CN109341451A - A kind of damped blasting of tunnels structure and construction - Google Patents

A kind of damped blasting of tunnels structure and construction Download PDF

Info

Publication number
CN109341451A
CN109341451A CN201811332302.3A CN201811332302A CN109341451A CN 109341451 A CN109341451 A CN 109341451A CN 201811332302 A CN201811332302 A CN 201811332302A CN 109341451 A CN109341451 A CN 109341451A
Authority
CN
China
Prior art keywords
hole
blasting
damped
borehole
explosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811332302.3A
Other languages
Chinese (zh)
Inventor
刘洪伟
刘继鹏
庞前凤
李冰
刘志鹏
徐小燕
丁景波
张文迪
陈诚
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 22nd Bureau Group Co Ltd
China Railway 22nd Bureau Group Urban Rail Engineering Co., Ltd.
Original Assignee
China Railway 22nd Bureau Group Co Ltd
China Railway 22nd Bureau Group Urban Rail Engineering Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 22nd Bureau Group Co Ltd, China Railway 22nd Bureau Group Urban Rail Engineering Co., Ltd. filed Critical China Railway 22nd Bureau Group Co Ltd
Priority to CN201811332302.3A priority Critical patent/CN109341451A/en
Publication of CN109341451A publication Critical patent/CN109341451A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of damped blasting of tunnels structure and constructions, including explosion to excavate section;It is laid in the borehole that section is excavated in the explosion;The type of the borehole includes snubber, reliever, periphery hole.A kind of damped blasting of tunnels structure of the present invention and construction combine practical construction experience, and meet the regulation of relevant criterion, can adapt to more special construction environment, can reduce the vibration generated when explosion, demolition effect is good.

