CN102494571A - Construction method for damped blasting of tunnels - Google Patents

Construction method for damped blasting of tunnels Download PDF

Info

Publication number
CN102494571A
CN102494571A CN2011104089129A CN201110408912A CN102494571A CN 102494571 A CN102494571 A CN 102494571A CN 2011104089129 A CN2011104089129 A CN 2011104089129A CN 201110408912 A CN201110408912 A CN 201110408912A CN 102494571 A CN102494571 A CN 102494571A
Authority
CN
China
Prior art keywords
hole
construction method
detonators
reliever
blasting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104089129A
Other languages
Chinese (zh)
Inventor
杨鲲鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
China Construction Eighth Engineering Division Co Ltd Dalian Branch
Original Assignee
China Construction Eighth Engineering Division Co Ltd Dalian Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd Dalian Branch filed Critical China Construction Eighth Engineering Division Co Ltd Dalian Branch
Priority to CN2011104089129A priority Critical patent/CN102494571A/en
Publication of CN102494571A publication Critical patent/CN102494571A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a construction method for damped blasting of tunnels. The construction method is characterized in that a working face comprises cutting eyes, auxiliary eyes and peripheral eyes; an air drill is adopted for forming holes in sequence; the working face is divided into a left half-range face and a right half-range face for respectively distributing the segment positions of detonators, wherein the left half-range face adopts even segment positions, the right half-range face adopts odd segment positions; the auxiliary eyes and the peripheral eyes are respectively connected into a group according to 3-5 blastholes in one row; and detonators with same segment positions in different groups can be used repeatedly, and then all the groups are connected in sequence and in series by adopting two segments of detonators, so that the fine differences inside and outside the holes of the detonating tubes are combined together. According to the construction method, the damped blasting measure for combining the fine differences inside and outside the holes are adopted, the detonating tubes with fine differences are connected in parallel and in series for combined use, the detonators with same segment positions in different groups are allowed to be used repeatedly, and the blasting time of the detonators with same segment positions in different groups is staggered through serial two segments of detonators, so that the explosive amount for simultaneous blasting is reduced and the blasting vibration speed is effectively reduced.

Description

A kind of construction method of tunnel shock-absorbing explosion
Technical field
The present invention relates to the damping blasting construction method in tunnel, be particularly useful for the subway project dug underground in bustling location, city, and situation constructions such as building and pile foundation are closely worn in the tunnel down.
Background technology
Subway engineering is built in bustling location in the city, the tunnel occurs through regular meeting and closely wears situation such as large-scale structures or bridge pile foundation plinth down.When adopting the blasting method excavation, blasting vibration may cause a devastating effect to building or pile foundation; If adopt shield machine construction, construction costs will significantly increase, and according to the national conditions of present China, also be difficult to popularize in an all-round way.
Tunnel Blasting construction at present is main adopts non-electricity millisecond elementary errors Nonel detonator, totally 20 sections, and top bar 50~60 big gun holes arranged approximately in the tunnel. calculates according to Sa road Paderewski formula, and single hop detonator battering charge is 0.36kg.Adopt traditional on line mode can't satisfy this requirement, the single hop battering charge can exceed this permissible value, causes explosion vibration velocity to exceed standard.Therefore, under existing technical equipment condition, can significantly not increase on the basis of construction costs, be necessary conventional blasting method is optimized, propose a kind of new damping blasting construction method.
Summary of the invention
The present invention seeks on existing priming system specification basis; Solve the bottleneck problem of single hop detonator battering charge; A kind of construction method of tunnel shock-absorbing explosion is provided, solves the not enough and maximum too small contradiction of explosive payload that allows of single hop of detonator section, effectively reduce explosion vibration velocity.
The present invention for realizing the technical scheme that above-mentioned purpose adopted is: a kind of construction method of tunnel shock-absorbing explosion; It is characterized by: face divides snubber, reliever and periphery hole, adopts air drill pore-forming successively, and face branch left and right sides half range carries out detonator respectively and arranges; Left side half range adopts the even number section; Right half range adopts the odd number section, and reliever, periphery hole become one group by 3~5 parallel hole connections of every row respectively, and not interior on the same group detonator section can be reused; Adopt 2 sections detonators to connect successively each group then; Elementary errors outside elementary errors and the hole in the hole of detonator is combined, thereby each burst time of organizing identical section detonator is staggered, reduced the explosive charge that detonates simultaneously.
Said snubber dynamite quantity per hole is greater than reliever and periphery hole big gun hole dynamite quantity per hole.
Said snubber adopts four hole V-cut modes, and four big gun holes are adopted 1,2,3,4 section respectively.
Said reliever is since 5 sections or 6 sections, and reliever is connected with snubber through 2 sections detonators.
Concentrated charge at the bottom of the said snubber employing hole; Reliever and periphery hole adopt at interval not coupling charging, and primacord connects.
The damping explosion measure that the present invention has adopted the inside and outside elementary errors in hole to combine; The parallel connection and serial connection of elementary errors detonator is used in combination, not allowing the detonator of identical section to reuse on the same group, through 2 sections detonators of series connection; With not on the same group in burst time of identical section detonator stagger; Thereby efficiently solve the contradiction that the big gun hole is many and the detonator section is not enough of once detonation, reduced the explosive charge that detonates simultaneously, according to the burst time curve statistics in each hole; Basically realize a hole one sound, effectively reduced explosion vibration velocity.
In addition because snubber need provide free face for follow-up explosion; Dynamite quantity per hole is larger than other big gun holes, adopts four hole V-cut modes, and four big gun holes are adopted 1,2,3,4 section respectively; Reliever is since 5 sections or 6 sections; After snubber detonated, recur quick-fried reliever and periphery hole were avoided vibration velocity stack in the snubber initiation process.
 
