition, since the volume of the high pressure line 35 is increased, it is difficult for the high pressure line 35 to be boosted. This also works to increase the operating frequency of the compressor 12.
  • the flow rate of the working gas supplied from the compressor 12 to the cold head 14 through the high pressure line 35 increases, and the flow rate of the working gas recovered from the cold head 14 to the compressor 12 through the low pressure line 36 also increases. Therefore, the differential pressure between the high pressure line 35 and the low pressure line 36 becomes large.
  • the refrigerating capacity of the cryogenic refrigerator 10 is proportional to the differential pressure. Therefore, if the differential pressure increases, the refrigerating capacity of the cryogenic refrigerator 10 increases. The cooling rate of the cold head 14 is increased.
  • the cooldown time can be shortened.
  • the cryogenic refrigerator 10 is particularly suitable for the conduction cooling type cryogenic system in that the cooldown time can be shortened.
  • the high pressure control is combined with the cool down operation.
  • the pressure target value of the high pressure line 35 is set to the upper limit value of the allowable pressure range or a value close to the upper limit value to control the pressure of the high pressure line 35 to such a relatively large value, and the cryogenic refrigerator in the cool down operation.
  • the refrigerating capacity of 10 can be easily maintained at a high level.
  • the differential pressure target value may be increased in order to enhance the refrigerating capacity of the cryogenic refrigerator 10.
  • the resulting pressure in the high pressure line 35 will be maintained within the allowable pressure range.
  • the compressor 12 may output a warning or shut down automatically. It may be necessary to restart the compressor 12. If the time required for the cool down operation is extended, it is not preferable.
  • the differential pressure control is combined with the normal cooling operation. Since the operating frequency of the compressor 12 can be appropriately adjusted according to the load of the cold head 14, the differential pressure control is useful for reducing the power consumption of the cryogenic refrigerator 10.
  • FIG. 7 is a diagram schematically showing the cryogenic refrigerator 10 according to the second embodiment.
  • the cryogenic refrigerator 10 according to the second embodiment is different from the cryogenic refrigerator 10 according to the first embodiment with respect to the configuration capable of changing the volume of the high-pressure line 35, and the rest is generally common.
  • different configurations will be mainly described, and common configurations will be briefly described or description thereof will be omitted.
  • the piping system 34 is connected to the high pressure line 35 when the cold head 14 is cooled from room temperature to cryogenic temperature, and is disconnected from the high pressure line 35 when the cold head 14 is maintained at cryogenic temperature. Equipped with.
  • the first step shown in FIG. 5, involves connecting the buffer volume 70 to the high pressure line 35.
  • the third step involves disconnecting the buffer volume 70 from the high pressure line 35.
  • the buffer volume 70 includes a buffer tank 72, a connecting pipe 74 connecting the buffer tank 72 to the high pressure line 35, and a valve 76 installed in the connecting pipe 74.
  • the connection pipe 74 is branched from the high pressure pipe 39.
  • the valve 76 is configured to control the flow of working gas in the connecting pipe 74.
  • the valve 76 is controlled according to the valve control signal V input from the control device 50. That is, the valve 76 is opened/closed or its opening is adjusted according to the valve control signal V.
  • the valve 76 is communicatively coupled to the controller 50 to receive the valve control signal V.
  • the buffer tank 72 When the valve 76 is opened, the buffer tank 72 is connected to the high pressure line 35 through the connecting pipe 74, and the working gas flow between the buffer tank 72 and the high pressure line 35 is allowed. Thus, the volume of the high pressure line 35 is increased.
  • the valve 76 When the valve 76 is closed, the buffer tank 72 is disconnected from the high pressure line 35, and the working gas flow between the buffer tank 72 and the high pressure line 35 is shut off. In this way, the volume of the high pressure line 35 is reduced.
  • the control device 50 controls the valve 76 based on the temperature measured by the cold head temperature sensor 30, thereby changing the volume of the high pressure line 35.
  • the control device 50 includes a temperature comparison unit 80 and a valve control unit 82.
  • the temperature comparison section 80 is configured to compare the measured temperature of the low temperature section 14b with the temperature threshold value T0 based on the measured temperature signal T1.
  • the temperature comparison unit 80 is configured to output the result of temperature comparison to the valve control unit 82.
  • the valve control unit 82 is configured to generate the valve control signal V according to the input from the temperature comparison unit 80.
  • the valve control unit 82 opens the valve 76 when the measured temperature is higher than the temperature threshold value T0, and closes the valve 76 when the measured temperature is equal to or lower than the temperature threshold value T0.
  • the temperature threshold T0 may be, for example, a target cooling temperature of the cold head 14, and may be predetermined from a temperature range of, for example, about 4K to about 50K.
  • the control device 50 may include a storage unit 84 that stores the temperature threshold value T0.
  • valve 76 is opened in the cool down operation, and the valve 76 is closed in the normal cooling operation.
  • control device 50 may include the compressor controller 60 and execute the control process shown in FIG. 6. Therefore, when the measured temperature is higher than the temperature threshold value T0, the valve 76 is opened, the volume of the high pressure line 35 is increased, and the high pressure control is executed. When the measured temperature is equal to or lower than the temperature threshold value T0, the valve 76 is closed, the volume of the high pressure line 35 is reduced, and the differential pressure control is executed.
  • the cooldown time can be shortened as in the first embodiment.
  • FIG. 8A and FIG. 8B show another example of the buffer volume 70.
  • the buffer tank 72 may be connected not only to the high pressure line 35 but also to the low pressure line 36.
  • the valve 76 is provided in the high pressure side connection pipe 74 that connects the buffer tank 72 to the low pressure line 36.
  • the other valve 78 is provided in the low pressure side connecting pipe that connects the buffer tank 72 to the low pressure line 36.
  • the pressure in the buffer tank 72 can be returned to the initial pressure by opening the valve 78 at an appropriate time during the normal cooling operation, which is convenient.
  • the buffer volume 70 does not have to take the form of a tank.
  • the buffer volume 70 may include a buffer pipe 90 connected in parallel to the high-pressure line 35, and valves 92 and 94 provided at the inlet and outlet of the buffer pipe 90.
  • the buffer pipe 90 is connected to the high pressure line 35 by valves 92 and 94.
  • the volume of the high pressure line 35 is increased by opening the valves 92 and 94, and the volume of the high pressure line 35 is decreased by closing the valves 92 and 94.
  • the cool down operation is combined with the high pressure control, but if the circumstances permit, in the cryogenic refrigerator 10 according to the embodiment, even if the cool down operation is combined with the differential pressure control. Good.
  • the present invention can be used in the field of cryogenic refrigerator start-up methods and cryogenic refrigerators.
  • cryogenic refrigerator 10 cryogenic refrigerator, 12 compressor, 14 cold head, 30 cold head temperature sensor, 35 high pressure line, 36 low pressure line, 39 high pressure pipe, 39a 1st high pressure pipe, 39b 2nd high pressure pipe, 60 compressor controller, 70 Buffer volume.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Compressors, Vaccum Pumps And Other Relevant Systems (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Devices That Are Associated With Refrigeration Equipment (AREA)

