WO2022265373A1 - 건설 현장 작업 관리 방법 및 이를 실행하는 시스템 - Google Patents

건설 현장 작업 관리 방법 및 이를 실행하는 시스템 Download PDF

Info

Publication number
WO2022265373A1
WO2022265373A1 PCT/KR2022/008437 KR2022008437W WO2022265373A1 WO 2022265373 A1 WO2022265373 A1 WO 2022265373A1 KR 2022008437 W KR2022008437 W KR 2022008437W WO 2022265373 A1 WO2022265373 A1 WO 2022265373A1
Authority
WO
WIPO (PCT)
Prior art keywords
work
permit
construction site
management server
request message
Prior art date
Application number
PCT/KR2022/008437
Other languages
English (en)
French (fr)
Inventor
안재현
장현
조재연
김영환
김철민
정재웅
안예빈
이아미
허동영
홍초희
Original Assignee
에스케이에코플랜트(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 에스케이에코플랜트(주) filed Critical 에스케이에코플랜트(주)
Publication of WO2022265373A1 publication Critical patent/WO2022265373A1/ko

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry

Definitions

  • the present invention relates to a construction site work management method and a system for executing the same, and more particularly, to a construction site work management method and a system for executing the same, which enable effective safety checks on high-risk work.
  • the person in charge prepares a safety work permit application related to the work and requests permission of the work from the safety department.
  • the safety work permit application the request is made by specifying the details of the work, such as the risk level information of the facility and region, worker information, and other external technicians if there is such information, work contents, and work schedule.
  • the workplace management organization when the workplace management organization receives an application for a safety work permit, it conducts a qualification examination to evaluate the worker's skill level and whether he or she is authorized for a hazardous area. After the qualification test, the safety work instructions and preparation tools related to safety work to be equipped in the relevant hazardous area and hazardous facilities are prepared in a document and issued together with the safety work permit. A daily safety checklist is also attached.
  • the worker can proceed with the planned/approved work after receiving notification of the safety work permit from the safety department and receiving the safety work permit, safety manual, and daily safety checklist related to the safety work.
  • An object of the present invention is to provide a construction site work management method and a system for executing the same, which enable effective safety checks on high-risk work.
  • the present invention is a construction site work management method and a system for executing the same, which provide convenience at the construction site by enabling a reply to be received after delivering the content to the manager when an inconsistency is found in the process of working based on a work permit is intended to provide
  • an object of the present invention is to provide a construction site work management method and a system for executing the same by providing a checklist for each of high-risk work and general work so as to automatically generate a safety inspection log based on the checklist. do.
  • an object of the present invention is to provide a construction site work management method and a system for executing the same, which can improve the efficiency of management by providing visualization of the operational status of permits issued at the business site in the form of Dash-Board.
  • the present invention allows the worker to scan or directly input the identification code inserted into the work permit, or through facial recognition to match the worker who is committed to the work for each work permit with the permit, and to match the inspection record for the work permit with the worker.
  • the purpose of this study is to provide a construction site work management method that can be used to calculate the worker's safety work procedure implementation history and productivity for the work, and a system that executes it.
  • the present invention is a construction site work management method and work management method that enables workers to participate in risk assessment by linking risk assessment and work permit and enabling workers to enter risk factors and safety measures on the work permit through worker terminals It aims to provide a system that runs.
  • the present invention is a construction site work management method that enables BI (Business Intelligence) services to be provided by visualizing the status of issued work permits (i.e., issuance, inspection, work in progress, work cancellation, extended work, work suspension) and to provide a system for executing the same.
  • BI Business Intelligence
  • the present invention provides a construction site work management method in which a user directly selects a work permit target work, and a checklist for each target work is registered by the user to be utilized according to the characteristics of each business site, and a system for executing the same aims to do
  • the construction site work management system for achieving this purpose provides a work permit work procedure for items subject to a work permit, generates and provides a work permit when information is input through the work permit work procedure, and requests a review of the work permit.
  • a construction site work management server that generates a list of work permits using the work permit according to a response message to the message and terminates the work upon receipt of an inspection result for the work permit, and works through the work permit work procedure.
  • a work permit review request message for the work permit is provided, and upon receipt of the work permit review request message, the work permit extracted from the work permit review request message is reviewed and work is returned or work registration is processed, and an inspector terminal that creates a check list based on the work permit.
  • a construction site work management method for achieving this object includes providing, by a construction site work management server, a work permit work procedure for an item subject to a work permit to a manager terminal, the manager terminal receiving a work permit through the work permit work procedure.
  • a safety inspection log can be automatically generated based on the check list by providing a check list for each of high-risk work and normal work.
  • the identification code inserted in the work permit is scanned or directly input by the worker, or through facial recognition, the worker who is committed to the work for each work permit is matched with the permit, and the check record for the work permit is matched with the worker.
  • BI Business Intelligence
  • FIG. 1 is a network configuration diagram illustrating a construction site work management system according to an embodiment of the present invention.
  • FIG. 2 is a network configuration diagram illustrating a construction site work management system according to another embodiment of the present invention.
  • FIG. 3 is a network configuration diagram illustrating a construction site work management system according to another embodiment of the present invention.
  • FIG. 4 is a network configuration diagram illustrating a construction site work management system according to another embodiment of the present invention.
  • FIG. 5 is a block diagram illustrating the internal structure of a construction site work management server according to another embodiment of the present invention.
  • FIG. 6 is a flowchart illustrating an embodiment of a construction site work management method according to the present invention.
  • 7 to 26 are exemplary diagrams for explaining an execution screen of a manager terminal according to a construction site work management method according to the present invention.
  • FIG. 1 is a network configuration diagram illustrating a construction site work management system according to an embodiment of the present invention.
  • the construction site work management system includes a construction site work management server 100 , a worker terminal 200 and a manager terminal 300 .
  • the construction site work management server 100 includes an education completion information database 110, a license database 111, a career information database 112, a worker database 113, and a health examination database 114.
  • the construction site work management server 100 receives and stores worker profile information from the worker terminal 200 through communication with the worker terminal 200 .
  • worker profile information may include personal information, career, education history, health checkup history, and the like.
  • the construction site work management server 100 provides a training completion information registration process to the worker terminal 200 before the worker goes to work, and receives training completion information through the training completion information registration process.
  • the education completion information may include a name, a date of birth, a registration number, a date of completion, a photograph of the certificate of completion, and the like for each certificate of education completion.
  • the above training certificate is a certificate issued after completing training on construction site safety management, and may include a basic health certificate.
  • an authenticity determination code for determining authenticity may be inserted into the above education certificate and issued. That is, when printed by an educational completion issuing institution, pixel spaces of different sizes corresponding to authenticity/counterfeit codes are output together and issued.
  • the construction site work management server 100 can determine the authenticity of the education certificate by using the authenticity determination code received from the education certificate issuing institution server.
  • the construction site work management server 100 analyzes the pixels in the process of scanning to determine the authenticity of the training certificate, the pixel space corresponding to the authenticity determination code can be extracted because the values of the pixels are different. .
  • the construction site work management server 100 extracts a plurality of pixel spaces from the training certificate in the process of scanning and analyzing the training certificate, and then generates an authenticity discrimination code using binary values indicated by the dotted dots in the plurality of pixel spaces. can do.
  • the construction site work management server 100 extracts 1 pixel space of 4 dots and 6 pixel spaces of 8 dots, the pixel space of 4 dots is recognized as 1, and 8 By recognizing a pixel space made up of dots as 0, the authenticity determination code “1000000” can be generated.
  • the construction site work management server 100 extracts 2 pixel spaces of 6 dots and 3 pixel spaces of 8 dots, the pixel space of 6 dots is recognized as 1, and 8 A pixel space composed of points is recognized as 0 to generate the authenticity determination code “11000”.
  • the construction site work management server 100 may determine the authenticity of the training certificate by comparing the authenticity determination code and the previously received authenticity determination code.
  • the construction site work management server 100 calculates the effective time and training time for each training using the training completion information recorded on the training completion certificate after determining whether the training completion certificate is authentic, and then lists the training types for each worker. And the authentication time is stored in the education completion information database 110 .
  • the accumulated education time is updated by reflecting the education time to the previously accumulated accumulated education time.
  • the construction site work management server 100 After that, the construction site work management server 100 generates a worker education list and provides the worker education list to the worker terminal 200 .
  • the worker training list may include a manager, company, site, date, name, date of birth, whether or not a new person has completed training, an effective period, whether to go to work, a list of required training, whether or not required training has been completed.
  • the construction site work management server 100 receives the attendance authentication information from the worker terminal 200, and after the worker's training is conducted according to the worker training list received from the manager terminal 300, the training proof photo and training Receives a training completion confirmation request message including supporting information.
  • the attendance certification information may include the name of the worker and the name of the supervisor, and the training proof information is the training category, training target, work type name, training date, training location, training time, training manager (manager, etc.), training content etc. may be included.
  • the construction site work management server 100 certifies attendance by using the attendance authentication information in the training completion confirmation request message, extracts training evidence information, and then provides education for each worker stored in the training completion information database 110 using the training evidence information. Updates the type list and cumulative time.
  • the construction site work management server 100 calculates the effective time and training time for each training using the training evidence information, updates the training type list for each worker using the training type, and calculates the accumulated time using the certification time. It is updated and stored in the education completion information database 110 for each worker.
  • the construction site work management server 100 provides a qualification acquisition information registration procedure to the worker terminal 200, receives qualification acquisition information through the qualification acquisition information registration procedure, and transfers the qualification acquisition information for each worker to the qualification database 111. save to
  • the certificate acquisition information includes essential and optional information for each certificate, and the essential information includes title, name, nationality, resident registration number, address, nationality, date of issuance, aptitude test, expiration date, license in possession, and photo evidence
  • the selection information may include an insurance policy, a business registration certificate, an equipment registration certificate (eg, a result of a non-destructive test of a crane, a pump car, etc.), a photograph of evidence, and the like.
  • the above qualification is a qualification issued after certification of technology usable at a construction site through a test, and may include a mechanical pilot and the like.
  • an authenticity determination code for determining authenticity may be inserted and issued. That is, when a certificate is issued by an institution, pixel spaces of different sizes corresponding to authenticity/counterfeiting codes are output together and issued.
  • the construction site work management server 100 can determine the authenticity of the certificate by using the authenticity determination code received from the certificate test host organization server.
  • the pixel space of different sizes inserted in the above certificate is set to a color similar to that of the background of the certificate of education (i.e., the color corresponding to the value where the RGB value of the background is above or below a certain value), the user's eyes Although it is not visible, when the construction site work management server 100 analyzes pixels to determine authenticity of an evidence photo such as a license, the pixel space corresponding to the authenticity determination code can be extracted because the pixel values are different.
  • the construction site work management server 100 extracts a plurality of pixel spaces from the proof photos, such as license certificates, in the process of scanning and analyzing proof photos, such as certificates, and then uses binary values indicated by dotted dots in the plurality of pixel spaces. Thus, an authenticity determination code can be generated.
  • the construction site work management server 100 extracts 1 pixel space of 4 dots and 6 pixel spaces of 8 dots, the pixel space of 4 dots is recognized as 1, and 8 By recognizing a pixel space made up of dots as 0, the authenticity determination code “1000000” can be generated.
  • the construction site work management server 100 extracts 2 pixel spaces of 6 dots and 3 pixel spaces of 8 dots, the pixel space of 6 dots is recognized as 1, and 8 A pixel space composed of points is recognized as 0 to generate the authenticity determination code “11000”.
  • the construction site work management server 100 may determine the authenticity of the certificate by comparing the authenticity determination code and the previously received authenticity determination code. As described above, the construction site work management server 100 stores certification acquisition information for each worker in the certification database 111 after determining whether the certification is authentic.
  • the construction site work management server 100 uses the certification acquisition information for each worker stored in the certification database 111 to determine if the period remaining until the expiration date of the certification validity period or the validity period of each equipment registration certificate is less than a specific period, the manager terminal 300 ) can provide a notification message for the expiration of the validity period of the license.
  • the construction site work management server 100 receives a past career registration request message including career information from the worker terminal 200
  • the career information is extracted from the past career registration request message and then the career information for each worker is stored in the career information database. Save to (112).
  • the career information may include the number of days worked, type of work, ordering party (eg, company), type of project (eg, civil engineering, construction, plant, etc.), manager, detailed type of work, and the like.
  • the construction site work management server 100 extracts workers from the career information database 112 according to the experienced worker search request message, and guides experienced workers including career information. provide a message. In this way, the construction site work management server 100 provides career information together so that the operator can refer to the project arrangement of workers based on the career information.
  • the construction site work management server 100 checks the career and updates the career information for each worker stored in the career information database 112 .
  • the construction site work management server 100 generates a list of workers by using the worker information for each worker stored in the worker database 113 and the health checkup target stored in the health checkup database 114, and then the hospital server ( Not shown) provides a health checkup reservation message for reserving a health checkup for workers on the worker list.
  • the list of workers may include a checkup type for each worker, a next checkup date, a scheduled checkup institution, a desired checkup reservation date, and the like.
  • the construction site work management server 100 recognizes the examination result document issued by the hospital server (not shown), generates a examination result from the examination result document, and then stores the examination result for each worker in the worker database 113. Save.
  • the construction site safety management server 100 when the construction site safety management server 100 receives a checkup result document issued by the hospital server from the manager terminal 300, it recognizes the checkup result document using OCR technology and then corresponds to a predetermined item The contents are extracted and stored in the worker database (113).
  • FIG. 2 is a network configuration diagram illustrating a construction site work management system according to another embodiment of the present invention.
  • the construction site work management system includes a construction site work management server 100 , a manager terminal 300 and a Korea Meteorological Administration server 400 .
  • the construction site safety management server 100 includes an accident risk assessment database 120, a risk assessment standard model 121, a risk assessment database 122, a site risk characteristic prediction model 123, and an accident case database 124. .
  • the construction site work management server 100 generates risk evaluation results for each work type based on the accident risk evaluation database 120 and the risk evaluation standard model 121 .
  • the accident risk evaluation database 120 stores accident frequency ratios for each work type, accident occurrence intensity ratios for each work type, and details for each disaster.
  • the details of each disaster may include the process, artifact, accident type, unit work, number of victims (death/injury), site location, construction type, construction amount, and completion rate.
  • Risk factors for each type of work and safety measures for each risk factor are stored in the risk evaluation standard model 121 .
  • the keywords correspond to the keywords in the accident risk assessment database 120. Extract the accident frequency rate by work type, accident intensity rate by work type, and details by disaster.
  • the above keywords may be determined by process, accident person, accident type, unit work content, and the like.
  • the construction site work management server 100 calculates the risk evaluation result for each work type using the accident occurrence frequency ratio for each work type and the accident occurrence intensity ratio for each work type.
  • the construction site worker management server 100 may calculate the risk evaluation result for each work type through the AI engine or through [Equation 1] to [Equation 6] below.
  • the process of calculating the risk evaluation result for each type of work will be described through [Equation 1] to [Equation 6].
  • the construction site work management server 100 evaluates the risk for each work type by using the accident frequency ratio for each work type and the accident occurrence intensity ratio for each work type extracted from the risk evaluation database 122 based on [Equation 1]. grades can be calculated.
  • the risk evaluation database 122 stores the accident frequency ratio and accident intensity ratio for each work type, and may be automatically updated as the application is used.
  • Part_Danger_level Risk evaluation level by work type
  • the accident frequency rate (Danger_fre_rate) by work type is calculated by [Equation 2] below
  • the accident intensity rate (Danger_str_rate) by work type is calculated by [Equation 3] below
  • the weight (Danger_W) determined by the time of accident for each construction type is assigned a higher weight as the time of accident is closer to the present time for cases where the time of accident does not exceed 3 years from the present time.
  • a pre-determined weight (e.g., “1”) is assigned to cases in which the current time exceeds 3 years.
  • part_victim accident index by work type
  • the accident index (part_victim) and the total disaster index (total_victi) for each type of work may be determined by the details (ie, the number of victims) for each disaster extracted from the risk evaluation database 122.
  • part_dead_people_rate Calculated by [Equation 4] as the death rate for each type of work
  • part_injured_people_rate Calculated by [Equation 5] as the ratio of injured people by work type
  • part_dead_people_rate (part_dead_people / total_dead_people) ⁇ 100
  • part_dead_people_rate Rate of death by type of work
  • part_dead_people Number of deaths by type of work
  • total_dead_people total number of dead people
  • the number of deaths by type of work (part_dead_people) and the total number of deaths (total_dead_people) may be determined by the details of each disaster extracted from the risk assessment database 122 (ie, deaths among the number of victims).
  • part_dead_people_rate Percentage of injured people by work type
  • part_dead_people Number of injured people by type of work
  • total_dead_people total number of dead people
  • the number of injured people by work type (part_dead_people) and the total number of injured people (total_dead_people) may be determined by the details of each disaster extracted from the risk assessment database 122 (ie, the number of injured people among the number of injured people).
  • the risk evaluation grade for each type of work calculated through [Equation 1] to [Equation 5] may be as shown in [Table 1] below.
  • the construction site work management server 100 when the risk evaluation grade for each work type is determined based on the accident risk evaluation database 120, the risk factor corresponding to the risk evaluation grade for each work type in the risk evaluation standard model 121 and safety measures for each risk factor are extracted.
  • the construction site work management server 100 generates risk evaluation result data using risk evaluation grades, risk factors, and safety measures for each risk factor, and then stores the risk evaluation result data in a risk evaluation database.
  • the construction site work management server 100 predicts risk by reflecting the risk evaluation result data, site information, and risk evaluation index for each construction cycle based on the site risk characteristic prediction model. generate data
  • the site information above may include site address, construction type, construction scale (amount), construction period, master schedule/construction permit information for each construction cycle: site location, actual start date, main use code name, etc.
  • the site risk characteristics prediction model 123 is the site location, construction type, construction scale, weather, process progress, delay, patrol data by work type, patrol data by accident type, and all workers The safety score ratio for each site worker and work team is stored.
  • ConstructionPeriod_Danger_value PastPart_Danger_value + weight
  • ConstructionPeriod_Danger_value Risk evaluation index for each construction period
  • PastPart_Danger_value Risk evaluation index for each type of work in the past
  • the field risk characteristic weight may be changed according to fixed factors, variable factors, and field inappropriate matters.
  • Fixed factors include site location, type of construction, and scale of construction, and variable factors include weather information received from the Korea Meteorological Administration server 400 and progress and delay against a predetermined schedule.
  • Site nonconformities refer to site nonconformities pointed out by the site manager.
  • field nonconformities may include failure to fasten safety rings.
  • the risk evaluation index for each construction cycle is changed by changing the site risk characteristic weight according to the fixed factor, the variable factor, and the field unsuitability.
  • FIG. 3 is a network configuration diagram illustrating a construction site work management system according to another embodiment of the present invention.
  • the construction site work management system includes a construction site work management server 100 and an inspector terminal 500, and the inspector terminal 500 includes a manager terminal 300 and a supervisor terminal 600. .
  • the inspector terminal 500 includes a manager terminal 300 and a supervisor terminal 600.
  • a drone (not shown) may be further included.
  • the drone photographs a construction site surveillance target according to a control signal received from the construction site work management server 100, generates scan information and images for the monitoring target, and provides the scanned information and images to the construction site work management server 100.
  • the drone scans a "safety handrail" to be monitored for a construction phenomenon, and then provides scan information and an image to be monitored to the construction site work management server 100 .
  • the drone irradiates light to the monitoring target at the construction site to photograph the monitoring target, and then scan information and An image to be monitored is generated and provided to the construction site work management server 100 .
  • the monitoring target may include a worker's helmet, construction materials, and the like.
  • a monitoring target is made of metal
  • dot dots having different depths and widths reflect the applied light.
  • the drone provides scan information including reflected light information on the monitoring target and monitoring target image to the construction site work management server 100 by using information of light reflected from the monitoring target.
  • the drone scans the monitoring target to generate a monitoring target image, and then provides the monitoring target image to the construction site work management server 100.
  • a plurality of halftone dots corresponding to the monitoring code may be inserted into the monitoring target image in a color similar to the pattern of the monitoring target. That is, a plurality of halftone dots corresponding to the monitoring code may be inserted into the monitoring target image with pixel values higher than or lower than a specific value than the pixel value of the pattern of the monitoring target.
  • the construction site work management server 100 may extract a plurality of halftone dots by analyzing pixels of the image to be monitored, and then generate a monitoring code using binary values corresponding to the plurality of halftone dots.
  • the construction site work management server 100 includes a work permit database 130 and a site subscriber database 131 .