Description of drawings
Fig. 1 is the tunnel of the present invention on line method network of topping bar.
Fig. 2 is the tunnel of the present invention on line method network of getting out of a predicament or an embarrassing situation.
Fig. 3 is the tunnel of the present invention snubber initiation net figure that tops bar.
The specific embodiment
Below in conjunction with specific embodiment the present invention is done further explain, but the present invention is not limited to specific embodiment.
Embodiment 1
Wear the underground large-scale shopping gallery in a place under one running tunnel, gallery is a reinforced concrete frame structure, B1, pile foundation under the raft plate.The tunnel vault apart from stake at the bottom of 4.0m only, apart from only about 8m at the bottom of the raft plate.The construction method of the damping explosion that it is concrete is following:
Adopt YT-28 type air drill pore-forming, two typhoons bore and carry out simultaneously, and drilling depth is snubber 1.2m, reliever and periphery hole 1.0m;
Snubber adopts four hole V-cuts, aperture spacing 1.8m, and spacing 0.5m at the bottom of the hole need control angle well during boring, and angle is excessive or too smallly all can influence the slotting effect;
Carry out powder charge in order.Snubber dynamite quantity per hole 400g, concentrated charge at the bottom of the hole, four holes are adopted 1,2,3,4 section respectively.The left half range of topping bar adopts the even number section, since 6 sections, and 6,8,10 sections Right half range adopts the odd number section, since 5 sections, and 5,7,9 sections 3~5 holes are one group, reliever single hole powder charge 300g, periphery hole single hole powder charge 200g.Reliever and periphery hole adopt at interval not coupling charging, and primacord connects.Powder charge is carried out on line by the order of periphery hole → reliever → snubber after accomplishing, and adopts 2 sections detonator A series connection (like Fig. 1) between each group;
Each big gun hole adopts the stemming shutoff tight, prevents gas leakage, to such an extent as to influence demolition effect;
Above-mentioned work is accomplished, and after check is confirmed, connects initiator and ignites.
This damping blasting construction method, the on line mode through elementary errors inside and outside the employing hole combines effectively staggers the burst time in each big gun hole, has reduced the explosive charge that detonates simultaneously.Show that through explosion vibration velocity monitor explosion vibration velocity can be controlled in below the 0.8cm/s, guaranteed the stable and construction safety of building.

Claims (5)

1. the construction method of a tunnel shock-absorbing explosion; It is characterized by: face divides snubber, reliever and periphery hole, adopts air drill pore-forming successively, and face branch left and right sides half range carries out detonator respectively and arranges; Left side half range adopts the even number section; Right half range adopts the odd number section, and reliever, periphery hole become one group by 3~5 parallel hole connections of every row respectively, and not interior on the same group detonator section can be reused; Adopt 2 sections detonators to connect successively each group then, thereby elementary errors outside elementary errors and the hole in the hole of detonator is combined.
2. the construction method of a kind of tunnel shock-absorbing explosion according to claim 1 is characterized by: said snubber dynamite quantity per hole is greater than reliever and periphery hole big gun hole dynamite quantity per hole.
3. the construction method of a kind of tunnel shock-absorbing explosion according to claim 1 is characterized by: said snubber adopts four hole V-cut modes, and four big gun holes are adopted 1,2,3,4 section respectively.
4. the construction method of a kind of tunnel shock-absorbing explosion according to claim 3 is characterized by: said reliever is since 5 sections or 6 sections, and reliever is connected with snubber through 2 sections detonators.
5. according to the construction method of the arbitrary described a kind of tunnel shock-absorbing explosion of claim 1-4, it is characterized by: concentrated charge at the bottom of the said snubber employing hole; Reliever and periphery hole adopt at interval not coupling charging, and primacord connects.
CN2011104089129A 2011-12-11 2011-12-11 Construction method for damped blasting of tunnels Pending CN102494571A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104089129A CN102494571A (en) 2011-12-11 2011-12-11 Construction method for damped blasting of tunnels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104089129A CN102494571A (en) 2011-12-11 2011-12-11 Construction method for damped blasting of tunnels