Abstract

極低温冷凍機(10)の起動方法は、コールドヘッド(14)が室温にあるとき、高圧ライン(35)の容積を増加させることと、高圧ライン(35)の容積を増加させた後、高圧ライン(35)の圧力または高圧ライン(35)と低圧ライン(36)の差圧に基づいて圧縮機(12)の運転周波数を制御しながら、コールドヘッド(14)を室温から極低温に冷却することと、コールドヘッド(14)を極低温に冷却した後、高圧ライン(35)の容積を減少させることと、高圧ライン(35)の容積を減少させた後、コールドヘッド(14)を極低温に維持することと、を備える。

Description

極低温冷凍機の起動方法、極低温冷凍機
 本発明は、極低温冷凍機の起動方法および極低温冷凍機に関する。
 極低温冷凍機は、極低温環境で使用される超電導機器、測定機器、試料など様々な対象物を冷却するために利用されている。
特開平11-281182号公報
 極低温冷凍機で対象物を冷却するには、まず、極低温冷凍機を起動し、室温など初期温度から目的の極低温まで極低温冷凍機を冷却しなければならない。これは、極低温冷凍機のクールダウンとも称される。クールダウンは対象物の冷却を始めるための準備にすぎないから、その所要時間はなるべく短いことが望まれる。
 本発明のある態様の例示的な目的のひとつは、極低温冷凍機のクールダウン時間を短縮することにある。
 本発明のある態様によると、極低温冷凍機の起動方法が提供される。極低温冷凍機は、圧縮機と、コールドヘッドと、圧縮機からコールドヘッドに冷媒ガスを供給する高圧ラインと、コールドヘッドから圧縮機に冷媒ガスを回収する低圧ラインと、を備える。この方法は、コールドヘッドが室温にあるとき、高圧ラインの容積を増加させることと、高圧ラインの容積を増加させた後、高圧ラインの圧力または高圧ラインと低圧ラインの差圧に基づいて圧縮機の運転周波数を制御しながら、コールドヘッドを室温から極低温に冷却することと、コールドヘッドを極低温に冷却した後、高圧ラインの容積を減少させることと、高圧ラインの容積を減少させた後、コールドヘッドを極低温に維持することと、を備える。
 本発明のある態様によると、極低温冷凍機は、圧縮機と、コールドヘッドと、圧縮機からコールドヘッドに冷媒ガスを供給する高圧ラインと、コールドヘッドから圧縮機に冷媒ガスを回収する低圧ラインと、高圧ラインの圧力または高圧ラインと低圧ラインの差圧を測定する圧力センサと、圧力センサによって測定された圧力に基づいて圧縮機の運転周波数を制御する圧縮機コントローラと、コールドヘッドが室温から極低温に冷却されるとき高圧ラインに接続され、コールドヘッドが極低温に維持されるとき高圧ラインから切り離されるように構成されたバッファ容積と、を備える。
 本発明のある態様によると、極低温冷凍機は、圧縮機と、コールドヘッドと、圧縮機からコールドヘッドに冷媒ガスを供給する高圧ラインと、コールドヘッドから圧縮機に冷媒ガスを回収する低圧ラインと、高圧ラインの圧力または高圧ラインと低圧ラインの差圧を測定する圧力センサと、圧力センサによって測定された圧力に基づいて圧縮機の運転周波数を制御する圧縮機コントローラと、を備える。高圧ラインの容積が低圧ラインの容積より大きい。
 なお、以上の構成要素の任意の組み合わせや本発明の構成要素や表現を、方法、装置、システムなどの間で相互に置換したものもまた、本発明の態様として有効である。
 本発明によれば、極低温冷凍機のクールダウン時間を短縮することができる。
第1実施形態に係る極低温冷凍機を概略的に示す図である。 第1実施形態に係る極低温冷凍機を概略的に示す図である。 極低温冷凍機に関するブロック図である。 極低温冷凍機の圧力制御方法を説明するフローチャートである。 極低温冷凍機の起動方法を説明するフローチャートである。 起動方法の第2ステップの一例を示すフローチャートである。 第2実施形態に係る極低温冷凍機を概略的に示す図である。 図8(a)および図8(b)は、バッファ容積の他の例を示す。
 以下、図面を参照しながら、本発明を実施するための形態について詳細に説明する。説明および図面において同一または同等の構成要素、部材、処理には同一の符号を付し、重複する説明は適宜省略する。図示される各部の縮尺や形状は、説明を容易にするために便宜的に設定されており、特に言及がない限り限定的に解釈されるものではない。実施の形態は例示であり、本発明の範囲を何ら限定するものではない。実施の形態に記述されるすべての特徴やその組み合わせは、必ずしも発明の本質的なものであるとは限らない。
 図1および図2は、第1実施形態に係る極低温冷凍機10を概略的に示す図である。図1には、極低温冷凍機10のクールダウン運転が示され、図2には、極低温冷凍機10の通常冷却運転が示されている。極低温冷凍機10の高圧側の配管が取り替えられ、高圧側の冷媒ガス容積が異なっていることを除いて、図1および図2に示される極低温冷凍機10は同じである。
 クールダウン運転において、極低温冷凍機10は、室温またはその付近の初期温度から目標冷却温度へと急速に冷却される。目標冷却温度は、超電導マグネットなどの超電導機器、またはその他の被冷却物を冷却するための所望の極低温から選択される。通常冷却運転は、極低温冷凍機10を目標冷却温度に維持するようにクールダウン運転に続いて行われる。通常冷却運転が開始されると、被冷却物を稼動させることができる。その準備段階として、クールダウン運転は行われる。
 詳細は後述するが、クールダウン運転における高圧側の冷媒ガス容積が、通常冷却運転に比べて増加されている。クールダウン運転においては、高圧側の冷媒ガス容積が低圧側に比べて増加されているとも言える。
 極低温冷凍機10は、圧縮機12と、コールドヘッド14とを備える。圧縮機12は、極低温冷凍機10の作動ガスをコールドヘッド14から回収し、回収した作動ガスを昇圧して、再び作動ガスをコールドヘッド14に供給するよう構成されている。コールドヘッド14は、膨張機とも称され、室温部14aと、冷却ステージとも称される低温部14bとを有する。圧縮機12とコールドヘッド14により極低温冷凍機10の冷凍サイクルが構成され、それにより低温部14bが所望の極低温に冷却される。作動ガスは、冷媒ガスとも称され、通例はヘリウムガスであるが、適切な他のガスが用いられてもよい。理解のために、作動ガスの流れる方向を図1に矢印で示す。
 極低温冷凍機10は、一例として、単段式または二段式のギフォード・マクマホン(Gifford-McMahon;GM)冷凍機であるが、パルス管冷凍機、スターリング冷凍機、またはそのほかのタイプの極低温冷凍機であってもよい。コールドヘッド14は、極低温冷凍機10のタイプに応じて異なる構成を有するが、圧縮機12は、極低温冷凍機10のタイプによらず、以下に説明する構成を用いることができる。
