CN107191004B - 砖柱加固施工方法 - Google Patents

砖柱加固施工方法 Download PDF

Info

Publication number
CN107191004B
CN107191004B CN201710537097.3A CN201710537097A CN107191004B CN 107191004 B CN107191004 B CN 107191004B CN 201710537097 A CN201710537097 A CN 201710537097A CN 107191004 B CN107191004 B CN 107191004B
Authority
CN
China
Prior art keywords
steel
brick column
brick
presstressed reinforcing
spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710537097.3A
Other languages
English (en)
Other versions
CN107191004A (zh
Inventor
叶长青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hengyiming New Material Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710537097.3A priority Critical patent/CN107191004B/zh
Publication of CN107191004A publication Critical patent/CN107191004A/zh
Application granted granted Critical
Publication of CN107191004B publication Critical patent/CN107191004B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明公开了一种砖柱加固施工方法,其特征是施工步骤包括:(1)使砖柱处于卸载状态;(2)砖柱横向灰缝预埋U形预埋件;(3)将钢垫板***砖柱竖向灰缝,钢垫板外侧焊接垫钢筋,形成转向钢块;(4)离砖柱端头250~300mm处设置角钢;(5)挂设预应力筋;(6)用锚具将预应力筋初步固定在角钢,进行第一次通电加热;(7)喷射膨胀混凝土;(8)在喷射混凝土45min后进行第二次通电加热;(9)在喷射混凝土12个小时后进行第三次通电加热;(10)将钢缀板与U形预埋件进行焊接。