  • the construction site work management server 100 provides a work permit work procedure to the manager terminal 300 based on worker data.
  • the work permit database 130 includes a checklist for each work permit, and the field subscriber database 131 stores the name and affiliation of each foreman and the name and affiliation of each worker.
  • the construction site work management server 100 generates a work permit list using the work permit when the work permit is generated based on the work permit work procedure by the manager terminal manager terminal 300 .
  • the work permit generated by the manager may include the permit number, date, company name, work details for each type of work, work place, input number of people, work hours, work conductor, input device, workers, and the like.
  • the construction site work management server 100 provides work details, work places, input personnel, work hours, work conductors, input devices, workers, and work permit targets (ie, dangerous work permits, general work permits) for each work type of the work permit. , permit type (i.e., special, hazardous, general), manager, inspector, etc., to create a list of permits to work.
  • This list of work permits is a table in which lists are created for each type of work permit so that work permits can be intuitively checked.
  • the construction site work management server 100 creates a work permit generation list and stores it in the work permit database 130 . After that, the manager assigns tasks to be checked by himself.
  • the construction site work management server 100 receives the work permit checklist generated according to the work permit assignment details, it stores the work permit checklist in the work permit database 130 .
  • the work permit database 130 includes work permit inspection results, inspectors, inspection time, photos, details, and the like.
  • the construction site work management server 100 moves to the work place based on the work stop request message when the work stop is selected through the non-conformity registration procedure after the non-conformity is found and the work stop request message is received.
  • a control command for photographing an inspection target corresponding to the details of may be provided to the drone.
  • the construction site work management server 100 is located on the 4th basement floor of Building 105.
  • a control command to move to the collecting well and photograph the upper safety ring may be provided to the drone.
  • the construction site work management server 100 receives at least one of scan information (for example, information on reflected light of building materials) and a monitoring target image for the monitoring target from the drone, and then scan information and the monitoring target image. At least one of them is used to generate a monitoring code.
  • scan information for example, information on reflected light of building materials
  • monitoring target image for the monitoring target from the drone
  • the construction site work management server 100 extracts a plurality of dots having different sizes by analyzing the monitoring target image when receiving the monitoring target image. Then, the construction site work management server 100 generates a monitoring code using binary values corresponding to a plurality of halftone dots.
  • the construction site work management server 100 refers to the binary value table, extracts binary values according to the number of dotted dots, and generates a monitoring code through a combination of binary values.
  • the construction site work management server 100 when the construction site work management server 100 receives both the scan information and the image to be monitored, since the scan information is information on the reflected light to be monitored, the corresponding dot indicates the amount of reflected light. Binary values can be determined, and a monitoring code can be finally generated through a combination of these binary values.
  • the construction site work management server 100 refers to the binary value table to obtain a binary value according to the number indicated by the shade value corresponding to the light information. decide
  • the construction site work management server 100 may determine whether a binary value indicated by a shade value corresponding to light information is 0 or 1 by referring to the binary value table. Then, the building monitoring device 200 determines a monitoring code by sequentially combining binary values.
  • a binary value corresponding to a shade value of 24 is stored as 1, and a binary value corresponding to a shade value of 35 is stored as 0, and the construction site work management server 100 stores light information
  • the shade value corresponding to is 24, the binary value is determined as 1, and when the shade value corresponding to light information is 35, the binary value is determined as 0 to generate the monitoring code “1000000”.
  • the construction site work management server 100 determines whether the monitoring target corresponding to the monitoring code is the same as the target for which the work stop is requested, and if the result is the same, the monitoring target image is analyzed to determine the reason for the work stop request. After verification, the verification result is provided to the manager terminal 300 . Therefore, the manager terminal 300 can determine whether or not to stop the work according to the verification result by the construction site work management server 100 .
  • the construction site work management server 100 uses the worker's ID to link with the worker database 113 to record safety records in each worker's profile. update the history
  • the construction site work management server 100 provides a work termination request message to the manager terminal 300 when the work permit check is completed, and after work termination is registered, the work permit termination details are stored in the work permit database 130. Save.
  • the manager terminal 300 selects a work stop or correction request through a nonconformity registration procedure when a nonconformity is found during inspection of a specific work on the work permit list received from the construction site work management server 100 .
  • the manager terminal 300 If, after a nonconformity is found, the manager terminal 300 provides a work stop request message to different manager terminals if work stop is selected after a nonconformity is found, and if a correction request is selected after a nonconformity is found, a correction request message is sent to different administrators. provided to the terminal.
  • the manager terminal 300 stores the nonconformities for each person in the developing subscriber database 131 connected to the work permit database 130 when nonconformities are found.
  • the manager terminal 300 After receiving the work permit work procedure from the construction site work management server 100, the manager terminal 300 generates a work permit through the work permit work procedure. At this time, the manager terminal 300 inputs the permit number, date, company name, work details for each type of work, work place, input number of people, work time, work conductor, input device, and workers through the work permit work procedure to generate a work permit.
  • the inspector terminal 500 performs an inspection based on the work permit list received from the construction site work management server 100 .
  • the inspector terminal 500 inputs a detailed check list, photos, and inspection results through an inspection result input procedure for each inspection target item for each work type based on the work permit. After that, the inspector terminal 500 may provide any one of an inspection completion message, a work stop notification message, and a work partial supplement request message to different manager terminals according to the inspection result.
  • the inspector terminal 500 may provide an inspection completion message to the corresponding work type manager terminal and worker terminals when the inspection result is "good".
  • the inspector terminal 500 may provide a work stop notification message to the corresponding process manager terminal and worker terminals when the inspection result is “defective”.
  • the inspector terminal 500 may provide a supplementary request message for part of the work to the corresponding process manager terminal and worker terminals when the inspection result is "other supplementation".
  • FIG. 4 is a network configuration diagram illustrating a construction site work management system according to another embodiment of the present invention.
  • the construction site work management system includes a construction site work management server 100 and an inspector terminal 500, and the inspector terminal 500 includes a manager terminal 300 and a supervisor terminal 600. .
  • the construction site work management server 100 provides an unsafe behavior input procedure for each worker stored in the worker database 113 to the inspector terminal 500 .
  • the unsafe behavior input procedure for each worker is a procedure for inputting the unsafe behavior of the worker when a behavior corresponding to a predetermined unsafe behavior is found among the behaviors of the worker working at the construction site.
  • the predetermined unsafe behavior refers to an behavior capable of increasing the probability of occurrence of a disaster type based on the disaster type.
  • the unsafe behavior input procedure can input the manager, work team, worker, accident type, details, photos, etc. hitting an object, bumping into, unbalanced and unreasonable motion, lack of oxygen, cutting/cutting/cutting, fire/explosion), a list of unsafe behaviors corresponding to the type of accident is provided, At least one non-safety action can be selected.
  • the construction site work management server 100 displays “1) not wearing a safety belt or not fastening a safety ring when working at a height of 2 m or more, 2 ) Arbitrary disassembly of safety facilities in the fall hazard area”, etc., so that workers can select at least one unsafe behavior corresponding to the unsafe behavior.
  • the construction site work management server 100 provides "1) unauthorized access within the working radius of the equipment” as a list of unsafe behaviors corresponding to "getting in” when "getting in” is selected among the types of disasters, so that workers' At least one unsafe behavior corresponding to the unsafe behavior may be selected.
  • the construction site work management server 100 provides “1) trespassing to confined spaces” as a list of unsafe actions corresponding to “oxygen deficiency” when “oxygen deficiency” is selected among the types of disasters, thereby preventing workers from entering the confined space without permission. At least one unsafe behavior corresponding to the unsafe behavior may be selected.
  • the construction site work management server 100 receives corrective action information (eg, manager, work team) from the manager terminal 300 among the inspector terminals 500 , disaster type, before and after action photos) are received and stored in the action item database 140 .
  • corrective action information eg, manager, work team
  • the construction site safety management server 100 provides a procedure for deregistering nonconformities when it is determined that the content pointed out as nonconformity is unreasonable.
  • manager terminal 300 among the inspector terminals 500 receives details, photos, and safety accident-related contents from the construction site worker management server 100 through the safety reporting report procedure, it determines whether to adopt the safety reporting report and constructs It is provided to the site safety management server 100.
  • the contents of the safety report are stored in the corresponding worker database 113, and the contents of the safety report (that is, site, adoption or not, accident type, detailed contents, photos, etc.) are stored in the safety newspaper database 411.
  • the manager terminal 300 of the inspector terminal 500 receives the unsafe behavior input procedure for each worker from the construction site work management server 100, the manager, work team, worker, accident type, and details are entered through the unsafe behavior input procedure for each worker. Receive content, photos, etc.
  • the manager terminal 300 among the inspector terminals 500 generates a corrective action document based on the information received through the unsafe behavior input procedure for each worker, and then provides the corrective action document to the manager terminal 300 .
  • the manager terminal 300 among the inspector terminals 500 generates a corrective action document for preventing the occurrence of the corresponding accident type based on the accident type received through the unsafe behavior input procedure for each worker, and then writes the corrective action document. It is provided to the manager terminal 300 .
  • the manager terminal 300 among the inspector terminals 500 creates corrective action information (eg, manager, work team, type of disaster, before and after action photos) and constructs It is provided to the field work management server 100.
  • corrective action information eg, manager, work team, type of disaster, before and after action photos
  • the inspector terminal 500 and the manager terminal 300 generate safety inspection diaries using the unsafe behavior and input information collected through the unsafe behavior input procedure.
  • the inspector terminal 500 and the manager terminal 300 reflect the unsafe behavior input by the manager among the inspectors in the safety inspection log of the corresponding worker, and reflect the corrective actions input by the supervisor among the inspectors in the safety inspection log. do.
  • manager terminal 300 among the inspector terminals 500 receives details, photos, and safety accident-related information from the construction site work management server 100 through the safety reporting report procedure, it determines whether to adopt the safety reporting report and constructs It is provided to the site safety management server 100.
  • the contents of the safety report are stored in the corresponding worker database 113, and the contents of the safety report (that is, site, adoption or not, accident type, detailed contents, photos, etc.) are stored in the safety newspaper database 411.
  • the manager terminal 300 among the inspector terminals 500 generates a corrective action document for preventing the occurrence of the corresponding disaster type based on the matched disaster type through a disaster type matching process, and then writes the corrective action document to the manager terminal ( 300) is provided.
  • the manager terminal 300 among the inspector terminals 500 creates corrective action information (eg, manager, work team, type of disaster, before and after action photos) and constructs It is provided to the field work management server 100.
  • corrective action information eg, manager, work team, type of disaster, before and after action photos
  • the construction site worker management server 100 stores the unsafe behavior in the database of the worker providing the cause or the corresponding company entered together when the relevant negligence information is input.
  • FIG. 5 is a block diagram illustrating the internal structure of a construction site work management server according to another embodiment of the present invention.
  • the construction site work management server 100 includes a work permit management unit 111, a work permit list management unit 112, a non-conformity determination unit 113, a work permit work completion management unit 114, and a work permit database. (130) and field subscriber database (131).
  • the work permit manager 111 provides a work permit work procedure to the manager terminal 300 based on the work permit database 130 and the on-site subscriber database 131 .
  • the work permit database 130 includes a checklist for each work permit
  • the field subscriber database 131 stores the names and affiliations of each manager and the names and affiliations of each worker.
  • the work permit list management unit 112 creates a work permit list using the work permit.
  • the work permit generated by the manager may include the permit number, date, company name, work details for each type of work, work place, input number of people, work hours, work conductor, input device, workers, and the like.
  • the work permit list management unit 112 includes work contents, work places, input personnel, work hours, work supervisors, input devices, workers, work permit targets (ie, dangerous work permits, general work permits), Create a list of permits to work using the type of permit (i.e., hazardous, general), supervisor, person in charge, etc.
  • This list of work permits is a table in which lists are created for each type of work permit so that work permits can be intuitively checked.
  • the work permit list management unit 112 is approved by the manager, the work permit approval list is generated and stored in the work permit database 130, and then the work permit assignment details are checked by the inspector terminal 500 provided to
  • the work permit list management unit 112 receives the work permit checklist generated according to the work permit assignment details, it stores the work permit checklist in the work permit database 130 .
  • the work permit database 130 includes work permit inspection results, inspectors, inspection time, photos, details, and the like.
  • the non-conformance determination unit 113 when the non-conformance determination unit 113 receives a work stop request message after the non-conformity is found and the work stop is selected through the non-conformity registration procedure, it moves to the work place based on the work stop request message to determine the non-conformity.
  • a control command for photographing an inspection target corresponding to detailed contents may be provided to the drone.
  • the non-conformity judgment unit 113 determines the 105 building 105 basement 4 floor house You can give the drone a control command to move to the crystal and film the upper safety ring.
  • the non-conformity determination unit 113 receives at least one of the scan information and the image to be monitored. At least one of them is used to generate the monitoring code.
  • the non-conformity determination unit 113 when the non-conformity determination unit 113 receives the monitoring target image, it analyzes the monitoring target image and extracts a plurality of dots having different sizes from each other. Then, the incongruity determination unit 113 generates a monitoring code using binary values corresponding to the plurality of halftone dots.
  • the non-conformance determination unit 113 refers to the binary value table, extracts binary values according to the number of dotted dots, and generates a monitoring code through a combination of binary values.
  • the non-conformity determination unit 113 when the non-conformity determination unit 113 receives both the scan information and the image to be monitored, since the scan information is information on the reflected light to be monitored, the binary number indicated by the corresponding dot according to the amount of reflected light. A value can be determined, and a monitoring code can be finally generated through a combination of these binary values.
  • the non-conformance determination unit 113 refers to the binary value table to determine the binary value according to the number indicated by the shade value corresponding to the light information. Decide.
  • the nonconformity determination unit 113 may determine whether a binary value indicated by a shade value corresponding to light information is 0 or 1 by referring to the binary value table. Then, the building monitoring device 200 determines a monitoring code by sequentially combining binary values.
  • the non-conformance determination unit 113 determines whether the monitoring target corresponding to the monitoring code is the same as the target for which work stop is requested, and if the result is the same, the monitoring target image is analyzed to verify the reason for the work stop request. After that, the verification result is provided to the manager terminal 300 . Therefore, the manager terminal 300 can determine whether or not to stop the work according to the verification result by the construction site work management server 100 .
  • the nonconformity determination unit 113 uses the worker's ID to link with the worker database 113 to record safety history history in each worker's profile. update
  • the work permit work termination management unit 114 When the work permit check is completed, the work permit work termination management unit 114 provides a work termination request message to the manager terminal 300, and after work termination is registered, the work permit termination information is stored in the work permit database 130.
  • FIG. 6 is a flowchart illustrating an embodiment of a construction site work management method according to the present invention.
  • the construction site work management server 100 provides a work permit work procedure for a work permit target item to the manager terminal 300 (step S610).
  • the manager terminal 300 generates a work permit through the work permit operation procedure (step S615), and then provides a work permit review request message for the work permit to the manager terminal 300 (step S620).
  • the manager terminal 300 transmits the permit number, date, company name, work details by work type, work place, input number of people, work time, work conductor, input device, and workers through the work permit work procedure. You can create a permit to work by entering
  • the manager terminal 300 After reviewing the work permit extracted from the work permit review request message, the manager terminal 300 processes work rejection or job registration (step S625), and sends a response message to the work permit review request message to the manager terminal 300 and construction It is provided to the field work management server 100 (step S630).
  • the manager terminal 300 selects a work stop or correction request through a non-conformance registration procedure when a non-conformity is found during the inspection of a specific work on the work permit list, and if the work stop is selected A work stop request message is provided to different manager terminals, and when the correction request is selected, the correction request message is provided to different manager terminals.
  • the construction site work management server 100 generates a work permit list using the work permit according to a response message to the work permit review request message (step S635).
  • the construction site work management server 100 provides inspection target items to the inspector terminal 500 on the day of work based on the work permit assignment details (step S640).
  • the inspector terminal 500 creates a checklist based on the work permit corresponding to the inspection target item (step S645) and provides it to the construction site work management server 100 (step S650).
  • step S645 the inspector terminal 500 inputs a detailed checklist, photos, and inspection results through an inspection result input procedure for each inspection target item for each work type based on the work permit, and then inputs the inspection result.
  • any one of a check completion message, a work stop notification message, and a work part supplementation request message is provided to different manager terminals.
  • the construction site work management server 100 terminates the work upon receiving the check result for the work permit (step S655).
  • the construction site work management server 100 determines whether the worker assigned to the work and the worker specified in advance match.
  • the construction site work management server 100 when the construction site work management server 100 receives the identification code of the work permit from the worker terminal 200 scanning the QR code of the work permit, the worker and the worker terminal on the work permit corresponding to the identification code ( 200) determines whether the workers put into work and the workers specified in advance match according to whether or not the workers corresponding to 200) match.
  • the construction site work management server 100 receives an opinion from the worker terminal 200 about the risk assessment information linked to the work permit matched by the worker, the work permit status is visualized to BI (Business Intelligence) service manager It is provided on the terminal and integrated master web page.
  • BI Business Intelligence
  • 7 to 26 are exemplary diagrams for explaining an execution screen of a manager terminal according to a construction site work management method according to the present invention.
  • the construction site work management server 100 selects one of the work permission target items from the list to view the progress of the work permission target items at a glance as shown in FIG.
  • a work permit work procedure for a work permission target item for one item is provided to the manager terminal 300 .
  • the work permit work procedure provided to the manager terminal 300 is as shown in FIG. 8 .
  • the manager terminal 300 inputs the permit number, date, company name, work details for each type of work, work place, input number of people, work hours, work conductor, input device, workers, etc. through the work permit work procedure as shown in FIG. can create After generating the work permit of FIG. 8 , the manager terminal 300 provides a work permit review request message to the manager terminal 300 when requesting a work for the work permit as shown in FIG. 9 .
  • the manager terminal 300 reviews the work permit extracted from the work permit review request message, and then returns the work or registers the job.
  • the construction site work management server 100 If, in FIG. 10 , the manager terminal 300 is processed as a work registration for a work permit, the construction site work management server 100 generates a work permit list as shown in FIG. 11 .
  • the construction site work management server 100 for each work type of the work permit, work content, work place, input number of people, work time, work conductor, input device, worker, work permit subject (ie, dangerous work permit, Create a list of work permits using the permit type (ie, risk, general), manager inspection person, etc.
  • This list of work permits is a table in which lists are created for each type of work permit so that work permits can be intuitively checked.
  • the construction site work management server 100 when the work permit list is approved by the approver as shown in FIG. 12, the construction site work management server 100 generates a work permit approval list, stores it in the work permit database 130, and then records work permit assignment details. It is provided to the inspector terminal 500.
  • the construction site work management server 100 receives the work permit checklist generated according to the work permit assignment details, it stores the work permit checklist in the work permit database 130 .
  • the work permit database 130 includes work permit inspection results, inspectors, inspection time, photos, details, and the like.
  • the construction site work management server 100 provides inspection target items to the inspector terminal 500 as shown in FIG. 13 on the day of work, and the inspector terminal 500 responds to the registration request for the work permit inspection result as shown in FIG. 14.
  • the work permit inspection may be completed by inputting the work permit inspection result, inspector, inspection time, photo, and details. If the construction site work management server 100 completes the work permit check, it provides a work termination request message to the manager terminal 300 so that work termination is registered.
  • the manager terminal 300 when the manager terminal 300 receives the work permit review request message, after checking the work permit extracted from the work permit review request message, if the work rejection is processed as registration according to the inspection result, construction
  • the on-site work management server 100 provides the manager terminal 300 with a message requesting security details of the work permit as shown in FIG. 16 . Accordingly, the manager terminal 300 may receive a message requesting security details of the work permit as shown in FIG. 17 .
  • a re-approval request message for the work permit is generated and provided to the manager terminal 300 as shown in FIG. 18 .
  • the manager terminal 300 may receive the re-approval request message as shown in FIG. 19, check the work permit in the re-approval request message, and then process final approval for the work permit.
  • the manager terminal 300 selects a work suspension or correction request through a non-conformance registration procedure as shown in FIG.
  • a work stop request message is provided to different manager terminals, and when the correction request is selected, the corrective request message is provided to different manager terminals.
  • the manager terminal 300 may update the safety history history by interlocking with individual profiles when the names of the foremen and workers whose work is stopped are input.
  • the manager terminal 300 may receive an inspection record and provide it to the manager terminal 300 after receiving the inspection record when a nonconformity for other work other than a dangerous work type is found as shown in FIG. 25, and the registered nonconformity as shown in FIG. and action items are provided to the construction site work management server 100 so that they are reflected in the safety inspection log.
  • the present invention enables safety management work to be carried out effectively using construction site data, and is a technology that can be widely used in the construction industry to realize its practical and economical value.

