CN110342204A - A method of it circulates and transports applied to Painting Shop steel rod elements - Google Patents
A method of it circulates and transports applied to Painting Shop steel rod elements Download PDFInfo
- Publication number
- CN110342204A CN110342204A CN201910718351.9A CN201910718351A CN110342204A CN 110342204 A CN110342204 A CN 110342204A CN 201910718351 A CN201910718351 A CN 201910718351A CN 110342204 A CN110342204 A CN 110342204A
- Authority
- CN
- China
- Prior art keywords
- painting shop
- circulation
- tooling trolley
- rod elements
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
- B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
- B05B13/00—Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
- B05B13/02—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
- B05B13/0221—Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G35/00—Mechanical conveyors not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2201/00—Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
- B65G2201/02—Articles
- B65G2201/0214—Articles of special size, shape or weigh
- B65G2201/0217—Elongated
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Spray Control Apparatus (AREA)
Abstract
The present invention provides a kind of method applied to the circulation transport of Painting Shop steel rod elements, includes the following steps: to make tooling trolley;When the rod piece ball blast that group welds terminates, successively the rod piece to coating is placed on tooling trolley;Using the lifting lug on tooling trolley using being rolled to coating area on mechanical hoisting to flowing water trajectory, continue circulation after spraying until firing chamber, the tooling trolley for slinging single layer stack processing in the upper surface of the tooling trolley of another single layer, forms a whole and carries out operation into physics heating region;After the heating of the physics of a few hours, circulation is continued to buffer area and dry section by track, packing processing is waited, finally carries out entrucking.The present invention has the tooling trolley steel wheel of track groove and the track formation assembly line on ground by bottom belt, realizes the efficient utilization for the convenience and factory floor space transported during coating decoration and coating dry solidification, circulation production efficiency is significantly promoted.
Description
Technical field
It is made the invention belongs to steel construction factory steel rod elements painting and carries circulation field, more particularly, to a kind of application
In the method for Painting Shop steel rod elements circulation transport.
Background technique
Steel structural rod piece refer to steel plate and Re Zha, clod wash or fabricated structural shape through capable of bearing of being formed by connecting of connector and
Transmit the structure type of load.
Steel structure system has from heavy and light, batch production manufacture, quick for installation, short construction period, anti-seismic performance is good, invests back
The comprehensive advantages such as fast, low in the pollution of the environment are received, the building production field instantly has been widely used, and batch production makes steel
Efficient operating is needed just to be able to satisfy the demand of development of projects and factory lines production when structure, wherein the coating system of steel rod elements
Make since it is desired that a large amount of construction and circulation place, enter particularly into the dry solidification period longer occupied ground painted after winter
Greatly, so becoming the serious big factor for restricting efficiently production steel construction.
Existing apparatus has the disadvantage that:
1, a large amount of place can be occupied using the method for common fixing tool moulding bed, space utilization rate is low, circulation and production
Low efficiency;Component is had bad luck usually by means of machine power tool over long distances, had not only destroyed coating and but also had occupied a large amount of mechanical equipments;
2, it after using common fixing moulding bed structure and the production of the method for general single layer moulding bed, needs to accelerate after constructing under cryogenic
It needs to build the heating heat circulating system of large area when curing of coatings, increases entreprise cost;As under microthermal climate in narrow liter
Heating link single layer circulation tire in greenhouse can only utilize limited solid space, can not carry out efficiently utilizing thermal energy;
3, need to occupy a large amount of places, room temperature single track in coating dry solidification buffer area using the method for common fixing moulding bed structure
The coating occupancy time limit is about 24-48 hours, and placing space is limited, is unable to fully utilize limited space.
Summary of the invention
In view of this, the present invention is directed to propose a kind of method applied to the circulation transport of Painting Shop steel rod elements, solves
Occupied ground is big, space utilization rate is low, various similar specification during existing factory tooling moulding bed coating decoration and coating are dry
The low problem of steel rod elements circulation production efficiency reduces a large amount of liftings and has bad luck mechanical uses, under cryogenic to rod piece coating
Physics heating occupancy resource is more, the thermal efficiency utilizes low problem.
In order to achieve the above objectives, the technical scheme of the present invention is realized as follows:
A method of it circulates and transports applied to Painting Shop steel rod elements, include the following steps: step A, production tooling is small
Vehicle;
Rod piece to coating is successively placed on tooling trolley when the rod piece ball blast that group welds terminates by step B, using same
The limit angle steel of specification is fixed on the two sides detent for being easy to the rod piece slided;
Step C is sprayed using the lifting lug on tooling trolley using coating area is rolled on mechanical hoisting to flowing water trajectory
After continue circulation until firing chamber, the tooling trolley for slinging single layer stack processing in the tooling trolley of another single layer
The upper surface of, it forms a whole and carries out operation into physics heating region;
Step D continues circulation to buffer area and dry section by track, waiting is beaten after the heating of the physics of a few hours
Packet processing, finally carries out entrucking.