 なお、一般に、圧縮機12からコールドヘッド14に供給される作動ガスの圧力と、コールドヘッド14から圧縮機12に回収される作動ガスの圧力は、ともに大気圧よりかなり高く、それぞれ第1高圧及び第2高圧と呼ぶことができる。説明の便宜上、第1高圧及び第2高圧はそれぞれ単に高圧及び低圧とも呼ばれる。典型的には、高圧は例えば2~3MPaである。低圧は例えば0.5~1.5MPaであり、例えば約0.8MPaである。
 圧縮機12は、吐出ポート18、吸入ポート19、高圧流路20、低圧流路21、第1圧力センサ22、第2圧力センサ23、圧縮機本体25、および圧縮機筐体26を備える。吐出ポート18は、圧縮機12の作動ガス吐出ポートとして圧縮機筐体26に設置され、吸入ポート19は、圧縮機12の作動ガス吸入ポートとして圧縮機筐体26に設置されている。高圧流路20は、圧縮機本体25の吐出口を吐出ポート18に接続し、低圧流路21は、吸入ポート19を圧縮機本体25の吸入口に接続する。圧縮機筐体26は、高圧流路20、低圧流路21、第1圧力センサ22、第2圧力センサ23、および圧縮機本体25を収容する。圧縮機12は、圧縮機ユニットとも称される。
 圧縮機本体25は、その吸入口から吸入される作動ガスを内部で圧縮して吐出口から吐出するよう構成されている。圧縮機本体25は、例えば、スクロール方式、ロータリ式、または作動ガスを昇圧するそのほかのポンプであってもよい。圧縮機本体25は、固定された一定の作動ガス流量を吐出するよう構成されていてもよい。あるいは、圧縮機本体25は、吐出する作動ガス流量を可変とするよう構成されていてもよい。圧縮機本体25は、圧縮カプセルと称されることもある。
 第1圧力センサ22は、高圧流路20を流れる作動ガスの圧力を測定するよう高圧流路20に配置されている。第1圧力センサ22は、測定された圧力を表す第1測定圧信号P1を出力するよう構成されている。第2圧力センサ23は、低圧流路21を流れる作動ガスの圧力を測定するよう低圧流路21に配置されている。第2圧力センサ23は、測定された圧力を表す第2測定圧信号P2を出力するよう構成されている。よって第1圧力センサ22、第2圧力センサ23はそれぞれ、高圧センサ、低圧センサと呼ぶこともできる。また本書では、第1圧力センサ22と第2圧力センサ23のいずれか指して、または両方を総称して、単に「圧力センサ」と表記することもある。
 なお、圧力センサは、差圧センサを含んでもよい。差圧センサは、たとえば、圧縮機本体25を迂回するように高圧流路20と低圧流路21を接続するバイパスラインに設けられてもよい。差圧センサは、極低温冷凍機10における作動ガスの高圧と低圧の差圧を測定し、測定された差圧を表す測定差圧信号を出力するよう構成されている。差圧センサは、高圧センサ、低圧センサに代えて、またはそれに加えて、設けられてもよい。
 なお、圧縮機12は、そのほか種々の構成要素を有しうる。例えば、高圧流路20には、オイルセパレータ、アドソーバなどが設けられていてもよい。低圧流路21には、ストレージタンクそのほかの構成要素が設けられていてもよい。また、圧縮機12には、圧縮機本体25をオイルで冷却するオイル循環系や、オイルを冷却する冷却系などが設けられていてもよい。
 極低温冷凍機10は、メインスイッチ28を備える。メインスイッチ28は、例えば操作ボタンまたはスイッチのような人手により操作可能な操作具を備え、操作されたとき極低温冷凍機10が起動され、その運転が開始される。メインスイッチ28は、極低温冷凍機10の起動スイッチとして機能するだけでなく、極低温冷凍機10の停止スイッチを兼ねてもよい。メインスイッチ28は、たとえば圧縮機筐体26に設置されている。
 コールドヘッド14は、低温部14bに取り付けられたコールドヘッド温度センサ30を備える。コールドヘッド温度センサ30は、低温部14bの測定温度を表す測定温度信号T1を出力するよう構成されている。
 また、極低温冷凍機10は、圧縮機12とコールドヘッド14の間で作動ガスを循環させる配管システム34を備える。配管システム34は、圧縮機12からコールドヘッド14に作動ガスを供給する高圧ライン35と、コールドヘッド14から圧縮機12に作動ガスを回収する低圧ライン36とを備える。コールドヘッド14の室温部14aは、高圧ポート37と低圧ポート38とを備える。
 高圧ポート37は、第1高圧配管39aまたは第2高圧配管39bによって吐出ポート18に接続されている。図1に示されるように、第1高圧配管39aは、クールダウン運転に使用される。図2に示されるように、第2高圧配管39bは、通常冷却運転に使用される。以下、第1高圧配管39aと第2高圧配管39bをまとめて高圧配管39と称することがある。低圧ポート38は、低圧配管40によって吸入ポート19に接続されている。
 コールドヘッド14から圧縮機12に回収される作動ガスは、コールドヘッド14の低圧ポート38から低圧配管40を通じて圧縮機12の吸入ポート19に入り、さらに低圧流路21を経て圧縮機本体25に戻り、圧縮機本体25によって圧縮され昇圧される。圧縮機12からコールドヘッド14に供給される作動ガスは、圧縮機本体25から高圧流路20を通じて圧縮機12の吐出ポート18から出て、さらに高圧配管39とコールドヘッド14の高圧ポート37を経てコールドヘッド14に供給される。
 一例として、高圧配管39および低圧配管40は、フレキシブル管により構成されるが、リジッド管で構成されてもよい。高圧配管39および低圧配管40の両端には脱着可能な継手が設けられている。吐出ポート18および高圧ポート37には高圧配管39の両端の継手に脱着可能な継手が設けられ、吸入ポート19および低圧ポート38には低圧配管40の両端の継手に脱着可能な継手が設けられている。脱着可能な継手は、例えば、セルフシーリング・カップリングである。よって、高圧配管39および低圧配管40は、圧縮機12およびコールドヘッド14に取り外し可能に取り付けられる。
 図1と図2の対比から理解されるように、クールダウン運転における高圧ライン35の容積が、通常冷却運転における高圧ライン35の容積よりも大きくなっている。例示的な構成として、第1高圧配管39aの容積が第2高圧配管39bの容積より大きい。第1高圧配管39aは第2高圧配管39bよりも太い。第1高圧配管39aの呼び径D1が第2高圧配管39bの呼び径D2より大きい。たとえば、第1高圧配管39aは、第2高圧配管39bに対して、1つまたは2つ大きい呼び径の配管であってもよい。第1高圧配管39aがより太いことに代えて、またはそれに加えて、第1高圧配管39aは、第2高圧配管39bより長くてもよい。図1および図2では、第1高圧配管39aの長さL1は、第2高圧配管39bの長さL2と等しいが、たとえば、第1高圧配管39aの長さL1は、第2高圧配管39bの長さL2の1~2倍の範囲にあってもよい。