Landscapes

  • Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Engineering & Computer Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Operations Research (AREA)

Abstract

본 발명의 일 실시예에 따른 건설 현장 작업 관리 시스템은 작업 허가 대상 항목에 대한 작업 허가서 작업 절차를 제공하고, 상기 작업 허가서 작업 절차를 통해 정보를 입력받으면 작업 허가서를 생성하여 제공하고, 상기 작업 허가서 검토 요청 메시지에 대한 응답 메시지에 따라 상기 작업 허가서를 이용하여 작업 허가서 목록표를 생성하고, 상기 작업 허가서에 대한 점검 결과를 수신하면 상기 작업을 종결 처리하는 건설 현장 작업 관리 서버 및 상기 작업 허가서 작업 절차를 통해 작업 허가서를 생성한 후 상기 작업 허가서에 대한 작업 허가서 검토 요청 메시지를 제공하고, 상기 작업 허가서 검토 요청 메시지를 수신하면 상기 작업 허가서 검토 요청 메시지에서 추출한 작업 허가서를 검토한 후 작업 반려 또는 작업 등록 처리하고, 상기 작업 허가서를 기초로 체크 리스트를 작성하는 점검자 단말을 포함한다.

Description

건설 현장 작업 관리 방법 및 이를 실행하는 시스템
본 발명은 건설 현장 작업 관리 방법 및 이를 실행하는 시스템에 관한 것으로, 보다 구체적으로 고위험 작업에 대한 안전 점검을 효과적으로 진행할 수 있도록 하는 건설 현장 작업 관리 방법 및 이를 실행하는 시스템에 관한 것이다.
현재 일반적으로 위험 작업이 많이 발생하고 있는 업장에서는 안전사고에 대한 문제를 가장 비중 있게 다루고 있는 실정이다.
상기의 원인으로 인하여 그런 인적/물적 안전사고 문제 발생을 미연에 방지하기 위해서 업장에서는 위험에 관련된 모든 업무에 있어 사전에 승인을 득하게 하는 일련의 업무가 이루어지고 있다. 상기한 기존 업무의 흐름을 구체적으로 살펴보면 몇 가지로 아래와 같이 정리할 수가 있다.
첫째, 업장의 위험지역이나 위험설비 또는 특정 작업에 있어 어떠한 작업이 발생을 하면 해당 담당자는 작업에 관련된 안전작업허가 신청서를 작성을 하여 안전부서에 해당 작업의 허가를 요청을 한다. 안전작업 허가 신청서에는 설비 및 지역의 위험등급 정보 및 작업자 정보, 기타 외부기술자가 있는 경우 해당 정보, 작업에 대한 내용, 작업 일정 등의 작업 내용을 구체적으로 명기하여 요청을 한다.
둘째, 사업장 관리조직은 안전작업 허가 신청서를 받게 되면 작업자의 기술 등급 및 위험지역 인가자인지를 평가하는 적격심사를 하게 된다. 적격심사 후 해당 위험지역 및 위험설비에 있어 갖추어야 할 안전작업 지시서 및 안전 작업에 관련된 준비 공구를 문서로 작성을 하여 안전작업 허가증과 같이 내려준다. 또한 일일 안전 점검표도 첨부한다.
셋째, 작업자는 안전부서의 안전작업 허가를 통보를 받고, 안전작업과 관련된 안전작업 허가증, 안전지침서, 일일 안전 점검표를 수령 후 계획/승인된 작업을 진행할 수가 있게 된다.
상기한 내용을 볼 때에 업장의 작업을 위한 안전작업 허가에 있어 많은 시간이 소비가 된다는 것을 알 수가 있으며, 또 다른 문제점으로 긴급 상황에서 이러한 안전작업 허가를 받기 위한 업무 흐름이 너무나 표준화가 되어 있지 않다는 것이다.
한 가지 덧붙인다면 안전작업 허가를 안전부서에 요청 후 보전 작업자나 방문자의 안전에 관련된 표준등급이 아니라면 안전부서에서 재차 적격자격을 가진 작업자를 요청하게 되며, 반복적인 업무흐름을 유도하므로 이 과정에서도 마찬가지로 시간적인 낭비가 많이 발생된다고 할 수가 있다.
본 발명은 고위험 작업에 대한 안전 점검을 효과적으로 진행할 수 있도록 하는 건설 현장 작업 관리 방법 및 이를 실행하는 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 작업 허가서를 기초로 작업하는 과정에서 부적합 사항 발견 시 해당 내용을 관리자에 전달한 후 회신 받을 수 있도록 하여 건설 현장에서 편의성을 제공할 수 있도록 하는 건설 현장 작업 관리 방법 및 이를 실행하는 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 고위험 작업 및 일반 작업 각각에 대한 체크 리스트를 제공함으로써 체크 리스트를 기초로 안전 점검 일지를 자동으로 생성할 수 있도록 하는 건설 현장 작업 관리 방법 및 이를 실행하는 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 사업장에서 발행된 허가서의 운연현황을 Dash-Board 형태로 시각화 제공함으로써 관리의 효율성을 제고할 수 있도록 하는 건설 현장 작업 관리 방법 및 이를 실행하는 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 작업 허가서에 삽입된 식별 코드를 근로자가 스캔 또는 직접 입력하거나 안면 인식을 통해 작업 허가서 별 해당 작업에 투입되는 근로자를 허가서와 매칭하도록 하고 작업 허가서에 대한 점검 기록을 근로자와 매칭함으로써 근로자의 안전작업절차 이행이력, 해당 작업에 대한 생산성 산출에 활용할 수 있도록 하는 건설 현장 작업 관리 방법 및 이를 실행하는 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 위험성 평가와 작업 허가서를 연동하게 하고 근로자 단말기를 통하여 작업 허가서 상 근로자가 위험 요인 및 안전 대책을 기입할 수 있도록 하여 근로자의 위험성 평가에 참여할 수 있도록 하는 건설 현장 작업 관리 방법 및 이를 실행하는 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 발행된 작업 허가서의 현황(즉, 발행, 점검유무, 작업중, 작업취소, 연장작업, 작업중지)을 시각화 하여 BI(Business Intelligence)서비스를 제공할 수 있도록 하는 건설 현장 작업 관리 방법 및 이를 실행하는 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 작업 허가서 대상 작업을 사용자가 직접 선정하고, 대상 작업 별 체크 리스트를 사용자가 등록하도록 하여 각 사업장의 특성에 맞도록 활용할 수 있도록 하는 건설 현장 작업 관리 방법 및 이를 실행하는 시스템을 제공하는 것을 목적으로 한다.
본 발명의 목적들은 이상에서 언급한 목적으로 제한되지 않으며, 언급되지 않은 본 발명의 다른 목적 및 장점들은 하기의 설명에 의해서 이해될 수 있고, 본 발명의 실시예에 의해 보다 분명하게 이해될 것이다. 또한, 본 발명의 목적 및 장점들은 특허 청구 범위에 나타낸 수단 및 그 조합에 의해 실현될 수 있음을 쉽게 알 수 있을 것이다.
이러한 목적을 달성하기 위한 건설 현장 작업 관리 시스템은 작업 허가 대상 항목에 대한 작업 허가서 작업 절차를 제공하고, 상기 작업 허가서 작업 절차를 통해 정보를 입력받으면 작업 허가서를 생성하여 제공하고, 상기 작업 허가서 검토 요청 메시지에 대한 응답 메시지에 따라 상기 작업 허가서를 이용하여 작업 허가서 목록표를 생성하고, 상기 작업 허가서에 대한 점검 결과를 수신하면 상기 작업을 종결 처리하는 건설 현장 작업 관리 서버 및 상기 작업 허가서 작업 절차를 통해 작업 허가서를 생성한 후 상기 작업 허가서에 대한 작업 허가서 검토 요청 메시지를 제공하고, 상기 작업 허가서 검토 요청 메시지를 수신하면 상기 작업 허가서 검토 요청 메시지에서 추출한 작업 허가서를 검토한 후 작업 반려 또는 작업 등록 처리하고, 상기 작업 허가서를 기초로 체크 리스트를 작성하는 점검자 단말을 포함한다.
또한 이러한 목적을 달성하기 위한 건설 현장 작업 관리 방법은 건설 현장 작업 관리 서버가 작업 허가 대상 항목에 대한 작업 허가서 작업 절차를 관리자 단말에 제공하는 단계, 상기 관리자 단말이 상기 작업 허가서 작업 절차를 통해 작업 허가서를 생성한 후 상기 작업 허가서에 대한 작업 허가서 검토 요청 메시지를 관리자 단말에 제공하는 단계, 상기 관리자 단말이 상기 작업 허가서 검토 요청 메시지에서 추출한 작업 허가서를 검토한 후 작업 반려 또는 작업 등록 처리하는 단계, 상기 건설 현장 작업 관리 서버가 상기 작업 허가서 검토 요청 메시지에 대한 응답 메시지에 따라 상기 작업 허가서를 이용하여 작업 허가서 목록표를 생성하는 단계, 상기 건설 현장 작업 관리 서버가 작업 허가서 배정 내역을 기초로 작업 당일에 점검 대상 항목을 점검자 단말에 제공하는 단계, 상기 점검자 단말이 상기 점검 대상 항목에 해당하는 작업 허가서를 기초로 체크 리스트를 작성하여 상기 건설 현장 작업 관리 서버에 제공하는 단계 및 상기 건설 현장 작업 관리 서버가 상기 작업 허가서에 대한 점검 결과를 수신하면 상기 작업을 종결 처리하는 단계를 포함한다.
전술한 바와 같은 본 발명에 의하면, 고위험 작업에 대한 안전 점검을 효과적으로 진행할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 작업 허가서를 기초로 작업하는 과정에서 부적합 사항 발견 시 해당 내용을 관리자에 전달한 후 회신 받을 수 있도록 하여 건설 현장에서 편의성을 제공할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 고위험 작업 및 일반 작업 각각에 대한 체크 리스트를 제공함으로써 체크 리스트를 기초로 안전 점검 일지를 자동으로 생성할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 사업장에서 발행된 허가서의 운연현황을 Dash-Board 형태로 시각화 제공함으로써 관리의 효율성을 제고할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 작업 허가서에 삽입된 식별 코드를 근로자가 스캔 또는 직접 입력하거나 안면 인식을 통해 작업 허가서 별 해당 작업에 투입되는 근로자를 허가서와 매칭하도록 하고 작업 허가서에 대한 점검 기록을 근로자와 매칭함으로써 근로자의 안전작업절차 이행이력, 해당 작업에 대한 생산성 산출에 활용할 수 있다는 장점이 있다
또한 본 발명에 의하면, 위험성 평가와 작업 허가서를 연동하게 하고 근로자 단말기를 통하여 작업 허가서 상 근로자가 위험요인 및 안전대책을 기입할 수 있도록 하여 근로자의 위험성 평가에 참여할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 발행된 작업 허가서의 현황(즉, 발행, 점검유무, 작업중, 작업취소, 연장작업, 작업중지)을 시각화 하여 BI(Business Intelligence)서비스를 제공할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 작업 허가서 대상 작업을 사용자가 직접 선정하고, 대상 작업별 체크 리스트를 사용자가 등록하도록 하여 각 사업장의 특성에 맞도록 활용할 수 있다는 장점이 있다.
도 1은 본 발명의 일 실시예에 따른 건설 현장 작업 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 2는 본 발명의 다른 일 실시예에 따른 건설 현장 작업 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 3은 본 발명의 또 다른 일 실시예에 따른 건설 현장 작업 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 4는 본 발명의 또 다른 일 실시예에 따른 건설 현장 작업 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 5는 본 발명의 또 다른 일 실시예에 따른 건설 현장 작업 관리 서버의 내부 구조를 설명하기 위한 블록도이다.
도 6은 본 발명에 따른 건설 현장 작업 관리 방법의 일 실시예를 설명하기 위한 흐름도이다.
도 7 내지 도 26은 본 발명에 따른 건설 현장 작업 관리 방법에 따라 관리자 단말의 실행 화면을 설명하기 위한 예시도이다.
<부호의 설명>
100: 건설 현장 작업 관리 서버
200: 근로자 단말
300: 관리자 단말
400: 기상청 서버
500: 점검자 단말
600: 감시단 단말
전술한 목적, 특징 및 장점은 첨부된 도면을 참조하여 상세하게 후술되며, 이에 따라 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 본 발명의 기술적 사상을 용이하게 실시할 수 있을 것이다. 본 발명을 설명함에 있어서 본 발명과 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 상세한 설명을 생략한다. 이하, 첨부된 도면을 참조하여 본 발명에 따른 바람직한 실시예를 상세히 설명하기로 한다. 도면에서 동일한 참조부호는 동일 또는 유사한 구성요소를 가리키는 것으로 사용된다.
도 1은 본 발명의 일 실시예에 따른 건설 현장 작업 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 1을 참조하면, 건설 현장 작업 관리 시스템은 건설 현장 작업 관리 서버(100), 근로자 단말(200) 및 관리자 단말(300)을 포함한다. 건설 현장 작업 관리 서버(100)는 교육 이수 정보 데이터베이스(110), 자격증 데이터베이스(111), 경력 정보 데이터베이스(112), 근로자 데이터베이스(113) 및 건강 검진 데이터베이스(114)를 포함한다.
