CN110342204A - A method of it circulates and transports applied to Painting Shop steel rod elements - Google Patents

A method of it circulates and transports applied to Painting Shop steel rod elements Download PDF

Info

Publication number
CN110342204A
CN110342204A CN201910718351.9A CN201910718351A CN110342204A CN 110342204 A CN110342204 A CN 110342204A CN 201910718351 A CN201910718351 A CN 201910718351A CN 110342204 A CN110342204 A CN 110342204A
Authority
CN
China
Prior art keywords
painting shop
circulation
tooling trolley
rod elements
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910718351.9A
Other languages
Chinese (zh)
Inventor
马兴原
高盼盼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Tianjin Equipment Manufacturing Co Ltd
Original Assignee
MCC Tiangong Tianjin Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Tianjin Equipment Manufacturing Co Ltd filed Critical MCC Tiangong Tianjin Equipment Manufacturing Co Ltd
Priority to CN201910718351.9A priority Critical patent/CN110342204A/en
Publication of CN110342204A publication Critical patent/CN110342204A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0221Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G35/00Mechanical conveyors not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/02Articles
    • B65G2201/0214Articles of special size, shape or weigh
    • B65G2201/0217Elongated

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Spray Control Apparatus (AREA)

Abstract

The present invention provides a kind of method applied to the circulation transport of Painting Shop steel rod elements, includes the following steps: to make tooling trolley;When the rod piece ball blast that group welds terminates, successively the rod piece to coating is placed on tooling trolley;Using the lifting lug on tooling trolley using being rolled to coating area on mechanical hoisting to flowing water trajectory, continue circulation after spraying until firing chamber, the tooling trolley for slinging single layer stack processing in the upper surface of the tooling trolley of another single layer, forms a whole and carries out operation into physics heating region;After the heating of the physics of a few hours, circulation is continued to buffer area and dry section by track, packing processing is waited, finally carries out entrucking.The present invention has the tooling trolley steel wheel of track groove and the track formation assembly line on ground by bottom belt, realizes the efficient utilization for the convenience and factory floor space transported during coating decoration and coating dry solidification, circulation production efficiency is significantly promoted.