 また、図1に示されるように、クールダウン運転においては、高圧ライン35の容積が低圧ライン36の容積よりも大きくなっている。例示的な構成として、第1高圧配管39aの容積が低圧配管40の容積より大きい。第1高圧配管39aは低圧配管40よりも太い。第1高圧配管39aの呼び径D1が低圧配管40の呼び径D3より大きい。たとえば、第1高圧配管39aは、低圧配管40に対して、1つまたは2つ大きい呼び径の配管であってもよい。第1高圧配管39aがより太いことに代えて、またはそれに加えて、第1高圧配管39aは、低圧配管40より長くてもよい。図1では、第1高圧配管39aと低圧配管40は長さが等しいが、たとえば、第1高圧配管39aの長さL1は、低圧配管40の長さL3の1~2倍の範囲にあってもよい。
 図2に示されるように、通常冷却運転においては、高圧ライン35および低圧ライン36の容積は等しくなっている。第2高圧配管39bは、低圧配管40と同じ容積を有する。第2高圧配管39bは、低圧配管40と同じ太さ、同じ長さを有する。
 しかしながら、ある実施形態においては、クールダウン運転だけでなく通常冷却運転においても、高圧ライン35の容積が低圧ライン36の容積よりも大きくてもよい。第1高圧配管39aが第2高圧配管39bと交換されるのではなく、クールダウン運転と通常冷却運転の両方において第1高圧配管39aが使用されてもよい。
 なお、典型的な極低温冷凍機においては、高圧ラインの容積が運転状態に応じて変更されることは無い。高圧ラインの容積は低圧ラインの容積と等しい。圧縮機とコールドヘッドを接続する高圧側の配管と低圧側の配管は、同じ寸法(太さ、長さなど)を有する。
 本書では、高圧ライン35の容積とは、吐出ポート18から高圧ポート37までの配管容積として定義されうる。圧縮機12の内部にある高圧流路20、およびコールドヘッド14の内部流路は、高圧ライン35に含めない。よって、高圧ライン35の容積は、高圧配管39(すなわち、第1高圧配管39aまたは第2高圧配管39bのいずれか)の容積に実質的に相当しうる。同様に、低圧ライン36の容積とは、吸入ポート19から低圧ポート38までの配管容積として定義されうる。圧縮機12の内部にある低圧流路21、およびコールドヘッド14の内部流路は、低圧ライン36に含めない。よって、低圧ライン36の容積は、低圧配管40の容積に実質的に相当しうる。
 図3は、極低温冷凍機10に関するブロック図である。極低温冷凍機10は、極低温冷凍機10を制御する制御装置50を備える。制御装置50は、圧縮機コントローラ60と、圧縮機インバータ62とを備える。制御装置50は、圧縮機12に搭載されていてもよい。圧縮機本体25は、圧縮機本体25を駆動する圧縮機モータ64を備える。
 第1圧力センサ22および第2圧力センサ23はそれぞれ、制御装置50に通信可能に接続されており、第1測定圧信号P1および第2測定圧信号P2を制御装置50に出力する。コールドヘッド温度センサ30はそれぞれ、制御装置50に通信可能に接続されており、測定温度信号T1を制御装置50に出力する。
 圧縮機コントローラ60は、第1圧力センサ22によって測定された圧力に基づいて、または第1圧力センサ22および第2圧力センサ23によって測定された差圧に基づいて、圧縮機12の運転周波数を制御する。ここで、圧縮機12の運転周波数とは例えば、圧縮機モータ64に供給される電力の周波数に相当し、圧縮機モータ64の運転周波数または回転数を指す。圧縮機コントローラ60は、圧縮機12の運転周波数を決定し、決定された圧縮機12の運転周波数に応じたインバータ制御信号S1を生成する。圧縮機インバータ62は、インバータ制御信号S1に従って、商用電源などの外部電源からの入力電力からモータ駆動信号S2を生成し、圧縮機モータ64に出力する。圧縮機モータ64は、モータ駆動信号S2によって駆動される。こうして圧縮機モータ64は、圧縮機コントローラ60によって決定された運転周波数で駆動される。
 メインスイッチ28は、操作されたとき制御装置50に起動指令信号S3を出力するように構成されている。圧縮機コントローラ60は、起動指令信号S3を受け、圧縮機12の制御を開始する。
 制御装置50は、ハードウェア構成としてはコンピュータのCPUやメモリをはじめとする素子や回路で実現され、ソフトウェア構成としてはコンピュータプログラム等によって実現されるが、図3では適宜、それらの連携によって実現される機能ブロックとして描いている。これらの機能ブロックはハードウェア、ソフトウェアの組合せによっていろいろなかたちで実現できることは、当業者には理解されるところである。
 図4は、極低温冷凍機10の圧力制御方法を説明するフローチャートである。制御装置50の圧縮機コントローラ60は、以下に説明される、配管システム34の圧力制御処理を実行するよう構成されている。配管システム34の圧力制御は、極低温冷凍機10の運転中に所定の周期で繰り返し実行される。
 配管システム34の圧力が測定される(S10)。配管システム34の圧力は、圧力センサを使用して測定される。圧縮機コントローラ60は、第1測定圧信号P1及び/または第2測定圧信号P2から配管システム34の測定圧PMを取得する。
 次に、配管システム34の測定圧PMが目標圧PTと比較される(S12)。配管システム34の目標圧PTは、極低温冷凍機10の使用者によって制御装置50に予め入力され、または制御装置50によって自動的に設定され、制御装置50に保存されている。圧縮機コントローラ60は、測定圧PMを目標圧PTと比較し、比較結果として両者の大小関係を出力する。すなわち、圧縮機コントローラ60による比較結果は、次の3つの状態、(i)測定圧PMが目標圧PTより大きい、(ii)測定圧PMが目標圧PTより小さい、(iii)測定圧PMが目標圧PTと等しい、のうちいずれかを表す。
 圧縮機コントローラ60は、測定圧PMと目標圧PTの比較結果に基づいて圧縮機12の運転周波数を決定する。上述のように、決定された運転周波数で圧縮機モータ64が運転される。それにより、配管システム34の測定圧PMが目標圧PTに近づくように変化する。このようにして、配管システム34の圧力制御が提供され、配管システム34の測定圧PMを目標圧PTに追従させることができる。
 具体的には、(i)測定圧PMが目標圧PTより大きい場合には、圧縮機コントローラ60は、圧縮機12の運転周波数を減少させる(S14)。(ii)測定圧PMが目標圧PTより小さい場合には、圧縮機コントローラ60は、圧縮機12の運転周波数を増加させる(S16)。(iii)測定圧PMが目標圧PTと等しい場合には、運転周波数を増減させる必要が無いので、運転周波数は維持される。
 圧縮機12の運転周波数の変化量(すなわち増加量または減少量)は、測定圧PMと目標圧PTの偏差に基づいて(たとえばPID制御により)決定されてもよい。あるいは、圧縮機12の運転周波数の変化量は、予め設定された大きさであってもよい。
 配管システム34の圧力制御の一例は、高圧ライン35の作動ガス圧力を目標値に保つ高圧制御である。高圧制御が実行される場合、第1圧力センサ22による測定値が測定圧PMとして使用される。測定圧PMが目標圧PTより大きい(小さい)場合には、圧縮機12の運転周波数を減少(増加)させることによって、測定圧PMを小さく(大きく)して目標圧PTに近づけることができる。