건설 현장 작업 관리 서버(100)는 근로자 단말(200)과의 통신을 통해 근로자 단말(200)로부터 근로자 프로필 정보를 수신하여 저장한다. 이때, 근로자 프로필 정보는 신상 정보, 경력, 교육 이력 및 건강 검진 이력 등을 포함할 수 있다.
먼저, 건설 현장 작업 관리 서버(100)는 근로자가 출근하기 이전에 근로자 단말(200)에 교육 이수 정보 등록 절차를 제공하고, 교육 이수 정보 등록 절차를 통해 교육 이수 정보를 수신한다.
이때, 교육 이수 정보는 교육 이수증 별로 이름, 생년월일, 등록번호, 이수일자, 이수증 증빙 사진 등을 포함할 수 있다. 상기의 교육 이수증은 건설 현장 안전 관리에 관한 교육을 이수한 후 발급되는 증명서로, 기초 보건 이수증 등을 포함할 수 있다.
상기의 교육 이수증에는 교육 이수 발급 기관에 의해 발급될 때 진위 여부를 판별하기 위한 진위 판별 코드가 삽입되어 발급될 수 있다. 즉, 교육 이수 발급 기관에 의해 인쇄될 때 진위 판별 코드에 해당하는 서로 다른 크기의 픽셀 공간을 함께 출력하여 발급되도록 한다.
상기와 같이, 교육 이수 발급 기관에 의해 교육 이수증이 발급될 때 교육 이수증에 삽입된 진위 판별 코드는 교육 이수 발급 기관 서버로부터 수신되어 미리 저장된다. 따라서, 건설 현장 작업 관리 서버(100)는 교육 이수 발급 기관 서버로부터 수신된 진위 판별 코드를 이용하여 교육 이수증의 진위 여부를 판별할 수 있는 것이다.
상기의 교육 이수증에 삽입되어 있는 서로 다른 크기의 픽셀 공간은 교육 이수증의 배경 화면과 유사한 색(즉, 배경 화면의 RGB 값이 특정 값 이상이거나 이하인 값에 해당하는 색)으로 설정되어 있기 때문에 사용자의 눈에는 보이지 않지만, 건설 현장 작업 관리 서버(100)가 교육 이수증의 진위 여부를 판단하기 위해 스캔하는 과정에서 픽셀 분석하면 픽셀의 값이 다르기 때문에 진위 판별 코드에 해당하는 픽셀 공간이 추출될 수 있는 것이다.
따라서, 건설 현장 작업 관리 서버(100)는 교육 이수증을 스캔하여 분석하는 과정에서 교육 이수증에서 복수의 픽셀 공간을 추출한 후, 복수의 픽셀 공간이 망점이 지시하는 이진수 값을 이용하여 진위 판별 코드를 생성할 수 있다.
예를 들어, 건설 현장 작업 관리 서버(100)는 4개의 점으로 이루어진 픽셀 공간 1개와 8개의 점으로 이루어진 픽셀 공간 6개를 추출한 경우, 4개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "1000000"를 생성할 수 있다.
다른 예를 들어, 건설 현장 작업 관리 서버(100)는 6개의 점으로 이루어진 픽셀 공간 2개와 8개의 점으로 이루어진 픽셀 공간 3개를 추출한 경우, 6개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "11000"를 생성한다.
그런 다음, 건설 현장 작업 관리 서버(100)는 진위 판별 코드 및 미리 ㅅ수신된 진위 판별 코드를 비교하여 교육 이수증의 진위 여부를 판별할 수 있다.
상기와 같이, 건설 현장 작업 관리 서버(100)는 교육 이수증의 진위 여부가 판별된 후 교육 이수증을 기록된 교육 이수 정보를 이용하여 교육 별 유효 시간 및 교육 시간을 산출한 후, 근로자 별로 교육 종류 리스트 및 인증 시간을 교육 이수 정보 데이터베이스(110)에 저장한다.
이때, 교육 이수 정보 데이터베이스(110)에 근로자에 해당하는 누적 교육 시간이 존재하는 경우 기존에 누적된 누적 교육 시간에 교육 시간을 반영하여 누적 교육 시간을 갱신한다.
그 후, 건설 현장 작업 관리 서버(100)는 근로자 교육 리스트를 생성하고, 근로자 교육 리스트를 근로자 단말(200)에 제공한다.
이때, 근로자 교육 리스트는 관리자, 업체, 현장, 날짜, 이름, 생년월일, 신규자 교육 이수 여부, 유효기간, 출근여부, 필수 교육 리스트, 필수 교육 이수 여부 등을 포함할 수 있다.
그런 다음, 건설 현장 작업 관리 서버(100)는 근로자 단말(200)로부터 출석 인증 정보를 수신하고, 관리자 단말(300)로부터 수신된 근로자 교육 리스트에 따라 근로자의 교육이 실시된 후 교육 증빙 사진 및 교육 증빙 정보를 포함하는 교육 이수 확인 요청 메시지를 수신한다.
이때, 출석 인증 정보는 근로자 이름 및 관리 감독자 이름을 포함할 수 있고, 교육 증빙 정보는 교육 구분, 교육 대상, 작업 공종 명, 교육 일자, 교육 장소, 교육 시간, 교육 담당(관리자 등), 교육 내용 등을 포함할 수 있다.
건설 현장 작업 관리 서버(100)는 교육 이수 확인 요청 메시지 중 출석 인증 정보를 이용하여 출석을 인증하고 교육 증빙 정보를 추출한 후, 교육 증빙 정보를 이용하여 교육 이수 정보 데이터베이스(110)에 저장된 근로자 별로 교육 종류 리스트 및 누적 시간을 갱신한다.
즉, 건설 현장 작업 관리 서버(100)는 교육 증빙 정보를 이용하여 교육 별 유효 시간 및 교육 시간을 산출한 후, 교육 종류를 이용하여 근로자 별로 교육 종류 리스트를 갱신하고 인증 시간을 이용하여 누적 시간을 갱신하여 근로자 별로교육 이수 정보 데이터베이스(110)에 저장한다.
또한, 건설 현장 작업 관리 서버(100)는 근로자 단말(200)에 자격증 취득 정보 등록 절차를 제공하고, 자격증 취득 정보 등록 절차를 통해 자격증 취득 정보를 수신하여 근로자 별 자격증 취득 정보를 자격증 데이터베이스(111)에 저장한다.
이때, 자격증 취득 정보는 자격증 별로 필수 정보 및 선택 정보를 포함하고, 필수 정보는 제호, 성명, 국적, 주민등록번호, 주소, 국적, 발급 일자, 적성 검사, 유효 기간, 소지 면허, 증빙 사진을 포함하고, 선택 정보는 보험 증권, 사업자 등록증, 장비 등록증(예를 들어, 크레인, 펌프카 등의 비파괴 검사 결과), 증빙 사진 등을 포함할 수 있다. 상기의 자격증은 건설 현장에서 활용가능한 기술을 시험을 통해 인증된 후에 발급되는 자격증으로, 기계 조종사 등을 포함할 수 있다.
상기의 자격증은 건설 현장에서 활용가능한 기술을 시험을 주관하는 기관에 의해 발급될 때 진위 여부를 판별하기 위한 진위 판별 코드가 삽입되어 발급될 수 있다. 즉, 기관에 의해 자격증이 발급될 때 진위 판별 코드에 해당하는 서로 다른 크기의 픽셀 공간을 함께 출력하여 발급되도록 한다.
상기와 같이, 자격증이 발급될 때 자격증에 삽입된 진위 판별 코드는 자격증 시험 주최 기관 서버로부터 수신되어 미리 저장된다. 따라서, 건설 현장 작업 관리 서버(100)는 자격증 시험 주최 기관 서버로부터 수신된 진위 판별 코드를 이용하여 자격증의 진위 여부를 판별할 수 있는 것이다.
상기의 자격증에 삽입되어 있는 서로 다른 크기의 픽셀 공간은 교육 이수증의 배경 화면과 유사한 색(즉, 배경 화면의 RGB 값이 특정 값 이상이거나 이하인 값에 해당하는 색)으로 설정되어 있기 때문에 사용자의 눈에는 보이지 않지만, 건설 현장 작업 관리 서버(100)가 자격증 등과 같은 증빙 사진의 진위 여부를 판단하기 위해 픽셀 분석하면 픽셀의 값이 다르기 때문에 진위 판별 코드에 해당하는 픽셀 공간이 추출될 수 있는 것이다.
따라서, 건설 현장 작업 관리 서버(100)는 자격증 등과 같은 증빙 사진을 스캔하여 분석하는 과정에서 자격증 등과 같은 증빙 사진에서 복수의 픽셀 공간을 추출한 후, 복수의 픽셀 공간이 망점이 지시하는 이진수 값을 이용하여 진위 판별 코드를 생성할 수 있다.
예를 들어, 건설 현장 작업 관리 서버(100)는 4개의 점으로 이루어진 픽셀 공간 1개와 8개의 점으로 이루어진 픽셀 공간 6개를 추출한 경우, 4개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "1000000"를 생성할 수 있다.
다른 예를 들어, 건설 현장 작업 관리 서버(100)는 6개의 점으로 이루어진 픽셀 공간 2개와 8개의 점으로 이루어진 픽셀 공간 3개를 추출한 경우, 6개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "11000"를 생성한다.
그런 다음, 건설 현장 작업 관리 서버(100)는 진위 판별 코드 및 미리 수신된 진위 판별 코드를 비교하여 자격증의 진위 여부를 판별할 수 있다. 상기와 같이, 건설 현장 작업 관리 서버(100)는 자격증의 진위 여부가 판별된 후 자격증 데이터베이스(111)에 근로자 별 자격증 취득 정보를 저장한다.
따라서, 건설 현장 작업 관리 서버(100)는 자격증 데이터베이스(111)에 저장된 근로자 별 자격증 취득 정보를 이용하여 자격증 유효 기간 또는 장비 등록증 각각의 유효 기간의 만료까지 남은 기간이 특정 기간 이하이면 관리자 단말(300)에 자격증 유효 기간 만료 안내 메시지를 제공할 수 있는 것이다.
또한, 건설 현장 작업 관리 서버(100)는 근로자 단말(200)로부터 경력 정보를 포함하는 과거 경력 등록 요청 메시지를 수신하면, 과거 경력 등록 요청 메시지에서 경력 정보를 추출한 후 근로자 별 경력 정보를 경력 정보 데이터베이스(112)에 저장한다. 이때, 경력 정보는 근무 일수, 공종, 발주처(예를 들어, 회사), 프로젝트 종류(예를 들어, 토목, 건축, 플랜트 등), 관리자, 세부 공종 등을 포함할 수 있다.
그 후, 건설 현장 작업 관리 서버(100)는 관리자 단말(300)로부터 경력자 검색 요청 메시지를 수신하면, 경력자 검색 요청 메시지에 따라 경력 정보 데이터베이스(112)에서 근로자를 추출한 후 경력 정보를 포함하는 경력자 안내 메시지를 제공한다. 이와 같이, 건설 현장 작업 관리 서버(100)는 경력 정보를 함께 제공함으로써 사업자가 경력 정보를 기초로 근로자의 프로젝트 배치 시 참고할 수 있도록 한다.
만일, 건설 현장 작업 관리 서버(100)는 근로자가 사업자에 의해 고용되어 프로젝트에 참여하게 되면, 경력을 확인하여 경력 정보 데이터베이스(112)에 저장된 근로자 별 경력 정보를 갱신한다.
또한, 건설 현장 작업 관리 서버(100)는 근로자 데이터베이스(113)에 저장되어 있는 근로자 별 근로자 정보 및 건강 검진 데이터베이스(114)에 저장되어 있는 건강 검진 대상을 이용하여 근로자 리스트를 생성한 후 병원 서버(미도시됨)에 근로자 리스트 상의 근로자의 건강 검진을 예약하는 건강 검진 예약 메시지를 제공한다. 이때, 근로자 리스트는 근로자 별 검진 종류, 다음 검진 일자, 예정 검진 기관, 희망 검진 예약일 등을 포함할 수 있다.
그 후, 건설 현장 작업 관리 서버(100)는 병원 서버(미도시됨)에 의해 발급된 검진 결과 문서를 인식하여 검진 결과 문서에서 검진 결과를 생성한 후 근로자 별 검진 결과를 근로자 데이터베이스(113)에 저장한다.
일 실시예에서, 건설 현장 안전 관리 서버(100)는 관리자 단말(300)로부터병원 서버에 의해 발급된 검진 결과 문서를 수신하면, OCR 기술을 이용하여 검진 결과 문서를 인식한 후 미리 결정된 항목에 해당하는 내용을 추출하여 근로자 데이터베이스(113)에 저장한다.
도 2는 본 발명의 다른 일 실시예에 따른 건설 현장 작업 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 2를 참조하면, 건설 현장 작업 관리 시스템은 건설 현장 작업 관리 서버(100), 관리자 단말(300) 및 기상청 서버(400)를 포함한다. 건설 현장 안전 관리 서버(100)는 사고 위험도 평가 데이터베이스(120), 위험성 평가 표준 모델(121), 위험도 평가 데이터베이스(122), 현장 위험 특성 예측 모델(123) 및 사고 사례 데이터베이스(124)를 포함한다.
건설 현장 작업 관리 서버(100)는 사고 위험도 평가 데이터베이스(120) 및 위험성 평가 표준 모델(121)을 기초로 공종 별 위험성 평가 결과를 생성한다.
상기의 사고 위험도 평가 데이터베이스(120)에는 공종 별 사고발생빈도 비율, 공종 별 사고발생강도 비율, 재해 별 세부 내용이 저장되어 있다. 이때, 재해 별 세부 내용은 공정, 기인물, 사고유형, 단위작업, 재해자수(사망/부상), 현장위치, 공사종류, 공사금액, 공정율을 포함할 수 있다. 상기의 위험성 평가 표준 모델(121)에는 공종 별 위험 요인 및 위험 요인 별 안전 대책이 저장되어 있다.
먼저, 건설 현장 작업 관리 서버(100)는 건설 현장 상황(즉, 공사 규모,공사 유형, 공정률, 기후 등) 및 작업 내용 각각에 해당하는 키워드를 수신하면 사고 위험도 평가 데이터베이스(120)에서 키워드에 해당하는 공종 별 사고발생빈도 비율, 공종 별 사고발생강도 비율 및 재해 별 세부 내용을 추출한다. 상기의 키워드는 공정, 사고기 인물, 사고 유형, 단위 작업 내용 등으로 결정될 수 있다.
그런 다음, 건설 현장 작업 관리 서버(100)는 공종 별 사고발생빈도 비율 및 공종 별 사고발생강도 비율을 이용하여 공종 별 위험도 평가 결과를 산출한다.