Description

A kind of damped blasting of tunnels structure and construction
Technical field
The present invention relates to technical field of building construction, and in particular to a kind of damped blasting of tunnels structure and construction.
Background technique
Recent domestic subway construction development is advanced by leaps and bounds, before especially man of China various aspects development speed ranks the world Column, the city underground in China builds on a large scale, and city underground route is in underground and to be all disposed within city again relatively bustling Region, the construction environments such as Adjacent Buildings, underground utilities are increasingly complex, and subway work difficulty and complexity are relatively large, especially It is encounter Newly-built mine method Tunnel Blasting construction and under wear, side wear some complicated construction environment such as existing foundation pit can to construction band Carry out very big risk, when bursting work, wants influence of the reduction concussion of blasting of maximum magnitude to surrounding enviroment, it is careless slightly will The collapsing of tunnel and foundation pit is caused to cause huge casualties and economic loss.Therefore how correct under this particular surroundings Be with Tunneling by mining method Technology of Blasting construction safety an important leverage.
Summary of the invention
The object of the present invention is to provide the damped blasting of tunnels structures and construction of a kind of good damping effect.
To achieve the goals above, the invention provides the following technical scheme:
A kind of damped blasting of tunnels structure disclosed by the invention, comprising:
Section is excavated in explosion;
It is laid in the borehole that section is excavated in the explosion;
The type of the borehole includes snubber, reliever, periphery hole.
Further, when section is excavated in the explosion is constructed using full section method, main line wide 6.16m in tunnel is high 6.41m;
The parameter of the borehole is aperture φ 42, single cycle drilling depth 1.8m;
Hole pattern parameters are as follows: second level V-cut eye array pitch 750mm, 75-85 ° of inclination angle, 1.5~2.2m of slot opening, hole depth 2.0m, ultra-deep 0.2m, the long 2.3m in hole;Reliever 650~900mm of pitch of holes, 650~900mm of array pitch;Periphery hole is quick-fried using smooth surface It is broken, 5 ° of camber angle, along design profile line cloth hole, eye and stalk eyelet are pushed up away from 400~500mm, the quick-fried thickness 800mm of light, bottom plate hole Away from 710mm.
Further, explosive payload in the borehole are as follows: explosive specific charge q=1.17kg/m3;Total dose Q=q*V=71kg; Explosion volume V=S*L=60m3
Further, when section is excavated in the explosion is constructed using double step method, main line wide 6.16m in tunnel is high 6.41m;
The parameter of the borehole is aperture φ 42mm, single cycle drilling depth 1.8m;
Hole pattern parameters: top bar snubber is arranged in the middle part of tunnel, second level V-cut eyelet array pitch 750mm, 80 ° of inclination angle ~85 °, slot opening 1.5m, hole depth 2.0m, ultra-deep 0.1m, the long 2.2m in hole, drilling depth 1.8m;Top bar snubber and periphery hole it Between set reliever, reliever 700~750mm of pitch of holes, 550~750mm of array pitch;It gets out of a predicament or an embarrassing situation and tunnels minimum burden in eye and be 800~1000mm, pitch of holes are 700~1050mm;Periphery hole is along design profile cloth hole, and 5 ° of camber angle, along design profile line cloth Eye and stalk eyelet are pushed up away from 450~500mm in hole, and the quick-fried thickness 800mm of light, bottom plate hole is away from 710mm.
Further, explosive payload in the borehole are as follows: main line top bar is averaged explosive specific charge q=1.2kg/m3;Total dose Q =q*V=42.5kg, explosion volume V=S*L=35.1m3
A kind of damped blasting of tunnels structure construction engineering method disclosed by the invention, includes the following steps:
The selection of S1, blasting design scheme;
The selection of S2, rock drilling equipment;
The selection of S3, explosive;
S4, blasting parameter design and explosive payload calculate;
S5, cloth hole and drilling;
S6, powder charge, blocking;
S7, design of firing circuit.
