CN103556819B - 一种在梁板上预留构造柱孔洞的施工方法 - Google Patents

一种在梁板上预留构造柱孔洞的施工方法 Download PDF

Info

Publication number
CN103556819B
CN103556819B CN201310593262.9A CN201310593262A CN103556819B CN 103556819 B CN103556819 B CN 103556819B CN 201310593262 A CN201310593262 A CN 201310593262A CN 103556819 B CN103556819 B CN 103556819B
Authority
CN
China
Prior art keywords
hole
slab
steel plate
plate base
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310593262.9A
Other languages
English (en)
Other versions
CN103556819A (zh
Inventor
令狐延
孙鹏程
王理
程群
周冲
张健
徐波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201310593262.9A priority Critical patent/CN103556819B/zh
Publication of CN103556819A publication Critical patent/CN103556819A/zh
Application granted granted Critical
Publication of CN103556819B publication Critical patent/CN103556819B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

针对现有构造柱植筋施工方法的不足,本发明提供了一种在梁板上预留构造柱孔洞的施工方法:用施工模板拼接用以浇铸梁板的梁板模板框架;在梁板模板框架中需要设置构造柱的位置摆放坡形钢板底座;在坡形钢板底座的顶面垂直上焊接有四根孔洞定位杆;在坡形钢板底座及孔洞定位杆的表面涂上脱模剂;在每个孔洞定位杆外套接一个PVC套管,将混凝土料浆填满梁板模板框架的腔体,混凝土料浆凝固成为混凝土梁板;将梁板模板框架、PVC套管、坡形钢板底座以及孔洞定位杆拆除。本发明存在的优点有:本发明方法的工序简单、可操作性强、施工难度小,且不会对梁板的强度造成损害,从而缩短了施工周期、节约人物力成本并确保了建筑物的结构质量。

