CN109341450A - A kind of Tunnel Blasting structure and Tunnel Blasting construction method - Google Patents

A kind of Tunnel Blasting structure and Tunnel Blasting construction method Download PDF

Info

Publication number
CN109341450A
CN109341450A CN201811274309.4A CN201811274309A CN109341450A CN 109341450 A CN109341450 A CN 109341450A CN 201811274309 A CN201811274309 A CN 201811274309A CN 109341450 A CN109341450 A CN 109341450A
Authority
CN
China
Prior art keywords
bore region
periphery
hole
region
auxiliary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811274309.4A
Other languages
Chinese (zh)
Other versions
CN109341450B (en
Inventor
丁锐
姜伟
王彬
黄胜
宗秋雷
杨勇才
孔令森
帅坤
邓林洋
张晓川
邓大龙
刘庆武
冯宇航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 7 Co Ltd
PowerChina Railway Construction Investment Group Co Ltd
PowerChina South Construction Investment Co Ltd
Original Assignee
Sinohydro Bureau 7 Co Ltd
PowerChina Railway Construction Co Ltd
PowerChina South Construction Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 7 Co Ltd, PowerChina Railway Construction Co Ltd, PowerChina South Construction Investment Co Ltd filed Critical Sinohydro Bureau 7 Co Ltd
Priority to CN201811274309.4A priority Critical patent/CN109341450B/en
Publication of CN109341450A publication Critical patent/CN109341450A/en
Application granted granted Critical
Publication of CN109341450B publication Critical patent/CN109341450B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of Tunnel Blasting structure, which includes top bar and gets out of a predicament or an embarrassing situation for hard rock region and the tunnel of periphery Nearby Structure, structures, including the short drilling depth section of up/down steps, the short drilling depth section of up/down steps;Top bar includes slotting bore region, the first auxiliary bore region for being located on keyhole area periphery and the first periphery bore region set on the first via hole area periphery, slotting bore region includes nine keyholes, and nine keyholes include five explosive holes, four emptying apertures;It is described to get out of a predicament or an embarrassing situation including the second auxiliary bore region, third auxiliary bore region and the second periphery hole region.The present invention also provides a kind of Tunnel Blasting construction method, step S10, burn cut bore regions;Step S20, explosion first assist bore region;Step S30, the first periphery of explosion bore region;Step S40, explosion second assist bore region;Step S50, explosion third assist bore region;Step S60, the second periphery hole of explosion region.The influence of structures of the present invention is minimized.

