WO2023103406A1 - Procédé de construction de mortier de plâtrage - Google Patents

Procédé de construction de mortier de plâtrage Download PDF

Info

Publication number
WO2023103406A1
WO2023103406A1 PCT/CN2022/108395 CN2022108395W WO2023103406A1 WO 2023103406 A1 WO2023103406 A1 WO 2023103406A1 CN 2022108395 W CN2022108395 W CN 2022108395W WO 2023103406 A1 WO2023103406 A1 WO 2023103406A1
Authority
WO
WIPO (PCT)
Prior art keywords
mortar
plastering
wall
layer
ash
Prior art date
Application number
PCT/CN2022/108395
Other languages
English (en)
Chinese (zh)
Inventor
吴涛涛
Original Assignee
上海隆振建筑工程股份有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 上海隆振建筑工程股份有限公司 filed Critical 上海隆振建筑工程股份有限公司
Publication of WO2023103406A1 publication Critical patent/WO2023103406A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/02Coverings or linings, e.g. for walls or ceilings of plastic materials hardening after applying, e.g. plaster

Definitions

  • the invention relates to the technical field of plastering mortar construction, in particular to a construction process of plastering mortar.
  • plastering mortar any mortar that is applied on the surface of buildings and components and the surface of the base material, and has the functions of protecting the base layer and meeting the requirements of use, can be collectively referred to as plastering mortar (also called plastering mortar).
  • Plastering mortar is mainly used for anti-crack protection layer outside the insulation layer in benzene thin plastering insulation system, also known as polymer plastering anti-cracking mortar.
  • plastering mortar when applying plastering mortar, it is mainly to apply the plastering mortar directly on the wall at one time after cleaning the wall. Controlled, it is easy to cause the final adhesion of the plastering mortar to be poor, and it is easy to fall off. At the same time, it is easy to cause hollowing and other connection of the plastering mortar during the drying process due to too thick one-time application, which greatly reduces the plastering quality of the plastering mortar. On the other hand During the plastering process, due to the inability to effectively level and seal the wall, the quality of the final surface mortar after construction is poor and prone to cracking.
  • the object of the present invention is to provide a construction technique for plastering mortar in order to solve the above problems.
  • a construction technique for plastering mortar which comprises the following steps:
  • Step 1 Base treatment: Remove dust, dirt, alkali film, mortar and other attachments on the wall, and sprinkle water to moisten it.
  • the prepared cement mortar can be evenly sprayed on the surface by chiseling and blowing.
  • On the wall use a grinding board to dry the rough surface.
  • a steel trowel to cross and draw oblique lines at certain distances on the surface. After the cement mortar is hardened, apply the bottom ash;
  • Step 2 Squaring and hanging straight: Before plastering the bottom layer, you must first perform operations such as square corners, leveling horizontal lines, hanging vertical lines, and popping up reference lines. For intermediate plastering, you can first check the wall with a mop board Flatness and verticality, and in the case of controlling the squareness of the sun angle and the crossing curve, roughly determine the thickness of the plaster and then hang the line. For advanced plastering, the room is firstly squared, and the cross line is popped up on the ground as a benchmark. Combined with the flatness and verticality of the wall surface, the position of the hanging line is roughly determined. After the wall is plastered, the supporting line is pier.
  • a standard pier When pierning, a standard pier should be made on each of the left and right corners, and then the vertical line of the hammer should be used to make the lower corner of the wall. Two standards, and then pass the line between the two standards on the left and right corners of the wall, and make several mortar piers at the upper and lower corners of the doors and windows at intervals of about 1.-1.3 meters;
  • Step 3 Wall punching reinforcement: After the mortar pier is hardened, apply the same mortar as the plastering layer, and make a 35-50mm wide mortar belt between the upper and lower mortar pier, and use the upper and lower mortar pier as a reference, and push it flat with pressing teeth After punching the rib tile city, the blocking and plastering operations can only be carried out after it is slightly dry;
  • Step 4 Make corner protection: According to the gap between the mortar pier and the edge of the door frame and the wall, after using a square ruler to measure, hang it straight at the outside corner twice, fix the ruler board, wipe the place with cement mortar, and use the outside corner Push out the small rounded corner with the trowel, and finally use the ruler to cut off the excess mortar at a position 50mm away from the male corner twice at an oblique angle of 45 degrees;
  • Step 5 Wipe the bottom layer and middle layer of dust: When the wall is wet, wipe the bottom layer of dust. For the surface of the concrete wall, brush one side of the cement slurry first, and then wipe the bottom layer of dust with the brush. After the bottom layer is slightly dry, use the same method If the middle layer of ash is too thick, apply it layer by layer, and test its verticality, flatness, and positive angle after application;
  • Step 6 Plastering the overlay: When the middle layer of ash reaches 7 dry, you can apply the overlay of paper-reinforced ash.
  • the thickness of the overlay of paper-reinforced ash shall not exceed 2.5mm.
  • it should be compacted in time, and depending on the degree of dryness and wetness of the mortar, use an ash spoon to dip the water and press it to make the surface layer more delicate and smooth.
  • the sub-tweets are smooth and smooth, and the gray overlay of the paper bars should be bonded firmly without spoon marks, air bubbles, paper particles and uneven joints, and the internal corners intersecting with the walls or beams should be in a straight line;
  • Step 7 Apply cement mortar surface layer: The next day after the middle layer mortar is applied, use 1:2.5 cement mortar to plaster the surface layer with a thickness of 5-8mm. When operating, first wet the wall surface, and then scrape it thinly with mortar. Make it stick to the middle layer of ash, and then apply the second layer to reach the required thickness. Use a pressure gauge to level it out and straighten it. After it is closed, use a gray spoon to compact and calender;
