CN101832035A - 一种加固混凝土柱的构造及施工方法 - Google Patents
一种加固混凝土柱的构造及施工方法 Download PDFInfo
- Publication number
- CN101832035A CN101832035A CN 201010185184 CN201010185184A CN101832035A CN 101832035 A CN101832035 A CN 101832035A CN 201010185184 CN201010185184 CN 201010185184 CN 201010185184 A CN201010185184 A CN 201010185184A CN 101832035 A CN101832035 A CN 101832035A
- Authority
- CN
- China
- Prior art keywords
- concrete column
- prestressing force
- intensity
- incorporation
- force bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101851845A CN101832035B (zh) | 2010-05-15 | 2010-05-15 | 一种加固混凝土柱的构造及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101851845A CN101832035B (zh) | 2010-05-15 | 2010-05-15 | 一种加固混凝土柱的构造及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101832035A true CN101832035A (zh) | 2010-09-15 |
CN101832035B CN101832035B (zh) | 2011-05-11 |
Family
ID=42716233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101851845A Expired - Fee Related CN101832035B (zh) | 2010-05-15 | 2010-05-15 | 一种加固混凝土柱的构造及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101832035B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102808525A (zh) * | 2011-06-02 | 2012-12-05 | 福懋兴业股份有限公司 | 补强夹套及混凝土柱的补强方法 |
CN107191004A (zh) * | 2016-03-10 | 2017-09-22 | 叶长青 | 砖柱加固施工方法 |
CN108277998A (zh) * | 2018-04-04 | 2018-07-13 | 四川森宇建筑工程有限公司 | 一种混凝土加固墙体结构 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6247279B1 (en) * | 1998-03-24 | 2001-06-19 | University Of Ottawa | Retrofitting existing concrete columns by external prestressing |
CN1546823A (zh) * | 2003-11-28 | 2004-11-17 | 广东省建筑科学研究院 | 混凝土柱预应力包钢加固法 |
CN101397854A (zh) * | 2008-01-23 | 2009-04-01 | 贵州大学 | 外包预应力紧固式钢管混凝土柱及加固的方法 |
-
2010
- 2010-05-15 CN CN2010101851845A patent/CN101832035B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6247279B1 (en) * | 1998-03-24 | 2001-06-19 | University Of Ottawa | Retrofitting existing concrete columns by external prestressing |
CN1546823A (zh) * | 2003-11-28 | 2004-11-17 | 广东省建筑科学研究院 | 混凝土柱预应力包钢加固法 |
CN101397854A (zh) * | 2008-01-23 | 2009-04-01 | 贵州大学 | 外包预应力紧固式钢管混凝土柱及加固的方法 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102808525A (zh) * | 2011-06-02 | 2012-12-05 | 福懋兴业股份有限公司 | 补强夹套及混凝土柱的补强方法 |
CN102808525B (zh) * | 2011-06-02 | 2016-04-06 | 福懋兴业股份有限公司 | 混凝土柱的补强夹套及混凝土柱的补强方法 |
CN107191004A (zh) * | 2016-03-10 | 2017-09-22 | 叶长青 | 砖柱加固施工方法 |
CN107191004B (zh) * | 2016-03-10 | 2019-06-04 | 叶长青 | 砖柱加固施工方法 |
CN108277998A (zh) * | 2018-04-04 | 2018-07-13 | 四川森宇建筑工程有限公司 | 一种混凝土加固墙体结构 |
Also Published As
Publication number | Publication date |
---|---|
CN101832035B (zh) | 2011-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9783987B2 (en) | Pre-tensioned centrifugal concrete structure with steel strands | |
CN101922237B (zh) | 预应力钢绞线加固混凝土受弯构件连接件式张拉锚固*** | |
CN103114717B (zh) | 一种伸缩缝两侧剪力墙模板*** | |
CN101942904B (zh) | 预应力钢绞线加固混凝土受弯构件钢板式张拉锚固*** | |
CN101812924B (zh) | 一种预应力钢绞线加固混凝土柱体的张拉锚固*** | |
CN204040446U (zh) | 型钢悬挑脚手架结构 | |
CN101832035B (zh) | 一种加固混凝土柱的构造及施工方法 | |
CN101487344B (zh) | 预应力纤维布加固混凝土柱的横向张拉方法 | |
CN106121268B (zh) | 预应力钢丝绳综合加固梁板柱的***及方法 | |
CN104806031A (zh) | 木结构加固施工方法 | |
CN207749851U (zh) | Cfrp板多点支撑预应力加固的结构组件 | |
CN106012834B (zh) | 一种空间扭曲曲线异型反对称钢主塔内支撑及张拉*** | |
CN105735666B (zh) | 一种快速加固混凝土柱的方法 | |
CN206071086U (zh) | 预应力钢丝绳综合加固梁板柱的*** | |
CN204174840U (zh) | 预应力锚固防松锚具 | |
CN203257121U (zh) | 一种钢筋混凝土梁与楼板的新型加固装置 | |
KR101471648B1 (ko) | 하이브리드 텐던 구조를 갖는 콘크리트 구조체 및 이의 제작 방법 | |
CN102619338A (zh) | 超长环梁的预应力筋的施工方法 | |
CN107503472A (zh) | 一种组合式预应力锚具 | |
CA2941682A1 (en) | Anchoring means using a cable for a horizontal joint, and anchoring method using a cable for a horizontal joint | |
KR101265544B1 (ko) | 디본딩 방식을 적용한 프리텐션 피에스씨 i형 거더 | |
CN106436587A (zh) | 环链式预应力钢丝绳自动同步张拉***及方法 | |
CN208965741U (zh) | 一种墙体拉结筋预埋组件 | |
KR101535180B1 (ko) | 교량상부구조용 콘크리트거더 | |
KR20140059941A (ko) | 지점부에 강봉을 이용한 압축력이 도입된 거더 연속화 시공방법 및 이것을 이용한 교량 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: SANJIAN CONSTRUCTION ENGINEERING GROUP CO., LTD. Free format text: FORMER OWNER: ZHU HONG Effective date: 20120328 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 325024 WENZHOU, ZHEJIANG PROVINCE TO: 325000 WENZHOU, ZHEJIANG PROVINCE |
|
TR01 | Transfer of patent right |
Effective date of registration: 20120328 Address after: 325000 No. 5, Lane 26, Yang Fu Road, Wenzhou, Zhejiang Patentee after: Sanjian Construction Engineering Group Co., Ltd. Address before: Hit street town of Longwan District of Wenzhou city in Zhejiang province 325024 standard Road 71 Lane 2 Patentee before: Zhu Hong |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110511 Termination date: 20200515 |