Further, the tooling trolley includes several layers rectangular frame, and four edges of every layer of rectangular frame upper end are equal
It is fixed with support device, a receiving block is fixed in the upper end of each support device, and each receiving block upper end is formed with front and back perforation
Holding groove, the bottom end of the holding groove of four receiving blocks is coplanar, and rectangular frame is by two crossbeams and two stringers are end to end encloses
At two crossbeams are fixed on the lower end of two stringers, and receiving block is located at the surface of crossbeam, and the crossbeam of upper layer rectangular frame is just
It can snap onto the holding groove of lower layer, there are four wheel bodys for the bottom end installation of rectangular frame.
Further, the middle position overlap joint of two crossbeams of the rectangular frame is fixed with intermediate beam, intermediate beam and two
Stringer is parallel to each other.
Further, the both ends of each stringer are respectively and fixedly provided with lifting lug.
Further, the wheel body is mounted on crossbeam bottom end.
Further, two wheel bodys of each crossbeam are respectively positioned between two holding grooves.
Further, the upper end of the crossbeam and intermediate beam is respectively and fixedly provided with support angle steel, and the tip of support angle steel is upward.
Further, the support device is height-adjustable mechanism, including sleeve and support rod, supports rod set in sleeve
Interior, corresponding position is equipped with jack between sleeve and support rod, is inserted into bolt out of sleeve extroversion support rod determine support rod
Position.
Further, the upper end of each support angle steel is fixedly installed several limit angle steel, and rod piece is overlapped on adjacent two
Between a limit angle steel.
Compared with the existing technology, a kind of method applied to the circulation transport of Painting Shop steel rod elements of the present invention, tool
Have it is following the utility model has the advantages that the present invention by bottom belt have track groove steel wheel and ground track formed assembly line, realize painting
Dress is constructed with the efficient utilization of the convenience and factory floor space transported during coating dry solidification, circulation production efficiency substantially
Degree is promoted, and is contacted by Bolted angle connection contact surface with steel rod elements, is utmostly reduced rod piece occlusion area, reduce big batch
Repair coating moulding bed blocked area work, separately reduce lifting and have bad luck mechanical use, under cryogenic to steel rod elements object
Thermal efficiency can be made full use of using laminated multi-layer according to the actual situation when reason heating, making full use of upward space is the dry of next step
Place is saved in dry solidification, the residence time in limited space of the coating dry solidification after accelerating coating.And factory's production is simple, nothing
Complicated procedures of forming;The space efficient of the present apparatus and convenient for circulation transport features, will be in factory's steel rod elements coating actual production
It is used widely.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to provide further understanding of the present invention, schematic reality of the invention
It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of the double-deck rectangular frame;
Fig. 3 is the structural schematic diagram of support device;
Fig. 4 is the schematic diagram when present invention uses;
Fig. 5 is the enlarged diagram of part A in Fig. 4;
Fig. 6 is schematic diagram when the double-deck rectangular frame of the present invention uses;
Description of symbols:
1- crossbeam;2- holding groove;3- stringer;4- intermediate beam;5- support device;51- support rod;52- bolt;53- sleeve;
6- wheel body;7- support angle steel;8- lifting lug;9- limits angle steel;10- rod piece;11- assembly line straight guide.
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase
Mutually combination.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower",
The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark
Show that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as pair
Limitation of the invention.In addition, term " first ", " second " etc. are used for description purposes only, it is not understood to indicate or imply phase
To importance or implicitly indicate the quantity of indicated technical characteristic.The feature for defining " first ", " second " etc. as a result, can
To explicitly or implicitly include one or more of the features.In the description of the present invention, unless otherwise indicated, " multiple "
It is meant that two or more.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can
To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary
Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood by concrete condition
Concrete meaning in the present invention.
