EP3438334B1 - Luftspinnmaschine und anzeigesteuerungsverfahren - Google Patents

Luftspinnmaschine und anzeigesteuerungsverfahren Download PDF

Info

Publication number
EP3438334B1
EP3438334B1 EP18184218.8A EP18184218A EP3438334B1 EP 3438334 B1 EP3438334 B1 EP 3438334B1 EP 18184218 A EP18184218 A EP 18184218A EP 3438334 B1 EP3438334 B1 EP 3438334B1
Authority
EP
European Patent Office
Prior art keywords
sliver
spinning
length
air spinning
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP18184218.8A
Other languages
English (en)
French (fr)
Other versions
EP3438334A1 (de
Inventor
Hiroyuki Susami
Shinji Iwata
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Murata Machinery Ltd
Original Assignee
Murata Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Murata Machinery Ltd filed Critical Murata Machinery Ltd
Publication of EP3438334A1 publication Critical patent/EP3438334A1/de
Application granted granted Critical
Publication of EP3438334B1 publication Critical patent/EP3438334B1/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H1/00Spinning or twisting machines in which the product is wound-up continuously
    • D01H1/11Spinning by false-twisting
    • D01H1/115Spinning by false-twisting using pneumatic means
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H13/00Other common constructional features, details or accessories
    • D01H13/32Counting, measuring, recording or registering devices
    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H4/00Open-end spinning machines or arrangements for imparting twist to independently moving fibres separated from slivers; Piecing arrangements therefor; Covering endless core threads with fibres by open-end spinning techniques
    • D01H4/02Open-end spinning machines or arrangements for imparting twist to independently moving fibres separated from slivers; Piecing arrangements therefor; Covering endless core threads with fibres by open-end spinning techniques imparting twist by a fluid, e.g. air vortex