Publications (1)

Publication Number Publication Date
CN102494571A true CN102494571A (en) 2012-06-13

Family

ID=46186415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104089129A Pending CN102494571A (en) 2011-12-11 2011-12-11 Construction method for damped blasting of tunnels

Country Status (1)

Country Link
CN (1) CN102494571A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103175451A (en) * 2013-03-13 2013-06-26 中国建筑土木建设有限公司 Construction method of tunnel shock relieve hole controlling blasting
CN104266557A (en) * 2014-07-31 2015-01-07 山东华联矿业股份有限公司 Precontrol roof sublevel ore breaking once shaft forming method
CN104482816A (en) * 2014-12-03 2015-04-01 中国矿业大学(北京) Gradient pre-splitting blasting method and device of lancing cartridges around vertical shaft
CN104596373A (en) * 2015-01-05 2015-05-06 山西路桥集团长临高速公路有限公司 Excitation needle detonation construction method for mountain tunnel
CN104634199A (en) * 2015-02-10 2015-05-20 四川公路桥梁建设集团有限公司 Method for implementing tunnel periphery hole smooth blasting by means of detonating cord and nonel detonator
CN104895574A (en) * 2015-05-06 2015-09-09 重庆工程职业技术学院 Construction method for controlling large cross section tunnel blasting vibration velocity
CN105043176A (en) * 2015-07-08 2015-11-11 中交路桥南方工程有限公司 Multi-level small-wedge-shaped cuthole blasting vibration reduction method
CN109341450A (en) * 2018-10-30 2019-02-15 中电建南方建设投资有限公司 A kind of Tunnel Blasting structure and Tunnel Blasting construction method
CN109341451A (en) * 2018-11-09 2019-02-15 中铁二十二局集团轨道工程有限公司 A kind of damped blasting of tunnels structure and construction
CN110455137A (en) * 2019-07-16 2019-11-15 中铁隧道集团二处有限公司 Elementary errors is networked construction method outside a kind of hole for bored tunnel buffer blasting
CN110595305A (en) * 2019-08-08 2019-12-20 中铁二局第二工程有限公司 Wave crest uncorrelated detonation method
CN111780634A (en) * 2020-07-20 2020-10-16 中国铁建投资集团有限公司 Method for reducing blasting vibration velocity
CN113153357A (en) * 2021-04-29 2021-07-23 重庆大学 Tunnel inverted arch half-width dismantling device and construction method
CN114791246A (en) * 2022-04-02 2022-07-26 中铁十六局集团路桥工程有限公司 Blasting construction method for existing small-clear-distance close-connection tunnel

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201764913U (en) * 2010-08-30 2011-03-16 中铁十九局集团有限公司 Repetitive type wedge-shaped cut
CN102230768A (en) * 2011-06-08 2011-11-02 中煤第七十一工程处 High-efficiency inclined shaft tunneling blasting method for red clay

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201764913U (en) * 2010-08-30 2011-03-16 中铁十九局集团有限公司 Repetitive type wedge-shaped cut
CN102230768A (en) * 2011-06-08 2011-11-02 中煤第七十一工程处 High-efficiency inclined shaft tunneling blasting method for red clay