Description

A method of it circulates and transports applied to Painting Shop steel rod elements
Technical field
It is made the invention belongs to steel construction factory steel rod elements painting and carries circulation field, more particularly, to a kind of application In the method for Painting Shop steel rod elements circulation transport.
Background technique
Steel structural rod piece refer to steel plate and Re Zha, clod wash or fabricated structural shape through capable of bearing of being formed by connecting of connector and Transmit the structure type of load.
Steel structure system has from heavy and light, batch production manufacture, quick for installation, short construction period, anti-seismic performance is good, invests back The comprehensive advantages such as fast, low in the pollution of the environment are received, the building production field instantly has been widely used, and batch production makes steel Efficient operating is needed just to be able to satisfy the demand of development of projects and factory lines production when structure, wherein the coating system of steel rod elements Make since it is desired that a large amount of construction and circulation place, enter particularly into the dry solidification period longer occupied ground painted after winter Greatly, so becoming the serious big factor for restricting efficiently production steel construction.
Existing apparatus has the disadvantage that:
1, a large amount of place can be occupied using the method for common fixing tool moulding bed, space utilization rate is low, circulation and production Low efficiency;Component is had bad luck usually by means of machine power tool over long distances, had not only destroyed coating and but also had occupied a large amount of mechanical equipments;
2, it after using common fixing moulding bed structure and the production of the method for general single layer moulding bed, needs to accelerate after constructing under cryogenic It needs to build the heating heat circulating system of large area when curing of coatings, increases entreprise cost;As under microthermal climate in narrow liter Heating link single layer circulation tire in greenhouse can only utilize limited solid space, can not carry out efficiently utilizing thermal energy;
3, need to occupy a large amount of places, room temperature single track in coating dry solidification buffer area using the method for common fixing moulding bed structure The coating occupancy time limit is about 24-48 hours, and placing space is limited, is unable to fully utilize limited space.
Summary of the invention
In view of this, the present invention is directed to propose a kind of method applied to the circulation transport of Painting Shop steel rod elements, solves Occupied ground is big, space utilization rate is low, various similar specification during existing factory tooling moulding bed coating decoration and coating are dry The low problem of steel rod elements circulation production efficiency reduces a large amount of liftings and has bad luck mechanical uses, under cryogenic to rod piece coating Physics heating occupancy resource is more, the thermal efficiency utilizes low problem.
In order to achieve the above objectives, the technical scheme of the present invention is realized as follows:
A method of it circulates and transports applied to Painting Shop steel rod elements, include the following steps: step A, production tooling is small Vehicle;
Rod piece to coating is successively placed on tooling trolley when the rod piece ball blast that group welds terminates by step B, using same The limit angle steel of specification is fixed on the two sides detent for being easy to the rod piece slided;
Step C is sprayed using the lifting lug on tooling trolley using coating area is rolled on mechanical hoisting to flowing water trajectory After continue circulation until firing chamber, the tooling trolley for slinging single layer stack processing in the tooling trolley of another single layer The upper surface of, it forms a whole and carries out operation into physics heating region;
Step D continues circulation to buffer area and dry section by track, waiting is beaten after the heating of the physics of a few hours Packet processing, finally carries out entrucking.
Further, the tooling trolley includes several layers rectangular frame, and four edges of every layer of rectangular frame upper end are equal It is fixed with support device, a receiving block is fixed in the upper end of each support device, and each receiving block upper end is formed with front and back perforation Holding groove, the bottom end of the holding groove of four receiving blocks is coplanar, and rectangular frame is by two crossbeams and two stringers are end to end encloses At two crossbeams are fixed on the lower end of two stringers, and receiving block is located at the surface of crossbeam, and the crossbeam of upper layer rectangular frame is just It can snap onto the holding groove of lower layer, there are four wheel bodys for the bottom end installation of rectangular frame.
Further, the middle position overlap joint of two crossbeams of the rectangular frame is fixed with intermediate beam, intermediate beam and two Stringer is parallel to each other.
Further, the both ends of each stringer are respectively and fixedly provided with lifting lug.
Further, the wheel body is mounted on crossbeam bottom end.
Further, two wheel bodys of each crossbeam are respectively positioned between two holding grooves.
Further, the upper end of the crossbeam and intermediate beam is respectively and fixedly provided with support angle steel, and the tip of support angle steel is upward.
Further, the support device is height-adjustable mechanism, including sleeve and support rod, supports rod set in sleeve Interior, corresponding position is equipped with jack between sleeve and support rod, is inserted into bolt out of sleeve extroversion support rod determine support rod Position.
Further, the upper end of each support angle steel is fixedly installed several limit angle steel, and rod piece is overlapped on adjacent two Between a limit angle steel.
Compared with the existing technology, a kind of method applied to the circulation transport of Painting Shop steel rod elements of the present invention, tool Have it is following the utility model has the advantages that the present invention by bottom belt have track groove steel wheel and ground track formed assembly line, realize painting Dress is constructed with the efficient utilization of the convenience and factory floor space transported during coating dry solidification, circulation production efficiency substantially Degree is promoted, and is contacted by Bolted angle connection contact surface with steel rod elements, is utmostly reduced rod piece occlusion area, reduce big batch Repair coating moulding bed blocked area work, separately reduce lifting and have bad luck mechanical use, under cryogenic to steel rod elements object Thermal efficiency can be made full use of using laminated multi-layer according to the actual situation when reason heating, making full use of upward space is the dry of next step Place is saved in dry solidification, the residence time in limited space of the coating dry solidification after accelerating coating.And factory's production is simple, nothing Complicated procedures of forming;The space efficient of the present apparatus and convenient for circulation transport features, will be in factory's steel rod elements coating actual production It is used widely.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to provide further understanding of the present invention, schematic reality of the invention It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of the double-deck rectangular frame;
Fig. 3 is the structural schematic diagram of support device;
Fig. 4 is the schematic diagram when present invention uses;
Fig. 5 is the enlarged diagram of part A in Fig. 4;
Fig. 6 is schematic diagram when the double-deck rectangular frame of the present invention uses;
Description of symbols:
1- crossbeam;2- holding groove;3- stringer;4- intermediate beam;5- support device;51- support rod;52- bolt;53- sleeve; 6- wheel body;7- support angle steel;8- lifting lug;9- limits angle steel;10- rod piece;11- assembly line straight guide.
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair Limitation of the invention.In addition, term " first ", " second " etc. are used for description purposes only, it is not understood to indicate or imply phase To importance or implicitly indicate the quantity of indicated technical characteristic.The feature for defining " first ", " second " etc. as a result, can To explicitly or implicitly include one or more of the features.In the description of the present invention, unless otherwise indicated, " multiple " It is meant that two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition Concrete meaning in the present invention.
The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
As shown in figures 1 to 6, a method of circulate and transport applied to Painting Shop steel rod elements, include the following steps: step A makes tooling trolley;
Rod piece to coating is successively placed on tooling trolley when the rod piece ball blast that group welds terminates by step B, using same The limit angle steel of specification is fixed on the two sides detent for being easy to the rod piece slided;
Step C is sprayed using the lifting lug on tooling trolley using coating area is rolled on mechanical hoisting to flowing water trajectory After continue circulation until firing chamber, the tooling trolley for slinging single layer stack processing in the tooling trolley of another single layer The upper surface of, it forms a whole and carries out operation into physics heating region;
Step D continues circulation to buffer area and dry section by track, waiting is beaten after the heating of the physics of a few hours Packet processing, finally carries out entrucking.It is all that efficient circulation transport is completed by the cooperation of crane and track in whole flow process.
The tooling trolley includes several layers rectangular frame, and four edges of every layer of rectangular frame upper end are respectively and fixedly provided with branch A receiving block is fixed in support arrangement 5, the upper end of each support device 5, and each receiving block upper end is formed with the undertaking that front and back penetrates through The bottom end of slot 2, the holding groove 2 of four receiving blocks is coplanar, and rectangular frame is by two crossbeams 1 and two stringers 3 are end to end surrounds, Two crossbeams 1 are fixed on the lower end of two stringers 3, and receiving block is located at the surface of crossbeam 1, and the crossbeam 1 of upper layer rectangular frame is rigid In the holding groove 2 that lower layer can be snapped onto well, there are four wheel bodys 6 for the bottom end installation of rectangular frame.Four wheel bodys 6 are four with rolling The track steel wheel of axis exposes outside about 1/3 steel wheel slot and contacts with assembly line straight guide 11, convenient for rolling on.
The middle position overlap joint of two crossbeams 1 of the rectangular frame is fixed with intermediate beam 4, intermediate beam 4 and two stringers 3 It is parallel to each other.
The both ends of each stringer 3 are respectively and fixedly provided with lifting lug 8, for lifting or drawing.
The wheel body 6 is mounted on 1 bottom end of crossbeam.
Two wheel bodys 6 of each crossbeam 1 are respectively positioned between two holding grooves 2, can prevent the present apparatus when track is mobile by Relative displacement between bilevel rectangular frame and cause upper layer rectangular frame to fall down.
The upper end of the crossbeam 1 and intermediate beam 4 is respectively and fixedly provided with support angle steel 7, and the tip of support angle steel 7 is upward.Each The upper end of support angle steel 7 is slidably provided with several limit angle steel 9, and rod piece 10 is overlapped between two neighboring limit angle steel 9. It is identical as 7 specification of support angle steel to limit angle steel 9, can prevent rod piece 10 from sliding convenient for overlaying in support angle steel 7.
The support device 5 is height-adjustable mechanism, including sleeve 53 and support rod 51, and 51 sets of support rod in sleeve 53 Interior, corresponding position is equipped with jack between sleeve 53 and support rod 51, is inserted into bolt 52 out of sleeve 53 export-oriented support rod 51 Position support rod 51.
The purpose of this case is to enter spraying area after ball blast using a kind of novel flow track trolley orderly to put It puts each loose mail to be sprayed well, after being constructed on the tooling moulding bed of this flowing, both with Manual-pushing or instrument can be used Trailer wagon flow to heating room (physics heating region), in case of laminated multi-layer can also be carried out when component relative altitude is smaller, Abundant space efficient then flows out buffer area and further spontaneously dries the shippings to be packaged such as solidification.
In use, two layers of rectangular frame can be stacked, the crossbeam 1 of the rectangular frame on upper layer just falls in holding groove In 2.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (9)