Definitions

  • the present invention primarily relates to an air spinning machine. More specifically, the present invention relates to a configuration for calculating a consumed sliver length.
  • a configuration is conventionally known in which a process of calculating a consumed sliver length, etc. is executed for the purpose of efficient replenishment of a sliver which is a raw material.
  • This type of textile machine is disclosed in Japanese Examined Patent Application Publication No. H2-29770 (1990 ), Japanese Examined Utility Model Application Publication No. H7-40536 (1995 ), and Japanese Unexamined Patent Application Publication No. H11-279862 (1999 ).
  • Japanese Examined Patent Application Publication No. H2-29770 (1990 ) discloses a production management device for an open-end fine spinning machine or the like.
  • the production management device calculates a consumed sliver length, and if the consumed sliver length reaches a pre-set value, notifies a worker of it.
  • the production management device calculates the consumed sliver length by detecting rotation of a drive shaft that drives a winding drum or a draw-off roller.
  • Japanese Examined Utility Model Application Publication No. H7-40536 (1995 ) discloses an automatic sliver splicing apparatus that splices a beginning of a sliver to an end of a sliver.
  • the automatic sliver splicing apparatus detects a terminal of a sliver by using a phototube type sensor.
  • Japanese Unexamined Patent Application Publication No. H11-279862 (1999 ) relates to a sliver can replacement system that supplies a sliver can accommodating a sliver to a spinning machine.
  • the sliver can replacement system includes a sliver can replacement management device.
  • the sliver can replacement management device calculates a next timing for sliver can replacement based on data of, for example, the amount of a sliver accommodated in the sliver can, a spinning speed in each spinning unit, and a spun yarn count.
  • EP 1 347 085 A2 discloses a spinning unit having an individual-spindle-driving motor to drive rollers of a draft device.
  • the motor is a stepping motor configured to have its rotations speed controlled by a central control device.
  • Japanese Examined Patent Application Publication No. H2-29770 (1990 ) detects rotation of the drive shaft that drives the winding drum or the draw-off roller which is arranged downstream of a spinning apparatus in a fiber travelling direction. This cannot detect a precise consumed sliver length. For example, when a fiber loss occurs in the spinning apparatus, a consumed sliver length that is based on the fiber loss cannot be reflected in an overall consumed sliver length. In addition, when a yarn is partially removed for the purpose of preventing a yarn defect or the like from being wound around a package, it is difficult that a consumed sliver length based on the yarn having this removal is reflected in an overall consumed sliver length. Japanese Examined Utility Model Application Publication No.
  • H7-40536 (1995 ) is a configuration that detects a sliver terminal, and is not a configuration that calculates a specific consumed sliver length.
  • a timing for sliver can replacement is calculated based on a set spinning speed, and therefore the timing for sliver can replacement may not be precisely calculated.
  • a primary object of the present invention is to provide a configuration that precisely calculates a consumed sliver length in an air spinning machine for air spinning.
  • a first aspect of the present invention provides an air spinning machine having the following configuration.
  • the air spinning machine includes a conveyor roller, an air spinning device, an electric motor, and a control part.
  • the conveyor roller feeds a sliver.
  • the air spinning device produces a spun yarn by twisting a fiber bundle made from the sliver with airflow.
  • the electric motor drives the conveyor roller, and has its rotation amount controlled in accordance with a command signal.
  • the control part calculates a consumed length of the sliver based on the command signal.
  • the consumed length of the sliver can be calculated without using a sensor that directly detects the rotation amount of the conveyor roller or the like. This can avoid a cost increase and complication of the configuration of the air spinning machine which may otherwise be caused by addition of a sensor. Moreover, the calculation is performed based on the rotation amount of the conveyor roller that feeds the sliver, and therefore the consumed length of the sliver can be more precisely calculated as compared to when the consumed length of the sliver is calculated based on, for example, a spinning speed.
  • the air spinning machine includes a plurality of spinning units each having at least the conveyor roller and the air spinning device.
  • control part calculates at least either a remaining time before the sliver runs out in any of the plurality of spinning units or a total quantity of sliver required to be replenished in a predetermined time, based on information of an initial length of the sliver and a fiber travelling speed.
  • replenishment of the sliver can be implemented efficiently.
  • the air spinning machine is configured as follows.
  • the air spinning machine includes a first display part that displays information about the plurality of spinning units.
  • the first display part displays at least either the remaining time or the quantity calculated by the control part.
  • the air spinning machine is configured as follows.
  • the air spinning machine includes an alarm part individually disposed in each of the spinning units, the alarm part being configured to be switchable between an alarm state and a non-alarm state.
  • the alarm part switches to the alarm state in a case where the spinning unit where the alarm part is disposed satisfies at least either a condition that a remaining length of the sliver in the spinning unit be equal to or less than a predetermined length or a condition that a remaining time for which the spinning unit is able to perform spinning by using the currently remaining sliver be equal to or less than a predetermined time.
  • the air spinning machine is configured as follows.
  • the air spinning machine includes a second display part individually disposed in each of the spinning units, the second display part being capable of displaying at least a numeral.
  • the second display part displays at least either a remaining length of the sliver or a remaining time before the sliver runs out in the spinning unit where the second display part is disposed.
  • the air spinning machine includes a transmitter that transmits, to outside, at least either the quantity of sliver required to be replenished or a timing when replenishment of the sliver is required, for the plurality of spinning units.
  • the air spinning machine is configured as follows.
  • the air spinning machine includes a guide device that guides the sliver, and a feed device that forms the fiber bundle from the sliver guided by the guide device and feeds the fiber bundle to the air spinning device.
  • the conveyor roller is provided in the guide device or in the feed device, or the conveyor roller is disposed between the guide device and the feed device with respect to a fiber travelling direction.
  • the air spinning machine is configured as follows.
  • the control part executes a process of calculating a remaining length of the sliver based on the consumed length of the sliver.
  • the control part is capable of performing a control that stops the feed device for each of the spinning units based on the calculated remaining length of the sliver, and in this control, the control part stops the feed device in such a manner that an upstream end portion of the sliver in the fiber travelling direction is located at a position upstream of the guide device.
  • control part stores a stop length that is a threshold for the remaining length of the sliver, and stops the feed device upon the remaining length of the sliver becoming equal to or less than the stop length.
  • This configuration can prevent a portion of the sliver near its terminal, which is likely to have a poor quality, from being used to produce the spun yarn.
  • the air spinning machine is configured as follows.
  • the feed device is a draft device that forms a fiber bundle by drafting a sliver guided by the guide device.
  • the conveyor roller is formed of a plurality of draft rollers and a plurality of facing rollers included in the draft device.
  • the air spinning machine includes a draft device cradle that presses the plurality of facing rollers included respectively in adjacent two of the spinning units to the plurality of draft rollers, or that presses the plurality of draft rollers included respectively in adjacent two of the spinning units to the plurality of facing rollers.
  • the control part stops the draft device of one of the two spinning units while the draft device cradle is pressing the draft rollers or the facing rollers and the draft devices of the two spinning units are holding the slivers.
  • one of the spinning units whose draft device is stopped with the sliver held thereon, can resume the spinning operation without cancelling the pressing applied by the draft device cradle. Since one of the spinning units can resume the spinning operation while the other of the spinning units keeps performing the spinning operation, a reduction in production efficiency can be prevented.
  • the air spinning machine is configured as follows.
  • the air spinning machine includes a sliver storage part and a package placement part.
  • the sliver storage part stores the sliver to be guided by the guide device.
  • the package placement part a package obtained after the spun yarn spun by the air spinning device is wound is placed.
  • the package placement part, the spinning unit, the guide device, and the sliver storage part are arranged in this order with respect to a direction perpendicular to a direction in which the spinning units are juxtaposed, and a passage extending in the juxtaposition direction is provided on a side opposite to the spinning unit relative to the package placement part.
  • the sliver storage part is arranged on the side opposite to the passage relative to the spinning unit, which usually would make it difficult for an operator working on the passage to visually observe the remaining length of the sliver.
  • replenishment of the sliver is often implemented after the sliver runs out, and therefore the production efficiency is reduced.
  • adoption of the present invention can make it easy for an operator to grasp the consumed length of the sliver even in the above-described layout. Consequently, replenishment of the sliver is more likely to be implemented before the sliver runs out. Accordingly, the production efficiency can be increased.
  • the air spinning machine is configured as follows.
  • the air spinning machine includes a sliver storage part that stores the sliver to be guided by the guide device.
  • a sensor for detecting the sliver is not provided between the sliver storage part and the air spinning device.
  • a sensor for detecting a rotation amount of the conveyor roller or a length over which the sliver is fed is not provided between an upstream end portion of the feed device and an upstream end portion of the guide device.
  • the configuration of the air spinning machine can be simplified, and manufacturing costs can be lowered.
  • the electric motor is a step motor.
  • a consumed sliver length can be calculated from a command signal through a simple arithmetic operation.
  • the air spinning machine is configured as follows.
  • the air spinning device includes a nozzle block and a hollow guide shaft member.
  • the nozzle block jets air to generate a swirling flow in a spinning chamber, to twist the fiber bundle.