Further, in the step S1, when the distances of two working faces is less than 30m, when a working face bursting work, The personnel of another working face are notified to withdraw, when two working faces are less than 15m, an only quasi- working face bursting work, separately One working face stops operation.
Further, in the step S2, Tunnel Blasting drilling machine takes the bit bore of Ф 42mm diameter.
Further, the arrangement of the Tunnel Blasting snubber, reliever, periphery hole, country rock keyhole are drawn using wedge shape Slot, slot opening 1.5m, array pitch 750mm, bottom hole spacing 400mm;
Periphery hole is evenly arranged along design profile line, in order to control out break and convenient for falling drilling when jewel hole next time Eye, plans borehole direction with 3%~5% slope extrapolation, eyeground falls in 10cm~15cm other than design profile line.Bottom plate eye Eyeground must also fall in 5cm~10cm or so other than design profile line, and fall in same vertical plane with the eyeground of reliever, periphery hole On, and take biggish explosive specific charge, be conducive to cover the compacting of ballast on overcoming and play the role of turning over quarrel.Periphery pitch of holes takes 400~500mm, 500~700mm of minimum burden.0.15~0.25kg/m of concentration of charge;
The arrangement of via hole should be arranged successively from inside to outside, successively be detonated, gradually close to excavation contour line, pitch-row takes 500 ~800mm.
Further, the Tunnel Blasting blasthole uses bottom hole concentrated charge structure, and photoface exploision uses spaced loading, volume Shape emulsion explosive is decided quick-fried medicine, and detonating capsule is placed in bottom hole, and sockets for collecting energy is directed toward aperture, clay that air part 1:3 match and The stemming blocking that sand mixes, stemming length cannot be less than 200mm.
In the above-mentioned technical solutions, a kind of damped blasting of tunnels structure of the present invention and construction combine practice of construction warp It tests, and meets the regulation of relevant criterion, can adapt to more special construction environment, the vibration generated when explosion can be reduced, Demolition effect is good.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only one recorded in the present invention A little embodiments are also possible to obtain other drawings based on these drawings for those of ordinary skill in the art.
Fig. 1 is the shallow bore hole blast hole projectile filling knot of a kind of damped blasting of tunnels structure provided in an embodiment of the present invention and construction Structure schematic diagram;
Fig. 2 is the deep hole blast hole projectile filling knot of a kind of damped blasting of tunnels structure provided in an embodiment of the present invention and construction Structure schematic diagram;
Fig. 3 is the light blast hole charge constitution of a kind of damped blasting of tunnels structure provided in an embodiment of the present invention and construction Schematic diagram.
Specific embodiment
In order to make those skilled in the art more fully understand technical solution of the present invention, below in conjunction with attached drawing to this hair It is bright to be further detailed.
Embodiment one:
Referring to a kind of damped blasting of tunnels structure that shown in Fig. 1 to Fig. 3, the embodiment of the present invention one is provided, comprising:
Section is excavated in explosion;
It is laid in the borehole that section is excavated in explosion;
The type of borehole includes snubber, reliever, periphery hole.
Preferably, above-mentioned when explosion is excavated section and constructed using full section method, main line wide 6.16m in tunnel is high 6.41m;
The parameter of borehole is aperture φ 42, single cycle drilling depth 1.8m;
Hole pattern parameters are as follows: second level V-cut eye array pitch 750mm, 75-85 ° of inclination angle, 1.5~2.2m of slot opening, hole depth 2.0m, ultra-deep 0.2m, the long 2.3m in hole;Reliever 650~900mm of pitch of holes, 650~900mm of array pitch;Periphery hole is quick-fried using smooth surface It is broken, 5 ° of camber angle, along design profile line cloth hole, eye and stalk eyelet are pushed up away from 400~500mm, the quick-fried thickness 800mm of light, bottom plate hole Away from 710mm.
Preferably, explosive payload in above-mentioned borehole are as follows: explosive specific charge q=1.17kg/m3;Total dose Q=q*V=71kg; Explosion volume V=S*L=60m3
