CN105696796A - 一种悬挑脚手架钢梁锚固方法 - Google Patents
一种悬挑脚手架钢梁锚固方法 Download PDFInfo
- Publication number
- CN105696796A CN105696796A CN201610095282.7A CN201610095282A CN105696796A CN 105696796 A CN105696796 A CN 105696796A CN 201610095282 A CN201610095282 A CN 201610095282A CN 105696796 A CN105696796 A CN 105696796A
- Authority
- CN
- China
- Prior art keywords
- floor
- concrete
- nut
- anchor bolt
- sleeve pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/18—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明公开了一种悬挑脚手架钢梁锚固方法,混凝土楼板底模安装后、混凝土浇筑前,将套管固定在套管底座上,组成预埋成孔装置,固定在悬挑脚手架钢梁的锚固位置处;混凝土凝固后,形成垂直于楼板的两个成孔;从楼板的上表面旋入螺母,再在楼板的下表面旋入螺母,调正锚固螺栓的位置后,楼板的上下表面同时旋紧螺母即可将钢梁固定在楼板上;施工完毕需要拆除时,拧松锚栓上下任一端的螺母,即可很快将锚固螺栓卸下,预埋成孔装置在楼板中不取出。本发明的套管底座保证了套管始终垂直于楼板,预埋时不会歪倒倾斜;安装和拆卸方便,连接稳定,能够保证施工安全;可以多次重复使用,节省了材料,且大幅节约了劳力,提高了工作效率。
Description
技术领域
本发明涉及一种悬挑脚手架钢梁锚固方法,属于建筑结构技术领域。
背景技术
近二十年来,随着我国建筑行业的飞速发展,建筑结构向着更高、更复杂的形式推进,高层、异形建筑结构日益增多,而悬挑式脚手架往往是保障其顺利施工的必备条件,使用量巨大。其中,悬挑脚手架中钢梁的锚固又是保障悬挑脚手架安全的关键。目前,绝大多数传统的悬挑脚手架钢梁的锚固方法多为采用锚栓现浇于混凝土楼板之中。锚栓只能一次性使用,而且在使用完毕之后还要费工将超出楼板的部分切除。此方法不仅浪费大量钢材,而且多余锚栓的切除也要浪费大量人力、物力。
发明内容
针对上述现有技术存在的问题,本发明的目的是提供一种连接稳定,可以多次重复使用、锚栓安装简单,拆除方便的悬挑脚手架钢梁锚固方法。
为实现上述目的,本发明采用的技术方案是:一种悬挑脚手架钢梁锚固方法,包括如下步骤:
步骤1:根据实际工程需要,计算悬挑脚手架钢梁的锚固长度与锚固螺栓的规格、位置和数量,使之符合受力与构造要求,进而确定预埋成孔装置的尺寸、位置和数量。
步骤2:混凝土楼板底模安装后、混凝土浇筑前,将套管固定在套管底座上,组成预埋成孔装置,固定在悬挑脚手架钢梁的锚固位置处;浇筑混凝土楼板时,保持预埋的套管位置稳定,混凝土凝固后,形成垂直于楼板的两个成孔;
步骤3:待混凝土强度满足安装脚手架强度后,按设计位置放置悬挑钢梁,从楼板上表面***锚固螺栓,所述锚固螺栓分别依次从设有通孔的角钢压板、套管和套管底座穿过,并从楼板下表面穿出;
步骤4:从楼板的上表面旋入螺母,再在楼板的下表面旋入螺母,调正锚固螺栓的位置后,楼板的上下表面同时旋紧螺母即可将钢梁固定在楼板上;
步骤5:施工完毕需要拆除时,拧松锚栓上下任一端的螺母,即可很快将锚固螺栓卸下,移除悬挑钢梁;
步骤6:采用细石混凝土将楼板混凝土中的锚固螺栓预留孔道灌注密实。
优选的,浇筑混凝土楼板前,在所述套管表面涂刷隔离剂。
优选的,所述套管内外表面粗糙。
本发明的套管底座保证了套管始终垂直于楼板,预埋时不会歪倒倾斜;安装和拆卸方便,连接稳定,能够保证施工安全;可以多次重复使用,节省了材料,且大幅节约了劳力,提高了工作效率。
附图说明
图1是本发明的结构示意图;
图中,1.套管,2.套管底座,3.楼板,4.锚固螺栓,5.角钢压板,6.钢梁,7.螺母。
具体实施方式
下面结合附图对本发明作进一步详细说明。
如图1所示,悬挑脚手架钢梁锚固方法包括如下步骤:
步骤1:根据实际工程需要,计算悬挑脚手架钢梁的锚固长度与锚固螺栓的规格、位置和数量,使之符合受力与构造要求,进而确定预埋成孔装置的尺寸、位置和数量。
步骤2:混凝土楼板底模安装后、混凝土浇筑前,将套管1固定在套管底座2上,组成预埋成孔装置,固定在悬挑脚手架钢梁的锚固位置处;浇筑混凝土楼板时,保持预埋的套管1位置稳定,混凝土凝固后,形成垂直于楼板的两个成孔;
步骤3:待混凝土强度满足安装脚手架强度后,按设计位置放置钢梁6,从楼板3上表面***锚固螺栓4,所述锚固螺栓4分别依次从设有通孔的角钢压板5、套管1和套管底座2穿过,并从楼板3下表面穿出;
步骤4:从楼板3的上表面旋入螺母7,再在楼板3的下表面旋入螺母7,调正锚固螺栓4的位置后,楼板3的上下表面同时旋紧螺母7即可将钢梁6固定在楼板3上;
步骤5:施工完毕需要拆除时,拧松锚栓上下任一端的螺母7,即可很快将锚固螺栓4卸下,移除钢梁6,预埋成孔装置埋在楼板3中不取出;