The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
As shown in figures 1 to 6, a method of circulate and transport applied to Painting Shop steel rod elements, include the following steps: step
A makes tooling trolley;
Rod piece to coating is successively placed on tooling trolley when the rod piece ball blast that group welds terminates by step B, using same
The limit angle steel of specification is fixed on the two sides detent for being easy to the rod piece slided;
Step C is sprayed using the lifting lug on tooling trolley using coating area is rolled on mechanical hoisting to flowing water trajectory
After continue circulation until firing chamber, the tooling trolley for slinging single layer stack processing in the tooling trolley of another single layer
The upper surface of, it forms a whole and carries out operation into physics heating region;
Step D continues circulation to buffer area and dry section by track, waiting is beaten after the heating of the physics of a few hours
Packet processing, finally carries out entrucking.It is all that efficient circulation transport is completed by the cooperation of crane and track in whole flow process.
The tooling trolley includes several layers rectangular frame, and four edges of every layer of rectangular frame upper end are respectively and fixedly provided with branch
A receiving block is fixed in support arrangement 5, the upper end of each support device 5, and each receiving block upper end is formed with the undertaking that front and back penetrates through
The bottom end of slot 2, the holding groove 2 of four receiving blocks is coplanar, and rectangular frame is by two crossbeams 1 and two stringers 3 are end to end surrounds,
Two crossbeams 1 are fixed on the lower end of two stringers 3, and receiving block is located at the surface of crossbeam 1, and the crossbeam 1 of upper layer rectangular frame is rigid
In the holding groove 2 that lower layer can be snapped onto well, there are four wheel bodys 6 for the bottom end installation of rectangular frame.Four wheel bodys 6 are four with rolling
The track steel wheel of axis exposes outside about 1/3 steel wheel slot and contacts with assembly line straight guide 11, convenient for rolling on.
The middle position overlap joint of two crossbeams 1 of the rectangular frame is fixed with intermediate beam 4, intermediate beam 4 and two stringers 3
It is parallel to each other.
The both ends of each stringer 3 are respectively and fixedly provided with lifting lug 8, for lifting or drawing.
The wheel body 6 is mounted on 1 bottom end of crossbeam.
Two wheel bodys 6 of each crossbeam 1 are respectively positioned between two holding grooves 2, can prevent the present apparatus when track is mobile by
Relative displacement between bilevel rectangular frame and cause upper layer rectangular frame to fall down.
The upper end of the crossbeam 1 and intermediate beam 4 is respectively and fixedly provided with support angle steel 7, and the tip of support angle steel 7 is upward.Each
The upper end of support angle steel 7 is slidably provided with several limit angle steel 9, and rod piece 10 is overlapped between two neighboring limit angle steel 9.
It is identical as 7 specification of support angle steel to limit angle steel 9, can prevent rod piece 10 from sliding convenient for overlaying in support angle steel 7.
The support device 5 is height-adjustable mechanism, including sleeve 53 and support rod 51, and 51 sets of support rod in sleeve 53
Interior, corresponding position is equipped with jack between sleeve 53 and support rod 51, is inserted into bolt 52 out of sleeve 53 export-oriented support rod 51
Position support rod 51.
The purpose of this case is to enter spraying area after ball blast using a kind of novel flow track trolley orderly to put
It puts each loose mail to be sprayed well, after being constructed on the tooling moulding bed of this flowing, both with Manual-pushing or instrument can be used
Trailer wagon flow to heating room (physics heating region), in case of laminated multi-layer can also be carried out when component relative altitude is smaller,
Abundant space efficient then flows out buffer area and further spontaneously dries the shippings to be packaged such as solidification.
In use, two layers of rectangular frame can be stacked, the crossbeam 1 of the rectangular frame on upper layer just falls in holding groove
In 2.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.
Claims (9)
1. a kind of method applied to the circulation transport of Painting Shop steel rod elements, characterized by the following steps: step A, system
Make tooling trolley;
Rod piece to coating is successively placed on tooling trolley, utilizes same specification when the rod piece ball blast that group welds terminates by step B
Limit angle steel be fixed on be easy to slide rod piece two sides detent;
Step C, using the lifting lug on tooling trolley using coating area is rolled on mechanical hoisting to flowing water trajectory, spraying terminates
Subsequent afterflow turns until firing chamber, the tooling trolley for slinging single layer stack processing another single layer tooling trolley it is upper
Face forms a whole and carries out operation into physics heating region;
Step D continues circulation to buffer area and dry section by track, waits at packing after the heating of the physics of a few hours
Reason, finally carries out entrucking.
2. the method according to claim 1 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: the work
Filling trolley includes several layers rectangular frame, and four edges of every layer of rectangular frame upper end are respectively and fixedly provided with support device (5), each
A receiving block is fixed in the upper end of support device (5), the holding groove (2) of perforation before and after each receiving block upper end is formed with, and four
The bottom end of the holding groove (2) of receiving block is coplanar, and rectangular frame is by two crossbeams (1) and two stringers (3) are end to end surrounds, and two
A crossbeam (1) is fixed on the lower end of two stringers (3), and receiving block is located at the surface of crossbeam (1), the crossbeam of upper layer rectangular frame
(1) in the holding groove (2) that can just snap onto lower layer, there are four wheel body (6) for the bottom end installation of rectangular frame.