Description

A kind of Tunnel Blasting structure and Tunnel Blasting construction method
Technical field
The present invention relates to the technical fields of Tunnel Engineering explosion, more specifically, be related to a kind of Tunnel Blasting structure and Tunnel Blasting construction method.
Background technique
Currently, tunnel excavation construction does not encounter excavation route periphery inevitably, there are structures, corrugations, when tunnel excavation rock stratum Preferably and periphery is there are when structures, and to guarantee not affect to structure structure, excavation technology engineering method can select static quick-fried The excavation that the costs such as broken, hydraulic pressure demolition, presplit blasting, electronic detonator blasting are big, construction is cumbersome, this be significantly greatly increased tunnel excavation at Sheet and risk management and control responsibility, and there are still great risks for tunnel excavation.
The above deficiency, has much room for improvement.
Summary of the invention
In order to overcome the shortcomings of existing technology, the present invention provides a kind of Tunnel Blasting structure and Tunnel Blasting construction party Method.
Technical solution of the present invention is as described below:
A kind of Tunnel Blasting structure, the blasting arrangement are used for the tunnel of hard rock region and periphery Nearby Structure, structures, Including the short drilling depth section of up/down steps, the short drilling depth section of up/down steps includes top bar and gets out of a predicament or an embarrassing situation;
The top bar include slotting bore region, be located on the keyhole area periphery first auxiliary bore region, with And the first periphery bore region set on the first via hole area periphery, the slotting bore region include nine keyholes, nine A keyhole includes for being equipped with five explosive holes of explosive, being used to form four emptying apertures of free face;
Described get out of a predicament or an embarrassing situation assists porose area including the second auxiliary bore region, the third set on second auxiliary bore region two sides Domain and the second periphery hole region set on the third via hole areas outside.
Further, nine keyholes constitute the square matrix of three rows three column, five slottings on square matrix diagonal line Hole is the explosive hole, remaining four keyhole is the emptying aperture.
Further, the spacing of the adjacent keyhole is 0.09m~0.1m.
Further, the first auxiliary bore region includes multiple first via holes, and the spacing of adjacent first via hole is 0.5m。
Further, first periphery bore region includes multiple first periphery holes, and the spacing of adjacent first periphery hole is 0.45~0.55m.
Further, the second auxiliary multiple second via holes of bore region, the spacing of adjacent second via hole is 0.5~ 0.55m。
Further, the third assists the multiple third via holes of bore region, and the spacing of adjacent third via hole is 0.5~ 0.55m。
Further, multiple second periphery holes in second periphery hole region, the spacing of adjacent second periphery hole is 0.5~ 0.55m。
Further, the keyhole, first auxiliary the first via hole of bore region, first week of the first periphery bore region Lateral opening, the second auxiliary bore region the second via hole, the third via hole of third auxiliary bore region and the second periphery hole region The hole depth of the second periphery hole be 0.8m~1.0m, aperture 0.04m.
It is another object of the present invention to provide a kind of Tunnel Blasting construction methods characterized by comprising
Step S10, burn cut bore region, specifically: slotting bore region includes nine keyholes, wherein four keyholes For emptying aperture, free face is formed, in addition five keyholes are explosive hole, are provided with explosive, and block tightly, five explosive holes are simultaneously Detonation;
Step S20, explosion first assist bore region, specifically: multiple first via holes that the first auxiliary bore region includes It detonates simultaneously;
Step S30, the first periphery of explosion bore region, specifically: multiple first periphery holes that the first periphery bore region includes It detonates simultaneously;
Step S40, explosion second assist bore region, specifically: multiple second via holes that the second auxiliary bore region includes It detonates simultaneously, forms free face after the second auxiliary bore region explosion;
Step S50, explosion third assist bore region, specifically: multiple second via holes that third auxiliary bore region includes It detonates simultaneously;
Step S60, the second periphery hole of explosion region, specifically: multiple second periphery holes that the second periphery hole region includes It detonates simultaneously.
According to the present invention of above scheme, the beneficial effect is that: the present invention point multiple regions are detonated respectively, to neighbouring structure The influence for building object is minimized, and can carry out tunnel excavation face Cut Blasting, vibration frequency control within 1.2, thus Free face is formed, digs and lays the foundation for subsequent low frequency;And above-mentioned blasting arrangement is used, the use of explosive can be reduced, more Add convenient for scene control;It is identical to recycle pattern, operating personnel's working efficiency can be gradually increased, shorten the construction period, to reduce Cost;The present invention can be along the tunnel excavation section for any hard rock and structures periphery, and limitation is small, easy to operate;This hair Bright easy to operate, difficulty of construction is small, few using equipment, low production cost, can reach expected excavation effect with minimum investment.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without creative efforts, can also be attached according to these Figure obtains other attached drawings.
Fig. 1 is structures position relationship structural diagram of the invention;
Fig. 2 is Tunnel Blasting structural schematic diagram of the invention;
Fig. 3 is the structural schematic diagram of slotting bore region of the invention;