이때, 건설 현장 근로자 관리 서버(100)는 AI 엔진을 통해 공종 별 위험도 평가 결과를 산출하거나 하기의 [수학식 1] 내지 [수학식 6]을 통해 산출할 수 있다. 이하에서는 [수학식 1] 내지 [수학식 6]을 통해 공종 별 위험도 평가 결과를 산출하는 과정을 설명하기로 한다.
일 실시예에서, 건설 현장 작업 관리 서버(100)는 [수학식 1]을 기초로 위험도 평가 데이터베이스(122)에서 추출한 공종 별 사고발생빈도 비율 및 공종 별 사고발생강도 비율을 이용하여 공종 별 위험도 평가 등급을 산출할 수 있다. 이때, 위험도 평가 데이터베이스(122)에는 공종 별 사고발생빈도 비율 및 공종 별 사고발생강도 비율이 저장되어 있으며, 어플리케이션을 사용함에 따라 자동으로 업데이트될 수 있다.
[수학식 1]
Part_Danger_level = (Danger_fre_rate + Danger_str_rate) * Danger_W
Part_Danger_level: 공종 별 위험도 평가 등급
Danger_fre_rate: 공종 별 사고발생빈도 비율로서 [수학식 2]에 의해 산출,
Danger_str_rate: 공종 별 사고발생강도 비율로서 [수학식 3]에 의해 산출
Danger_W: 공종 별 사고발생 시기에 따라 결정되는 가중치
[수학식 1]에서 공종 별 사고발생빈도 비율(Danger_fre_rate)은 하기의 [수학식 2]에 의해 산출되고, 공종 별 사고발생강도 비율(Danger_str_rate)은 하기의 [수학식 3]에 의해 산출되고, 공종 별 사고발생시기에 따라 결정되는 가중치(Danger_W)는 사고발생시기가 현재 시점을 기준으로 3년을 초과하지 않는 사례에 대해서 사고발생시기가 현재 시점에 가까울수록 높은 가중치가 할당되며, 사고발생시기가 현재 시점을 기준으로 3년를 초과한 사례에 대해서는 미리 결정된 가중치(예를 들어, “1”)가 할당된다.
[수학식 2]
Danger_fre_rate = (part_victim / total_victim) ×100
Danger_fre_rate: 공종 별 사고발생빈도 비율,
part_victim: 공종 별 재해지수,
total_victim: 전체 재해지수
[수학식 2]에서 공종 별 재해지수(part_victim) 및 전체 재해지수(total_victi)는 위험도 평가 데이터베이스(122)에서 추출한 재해 별 세부 내용(즉, 재해자수)에 의해 결정될 수 있다.
[수학식 3]
Danger_str_rate
= (part_dead_people_rate × 3) + part_injured_people_rate
Danger_str_rate: 공종 별 사고발생강도 비율,
part_dead_people_rate: 공종 별 사망자 비율로서 [수학식 4]에 의해 산출,
part_injured_people_rate: 공종 별 부상자 비율로서 [수학식 5]에 의해 산출
[수학식 3]에서 공종 별 사망자 비율(part_dead_people_rate)은 [수학식 4]에 의해 산출되고, 공종 별 부상자 비율(part_injured_people_rate)은 [수학식 5]에 의해 산출된다.
[수학식 4]
part_dead_people_rate = (part_dead_people / total_dead_people) ×100
part_dead_people_rate: 공종 별 사망자 비율,
part_dead_people: 공종 별 사망자 수,
total_dead_people: 전체 사망자 수
[수학식 4]에서 공종 별 사망자 수(part_dead_people) 및 전체 사망자 수(total_dead_people)는 위험도 평가 데이터베이스(122)에서 추출한 재해 별 세부 내용(즉, 재해자수 중 사망자)에 의해 결정될 수 있다.
[수학식 5]
part_injured_people_rate
= (part_injured_people / total_injured_people) ×100
part_dead_people_rate: 공종 별 부상자 비율,
part_dead_people: 공종 별 부상자 수,
total_dead_people: 전체 부상자 수
[수학식 5]에서 공종 별 부상자 수(part_dead_people) 및 전체 부상자 수(total_dead_people)는 위험도 평가 데이터베이스(122)에서 추출한 재해 별 세부 내용(즉, 재해자수 중 부상자)에 의해 결정될 수 있다.
상기의 [수학식 1] 내지 [수학식 5]를 통해 산출된 공종 별 위험도 평가 등급은 하기의 [표 1]과 같을 수 있다.
[표 1]
Figure PCTKR2022008437-appb-I000001
상기와 같이, 건설 현장 작업 관리 서버(100)는 사고 위험도 평가 데이터베이스(120)를 기초로 공종 별 위험도 평가 등급이 결정되면, 위험성 평가 표준 모델(121)에서 공종 별 위험도 평가 등급에 해당하는 위험 요인 및 위험 요인 별 안전 대책을 추출한다.
그 후, 건설 현장 작업 관리 서버(100)는 위험도 평가 등급, 위험 요인 및 위험 요인 별 안전 대책을 이용하여 위험성 평가 결과 데이터를 생성한 후, 위험성 평가 결과 데이터를 위험성 평가 데이터베이스 저장한다.
상술한 과정을 통해 위험성 평가 결과 데이터를 생성한 후, 건설 현장 작업 관리 서버(100)는 현장 위험 특성 예측 모델을 기초로 위험성 평가 결과 데이터, 현장 정보 및 공사 주기 별 위험도 평가 지수를 반영하여 위험도 예측 데이터를 생성한다.
상기의 현장 정보는 현장주소, 공사종류, 공사규모(금액), 공사기간, 공사주기별 Master Schedule/ 건축인허가 정보: 대지위치, 실제착공일, 주용도코드명 등을 포함할 수 있다.
이때, 현장 위험 특성 예측 모델(123)은 현장 위치, 공사 종류, 공사 규모, 날씨, 공정 진척도, 지연도, 공종 별 순찰 데이터(Patrol Data), 사고 유형 별 순찰 데이터(Patrol Data), 전 근로자 대비 현장 근로자 및 작업팀 별 안전 스코어(safety score) 비율이 저장되어 있다.
[수학식 6]
ConstructionPeriod_Danger_value = PastPart_Danger_value + weight
ConstructionPeriod_Danger_value: 공사 주기 별 위험도 평가 지수,
PastPart_Danger_value: 과거 공종 별 위험도 평가 지수,
weight: 현장 위험 특성 가중치
상기의 [수학식 6]에서 현장 위험 특성 가중치는 고정 요인, 변동 요인 및 현장 부적합 사항에 따라 변경될 수 있다. 고정 요인은 현장 위치, 공사 종류, 공사 규모를 포함하고, 변동 요인은 기상청 서버(400)로부터 수신된 날씨 정보, 미리 결정된 스케쥴 대비 진척도 및 지연도를 포함한다.
현장 부적합 사항은 현장을 관리하는 관리자에 의해 지적된 현장의 부적합 사항을 의미한다. 예를 들어, 현장 부적합 사항은 안전고리 미체결 등을 포함할 수 있다. 상기와 같이, 고정 요인, 및 변동 요인 및 현장 부적합 사항에 따라 현장 위험 특성 가중치를 변경함으로써 공사 주기 별 위험도 평가 지수가 변경되도록 한다.
도 3은 본 발명의 또 다른 일 실시예에 따른 건설 현장 작업 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 3을 참조하면, 건설 현장 작업 관리 시스템은 건설 현장 작업 관리 서버(100) 및 점검자 단말(500)을 포함하고, 점검자 단말(500)은 관리자 단말(300) 및 감시단 단말(600)을 포함한다. 도 3의 일 실시예에서는 드론(미도시됨)을 더 포함할 수 있다.
드론은 건설 현장 작업 관리 서버(100)로부터 수신된 제어 신호에 따라 공사 현장의 감시 대상을 촬영한 후 감시 대상에 대한 스캔 정보 및 이미지를 생성하여 건설 현장 작업 관리 서버(100)에 제공한다. 예를 들어, 드론은 공사 현상의 감시 대상 “안전 난간대”를 스캔한 후 스캔 정보 및 감시 대상 이미지를 건설 현장 작업 관리 서버(100)에 제공한다.
이를 위해, 드론은 건설 현장 작업 관리 서버(100)로부터 수신된 제어 신호에 따라 공사 현장을 스캔하는 과정에서 공사 현장의 감시 대상에 빛을 조사하여 감시 대상을 촬영한 후 감시 대상에 대한 스캔 정보 및 감시 대상 이미지를 생성하여 건설 현장 작업 관리 서버(100)에 제공한다. 이때, 감시 대상은 작업자의 헬맷, 건축 자재 등을 포함할 수 있다.
일 실시에에서, 드론은 감시 대상이 금속으로 이루어진 경우 감시 대상을 스캔하는 과정에서 빛이 인가되면 서로 다른 깊이와 넓이의 망점은 인가된 빛을 반사하게 된다.
이때, 감시 대상에 형성되어 있는 망점의 깊이 및 넓이는 서로 다르기 때문에 반사되는 빛의 양이 상이하게 될 것이다. 따라서, 드론은 감시 대상에서 반사되는 빛의 정보를 이용하여 감시 대상에 대한 반사 빛의 정보를 포함하는 스캔 정보 및 감시 대상 이미지를 건설 현장 작업 관리 서버(100)에 제공한다.
다른 일 실시예에서, 드론은 감시 대상이 인쇄 과정을 통해 생성된 무늬가 있는 경우 감시 대상을 스캔하여 감시 대상 이미지를 생성한 후, 감시 대상 이미지를 건설 현장 작업 관리 서버(100)에 제공한다.
이때, 감시 대상 이미지에는 감시 대상의 무늬와 유사한 색상으로 감시 코드에 해당하는 복수의 망점이 삽입되어 있을 수 있다. 즉, 감시 대상 이미지에는 감시 대상의 무늬의 픽셀 값보다 특정 값 이상 또는 특정 값 이하에 해당하는 픽셀 값으로 감시 코드에 해당하는 복수의 망점이 삽입되어 있을 수 있다.
따라서, 건설 현장 작업 관리 서버(100)는 감시 대상 이미지의 픽셀을 분석하여 복수의 망점을 추출한 후, 복수의 망점에 해당하는 이진수 값을 이용하여 감시 코드를 생성할 수 있는 것이다.
건설 현장 작업 관리 서버(100)는 작업 허가서 데이터베이스(130) 및 현장 가입자 데이터베이스(131)를 포함한다.
건설 현장 작업 관리 서버(100)는 근로자 데이터를 기초로 작업 허가서 작업 절차를 관리자 단말(300)에 제공한다. 이때, 작업 허가서 데이터베이스(130)에는 작업 허가서 별 체크리스트를 포함하고, 현장 가입자 데이터베이스(131)에는 작업 반장 별 이름 및 소속 그리고 근로자 별 이름 및 소속이 저장되어 있다.
그 후, 건설 현장 작업 관리 서버(100)는 관리자 단말관리자 단말(300)에의해 작업 허가서 작업 절차를 기초로 작업 허가서가 생성되면, 작업 허가서를 이용하여 작업 허가서 목록표를 생성한다. 이때, 관리자에 의해 생성된 작업 허가서는 허가서 번호, 일자, 업체명, 공종 별 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 지휘자, 투입 장치, 근로자 등을 포함할 수 있다.
따라서, 건설 현장 작업 관리 서버(100)는 작업 허가서의 공종 별로 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 지휘자, 투입 장치, 근로자, 작업 허가서 대상(즉, 위험작업허가, 일반작업허가), 허가서 종류(즉, 특별, 위험, 일반), 관리자 점검 담당자 등을 이용하여 작업 허가서 목록표를 생성한다. 이러한 작업 허가서 목록표는 작업 허가서를 직관적으로 확인 가능하도록 작업 허가서의 공종 별로 목록들이 표로 생성된 것이다.
이때, 건설 현장 작업 관리 서버(100)는 관리자에 의해 작업 허가서 목록표가 생성되면, 작업 허가서 생성 목록을 생성하여 작업 허가서 데이터베이스(130)에 저장한다. 이후, 관리자가 스스로 점검할 작업을 배정한다.
만일, 건설 현장 작업 관리 서버(100)는 작업 허가서 배정 내역에 따라 생성된 작업 허가서 점검표를 수신하면, 작업 허가서 점검표를 작업 허가서 데이터베이스(130)에 저장한다. 이때, 작업 허가서 데이터베이스(130)에는 작업 허가서 점검 결과, 점검자, 점검 시간, 사진, 세부 내용 등을 포함한다.
이때, 건설 현장 작업 관리 서버(100)는 부적합 사항이 발견된 후 부적합 사항 등록 절차를 통해 작업 중지가 선택되어 작업 중지 요청 메시지를 수신하면, 작업 중지 요청 메시지를 기초로 작업 장소로 이동하여 부적합 사항의 상세 내용에 해당하는 점검 대상을 촬영하는 제어 명령을 드론에 제공할 수 있다.
예를 들어, 부적합 사항의 상세 내용이 “상부 안전 고리 미체결”이고, 작업 장소가 “105동 지하 4층 집수정”에 해당하는 경우, 건설 현장 작업 관리 서버(100)는 105동 지하 4층 집수정으로 이동하여 상부 안전 고리를 촬영하는 제어 명령을 드론에 제공할 수 있다.
그 후, 건설 현장 작업 관리 서버(100)는 드론으로부터 감시 대상에 대한 스캔 정보(예를 들어, 건축 자재 반사 빛의 정보) 및 감시 대상 이미지 중 적어도 하나를 수신한 후, 스캔 정보 및 감시 대상 이미지 중 적어도 하나를 이용하여 감시 코드를 생성한다.
일 실시예에서, 건설 현장 작업 관리 서버(100)는 감시 대상 이미지를 수신한 경우 감시 대상 이미지를 분석하여 다수의 점으로 이루어진 서로 다른 크기의 복수의 망점을 추출한다. 그런 다음, 건설 현장 작업 관리 서버(100)는 복수의 망점에 해당하는 이진수 값을 이용하여 감시 코드를 생성한다.
즉, 건설 현장 작업 관리 서버(100)는 이진수 값 테이블을 참조하여 망점이 구성된 점의 개수에 따라 이진수 값을 추출한 후 이진수 값의 조합을 통해 감시 코드를 생성한다.