Preferably, above-mentioned when explosion is excavated section and constructed using double step method, main line wide 6.16m in tunnel is high 6.41m;
The parameter of the borehole is aperture φ 42mm, single cycle drilling depth 1.8m;
Hole pattern parameters: top bar snubber is arranged in the middle part of tunnel, second level V-cut eyelet array pitch 750mm, 80 ° of inclination angle ~85 °, slot opening 1.5m, hole depth 2.0m, ultra-deep 0.1m, the long 2.2m in hole, drilling depth 1.8m;Top bar snubber and periphery hole it Between set reliever, reliever 700~750mm of pitch of holes, 550~750mm of array pitch;It gets out of a predicament or an embarrassing situation and tunnels minimum burden in eye and be 800~1000mm, pitch of holes are 700~1050mm;Periphery hole is along design profile cloth hole, and 5 ° of camber angle, along design profile line cloth Eye and stalk eyelet are pushed up away from 450~500mm in hole, and the quick-fried thickness 800mm of light, bottom plate hole is away from 710mm.
Preferably, explosive payload in above-mentioned borehole are as follows: main line top bar is averaged explosive specific charge q=1.2kg/m3;Total dose Q =q*V=42.5kg, explosion volume V=S*L=35.1m3
Embodiment two:
Referring to shown in Fig. 1 to Fig. 3, a kind of damped blasting of tunnels structure construction engineering method disclosed by the invention, including walk as follows It is rapid:
The selection of S1, blasting design scheme;
The selection of S2, rock drilling equipment;
The selection of S3, explosive;
S4, blasting parameter design and explosive payload calculate;
S5, cloth hole and drilling;
S6, powder charge, blocking;
S7, design of firing circuit.
Preferably, in above-mentioned step S1, when the distances of two working faces is less than 30m, when a working face bursting work, The personnel of another working face are notified to withdraw, when two working faces are less than 15m, an only quasi- working face bursting work, separately One working face stops operation.
Preferably, in above-mentioned step S2, Tunnel Blasting drilling machine takes the bit bore of Ф 42mm diameter.
Preferably, the arrangement of above-mentioned Tunnel Blasting snubber, reliever, periphery hole, country rock keyhole are drawn using wedge shape Slot, slot opening 1.5m, array pitch 750mm, bottom hole spacing 400mm;
Periphery hole is evenly arranged along design profile line, in order to control out break and convenient for falling drilling when jewel hole next time Eye, plans borehole direction with 3%~5% slope extrapolation, eyeground falls in 10cm~15cm other than design profile line.Bottom plate eye Eyeground must also fall in 5cm~10cm or so other than design profile line, and fall in same vertical plane with the eyeground of reliever, periphery hole On, and take biggish explosive specific charge, be conducive to cover the compacting of ballast on overcoming and play the role of turning over quarrel.Periphery pitch of holes takes 400~500mm, 500~700mm of minimum burden.0.15~0.25kg/m of concentration of charge;
The arrangement of via hole should be arranged successively from inside to outside, successively be detonated, gradually close to excavation contour line, pitch-row takes 500 ~800mm.
Preferably, above-mentioned Tunnel Blasting blasthole uses bottom hole concentrated charge structure, and photoface exploision uses spaced loading, volume Shape emulsion explosive is decided quick-fried medicine, and detonating capsule is placed in bottom hole, and sockets for collecting energy is directed toward aperture, clay that air part 1:3 match and The stemming blocking that sand mixes, stemming length cannot be less than 200mm.
In the above-mentioned technical solutions, a kind of damped blasting of tunnels structure of the present invention and construction combine practice of construction warp It tests, and meets the regulation of relevant criterion, can adapt to more special construction environment, the vibration generated when explosion can be reduced, Demolition effect is good.
It is above that certain exemplary embodiments of the invention are only described by way of explanation, undoubtedly, for ability The those of ordinary skill in domain without departing from the spirit and scope of the present invention can be with a variety of different modes to institute The embodiment of description is modified.Therefore, above-mentioned attached drawing and description are regarded as illustrative in nature, and should not be construed as to the present invention The limitation of claims.