  • the hollow guide shaft member guides the fiber bundle twisted in the spinning chamber to outside.
  • the air spinning machine of the above-described type has a high spinning speed, and therefore a consumed length of a sliver in a spinning unit whose spinning operation is temporarily stopped for some reason is significantly smaller than consumed lengths of slivers in the other spinning units .
  • a timing for replenishing the sliver largely differs among the plurality of spinning units. Accordingly, the effects of the present invention can be exerted more effectively.
  • the air spinning machine includes a reset operation part that enables implementation of an operation for resetting a result of calculation of the consumed length of the sliver calculated by the control part.
  • a second aspect of the present invention provides a display control method for controlling a display of sliver replenishment information, having the following configuration.
  • an external apparatus capable of communicating with the air spinning machine performs a receiving step and a display step as follows.
  • the receiving step at least either a consumed length of a sliver calculated based on the command signal or information calculated based on the consumed length of the sliver is received.
  • the display step a content received in the receiving step is displayed on the external apparatus.
  • upstream and downstream mean upstream and downstream with respect to a fiber travelling direction.
  • a fine spinning machine (air spinning machine) 1 includes a plurality of spinning units 2 juxtaposed, a yarn splicing cart 41, a doffing cart 42, and an engine box 43.
  • the engine box 43 has a machine control part 101 disposed therein.
  • the machine control part 101 controls the plurality of spinning units 2.
  • the engine box 43 includes a machine display part (first display part) 50.
  • the machine display part 50 when appropriately operated by an operator, displays information about an operation status and/or yarn quality of each spinning unit 2.
  • the machine control part 101 is configured to transmit the information to a portable terminal (external apparatus) 200 carried by the operator, via an antenna (transmitter) 103.
  • the machine control part 101 may transmit the information to a drawing frame which is a machine that performs a process preceding to the process of the fine spinning machine 1.
  • the machine display part 50 and the machine control part 101 may be provided in a place other than the engine box 43.
  • the portable terminal 200 which is a smartphone, a tablet terminal, a wearable terminal, or the like, includes at least a communication part that performs wireless communication with the fine spinning machine 1 and a display part that displays predetermined information.
  • the portable terminal 200 may be a general purpose machine capable of executing various applications, or may be a special purpose machine (embedded machine) capable of executing only an application related to a textile machine as exemplified by the fine spinning machine 1.
  • each spinning unit 2 includes a sliver storage part (sliver can) 5, a plurality of guide devices 6, a draft device (feed device) 7, an air spinning device 9, a yarn storage device 12, and a winding device 13, which are arranged in this order from upstream to downstream.
  • the draft device 7 drafts a sliver 15 while feeding the sliver 15 from the sliver storage part 5, to form a fiber bundle 8.
  • the fiber bundle 8 fed by the draft device 7 is spun by the air spinning device 9.
  • a spun yarn 10 outputted from the air spinning device 9 passes through a later-described yarn clearer 49, and then further passes through a yarn storage device 12. Then, the spun yarn 10 is wound around a bobbin 48 by the winding device 13, to form a package 28.
  • the guide devices 6 guide the sliver 15, which is stored in the sliver storage part 5, toward the draft device 7.
  • Each of the guide devices 6 is a columnar member including a guide portion that guides the sliver 15 in its widthwise direction.
  • the guide portion is disposed along a direction parallel to a fiber travelling direction.
  • a driving part for driving the guide devices 6 is not provided, but the draft device 7 arranged on the downstream side pulls the sliver 15 so that the sliver 15 is conveyed downstream.
  • a driving part for driving the guide devices 6 is provided.
  • the shape of the guide device 6 is not limited to a columnar shape.
  • the guide device 6 may, for example, be provided with a guide surface for contacting the sliver 15 and a regulating surface for making the sliver 15 less likely to deviate from the guide surface.
  • the guide device 6 may be configured to move (rotate) together with the sliver 15, or may be configured not to displace (rotate) even though the sliver 15 is moved.
  • the guide device 6 may be a roller that is rotationally driven, or may be a follower roller that is rotated due to friction against the sliver 15.
  • the draft device 7 conveys the sliver 15 fed from the guide devices 6 while pinching the sliver 15 with a plurality of draft rollers (bottom rollers, conveyor rollers) and a plurality of facing rollers (top rollers, conveyor rollers), thereby stretching (drafting) the sliver 15 to reach a predetermined fiber amount (or thickness), to form the fiber bundle 8.
  • the draft device 7 includes four draft rollers, namely, a back roller 16, a third roller 17, a middle roller 19, and a front roller 20, which are arranged in this order from upstream.
  • An apron belt 18 made of rubber is wrapped around the middle roller 19.
  • Each of the draft rollers is rotationally driven at a predetermined rotation speed.
  • the facing rollers of two adjacent spinning units 2 have their shafts coupled to each other and supported by a draft device cradle 21.
  • the draft device cradle 21 is displaceable between a position where the draft device cradle 21 presses the facing rollers against the draft rollers and a position where the draft device cradle 21 separates the facing rollers away from the draft rollers. Separating the facing rollers away from the draft rollers makes cleaning of the draft device 7 possible.
  • the draft device cradle 21 may be configured to support the draft rollers as well as the facing rollers.
  • the draft device 7 includes a first motor 81 for driving the back roller 16, a second motor 82 for driving the third roller 17, a third motor 83 for driving the middle roller 19, and a fourth motor 84 for driving the front roller 20.
  • the first motor 81 to the fourth motor 84 are provided for each spinning unit 2, and therefore whether to rotate the draft rollers and a rotation speed of the draft rollers can be changed for each spinning unit 2.
  • the draft device 7 includes a first motor control part 85, a second motor control part 86, a third motor control part 87, and a fourth motor control part 88, serving as motor drivers for driving the first motor (electric motor) 81 to the fourth motor 84, respectively.
  • the first motor 81 to the fourth motor 84 are controlled by a unit control part 102 provided for each spinning unit 2.
  • the unit control part 102 may be provided for every plurality of spinning units 2, instead of being provided for each spinning unit 2.
  • the first motor 81 is a step motor whose rotation amount (the number of rotations and the angle of rotation) is controlled based on the number of pulses (the number of pulses indicating rotation of the first motor 81) that are inputted from the unit control part 102 to the first motor control part 85.
  • the number of rotations of the first motor 81 per unit time can be controlled by changing the number of pulses inputted per unit time.
  • the unit control part 102 is able to obtain the number of rotations of the first motor 81 based on the number of pulses (command signal) indicating rotation of the first motor 81. In a case of the first motor 81 being a step motor, therefore, it is easy to obtain the number of rotations of the first motor 81.
  • the fine spinning machine 1 is not provided with a sensor for detecting the presence or absence of the sliver 15 guided by the guide devices 6.
  • the fine spinning machine 1 is also not provided with a sensor for detecting the number of rotations of the draft rollers (especially the back roller 16 which is a conveyor roller arranged most upstream in the fiber travelling direction).
  • the fine spinning machine 1 is also not provided with a sensor for directly or indirectly detecting a length over which the sliver 15 travels.
  • a sensor for detecting the amount of sliver 15 is not arranged in a range from the sliver storage part 5 to the air spinning device 9 (in another aspect, from the guide devices 6 to the draft device 7).
  • the air spinning device 9 produces the spun yarn 10 by using the fiber bundle 8 fed from the draft device 7. More specifically, as shown in FIG. 3 , the air spinning device 9 includes a first holder (nozzle block) 60 and a second holder 70.
  • the first holder 60 is arranged in an upstream end portion of the air spinning device 9.
  • the first holder 60 includes a fiber guide 61, a spinning chamber 62, and a nozzle 63.
  • the fiber guide 61 guides the fiber bundle 8 drafted by the draft device 7 toward the inside of the air spinning device 9.
  • the fiber guide 61 has a fiber introducing port 61a and a guide needle 61b.
  • the fiber bundle 8 drafted by the draft device 7 is introduced through the fiber introducing port 61a, and is guided into the spinning chamber 62 while being wrapped around the guide needle 61b.
  • the air spinning device 9 is configured such that air is jetted from the nozzle 63 into the spinning chamber 62 to apply a swirling airflow to the fiber bundle 8 in the spinning chamber 62. It may be acceptable that the guide needle 61b is omitted and a downstream end portion of the fiber guide 61 has a function as the guide needle 61b.
  • the second holder 70 includes a hollow guide shaft member 71.
  • the hollow guide shaft member 71 has a yarn passage 72 formed in its shaft center. Due to the air jetted from the nozzle 63, the rear ends of fibers of the fiber bundle 8 swing around the distal end of the hollow guide shaft member 71. The fiber bundle 8 twisted in this manner passes through the yarn passage 72, and is outputted outside the air spinning device 9 through a yarn outlet (not shown) which is provided on the downstream side.
  • the yarn storage device 12 is provided downstream of the air spinning device 9.
  • the yarn storage device 12 includes a yarn storage roller 26 as shown in FIG. 2 .
  • the yarn storage roller 26 is configured to have a certain amount of spun yarn 10 wound on its outer peripheral surface, for temporary storage. Rotating the yarn storage roller 26 at a predetermined rotation speed with the spun yarn 10 wound on the outer peripheral surface of the yarn storage roller 26 enables the spun yarn 10 to be drawn out from the air spinning device 9 and conveyed downstream at a predetermined speed. Since the spun yarn 10 can be temporarily stored on the outer peripheral surface of the yarn storage roller 26, the yarn storage device 12 is able to function as a buffer of sorts. This can deal with a trouble (for example, a slack of the spun yarn 10) caused by a phenomenon in which a spinning speed of the air spinning device 9 and a winding speed (a travelling speed of the spun yarn 10 wound around the package 28) are inconsistent for some reason.
  • a trouble for example, a slack of the spun yarn
  • a delivery roller and a nip roller may be provided to draw out the spun yarn 10 from the air spinning device 9 with this roller pair.
  • a delivery roller and a nip roller may be provided between the air spinning device 9 and the yarn storage device 12.
  • a slack tube that temporarily stores the spun yarn 10 with air, instead of the yarn storage device 12, may be provided downstream of the roller pair.