Description

砖柱加固施工方法
技术领域
本发明涉及一种加固施工方法,特别涉及砖柱加固施工方法。
背景技术
砖柱承载力不够时要进行加固,传统的加固方法是加大截面法,由于原有的结构体处于受力状态,已经产生应力应变,而后加的结构体没有应力应变,导致原有的结构体和后加的结构体应力应变不协调,造成后加的结构体与原有的结构体难以形成整体。有必要对此进行改进,对后加的结构体施加一定预应力,使其产生应力应变,有利于原有的结构体和后加的结构体协调受力。
发明内容
本发明是提供一种砖柱加固施工方法,解决砖柱承载力不够时要进行加固效果不好的问题。
砖柱表面清理粉刷砂浆后挂设两根预应力筋,预应力筋直径为18~25mm,预应力筋中间段为垂直布置,预应力筋中间段长度为0.45~0.55倍砖柱高度,两根预应力筋间距根据砖柱断面进行确定,当砖柱截面长度为250mm,两根预应力筋间距为60mm;当砖柱截面长度为300mm,两根预应力筋间距为75mm;当砖柱截面长度为350mm,两根预应力筋间距为90mm;当砖柱截面长度为400mm,两根预应力筋间距为100mm;当砖柱截面长度为450mm,两根预应力筋间距为110mm;当砖柱截面长度为500mm以及以上时,两根预应力筋间距为120mm。预应力筋垂直段变为斜向段的转折部位设置转向钢块,转向钢块由钢垫板和垫钢筋组成,钢垫板厚度为10mm,垫钢筋为直径12~14mm的圆钢,垫钢筋与预应力筋接触部位根据预应力筋转折弧度进行打磨,使预应力筋转折后与垫钢筋接触为面接触。钢垫板***砖柱竖向灰缝,离砖柱端头250~300mm处设置角钢,角钢***砖柱横向灰缝,预应力筋张拉完毕后通过锚具固定在角钢。预应力筋外面设置喷射混凝土,喷射混凝土采用膨胀混凝土,膨胀混凝土强度为C30或者以上,厚度为25~35mm,膨胀混凝土外面设置钢缀板,钢缀板与埋设在砖柱内U形预埋件焊接,钢缀板宽度为150~200mm,通过钢缀板包裹喷射混凝土使加固混凝土处于三向应力状态,对加固结构提早发挥力学作用有很大的效果,钢缀板设置间距与加固混凝土的应力发挥有很大的关系,为此进行大量试验,根据试验结果确定了钢缀板设置间距。表1为砖柱截面长度为400mm时钢缀板设置间距与加固混凝土的应力发挥系数情况,表中砖柱截面为正方形,加固混凝土的应力发挥系数是指在上部荷载下加固混凝土承载应力与极限应力的比值。根据表1结果,随着承载力的增加,加固混凝土的应力发挥系数会有所提升,在钢缀板设置间距大于550mm时应力发挥系数降低较大,而当钢缀板设置间距小于500mm时应力发挥系数变化不大。故砖柱截面长度为400mm时,钢缀板设置间距为大于500mm且小于或等于550mm。表2为砖柱截面长度为450mm时钢缀板设置间距与加固混凝土的应力发挥系数情况,根据表2情况,当砖柱截面长度为450mm时,钢缀板设置间距为大于550mm且小于或等于600mm。依次试验确定:当砖柱截面长度为500mm时,钢缀板设置间距为大于600mm且小于或等于650mm。当砖柱截面长度为550mm或大于550mm时,钢缀板设置间距为大于650mm且小于或等于700mm。当砖柱截面长度为350mm或小于350mm时,钢缀板设置间距为大于或等于450mm且小于或等于550mm。
表1为砖柱截面长度为400mm时钢缀板设置间距与加固混凝土的应力发挥系数情况
表2为砖柱截面长度为450mm时钢缀板设置间距与加固混凝土的应力发挥系数情况
施工步骤包括:
(1)使砖柱处于卸载状态。
(2)剥离砖柱表面清理粉刷砂浆,砖柱横向灰缝预埋U形预埋件。
(3)将钢垫板***砖柱竖向灰缝,钢垫板外侧焊接垫钢筋,形成转向钢块。
(4)离砖柱端头250~300mm处设置角钢,角钢***砖柱横向灰缝。
(5)挂设预应力筋,将预应力钢筋端部与三相低压变压器联接,变压器装有可变电阻,同时应带有冷却设备,从电热变压器接到预应力钢筋上的电线采用绝缘软铜丝绞线。
(6)用锚具将预应力筋初步固定在角钢,进行第一次通电加热,通电加热5min,建立初始应力,然后通过锚具将预应力钢筋固定在角钢。
(7)喷射膨胀混凝土。
(8)在喷射混凝土45min后进行第二次通电加热,通电加热5min。
(9)在喷射混凝土12个小时后进行第三次通电加热,通电加热10min,通过锚具将预应力钢筋固定在角钢。
(10)将钢缀板与U形预埋件进行焊接,焊缝长度要大于80mm。
本发明力学性能好,质量易于获得保证。
附图说明
图1为砖柱加固结构立面示意图,图2为砖柱加固结构截面示意图,图3为转向钢块结构示意图。
各附图中:1、砖柱,2、转向钢块,3、预应力筋,4、角钢,5、钢缀板,6、锚具,7、膨胀混凝土,8、U形预埋件,9、钢垫板,10、垫钢筋。
具体实施方式
图1为砖柱加固结构立面示意图,图2为砖柱加固结构截面示意图,图3为转向钢块结构示意图。实施例中砖柱1表面清理粉刷砂浆后挂设两根预应力筋3,预应力筋3直径为22mm,预应力筋3中间段为垂直布置,预应力筋3中间段长度为0.5倍砖柱1高度,砖柱1截面长度为400mm,两根预应力筋3间距为100mm。预应力筋3垂直段变为斜向段的转折部位设置转向钢块2,转向钢块2由钢垫板9和垫钢筋10组成,钢垫板9厚度为10mm,垫钢筋10为直径12mm的圆钢,垫钢筋10与预应力筋3接触部位根据预应力筋3转折弧度进行打磨,使预应力筋3转折后与垫钢筋10接触为面接触。钢垫板9***砖柱1竖向灰缝,离砖柱1端头300mm处设置角钢4,角钢4***砖柱1横向灰缝,预应力筋3张拉完毕后通过锚具6固定在角钢4。预应力筋3外面设置喷射混凝土,喷射混凝土采用膨胀混凝土7,膨胀混凝土7强度为C30,厚度为30mm,膨胀混凝土7外面设置钢缀板5,钢缀板5与埋设在砖柱1内U形预埋件8焊接,钢缀板5宽度为180mm。钢缀板5设置间距为大于520mm。
施工步骤包括:
(1)使砖柱1处于卸载状态。
(2)剥离砖柱1表面清理粉刷砂浆,砖柱1横向灰缝预埋U形预埋件8。
(3)将钢垫板9***砖柱1竖向灰缝,钢垫板9外侧焊接垫钢筋10,形成转向钢块2。
(4)离砖柱1端头300mm处设置角钢4,角钢4***砖柱1横向灰缝。
(5)挂设预应力筋3,将预应力钢筋端部与三相低压变压器联接,变压器装有可变电阻,同时应带有冷却设备,从电热变压器接到预应力钢筋上的电线采用绝缘软铜丝绞线。
(6)用锚具6将预应力筋3初步固定在角钢4,进行第一次通电加热,通电加热5min,建立初始应力,然后通过锚具6将预应力钢筋固定在角钢4。
(7)喷射膨胀混凝土7。
(8)在喷射混凝土45min后进行第二次通电加热,通电加热5min。
(9)在喷射混凝土12个小时后进行第三次通电加热,通电加热10min,通过锚具6将预应力钢筋固定在角钢4。
(10)将钢缀板5与U形预埋件进行焊接,焊缝长度要大于80mm。

Claims (1)