 高圧制御に使用される目標圧PTの値は、許容される圧力範囲において比較的大きい値であってもよい。そうした許容圧力範囲は典型的に、圧縮機12の運転可能な圧力範囲であり、圧縮機12の仕様として予め定められている。目標圧PTの値は、たとえば、許容圧力範囲の上限値の80%以上または90%以上であってもよく、上限値に等しくてもよい。
 配管システム34の圧力制御の他の一例は、高圧ライン35と低圧ライン36との圧力差を目標値に保つ差圧制御である。差圧制御が実行される場合、第1圧力センサ22の測定値から第2圧力センサ23の測定値を引いて得られる差圧測定値が測定圧PMとして使用される。測定圧PMが目標圧PTより大きい(小さい)場合には、圧縮機12の運転周波数を減少(増加)させることによって、測定圧PMを小さく(大きく)して目標圧PTに近づけることができる。
 図5は、極低温冷凍機10の起動方法を説明するフローチャートである。この方法は、たとえば、メインスイッチ28が操作されたとき制御装置50によって実行される。
 図5に示されるように、起動方法は、コールドヘッド14が室温にあるとき、高圧ライン35の容積を増加させることを備える(S20、以下では第1ステップともいう)。第1ステップは、第1高圧配管39aで圧縮機12をコールドヘッド14に接続することを含む。図1に示されるように、第1高圧配管39aの一端が吐出ポート18に接続され、他端が高圧ポート37に接続される。こうして、高圧ライン35の容積が増加される。なお、低圧配管40は既に圧縮機12とコールドヘッド14に接続されている。
 起動方法は、高圧ライン35の容積を増加させた後、高圧ライン35の圧力または高圧ライン35と低圧ライン36の差圧に基づいて圧縮機12の運転周波数を制御しながら、コールドヘッド14を室温から極低温に冷却することを備える(S22、以下では第2ステップともいう)。第2ステップは、コールドヘッド14を室温から極低温に冷却するとともに、高圧ライン35の圧力を圧力目標値に追従させるように圧縮機12の運転周波数を制御することを含む。
 起動方法は、コールドヘッド14を極低温に冷却した後、高圧ライン35の容積を減少させることを備える(S24、以下では第3ステップともいう)。第3ステップは、第2高圧配管39bで圧縮機12をコールドヘッド14に接続することを含む。第1高圧配管39aが取り外され、代わりに第2高圧配管39bが吐出ポート18、高圧ポート37に接続される。上述のように第1高圧配管39aの容積が第2高圧配管39bの容積より大きいので、高圧ライン35の容積が減少される。
 起動方法は、高圧ライン35の容積を減少させた後、コールドヘッド14を極低温に維持することを備える(S26、以下では第4ステップともいう)。第4ステップは、高圧ライン35と低圧ライン36の差圧を差圧目標値に追従させるように圧縮機12の運転周波数を制御することを含む。第4ステップ以降は、極低温冷凍機10の通常冷却運転となる。
 第2ステップにおいては、コールドヘッド14の低温部14bの測定温度に基づいてクールダウン運転から通常冷却運転に自動的に移行することも可能である。このような実施例を述べる。
 図6は、起動方法の第2ステップの一例を示すフローチャートである。図示されるように、圧縮機コントローラ60は、コールドヘッド温度センサ30からの測定温度信号T1に基づいて、低温部14bの測定温度を温度しきい値と比較する(S30)。温度しきい値はたとえば、コールドヘッド14の目標冷却温度(たとえば、約4K~約50K)である。
 測定温度が温度しきい値を上回る場合には(S30のY)、高圧制御が実行される(S32)。圧縮機コントローラ60は、コールドヘッド温度センサ30によって測定された温度に基づいて、コールドヘッド14が室温から極低温に冷却されるとき、圧力センサによって測定された高圧ライン35の圧力を圧力目標値に追従させるように圧縮機12の運転周波数を制御する。
 測定温度が温度しきい値以下の場合には(S30のN)、差圧制御が実行される(S34)。圧縮機コントローラ60は、コールドヘッド温度センサ30によって測定された温度に基づいて、コールドヘッド14が極低温に維持されるとき、圧力センサによって測定された高圧ライン35と低圧ライン36の差圧を差圧目標値に追従させるように圧縮機12の運転周波数を制御する。
 このようにして、クールダウン運転では高圧制御が実行され、通常冷却運転では差圧制御が実行される。通常冷却運転への移行後に第3ステップを行うことができる。あるいは、通常冷却運転への移行後に第3ステップを行わないことも可能である。
 以上、実施形態に係る極低温冷凍機10の構成を述べた。続いてその動作を説明する。メインスイッチ28が操作されると、極低温冷凍機10はクールダウン運転を開始する。このとき、圧縮機12では高圧制御が行われる。高圧制御の圧力目標値は比較的大きい値に設定されているから、ふつう、高圧ライン35の圧力は目標値に満たない。よって、高圧ライン35の圧力が目標値へと昇圧されるように、圧縮機12の運転周波数は増加され、圧縮機モータ64の回転数が増える。加えて、高圧ライン35の容積が増加されているので、高圧ライン35は昇圧されにくくなっている。このことも、圧縮機12の運転周波数を増加させるように働く。
 そうすると、圧縮機12から高圧ライン35を通じてコールドヘッド14に供給される作動ガス流量が増えるとともに、コールドヘッド14から低圧ライン36を通じて圧縮機12に回収される作動ガス流量も増える。そのため、高圧ライン35と低圧ライン36の差圧が大きくなる。理論的に、極低温冷凍機10の冷凍能力は差圧に比例する。よって、差圧が拡大すれば、極低温冷凍機10の冷凍能力は高まる。コールドヘッド14の冷却速度が増加される。
 したがって、実施形態に係る極低温冷凍機10によると、クールダウン時間を短縮することができる。
 極低温冷凍機10による超電導機器など被冷却物の冷却には、大きく2つの方式がある。すなわち、コールドヘッド14の低温部14bに被冷却物を接触させることにより被冷却物を直接冷却する、いわゆる伝導冷却方式と、低温部14bで液体ヘリウムなどの冷媒を冷却し、冷媒を利用して被冷却物を冷却する方式である。冷媒方式では、冷媒が貯留されていれば、極低温冷凍機10の非稼動時(たとえばメンテナンスなど)やクールダウン中においても被冷却物を冷却できる。しかし、伝導冷却方式では、極低温冷凍機10の非稼動時やクールダウン中においては被冷却物を冷却できないか、冷却が不十分となる。したがって、実施形態に係る極低温冷凍機10はクールダウン時間を短縮できる点で、とくに、伝導冷却方式の極低温システムに適する。
 実施形態に係る極低温冷凍機10によると、クールダウン運転に高圧制御が組み合わされている。高圧制御では高圧ライン35の圧力目標値を許容圧力範囲の上限値またはそれに近い値に設定することにより、高圧ライン35の圧力をそうした比較的大きい値に制御し、クールダウン運転における極低温冷凍機10の冷凍能力を高いレベルに容易に維持することができる。