  • a yarn guide 25 and the winding device 13 are arranged downstream of the yarn storage device 12. It may be acceptable that a waxing device is provided between the yarn guide 25 and the winding device 13, to apply a wax to the spun yarn 10.
  • the winding device 13 includes a cradle arm 46, a winding drum 98, and a traverse guide 99.
  • the cradle arm 46 rotatably supports the bobbin 48 for winding the spun yarn 10.
  • the winding drum 98 receives a drive force transmitted from a winding drum drive motor (not shown), to be rotated while being in contact with an outer peripheral surface of the package 28 or the bobbin 48.
  • the winding drum drive motor for example, is shared by the plurality of spinning units 2, and is arranged in the engine box 43.
  • the traverse guide 99 is capable of engaging with the spun yarn 10.
  • the winding device 13 drives the winding drum 98 by the winding drum drive motor while reciprocating the traverse guide 99 by drive means (not shown). Thereby, the winding device 13 rotates the package 28 which is in contact with the winding drum 98, to wind the spun yarn 10 around the package 28 while traversing the spun yarn 10.
  • Each spinning unit 2 includes a unit display panel 53.
  • the unit display panel 53 includes an alarm lamp (alarm part) 54, a unit display part (second display part) 55, and a reset operation part 56.
  • the alarm lamp 54 is turned off in a normal state (non-alarm state), and is turned on when an abnormality requiring intervention of an operator occurs in the spinning unit 2 (alarm state).
  • the alarm lamp 54 may be turned on both in the normal state and in an abnormal state, and be configured to have its color in the normal state different from its color in the abnormal state.
  • the alarm lamp 54 may be turned off or turned on in the normal state, and be configured to flash in the abnormal state. The operator is able to recognize occurrence of an abnormality by visually observing the state of the alarm lamp 54.
  • the unit display part 55 is a segment display which, at a time of occurrence of an abnormality, displays information about the abnormality, an error code, and the like.
  • the reset operation part 56 is, for example, a button for resetting a result (accumulated length) of calculation of a consumed length of the sliver 15 which will be described later.
  • the yarn splicing cart 41 includes a yarn splicing device 93, a suction pipe 94, and a suction mouth 95, as shown in FIG. 1 and FIG. 2 . If a yarn breakage or a yarn disconnection occurs in a spinning unit 2, the yarn splicing cart 41 travels on a rail (not shown) and stops at or near the spinning unit 2. The suction pipe 94 swings upward about a shaft to catch a spun yarn 10 outputted from the air spinning device 9, and swings downward about the shaft, thus guiding the spun yarn 10 to the yarn splicing device 93.
  • the suction mouth 95 swings downward about a shaft to catch a spun yarn 10 from the package 28, and swings upward about the shaft, thus guiding the spun yarn 10 to the yarn splicing device 93.
  • the yarn splicing device 93 splices yarns of the guided spun yarns 10 to each other. This enables the winding device 13 to resume winding of the spun yarn 10.
  • the doffing cart 42 performs a bobbin setting work of feeding a bobbin 48 to the cradle arm 46 and preparing to wind the spun yarn 10, and a doffing work of removing a fully wound package 28 from the cradle arm 46.
  • the doffing cart 42 Upon receiving an instruction to perform the bobbin setting work and/or the doffing work on a spinning unit 2, the doffing cart 42 travels on a travelling path to the spinning unit 2, the travelling path being outside a region where the spinning units 2 are juxtaposed.
  • the doffing cart 42 stops in front of the spinning unit 2 associated with the instruction, and performs the bobbin setting work or the doffing work (or both of the works).
  • the package 28 doffed by the doffing cart 42 is placed in a package placement part 47.
  • the package placement part 47 has a function as a conveyor, and the package 28 is conveyed in a direction in which the spinning units 2 are juxtaposed, and is automatically sent to the next process. It however may be acceptable that the package placement part 47 has no conveyor function and the operator collects the package 28 from the package placement part 47 by hand. The doffing work is performed in the above-described manner.
  • a passage 44 where the operator passes is provided on a side opposite to the spinning unit 2 across the package placement part 47.
  • the passage 44 is provided on a front side of the fine spinning machine 1 (for example, the side where the machine display part 50 or the unit display panel 53 is arranged) (machine front side).
  • the fine spinning machine 1 has the sliver storage part 5 arranged on the machine rear side (right side in FIG. 2 ), and the passage 44 provided on the opposite side which means the machine front side (left side in FIG. 2 ). In a region therebetween, the passage 44, the spinning unit 2, the guide devices 6, and the sliver storage part 5 are arranged in this order from the machine front side. Since a number of members are interposed between the passage 44 and the sliver storage part 5, the operator passing through the passage 44 cannot directly visually observe a remaining length of the sliver 15 of the sliver storage part 5. This involves a problem of difficulty in grasping a timing for replenishing the sliver 15.
  • the fine spinning machine 1 of this embodiment has a configuration for enabling the operator to easily observe the remaining length of the sliver 15.
  • Processes for calculating and displaying information about replenishment of the sliver 15 will now be described with reference to FIG. 5 to FIG. 9 . These processes are executed by the machine control part 101, the unit control part 102, and the portable terminal 200.
  • the machine control part 101 and the unit control part 102 may be collectively referred to as control part 100.
  • an overall work of producing the package 28 from the sliver 15 will be referred to as "spinning operation".
  • the spinning operation is an operation including drafting by the draft device 7 and spinning by the air spinning device 9.
  • the unit control part 102 is able to acquire the cumulative number of rotations of the first motor 81 based on the number of pulses that are transmitted to the first motor control part 85, the pulses indicating rotation of the back roller 16. Since the ratio between the number of rotations of the first motor 81 and the number of rotations of the back roller 16 is fixed, the cumulative number of rotations of the back roller 16 can be calculated (acquired) based on the cumulative number of rotations of the first motor 81 (S101). When the ratio between the number of rotations of the back roller 16 and the number of rotations of the first motor 81 is one, the cumulative number of rotations of the first motor 81 is equal to the cumulative number of rotations of the back roller 16.
  • the unit control part 102 calculates a consumed length of the sliver 15 based on the cumulative number of rotations of the back roller 16 acquired in step S101 (S102). More specifically, the unit control part 102 multiplies the cumulative number of rotations of the back roller 16 by the diameter of the back roller 16 and pi, thereby calculating a length of the sliver 15 sent out by the back roller 16 (that is, a consumed length of the sliver 15). In consideration of slippage between the sliver 15 and the back roller 16, further multiplication by a correction factor or the like may be executed.
  • the unit control part 102 acquires the consumed length of the sliver 15 calculated in step S102, a fiber travelling speed set value (a set travelling speed of any of the sliver 15, the fiber bundle 8, and the spun yarn 10), and information of an initial length of the sliver 15.
  • a fiber travelling speed set value a set travelling speed of any of the sliver 15, the fiber bundle 8, and the spun yarn 10
  • information of an initial length of the sliver 15 is a constant value.
  • the fiber travelling speed set value and the information of the initial length of the sliver 15 are preliminarily inputted by the operator, and stored in the machine control part 101 or in the unit control part 102. Alternatively, these types of information may be acquired by the machine control part 101 communicating with another apparatus. For example, the information of the initial length of the sliver 15 may be acquired from a storage part of the sliver storage part 5 or from the drawing frame.
  • the unit control part 102 calculates a remaining length of the sliver 15 and a remaining time before the sliver 15 runs out, based on the cumulative number of rotations of the back roller 16, the fiber travelling speed set value, and the information of the initial length of the sliver 15 (S103).
  • the remaining length of the sliver 15 can be calculated by subtracting the consumed length of the sliver 15 from the information of the initial length of the sliver 15.
  • the consumed length of the sliver 15 per unit time can be calculated by using the fiber travelling speed set value, and thus the remaining time before the sliver 15 runs out can be calculated.
  • step S103 It may be also acceptable to perform the processing of step S103 by using a fiber travelling speed (for example, an average travelling speed of the sliver 15 over a predetermined time period in the past) that is calculated not based on the fiber travelling speed set value but based on the rotation speed of the back roller 16.
  • a fiber travelling speed for example, an average travelling speed of the sliver 15 over a predetermined time period in the past
  • the unit control part 102 displays, on the unit display part 55, the remaining length of the sliver 15 or the remaining time calculated in step S103 (S104). Since the unit display part 55 is a segment display, a numeral corresponding to the remaining length or the remaining time is displayed. In a case of displaying the remaining length, the remaining length may be indicated as a specific numerical value (e.g., "2" meters), or may be indicated as the percentage (e.g., "15" %) of the remaining length in the initial length. Instead of the remaining length, the remaining time may be indicated.
  • both the remaining length and the remaining time can be displayed.
  • the unit display part 55 may be configured such that which of the remaining length and the remaining time is to be displayed is switchable.
  • the unit control part 102 determines whether or not the remaining length calculated in step S103 is equal to or less than a stop length (S105).
  • the stop length is a numerical value for prescribing a timing for stopping the spinning operation.
  • a spinning operation is stopped upon detecting that the fiber bundle 8 is fully fed to the air spinning device 9 or that the spun yarn 10 is no longer outputted from the air spinning device 9.
  • a work of placing a sliver 15 onto the guide devices 6 is necessary to resume the spinning operation after replenishment of the sliver 15.
  • the draft device cradle 21 supports the facing rollers of two spinning units 2 together as described above, and therefore it is also necessary to separate the facing rollers away from the draft rollers and to redo the setting of the sliver 15 to the draft device 7. It therefore is necessary to stop a spinning operation of an adjacent spinning unit 2, too.
  • this embodiment stops the spinning operation if the remaining length becomes equal to or less than the stop length (S106).
  • the stop length is such a value that an upstream end portion of the sliver 15 is located at a position upstream of the guide devices 6 (that is, upstream of the draft device 7) after the spinning operation is stopped.