1. a kind of method applied to the circulation transport of Painting Shop steel rod elements, characterized by the following steps: step A, system Make tooling trolley;
Rod piece to coating is successively placed on tooling trolley, utilizes same specification when the rod piece ball blast that group welds terminates by step B Limit angle steel be fixed on be easy to slide rod piece two sides detent;
Step C, using the lifting lug on tooling trolley using coating area is rolled on mechanical hoisting to flowing water trajectory, spraying terminates Subsequent afterflow turns until firing chamber, the tooling trolley for slinging single layer stack processing another single layer tooling trolley it is upper Face forms a whole and carries out operation into physics heating region;
Step D continues circulation to buffer area and dry section by track, waits at packing after the heating of the physics of a few hours Reason, finally carries out entrucking.
2. the method according to claim 1 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: the work Filling trolley includes several layers rectangular frame, and four edges of every layer of rectangular frame upper end are respectively and fixedly provided with support device (5), each A receiving block is fixed in the upper end of support device (5), the holding groove (2) of perforation before and after each receiving block upper end is formed with, and four The bottom end of the holding groove (2) of receiving block is coplanar, and rectangular frame is by two crossbeams (1) and two stringers (3) are end to end surrounds, and two A crossbeam (1) is fixed on the lower end of two stringers (3), and receiving block is located at the surface of crossbeam (1), the crossbeam of upper layer rectangular frame (1) in the holding groove (2) that can just snap onto lower layer, there are four wheel body (6) for the bottom end installation of rectangular frame.
3. the method according to claim 2 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: the square The middle position overlap joint of two crossbeams (1) of shape frame is fixed with intermediate beam (4), and intermediate beam (4) is mutually flat with two stringers (3) Row.
4. the method according to claim 3 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: each vertical The both ends of beam (3) are respectively and fixedly provided with lifting lug (8).
5. the method according to claim 2 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: the wheel Body (6) is mounted on crossbeam (1) bottom end.
6. the method according to claim 5 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: each cross Two wheel bodys (6) of beam (1) are respectively positioned between two holding grooves (2).
7. the method according to claim 3 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: the cross The upper end of beam (1) and intermediate beam (4) is respectively and fixedly provided with support angle steel (7), and the tip of support angle steel (7) is upward.
8. according to the described in any item methods applied to the circulation transport of Painting Shop steel rod elements of claim 2-7, feature exists In: the support device (5) is height-adjustable mechanism, including sleeve (53) and support rod (51), and support rod (51), which covers, to be covered In cylinder (53), corresponding position is equipped with jack between sleeve (53) and support rod (51), from the export-oriented support rod (51) of sleeve (53) Interior insertion bolt (52) come make support rod (51) position.
9. the method according to claim 7 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: Mei Gezhi The upper end of support angle steel (7) is fixedly installed several limits angle steel (9), and rod piece (10) is overlapped on two neighboring limit angle steel (9) between.
CN201910718351.9A 2019-08-05 2019-08-05 A method of it circulates and transports applied to Painting Shop steel rod elements Pending CN110342204A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910718351.9A CN110342204A (en) 2019-08-05 2019-08-05 A method of it circulates and transports applied to Painting Shop steel rod elements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910718351.9A CN110342204A (en) 2019-08-05 2019-08-05 A method of it circulates and transports applied to Painting Shop steel rod elements

