CN102619338A - 超长环梁的预应力筋的施工方法 - Google Patents

超长环梁的预应力筋的施工方法 Download PDF

Info

Publication number
CN102619338A
CN102619338A CN2011100568514A CN201110056851A CN102619338A CN 102619338 A CN102619338 A CN 102619338A CN 2011100568514 A CN2011100568514 A CN 2011100568514A CN 201110056851 A CN201110056851 A CN 201110056851A CN 102619338 A CN102619338 A CN 102619338A
Authority
CN
China
Prior art keywords
mentioned
prestressing tendon
unbonded prestressing
tendon
stressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100568514A
Other languages
English (en)
Other versions
CN102619338B (zh
Inventor
青光绪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Jinchao Machine Tool Co.,Ltd.
Original Assignee
青光绪
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 青光绪 filed Critical 青光绪
Priority to CN201110056851.4A priority Critical patent/CN102619338B/zh
Publication of CN102619338A publication Critical patent/CN102619338A/zh
Application granted granted Critical
Publication of CN102619338B publication Critical patent/CN102619338B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

本发明超长环梁的预应力筋的施工方法,涉及一种现浇后张法无粘结预应力筋钢筋砼的施工方法。该方法包含:步骤A,确定无粘结预应力筋的端部位置和曲线架;步骤B,在模板上安装预应力梁的钢筋梁骨架;步骤C,在上述的钢筋梁骨架上固定无粘结预应力筋的上述曲线架;步骤D,在上述的钢筋梁骨架内按照上述曲线架安装上述无粘结预应力筋;步骤E,按照上述端部的位置将上述无粘结预应力筋端部的锚固***固定在上述的模板内;步骤F,绑扎上述预应力梁其余的普通钢筋;步骤G,浇筑上述预应力梁的混凝土,步骤H,借助上述锚固***对上述无粘结预应力筋的钢绞线实施张拉;步骤I,切割上述预应力筋的钢绞线端头多余部分,封闭锚固***。