3. the method according to claim 2 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: the square
The middle position overlap joint of two crossbeams (1) of shape frame is fixed with intermediate beam (4), and intermediate beam (4) is mutually flat with two stringers (3)
Row.
4. the method according to claim 3 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: each vertical
The both ends of beam (3) are respectively and fixedly provided with lifting lug (8).
5. the method according to claim 2 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: the wheel
Body (6) is mounted on crossbeam (1) bottom end.
6. the method according to claim 5 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: each cross
Two wheel bodys (6) of beam (1) are respectively positioned between two holding grooves (2).
7. the method according to claim 3 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: the cross
The upper end of beam (1) and intermediate beam (4) is respectively and fixedly provided with support angle steel (7), and the tip of support angle steel (7) is upward.
8. according to the described in any item methods applied to the circulation transport of Painting Shop steel rod elements of claim 2-7, feature exists
In: the support device (5) is height-adjustable mechanism, including sleeve (53) and support rod (51), and support rod (51), which covers, to be covered
In cylinder (53), corresponding position is equipped with jack between sleeve (53) and support rod (51), from the export-oriented support rod (51) of sleeve (53)
Interior insertion bolt (52) come make support rod (51) position.
9. the method according to claim 7 applied to the circulation transport of Painting Shop steel rod elements, it is characterised in that: Mei Gezhi
The upper end of support angle steel (7) is fixedly installed several limits angle steel (9), and rod piece (10) is overlapped on two neighboring limit angle steel
(9) between.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910718351.9A CN110342204A (en) | 2019-08-05 | 2019-08-05 | A method of it circulates and transports applied to Painting Shop steel rod elements |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910718351.9A CN110342204A (en) | 2019-08-05 | 2019-08-05 | A method of it circulates and transports applied to Painting Shop steel rod elements |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110342204A true CN110342204A (en) | 2019-10-18 |
Family
ID=68183987
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910718351.9A Pending CN110342204A (en) | 2019-08-05 | 2019-08-05 | A method of it circulates and transports applied to Painting Shop steel rod elements |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110342204A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112403765A (en) * | 2020-11-12 | 2021-02-26 | 常德迪格机械制造有限公司 | Machining equipment for manufacturing oil cylinder parts |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203713931U (en) * | 2013-12-16 | 2014-07-16 | 睿志达光电(深圳)有限公司 | Loading turnover trolley of glass reinforcing furnace |
CN204123385U (en) * | 2014-09-12 | 2015-01-28 | 南车洛阳机车有限公司 | Harmonious locomotive circulation frock |
CN105345678A (en) * | 2015-12-17 | 2016-02-24 | 常州好迪机械有限公司 | U-shaped shot blasting frame for truck angle iron plate |
CN105692447A (en) * | 2016-04-19 | 2016-06-22 | 中铁十六局集团铁运工程有限公司 | Hoisting device of underground railway line turnout assembly and hoisting method |
CN205363818U (en) * | 2016-01-21 | 2016-07-06 | 南京中志车辆配件有限公司 | Urban rail vehicle air conditioner examines and repair all revolving racks of transportation |
CN105834035A (en) * | 2016-05-13 | 2016-08-10 | 中船黄埔文冲船舶有限公司 | Double-layer coating bracket for main chords and diagonal pipes |
CN106476820A (en) * | 2016-10-21 | 2017-03-08 | 安徽江淮汽车集团股份有限公司 | Knuckle circulation dolly |
CN206105632U (en) * | 2016-10-06 | 2017-04-19 | 李彬 | Ball device is thrown to steel construction production line steel member |
CN206304967U (en) * | 2016-12-16 | 2017-07-07 | 上海振华重工集团(南通)传动机械有限公司 | A kind of Painting Shop paint-spraying production line |
CN108582009A (en) * | 2018-06-15 | 2018-09-28 | 宝钢钢构有限公司 | A kind of stackable finished product smallclothes paint turnover rack |
CN208494724U (en) * | 2018-07-17 | 2019-02-15 | 青岛恒林机械有限公司 | A kind of steel pipe bundle ball blast spray painting drying integral machine |
CN109821691A (en) * | 2018-12-25 | 2019-05-31 | 山东艾弗森特智能设备制造有限公司 | Steel construction intelligence spray-painting production line |