Claims (10)

1. a kind of damped blasting of tunnels structure characterized by comprising
Section is excavated in explosion;
It is laid in the borehole that section is excavated in the explosion;
The type of the borehole includes snubber, reliever, periphery hole.
2. a kind of damped blasting of tunnels structure according to claim 1, which is characterized in that excavate section when the explosion and adopt When being constructed with full section method, tunnel main line wide 6.16m, high 6.41m;
The parameter of the borehole is aperture φ 42, single cycle drilling depth 1.8m;
Hole pattern parameters are as follows: second level V-cut eye array pitch 750mm, 75-85 ° of inclination angle, 1.5~2.2m of slot opening, hole depth 2.0m surpass Deep 0.2m, the long 2.3m in hole;Reliever 650~900mm of pitch of holes, 650~900mm of array pitch;Periphery hole uses photoface exploision, flare Eye and stalk eyelet are pushed up away from 400~500mm, the quick-fried thickness 800mm of light, bottom plate hole is away from 710mm along design profile line cloth hole in 5 ° of angle.
3. a kind of damped blasting of tunnels structure according to claim 2, which is characterized in that explosive payload in the borehole are as follows: Explosive specific charge q=1.17kg/m3;Total dose Q=q*V=71kg;Explosion volume V=S*L=60m3
4. a kind of damped blasting of tunnels structure according to claim 1, which is characterized in that excavate section when the explosion and adopt When being constructed with double step method, tunnel main line wide 6.16m, high 6.41m;
The parameter of the borehole is aperture φ 42mm, single cycle drilling depth 1.8m;
Hole pattern parameters: top bar snubber is arranged in the middle part of tunnel, second level V-cut eyelet array pitch 750mm, and 80 ° of inclination angle~ 85 °, slot opening 1.5m, hole depth 2.0m, ultra-deep 0.1m, the long 2.2m in hole, drilling depth 1.8m;Top bar is between snubber and periphery hole If reliever, reliever 700~750mm of pitch of holes, 550~750mm of array pitch;Getting out of a predicament or an embarrassing situation and tunneling minimum burden in eye is 800 ~1000mm, pitch of holes are 700~1050mm;Periphery hole is along design profile cloth hole, and 5 ° of camber angle, along design profile line cloth hole, Eye and stalk eyelet are pushed up away from 450~500mm, the quick-fried thickness 800mm of light, bottom plate hole is away from 710mm.
5. a kind of damped blasting of tunnels structure according to claim 4, which is characterized in that explosive payload in the borehole are as follows: Main line top bar is averaged explosive specific charge q=1.2kg/m3;Total dose Q=q*V=42.5kg, explosion volume V=S*L=35.1m3
6. a kind of damped blasting of tunnels structure construction engineering method, which comprises the steps of:
The selection of S1, blasting design scheme;
The selection of S2, rock drilling equipment;
The selection of S3, explosive;
S4, blasting parameter design and explosive payload calculate;
S5, cloth hole and drilling;
S6, powder charge, blocking;
S7, design of firing circuit.
7. a kind of damped blasting of tunnels structure construction engineering method according to claim 6, which is characterized in that the step S1 In, when the distances of two working faces is less than 30m, when a working face bursting work, the personnel of another working face to be notified to remove From when two working faces are less than 15m, only a quasi- working face bursting work, another working face stop operation.
8. a kind of damped blasting of tunnels structure construction engineering method according to claim 6, which is characterized in that the step S2 In, Tunnel Blasting drilling machine takes the bit bore of Ф 42mm diameter.
9. a kind of damped blasting of tunnels structure construction engineering method according to claim 6, which is characterized in that the Tunnel Blasting The arrangement of snubber, reliever, periphery hole, country rock keyhole use V-cut, slot opening 1.5m, array pitch 750mm, between bottom hole Away from 400mm;
Periphery hole is evenly arranged along design profile line, in order to control out break and convenient for falling drilling eye when jewel hole next time, is intended By borehole direction with 3%~5% slope extrapolation, eyeground falls in 10cm~15cm other than design profile line.The eyeground of bottom plate eye Also 5cm~10cm or so other than design profile line must be fallen in, and is fallen in the same vertical plane with the eyeground of reliever, periphery hole, And biggish explosive specific charge is taken, be conducive to cover the compacting of ballast on overcoming and plays the role of turning over quarrel.Periphery pitch of holes takes 400 ~500mm, 500~700mm of minimum burden.0.15~0.25kg/m of concentration of charge;
The arrangement of via hole should be arranged successively from inside to outside, successively be detonated, gradually close to excavation contour line, pitch-row takes 500~ 800mm。
10. a kind of damped blasting of tunnels structure according to claim 6, which is characterized in that the Tunnel Blasting blasthole is adopted With bottom hole concentrated charge structure, photoface exploision uses spaced loading, and web-like emulsion explosive is decided quick-fried medicine, and detonating capsule is placed in hole Bottom, sockets for collecting energy are directed toward aperture, and the stemming that the clay and sand that air part is matched with 1:3 mix blocks, and stemming length must not Less than 200mm.
CN201811332302.3A 2018-11-09 2018-11-09 A kind of damped blasting of tunnels structure and construction Pending CN109341451A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811332302.3A CN109341451A (en) 2018-11-09 2018-11-09 A kind of damped blasting of tunnels structure and construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811332302.3A CN109341451A (en) 2018-11-09 2018-11-09 A kind of damped blasting of tunnels structure and construction