Description

超长环梁的预应力筋的施工方法
技术领域
本发明涉及一种现浇后张法无粘结预应力筋钢筋砼的施工方法。
背景技术
现浇后张法无粘结预应力筋钢筋砼技术应用广泛,是公路、铁路与市政工程桥梁现浇和预制结构采用最多的工艺技术,尤其是跨河(涧)悬浇施工技术。该项工艺技术的要点是:在模板上安装预应力梁的钢筋梁骨架后,在该梁骨架内安装无粘结预应力筋;然后将无粘结预应力筋端部的锚固***固定在模板内;接着绑扎该预应力梁其余的普通钢筋。然后浇筑该预应力梁的混凝土,待该混凝土到达强度的80%时,借助上述锚固***对该无粘结预应力筋的钢绞线实施张拉,钢筋砼施加预应力。待该混凝土到达强度的100%时,切割预应力筋端头多余的部分,最后封闭锚固***。该项工艺技术现已应用于工业与民用和公共建筑,人防工程的大跨度、大空间的框架梁、框架柱(网)的砼楼板、大悬臂梁等建(构)筑物结构之中。根据受力的需要,无粘结预应力筋可设计成多种曲线受力形式结构。总长度在500m~1000m范围内的超长预应力环梁内设有多条无粘结预应力筋,各个无粘结预应力筋按等跨或不等跨三跨连续梁进行布置,且各个无粘结预应力筋的接头在超长预应力环梁的每个张拉端处交错分开布置,使其成为一个(椭)圆周形预应力铁箍。由于超长环梁中单根(束)无粘结预应力筋张拉端弯曲点为三向弧形布置,施工时张拉难度极大。现有的变角预应力张拉工艺,用变角块将张拉端预应力筋按规定方向进行换角或弯起,使张拉千斤顶的轴线和锚垫板法兰线呈一定角度并对其实施张拉,占用的施工空间小。现有的变角预应力张拉工艺虽然可以解决预应力张拉时施工空间受限制的问题,但难以克服张拉时无粘结预应力筋内的摩擦阻力,容易造成无粘结预应力筋的钢绞线断丝、滑丝和端部滑脱,给工程留下质量隐患。
发明内容
本发明旨在提供一种超长环梁的预应力筋的施工方法,以避免无粘结预应力筋断丝、滑丝和端部滑脱。
本发明的技术方案是:超长环梁的预应力筋的施工方法,包含的步骤有:
步骤A,确定无粘结预应力筋的端部位置和曲线架;
步骤B,在模板上安装预应力梁的钢筋梁骨架;
步骤C,在上述的钢筋梁骨架上固定无粘结预应力筋的上述曲线架;
步骤D,在上述的钢筋梁骨架内按照上述曲线架安装上述无粘结预应力筋;
步骤E,按照上述端部的位置将上述无粘结预应力筋端部的锚固***固定在上述的模板内;
步骤F,绑扎上述预应力梁其余的普通钢筋;
步骤G,浇筑上述预应力梁的混凝土;
步骤H,借助上述锚固***对上述无粘结预应力筋的钢绞线实施张拉;
步骤I,切割上述预应力筋的钢绞线端头多余部分,封闭锚固***。
本发明超长环梁的预应力筋的施工方法,在500m~1000m以内超长环梁在砼浇灌前,按无粘结预应力筋各个弯曲部位布置须满足曲线流畅的需要,以减少张拉时的摩擦阻力的原则,使用曲线架和改变无粘结预应力筋张拉端位置的方式,对原始设计施工图中无粘结预应力筋端部两头位置进行“换角变位”预埋、安装和张拉,减小(少)环形梁三跨连续梁段单根预应力筋三向弯曲点的弯曲度,减轻张拉时的摩擦阻力,避免无粘结预应力筋断丝、滑丝和端部滑脱,并解决了张拉应力损失与端部锚固问题。该工艺方法施工方便,工法技术成熟,可操作性强,安全可靠,效果显著。
附图说明
图1为本发明超长环梁的预应力筋的施工方法一个实施例的施工过程示意图。
图2为图1实施例中确定无粘结预应力筋的端部位置的第一种方式的示意图。
图3为图1实施例中确定无粘结预应力筋的端部位置的第二种方式的示意图。
图4为图1实施例中确定无粘结预应力筋的曲线架的示意图。
具体实施方式
总长度在500m~1000m范围内的超长预应力环梁内设有多条无粘结预应力筋,各个无粘结预应力筋按等跨或不等跨三跨连续梁进行布置,且各个无粘结预应力筋的接头在超长预应力环梁的每个张拉端处交错分开布置,使其成为一个(椭)圆周形预应力铁箍。本发明超长环梁的预应力筋的施工方法就是针对超长预应力环梁内无粘结预应力筋的施工,避免无粘结预应力筋断丝、滑丝和端部滑脱。本发明超长环梁的预应力筋的施工方法一个实施例的施工过程,如图1所示。该施工方法,包含的步骤有:
步骤A,确定无粘结预应力筋的端部位置和曲线架。其中:
确定无粘结预应力筋的端部位置的第一种方式,请参看图2:无粘结预应力筋3在超长预应力环梁中弯曲的连续预应力梁1内部延伸,并且无粘结预应力筋3的端部从与该预应力梁1相交的柱子2的侧面向外引出;按无粘结预应力筋3各个弯曲部位布置须满足曲线流畅的需要,以减少张拉时的摩擦阻力的原则,将无粘结预应力筋3的张拉端位置从原始设计施工图中无粘结预应力筋3端部锚固***4’的位置向切线方向移动,改变到新的锚固***4的位置,无粘结预应力筋3端部实现一个换位和一个变角。该无粘结预应力筋3的另一端也如此处理。
确定无粘结预应力筋的端部位置的第二种方式,请参看图3:无粘结预应力筋30在超长预应力环梁中的连续预应力梁10内部延伸,并且无粘结预应力筋30的端部从与该预应力梁10相交的框架梁20侧面处的楼板弯曲地向斜上方引出;按无粘结预应力筋30各个弯曲部位布置须满足曲线流畅的需要,以减少张拉时的摩擦阻力的原则,将无粘结预应力筋30的张拉端位置从原始设计施工图中无粘结预应力筋30端部锚固***40’的位置向切线方向移动,改变到新的锚固***40的位置,从离开与该预应力梁10相交的框架梁20侧面处一段距离的楼板向斜上方引出,无粘结预应力筋30端部实现一个换角和一个变位。该无粘结预应力筋30的另一端也如此处理。
确定无粘结预应力筋的曲线架,请参看图4:无粘结预应力筋300在连续预应力梁100内部延伸,并且无粘结预应力筋300的端部从与该预应力梁100相交的柱子200的侧面向外引出;按无粘结预应力筋300各个弯曲部位布置须满足曲线流畅的需要,以减少张拉时的摩擦阻力的原则,用曲线架500将无粘结预应力筋300靠近的张拉端部分从原始设计施工图中无粘结预应力筋300’的自然下垂位置向上提。曲线架500的位置应设在该预应力梁100的最大剪力面上,即曲线架500到与该预应力梁100相交的柱子200的距离L1大约为750毫米。曲线架500相对无粘结预应力筋300平直段的高度差H1为该无粘结预应力筋300端部锚固***400相对无粘结预应力筋300平直段的高度差H2的二分之一。曲线架200使原始设计施工图中无粘结预应力筋300’靠***直部的弯曲段301’改变为无粘结预应力筋300靠***直部新的平缓的弯曲段301,弯曲度大为减小;使原始设计施工图中无粘结预应力筋300’靠近锚固***400的弯曲段302’改变为无粘结预应力筋300靠近锚固***400新的平缓的弯曲段301,弯曲度也大为减小。无粘结预应力筋300靠近端部的这一段又实现了两个换角。该无粘结预应力筋300的另一端也如此处理。另外,对于无粘结预应力筋在超长预应力环梁中的连续预应力梁内部延伸,并且无粘结预应力筋的端部从与该预应力梁相交的框架梁侧面处的楼板弯曲地向斜上方引出的情形,用框架梁替代前述的柱子进行相同的处理,即可确定相应的曲线架。
步骤B,在模板上安装该超长环形预应力梁的钢筋梁骨架。
步骤C,在上述的钢筋梁骨架上固定无粘结预应力筋的上述曲线架;曲线架可以取几字形的结构,立在模板上;也可以是一根横向的直杆,焊在上述的钢筋梁骨架上。
步骤D,在上述的钢筋梁骨架内按照上述曲线架安装上述无粘结预应力筋。
步骤E,按照上述无粘结预应力筋端部的位置将上述无粘结预应力筋端部的锚固***固定在上述的模板内。
步骤F,绑扎上述超长环形预应力梁其余的普通钢筋。
步骤G,浇筑上述超长环形预应力梁的混凝土。
步骤H,待上述超长环形预应力梁的混凝土到达强度的80%时,借助上述锚固***对上述无粘结预应力筋的钢绞线实施张拉;对预应力筋的张拉控制,“以控制张拉力为主,同时用张拉伸长值作为校核依据”。工程张拉控制应力取0.75倍钢绞线强度标准值,预应力筋采用单根张拉的方式,每根预应力筋单根张拉力值与参数取值按《预应力混凝土用钢绞线》GB/T5224-2003规范的规定执行。
步骤I,待上述超长环形预应力梁的混凝土到达强度的100%时,切割上述预应力筋的钢绞线端头多余部分,封闭锚固***。张拉后,用砂轮切割机切掉预应力筋的钢绞线张拉端多余的钢绞线,预应力筋的钢绞线外露长度不宜小于其直径的1.5倍,且不宜小于30毫米,用环氧树脂涂封锚具及预应力筋外露的钢绞线。封闭前应将锚具周围的混凝土凿毛、冲洗干净,凸出式的锚头宜配置钢筋网片,用微膨胀细石混凝土进行封闭。
以上所述,仅为本发明较佳实施例,不以此限定本发明实施的范围,依本发明的技术方案及说明书内容所作的等效变化与修饰,皆应属于本发明涵盖的范围。