Fig. 4 is the structural schematic diagram of the first auxiliary bore region explosion of the invention;
Fig. 5 is the structural schematic diagram of the first periphery bore region explosion of the invention;
Fig. 6 is the structural schematic diagram of the second auxiliary bore region of the invention, third auxiliary bore region explosion;
Fig. 7 is Tunnel Blasting construction method structural schematic diagram of the invention.
Wherein, each appended drawing reference in figure:
1- structures;The short drilling depth section of 2- up/down steps;
21- top bar;22- gets out of a predicament or an embarrassing situation;
211- slotting bore region;212- first assists bore region;The first periphery 213- bore region;
2111- keyhole;21111- explosive hole;21112- emptying aperture;
The first via hole of 2121-;
The first periphery hole of 2131-;
221- second assists bore region;222- third assists bore region;The second periphery hole of 223- region;
The second via hole of 2211-;2221- third via hole;The second periphery hole of 2231-.
Specific embodiment
In order to which technical problems, technical solutions and advantages to be solved are more clearly understood, tie below Accompanying drawings and embodiments are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only used To explain the present invention, it is not intended to limit the present invention.
It should be noted that be referred to as " being fixed on " or " being set to " another component when component, it can directly or It is located on another component indirectly.When a component referred to as " is connected to " another component, it can be directly or It is connected on another component in succession.Term " on ", "lower", "left", "right", "front", "rear", "vertical", "horizontal", "top", The orientation or position of the instructions such as "bottom", "inner", "outside" are orientation based on the figure or position, are merely for convenience of describing, It should not be understood as the limitation to the technical program.Term " first ", " second " are used merely to facilitate description purpose, and should not be understood as Indication or suggestion relative importance or the quantity for implicitly indicating technical characteristic.The meaning of " plurality " is two or more, Unless otherwise specifically defined.
It please refers to Fig.1 to Fig.3, a kind of Tunnel Blasting structure, the blasting arrangement is for hard rock region and building is closed on periphery The tunnel of object, structures 1, including the short drilling depth section 2 of up/down steps, the short drilling depth section 2 of up/down steps include top bar 21 and get out of a predicament or an embarrassing situation 22;
Top bar 21 include slotting bore region 211, the first auxiliary bore region 212 for being located on the periphery of slotting bore region 211, And the first periphery bore region 213 set on the first via hole area periphery, slotting bore region 211 include nine keyholes 2111, nine keyholes 2111 include for being equipped with five explosive holes 21111 of explosive, being used to form four emptying apertures of free face 21112;
Get out of a predicament or an embarrassing situation 22 include second auxiliary bore region 221, set on second auxiliary 221 two sides of bore region third assist porose area Domain 222 and the second periphery hole region 223 on the outside of third auxiliary bore region 222.
Please refer to Fig. 2, referring to Fig. 3, preferably, nine keyholes 2111 constitute the square matrix of three rows three column, positioned at square matrix Five keyholes 2111 on diagonal line are explosive hole 21111, remaining four keyhole 2111 is emptying aperture 21112.
Preferably, the spacing of adjacent keyhole 2111 is 0.09m~0.1m.
Preferably, the hole depth of keyhole 2111 is 0.8m~1.0m, aperture 0.04m.
In one embodiment, five 2111 parameters of keyhole are as shown in table 1:
Table 1
Please refer to Fig. 2, Fig. 4, it is preferable that first auxiliary bore region 212 include multiple first via holes 2121, adjacent first The spacing of via hole 2121 is 0.5m.
Preferably, the hole depth of the first via hole 2121 is 0.8m~1.0m, aperture 0.04m.
In one embodiment, the parameter of each first via hole 2121 is as shown in table 2:
Table 2
Please refer to Fig. 2, referring to Fig. 5, preferably, the first periphery bore region 213 includes multiple first periphery holes 2131, phase The spacing of adjacent first periphery hole 2131 is 0.45~0.55m.
Preferably, the hole depth of the first periphery hole 2131 is 0.8m~1.0m, aperture 0.04m.
In one embodiment, the parameter of each first periphery hole 2131 is as shown in table 3:
Table 3
Please refer to Fig. 2, referring to Fig. 6, preferably, second more than 221 the second via holes 2211 of auxiliary bore region, adjacent the The spacing of two via holes 2211 is 0.5~0.55m.
Preferably, third assists a third via hole 2221 of bore region more than 222, and the spacing of adjacent third via hole 2221 is 0.5~0.55m.
Preferably, the second periphery hole 2231 of more than 223, the second periphery hole region, the spacing of adjacent second periphery hole 2231 are 0.5~0.55m
Preferably, the second via hole 2211, third via hole 2221, the second periphery hole 2231 hole depth be 0.8m~ 1.0m, aperture 0.04m.
In one embodiment, each second via hole 2211, third via hole 2221, the second periphery hole 2231 parameter such as Shown in table 4:
Table 4
Fig. 1 to Fig. 7 is please referred to, it is another object of the present invention to provide a kind of tunnel using Tunnel Blasting structure is quick-fried Broken construction method, comprising:
Step S10, burn cut bore region 211, specifically: slotting bore region 211 includes nine keyholes 2111, wherein Four keyholes 2111 are emptying aperture 21112, form free face, and in addition five keyholes 2111 are explosive hole 21111, are provided with fried Medicine, and block tightly, five explosive holes 21111 are detonated simultaneously;
Step S20, explosion first assist bore region 212, specifically: first assists multiple first that bore region 212 includes Via hole 2121 detonates simultaneously;
Step S30, the first periphery of explosion bore region 213, specifically: the first periphery bore region 213 include multiple first Periphery hole 2131 detonates simultaneously;