  • Step 8 Plastering maintenance: After plastering, water the plastered wall in time for maintenance to ensure the final plastering quality of the mortar and avoid cracking.
  • the cement mortar in the step 1 has a material-to-water ratio of 1:2.5, and the cement mortar needs to be mixed with an adhesive before use.
  • the material-to-water ratio of the base cement mortar, and adding the adhesive effectively improving the adhesion of the base mortar after plastering.
  • the material water of the cement-mixed mortar used when plastering the bottom ash in the step 5 is 1:1.6, and the plastering thickness is 4-6mm.
  • the plastering thickness is 4-6mm.
  • the mortar used for the middle layer ash in the step 5 is the same as the mortar used for the bottom layer ash, and the plastering thickness is 5-7mm.
  • the invention strictly controls the material-water ratio and plastering thickness of the plastering mortar before and after plastering, effectively ensuring the compactness and adhesion of the mortar after plastering, so that the mortar is not easy to fall off after plastering, and no hollowing phenomenon occurs.
  • the plastering quality of the mortar is greatly improved.
  • by effectively sealing and leveling the plastering wall before the plastering process problems such as cracking after the plastering are effectively avoided, ensuring the final construction quality and facilitating large-scale promotion application.
  • a construction technique for plastering mortar which comprises the following steps:
  • Step 1 Base treatment: Remove dust, dirt, alkali film, mortar and other attachments on the wall, and sprinkle water to moisten it.
  • the prepared cement mortar can be evenly sprayed on the surface by chiseling and blowing.
  • On the wall use a grinding board to dry the rough surface.
  • a steel trowel to cross and draw oblique lines at certain distances on the surface. After the cement mortar is hardened, apply the bottom ash;
  • Step 2 Squaring and hanging straight: Before plastering the bottom layer, you must first perform operations such as square corners, leveling horizontal lines, hanging vertical lines, and popping up reference lines. For intermediate plastering, you can first check the wall with a mop board Flatness and verticality, and in the case of controlling the squareness of the sun angle and the crossing curve, roughly determine the thickness of the plaster and then hang the line. For advanced plastering, the room is firstly squared, and the cross line is popped up on the ground as a benchmark. Combined with the flatness and verticality of the wall surface, the position of the hanging line is roughly determined. After the wall is plastered, the supporting line is pier.
  • a standard pier When pierning, a standard pier should be made on each of the left and right corners, and then the vertical line of the hammer should be used to make the lower corner of the wall. Two standards, and then pass the line between the two standards on the left and right corners of the wall, and make several mortar piers at the upper and lower corners of the doors and windows at intervals of about 1.-1.3 meters;
  • Step 3 Wall punching reinforcement: After the mortar pier is hardened, apply the same mortar as the plastering layer, and make a 35-50mm wide mortar belt between the upper and lower mortar pier, and use the upper and lower mortar pier as a reference, and push it flat with pressing teeth After punching the rib tile city, the blocking and plastering operations can only be carried out after it is slightly dry;
  • Step 4 Make corner protection: According to the gap between the mortar pier and the edge of the door frame and the wall, after using a square ruler to measure, hang it straight at the outside corner twice, fix the ruler board, wipe the place with cement mortar, and use the outside corner Push out the small rounded corner with the trowel, and finally use the ruler to cut off the excess mortar at a position 50mm away from the male corner twice at an oblique angle of 45 degrees;
  • Step 5 Wipe the bottom layer and middle layer of dust: When the wall is wet, wipe the bottom layer of dust. For the surface of the concrete wall, brush one side of the cement slurry first, and then wipe the bottom layer of dust with the brush. After the bottom layer is slightly dry, use the same method If the middle layer of ash is too thick, apply it layer by layer, and test its verticality, flatness, and positive angle after application;
  • Step 6 Plastering the overlay: When the middle layer of ash reaches 7 dry, you can apply the overlay of paper-reinforced ash.
  • the thickness of the overlay of paper-reinforced ash shall not exceed 2.5mm.
  • it should be compacted in time, and depending on the degree of dryness and wetness of the mortar, use an ash spoon to dip the water and press it to make the surface layer more delicate and smooth.
  • the sub-tweets are smooth and smooth, and the gray overlay of the paper bars should be bonded firmly without spoon marks, air bubbles, paper particles and uneven joints, and the internal corners intersecting with the walls or beams should be in a straight line;
  • Step 7 Apply cement mortar surface layer: The next day after the middle layer mortar is applied, use 1:2.5 cement mortar to plaster the surface layer with a thickness of 5-8mm. When operating, first wet the wall surface, and then scrape it thinly with mortar. Make it stick to the middle layer of ash, and then apply the second layer to reach the required thickness. Use a pressure gauge to level it out and straighten it. After it is closed, use a gray spoon to compact and calender;
  • Step 8 Plastering maintenance: After plastering, water the plastered wall in time for maintenance to ensure the final plastering quality of the mortar and avoid cracking.
  • the cement mortar in step 1 has a material-to-water ratio of 1:2.5, and the cement mortar needs to be doped with an adhesive before use.
  • the material-to-water ratio of the base cement mortar By strictly controlling the material-to-water ratio of the base cement mortar and increasing the Adhesive, which effectively improves the adhesion of the base mortar after plastering.
  • the material water of the cement mixed mortar used in step 5 when plastering the bottom ash is 1:1.6, and the thickness of the plastering is 4-6mm.
  • the mortar used for the middle layer ash in the step 5 is the same as the mortar used for the bottom layer ash, and the thickness of the plastering is 5-7mm.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Finishing Walls (AREA)