  • the unit control part 102 determines whether or not the remaining length is equal to or less than a caution length (predetermined length) (S107).
  • the caution length which is longer than the stop length, is a length for determining a timing for prompting the operator to replenish the sliver 15. If the calculated remaining length is equal to or less than the caution length, the unit control part 102 turns on the alarm lamp 54 (S108). At this time, an error code indicating that the sliver 15 is running short may be displayed on the unit display part 55. In addition to or instead of the alarm lamp 54, an alarm sound may be outputted. Instead of turning on the alarm lamp 54 based on the remaining length, the alarm lamp 54 may be turned on upon the remaining time becoming equal to or less than a caution time (predetermined time).
  • step S109 the unit control part 102 transmits the calculated remaining length of the sliver 15 and the calculated remaining time to the machine control part 101 (S109).
  • the transmission in step S109 may be either wired or wireless.
  • the unit control part 102 executes the processing of step S101 again.
  • the unit control part 102 determines whether or not the reset operation part 56 is operated (S110). If the reset operation part 56 is operated, the unit control part 102 resets the consumed length of the sliver 15. By the reset operation part 56 being operated after replenishment of the sliver 15, therefore, the unit control part 102 is allowed to appropriately calculate the consumed length of the sliver 15 with replenishment of the sliver 15 taken into account. Specifically, the consumed length of the sliver 15 managed by the unit control part 102 is zeroed, and the remaining length of the sliver 15 is matched to the information of the initial length of the sliver 15.
  • a sliver 15 remaining in the sliver storage part 5 after the spinning operation is stopped is likely to have a poor quality.
  • the operator therefore, discards the remaining sliver 15, and joins a downstream end portion of the replenished sliver 15 to the sliver 15 set in the spinning unit 2, the joining being implemented at a position upstream of the guide devices 6.
  • the operator may not necessarily discard the remaining sliver 15.
  • the unit control part 102 determines the presence or absence of an instruction to resume the spinning operation (S112). If the instruction to resume the spinning operation is given, the unit control part 102 resumes the spinning operation (S113), and executes the processing of step S101 again. If the instruction to resume the spinning operation is not given, the unit control part 102 waits until the resumption instruction is given.
  • the machine control part 101 acquires (receives) the information (specifically, the remaining length of the sliver 15 and the remaining time in each spinning unit 2) transmitted by the unit control part 102 in step S109 as described above (S201).
  • the machine control part 101 compares the remaining times received from the unit control parts 102 of the plurality of spinning units 2 against one another, selects the shortest remaining time, and displays it on the machine display part 50 as "Time until replenishment is required" as shown in FIG. 10 (S202). The operator seeing this display can grasp a timing when the sliver 15 needs to be replenished.
  • the machine control part 101 displays, on the machine display part 50, information indicating the spinning unit 2 for which the remaining time selected and displayed in step S202 has been calculated (S203).
  • the operator seeing this display can grasp which spinning unit 2 needs next replenishment of the sliver 15.
  • the spinning unit 2 having the shortest remaining time but also any spinning unit 2 that needs replenishment of the sliver 15 in a predetermined time may be displayed on the machine display part 50.
  • the machine control part 101 calculates the total quantity (for example, the number of slivers 15, the number of sliver storage parts) of sliver 15 required to be replenished in a predetermined time based on the acquired remaining time, and displays a calculation result on the machine display part 50 (S204). The operator seeing this display can grasp how much quantity of sliver 15 is required.
  • the machine control part 101 transmits the information displayed on the machine display part 50 (specifically, the time until replenishment is required, information indicating the spinning unit 2 that needs next replenishment, and the total quantity of sliver required to be replenished in a predetermined time) to the portable terminal 200 via the antenna 103 (S205).
  • Information transmitted to the portable terminal 200 may include one or two of the three types of information mentioned above, or may include information about each spinning unit 2 that the machine control part 101 has acquired from the unit control part 102.
  • the information transmitted to the portable terminal 200 may be information calculated separately for the purpose of being transmitted to the portable terminal 200, as long as it is sliver replenishment information which means information related to replenishment of the sliver 15.
  • the timing may be each time the contents of information displayed on the machine display part 50 are updated as shown in FIG. 7 , or may be upon receiving a request from the portable terminal 200. Any other timings may be acceptable.
  • the portable terminal 200 receives the information displayed on the machine display part 50 (specifically, the time until replenishment is required, information indicating the spinning unit 2 that needs next replenishment, and the total quantity of sliver required to be replenished in a predetermined time) from the machine control part 101 (S301; receiving step).
  • the portable terminal 200 displays, on a display screen of the portable terminal 200, the information received from the machine control part 101 (S302; display step).
  • the operator carrying this portable terminal 200 can grasp the status of consumption of the sliver 15 without the need to see the unit display panel 53 of the machine display part 50, which enables the sliver 15 to be replenished more efficiently.
  • the information transmitted by the machine control part 101 may be another type of information as described above.
  • the portable terminal 200 displays information different from the above-described information.
  • the portable terminal 200 may be configured to receive and store various types of information related to replenishment of the sliver 15, which are possessed by the machine control part 101, and to display a type of information in response to an operator's operation.
  • the portable terminal 200 may be configured to access the machine control part 101 in response to an operator's operation and acquire corresponding information.
  • the fine spinning machine 1 of this embodiment includes the back roller 16, the air spinning device 9, the first motor 81, and the control part 100.
  • the back roller 16 feeds the sliver 15.
  • the air spinning device 9 produces the spun yarn 10 by twisting the fiber bundle 8 made from the sliver 15 with airflow.
  • the first motor 81 drives the back roller 16, and has its rotation amount controlled in accordance with a command signal (specifically, the number of pulses).
  • the control part 100 calculates a consumed length of the sliver 15 based on the command signal.
  • the consumed length of the sliver 15 can be calculated without using a sensor that directly detects the rotation amount of the draft rollers or the like. This can avoid a cost increase and complication of the configuration of the fine spinning machine 1 which may otherwise be caused by addition of a sensor. Moreover, the calculation is performed based on the rotation amount of the draft rollers that feed the sliver 15, and therefore the consumed length of the sliver 15 can be more precisely calculated as compared to when the consumed length of the sliver 15 is calculated based on, for example, the spinning speed.
  • the fine spinning machine 1 of this embodiment includes the plurality of spinning units 2 each having at least the back roller 16 and the air spinning device 9.
  • control part 100 calculates at least either the remaining time before the sliver 15 runs out in any of the plurality of spinning units 2 or the total quantity of sliver 15 required to be replenished in a predetermined time, based on the information of the initial length of the sliver 15 and the fiber travelling speed.
  • replenishment of the sliver 15 can be implemented efficiently.
  • the fine spinning machine 1 of this embodiment includes the machine display part 50 that displays information about the plurality of spinning units 2.
  • the machine display part 50 displays at least either the remaining time before the sliver 15 runs out in any of the plurality of spinning units 2 or the total quantity of sliver 15 required to be replenished in a predetermined time.
  • the fine spinning machine 1 of this embodiment includes the alarm lamps 54 individually disposed in the respective spinning units 2, each of the alarm lamps 54 being configured to be switchable between the alarm state and the non-alarm state.
  • the alarm lamp 54 switches to the alarm state in a case where the spinning unit 2 where the alarm lamp 54 is disposed satisfies at least either a condition that the remaining length of the sliver 15 in the spinning unit 2 be equal to or less than the caution length or a condition that the remaining time for which the spinning unit 2 is able to perform spinning by using the currently remaining sliver 15 be equal to or less than the caution time.
  • the operator replenishing the sliver 15 observes details of alarming given by the alarm lamp 54 (whether or not it is turned on, its lighting color, whether or not it is flashing, etc.), which enables the operator to identify the spinning unit 2 that needs replenishment of the sliver 15 at an early stage. Accordingly, replenishment of the sliver 15 can be implemented efficiently.
  • the fine spinning machine 1 of this embodiment includes the unit display parts 55 individually disposed in the respective spinning units 2, each of the unit display parts 55 being capable of displaying at least a numeral.
  • the unit display part 55 displays at least either the remaining length of the sliver 15 or the remaining time before the sliver 15 runs out in the spinning unit 2 where this unit display part 55 is disposed.
  • the fine spinning machine 1 of this embodiment includes the antenna 103 that transmits, to outside, at least either the quantity of sliver 15 required to be replenished or a timing when replenishment of the sliver 15 is required, for the plurality of spinning units 2.
  • the fine spinning machine 1 of this embodiment includes the guide devices 6 that guide the sliver 15, and the draft device 7 that forms the fiber bundle 8 from the sliver 15 guided by the guide devices 6 and feeds the fiber bundle 8 to the air spinning device 9.
  • the draft device 7 is provided with the back roller 16 serving as a conveyor roller.
  • the control part 100 executes the process of calculating the remaining length of the sliver 15 based on the consumed length of the sliver 15.
  • the control part 100 is capable of performing a control that stops the draft device 7 for each spinning unit 2 based on the calculated remaining length of the sliver 15. In this control, the draft device 7 is stopped in such a manner that the upstream end portion of the sliver 15 in the fiber travelling direction is located at a position upstream of the guide devices 6.
  • the control part 100 stores the stop length which is a threshold for the remaining length of the sliver 15, and stops the draft device 7 upon the remaining length of the sliver 15 becoming equal to or less than the stop length.
  • This configuration can prevent a portion of the sliver 15 near its terminal, which is likely to have a poor quality, from being used to produce the spun yarn 10.