Step S40, explosion second assist bore region 221, specifically: second assists multiple second that bore region 221 includes Via hole 2211 detonates simultaneously, forms free face after the second auxiliary 221 explosion of bore region;
Step S50, explosion third assist bore region 222, specifically: third assists multiple second that bore region 222 includes Via hole 22221 detonates simultaneously;
Step S60, the second periphery hole of explosion region 223, specifically: the second periphery hole region 223 include multiple second Periphery hole 2231 detonates simultaneously.
Tunnel Blasting structure and Tunnel Blasting construction method provided by the invention have the beneficial effect that the multiple areas of the present invention point Domain is detonated respectively, and the influence to neighbouring structures is minimized, and can carry out tunnel excavation face Cut Blasting, vibration frequency Control is within 1.2, to form free face, digs and lays the foundation for subsequent low frequency;And above-mentioned blasting arrangement is used, it can The use for reducing explosive, easily facilitates live control;It is identical to recycle pattern, operating personnel's working efficiency can be gradually increased, It shortens the construction period, to reduce cost;The present invention can limit to along the tunnel excavation section for any hard rock and structures periphery Property is small, easy to operate;The present invention is easy to operate, and difficulty of construction is small, low production cost few using equipment, can be reached with minimum investment To expected excavation effect.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of Tunnel Blasting structure, it is characterised in that: the blasting arrangement is for hard rock region and periphery Nearby Structure, constructs The tunnel of object, including the short drilling depth section of up/down steps, the short drilling depth section of up/down steps include top bar and get out of a predicament or an embarrassing situation;
The top bar includes slotting bore region, the first the auxiliary bore region, Yi Jishe for being located on the keyhole area periphery In the first periphery bore region of the first via hole area periphery, the slotting bore region includes nine keyholes, and nine are drawn Slot includes for being equipped with five explosive holes of explosive, being used to form four emptying apertures of free face;
It is described get out of a predicament or an embarrassing situation including second auxiliary bore region, set on it is described second auxiliary bore region two sides third auxiliary bore region, And set on the second periphery hole region of the third via hole areas outside.
2. Tunnel Blasting structure as described in claim 1, it is characterised in that: nine keyholes constitute the side of three rows three column Battle array, five keyholes on square matrix diagonal line are the explosive hole, remaining four keyhole is the emptying aperture.
3. Tunnel Blasting structure as described in claim 1, it is characterised in that: the spacing of the adjacent keyhole be 0.09m~ 0.1m。
4. Tunnel Blasting structure as described in claim 1, it is characterised in that: the first auxiliary bore region includes multiple first Via hole, the spacing of adjacent first via hole are 0.5m.
5. Tunnel Blasting structure as described in claim 1, it is characterised in that: first periphery bore region includes multiple first Periphery hole, the spacing of adjacent first periphery hole are 0.45~0.55m.
6. Tunnel Blasting structure as described in claim 1, it is characterised in that: multiple second auxiliary of the second auxiliary bore region Hole, the spacing of adjacent second via hole are 0.5~0.55m.
7. Tunnel Blasting structure as described in claim 1, it is characterised in that: the multiple third auxiliary of third auxiliary bore region Hole, the spacing of adjacent third via hole are 0.5~0.55m.
8. Tunnel Blasting structure as described in claim 1, it is characterised in that: multiple second peripheries in second periphery hole region Hole, the spacing of adjacent second periphery hole are 0.5~0.55m.
9. Tunnel Blasting structure as described in claim 1, it is characterised in that: the of the keyhole, the first auxiliary bore region One via hole, the first periphery hole of the first periphery bore region, the second via hole of the second auxiliary bore region, third assist bore region Third via hole and the hole depth of the second periphery hole in the second periphery hole region be 0.8m~1.0m, aperture 0.04m.
10. a kind of Tunnel Blasting construction method using Tunnel Blasting structure according to any one of claims 1 to 9, feature It is, comprising:
Step S10, burn cut bore region, specifically: slotting bore region includes nine keyholes, wherein four keyholes are sky Hole forms free face, and in addition five keyholes are explosive hole, is provided with explosive, and block tightly, five explosive holes are risen simultaneously It is quick-fried;
Step S20, explosion first assist bore region, specifically: multiple first via holes that the first auxiliary bore region includes are simultaneously Detonation;
Step S30, the first periphery of explosion bore region, specifically: multiple first periphery holes that the first periphery bore region includes are simultaneously Detonation;
Step S40, explosion second assist bore region, specifically: multiple second via holes that the second auxiliary bore region includes are simultaneously Detonation forms free face after the second auxiliary bore region explosion;
Step S50, explosion third assist bore region, specifically: multiple second via holes that third auxiliary bore region includes are simultaneously Detonation;
Step S60, the second periphery hole of explosion region, specifically: multiple second periphery holes that the second periphery hole region includes are simultaneously Detonation.
CN201811274309.4A 2018-10-30 2018-10-30 Tunnel blasting structure and tunnel blasting construction method Active CN109341450B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811274309.4A CN109341450B (en) 2018-10-30 2018-10-30 Tunnel blasting structure and tunnel blasting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811274309.4A CN109341450B (en) 2018-10-30 2018-10-30 Tunnel blasting structure and tunnel blasting construction method