1.一种砖柱加固施工方法,其特征是砖柱表面清理粉刷砂浆后挂设两根预应力筋,预应力筋中间段为垂直布置,预应力筋中间段长度为0.45~0.55倍砖柱高度,预应力筋垂直段变为斜向段的转折部位设置转向钢块,钢垫板***砖柱竖向灰缝,离砖柱端头250~300mm处设置角钢,角钢***砖柱横向灰缝,预应力筋张拉完毕后通过锚具固定在角钢;预应力筋外面设置喷射混凝土,喷射混凝土采用膨胀混凝土,膨胀混凝土外面设置钢缀板,钢缀板与埋设在砖柱内U形预埋件焊接,钢缀板宽度为150~200mm;
两根预应力筋间距根据砖柱断面进行确定,当砖柱截面长度为250mm,两根预应力筋间距为60mm;当砖柱截面长度为300mm,两根预应力筋间距为75mm;当砖柱截面长度为350mm,两根预应力筋间距为90mm;当砖柱截面长度为400mm,两根预应力筋间距为100mm;当砖柱截面长度为450mm,两根预应力筋间距为110mm;当砖柱截面长度为500mm以及以上时,两根预应力筋间距为120mm;
转向钢块由钢垫板和垫钢筋组成,钢垫板厚度为10mm,垫钢筋为直径12~14mm的圆钢,垫钢筋与预应力筋接触部位根据预应力筋转折弧度进行打磨,使预应力筋转折后与垫钢筋接触为面接触;
砖柱截面长度为400mm时,钢缀板设置间距为大于500mm且小于或等于550mm;当砖柱截面长度为450mm时,钢缀板设置间距为大于550mm且小于或等于600mm;当砖柱截面长度为500mm时,钢缀板设置间距为大于600mm且小于或等于650mm;当砖柱截面长度为550mm或大于550mm时,钢缀板设置间距为大于650mm且小于或等于700mm;当砖柱截面长度为350mm或小于350mm时,钢缀板设置间距为大于或等于450mm且小于或等于550mm;
施工步骤包括:
(1)在砖柱周围设置,使砖柱处于卸载状态;
(2)剥离砖柱表面清理粉刷砂浆,砖柱横向灰缝预埋U形预埋件;
(3)将钢垫板***砖柱竖向灰缝,钢垫板外侧焊接垫钢筋,形成转向钢块;
(4)离砖柱端头250~300mm处设置角钢,角钢***砖柱横向灰缝;
(5)挂设预应力筋,将预应力钢筋端部与三相低压变压器联接, 变压器装有可变电阻,同时应带有冷却设备,从电热变压器接到预应力钢筋上的电线采用绝缘软铜丝绞线;
(6)用锚具将预应力筋初步固定在角钢,进行第一次通电加热,通电加热5min,建立初始应力,然后通过锚具将预应力钢筋固定在角钢;
(7)喷射膨胀混凝土;
(8)在喷射混凝土45min后进行第二次通电加热,通电加热5min;
(9)在喷射混凝土12个小时后进行第三次通电加热,通电加热10min,通过锚具将预应力钢筋固定在角钢;
(10)将钢缀板与U形预埋件进行焊接,焊缝长度要大于80mm。
CN201710537097.3A 2016-03-10 2016-03-10 砖柱加固施工方法 Active CN107191004B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710537097.3A CN107191004B (zh) 2016-03-10 2016-03-10 砖柱加固施工方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610181674.5A CN105696805B (zh) 2016-03-10 2016-03-10 砖柱加固方法
CN201710537097.3A CN107191004B (zh) 2016-03-10 2016-03-10 砖柱加固施工方法

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610181674.5A Division CN105696805B (zh) 2016-03-10 2016-03-10 砖柱加固方法

Publications (2)

Publication Number Publication Date
CN107191004A CN107191004A (zh) 2017-09-22
CN107191004B true CN107191004B (zh) 2019-06-04

Family

ID=56232939

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201710537097.3A Active CN107191004B (zh) 2016-03-10 2016-03-10 砖柱加固施工方法
CN201610181674.5A Active CN105696805B (zh) 2016-03-10 2016-03-10 砖柱加固方法

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610181674.5A Active CN105696805B (zh) 2016-03-10 2016-03-10 砖柱加固方法

Country Status (1)

Country Link
CN (2) CN107191004B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836604B (zh) * 2017-02-07 2022-08-12 叶长青 大跨度斜屋面的制作方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1401873A (zh) * 2002-09-05 2003-03-12 杜旌 预应力加固混凝土受压构件的方法
CN101832035A (zh) * 2010-05-15 2010-09-15 朱虹 一种加固混凝土柱的构造及施工方法
CN202925924U (zh) * 2012-11-04 2013-05-08 西安建筑科技大学 一种砖柱的组合加固装置
CN103306492A (zh) * 2013-05-29 2013-09-18 朱奎 混凝土病梁的加固方法
CN103388408A (zh) * 2013-07-28 2013-11-13 桂林理工大学 一种建筑结构体外预应力筋加固转向块
EA020664B1 (ru) * 2010-08-16 2014-12-30 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" Устройство для усиления несущих конструкций