  • the fine spinning machine 1 of this embodiment includes the draft device cradle 21 that presses the plurality of facing rollers included respectively in two adjacent spinning units 2 to the plurality of draft rollers, or that presses the plurality of draft rollers included respectively in two adjacent spinning units 2 to the plurality of facing rollers.
  • the control part 100 stops the draft device 7 of one of the two spinning units 2 while the draft device cradle 21 is pressing the draft rollers and the draft devices 7 of the two spinning units 2 are holding slivers 15.
  • one of the spinning units 2 whose draft device 7 is stopped with the sliver 15 held thereon, can resume the spinning operation without cancelling the pressing applied by the draft device cradle 21. Since one of the spinning units 2 can resume the spinning operation while the other of the spinning units 2 keeps performing the spinning operation, a reduction in production efficiency can be prevented.
  • the fine spinning machine 1 of this embodiment includes the sliver storage part 5 and the package placement part 47.
  • the sliver storage part 5 stores a sliver 15 to be guided by the guide devices 6.
  • the package placement part 47 a package obtained after the spun yarn 10 spun by the air spinning device 9 is wound is placed.
  • the package placement part 47, the spinning unit 2, the guide devices 6, and the sliver storage part 5 are arranged in this order with respect to a direction perpendicular to the direction in which the spinning units 2 are juxtaposed, and a passage extending in the juxtaposition direction is provided on the side opposite to the spinning unit 2 relative to the package placement part 47.
  • the sliver storage part 5 is arranged on the side opposite to the passage relative to the spinning unit 2, which usually would make it difficult for an operator working on the passage to visually observe the remaining length of the sliver 15.
  • replenishment of the sliver 15 is often implemented after the sliver 15 runs out, and therefore the production efficiency is reduced.
  • adoption of the present invention can make it easy for an operator to grasp the consumed length of the sliver 15 even in the above-described layout. Consequently, replenishment of the sliver 15 is more likely to be implemented before the sliver 15 runs out. Accordingly, the production efficiency can be increased.
  • the fine spinning machine 1 of this embodiment includes the sliver storage part 5 that stores the sliver 15 to be guided by the guide devices 6.
  • a sensor for detecting the sliver 15 is not provided between the sliver storage part 5 and the air spinning device 9.
  • a sensor for detecting a rotation amount of the draft rollers or a length over which the sliver 15 is fed is not provided between the upstream end portion of the draft device 7 and the upstream end portion of the guide devices 6.
  • the fine spinning machine 1 of this embodiment enables information about the amount of sliver 15 to be grasped without providing any sensor for detecting the presence or absence of the sliver 15.
  • the first motor 81 is a step motor.
  • a consumed sliver length can be calculated from a command signal through a simple arithmetic operation.
  • the fine spinning machine 1 of this embodiment includes the first holder 60 and the hollow guide shaft member 71.
  • the first holder 60 jets air to generate a swirling flow in the spinning chamber 62, thereby twisting the fiber bundle 8.
  • the hollow guide shaft member 71 guides the fiber bundle 8 twisted in the spinning chamber 62 to outside (outside of the hollow guide shaft member 71, which means outside of the air spinning device 9).
  • the fine spinning machine 1 of the above-described type has a high spinning speed, and therefore a consumed length of a sliver 15 in a spinning unit 2 whose spinning operation is temporarily stopped for some reason is significantly smaller than consumed lengths of slivers 15 in the other spinning units 2.
  • a timing for replenishing the sliver 15 largely differs among the plurality of spinning units 2. Accordingly, the effects of the present invention can be exerted more effectively.
  • the fine spinning machine 1 of this embodiment includes the reset operation part 56 that enables implementation of an operation for resetting a result of calculation of the consumed length of the sliver 15 calculated by the control part 100.
  • hardware that generates a pulse indicating rotation of the back roller 16 and hardware that calculates the cumulative number of rotations based on the number of pulses are the same. They, however, may be different from each other.
  • the first motor 81 to the fourth motor 84 are provided for each spinning unit 2.
  • the draft rollers of the plurality of spinning units 2 may be driven by a common motor.
  • the rotation speeds of the draft rollers of the respective spinning units 2 are equal.
  • switching between transmission and non-transmission of power from the motor to the draft rollers can be implemented by using a clutch, and thereby whether or not to rotate the draft rollers can be switched for each spinning unit 2.
  • a consumed sliver length can be calculated based on a rotation amount of the draft rollers and an operation state of the clutch.
  • the third motor 83 and the fourth motor 84 are shared by the plurality of spinning units 2 and are disposed in the engine box 43.
  • alarming by the alarm lamp 54 and displaying by the unit display part 55 are performed based on the remaining length of the sliver 15, but it may be performed based on the remaining time before the sliver 15 runs out.
  • a consumed length of the sliver 15 is calculated based on the number of pulses used for rotating the first motor 81 that drives the back roller 16.
  • a consumed length of the sliver 15 may be calculated based on the number of pulses used for rotating a motor that drives another draft roller (the third roller 17, the middle roller 19, the front roller 20).
  • a draft roller other than the back roller 16 may serve as a conveyor roller of the present invention.
  • a roller other than the draft rollers may serve as a conveyor roller.
  • a drive roller other than the draft rollers which is disposed inside a region of the draft device 7 may serve as a conveyor roller. Being inside the region of the draft device 7 means being supported by the draft device cradle 21 or being disposed near the draft rollers.
  • a roller disposed upstream of the draft device 7 may serve as a conveyor roller.
  • a rotationally driven roller arranged as the guide device 6 may serve as a conveyor roller. In such a configuration, it is preferable that the rotation speed of this conveyor roller is exactly the same as or approximate to the rotation speed of the back roller 16.
  • a rotationally driven roller disposed between the guide devices 6 and the draft device 7 may serve as a conveyor roller.
  • any of such conveyor rollers is a roller that rotates while being in contact with the sliver 15 and that feeds the sliver 15 along with the rotation.
  • the shape of the conveyor roller may be a shape other than a columnar shape, as long as it is configured to rotate and feed the sliver 15.
  • Each of such conveyor rollers may be rotationally driven on a standalone basis, or may be rotationally driven together with another roller.
  • an electric motor that drives the conveyor roller may be configured to rotationally drive the conveyor roller alone, to rotationally drive the conveyor roller together with another roller included in the same spinning unit 2, or to rotationally drive the conveyor roller together with a roller included in another spinning unit 2.
  • a consumed length of the sliver 15 is detected based on the number of pulses used for rotating the first motor 81.
  • a reference example shown in FIG. 11 can also exert the same effects.
  • a rotation sensor 89 that detects a rotation amount of the back roller 16 is provided, and the cumulative number of rotations of the back roller 16 is calculated based on a detection result from the rotation sensor 89.
  • the back roller 16 and the third roller 17 are rotated in synchronization, because the ratio between the numbers of rotations of them is fixed though they have different rotation speeds.
  • the fine spinning machine 1 may include a sensor for detecting a rotation amount of the third roller 17 instead of a sensor for detecting a rotation amount of the back roller 16.
  • a gear that transmits power from an output shaft of the first motor 81 to a drive shaft of the back roller 16 or the third roller 17 is also rotated in synchronization with the back roller 16, and therefore the number of rotations of the gear may be detected.
  • the reset operation part 56 is provided on the passage 44 side (machine front side) of the spinning unit 2, but it may be provided on the side (machine rear side, near the sliver storage part 5 and the guide devices 6) opposite to the passage 44 across the spinning unit 2.
  • the fine spinning machine 1 may be configured to cause an automatic resetting after resuming a spinning operation that has been stopped as a result of a sliver remaining length becoming equal to or less than the stop length.
  • the process of calculating information about replenishment of the sliver 15 is executed by the machine control part 101 or by the unit control part 102.
  • the process executed by the machine control part 101 in the above illustration may be partially executed by the unit control part 102, and vice versa.
  • the process of calculating a remaining time in each spinning unit 2 may be executed by the machine control part 101.
  • the unit control part 102 may have a function for communicating with the portable terminal 200.
  • the air spinning device 9 may include, instead of the configuration described in the embodiment above, a pair of air-jet nozzles for twisting a fiber bundle in opposite directions.
  • the air spinning device 9 of the embodiment described above is an air-jet fine spinning machine
  • the present invention is applicable to an open-end fine spinning machine, too.
  • An open-end fine spinning machine is provided with a feed device instead of a draft device.
  • the feed device includes a feed roller (conveyor roller) that feeds a sliver guided by a guide device to an air spinning device (specifically, to a fiber opening chamber for opening a fiber and a spinning chamber for bundling and twisting the opened fibers).
  • the feed roller may not be provided with a facing roller.
  • a command signal indicating a rotation amount of an electric motor that drives the feed roller can be used to calculate a consumed sliver length, etc., similarly to the embodiment described above.
  • the variation illustrated above is applicable not only to an air-jet fine spinning machine but also to an open-end fine spinning machine, unless incompatible therewith.
  • a consumed length of the sliver 15, etc. is calculated based on a command signal (the number of pulses) given to the first motor 81 which is a step motor.
  • An electric motor that drives the conveyor roller need not be a step motor but may be a servo motor for example, as long as a rotation amount of the motor is controlled in accordance with a command signal.
  • a travelling path through which the spun yarn 10 travels from the draft device 7 to the winding device 13 at a time of being wound around the package 28 is set so as to extend from up to down with respect to a height direction of the fine spinning machine 1, and the sliver storage part 5 is provided on the machine rear side.
  • the travelling path may be set so as to extend from down to up, and the sliver storage part 5 may be disposed at a position on the machine front side and below the draft device 7.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Claims (18)