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
房泽法等: "单孔单响***网络在路基拓宽中的应用", 《岩石力学与工程学报》, vol. 21, no. 7, 31 July 2002 (2002-07-31), pages 1079 - 1083 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103175451A (en) * 2013-03-13 2013-06-26 中国建筑土木建设有限公司 Construction method of tunnel shock relieve hole controlling blasting
CN103175451B (en) * 2013-03-13 2015-08-05 中国建筑土木建设有限公司 A kind of construction method of tunnel shock-absorbing hole controlled blasting
CN104266557A (en) * 2014-07-31 2015-01-07 山东华联矿业股份有限公司 Precontrol roof sublevel ore breaking once shaft forming method
CN104482816A (en) * 2014-12-03 2015-04-01 中国矿业大学(北京) Gradient pre-splitting blasting method and device of lancing cartridges around vertical shaft
CN104596373A (en) * 2015-01-05 2015-05-06 山西路桥集团长临高速公路有限公司 Excitation needle detonation construction method for mountain tunnel
CN104634199A (en) * 2015-02-10 2015-05-20 四川公路桥梁建设集团有限公司 Method for implementing tunnel periphery hole smooth blasting by means of detonating cord and nonel detonator
CN104634199B (en) * 2015-02-10 2016-05-25 四川公路桥梁建设集团有限公司 Utilize primacord and Nonel detonator to realize the method for tunnel perimeter eye photoface exploision
CN104895574A (en) * 2015-05-06 2015-09-09 重庆工程职业技术学院 Construction method for controlling large cross section tunnel blasting vibration velocity
CN105043176A (en) * 2015-07-08 2015-11-11 中交路桥南方工程有限公司 Multi-level small-wedge-shaped cuthole blasting vibration reduction method
CN105043176B (en) * 2015-07-08 2018-07-10 中交路桥南方工程有限公司 A kind of small wedge shot shock-dampening method of multistage
CN109341450A (en) * 2018-10-30 2019-02-15 中电建南方建设投资有限公司 A kind of Tunnel Blasting structure and Tunnel Blasting construction method
CN109341450B (en) * 2018-10-30 2022-06-21 中电建南方建设投资有限公司 Tunnel blasting structure and tunnel blasting construction method
CN109341451A (en) * 2018-11-09 2019-02-15 中铁二十二局集团轨道工程有限公司 A kind of damped blasting of tunnels structure and construction
CN110455137A (en) * 2019-07-16 2019-11-15 中铁隧道集团二处有限公司 Elementary errors is networked construction method outside a kind of hole for bored tunnel buffer blasting
CN110455137B (en) * 2019-07-16 2022-05-24 中铁隧道集团二处有限公司 Extrahole differential networking construction method for vibration reduction blasting of underground excavation tunnel
CN110595305A (en) * 2019-08-08 2019-12-20 中铁二局第二工程有限公司 Wave crest uncorrelated detonation method
CN110595305B (en) * 2019-08-08 2021-07-30 中铁二局第二工程有限公司 Wave crest uncorrelated detonation method
CN111780634A (en) * 2020-07-20 2020-10-16 中国铁建投资集团有限公司 Method for reducing blasting vibration velocity
CN113153357A (en) * 2021-04-29 2021-07-23 重庆大学 Tunnel inverted arch half-width dismantling device and construction method
CN114791246A (en) * 2022-04-02 2022-07-26 中铁十六局集团路桥工程有限公司 Blasting construction method for existing small-clear-distance close-connection tunnel

Similar Documents

Publication Publication Date Title
CN102494571A (en) Construction method for damped blasting of tunnels
CN102878876B (en) Mine roadway advancing and undermining method and main blasting parameters
CN102927867B (en) Vibration absorbing method for cut presplitting blasting
CN102808622B (en) Method for recovering ore pillar by medium-length hole and deep hole combined blasting technology
CN105333778B (en) Medium-deep hole large-section composite cut blasting structure and method
CN102914226B (en) Hollow-hole rhombic parallel cut blasting damping method
CN101614134B (en) Drilling-explosion-pumping triadic pressure-relief outburst-prevention method
CN103541734B (en) Under wear literary composition and protect building Tunnel Blasting comprehensive shock-dampening method
CN108132006B (en) Anti-clogging quick well formation undercut blast hole arragement construction and its blasting method
CN102927866B (en) Open-bench blasting method capable of controlling forward stroke of blasting muck pile
CN104453904B (en) Sublevel filling mining method without drawing groove
CN102607353B (en) A kind of perron Delay between holes controlled blasting method
CN205262309U (en) Compound undercutting blasting structure of big section of medium -length hole
CN102401616A (en) Blasting excavation method of vertical shaft
CN104482816B (en) A kind of vertical periphery segment algorithm gradient presplit blasting method and device
CN103557758B (en) Associating time delay subregion millisecond detonating network inside and outside excavation region hole in Tunnel Blasting
CN104634199A (en) Method for implementing tunnel periphery hole smooth blasting by means of detonating cord and nonel detonator
CN104390538B (en) A kind of stress relieving blasting method based on face grooving
CN109870081B (en) Small-section tunnel cut method additionally provided with guide damping holes
CN114166082B (en) Tunnel advanced drilling hole combination accurate control blasting structure and construction process
CN104596375A (en) Fully mechanized excavation construction method for rock roadway
CN108915694B (en) Construction method for tunnel lower-layer step full-section protective-layer-free extrusion blasting and road repairing and access protection
CN110196002B (en) Safe and efficient blasting construction method for vertical shaft wall beam nest
CN103557756B (en) Pilot heading hole-specifically delayed ignition network in Tunnel Blasting
CN110725685A (en) Hydraulic fracturing combined hydraulic blasting roadway large-footage tunneling method and fracturing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION CO.

Effective date: 20130306

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130306

Address after: 116000. 235 and 237 Gorky Road, Shahekou District, Liaoning, Dalian

Applicant after: Dalian Branch China Construction Eineering Division Corp. Ltd.

Applicant after: China Construction Eighth Engineering Division Co., Ltd.

Address before: 116000. 235 and 237 Gorky Road, Shahekou District, Liaoning, Dalian

Applicant before: Dalian Branch China Construction Eineering Division Corp. Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120613