다른 일 실시예에서, 건설 현장 작업 관리 서버(100)는 스캔 정보 및 감시 대상 이미지를 모두 수신한 경우, 스캔 정보가 감시 대상 반사 빛의 정보이기 때문에 반사되는 빛의 양에 따라 해당 망점이 지시하는 이진수 값을 결정할 수 있으며, 이러한 이진수 값의 조합을 통해 최종적으로 감시 코드를 생성할 수 있는 것이다.
보다 구체적으로, 건설 현장 작업 관리 서버(100)는 드론으로부터 수신된 스캔 정보가 감시 대상 반사 빛의 정보인 경우, 이진수 값 테이블 참조하여 빛의 정보에 해당하는 음영 값이 지시하는 숫자에 따라 이진수 값을 결정한다.
즉, 건설 현장 작업 관리 서버(100)는 이진수 값 테이블을 참조하여 빛의 정보에 해당하는 음영 값이 지시하는 이진수 값이 0 또는 1인지 판단할 수 있다. 그런 다음, 건축물 감리 장치(200)는 이진수 값을 순차적으로 결합하여 감시 코드를 결정한다.
예를 들어, 이진수 값 테이블에 음영 값 24에 해당하는 이진수 값이 1로 저장되어 있고, 음영 값 35에 해당하는 이진수 값이 0으로 저장되어 있으며, 건설 현장 작업 관리 서버(100)는 빛의 정보에 해당하는 음영 값이 24인 경우 이진수 값을 1로 결정하고, 빛의 정보에 해당하는 음영 값이 35인 경우 이진수 값을 0을 결정하여 감시 코드 "1000000"를 생성할 수 있다.
그 후, 건설 현장 작업 관리 서버(100)는 감시 코드에 해당하는 감시 대상이 작업 중지 요청된 대상과 동일한지 여부를 판단한 후, 상기 판단 결과 동일하면 감시 대상 이미지를 분석하여 작업 중지 요청된 이유를 검증한 후 검증 결과를 관리자 단말(300)에 제공한다. 따라서, 관리자 단말(300)은 건설 현장 작업 관리 서버(100)에 의한 검증 결과에 따라 작업 중지 여부를 결정할 수 있는 것이다.
상기의 실시예에서, 감시 코드가 작업자의 헬맷 및 근로자의 ID를 지시하는 경우, 건설 현장 작업 관리 서버(100)는 근로자의 ID를 이용하여 근로자 데이터베이스(113)와 연동하여 근로자 별 프로필에 안전 이력 히스토리를 업데이트한다.
그 후, 건설 현장 작업 관리 서버(100)는 작업 허가서 점검이 완료되면 작업 종결 요청 메시지를 관리자 단말(300)에 제공하여 작업 종결이 등록된 후 작업 허가서의 종결 내용을 작업 허가서 데이터베이스(130)에 저장한다.
관리자 단말(300)은 건설 현장 작업 관리 서버(100)로부터 수신된 작업 허가서 목록표 상의 특정 작업에 대한 점검 시 부적합 사항이 발견되면 부적합 사항 등록 절차를 통해 작업 중지 또는 시정 요청을 선택한다.
만일, 관리자 단말(300)은 부적합 사항이 발견된 후 작업 중지가 선택되면 작업 중지 요청 메시지를 서로 다른 관리자 단말에 제공하고, 부적합 사항이 발견된 후 시정 요청이 선택되면 시정 요청 메시지를 서로 다른 관리자 단말에 제공한다.
한편, 관리자 단말(300)은 부적합 사항이 발견이 발견되면 해당 부적합 사항을 작업 허가서 데이터베이스(130)와 연결된 현상 가입자 데이터베이스(131)에 각 인원별로 저장한다.
관리자 단말(300)은 건설 현장 작업 관리 서버(100)로부터 작업 허가서 작업 절차를 수신한 후, 작업 허가서 작업 절차를 통해 작업 허가서를 생성한다. 이때, 관리자 단말(300)은 작업 허가서 작업 절차를 통해 허가서 번호, 일자, 업체명, 공종 별 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 지휘자, 투입 장치 및 근로자를 입력하여 작업 허가서를 생성할 수 있다.
점검자 단말(500)은 건설 현장 작업 관리 서버(100)로부터 수신된 작업 허가서 목록표를 기초로 점검을 진행한다.
먼저, 점검자 단말(500)은 작업 허가서를 기초로 공종 별 점검 대상 항목 각각에 대한 점검 결과 입력 절차를 통해 상세 체크 리스트, 사진 및 점검 결과를 입력한다. 그 후, 점검자 단말(500)은 점검 결과에 따라 서로 다른 관리자 단말에 점검 완료 메시지, 작업 중지 알림 메시지 및 작업 일부 보완 요청 메시지 중 어느 하나의 메시지를 제공할 수 있다.
예를 들어, 점검자 단말(500)은 점검 결과 “양호 시”, 해당 공종 관리자 단말 및 근로자 단말에 점검 완료 메시지를 제공할 수 있다.
다른 예를 들어, 점검자 단말(500)은 점검 결과 “불량 시”, 해당 공정 관리자 단말 및 근로자 단말에 작업 중지 알림 메시지를 제공할 수 있다.
또 다른 예를 들어, 점검자 단말(500)은 점검 결과 “기타 보완 시”, 해당 공정 관리자 단말 및 근로자 단말에 작업 일부 보완 요청 메시지를 제공할 수 있다.
도 4는 본 발명의 또 다른 일 실시예에 따른 건설 현장 작업 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 4를 참조하면, 건설 현장 작업 관리 시스템은 건설 현장 작업 관리 서버(100) 및 점검자 단말(500)을 포함하고, 점검자 단말(500)은 관리자 단말(300) 및 감시단 단말(600)을 포함한다.
건설 현장 작업 관리 서버(100)는 근로자 데이터베이스(113)에 저장되어 있는 근로자 별 불안전 행동 입력 절차를 점검자 단말(500)에 제공한다. 이때, 근로자 별 불안전 행동 입력 절차는 건설 현장에 근무하는 근로자의 행동 중 미리 결정된 불안전 행동에 해당하는 행동이 발견되면 해당 근로자의 불안전 행동을 입력하는 절차이다. 상기의 미리 결정된 불안전 행동은 재해 유형을 기초로 재해 유형이 발생될 확률을 높일 수 있는 행동을 의미한다.
즉, 불안전 행동 입력 절차는 관리자, 작업팀, 근로자, 재해 유형, 상세 내용, 사진 등을 입력할 수 있으며, 점검자에 의해 재해 유형(예를 들어, 감전, 깔림, 끼임, 넘어짐, 떨어짐, 무너짐, 물체에 맞음, 부딪힘, 불균형 및 무리한 동작, 산소결핍, 절단/베임/잘림, 화재폭발)이 선택되면 해당 재해 유형에 해당하는 불안전 행동 리스트를 제공하여 불안전 안전 행동 리스트 중 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
예를 들어, 건설 현장 작업 관리 서버(100)는 재해 유형 중 “떨어짐”이 선택되면, “떨어짐”에 해당하는 불안전 행동 리스트로 “1) 2m 이상 고소 작업 시 안전대 미착용 또는 안전고리 미체결, 2) 추락 위험 구간 안전 시설물 임의 해체” 등을 제공하여 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
다른 예를 들어, 건설 현장 작업 관리 서버(100)는 재해 유형 중 “끼임”이 선택되면, “끼임”에 해당하는 불안전 행동 리스트로 “1) 장비 작업반경 내 무단출입”등을 제공하여 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
또 다른 예를 들어, 건설 현장 작업 관리 서버(100)는 재해 유형 중 “산소 결핍”이 선택되면 “산소 결핍”에 해당하는 불안전 행동 리스트로 “1) 밀폐공간 무단출입”등을 제공하여 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
그 후, 건설 현장 작업 관리 서버(100)는 시정 조치서에 의거하여 관리자에 의해 시정이 완료되면, 점검자 단말(500) 중 관리자 단말(300)로부터 시정 조치 정보(예를 들어, 관리자, 작업팀, 재해 유형, 조치 전후 사진)를 수신하여 조치 사항 데이터베이스(140)에 저장한다. 반대로, 건설 현장 안전 관리 서버(100)는 부적합 사항으로 지적된 내용이 합당하지 않다고 판단되는 경우 부적합 사항 등록 취소 절차를 제공한다.
또한, 점검자 단말(500) 중 관리자 단말(300)은 건설 현장 근로자 관리 서버(100)로부터 안전 신문고 제보 절차를 통해 세부내용, 사진, 안전 사고 관련 내용을 수신하면, 안전 신문고 채택 여부를 결정하여 건설 현장 안전 관리 서버(100)에 제공한다.
이에 따라, 건설 현장 안전 관리 서버(100)는 안전 신문고로 채택된 경우 해당 안전 신문고의 내용을 해당 근로자 데이터베이스(113)에 저장하고, 안전 신문고의 내용(즉, 현장, 채택 여부, 재해 유형, 상세 내용, 사진 등)을 안전 신문고 데이터베이스(411)에 저장한다.
점검자 단말(500) 중 관리자 단말(300)은 건설 현장 작업 관리 서버(100)로부터 근로자 별 불안전 행동 입력 절차를 수신하면, 근로자 별 불안전 행동 입력 절차를 통해 관리자, 작업팀, 근로자, 재해 유형, 상세 내용, 사진 등을 수신한다.
그 후, 점검자 단말(500) 중 관리자 단말(300)은 근로자 별 불안전 행동 입력 절차를 통해 수신된 정보를 기초로 시정 조치서를 생성한 후 시정 조치서를 관리자 단말(300)에 제공한다.
일 실시예에서, 점검자 단말(500) 중 관리자 단말(300)은 근로자 별 불안전 행동 입력 절차를 통해 수신된 재해 유형을 기초로 해당 재해 유형의 발생을 예방하기 위한 시정 조치서를 생성한 후 시정 조치서를 관리자 단말(300)에 제공한다.
점검자 단말(500) 중 관리자 단말(300)은 시정 조치서에 의거하여 관리자에 의해 시정이 완료되면, 시정 조치 정보(예를 들어, 관리자, 작업팀, 재해 유형, 조치 전후 사진)을 생성하여 건설 현장 작업 관리 서버(100)에 제공한다.
그 후, 점검자 단말(500) 및 관리자 단말(300)은 불안전 행동 입력 절차를 통해 수집된 불안전 행동 및 입력 정보를 이용하여 안전 점검 일지를 생성한다. 이때, 점검자 단말(500) 및 관리자 단말(300)은 점검자 중 관리자 관리자가 입력한 불안전 행동은 해당 근로자의 안전점검일지에 반영하고, 점검자 중 감시단이 입력한 시정 조치한 내용을 안전점검일지에 반영한다.
또한, 점검자 단말(500) 중 관리자 단말(300)은 건설 현장 작업 관리 서버(100)로부터 안전 신문고 제보 절차를 통해 세부내용, 사진, 안전 사고 관련 내용을 수신하면, 안전 신문고 채택 여부를 결정하여 건설 현장 안전 관리 서버(100)에 제공한다.
이에 따라, 건설 현장 안전 관리 서버(100)는 안전 신문고로 채택된 경우 해당 안전 신문고의 내용을 해당 근로자 데이터베이스(113)에 저장하고, 안전 신문고의 내용(즉, 현장, 채택 여부, 재해 유형, 상세 내용, 사진 등)을 안전 신문고 데이터베이스(411)에 저장한다.
그 후, 점검자 단말(500) 중 관리자 단말(300)은 재해 유형의 매칭 과정을 통해 매칭되는 재해 유형을 기초로 해당 재해 유형의 발생을 예방하기 위한 시정 조치서를 생성한 후 시정 조치서를 관리자 단말(300)에 제공한다.
점검자 단말(500) 중 관리자 단말(300)은 시정 조치서에 의거하여 관리자에 의해 시정이 완료되면, 시정 조치 정보(예를 들어, 관리자, 작업팀, 재해 유형, 조치 전후 사진)을 생성하여 건설 현장 작업 관리 서버(100)에 제공한다.
따라서, 건설 현장 근로자 관리 서버(100)는 불안전 행동 입력이 발생되면, 해당 부적항 사항 내용 입력 시 함께 입력한 원인 제공 근로자 또는 해당 업체의 데이터베이스에 불안전 행동을 저장한다.
도 5는 본 발명의 또 다른 일 실시예에 따른 건설 현장 작업 관리 서버의 내부 구조를 설명하기 위한 블록도이다.
도 5를 참조하면, 건설 현장 작업 관리 서버(100)는 작업 허가서 관리부(111), 작업 허가서 목록표 관리부(112), 부적합 사항 판단부(113), 작업 허가서 작업 종결 관리부(114), 작업 허가서 데이터베이스(130) 및 현장 가입자 데이터베이스(131)를 포함한다.
작업 허가서 관리부(111)는 작업 허가서 데이터베이스(130) 및 현장 가입자 데이터베이스(131)를 기초로 작업 허가서 작업 절차를 관리자 단말(300)에 제공한다. 이때, 작업 허가서 데이터베이스(130)에는 작업 허가서 별 체크리스트를 포함하고, 현장 가입자 데이터베이스(131)에는 관리자 별 이름 및 소속 그리고 근로자 별 이름 및 소속이 저장되어 있다.
작업 허가서 목록표 관리부(112)는 작업 허가서 관리부(111)를 통해 작업 허가서가 생성되면, 작업 허가서를 이용하여 작업 허가서 목록표를 생성한다. 이때, 관리자에 의해 생성된 작업 허가서는 허가서 번호, 일자, 업체명, 공종 별 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 지휘자, 투입 장치, 근로자 등을 포함할 수 있다.
따라서, 작업 허가서 목록표 관리부(112)는 작업 허가서의 공종 별로 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 지휘자, 투입 장치, 근로자, 작업 허가서 대상(즉, 위험작업허가, 일반작업허가), 허가서 종류(즉, 위험, 일반), 관리자 점검 담당자 등을 이용하여 작업 허가서 목록표를 생성한다. 이러한 작업 허가서 목록표는 작업 허가서를 직관적으로 확인 가능하도록 작업 허가서의 공종 별로 목록들이 표로 생성된 것이다.
이때, 작업 허가서 목록표 관리부(112)는 관리자에 의해 작업 허가서 목록표에 대한 승인이 되면, 작업 허가서 승인 목록을 생성하여 작업 허가서 데이터베이스(130)에 저장한 후, 작업 허가서 배정 내역을 점검자 단말(500)에 제공한다.