  1. Eine Luftspinnmaschine (1), die folgende Merkmale aufweist:
    eine Förderrolle (16, 17, 19, 20), die dazu ausgebildet ist, ein Faserband (15) zuzuführen;
    eine Luftspinnvorrichtung (9), die dazu ausgebildet ist, ein gesponnenes Garn (10) zu erzeugen durch Verdrehen eines Faserbündels (8), das aus dem Faserband (15) hergestellt ist, mit einem Luftstrom; und
    einen Elektromotor (81, 82, 83, 84), der dazu ausgebildet ist, die Förderrolle (16, 17, 19, 20) anzutreiben und dessen Drehmenge gemäß einem Befehlssignal gesteuert wird; gekennzeichnet durch
    ein Steuerteil (100), das dazu ausgebildet ist, eine verbrauchte Länge des Faserbands (15) basierend auf dem Befehlssignal zu berechnen.
  2. Die Luftspinnmaschine (1) gemäß Anspruch 1, die eine Mehrzahl von Spinneinheiten (2) aufweist, die jeweils zumindest die Förderrolle (16, 17, 19, 20) und die Luftspinnvorrichtung (9) aufweisen.
  3. Die Luftspinnmaschine (1) gemäß Anspruch 2, bei der
    das Steuerteil (100) dazu ausgebildet ist, zumindest entweder eine verbleibende Zeit, bevor das Faserband (15) in einer der Mehrzahl von Spinneinheiten (2) ausgeht, oder eine Gesamtmenge an Faserband (15), die in einer vorbestimmten Zeit nachgefüllt werden muss, basierend auf Informationen einer Anfangslänge des Faserbands (15) und einer Faserbewegungsgeschwindigkeit zu berechnen.
  4. Die Luftspinnmaschine (1) gemäß Anspruch 3, die ein Maschinenanzeigeteil (50) aufweist, das dazu ausgebildet ist, Informationen über die Mehrzahl von Spinneinheiten (2) anzuzeigen, wobei das Maschinenanzeigeteil (50) dazu ausgebildet ist, zumindest entweder die verbleibende Zeit oder die Menge, die durch das Steuerteil (100) berechnet wird, anzuzeigen.
  5. Die Luftspinnmaschine (1) gemäß einem der Ansprüche 2 bis 4, die ein Alarmteil (54) aufweist, das individuell in jeder der Spinneinheiten (2) angeordnet ist, wobei das Alarmteil (54) dazu ausgebildet ist, zwischen einem Alarmzustand und einem Nicht-Alarmzustand umschaltbar zu sein, wobei
    das Alarmteil (54) dazu ausgebildet ist, in einem Fall in den Alarmzustand zu schalten, in dem die Spinneinheit (2), an der das Alarmteil (54) angeordnet ist, zumindest entweder eine Bedingung, dass eine verbleibende Länge des Faserbands (15) in der Spinneinheit (2) kleiner oder gleich einer vorbestimmten Länge ist, oder eine Bedingung erfüllt, dass eine verbleibende Zeit, für die die Spinneinheit (2) ein Spinnen durch Verwendung des momentan verbleibenden Faserbands (15) durchführen kann, kleiner oder gleich einer vorbestimmten Zeit ist.
  6. Die Luftspinnmaschine (1) gemäß einem der Ansprüche 2 bis 5, die ein Einheitanzeigeteil (55) aufweist, das individuell in jeder der Spinneinheiten (2) angeordnet ist, wobei das Einheitsanzeigeteil zumindest eine Ziffer anzeigen kann, wobei
    das Einheitanzeigeteil (55) dazu ausgebildet ist, zumindest entweder eine verbleibende Länge des Faserbands (15) oder eine verbleibende Zeit anzuzeigen, bevor das Faserband (15) in der Spinneinheit (2) ausgeht, in der das Einheitanzeigeteil (55) angeordnet ist.
  7. Die Luftspinnmaschine (1) gemäß einem der Ansprüche 2 bis 6, die einen Sender (103) aufweist, der dazu ausgebildet ist, zumindest entweder die Menge an Faserband (15), die nachgefüllt werden muss, oder eine Zeitgebung, zu der ein Nachfüllen des Faserbands (15) erforderlich ist, für die Mehrzahl von Spinneinheiten nach außen zu übertragen.
  8. Die Luftspinnmaschine (1) gemäß einem der Ansprüche 2 bis 6, die ferner folgende Merkmale aufweist:
    eine Führungsvorrichtung (6), die dazu ausgebildet, das Faserband (15) zu führen; und
    eine Zuführvorrichtung (7), die dazu ausgebildet ist, das Faserbündel (8) aus dem Faserband (15) zu bilden, das durch die Führungsvorrichtung (6) geführt wird, und das Faserbündel (8) der Luftspinnvorrichtung (9) zuzuführen, wobei
    die Förderrolle (16, 17, 19, 20) in der Führungsvorrichtung (6) oder in der Zuführvorrichtung (7) vorgesehen ist oder die Förderrolle (16, 17, 19, 20) zwischen der Führungsvorrichtung (6) und der Zuführvorrichtung (7) in Bezug auf eine Faserbewegungsrichtung angeordnet ist, in der sich eine Faser des Faserbands (15) bewegt.
  9. Die Luftspinnmaschine (1) gemäß Anspruch 8, bei der
    das Steuerteil (100) zu Folgendem ausgebildet ist:
    Ausführen eines Vorgangs eines Berechnens einer verbleibenden Länge des Faserbands (15) basierend auf der verbrauchten Länge des Faserbands (15) und Informationen über eine Anfangslänge des Faserbands (15),
    Durchführen-Können einer Steuerung, die die Zuführvorrichtung (7) für jede der Spinneinheiten (2) stoppt, basierend auf der berechneten verbleibenden Länge des Faserbands (15), und
    bei der Steuerung Stoppen der Zuführvorrichtung (7) auf derartige Weise, dass ein vorgelagerter Endabschnitt des Faserbands (15) in der Faserbewegungsrichtung sich an einer Position in Verarbeitungsrichtung vor der Führungsvorrichtung (6) befindet.
  10. Die Luftspinnvorrichtung (1) gemäß Anspruch 8 oder 9, bei der
    das Steuerteil (100) dazu ausgebildet ist, eine Stopplänge, die eine Schwelle für die verbleibende Länge des Faserbands (50) ist, zu speichern und die Zuführvorrichtung (7) zu stoppen, nachdem die verbleibende Länge des Faserbands (15) kleiner oder gleich der Stopplänge wird.
  11. Die Luftspinnmaschine (1) gemäß Anspruch 10, bei der
    die Zuführvorrichtung (7) eine Ziehvorrichtung ist, die dazu ausgebildet ist, ein Faserbündel (8) zu bilden durch Ziehen eines Faserbands (15), das durch die Führungsvorrichtung (6) geführt wird,
    die Förderrolle (16, 17, 19, 20) in der Ziehvorrichtung vorgesehen ist und aus einer einer Mehrzahl von Ziehrollen und einer Mehrzahl zugewandter Rollen gebildet ist, die in der Ziehvorrichtung beinhaltet sind,
    die Luftspinnmaschine (1) einen Ziehvorrichtungsschlitten (21) aufweist, der dazu ausgebildet ist, die Mehrzahl zugewandter Rollen, die jeweils in benachbarten zwei der Spinneinheiten (2) beinhaltet sind, an die Mehrzahl von Ziehrollen zu pressen oder die Mehrzahl von Ziehrollen, die jeweils in benachbarten zwei der Spinneinheiten (2) beinhaltet sind, an die Mehrzahl zugewandter Rollen zu pressen, und
    das Steuerteil (100) dazu ausgebildet ist, die Ziehvorrichtung von einer der zwei Spinneinheiten (2) zu stoppen, während der Ziehvorrichtungsschlitten (21) die Ziehrollen oder die zugewandten Rollen presst und die Ziehvorrichtungen der beiden Spinneinheiten (2) die Faserbänder (15) halten.
  12. Die Luftspinnmaschine (1) gemäß einem der Ansprüche 8 bis 11, die ferner folgende Merkmale aufweist:
    ein Faserbandlagerteil (5), das dazu ausgebildet ist, das Faserband (15), das durch die Führungsvorrichtung (6) geführt werden soll, zu lagern; und
    ein Wickelkörperplatzierungsteil (47), an dem ein Wickelkörper platziert ist, der erhalten wird, nachdem das gesponnene Garn (10), das durch die Luftspinnvorrichtung (9) erzeugt wird, gewickelt ist, wobei
    in einer Draufsicht das Wickelkörperplatzierungsteil (47), die Spinneinheit (2), die Führungsvorrichtung (6) und das Faserbandlagerteil (5) in dieser Reihenfolge in Bezug auf eine Richtung senkrecht zu einer Richtung angeordnet sind, in der die Spinneinheiten nebeneinander angeordnet sind, und ein Durchgang, der sich in der Nebeneinanderanordnungsrichtung erstreckt, an einer Seite gegenüber von der Spinneinheit (2) relativ zu dem Wickelkörperplatzierungsteil (47) vorgesehen ist.
  13. Die Luftspinnmaschine (1) gemäß einem der Ansprüche 9 bis 11, die ein Faserbandlagerteil (5) aufweist, das dazu ausgebildet ist, das Faserband (15), das durch die Führungsvorrichtung (6) geführt werden soll, zu lagern, wobei
    kein Sensor zum Erfassen des Faserbands (15) zwischen dem Faserbandlagerteil (5) und der Luftspinnvorrichtung (9) vorgesehen ist.
  14. Die Luftspinnmaschine (1) gemäß einem der Ansprüche 8 bis 13, bei der
    kein Sensor zum Erfassen einer Drehmenge der Förderrolle (16, 17, 19, 20) oder einer Länge, über die das Faserband (15) zugeführt wird, zwischen einem vorgelagerten Endabschnitt der Zuführvorrichtung (7) und einem vorgelagerten Endabschnitt der Führungsvorrichtung (6) vorgesehen ist.
  15. Die Luftspinnmaschine (1) gemäß einem der Ansprüche 1 bis 14, bei der
    der Elektromotor (81, 82, 83, 84) ein Schrittmotor ist.
  16. Die Luftspinnmaschine (1) gemäß einem der Ansprüche 1 bis 15, bei der
    die Luftspinnvorrichtung (9) Folgendes aufweist:
    einen Düsenblock (60), der dazu ausgebildet ist, Luft auszuströmen, um eine Wirbelströmung in einer Spinnkammer (62) zu erzeugen, um das Faserbündel (8) zu verdrehen; und
    ein hohles Führungswellenbauteil (71), das dazu ausgebildet ist, das Faserbündel (8), das in der Spinnkammer (62) verdreht wird, nach außen zu führen.
  17. Die Luftspinnmaschine (1) gemäß einem der Ansprüche 1 bis 16, die ein Rücksetzvorgangsteil (56) aufweist, das dazu ausgebildet ist, eine Implementierung eines Vorgangs zum Zurücksetzen eines Ergebnisses einer Berechnung der verbrauchten Länge des Faserbands (15), die durch das Steuerteil berechnet wird, zu ermöglichen.
  18. Ein Anzeigesteuerverfahren zum Steuern einer Anzeige von Faserbandnachfüllinformationen, wobei das Verfahren gekennzeichnet ist durch:
    einen Empfangsschritt (S301) eines Empfangens zumindest entweder einer verbrauchten Länge eines Faserbands (15), die basierend auf einem Befehlssignal berechnet wird, oder von Informationen, die basierend auf der verbrauchten Länge des Faserbands (15) berechnet werden, die basierend auf dem Befehlssignal berechnet wird; und
    einen Anzeigeschritt (S302) eines Anzeigens eines Inhalts, der in dem Empfangsschritt empfangen wird, an einer externen Vorrichtung,
    wobei die externe Vorrichtung außerhalb einer Luftspinnmaschine (1) angeordnet ist, wobei die externe Vorrichtung mit der Luftspinnmaschine (1) kommunizieren kann,
    wobei die Luftspinnmaschine (1) folgende Merkmale aufweist:
    eine Förderrolle (16, 17, 19, 20), die ein Faserband (15) zuführt;
    eine Luftspinnvorrichtung (9), die ein gesponnenes Garn (10) erzeugt durch Verdrehen eines Faserbündels (8), das aus dem Faserband (15) hergestellt ist, mit einem Luftstrom; und
    einen Elektromotor (81, 82, 83, 84), der die Förderrolle (16, 17, 19, 20) antreibt und dessen Drehmenge gemäß dem empfangenen Befehlssignal gesteuert wird.
EP18184218.8A 2017-08-02 2018-07-18 Luftspinnmaschine und anzeigesteuerungsverfahren Active EP3438334B1 (de)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017149558A JP2019026981A (ja) 2017-08-02 2017-08-02 空気紡績機及び表示制御方法