步骤6:采用细石混凝土将楼板3混凝土中的锚固螺栓预留孔道灌注密实。
优选的,浇筑混凝土楼板3前,在所述套管1表面涂刷隔离剂。
优选的,为了保证套管1能与周围混凝土之间紧密结合,所述套管1内外表面粗糙。由于套管1内表面粗糙,能够与灌入的细石混凝土紧密结合,从而对混凝土楼板造成的损伤达到最小。本装置拆卸方便,可以多次重复使用,节省了材料;不需要切除多余的部分,节约了人力物力。
Claims (3)
1.一种悬挑脚手架钢梁锚固方法,其特征在于,包括如下步骤:
步骤1:根据实际工程需要,计算悬挑脚手架钢梁的锚固长度与锚固螺栓的规格、位置和数量,使之符合受力与构造要求,进而确定预埋成孔装置的尺寸、位置和数量。
步骤2:混凝土楼板底模安装后、混凝土浇筑前,将套管固定在套管底座上,组成预埋成孔装置,固定在悬挑脚手架钢梁的锚固位置处;浇筑混凝土楼板时,保持预埋的套管位置稳定,混凝土凝固后,形成垂直于楼板的两个成孔;
步骤3:待混凝土强度满足安装脚手架强度后,按设计位置放置悬挑钢梁,从楼板上表面***锚固螺栓,所述锚固螺栓分别依次从设有通孔的角钢压板、套管和套管底座穿过,并从楼板下表面穿出;
步骤4:从楼板的上表面旋入螺母,再在楼板的下表面旋入螺母,调正锚固螺栓的位置后,楼板的上下表面同时旋紧螺母即可将钢梁固定在楼板上;
步骤5:施工完毕需要拆除时,拧松锚栓上下任一端的螺母,即可很快将锚固螺栓卸下,移除悬挑钢梁;
步骤6:采用细石混凝土将楼板混凝土中的锚固螺栓预留孔道灌注密实。
2.根据权利要求1所述的悬挑脚手架钢梁锚固方法,其特征在于,浇筑混凝土楼板前,在所述套管表面涂刷隔离剂。
3.根据权利要求1所述的悬挑脚手架钢梁锚固方法,其特征在于,所述套管内外表面粗糙。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610095282.7A CN105696796A (zh) | 2016-02-19 | 2016-02-19 | 一种悬挑脚手架钢梁锚固方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610095282.7A CN105696796A (zh) | 2016-02-19 | 2016-02-19 | 一种悬挑脚手架钢梁锚固方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105696796A true CN105696796A (zh) | 2016-06-22 |
Family
ID=56223285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610095282.7A Pending CN105696796A (zh) | 2016-02-19 | 2016-02-19 | 一种悬挑脚手架钢梁锚固方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105696796A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108952153A (zh) * | 2018-07-09 | 2018-12-07 | 盐城鑫素元机械制造有限公司 | 一种现浇混凝土预埋成孔装置 |
CN111395725A (zh) * | 2020-04-22 | 2020-07-10 | 中建八局第二建设有限公司 | 不规则凸凹立面结构脚手架施工方法 |
CN111608377A (zh) * | 2019-02-25 | 2020-09-01 | 陕西建工第六建设集团有限公司 | 一种搭设悬挑脚手架及其综合性施工工法 |
CN113152871A (zh) * | 2021-04-18 | 2021-07-23 | 广西建工第一建筑工程集团有限公司 | 工具式临时悬挑钢梁基础体系装置及安拆使用方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103306473A (zh) * | 2012-03-09 | 2013-09-18 | 张全胜 | 悬挑脚手架工具式锚固件 |
CN104196226A (zh) * | 2014-09-18 | 2014-12-10 | 中建一局集团第二建筑有限公司 | 一种型钢梁固定地锚构造及其施工方法 |
CN204059920U (zh) * | 2014-09-18 | 2014-12-31 | 中建一局集团第二建筑有限公司 | 一种型钢梁固定地锚构造 |
CN204212392U (zh) * | 2014-10-16 | 2015-03-18 | 中建三局第一建设工程有限责任公司 | 工字钢锚固*** |
CN204386139U (zh) * | 2014-12-19 | 2015-06-10 | 中建三局集团有限公司 | 可拆卸式型钢锚固装置 |
-
2016