 これに対して、クールダウン運転に差圧制御を組み合わせる場合には、極低温冷凍機10の冷凍能力を高めるために、差圧目標値が増加されうる。この場合、結果として得られる高圧ライン35の圧力が許容圧力範囲内に維持されるか自明ではない。低圧ライン36の圧力についても同様である。もし、高圧ライン35または低圧ライン36のいずれかの圧力が許容圧力範囲から逸脱したとすると、圧縮機12は、警告を出力し、または自動的に運転を停止しうる。圧縮機12の再起動が必要になるかもしれない。クールダウン運転の所要時間が延びるとすれば、好ましくない。
 また、実施形態に係る極低温冷凍機10によると、通常冷却運転に差圧制御が組み合わされている。コールドヘッド14の負荷に応じて圧縮機12の運転周波数を適切に調整することができるので、差圧制御は極低温冷凍機10の消費電力の低減に役立つ。
 図7は、第2実施形態に係る極低温冷凍機10を概略的に示す図である。第2実施形態に係る極低温冷凍機10は、高圧ライン35の容積変更を可能とする構成に関して第1実施形態に係る極低温冷凍機10と相違し、その余については概ね共通する。以下では、相違する構成を中心に説明し、共通する構成については簡単に説明するか、あるいは説明を省略する。
 配管システム34は、コールドヘッド14が室温から極低温に冷却されるとき高圧ライン35に接続され、コールドヘッド14が極低温に維持されるとき高圧ライン35から切り離されるように構成されたバッファ容積70を備える。図5に示される第1ステップは、高圧ライン35にバッファ容積70を接続することを含む。第3ステップは、高圧ライン35からバッファ容積70を切り離すことを含む。
 バッファ容積70は、バッファタンク72と、バッファタンク72を高圧ライン35に連結する連結配管74と、連結配管74に設置されたバルブ76とを備える。連結配管74は、高圧配管39から分岐している。
 バルブ76は、連結配管74の作動ガス流れを制御するよう構成されている。バルブ76は、制御装置50から入力されるバルブ制御信号Vに従って制御される。つまりバルブ76はバルブ制御信号Vに従って開閉され、または開度が調節される。バルブ76は、バルブ制御信号Vを受信するよう制御装置50と通信可能に接続されている。
 バルブ76が開放されるとバッファタンク72は連結配管74を通じて高圧ライン35に連通され、バッファタンク72と高圧ライン35との間の作動ガス流れが許容される。こうして、高圧ライン35の容積は増加される。バルブ76が閉鎖されるとバッファタンク72は高圧ライン35から切断され、バッファタンク72と高圧ライン35との間の作動ガス流れが遮断される。こうして、高圧ライン35の容積は減少される。
 制御装置50は、コールドヘッド温度センサ30によって測定された温度に基づいて、バルブ76を制御し、それにより高圧ライン35の容積を変更する。
 制御装置50は、温度比較部80と、バルブ制御部82と、を備える。温度比較部80は、測定温度信号T1に基づいて、低温部14bの測定温度を温度しきい値T0と比較するよう構成されている。温度比較部80は、温度比較の結果をバルブ制御部82に出力するよう構成されている。バルブ制御部82は、温度比較部80からの入力に従ってバルブ制御信号Vを生成するよう構成されている。バルブ制御部82は、測定温度が温度しきい値T0より高いときバルブ76を開放し、測定温度が温度しきい値T0以下のときバルブ76を閉鎖する。温度しきい値T0は、例えば、コールドヘッド14の目標冷却温度であってもよく、たとえば約4K~約50Kの温度範囲から予め定められてもよい。制御装置50は、温度しきい値T0を記憶する記憶部84を備えてもよい。
 よって、クールダウン運転においてバルブ76は開放され、通常冷却運転においてバルブ76は閉鎖される。
 第1実施形態と同様に、制御装置50は、圧縮機コントローラ60を備え、図6に示される制御処理を実行してもよい。よって、測定温度が温度しきい値T0より高ければ、バルブ76が開放され高圧ライン35の容積が増加されるとともに、高圧制御が実行される。測定温度が温度しきい値T0以下であれば、バルブ76が閉鎖され高圧ライン35の容積が減少されるとともに、差圧制御が実行される。
 したがって、第2実施形態に係る極低温冷凍機10によると、第1実施形態と同様に、クールダウン時間を短縮することができる。
 図8(a)および図8(b)は、バッファ容積70の他の例を示す。図8(a)に示されるように、バッファタンク72は、高圧ライン35だけでなく、低圧ライン36にも接続されていてもよい。バルブ76は、バッファタンク72を低圧ライン36に接続する高圧側の連結配管74に設けられている。もう1つのバルブ78は、バッファタンク72を低圧ライン36に接続する低圧側の連結配管に設けられている。たとえば通常冷却運転において適時にバルブ78を開くことによって、バッファタンク72の圧力を初期圧に戻すことができ、便利である。
 バッファ容積70は、タンクの形をとることは必須でない。図8(b)に示されるように、バッファ容積70は、高圧ライン35に並列接続されたバッファ配管90と、バッファ配管90の出入口に設けられたバルブ92、94とを備えてもよい。バッファ配管90はバルブ92、94により高圧ライン35に接続されている。バルブ92、94を開くことにより高圧ライン35の容積が増加され、バルブ92、94を閉じることにより高圧ライン35の容積が減少される。
 以上、本発明を実施例にもとづいて説明した。本発明は上記実施形態に限定されず、種々の設計変更が可能であり、様々な変形例が可能であること、またそうした変形例も本発明の範囲にあることは、当業者に理解されるところである。ある実施の形態に関連して説明した種々の特徴は、他の実施の形態にも適用可能である。組合せによって生じる新たな実施の形態は、組み合わされる実施の形態それぞれの効果をあわせもつ。
 上述の実施の形態では、クールダウン運転に高圧制御が組み合わされているが、事情が許すのであれば、実施形態に係る極低温冷凍機10において、クールダウン運転に差圧制御が組み合わされてもよい。
 実施の形態にもとづき、具体的な語句を用いて本発明を説明したが、実施の形態は、本発明の原理、応用の一側面を示しているにすぎず、実施の形態には、請求の範囲に規定された本発明の思想を逸脱しない範囲において、多くの変形例や配置の変更が認められる。
 本発明は、極低温冷凍機の起動方法および極低温冷凍機の分野における利用が可能である。
 10 極低温冷凍機、 12 圧縮機、 14 コールドヘッド、 30 コールドヘッド温度センサ、 35 高圧ライン、 36 低圧ライン、 39 高圧配管、 39a 第1高圧配管、 39b 第2高圧配管、 60 圧縮機コントローラ、 70 バッファ容積。