Publications (1)

Publication Number Publication Date
CN110342204A true CN110342204A (en) 2019-10-18

Family

ID=68183987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910718351.9A Pending CN110342204A (en) 2019-08-05 2019-08-05 A method of it circulates and transports applied to Painting Shop steel rod elements

Country Status (1)

Country Link
CN (1) CN110342204A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112403765A (en) * 2020-11-12 2021-02-26 常德迪格机械制造有限公司 Machining equipment for manufacturing oil cylinder parts

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203713931U (en) * 2013-12-16 2014-07-16 睿志达光电(深圳)有限公司 Loading turnover trolley of glass reinforcing furnace
CN204123385U (en) * 2014-09-12 2015-01-28 南车洛阳机车有限公司 Harmonious locomotive circulation frock
CN105345678A (en) * 2015-12-17 2016-02-24 常州好迪机械有限公司 U-shaped shot blasting frame for truck angle iron plate
CN105692447A (en) * 2016-04-19 2016-06-22 中铁十六局集团铁运工程有限公司 Hoisting device of underground railway line turnout assembly and hoisting method
CN205363818U (en) * 2016-01-21 2016-07-06 南京中志车辆配件有限公司 Urban rail vehicle air conditioner examines and repair all revolving racks of transportation
CN105834035A (en) * 2016-05-13 2016-08-10 中船黄埔文冲船舶有限公司 Double-layer coating bracket for main chords and diagonal pipes
CN106476820A (en) * 2016-10-21 2017-03-08 安徽江淮汽车集团股份有限公司 Knuckle circulation dolly
CN206105632U (en) * 2016-10-06 2017-04-19 李彬 Ball device is thrown to steel construction production line steel member
CN206304967U (en) * 2016-12-16 2017-07-07 上海振华重工集团(南通)传动机械有限公司 A kind of Painting Shop paint-spraying production line
CN108582009A (en) * 2018-06-15 2018-09-28 宝钢钢构有限公司 A kind of stackable finished product smallclothes paint turnover rack
CN208494724U (en) * 2018-07-17 2019-02-15 青岛恒林机械有限公司 A kind of steel pipe bundle ball blast spray painting drying integral machine
CN109821691A (en) * 2018-12-25 2019-05-31 山东艾弗森特智能设备制造有限公司 Steel construction intelligence spray-painting production line