만일, 작업 허가서 목록표 관리부(112)는 작업 허가서 배정 내역에 따라 생성된 작업 허가서 점검표를 수신하면, 작업 허가서 점검표를 작업 허가서 데이터베이스(130)에 저장한다. 이때, 작업 허가서 데이터베이스(130)에는 작업 허가서 점검 결과, 점검자, 점검 시간, 사진, 세부 내용 등을 포함한다.
한편, 부적합 사항 판단부(113)는 부적합 사항이 발견된 후 부적합 사항 등록 절차를 통해 작업 중지가 선택되어 작업 중지 요청 메시지를 수신하면, 작업 중지 요청 메시지를 기초로 작업 장소로 이동하여 부적합 사항의 상세 내용에 해당하는 점검 대상을 촬영하는 제어 명령을 드론에 제공할 수 있다.
예를 들어, 부적합 사항의 상세 내용이 “상부 안전 고리 미체결”이고, 작업 장소가 “105동 지하 4층 집수정”에 해당하는 경우, 부적합 사항 판단부(113)는 105동 지하 4층 집수정으로 이동하여 상부 안전 고리를 촬영하는 제어 명령을 드론에 제공할 수 있다.
그 후, 부적합 사항 판단부(113)는 드론으로부터 감시 대상에 대한 스캔 정보(예를 들어, 건축 자재 반사 빛의 정보) 및 감시 대상 이미지 중 적어도 하나를 수신한 후, 스캔 정보 및 감시 대상 이미지 중 적어도 하나를 이용하여 감시 코드를 생성한다.
일 실시에에서, 부적합 사항 판단부(113)는 감시 대상 이미지를 수신한 경우 감시 대상 이미지를 분석하여 다수의 점으로 이루어진 서로 다른 크기의 복수의 망점을 추출한다. 그런 다음, 부적합 사항 판단부(113)는 복수의 망점에 해당하는 이진수 값을 이용하여 감시 코드를 생성한다.
즉, 부적합 사항 판단부(113)는 이진수 값 테이블을 참조하여 망점이 구성된 점의 개수에 따라 이진수 값을 추출한 후 이진수 값의 조합을 통해 감시 코드를 생성한다.
다른 일 실시예에서, 부적합 사항 판단부(113)는 스캔 정보 및 감시 대상 이미지를 모두 수신한 경우, 스캔 정보가 감시 대상 반사 빛의 정보이기 때문에 반사되는 빛의 양에 따라 해당 망점이 지시하는 이진수 값을 결정할 수 있으며, 이러한 이진수 값의 조합을 통해 최종적으로 감시 코드를 생성할 수 있는 것이다.
보다 구체적으로, 부적합 사항 판단부(113)는 드론으로부터 수신된 스캔 정보가 감시 대상 반사 빛의 정보인 경우, 이진수 값 테이블 참조하여 빛의 정보에 해당하는 음영 값이 지시하는 숫자에 따라 이진수 값을 결정한다.
즉, 부적합 사항 판단부(113)는 이진수 값 테이블을 참조하여 빛의 정보에 해당하는 음영 값이 지시하는 이진수 값이 0 또는 1인지 판단할 수 있다. 그런 다음, 건축물 감리 장치(200)는 이진수 값을 순차적으로 결합하여 감시 코드를 결정한다.
그 후, 부적합 사항 판단부(113)는 감시 코드에 해당하는 감시 대상이 작업 중지 요청된 대상과 동일한지 여부를 판단한 후, 상기 판단 결과 동일하면 감시 대상 이미지를 분석하여 작업 중지 요청된 이유를 검증한 후 검증 결과를 관리자 단말(300)에 제공한다. 따라서, 관리자 단말(300)은 건설 현장 작업 관리 서버(100)에 의한 검증 결과에 따라 작업 중지 여부를 결정할 수 있는 것이다.
상기의 실시예에서, 감시 코드가 작업자의 헬맷 및 근로자의 ID를 지시하는 경우, 부적합 사항 판단부(113)는 근로자의 ID를 이용하여 근로자 데이터베이스(113)와 연동하여 근로자 별 프로필에 안전 이력 히스토리를 업데이트한다.
작업 허가서 작업 종결 관리부(114)는 작업 허가서 점검이 완료되면 작업 종결 요청 메시지를 관리자 단말(300)에 제공하여 작업 종결이 등록된 후 작업 허가서의 종결 내용을 작업 허가서 데이터베이스(130)에 저장한다.
도 6은 본 발명에 따른 건설 현장 작업 관리 방법의 일 실시예를 설명하기 위한 흐름도이다.
도 6을 참조하면, 건설 현장 작업 관리 서버(100)는 작업 허가 대상 항목에 대한 작업 허가서 작업 절차를 관리자 단말(300)에 제공한다(단계 S610).
관리자 단말(300)은 상기 작업 허가서 작업 절차를 통해 작업 허가서를 생성한 후(단계 S615), 상기 작업 허가서에 대한 작업 허가서 검토 요청 메시지를 관리자 단말(300)에 제공한다(단계 S620).
단계 S615에 대한 일 실시예에서, 관리자 단말(300)은 작업 허가서 작업 절차를 통해 허가서 번호, 일자, 업체명, 공종 별 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 지휘자, 투입 장치 및 근로자를 입력하여 작업 허가서를 생성할 수 있다.
관리자 단말(300)은 상기 작업 허가서 검토 요청 메시지에서 추출한 작업 허가서를 검토한 후 작업 반려 또는 작업 등록 처리한 후(단계 S625), 작업 허가서 검토 요청 메시지에 대한 응답 메시지를 관리자 단말(300) 및 건설 현장 작업 관리 서버(100)에 제공한다(단계 S630).
단계 S625에 대한 일 실시예에서, 관리자 단말(300)은 작업 허가서 목록표 상의 특정 작업에 대한 점검 시 부적합 사항이 발견되면 부적합 사항 등록 절차를 통해 작업 중지 또는 시정 요청을 선택하고, 작업 중지가 선택되면 작업 중지 요청 메시지를 서로 다른 관리자 단말에 제공하고 상기 시정 요청이 선택되면 시정 요청 메시지를 서로 다른 관리자 단말에 제공한다.
건설 현장 작업 관리 서버(100)는 상기 작업 허가서 검토 요청 메시지에 대한 응답 메시지에 따라 상기 작업 허가서를 이용하여 작업 허가서 목록표를 생성한다(단계 S635).
상기 건설 현장 작업 관리 서버(100)는 작업 허가서 배정 내역을 기초로 작업 당일에 점검 대상 항목을 점검자 단말(500)에 제공한다(단계 S640).
상기 점검자 단말(500)은 상기 점검 대상 항목에 해당하는 작업 허가서를 기초로 체크 리스트를 작성하여(단계 S645) 상기 건설 현장 작업 관리 서버(100)에 제공한다(단계 S650).
단계 S645에 대한 일 실시예에서, 상기 점검자 단말(500)은 작업 허가서를 기초로 공종 별 점검 대상 항목 각각에 대한 점검 결과 입력 절차를 통해 상세 체크 리스트, 사진 및 점검 결과를 입력한 후, 점검 결과에 따라 서로 다른 관리자 단말에 점검 완료 메시지, 작업 중지 알림 메시지 및 작업 일부 보완 요청 메시지 중 어느 하나의 메시지를 제공한다.
상기 건설 현장 작업 관리 서버(100)는 상기 작업 허가서에 대한 점검 결과를 수신하면 상기 작업을 종결 처리한다(단계 S655).
도 6에는 개시되어 있지 않았지만, 건설 현장 작업 관리 서버(100)는 작업에 투입된 근로자 및 미리 지정된 근로자와 일치하는지 여부를 결정한다.
일 실시예에서, 건설 현장 작업 관리 서버(100)는 작업 허가서의 QR 코드를 스캔한 근로자 단말(200)로부터 작업 허가서의 식별 코드를 수신하면, 식별 코드에 해당하는 작업 허가서 상의 근로자 및 근로자 단말(200)에 해당하는 근로자가 일치하는지 여부에 따라 작업에 투입된 근로자 및 미리 지정된 근로자가 일치하는지 여부를 결정한다.
그 후, 건설 현장 작업 관리 서버(100)는 근로자가 매칭된 작업 허가서와 연동된 위험성 평가 정보에 대해 근로자 단말기(200)로부터 의견을 수신하면, 작업허가서 현황을 시각화 하여 BI(Business Intelligence) 서비스 관리자 단말기 및 통합마스터 Web Page에 제공한다.
도 7 내지 도 26은 본 발명에 따른 건설 현장 작업 관리 방법에 따라 관리자 단말의 실행 화면을 설명하기 위한 예시도이다.
도 7 내지 도 26을 참조하면, 건설 현장 작업 관리 서버(100)는 도 7에서와 같이 작업 허가 대상 항목의 진행 현황을 한눈에 볼 수 있는 목록표 중 어느 하나의 작업 허가 대상 항목을 선택한 후, 어느 하나의 항목에 대한 작업 허가 대상 항목에 대한 작업 허가서 작업 절차를 관리자 단말(300)에 제공한다. 관리자 단말(300)에 제공된 작업 허가서 작업 절차는 도 8과 같다.
관리자 단말(300)은 도 8과 같은 작업 허가서 작업 절차를 통해 허가서 번호, 일자, 업체명, 공종 별 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 지휘자, 투입 장치, 근로자 등을 입력하여 작업 허가서를 생성할 수 있다. 관리자 단말(300)은 도 8의 작업 허가서를 생성한 후 도 9와 같이 작업 허가서에 대한 작업 신청 시 관리자 단말(300)에 작업 허가서 검토 요청 메시지를 제공한다.
그 후, 도 10과 같이 관리자 단말(300)은 작업 허가서 검토 요청 메시지를 수신하면 작업 허가서 검토 요청 메시지에서 추출한 작업 허가서를 검토한 후 작업 반려 또는 작업 등록 처리한다.
만일, 도 10에서 관리자 단말(300)은 작업 허가서에 대한 작업 등록으로 처리되는 경우, 건설 현장 작업 관리 서버(100)는 도 11과 같이 작업 허가서 목록표를 생성한다.
따라서, 건설 현장 작업 관리 서버(100)는 도 11과 같이 작업 허가서의 공종 별로 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 지휘자, 투입 장치, 근로자, 작업 허가서 대상(즉, 위험작업허가, 일반작업허가), 허가서 종류(즉, 위험, 일반), 관리자 점검 담당자 등을 이용하여 작업 허가서 목록표를 생성한다.
이러한 작업 허가서 목록표는 작업 허가서를 직관적으로 확인 가능하도록 작업 허가서의 공종 별로 목록들이 표로 생성된 것이다.
이때, 건설 현장 작업 관리 서버(100)는 도 12와 같이 승인자에 의해 작업 허가서 목록표에 대한 승인이 되면, 작업 허가서 승인 목록을 생성하여 작업 허가서 데이터베이스(130)에 저장한 후, 작업 허가서 배정 내역을 점검자 단말(500)에 제공한다.
만일, 건설 현장 작업 관리 서버(100)는 작업 허가서 배정 내역에 따라 생성된 작업 허가서 점검표를 수신하면, 작업 허가서 점검표를 작업 허가서 데이터베이스(130)에 저장한다. 이때, 작업 허가서 데이터베이스(130)에는 작업 허가서 점검 결과, 점검자, 점검 시간, 사진, 세부 내용 등을 포함한다.
그 후, 건설 현장 작업 관리 서버(100)는 작업 당일 도 13과 같이 점검 대상 항목이 점검자 단말(500)에 제공되며, 점검자 단말(500)은 도 14와 같이 작업 허가서 점검 결과의 등록 요청에 따라 도 15와 같이 작업 허가서 점검 결과, 점검자, 점검 시간, 사진, 세부 내용 등을 입력하여 작업 허가서 점검을 완료할 수 있다. 만일, 건설 현장 작업 관리 서버(100)는 작업 허가서 점검이 완료되면 작업 종결 요청 메시지를 관리자 단말(300)에 제공하여 작업 종결이 등록되도록 한다.
이에 반하여, 도 10과 같이 관리자 단말(300)은 작업 허가서 검토 요청 메시지를 수신하면 작업 허가서 검토 요청 메시지에서 추출한 작업 허가서를 기초로 점검한 후 점검 결과에 따라 작업 반려가 등록으로 처리되는 경우, 건설 현장 작업 관리 서버(100)는 도 16과 같이 작업 허가서의 보안 사항의 요청하는 메시지를 관리자 단말(300)에 제공한다. 따라서, 관리자 단말(300)는 도 17과 같이 작업 허가서의 보안 사항의 요청하는 메시지 수신할 수 있다.
관리자 단말(300)은 도 17을 통해 작업 허가서의 보안 사항을 보안한 후 도 18과 같이 작업 허가서에 대한 재승인 요청 메시지를 생성하여 관리자 단말(300)에 제공한다. 이때, 보안 사항은
따라서, 관리자 단말(300)은 도 19와 같은 재승인 요청 메시지를 수신할 수 있고, 재승인 요청 메시지의 작업 허가서를 확인한 후 작업 허가서에 대한 최종 승인을 처리한다.
관리자 단말(300)은 도 20와 같이 작업 허가서 목록표 상의 특정 작업에 대한 점검 시 부적합 사항이 발견되면 도 21과 같이 부적합 사항 등록 절차를 통해 작업 중지 또는 시정 요청을 선택하고, 도 22와 같이 상기 작업 중지가 선택되면 작업 중지 요청 메시지를 서로 다른 관리자 단말에 제공하고 상기 시정 요청이 선택되면 시정 요청 메시지를 서로 다른 관리자 단말에 제공한다.
만일, 관리자 단말(300)은 도 23과 같은 과정을 통해 작업 중지 요청 메시지에 대한 응답으로 작업 중지가 승인되는 경우, 작업을 중지 처리한다. 그런 다음, 관리자 단말(300)은 도 24와 같이 작업 중지된 작업 반장 및 근로자의 이름이 입력 시 개인 별 프로필과 연동하여 안전 이력 히스토리를 업데이트할 수 있다.
상기와 같이, 관리자 단말(300)은 도 25와 같이 위험 공종 외 기타 작업에 대한 부적합 사항이 발견 시 점검 기록을 수신한 후 관리자 단말(300)에 제공할 수 있으며, 도 26와 같이 등록한 부적합 사항 및 조치 사항을 건설 현장 작업 관리 서버(100)에 제공하여 안전 점검 일지에 반영되도록 한다.
한정된 실시예와 도면에 의해 설명되었으나, 본 발명은 상기의 실시예에 한정되는 것은 아니며, 이는 본 발명이 속하는 분야에서 통상의 지식을 가진 자라면 이러한 기재로부터 다양한 수정 및 변형이 가능하다. 따라서, 본 발명 사상은 아래에 기재된 특허청구범위에 의해서만 파악되어야 하고, 이의 균등 또는 등가적 변형 모두는 본 발명 사상의 범주에 속한다고 할 것이다.
본 발명은, 건설 현장의 데이터를 이용하여 효과적으로 안전관리 업무를 진행할 수 있도록 한 것으로, 건설업 분야에서 널리 이용하여 그 실용적이고 경제적인 가치를 실현할 수 있는 기술이다.