Description

一种在梁板上预留构造柱孔洞的施工方法
技术领域
本发明属于建筑施工技术领域,涉及建筑工程二次结构中构造柱钢筋的施工。具体涉及一种在梁板上预留构造柱孔洞的施工方法。
背景技术
为提高多层建筑砌体结构的抗震性能,需要在房屋的砌体内适宜部位设置钢筋混凝土柱并与圈梁连接,共同加强建筑物的稳定性,这种钢筋混凝土柱通常就被称为构造柱。而传统的构造柱钢筋的做法一般为梁板砼浇筑完成后,采用钻孔的方式植筋,它的施工流程一般为:施工准备、定点定位、钻孔、清除浮尘、注入胶体、锚入钢筋、钢筋校正、固化保护、自检和移交项目验收,其存在工序复杂、可操作性差、施工难度大等缺点。
上述施工方法存在两个突出的弊端:一是整个工序费工费料,拖延施工的周期;二是在施工中需要钻孔,而高频震动会引起梁板内应力分布的不均、且易在梁板开孔区域产生细小裂纹,对梁板结构造成损害。
发明内容
为了解决现有构造柱植筋施工方法的不足,本发明提供了一种在梁板上预留构造柱孔洞的施工方法。本发明的具体技术方案如下:
一种在梁板上预留构造柱孔洞的施工方法,按如下步骤进行:
步骤一:用施工模板拼接用以浇筑梁板的梁板模板框架3;在梁板模板框架3中需要设置构造柱的位置摆放坡形钢板底座11;所述坡形钢板底座11底面尺寸与构造柱的尺寸一致,坡形钢板底座11顶面小于其底面的尺寸,即为上小下大、四周成坡形的金属薄板;
步骤二:在坡形钢板底座11的顶面垂直上焊接有四根或四根以上的孔洞定位杆12;所述孔洞定位杆12均为带肋的钢筋;孔洞定位杆12的长度大于梁板模板框架3的深度;
步骤三:在坡形钢板底座11及孔洞定位杆12的表面涂上脱模剂;
步骤四:在每个孔洞定位杆12外套接一个PVC套管2,在PVC套管2的外壁上均涂抹一层脱模剂;
步骤五:将混凝土料浆填满梁板模板框架3的腔体,并静置;直至混凝土料浆凝固成为混凝土梁板4;
步骤六:将梁板模板框架3自混凝土梁板4表面拆除;将PVC套管2自混凝土梁板4上方抽处;将坡形钢板底座11连同孔洞定位杆12自混凝土梁板4的底部拆除。
优选的方案是,PVC套管2套接在孔洞定位杆12后,将PVC套管2的上端部向下弯折,即使得PVC套管2呈倒置的J形。
优选的方案是,PVC套管2的顶部端口与孔洞定位杆12顶端之间的垂直间距不小于3cm。
优选的方案是,坡形钢板底座11的厚度不小于1cm。
本发明存在的优点有:
本发明方法的工序简单、可操作性强、施工难度小,且不会对梁板的强度造成损害,从而缩短了施工周期、节约人物力成本并确保了建筑物的结构质量。具体突出体现如下几点:
1)本方法避免了传统施工时为避免破坏结构主筋,而把结构保护层凿开的过程——此过程因结构梁板筋保护层厚度较薄(一般为1.5~2cm)和浇筑砼过程中的扰动使钢筋保护层的厚度不一而很难操作);
2)本方法避免了传统施工中的钻孔过程——而事实上,在现场实际施工过程中,对梁板的钻孔作业很难按照《混凝土结构加固设计规范GB50367-2006》中对植筋基本锚固长度的规定(孔深至少为10cm)的规定施行;
3)本方法避免了传统施工中孔内粉尘及水的清理过程——传统工艺过程中需用毛刷及风机清理干净孔内粉尘与水;
4)本方法避免了注胶过程——该过程需检验胶体质量,且在施工过程中需要将所钻出的孔洞内的空气清除,即避免空气被胶体封在孔道内,此外该工序在胶体固化前不能受到扰动;施工难度很大。
附图说明
图1为实施本发明方法步骤一至步骤三后的施工状态示意图。
图2为实施本发明方法步骤四后的施工状态示意图。
图3为实施本发明方法步骤五后的施工状态示意图。
图4为实施本发明方法步骤六后的施工产物(成品)的示意图。
附图标记:坡形钢板底座11、孔洞定位杆12、PVC套管2、梁板模板框架3、混凝土梁板4、预留孔5。
具体实施方式
现结合附图进一步详细说明本发明的结构特点。
一种在梁板上预留构造柱孔洞的施工方法,按如下步骤进行:
步骤一(参见图1):用施工模板拼接用以浇筑梁板的梁板模板框架3;在梁板模板框架3中需要设置构造柱的位置摆放坡形钢板底座11;所述坡形钢板底座11底面尺寸与构造柱的尺寸一致,坡形钢板底座11顶面小于其底面的尺寸,即为上小下大、四周成坡形的金属薄板;
步骤二(参见图1):在坡形钢板底座11的顶面垂直上焊接有四根或四根以上的孔洞定位杆12;所述孔洞定位杆12均为带肋的钢筋;孔洞定位杆12的长度大于梁板模板框架3的深度;
步骤三(参见图1):在坡形钢板底座11及孔洞定位杆12的表面涂上脱模剂;
步骤四(参见图2):在每个孔洞定位杆12外套接一个PVC套管2,在PVC套管2的外壁上均涂抹一层脱模剂;
步骤五(参见图3):将混凝土料浆填满梁板模板框架3的腔体,并静置;直至混凝土料浆凝固成为混凝土梁板4;
步骤六(参见图4):将梁板模板框架3自混凝土梁板4表面拆除;将PVC套管2自混凝土梁板4上方抽处;将坡形钢板底座11连同孔洞定位杆12自混凝土梁板4的底部拆除,即完成开设有预留孔5的混凝土梁板4的制作。
参见图2,优选的方案是,PVC套管2套接在孔洞定位杆12后,将PVC套管2的上端部向下弯折,即使得PVC套管2呈倒置的J形。该结构能够防止在砼浇筑过程中,混凝土料浆进入PVC套管2污染孔洞定位杆12,导致PVC套管2与孔洞定位杆12凝结成统一整体,无法拆卸的问题。
优选的方案是,PVC套管2的顶部端口与孔洞定位杆12顶端之间的垂直间距不小于3cm。
优选的方案是,坡形钢板底座11的厚度不小于1cm。用钉子将坡形钢板底座11固定在梁板模板框架3凹槽的顶面,防止在浇筑混凝土料浆时,坡形钢板底座11的放置位置发生偏移;坡形钢板底座11制作为坡形,有助于后期方便撬动、利于脱模。
进一步的优选方案是:孔洞定位杆12采用直径为10或12mm的钢筋。
进一步的优选方案是:PVC套管2由建筑施工中常用Φ16mm的水电PVC线管制成。

Claims (4)

1.一种在梁板上预留构造柱孔洞的施工方法,其特征在于,按如下步骤进行:
步骤一:用施工模板拼接用以浇筑梁板的梁板模板框架(3);在梁板模板框架(3)中需要设置构造柱的位置摆放坡形钢板底座(11);所述坡形钢板底座(11)底面尺寸与构造柱的尺寸一致,坡形钢板底座(11)顶面小于其底面的尺寸,即为上小下大、四周成坡形的金属薄板;
步骤二:在坡形钢板底座(11)的顶面垂直上焊接有四根或四根以上的孔洞定位杆(12);所述孔洞定位杆(12)均为带肋的钢筋;孔洞定位杆(12)的长度大于梁板模板框架(3)的深度;
步骤三:在坡形钢板底座(11)及孔洞定位杆(12)的表面涂上脱模剂;
步骤四:在每个孔洞定位杆(12)外套接一个PVC套管(2),在PVC套管(2)的外壁上均涂抹一层脱模剂;
步骤五:将混凝土料浆填满梁板模板框架(3)的腔体,并静置;直至混凝土料浆凝固成为混凝土梁板(4);
步骤六:将梁板模板框架(3)自混凝土梁板(4)表面拆除;将PVC套管(2)自混凝土梁板(4)上方抽处;将坡形钢板底座(11)连同孔洞定位杆(12)自混凝土梁板(4)的底部拆除。
2.如权利要求1所述的一种在梁板上预留构造柱孔洞的施工方法,其特征在于,PVC套管(2)套接在孔洞定位杆(12)后,将PVC套管(2)的上端部向下弯折,即使得PVC套管(2)呈倒置的J形。
3.如权利要求1所述的一种在梁板上预留构造柱孔洞的施工方法,其特征在于,PVC套管(2)的顶部端口与孔洞定位杆(12)顶端之间的垂直间距不小于3cm。
4.如权利要求1所述的一种在梁板上预留构造柱孔洞的施工方法,其特征在于,坡形钢板底座(11)的厚度不小于1cm。
CN201310593262.9A 2013-11-23 2013-11-23 一种在梁板上预留构造柱孔洞的施工方法 Active CN103556819B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310593262.9A CN103556819B (zh) 2013-11-23 2013-11-23 一种在梁板上预留构造柱孔洞的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310593262.9A CN103556819B (zh) 2013-11-23 2013-11-23 一种在梁板上预留构造柱孔洞的施工方法

Publications (2)

Publication Number Publication Date
CN103556819A CN103556819A (zh) 2014-02-05
CN103556819B true CN103556819B (zh) 2015-12-09

Family

ID=50011155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310593262.9A Active CN103556819B (zh) 2013-11-23 2013-11-23 一种在梁板上预留构造柱孔洞的施工方法

Country Status (1)

Country Link
CN (1) CN103556819B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831924B (zh) * 2015-05-29 2017-03-22 中建五局第三建设有限公司 一种梁底处配电箱进出线pvc配管的施工方法
CN105155669B (zh) * 2015-09-15 2017-12-12 成都市第四建筑工程公司 暗梁楼板构造柱结构施工方法
CN107542157A (zh) * 2016-06-28 2018-01-05 五冶集团上海有限公司 一种地下集水坑的快速成型施工方法
CN106968334A (zh) * 2017-04-25 2017-07-21 天津市建工工程总承包有限公司 一种现浇混凝土框架二次结构构造柱的施工方法
CN108842732B (zh) * 2018-08-09 2023-08-25 深圳市盛利华建筑工程有限公司 一种市政水利堤坝检查井施工辅助套具及其方法
CN109296138B (zh) * 2018-11-02 2023-10-27 广西建工集团第三建筑工程有限责任公司 一种构造柱后植钢筋的定位装置及施工方法
CN114086696B (zh) * 2021-12-01 2023-04-11 中冶南方城市建设工程技术有限公司 叠合式构造柱的施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1101883A1 (de) * 1999-11-17 2001-05-23 Construmat Ag Vorrichtung zur Herstellung eines Bewehrungsanschlusses zwischen einem bewehrten Betonbauteil und einem Anschlussbauteil
CN201460211U (zh) * 2009-07-27 2010-05-12 中国第二冶金建设有限责任公司 水暖预留孔洞模具
CN201574583U (zh) * 2009-12-30 2010-09-08 山东万鑫建设有限公司 一种简易管道孔洞预留模具
CN201620602U (zh) * 2010-03-18 2010-11-03 江苏弘盛建设工程集团有限公司 一种预埋套管
CN102121315A (zh) * 2011-01-07 2011-07-13 中建五局第三建设有限公司 紧定式钢套管预留孔洞施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1101883A1 (de) * 1999-11-17 2001-05-23 Construmat Ag Vorrichtung zur Herstellung eines Bewehrungsanschlusses zwischen einem bewehrten Betonbauteil und einem Anschlussbauteil
CN201460211U (zh) * 2009-07-27 2010-05-12 中国第二冶金建设有限责任公司 水暖预留孔洞模具
CN201574583U (zh) * 2009-12-30 2010-09-08 山东万鑫建设有限公司 一种简易管道孔洞预留模具
CN201620602U (zh) * 2010-03-18 2010-11-03 江苏弘盛建设工程集团有限公司 一种预埋套管
CN102121315A (zh) * 2011-01-07 2011-07-13 中建五局第三建设有限公司 紧定式钢套管预留孔洞施工方法