Publications (2)

Publication Number Publication Date
CN109341450A true CN109341450A (en) 2019-02-15
CN109341450B CN109341450B (en) 2022-06-21

Family

ID=65311039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811274309.4A Active CN109341450B (en) 2018-10-30 2018-10-30 Tunnel blasting structure and tunnel blasting construction method

Country Status (1)

Country Link
CN (1) CN109341450B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109813189A (en) * 2019-03-01 2019-05-28 中铁十八局集团有限公司 A kind of hard rock tunnel blasting digging method
CN110454172A (en) * 2019-09-02 2019-11-15 中铁二十一局集团第五工程有限公司 A kind of horizontal hole in tunnel and main tunnel intersection section constructing method and bench blasting method
CN110879026A (en) * 2019-12-04 2020-03-13 四川大学 Excavation and cut blasting method suitable for high-plasticity low-strength rock tunnel
CN112302673A (en) * 2020-10-30 2021-02-02 何满潮 Method for tunneling roadway by using instantaneous bursting device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101520292A (en) * 2009-03-12 2009-09-02 路桥集团国际建设股份有限公司 Method for excavating and blasting tunnel-type anchorage cavern
CN102494571A (en) * 2011-12-11 2012-06-13 中建八局大连建设工程有限公司 Construction method for damped blasting of tunnels
CN103123247A (en) * 2013-01-07 2013-05-29 重庆建工集团股份有限公司 Damping blasting method for steep dip small crossing angle layered surrounding rock small-distance tunnel excavation
CN103541734A (en) * 2013-11-01 2014-01-29 中铁四局集团有限公司 Comprehensive blasting damping method for tunnel of underpass civil security building
CN105737699A (en) * 2016-02-25 2016-07-06 中铁十八局集团有限公司 Secondary blasting rapid excavation method for deep holes of steps on IV-V-grade surrounding rock of double-track tunnel
CN107060771A (en) * 2016-12-28 2017-08-18 广东省长大公路工程有限公司 Middle short tunnel is unidirectionally appeared excavation method
CN107063017A (en) * 2016-12-24 2017-08-18 中铁十八局集团有限公司 It is a kind of to reduce the empty eye mud vibration damping controlled blasting method in the tunnel of vibrations and noise
CN207095427U (en) * 2017-08-11 2018-03-13 中铁四局集团有限公司 Bilateral wedge cut distribution structure of extra-large section tunnel
CN108286920A (en) * 2018-01-31 2018-07-17 中铁二十二局集团第工程有限公司 A kind of implementation of Tunnel Blasting and excavation

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101520292A (en) * 2009-03-12 2009-09-02 路桥集团国际建设股份有限公司 Method for excavating and blasting tunnel-type anchorage cavern
CN102494571A (en) * 2011-12-11 2012-06-13 中建八局大连建设工程有限公司 Construction method for damped blasting of tunnels
CN103123247A (en) * 2013-01-07 2013-05-29 重庆建工集团股份有限公司 Damping blasting method for steep dip small crossing angle layered surrounding rock small-distance tunnel excavation
CN103541734A (en) * 2013-11-01 2014-01-29 中铁四局集团有限公司 Comprehensive blasting damping method for tunnel of underpass civil security building
CN105737699A (en) * 2016-02-25 2016-07-06 中铁十八局集团有限公司 Secondary blasting rapid excavation method for deep holes of steps on IV-V-grade surrounding rock of double-track tunnel
CN107063017A (en) * 2016-12-24 2017-08-18 中铁十八局集团有限公司 It is a kind of to reduce the empty eye mud vibration damping controlled blasting method in the tunnel of vibrations and noise
CN107060771A (en) * 2016-12-28 2017-08-18 广东省长大公路工程有限公司 Middle short tunnel is unidirectionally appeared excavation method
CN207095427U (en) * 2017-08-11 2018-03-13 中铁四局集团有限公司 Bilateral wedge cut distribution structure of extra-large section tunnel
CN108286920A (en) * 2018-01-31 2018-07-17 中铁二十二局集团第工程有限公司 A kind of implementation of Tunnel Blasting and excavation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
水利电力部水利水电建设总局组织编写: "《水利水电工程施工组织设计手册 第2卷 施工技术》", 28 February 1990 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109813189A (en) * 2019-03-01 2019-05-28 中铁十八局集团有限公司 A kind of hard rock tunnel blasting digging method
CN109813189B (en) * 2019-03-01 2021-03-30 中铁十八局集团有限公司 Hard rock tunnel blasting excavation method
CN110454172A (en) * 2019-09-02 2019-11-15 中铁二十一局集团第五工程有限公司 A kind of horizontal hole in tunnel and main tunnel intersection section constructing method and bench blasting method
CN110454172B (en) * 2019-09-02 2020-10-09 中铁二十一局集团第五工程有限公司 Tunnel cross tunnel and main tunnel intersection construction method and bench blasting method
CN110879026A (en) * 2019-12-04 2020-03-13 四川大学 Excavation and cut blasting method suitable for high-plasticity low-strength rock tunnel
CN112302673A (en) * 2020-10-30 2021-02-02 何满潮 Method for tunneling roadway by using instantaneous bursting device
CN112302673B (en) * 2020-10-30 2021-10-26 何满潮 Method for tunneling roadway by using instantaneous bursting device

