CN107191004A - 砖柱加固施工方法 - Google Patents
砖柱加固施工方法 Download PDFInfo
- Publication number
- CN107191004A CN107191004A CN201710537097.3A CN201710537097A CN107191004A CN 107191004 A CN107191004 A CN 107191004A CN 201710537097 A CN201710537097 A CN 201710537097A CN 107191004 A CN107191004 A CN 107191004A
- Authority
- CN
- China
- Prior art keywords
- brick
- steel
- spacing
- column section
- section length
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
- Working Measures On Existing Buildindgs (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710537097.3A CN107191004B (zh) | 2016-03-10 | 2016-03-10 | 砖柱加固施工方法 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610181674.5A CN105696805B (zh) | 2016-03-10 | 2016-03-10 | 砖柱加固方法 |
CN201710537097.3A CN107191004B (zh) | 2016-03-10 | 2016-03-10 | 砖柱加固施工方法 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610181674.5A Division CN105696805B (zh) | 2016-03-10 | 2016-03-10 | 砖柱加固方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107191004A true CN107191004A (zh) | 2017-09-22 |
CN107191004B CN107191004B (zh) | 2019-06-04 |
Family
ID=56232939
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710537097.3A Active CN107191004B (zh) | 2016-03-10 | 2016-03-10 | 砖柱加固施工方法 |
CN201610181674.5A Active CN105696805B (zh) | 2016-03-10 | 2016-03-10 | 砖柱加固方法 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610181674.5A Active CN105696805B (zh) | 2016-03-10 | 2016-03-10 | 砖柱加固方法 |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN107191004B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106836604B (zh) * | 2017-02-07 | 2022-08-12 | 叶长青 | 大跨度斜屋面的制作方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1401873A (zh) * | 2002-09-05 | 2003-03-12 | 杜旌 | 预应力加固混凝土受压构件的方法 |
CN101832035A (zh) * | 2010-05-15 | 2010-09-15 | 朱虹 | 一种加固混凝土柱的构造及施工方法 |
CN202925924U (zh) * | 2012-11-04 | 2013-05-08 | 西安建筑科技大学 | 一种砖柱的组合加固装置 |
CN103306492A (zh) * | 2013-05-29 | 2013-09-18 | 朱奎 | 混凝土病梁的加固方法 |
CN103388408A (zh) * | 2013-07-28 | 2013-11-13 | 桂林理工大学 | 一种建筑结构体外预应力筋加固转向块 |
EA020664B1 (ru) * | 2010-08-16 | 2014-12-30 | Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" | Устройство для усиления несущих конструкций |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3050108B2 (ja) * | 1995-12-01 | 2000-06-12 | 鹿島建設株式会社 | 柱の補強方法 |
CN201531124U (zh) * | 2009-09-24 | 2010-07-21 | 马人乐 | 分级体外预应力加固砌体结构 |
CN102080454B (zh) * | 2010-12-02 | 2012-05-30 | 西安建筑科技大学 | 建筑中的柱加固方法 |
CN202925926U (zh) * | 2012-11-04 | 2013-05-08 | 西安建筑科技大学 | 一种砖柱加固装置 |
JP5411367B1 (ja) * | 2013-01-17 | 2014-02-12 | 株式会社サンヨーホーム | コンクリート柱の補強構造 |
-
2016
- 2016-03-10 CN CN201710537097.3A patent/CN107191004B/zh active Active
- 2016-03-10 CN CN201610181674.5A patent/CN105696805B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1401873A (zh) * | 2002-09-05 | 2003-03-12 | 杜旌 | 预应力加固混凝土受压构件的方法 |