-
2019
- 2019-08-05 CN CN201910718351.9A patent/CN110342204A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203713931U (en) * | 2013-12-16 | 2014-07-16 | 睿志达光电(深圳)有限公司 | Loading turnover trolley of glass reinforcing furnace |
CN204123385U (en) * | 2014-09-12 | 2015-01-28 | 南车洛阳机车有限公司 | Harmonious locomotive circulation frock |
CN105345678A (en) * | 2015-12-17 | 2016-02-24 | 常州好迪机械有限公司 | U-shaped shot blasting frame for truck angle iron plate |
CN205363818U (en) * | 2016-01-21 | 2016-07-06 | 南京中志车辆配件有限公司 | Urban rail vehicle air conditioner examines and repair all revolving racks of transportation |
CN105692447A (en) * | 2016-04-19 | 2016-06-22 | 中铁十六局集团铁运工程有限公司 | Hoisting device of underground railway line turnout assembly and hoisting method |
CN105834035A (en) * | 2016-05-13 | 2016-08-10 | 中船黄埔文冲船舶有限公司 | Double-layer coating bracket for main chords and diagonal pipes |
CN206105632U (en) * | 2016-10-06 | 2017-04-19 | 李彬 | Ball device is thrown to steel construction production line steel member |
CN106476820A (en) * | 2016-10-21 | 2017-03-08 | 安徽江淮汽车集团股份有限公司 | Knuckle circulation dolly |
CN206304967U (en) * | 2016-12-16 | 2017-07-07 | 上海振华重工集团(南通)传动机械有限公司 | A kind of Painting Shop paint-spraying production line |
CN108582009A (en) * | 2018-06-15 | 2018-09-28 | 宝钢钢构有限公司 | A kind of stackable finished product smallclothes paint turnover rack |
CN208494724U (en) * | 2018-07-17 | 2019-02-15 | 青岛恒林机械有限公司 | A kind of steel pipe bundle ball blast spray painting drying integral machine |
CN109821691A (en) * | 2018-12-25 | 2019-05-31 | 山东艾弗森特智能设备制造有限公司 | Steel construction intelligence spray-painting production line |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112403765A (en) * | 2020-11-12 | 2021-02-26 | 常德迪格机械制造有限公司 | Machining equipment for manufacturing oil cylinder parts |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8087867B2 (en) | Loading/unloading system for container terminal | |
EP3724073A1 (en) | Charging station and combined charging station | |
CN104631891A (en) | Combined type parking equipment and method with high space utilization rate | |
CN103998302A (en) | Semi-automatic station for exchanging a traction battery of an electric or hybrid vehicle | |
CN101434275B (en) | Welding skid for transmitting multiple coachbuilt body | |
CN110342204A (en) | A method of it circulates and transports applied to Painting Shop steel rod elements | |
CN110077365A (en) | Fast quick change electric system and fast quick change method for electrically | |
CN105174072A (en) | Loading and unloading method capable of preventing automatic container terminal AGV and quay crane from waiting for each other and quay crane | |
CN105270354A (en) | Quick central-positioned battery box assembling and disassembling system for electric automobile | |
CN201317419Y (en) | Welding skid used for transmitting various car bodies | |
CN101798026B (en) | Turn-back tippler unloading system for special coupling open wagon | |
CN104118401B (en) | Battery pallet and battery transport lowering or hoisting gear | |
CN108706260A (en) | A kind of transport vehicle system, transport vehicle and products storage circulation system | |
CN103895131A (en) | Die movable-type tire vulcanization machine set, and vulcanization method thereof | |
CN105937309B (en) | Public bicycles section based on bus manages system | |
CN107587759A (en) | A kind of arrangement of robot garage parking parking stall and path planning for intensive storage | |
CN208216509U (en) | Battery storage frame and new-energy automobile electrical changing station | |
CN111003442A (en) | Pallet truck steel coil transportation system and pallet steel coil transportation system linking device | |
CN110001601A (en) | For changing the positioning of level platform and jacking system, changing level platform and electric charging station | |
EP3705354A1 (en) | Battery pack storage system and automatic battery swapping station for electric car | |
CN207329564U (en) | A kind of production assembly line for large-scale workpiece | |
CN104670775A (en) | Digital-bus-based bracket and tray assembly capable of supplying materials circularly | |
DE202018006447U1 (en) | Area storage | |
CN206622802U (en) | A kind of producing device of full aluminium car bottom component | |
CN103010697B (en) | Conveying system for electrophoretic painting production of ultralong heavy workpieces |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20191018 |