Abstract

La présente invention concerne un procédé de construction de mortier de plâtrage, comprenant les étapes suivantes : étape 1, traitement de substrat : qui consiste à éliminer les adhésions telles que la poussière, la saleté, les films alcalins et le mortier sur la surface de paroi, et aspersion d'eau pour mouillage. Les effets bénéfiques sont tels que : la régulation stricte du rapport matière-eau et l'épaisseur de plâtrage du mortier de plâtrage avant et après plâtrage, assure de manière efficace la compacité et l'adhérence du mortier après plâtrage, de telle sorte que le mortier n'est pas susceptible de tomber après avoir été enduit, et un phénomène de creusement ne se produirait pas, ce qui permet d'améliorer de manière considérable la qualité du plâtrage de mortier ; en outre, la mise en œuvre d'un traitement, telle qu'une étanchéité et une mise à niveau efficaces, sur une paroi devant être plâtrée avant un processus de plâtrage, permet d'éviter de manière efficace le problème de fissuration après plâtrage au mortier, ce qui assure la qualité de construction finale et facilite la popularisation et l'application à grande échelle.
PCT/CN2022/108395 2021-12-09 2022-07-27 Procédé de construction de mortier de plâtrage WO2023103406A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202111497319.6 2021-12-09
CN202111497319.6A CN114135068A (zh) 2021-12-09 2021-12-09 一种抹面砂浆的施工工艺

Publications (1)

Publication Number Publication Date
WO2023103406A1 true WO2023103406A1 (fr) 2023-06-15

Family

ID=80385076

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2022/108395 WO2023103406A1 (fr) 2021-12-09 2022-07-27 Procédé de construction de mortier de plâtrage

Country Status (2)