Publications (1)

Publication Number Publication Date
CN109341451A true CN109341451A (en) 2019-02-15

Family

ID=65313017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811332302.3A Pending CN109341451A (en) 2018-11-09 2018-11-09 A kind of damped blasting of tunnels structure and construction

Country Status (1)

Country Link
CN (1) CN109341451A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111811348A (en) * 2020-08-14 2020-10-23 中交路桥建设有限公司 Excavation and tunneling construction method for damping control blasting of tunnel
CN113091542A (en) * 2021-04-29 2021-07-09 中铁六局集团有限公司 Railway blasting construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001021299A (en) * 1999-07-06 2001-01-26 Nishimatsu Constr Co Ltd Method for blasting excavation
CN102494571A (en) * 2011-12-11 2012-06-13 中建八局大连建设工程有限公司 Construction method for damped blasting of tunnels
CN105387777A (en) * 2015-10-30 2016-03-09 山东大学 Smooth blasting spaced loading joint-cutting pipe
CN107289827A (en) * 2017-08-11 2017-10-24 中铁四局集团有限公司 Double-side wedge cut tunneling blasting method for extra-large section tunnel
CN209295800U (en) * 2018-11-09 2019-08-23 中铁二十二局集团轨道工程有限公司 A kind of damped blasting of tunnels structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001021299A (en) * 1999-07-06 2001-01-26 Nishimatsu Constr Co Ltd Method for blasting excavation
CN102494571A (en) * 2011-12-11 2012-06-13 中建八局大连建设工程有限公司 Construction method for damped blasting of tunnels
CN105387777A (en) * 2015-10-30 2016-03-09 山东大学 Smooth blasting spaced loading joint-cutting pipe
CN107289827A (en) * 2017-08-11 2017-10-24 中铁四局集团有限公司 Double-side wedge cut tunneling blasting method for extra-large section tunnel
CN209295800U (en) * 2018-11-09 2019-08-23 中铁二十二局集团轨道工程有限公司 A kind of damped blasting of tunnels structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111811348A (en) * 2020-08-14 2020-10-23 中交路桥建设有限公司 Excavation and tunneling construction method for damping control blasting of tunnel
CN113091542A (en) * 2021-04-29 2021-07-09 中铁六局集团有限公司 Railway blasting construction method

Similar Documents

Publication Publication Date Title
CN105781560B (en) A kind of construction method of the remote base tunnel look-ahead explosion in super low coverage superimposing thread tunnel
CN108286920A (en) A kind of implementation of Tunnel Blasting and excavation
CN103123247A (en) Damping blasting method for steep dip small crossing angle layered surrounding rock small-distance tunnel excavation
MX339889B (en) Underground mining.
CN109341449A (en) A kind of high courtyard primary drilling Discrete control explosion well completion method of big section
CN107060773B (en) A kind of underground chamber drilling and blasting method damping excavation method of static(al) explosion presplitting shock insulation
CN109252868A (en) Hard-soft heterogeneous ground shield-tunneling construction boulder and basement rock protrusion processing method
CN105401946A (en) Reverse blasting excavation method of shaft and pilot shaft
CN109000525A (en) A kind of shield driving upper-soft lower-hard ground presplit blasting construction method
CN105569693A (en) Underground stable rock stratum large-scale chamber construction method applied to medium-length hole blasting
CN103726858A (en) Underground large-scale cave depot project sphere-cylinder combination excavation method
CN109341451A (en) A kind of damped blasting of tunnels structure and construction
CN108625855A (en) Safe and efficient mining methods under a kind of obturation
CN104457466B (en) A kind of blasting method of tunnel open excavation section
CN105865281A (en) Method for transverse open excavation controlled blasting construction adjacent to power station and booster station
CN109539915B (en) Cutting raise blasting construction method
CN209295800U (en) A kind of damped blasting of tunnels structure
CN107560510A (en) A kind of tunnel big cross section section constructing method and its face blast arrangement
CN102704950B (en) Support method used in passing water guide fracture structure in mine exploration
CN107091094A (en) Short inclined shaft pilot shaft excavation method in one kind
WO2022198841A1 (en) Flying-limiting hole drilling and blasting method for controlling flying stones in tunnel blasting
CN109322683A (en) Underground Large chamber medium-length hole controls blasting construction method
CN112432566A (en) Full-section rapid excavation method for large-section tunnel
CN104790950B (en) Optimized mining middle-deep blasthole millisecond blasting slot cutting method
CN104989409B (en) A kind of full face tunneling method after vertical shaft light section pore-forming

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination