A kind of construction method of tunnel shock-absorbing explosion
Technical field
The present invention relates to the damping blasting construction method in tunnel, be particularly useful for the subway project dug underground in bustling location, city, and situation constructions such as building and pile foundation are closely worn in the tunnel down.
Background technology
Subway engineering is built in bustling location in the city, the tunnel occurs through regular meeting and closely wears situation such as large-scale structures or bridge pile foundation plinth down.When adopting the blasting method excavation, blasting vibration may cause a devastating effect to building or pile foundation; If adopt shield machine construction, construction costs will significantly increase, and according to the national conditions of present China, also be difficult to popularize in an all-round way.
Tunnel Blasting construction at present is main adopts non-electricity millisecond elementary errors Nonel detonator, totally 20 sections, and top bar 50~60 big gun holes arranged approximately in the tunnel.
calculates according to Sa road Paderewski formula, and single hop detonator battering charge is 0.36kg.Adopt traditional on line mode can't satisfy this requirement, the single hop battering charge can exceed this permissible value, causes explosion vibration velocity to exceed standard.Therefore, under existing technical equipment condition, can significantly not increase on the basis of construction costs, be necessary conventional blasting method is optimized, propose a kind of new damping blasting construction method.
Summary of the invention
The present invention seeks on existing priming system specification basis; Solve the bottleneck problem of single hop detonator battering charge; A kind of construction method of tunnel shock-absorbing explosion is provided, solves the not enough and maximum too small contradiction of explosive payload that allows of single hop of detonator section, effectively reduce explosion vibration velocity.
The present invention for realizing the technical scheme that above-mentioned purpose adopted is: a kind of construction method of tunnel shock-absorbing explosion; It is characterized by: face divides snubber, reliever and periphery hole, adopts air drill pore-forming successively, and face branch left and right sides half range carries out detonator respectively and arranges; Left side half range adopts the even number section; Right half range adopts the odd number section, and reliever, periphery hole become one group by 3~5 parallel hole connections of every row respectively, and not interior on the same group detonator section can be reused; Adopt 2 sections detonators to connect successively each group then; Elementary errors outside elementary errors and the hole in the hole of detonator is combined, thereby each burst time of organizing identical section detonator is staggered, reduced the explosive charge that detonates simultaneously.
Said snubber dynamite quantity per hole is greater than reliever and periphery hole big gun hole dynamite quantity per hole.
Said snubber adopts four hole V-cut modes, and four big gun holes are adopted 1,2,3,4 section respectively.
Said reliever is since 5 sections or 6 sections, and reliever is connected with snubber through 2 sections detonators.
Concentrated charge at the bottom of the said snubber employing hole; Reliever and periphery hole adopt at interval not coupling charging, and primacord connects.
The damping explosion measure that the present invention has adopted the inside and outside elementary errors in hole to combine; The parallel connection and serial connection of elementary errors detonator is used in combination, not allowing the detonator of identical section to reuse on the same group, through 2 sections detonators of series connection; With not on the same group in burst time of identical section detonator stagger; Thereby efficiently solve the contradiction that the big gun hole is many and the detonator section is not enough of once detonation, reduced the explosive charge that detonates simultaneously, according to the burst time curve statistics in each hole; Basically realize a hole one sound, effectively reduced explosion vibration velocity.
In addition because snubber need provide free face for follow-up explosion; Dynamite quantity per hole is larger than other big gun holes, adopts four hole V-cut modes, and four big gun holes are adopted 1,2,3,4 section respectively; Reliever is since 5 sections or 6 sections; After snubber detonated, recur quick-fried reliever and periphery hole were avoided vibration velocity stack in the snubber initiation process.
Description of drawings
Fig. 1 is the tunnel of the present invention on line method network of topping bar.
Fig. 2 is the tunnel of the present invention on line method network of getting out of a predicament or an embarrassing situation.
Fig. 3 is the tunnel of the present invention snubber initiation net figure that tops bar.
The specific embodiment
Below in conjunction with specific embodiment the present invention is done further explain, but the present invention is not limited to specific embodiment.
Embodiment 1
Wear the underground large-scale shopping gallery in a place under one running tunnel, gallery is a reinforced concrete frame structure, B1, pile foundation under the raft plate.The tunnel vault apart from stake at the bottom of 4.0m only, apart from only about 8m at the bottom of the raft plate.The construction method of the damping explosion that it is concrete is following:
Adopt YT-28 type air drill pore-forming, two typhoons bore and carry out simultaneously, and drilling depth is snubber 1.2m, reliever and periphery hole 1.0m;
Snubber adopts four hole V-cuts, aperture spacing 1.8m, and spacing 0.5m at the bottom of the hole need control angle well during boring, and angle is excessive or too smallly all can influence the slotting effect;
Carry out powder charge in order.Snubber dynamite quantity per hole 400g, concentrated charge at the bottom of the hole, four holes are adopted 1,2,3,4 section respectively.The left half range of topping bar adopts the even number section, since 6 sections, and 6,8,10 sections Right half range adopts the odd number section, since 5 sections, and 5,7,9 sections 3~5 holes are one group, reliever single hole powder charge 300g, periphery hole single hole powder charge 200g.Reliever and periphery hole adopt at interval not coupling charging, and primacord connects.Powder charge is carried out on line by the order of periphery hole → reliever → snubber after accomplishing, and adopts 2 sections detonator A series connection (like Fig. 1) between each group;
Each big gun hole adopts the stemming shutoff tight, prevents gas leakage, to such an extent as to influence demolition effect;
Above-mentioned work is accomplished, and after check is confirmed, connects initiator and ignites.
This damping blasting construction method, the on line mode through elementary errors inside and outside the employing hole combines effectively staggers the burst time in each big gun hole, has reduced the explosive charge that detonates simultaneously.Show that through explosion vibration velocity monitor explosion vibration velocity can be controlled in below the 0.8cm/s, guaranteed the stable and construction safety of building.