Claims (9)

  1.  極低温冷凍機の起動方法であって、極低温冷凍機は、圧縮機と、コールドヘッドと、圧縮機からコールドヘッドに冷媒ガスを供給する高圧ラインと、コールドヘッドから圧縮機に冷媒ガスを回収する低圧ラインと、を備え、前記方法は、
     前記コールドヘッドが室温にあるとき、前記高圧ラインの容積を増加させることと、
     前記高圧ラインの容積を増加させた後、前記高圧ラインの圧力または前記高圧ラインと前記低圧ラインの差圧に基づいて前記圧縮機の運転周波数を制御しながら、前記コールドヘッドを室温から極低温に冷却することと、
     前記コールドヘッドを前記極低温に冷却した後、前記高圧ラインの容積を減少させることと、
     前記高圧ラインの容積を減少させた後、前記コールドヘッドを前記極低温に維持することと、を備えることを特徴とする方法。
  2.  前記コールドヘッドを室温から極低温に冷却することは、前記高圧ラインの圧力を圧力目標値に追従させるように前記圧縮機の運転周波数を制御することを含むことを特徴とする請求項1に記載の方法。
  3.  前記コールドヘッドを極低温に維持することは、前記高圧ラインと前記低圧ラインの差圧を差圧目標値に追従させるように前記圧縮機の運転周波数を制御することを含むことを特徴とする請求項1または2に記載の方法。
  4.  前記高圧ラインの容積を増加させることは、第1高圧配管で前記圧縮機を前記コールドヘッドに接続することを含み、
     前記高圧ラインの容積を減少させることは、第2高圧配管で前記圧縮機を前記コールドヘッドに接続することを含み、
     第1高圧配管の容積が第2高圧配管の容積より大きいことを特徴とする請求項1から3のいずれかに記載の方法。
  5.  前記高圧ラインの容積を増加させることは、前記高圧ラインにバッファ容積を接続することを含み、
     前記高圧ラインの容積を減少させることは、前記高圧ラインから前記バッファ容積を切り離すことを含むことを特徴とする請求項1から3のいずれかに記載の方法。
  6.  圧縮機と、
     コールドヘッドと、
     前記圧縮機から前記コールドヘッドに冷媒ガスを供給する高圧ラインと、
     前記コールドヘッドから前記圧縮機に前記冷媒ガスを回収する低圧ラインと、
     前記高圧ラインの圧力または前記高圧ラインと前記低圧ラインの差圧を測定する圧力センサと、
     前記圧力センサによって測定された圧力に基づいて前記圧縮機の運転周波数を制御する圧縮機コントローラと、
     前記コールドヘッドが室温から極低温に冷却されるとき前記高圧ラインに接続され、前記コールドヘッドが前記極低温に維持されるとき前記高圧ラインから切り離されるように構成されたバッファ容積と、を備えることを特徴とする極低温冷凍機。
  7.  圧縮機と、
     コールドヘッドと、
     前記圧縮機から前記コールドヘッドに冷媒ガスを供給する高圧ラインと、
     前記コールドヘッドから前記圧縮機に前記冷媒ガスを回収する低圧ラインと、
     前記高圧ラインの圧力または前記高圧ラインと前記低圧ラインの差圧を測定する圧力センサと、
     前記圧力センサによって測定された圧力に基づいて前記圧縮機の運転周波数を制御する圧縮機コントローラと、を備え、
     前記高圧ラインの容積が前記低圧ラインの容積より大きいことを特徴とする極低温冷凍機。
  8.  前記圧縮機コントローラは、前記コールドヘッドが室温から極低温に冷却されるとき、前記圧力センサによって測定された前記高圧ラインの圧力を圧力目標値に追従させるように前記圧縮機の運転周波数を制御することを特徴とする請求項6または7に記載の極低温冷凍機。
  9.  前記圧縮機コントローラは、前記コールドヘッドが前記極低温に維持されるとき、前記圧力センサによって測定された前記高圧ラインと前記低圧ラインの差圧を差圧目標値に追従させるように前記圧縮機の運転周波数を制御することを特徴とする請求項8に記載の極低温冷凍機。
PCT/JP2020/000516 2019-01-15 2020-01-09 極低温冷凍機の起動方法、極低温冷凍機 WO2020149214A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP20741716.3A EP3913300A4 (en) 2019-01-15 2020-01-09 PROCEDURE FOR STARTING A CRYOGENIC FREEZER AND CRYOGENIC FREEZER
CN202080009088.7A CN113302439B (zh) 2019-01-15 2020-01-09 超低温制冷机的启动方法、超低温制冷机
US17/371,137 US12007152B2 (en) 2019-01-15 2021-07-09 Starting method for cryocooler and cryocooler