Claims (1)

1.超长环梁的预应力筋的施工方法,包含的步骤有:
步骤A,确定无粘结预应力筋的端部位置和曲线架;
步骤B,在模板上安装预应力梁的钢筋梁骨架;
步骤C,在上述的钢筋梁骨架上固定无粘结预应力筋的上述曲线架;
步骤D,在上述的钢筋梁骨架内按照上述曲线架安装上述无粘结预应力筋;
步骤E,按照上述端部的位置将上述无粘结预应力筋端部的锚固***固定在上述的模板内;
步骤F,绑扎上述预应力梁其余的普通钢筋。
步骤G,浇筑上述预应力梁的混凝土。
步骤H,借助上述锚固***对上述无粘结预应力筋的钢绞线实施张拉;
步骤I,切割上述预应力筋的钢绞线端头多余部分,封闭锚固***。
CN201110056851.4A 2011-03-09 2011-03-09 超长环梁的预应力筋的施工方法 Expired - Fee Related CN102619338B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110056851.4A CN102619338B (zh) 2011-03-09 2011-03-09 超长环梁的预应力筋的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110056851.4A CN102619338B (zh) 2011-03-09 2011-03-09 超长环梁的预应力筋的施工方法

Publications (2)

Publication Number Publication Date
CN102619338A true CN102619338A (zh) 2012-08-01
CN102619338B CN102619338B (zh) 2015-07-15

Family

ID=46559521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110056851.4A Expired - Fee Related CN102619338B (zh) 2011-03-09 2011-03-09 超长环梁的预应力筋的施工方法

Country Status (1)

Country Link
CN (1) CN102619338B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485545A (zh) * 2013-09-13 2014-01-01 中南林业科技大学 一种无粘结预应力钢绞线试拆再锚施工的方法
CN111101533A (zh) * 2020-01-14 2020-05-05 中国中材国际工程股份有限公司 熟料库的偏心环形基础及其施工方法
CN112339065A (zh) * 2020-10-14 2021-02-09 燕山大学 一种后张法压浆封端工序改进方法
CN114961313A (zh) * 2022-04-11 2022-08-30 中建国际建设有限公司 一种后张预应力楼板锚固端修补方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1066701A (zh) * 1992-07-01 1992-12-02 中国建筑科学研究院建筑结构研究所 无粘结部分预应力混凝土多跨框架梁
CN1978803A (zh) * 2005-12-06 2007-06-13 杨中源 超长马鞍形预应力环梁无缝施工方法
CN101016790A (zh) * 2007-02-06 2007-08-15 同济大学 大跨预应力梁采用有粘结与无粘结混合配筋设计方法
CN101109227A (zh) * 2007-09-05 2008-01-23 中国建筑第七工程局 单跨大悬臂双预应力劲性钢筋砼大梁施工方法
CN102094457A (zh) * 2011-01-04 2011-06-15 山西省第三建筑工程公司 空间无粘结预应力环梁及其施工工艺

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1066701A (zh) * 1992-07-01 1992-12-02 中国建筑科学研究院建筑结构研究所 无粘结部分预应力混凝土多跨框架梁
CN1978803A (zh) * 2005-12-06 2007-06-13 杨中源 超长马鞍形预应力环梁无缝施工方法
CN101016790A (zh) * 2007-02-06 2007-08-15 同济大学 大跨预应力梁采用有粘结与无粘结混合配筋设计方法
CN101109227A (zh) * 2007-09-05 2008-01-23 中国建筑第七工程局 单跨大悬臂双预应力劲性钢筋砼大梁施工方法
CN102094457A (zh) * 2011-01-04 2011-06-15 山西省第三建筑工程公司 空间无粘结预应力环梁及其施工工艺