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203713931U (en) * 2013-12-16 2014-07-16 睿志达光电(深圳)有限公司 Loading turnover trolley of glass reinforcing furnace
CN204123385U (en) * 2014-09-12 2015-01-28 南车洛阳机车有限公司 Harmonious locomotive circulation frock
CN105345678A (en) * 2015-12-17 2016-02-24 常州好迪机械有限公司 U-shaped shot blasting frame for truck angle iron plate
CN205363818U (en) * 2016-01-21 2016-07-06 南京中志车辆配件有限公司 Urban rail vehicle air conditioner examines and repair all revolving racks of transportation
CN105692447A (en) * 2016-04-19 2016-06-22 中铁十六局集团铁运工程有限公司 Hoisting device of underground railway line turnout assembly and hoisting method
CN105834035A (en) * 2016-05-13 2016-08-10 中船黄埔文冲船舶有限公司 Double-layer coating bracket for main chords and diagonal pipes
CN206105632U (en) * 2016-10-06 2017-04-19 李彬 Ball device is thrown to steel construction production line steel member
CN106476820A (en) * 2016-10-21 2017-03-08 安徽江淮汽车集团股份有限公司 Knuckle circulation dolly
CN206304967U (en) * 2016-12-16 2017-07-07 上海振华重工集团(南通)传动机械有限公司 A kind of Painting Shop paint-spraying production line
CN108582009A (en) * 2018-06-15 2018-09-28 宝钢钢构有限公司 A kind of stackable finished product smallclothes paint turnover rack
CN208494724U (en) * 2018-07-17 2019-02-15 青岛恒林机械有限公司 A kind of steel pipe bundle ball blast spray painting drying integral machine
CN109821691A (en) * 2018-12-25 2019-05-31 山东艾弗森特智能设备制造有限公司 Steel construction intelligence spray-painting production line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112403765A (en) * 2020-11-12 2021-02-26 常德迪格机械制造有限公司 Machining equipment for manufacturing oil cylinder parts

Similar Documents

Publication Publication Date Title
US8087867B2 (en) Loading/unloading system for container terminal
EP3724073A1 (en) Charging station and combined charging station
CN104631891A (en) Combined type parking equipment and method with high space utilization rate
CN103998302A (en) Semi-automatic station for exchanging a traction battery of an electric or hybrid vehicle
CN101434275B (en) Welding skid for transmitting multiple coachbuilt body
CN110342204A (en) A method of it circulates and transports applied to Painting Shop steel rod elements
CN110077365A (en) Fast quick change electric system and fast quick change method for electrically
CN105174072A (en) Loading and unloading method capable of preventing automatic container terminal AGV and quay crane from waiting for each other and quay crane
CN105270354A (en) Quick central-positioned battery box assembling and disassembling system for electric automobile
CN201317419Y (en) Welding skid used for transmitting various car bodies
CN101798026B (en) Turn-back tippler unloading system for special coupling open wagon
CN104118401B (en) Battery pallet and battery transport lowering or hoisting gear
CN108706260A (en) A kind of transport vehicle system, transport vehicle and products storage circulation system
CN103895131A (en) Die movable-type tire vulcanization machine set, and vulcanization method thereof
CN105937309B (en) Public bicycles section based on bus manages system
CN107587759A (en) A kind of arrangement of robot garage parking parking stall and path planning for intensive storage
CN208216509U (en) Battery storage frame and new-energy automobile electrical changing station
CN111003442A (en) Pallet truck steel coil transportation system and pallet steel coil transportation system linking device
CN110001601A (en) For changing the positioning of level platform and jacking system, changing level platform and electric charging station
EP3705354A1 (en) Battery pack storage system and automatic battery swapping station for electric car
CN207329564U (en) A kind of production assembly line for large-scale workpiece
CN104670775A (en) Digital-bus-based bracket and tray assembly capable of supplying materials circularly
DE202018006447U1 (en) Area storage
CN206622802U (en) A kind of producing device of full aluminium car bottom component
CN103010697B (en) Conveying system for electrophoretic painting production of ultralong heavy workpieces

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191018