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3050108B2 (ja) * 1995-12-01 2000-06-12 鹿島建設株式会社 柱の補強方法
CN201531124U (zh) * 2009-09-24 2010-07-21 马人乐 分级体外预应力加固砌体结构
CN102080454B (zh) * 2010-12-02 2012-05-30 西安建筑科技大学 建筑中的柱加固方法
CN202925926U (zh) * 2012-11-04 2013-05-08 西安建筑科技大学 一种砖柱加固装置
JP5411367B1 (ja) * 2013-01-17 2014-02-12 株式会社サンヨーホーム コンクリート柱の補強構造

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1401873A (zh) * 2002-09-05 2003-03-12 杜旌 预应力加固混凝土受压构件的方法
CN101832035A (zh) * 2010-05-15 2010-09-15 朱虹 一种加固混凝土柱的构造及施工方法
EA020664B1 (ru) * 2010-08-16 2014-12-30 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" Устройство для усиления несущих конструкций
CN202925924U (zh) * 2012-11-04 2013-05-08 西安建筑科技大学 一种砖柱的组合加固装置
CN103306492A (zh) * 2013-05-29 2013-09-18 朱奎 混凝土病梁的加固方法
CN103388408A (zh) * 2013-07-28 2013-11-13 桂林理工大学 一种建筑结构体外预应力筋加固转向块

Also Published As

Publication number Publication date
CN107191004A (zh) 2017-09-22
CN105696805B (zh) 2017-11-28
CN105696805A (zh) 2016-06-22

Similar Documents

Publication Publication Date Title
CN103321444B (zh) 混凝土楼板加固施工方法
CN107191004B (zh) 砖柱加固施工方法
CN102251674A (zh) 超长混凝土结构跳仓式无缝施工方法
CN103306493B (zh) 建筑物结构的加固方法
CN206174120U (zh) 一种预制构造柱及其结构
CN202627500U (zh) 外振式支撑梁包扎用定型组合钢模板
CN105908885A (zh) 一种大幅面多孔洞轻质芯模及其施工方法
CN103374865A (zh) 无砟轨道板纵连铺设施工方法
CN208502075U (zh) 一种构造柱上部钢筋连接预埋装置
CN107916797B (zh) 一种提升旧建筑物承载性能的构造方法
CN103306492B (zh) 混凝土病梁的加固方法
CN202745392U (zh) 一种简易可周转使用的马凳
CN106894554A (zh) 预制板现浇梁的斜屋面结构及其施工方法
CN203498850U (zh) 超高层建筑筏板基础钢筋支架
CN204899041U (zh) 板筋上下保护层控制马凳
CN105442628B (zh) 悬挑基础侧壁重型埋件施工方法
JP6057329B2 (ja) ラックバーの高周波焼入装置
CN202622969U (zh) 一种抽拉式钢芯模预制空心板梁的模具
CN208251172U (zh) 双层止水带施工用限位卡
CN105862572A (zh) 超长竖向无粘结预应力结构及其装配方法
CN207944479U (zh) 一种管廊斜坡板砼隔离装置
CN105220884A (zh) 现浇砼楼板钢筋网片铺装方法
CN204456226U (zh) 一种免清理后浇带
CN205742615U (zh) 一种建筑墙体楼板结构
CN101653818A (zh) 连铸堵引锭方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 325000 No. 48 Xinghai Road, Jingshan Street, Ouhai District, Wenzhou City, Zhejiang Province

Applicant after: Ye Changqing

Address before: 325000 Jinchuan Road, Tianhe Street, Wenzhou Economic and Technological Development Zone, Wenzhou City, Zhejiang Province

Applicant before: Ye Changqing

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201125

Address after: No. 100, North Ring Road, Hede Town, Sheyang County, Yancheng City, Jiangsu Province

Patentee after: Gu Yaobin

Address before: 325000, No. 48, Jingshan Hill Road, Ouhai District, Wenzhou, Zhejiang

Patentee before: Ye Changqing

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230110

Address after: West side of Jinhai Avenue, south side of Dianchang Road, Sheyang Port Economic Zone, Sheyang County, Yancheng City, Jiangsu Province, 224300

Patentee after: Jiangsu Hengyiming New Material Technology Co.,Ltd.

Address before: No. 100, North Ring Road, Hede Town, Sheyang County, Yancheng City, Jiangsu Province

Patentee before: Gu Yaobin

TR01 Transfer of patent right