Publications (2)

Publication Number Publication Date
EP3438334A1 EP3438334A1 (de) 2019-02-06
EP3438334B1 true EP3438334B1 (de) 2022-04-06

Family

ID=62985969

Family Applications (1)

Application Number Title Priority Date Filing Date
EP18184218.8A Active EP3438334B1 (de) 2017-08-02 2018-07-18 Luftspinnmaschine und anzeigesteuerungsverfahren

Country Status (3)

Country Link
EP (1) EP3438334B1 (de)
JP (1) JP2019026981A (de)
CN (1) CN109385702B (de)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4345553A1 (de) * 2022-07-19 2024-04-03 TMT Machinery, Inc. Garnverarbeitungsanlage

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ2022490A3 (cs) 2022-11-22 2024-05-29 Rieter Cz S.R.O. Způsob detekce přítomnosti vlákenného pramene na vstupu do pracovního místa textilního stroje pro zpracování vlákenného pramene, zejména stroje pro výrobu příze, zařízení k jeho provádění, podávací nebo průtahové ústrojí pramene vláken a textilní stroj

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2521851A1 (de) * 1975-05-16 1976-11-25 Schlafhorst & Co W Verfahren und vorrichtung zum wechseln der faserbandbehaelter einer spinnmaschine
JPS5976932A (ja) * 1982-10-21 1984-05-02 Toyoda Autom Loom Works Ltd 紡機における生産管理装置
JPH0229770A (ja) 1988-07-20 1990-01-31 Minolta Camera Co Ltd 画像形成装置
JP2699813B2 (ja) 1993-07-30 1998-01-19 日本電気株式会社 インクジェット記録装置の記録ヘッド
JPH11279862A (ja) 1998-03-24 1999-10-12 Murata Mach Ltd ケンス交換システム
CH694332A5 (de) * 2000-04-14 2004-11-30 Rieter Ag Maschf Verfahren und Vorrichtung zur Herstellung eines Garnes mit ringgarnähnlichem Charakter.
JP3575470B2 (ja) * 2002-03-18 2004-10-13 村田機械株式会社 紡績方法及びその装置
JP4470964B2 (ja) * 2007-06-06 2010-06-02 株式会社豊田自動織機 粗紡機の運転制御方法及びその運転制御装置
JP2010202332A (ja) * 2009-03-03 2010-09-16 Murata Machinery Ltd 繊維機械
JP5884280B2 (ja) * 2011-03-18 2016-03-15 村田機械株式会社 糸巻取装置及び糸巻取方法
DE102011053811A1 (de) * 2011-09-21 2013-03-21 Rieter Ingolstadt Gmbh Spinnmaschine und Verfahren zur Unterbrechung der Garnherstellung an einer Spinnmaschine
JP2013067916A (ja) * 2011-09-22 2013-04-18 Murata Mach Ltd 紡績機、巻取装置、及び繊維機械
JP2014024613A (ja) * 2012-07-24 2014-02-06 Murata Mach Ltd 糸監視装置、糸巻取ユニット、及び、糸巻取機
JP2015000777A (ja) * 2013-06-13 2015-01-05 村田機械株式会社 糸巻取機

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4345553A1 (de) * 2022-07-19 2024-04-03 TMT Machinery, Inc. Garnverarbeitungsanlage

Also Published As

Publication number Publication date
JP2019026981A (ja) 2019-02-21
CN109385702A (zh) 2019-02-26
CN109385702B (zh) 2022-09-20
EP3438334A1 (de) 2019-02-06

Similar Documents

Publication Publication Date Title
EP2727870B1 (de) Garnwickelmaschine und Garnwickelverfahren
JP6991002B2 (ja) リング精紡機の紡績ユニットの正常な動作を監視する方法
EP2573017B1 (de) Garnwickeleinheit, Garnwickelvorrichtung und Spinnmaschine
EP3566987A1 (de) Garnwickelmaschine und garnwickelverfahren
JP2009242972A (ja) 紡績装置
EP3269851B1 (de) Spinnmaschine
JP2015132029A (ja) 糸処理予測装置、糸処理装置、及び、糸処理予測方法
EP3438334B1 (de) Luftspinnmaschine und anzeigesteuerungsverfahren
EP3025995B1 (de) Garnwicklungsmaschine
EP2805907B1 (de) Garnwicklungsmaschine
US10907278B2 (en) Method for automatically piecing a thread at a workstation of a textile machine, and textile machine
EP2671832B1 (de) Garnwicklungsvorrichtung
US6679043B2 (en) Spinning machine
JP2014125714A (ja) 紡績機
EP2080825A2 (de) Integrierte Garnwickelmaschine
EP3095742A1 (de) Garnwicklungsmaschine
CN111663210B (zh) 空气消耗量计算装置、纺纱机、纺纱***及空气消耗量计算方法
EP3744670B1 (de) Textilmaschine
EP3686330B1 (de) Spinnverfahren, spinnmaschine und spinnprogramm
CN220283137U (zh) 丝线加工机
EP4292968A1 (de) Garnverarbeitungsvorrichtung
EP4321464A1 (de) Automatische wickelmaschine
JP2021055227A (ja) 繊維屑発生量計算装置、空気紡績機、及び繊維屑発生量出力方法
CN118422388A (zh) 纺纱机及纺纱方法
CN114789938A (zh) 丝线加工设备

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20190718

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: D01H 13/32 20060101AFI20210915BHEP

INTG Intention to grant announced

Effective date: 20211020

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1481422

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220415

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602018033242

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20220406

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1481422

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220406

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220808

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220706

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220707

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220706

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20220620

Year of fee payment: 5

Ref country code: CZ

Payment date: 20220715

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220806

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602018033242

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

26N No opposition filed

Effective date: 20230110

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20220718

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20220731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220718

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220731

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220731

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220718

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220718

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602018033242

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20180718

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240201

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230718

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220406