Country Link
CN (1) CN114135068A (fr)
WO (1) WO2023103406A1 (fr)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135068A (zh) * 2021-12-09 2022-03-04 上海隆振建筑工程股份有限公司 一种抹面砂浆的施工工艺
CN114293721A (zh) * 2021-12-28 2022-04-08 上海建为历保科技股份有限公司 一种适用于传统建筑屋面裹垄和墙面的高性能抹灰构造方法
CN114775961A (zh) * 2022-04-28 2022-07-22 重庆渝能建筑安装工程有限公司 一种抹灰施工方法及抹灰装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127752A (zh) * 2020-09-07 2020-12-25 青岛中筑置业有限公司 外齐式外窗安装防渗漏施工工艺
CN112267628A (zh) * 2020-10-16 2021-01-26 中国建筑第八工程局有限公司 建筑工程内墙装修免抹灰***施工方法
CN114135068A (zh) * 2021-12-09 2022-03-04 上海隆振建筑工程股份有限公司 一种抹面砂浆的施工工艺

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103046709B (zh) * 2013-01-14 2015-03-18 山西省第二建筑工程公司 一种内墙面的建筑施工方法
CN107299731A (zh) * 2016-04-15 2017-10-27 中建四局第五建筑工程有限公司 一种山砂水泥砂浆抹灰防空鼓及开裂施工方法
CN113006397A (zh) * 2021-02-22 2021-06-22 北京梵客家居科技有限公司 一种厨卫空间规方找平的施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127752A (zh) * 2020-09-07 2020-12-25 青岛中筑置业有限公司 外齐式外窗安装防渗漏施工工艺
CN112267628A (zh) * 2020-10-16 2021-01-26 中国建筑第八工程局有限公司 建筑工程内墙装修免抹灰***施工方法
CN114135068A (zh) * 2021-12-09 2022-03-04 上海隆振建筑工程股份有限公司 一种抹面砂浆的施工工艺

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
LI QILONG: "Discussion on Construction Technology of Wall Surface Plastering", HEILONGJIANG SCIENCE AND TECHNOLOGY INFORMATION., no. 33, 29 November 2009 (2009-11-29), pages 320, XP093072008 *
LI SHENGXIONG: "Discussion on the formulation of special plan for plastering construction", HEILONGJIANG SCIENCE AND TECHNOLOGY INFORMATION., no. 24, 25 August 2010 (2010-08-25), pages 305, XP093072009 *
WANG FENG: "New Ideas on Construction Technology of Wall Plastering in Construction Engineering", BUILDING TECHNOLOGY DEVELOPMENT., vol. 45, no. 3, 15 February 2018 (2018-02-15), pages 58 - 59, XP093072010 *

Also Published As

Publication number Publication date
CN114135068A (zh) 2022-03-04

Similar Documents

Publication Publication Date Title
WO2023103406A1 (fr) Procédé de construction de mortier de plâtrage
CN103343655B (zh) 墙体窗施工方法
CN104179263A (zh) 一种建筑外墙外保温***防排水施工方法
CN104612261A (zh) 严寒大风地区聚苯乙烯板薄抹面外墙保温施工方法
CN106049539A (zh) 一种建筑工程施工方法
CN107035085A (zh) 一种室内墙面机喷石膏砂浆抹灰一次成型的施工方法
AU2009242229A1 (en) Use of flexible sealing slurries for the aftertreatment of fresh concrete slabs
CN102400525A (zh) 蒸压加气砼砌块墙体薄层抹灰方法
CN106284998A (zh) 内墙抹灰满铺玻璃纤维网格布施工方法
CN113006397A (zh) 一种厨卫空间规方找平的施工方法
CN104499614A (zh) 墙体保温一体化点挂***及其安装方法
CN111608280A (zh) 一种外墙保温施工方法
CN103291024B (zh) 一种新型水泥基抹灰砂浆的施工方法
CN109025354B (zh) 一种墙体抗裂的施工方法
CN110409747B (zh) 地面防水施工方法
CN102182323A (zh) 低纬度高原蒸压加气砼砌块干法砌筑施工工艺
CN108083740A (zh) 砂浆和腻子二合一复合料及其制备方法
CN113323314A (zh) 一种冻融环境下烧结陶瓷砖外墙铺贴施工方法
CN110130643B (zh) 一种塑胶、亚麻地面施工工艺
CN109610764B (zh) 一种花岗岩立面铺贴施工工艺
CN112127752A (zh) 外齐式外窗安装防渗漏施工工艺
CN105297950A (zh) 填充墙与水平承重结构空隙墙面防裂缝控制施工方法
CN113880489B (zh) 一种轻质抹灰石膏界面剂及其应用
CN110805218A (zh) 一种剪力墙与砖墙交界处薄抹灰施工方法
CN107630627A (zh) 一种轻质隔墙上使用的窗附框及其施工工艺

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22902841

Country of ref document: EP

Kind code of ref document: A1