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
牛俊平 等: "无粘结预应力环梁的张拉施工", 《山西建筑》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485545A (zh) * 2013-09-13 2014-01-01 中南林业科技大学 一种无粘结预应力钢绞线试拆再锚施工的方法
CN103485545B (zh) * 2013-09-13 2016-01-20 中南林业科技大学 一种无粘结预应力钢绞线试拆再锚施工的方法
CN111101533A (zh) * 2020-01-14 2020-05-05 中国中材国际工程股份有限公司 熟料库的偏心环形基础及其施工方法
CN112339065A (zh) * 2020-10-14 2021-02-09 燕山大学 一种后张法压浆封端工序改进方法
CN112339065B (zh) * 2020-10-14 2021-11-23 燕山大学 一种后张法压浆封端工序改进方法
CN114961313A (zh) * 2022-04-11 2022-08-30 中建国际建设有限公司 一种后张预应力楼板锚固端修补方法
CN114961313B (zh) * 2022-04-11 2024-06-11 中建国际建设有限公司 一种后张预应力楼板锚固端修补方法

Also Published As

Publication number Publication date
CN102619338B (zh) 2015-07-15

Similar Documents

Publication Publication Date Title
JP4040980B2 (ja) プレストレスト合成トラス桁及びその製造方法
CN104988844B (zh) 二次张拉预应力装配式波形钢腹板组合梁
CN105484151B (zh) 一种增强预制混凝土节段间连接的构造及其施工方法
KR100991869B1 (ko) 단경간 및 다경간 피에스씨 거더교 및 그 시공방법
KR101045929B1 (ko) 친환경 프리스트레스 장경간 경량 프리캐스트 콘크리트 패널 및 이의 시공방법
CN102619338B (zh) 超长环梁的预应力筋的施工方法
CN110700103B (zh) 一种连续性组合梁施工方法
CN108532445A (zh) 一种预制盖梁与预制墩柱的连接构造及其施工方法
CN106481023A (zh) 装配式钢混结合梁结构及其实施方法
CN109505222A (zh) 一种装配式网状吊杆系杆拱桥
CN113638304A (zh) 混凝土梁式桥隐盖梁结构体系及其施工方法
KR101152444B1 (ko) 프리텐션 방식의 프리스트레스 콘크리트 빔 및 그 제조방법
KR200407182Y1 (ko) 피씨플레이트
CN210947839U (zh) 一种体外预应力加固混凝土梁结构
JP2014227754A (ja) 橋桁および橋桁の施工方法
CN108316150B (zh) 斜拉桥主塔及钢锚梁的施工***和施工方法
CN106638334A (zh) 一种新型体外预应力加固装置及其施工方法
CN106948263B (zh) 一种斜拉桥混凝土索塔用锚拉板
CN212103636U (zh) 一种基于uhpc接缝的预制拼装空心桥墩
CN106121268B (zh) 预应力钢丝绳综合加固梁板柱的***及方法
KR20160086435A (ko) 프리스트레스트 도입과 절곡스터럽을 이용한 거더교 콘크리트 데크
EA038408B1 (ru) Способ усиления нижнего торца стальной балки
CN111350131A (zh) 一种三跨桥尾部喂梁架桥机的施工方法
KR20130120096A (ko) 교량용 프리 텐션 빔 거더
CN114045750B (zh) 高墩柱系梁的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191212

Address after: 314300 Yucheng town Yucheng North Bridge, Haiyan County, Jiaxing City, Zhejiang Province

Patentee after: Haiyan Shengxin Standard Parts Co., Ltd.

Address before: Changde City, Hunan province 415900 Dragon Town Hanshou County Hanshou County Office of energy (the original East Bank) East Building eighth green house

Patentee before: Qing Guangxu

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201130

Address after: 226600, Jiangsu County, Nantong province Haian corner town industrial concentration area

Patentee after: Nantong Jinchao Machine Tool Co.,Ltd.

Address before: 314300 Yucheng town Yucheng North Bridge, Haiyan County, Jiaxing City, Zhejiang Province

Patentee before: Haiyan Shengxin Standard Parts Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150715

Termination date: 20210309