CN101832035A (zh) * | 2010-05-15 | 2010-09-15 | 朱虹 | 一种加固混凝土柱的构造及施工方法 |
EA020664B1 (ru) * | 2010-08-16 | 2014-12-30 | Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" | Устройство для усиления несущих конструкций |
CN202925924U (zh) * | 2012-11-04 | 2013-05-08 | 西安建筑科技大学 | 一种砖柱的组合加固装置 |
CN103306492A (zh) * | 2013-05-29 | 2013-09-18 | 朱奎 | 混凝土病梁的加固方法 |
CN103388408A (zh) * | 2013-07-28 | 2013-11-13 | 桂林理工大学 | 一种建筑结构体外预应力筋加固转向块 |
Also Published As
Publication number | Publication date |
---|---|
CN107191004B (zh) | 2019-06-04 |
CN105696805B (zh) | 2017-11-28 |
CN105696805A (zh) | 2016-06-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5163987B2 (ja) | レールを硬化する装置 | |
CN105239775B (zh) | 一种用于筒仓滑模施工的钢筋安装质量动态控制方法 | |
CN103321444B (zh) | 混凝土楼板加固施工方法 | |
CN105696805B (zh) | 砖柱加固方法 | |
CN102251674A (zh) | 超长混凝土结构跳仓式无缝施工方法 | |
CN107905114A (zh) | 一种特大跨径连续刚构拱桥的施工方法 | |
CN206174120U (zh) | 一种预制构造柱及其结构 | |
CN107988918A (zh) | 混凝土卷模施工装置 | |
CN105133854B (zh) | 一种竖向构件的置换卸载结构及施工方法 | |
CN204875531U (zh) | 一种型钢贯穿式外撑悬挑托架体系 | |
CN103374865A (zh) | 无砟轨道板纵连铺设施工方法 | |
CN208502075U (zh) | 一种构造柱上部钢筋连接预埋装置 | |
CN107989398B (zh) | 墙体的加固构造施工方法 | |
CN111395570B (zh) | 一种清水混凝土复合外墙板及其施工方法 | |
CN106917359A (zh) | 道路桥梁裂缝加固装置及加固方法 | |
CN206245730U (zh) | 一种现浇坡屋面双层模板结构 | |
CN105625199B (zh) | 一种变截面连续箱梁底板崩裂区处理方法及修补结构 | |
CN106894554A (zh) | 预制板现浇梁的斜屋面结构及其施工方法 | |
CN107605172B (zh) | 一种混凝土屋面梁的加固结构施工方法 | |
CN203498850U (zh) | 超高层建筑筏板基础钢筋支架 | |
CN206091495U (zh) | 水处理构筑物底板与池壁一次成型的浇筑模板 | |
CN106759415A (zh) | 一种砼结构集水坑模板抗浮控制技术 | |
CN104859365B (zh) | 一种柱状山石景观的制作方法 | |
CN202622969U (zh) | 一种抽拉式钢芯模预制空心板梁的模具 | |
CN207944479U (zh) | 一种管廊斜坡板砼隔离装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 325000 No. 48 Xinghai Road, Jingshan Street, Ouhai District, Wenzhou City, Zhejiang Province Applicant after: Ye Changqing Address before: 325000 Jinchuan Road, Tianhe Street, Wenzhou Economic and Technological Development Zone, Wenzhou City, Zhejiang Province Applicant before: Ye Changqing |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201125 Address after: No. 100, North Ring Road, Hede Town, Sheyang County, Yancheng City, Jiangsu Province Patentee after: Gu Yaobin Address before: 325000, No. 48, Jingshan Hill Road, Ouhai District, Wenzhou, Zhejiang Patentee before: Ye Changqing |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230110 Address after: West side of Jinhai Avenue, south side of Dianchang Road, Sheyang Port Economic Zone, Sheyang County, Yancheng City, Jiangsu Province, 224300 Patentee after: Jiangsu Hengyiming New Material Technology Co.,Ltd. Address before: No. 100, North Ring Road, Hede Town, Sheyang County, Yancheng City, Jiangsu Province Patentee before: Gu Yaobin |
|
TR01 | Transfer of patent right |