Also Published As

Publication number Publication date
CN109341450B (en) 2022-06-21

Similar Documents

Publication Publication Date Title
CN109341450A (en) A kind of Tunnel Blasting structure and Tunnel Blasting construction method
KR100866105B1 (en) blast construction working method for a tunnel
CN103510520A (en) Sectionalized construction method of deep and large foundation pit
CN103590406A (en) Construction method for synchronously excavating ultra-large type deep foundation pits in partitioned mode
CN106088102A (en) Lattice type combined steel sheet pile cement soil composite pile and construction method thereof
CN103982137B (en) Design method for underground hydraulic fracturing drilled hole azimuth angle of coal mine
CN205259190U (en) Strenghthened type interlock stake
CN105865276B (en) The large-scale rock matter deep basal pit fishbone construction efficient Shock reducing blasting excavation method of guide groove in building dense area
BR112012032277B1 (en) METHOD OF FRACTURING A TRAINING IN AN UNDERGROUND LOCATION
CN102797468B (en) Minimum over-burden originating method for shield tunnel
CN203741996U (en) Beam column node for foundation pit project adopting top-down excavation method
KR101649948B1 (en) Construction Method for Circumscribed Regular Polygon Deep Foundation
CN205444167U (en) Underground continuous wall
CN102620614B (en) Cave depot is slagged tap the construction method of funnel
CN204849777U (en) Tilting board double row pile supporting construction that bears down on one
CN109269367A (en) It is a kind of to exempt from punching construction method for reinforced concrete frame structure demolition blasting
CN204495211U (en) A kind of blasting hole arrangement system of tunnel open excavation section
CN203613544U (en) Envelop enclosure for deep foundation pit partition simultaneous excavation
CN212082177U (en) Smooth blasting construction structure for upper step of step-method tunnel excavation
CN206220098U (en) Dividing wall dismounting structure
JP2018188874A (en) Earth retaining structure and construction method of the same
CN204570652U (en) A kind of karst strata rock-steady structure
KR20130125554A (en) The land-side protection wall structure and its construction method
CN103306248A (en) High dam spillway foundation drainage system and excavation method
CN113250696B (en) Method for arranging blasting holes in large-diameter vertical shaft excavation blasting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 518101 1008, 10th floor, building 8, 41 District, Xin'an street, Bao'an District, Shenzhen City, Guangdong Province (Huafeng Xin'an youth entrepreneurship base)

Patentee after: POWERCHINA SOUTH CONSTRUCTION INVESTMENT Co.,Ltd.

Patentee after: China Power Construction Railway Construction Investment Group Co.,Ltd.

Patentee after: SINOHYDRO BUREAU 7 Co.,Ltd.

Address before: 518101 1008, 10th floor, building 8, 41 District, Xin'an street, Bao'an District, Shenzhen City, Guangdong Province (Huafeng Xin'an youth entrepreneurship base)

Patentee before: POWERCHINA SOUTH CONSTRUCTION INVESTMENT Co.,Ltd.

Patentee before: POWERCHINA RAILWAY CONSTRUCTION Co.,Ltd.

Patentee before: SINOHYDRO BUREAU 7 Co.,Ltd.