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019004076A JP7201447B2 (ja) 2019-01-15 2019-01-15 極低温冷凍機の起動方法
JP2019-004076 2019-01-15

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US17/371,137 Continuation US12007152B2 (en) 2019-01-15 2021-07-09 Starting method for cryocooler and cryocooler

Publications (1)

Publication Number Publication Date
WO2020149214A1 true WO2020149214A1 (ja) 2020-07-23

Family

ID=71613335

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/000516 WO2020149214A1 (ja) 2019-01-15 2020-01-09 極低温冷凍機の起動方法、極低温冷凍機

Country Status (5)

Country Link
US (1) US12007152B2 (ja)
EP (1) EP3913300A4 (ja)
JP (1) JP7201447B2 (ja)
CN (1) CN113302439B (ja)
WO (1) WO2020149214A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220397322A1 (en) * 2021-06-15 2022-12-15 Applied Materials, Inc. Cryogenic Cooling System

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4332460A1 (en) * 2021-04-30 2024-03-06 Sumitomo Heavy Industries, LTD. Cryogenic refrigerator and operating method for cryogenic refrigerator
CN113776265B (zh) * 2021-09-06 2022-07-26 珠海格力电器股份有限公司 压缩机延迟启动控制方法和装置、冰箱
JP2024055145A (ja) 2022-10-06 2024-04-18 住友重機械工業株式会社 極低温冷凍機の運転方法および極低温冷凍機

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08313086A (ja) * 1995-05-23 1996-11-29 Daikin Ind Ltd 極低温冷凍機の低圧制御装置
JPH11281182A (ja) 1998-03-31 1999-10-15 Sumitomo Heavy Ind Ltd 蓄冷式冷凍機
JP2014173819A (ja) * 2013-03-12 2014-09-22 Sumitomo Heavy Ind Ltd クライオポンプシステム、クライオポンプシステムの運転方法、及び圧縮機ユニット

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04236069A (ja) 1991-01-16 1992-08-25 Sanyo Electric Co Ltd 冷凍装置
JP2000130874A (ja) * 1998-10-28 2000-05-12 Aisin Seiki Co Ltd 蓄冷型冷凍機
JP3754992B2 (ja) 2001-08-03 2006-03-15 住友重機械工業株式会社 マルチシステム冷凍機の運転方法、装置及び冷凍装置
GB2408071B (en) * 2002-08-17 2005-10-19 Siemens Magnet Technology Ltd Pressure relief valve for a helium gas compressor
CN101790644A (zh) * 2007-08-28 2010-07-28 佳能安内华股份有限公司 低温泵***
GB2455737B (en) * 2007-12-19 2010-08-11 Siemens Magnet Technology Ltd Variable charge compressor
JP5669658B2 (ja) * 2011-04-11 2015-02-12 住友重機械工業株式会社 クライオポンプシステム、圧縮機、及びクライオポンプの再生方法
JP5868224B2 (ja) * 2012-03-07 2016-02-24 住友重機械工業株式会社 クライオポンプシステム、クライオポンプシステムの運転方法、及び圧縮機ユニット
JP6067423B2 (ja) * 2013-03-04 2017-01-25 住友重機械工業株式会社 極低温冷凍装置、クライオポンプ、核磁気共鳴画像装置、及び極低温冷凍装置の制御方法
JP2015137798A (ja) * 2014-01-22 2015-07-30 住友重機械工業株式会社 極低温冷凍機
US10184693B2 (en) * 2015-10-23 2019-01-22 Sumitomo Heavy Industries, Ltd. GM cryocooler

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08313086A (ja) * 1995-05-23 1996-11-29 Daikin Ind Ltd 極低温冷凍機の低圧制御装置
JPH11281182A (ja) 1998-03-31 1999-10-15 Sumitomo Heavy Ind Ltd 蓄冷式冷凍機
JP2014173819A (ja) * 2013-03-12 2014-09-22 Sumitomo Heavy Ind Ltd クライオポンプシステム、クライオポンプシステムの運転方法、及び圧縮機ユニット

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3913300A4

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20220397322A1 (en) * 2021-06-15 2022-12-15 Applied Materials, Inc. Cryogenic Cooling System

Also Published As

Publication number Publication date
JP2020112315A (ja) 2020-07-27
US20210341199A1 (en) 2021-11-04
JP7201447B2 (ja) 2023-01-10
EP3913300A4 (en) 2022-03-23
US12007152B2 (en) 2024-06-11
CN113302439A (zh) 2021-08-24
EP3913300A1 (en) 2021-11-24
CN113302439B (zh) 2022-09-09

Similar Documents

Publication Publication Date Title
WO2020149214A1 (ja) 極低温冷凍機の起動方法、極低温冷凍機
CA2418893C (en) Control system for cryosurgery
US9470436B2 (en) Cryogenic refrigeration apparatus and method of controlling cryogenic refrigeration apparatus
WO2019163742A1 (ja) 極低温冷凍機
WO2013045929A2 (en) Apparatus and method for controlling a cryogenic cooling system
JP4445187B2 (ja) 極低温冷凍機
JP2007303815A (ja) 極低温冷凍機の運転方法
JP2012122352A (ja) Bog多段容積型圧縮機の運転制御方法
US11846458B2 (en) Cryocooler and control method of cryocooler
TWI727363B (zh) 低溫泵系統
US11156387B2 (en) Cryocooler and control device of cryocooler
CN115461582A (zh) 超导磁铁装置、超低温制冷机及超导磁铁装置的冷却方法
US11713912B2 (en) Cryocooler and starting method of cryocooler
JP2004301445A (ja) パルス管冷凍機
JPH1073333A (ja) 極低温冷却装置
US20240118007A1 (en) Method for operating cryocooler and cryocooler
JPH0420754A (ja) 冷凍機及びその冷凍能力の調整方法
JP2003279185A (ja) 極低温冷凍機
JP2795123B2 (ja) 極低温冷凍機のヘリウム圧縮装置
KR20230071991A (ko) 크라이오펌프시스템 및 크라이오펌프시스템의 운전방법
JPH11108476A (ja) 極低温冷却装置
CN117905671A (zh) 油润滑式的超低温制冷机用压缩机及其运行方法
JPH04335959A (ja) 極低温冷凍機

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20741716

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020741716

Country of ref document: EP

Effective date: 20210816