Also Published As

Publication number Publication date
CN103556819A (zh) 2014-02-05

Similar Documents

Publication Publication Date Title
CN103556819B (zh) 一种在梁板上预留构造柱孔洞的施工方法
CN105220874B (zh) 地下室超高外墙自撑单侧支模体系的施工方法
CN104652830B (zh) 一种预制楼面板和预制墙板搭建的施工方法
CN206616862U (zh) 模板根部加固装置
CN103469806A (zh) 一种预制砼基础承台侧模替代砖胎模的施工方法
CN204983662U (zh) 一种对拉螺杆与钢管排架组合单侧支模装置
CN104947719A (zh) 地下室顶板后浇带吊支模结构及其后浇带施工方法
CN109577639A (zh) 外墙保模一体化板与铝合金模板组合体系施工方法
CN106836463A (zh) 承台及地梁结构的施工装置和施工方法
CN203429641U (zh) 建筑施工用单侧支模加固结构体系
US8650830B2 (en) Method of basement construction
EA039205B1 (ru) Система межстенового соединения готовых стен жесткости и способ их соединения
CN106894587A (zh) 预制楼梯连接方法
CN105275097A (zh) 一种后浇带止水钢板和快易收口网安装方法
CN108755972B (zh) 预制件用垫脚及其使用方法
CN110792200A (zh) 一种无需后期剔打的砌体施工方法及其包管结构
CN203383508U (zh) 一种背靠砖混挡土墙的单侧支模体结构
CN105525753A (zh) 一种构造柱与主体结构同时施工的方法及结构
CN104727552A (zh) 一种在预制剪力墙上预留给水管槽的施工方法
CN107083804B (zh) 一种墙体构造柱插筋施工方法
CN106351376A (zh) 车库顶板施工方法
CN102828587A (zh) 一种加气混凝土砌块装饰外墙及其施工方法
CN102352690B (zh) 现浇混凝土空心楼板的钢管抗浮定位***的施工方法
CN106284653A (zh) 一种阳台构造柱顶预留空隙的施工方法
CN211257093U (zh) 地下现浇结构外墙后浇带模板预支设装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 230000 building 3, 262 Heping Road, Yaohai District, Hefei City, Anhui Province

Patentee after: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau

Address before: 230011 science and Technology Department of No.6 company of China Construction Fourth Bureau, Dongfang Building, Changjiang East Street, Yaohai District, Hefei City, Anhui Province

Patentee before: CHINA CONSTRUCTION 4TH ENGINEERING BUREAU, 6TH Co.,Ltd.

CP03 Change of name, title or address
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A construction method for reserving structural column holes on beams and slabs

Effective date of registration: 20231128

Granted publication date: 20151209

Pledgee: China Construction Bank Co.,Ltd. Hefei Chengdong sub branch

Pledgor: No 6 Construction Co.,Ltd. of China Construction Fourth Engineering Bureau

Registration number: Y2023980067840

PE01 Entry into force of the registration of the contract for pledge of patent right