- 2016-02-19 CN CN201610095282.7A patent/CN105696796A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103306473A (zh) * | 2012-03-09 | 2013-09-18 | 张全胜 | 悬挑脚手架工具式锚固件 |
CN104196226A (zh) * | 2014-09-18 | 2014-12-10 | 中建一局集团第二建筑有限公司 | 一种型钢梁固定地锚构造及其施工方法 |
CN204059920U (zh) * | 2014-09-18 | 2014-12-31 | 中建一局集团第二建筑有限公司 | 一种型钢梁固定地锚构造 |
CN204212392U (zh) * | 2014-10-16 | 2015-03-18 | 中建三局第一建设工程有限责任公司 | 工字钢锚固*** |
CN204386139U (zh) * | 2014-12-19 | 2015-06-10 | 中建三局集团有限公司 | 可拆卸式型钢锚固装置 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108952153A (zh) * | 2018-07-09 | 2018-12-07 | 盐城鑫素元机械制造有限公司 | 一种现浇混凝土预埋成孔装置 |
CN108952153B (zh) * | 2018-07-09 | 2023-09-12 | 盐城鑫素元机械制造有限公司 | 一种现浇混凝土预埋成孔装置 |
CN111608377A (zh) * | 2019-02-25 | 2020-09-01 | 陕西建工第六建设集团有限公司 | 一种搭设悬挑脚手架及其综合性施工工法 |
CN111608377B (zh) * | 2019-02-25 | 2021-09-10 | 陕西建工第六建设集团有限公司 | 一种搭设悬挑脚手架的综合性施工工法 |
CN111395725A (zh) * | 2020-04-22 | 2020-07-10 | 中建八局第二建设有限公司 | 不规则凸凹立面结构脚手架施工方法 |
CN111395725B (zh) * | 2020-04-22 | 2021-07-09 | 中建八局第二建设有限公司 | 不规则凸凹立面结构脚手架施工方法 |
CN113152871A (zh) * | 2021-04-18 | 2021-07-23 | 广西建工第一建筑工程集团有限公司 | 工具式临时悬挑钢梁基础体系装置及安拆使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105696796A (zh) | 一种悬挑脚手架钢梁锚固方法 | |
CN104453224A (zh) | 一种地下室外墙的模板支护结构及其施工方法 | |
CN109930455B (zh) | 一种市政道路路缘石安装结构及施工装置以及施工方法 | |
CN207863507U (zh) | 一种用于高层建筑楼层的竖向构件置换装置 | |
CN103556819B (zh) | 一种在梁板上预留构造柱孔洞的施工方法 | |
CN105464216A (zh) | 基于整体提升式模板加固***超高超大截面斜柱的施工方法 | |
CN207063522U (zh) | 一种框架柱高支模 | |
CN205077856U (zh) | 一种用于筒仓滑模施工的混凝土保护层控制及水平钢筋定位装置 | |
CN209723607U (zh) | 可调式整体楼梯踏步模板 | |
CN104213708A (zh) | 一种无锚固螺栓防火墙整体施工方法 | |
CN105735630A (zh) | 一种钢梁固定方法 | |
CN203452273U (zh) | 一种移动式现浇板厚度控制马凳 | |
CN105220882A (zh) | 一种水泥浇捣厚度控制装置及其使用方法 | |
CN202596148U (zh) | 可重复利用的悬挑脚手架锚固压环 | |
CN110158424B (zh) | 混凝土浇筑模板 | |
CN103132494B (zh) | 预埋锚锥精确定位方法 | |
CN204299162U (zh) | 悬挑工字钢梁锚固结构 | |
CN110043060A (zh) | 一种落地框架柱改为梁上柱结构的方法 | |
CN204386139U (zh) | 可拆卸式型钢锚固装置 | |
CN102943484B (zh) | 一种大中型设备安装斜铁坐浆快速找平法 | |
CN208858150U (zh) | 一种密肋楼盖模具 | |
CN207295497U (zh) | 一种临时钢管支撑底座钢板安装找平结构 | |
CN112538976A (zh) | 一种装配式楼梯预埋螺杆定位装置及方法 | |
CN105735631A (zh) | 一种悬挑脚手架钢梁锚固装置 | |
CN210858045U (zh) | 一种用于长条混凝土地面刮平轨道装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160622 |
|
RJ01 | Rejection of invention patent application after publication |