Claims (10)

  1. 작업 허가 대상 항목에 대한 작업 허가서 작업 절차를 제공하고, 상기 작업 허가서 작업 절차를 통해 정보를 입력받으면 작업 허가서를 생성하여 제공하고, 상기 작업 허가서 검토 요청 메시지에 대한 응답 메시지에 따라 상기 작업 허가서를 이용하여 작업 허가서 목록표를 생성하고, 상기 작업 허가서에 대한 점검 결과를 수신하면 상기 작업을 종결 처리하는 건설 현장 작업 관리 서버; 및
    상기 작업 허가서 작업 절차를 통해 작업 허가서를 생성한 후 상기 작업 허가서에 대한 작업 허가서 검토 요청 메시지를 제공하고, 상기 작업 허가서 검토 요청 메시지를 수신하면 상기 작업 허가서 검토 요청 메시지에서 추출한 작업 허가서를 검토한 후 작업 반려 또는 작업 등록 처리하고, 상기 작업 허가서를 기초로 체크 리스트를 작성하는 점검자 단말을 포함하는 것을 특징으로 하는
    건설 현장 작업 관리 시스템.
  2. 제1항에 있어서,
    상기 점검자 단말은
    상기 작업 허가서 작업 절차를 통해 허가서 번호, 일자, 업체명, 공종 별 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 지휘자, 투입 장치 및 근로자를 입력하여 작업 허가서를 생성하는 관리자 단말을 포함하는 것을 특징으로 하는
    건설 현장 작업 관리 시스템.
  3. 제1항에 있어서,
    상기 점검자 단말은
    상기 작업 허가서를 기초로 공종 별 점검 대상 항목 각각에 대한 점검 결과 입력 절차를 통해 상세 체크 리스트, 사진 및 점검 결과를 입력하고, 상기 점검 결과에 따라 서로 다른 관리자 단말에 점검 완료 메시지, 작업 중지 알림 메시지 및 작업 일부 보완 요청 메시지 중 어느 하나의 메시지를 제공하는 것을 특징으로 하는
    건설 현장 작업 관리 시스템.
  4. 제2항에 있어서,
    상기 관리자 단말은
    상기 작업 허가서 목록표 상의 특정 작업에 대한 점검 시 부적합 사항이 발견되면 부적합 사항 등록 절차를 통해 작업 중지 또는 시정 요청을 선택하고, 상기 작업 중지가 선택되면 작업 중지 요청 메시지를 서로 다른 관리자 단말에 제공하고 상기 시정 요청이 선택되면 시정 요청 메시지를 서로 다른 관리자 단말에 제공하는 것을 특징으로 하는
    건설 현장 작업 관리 시스템.
  5. 제4항에 있어서,
    상기 건설 현장 작업 관리 서버는
    상기 관리자 단말이 상기 부적합 사항 등록 절차를 통해 등록한 부적합 사항 및 조치 사항을 이용하여 안전 점검 일지를 생성하는 것을 특징으로 하는
    건설 현장 작업 관리 시스템.
  6. 건설 현장 작업 관리 서버가 작업 허가 대상 항목에 대한 작업 허가서 작업 절차를 관리자 단말에 제공하는 단계;
    상기 관리자 단말이 상기 작업 허가서 작업 절차를 통해 작업 허가서를 생성한 후 상기 작업 허가서에 대한 작업 허가서 검토 요청 메시지를 관리자 단말에 제공하는 단계;
    상기 관리자 단말이 상기 작업 허가서 검토 요청 메시지에서 추출한 작업 허가서를 검토한 후 작업 반려 또는 작업 등록 처리하는 단계;
    상기 건설 현장 작업 관리 서버가 상기 작업 허가서 검토 요청 메시지에 대한 응답 메시지에 따라 상기 작업 허가서를 이용하여 작업 허가서 목록표를 생성하는 단계;
    상기 건설 현장 작업 관리 서버가 작업 허가서 배정 내역을 기초로 작업 당일에 점검 대상 항목을 점검자 단말에 제공하는 단계;
    상기 점검자 단말이 상기 점검 대상 항목에 해당하는 작업 허가서를 기초로 체크 리스트를 작성하여 상기 건설 현장 작업 관리 서버에 제공하는 단계; 및
    상기 건설 현장 작업 관리 서버가 상기 작업 허가서에 대한 점검 결과를 수신하면 상기 작업을 종결 처리하는 단계를 포함하는 것을 특징으로 하는
    건설 현장 작업 관리 방법.
  7. 제6항에 있어서,
    상기 관리자 단말이 상기 작업 허가서 작업 절차를 통해 작업 허가서를 생성한 후 상기 작업 허가서에 대한 작업 허가서 검토 요청 메시지를 관리자 단말에 제공하는 단계는
    상기 작업 허가서 작업 절차를 통해 허가서 번호, 일자, 업체명, 공종 별 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 지휘자, 투입 장치 및 근로자를 입력하여 작업 허가서를 생성하는 단계를 포함하는 것을 특징으로 하는
    건설 현장 작업 관리 방법.
  8. 제6항에 있어서,
    상기 점검자 단말이 상기 점검 대상 항목에 해당하는 작업 허가서를 기초로 체크 리스트를 작성하여 상기 건설 현장 작업 관리 서버에 제공하는 단계는
    상기 점검자 단말이 상기 작업 허가서를 기초로 공종 별 점검 대상 항목 각각에 대한 점검 결과 입력 절차를 통해 상세 체크 리스트, 사진 및 점검 결과를 입력하는 단계; 및
    상기 점검자 단말이 상기 점검 결과에 따라 서로 다른 관리자 단말에 점검 완료 메시지, 작업 중지 알림 메시지 및 작업 일부 보완 요청 메시지 중 어느 하나의 메시지를 제공하는 단계를 더 포함하는 것을 특징으로 하는
    건설 현장 작업 관리 방법.
  9. 제6항에 있어서,
    상기 관리자 단말이 상기 작업 허가서 검토 요청 메시지에서 추출한 작업 허가서를 검토한 후 작업 반려 또는 작업 등록 처리하는 단계는
    상기 관리자 단말이 상기 작업 허가서 목록표 상의 특정 작업에 대한 점검 시 부적합 사항이 발견되면 부적합 사항 등록 절차를 통해 작업 중지 또는 시정 요청을 선택하는 단계; 및
    상기 관리자 단말이 상기 작업 중지가 선택되면 작업 중지 요청 메시지를 서로 다른 관리자 단말에 제공하고 상기 시정 요청이 선택되면 시정 요청 메시지를 서로 다른 관리자 단말에 제공하는 단계를 포함하는 것을 특징으로 하는
    건설 현장 작업 관리 방법.
  10. 제6항에 있어서,
    상기 건설 현장 작업 관리 서버가 상기 관리자 단말이 부적합 사항 등록 절차를 통해 등록한 부적합 사항 및 조치 사항을 이용하여 안전 점검 일지를 생성하는 단계를 더 포함하는 것을 특징으로 하는
    건설 현장 작업 관리 방법.
PCT/KR2022/008437 2021-06-17 2022-06-14 건설 현장 작업 관리 방법 및 이를 실행하는 시스템 WO2022265373A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020210079026A KR102363618B1 (ko) 2021-06-17 2021-06-17 건설 현장 작업 관리 방법 및 이를 실행하는 시스템
KR10-2021-0079026 2021-06-17

Publications (1)

Publication Number Publication Date
WO2022265373A1 true WO2022265373A1 (ko) 2022-12-22

Family

ID=80325246

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2022/008437 WO2022265373A1 (ko) 2021-06-17 2022-06-14 건설 현장 작업 관리 방법 및 이를 실행하는 시스템

Country Status (2)

Country Link
KR (1) KR102363618B1 (ko)
WO (1) WO2022265373A1 (ko)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116432989A (zh) * 2023-06-13 2023-07-14 中天建设集团有限公司 一种基于智能建造的施工现场安全管控***

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102363618B1 (ko) * 2021-06-17 2022-02-15 에스케이에코플랜트(주) 건설 현장 작업 관리 방법 및 이를 실행하는 시스템
KR102489398B1 (ko) * 2022-09-28 2023-01-18 방재웅 효율적이고 안전한 석면해체공사를 위한 스마트 감리 및 건설사업관리시스템

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140111124A (ko) * 2013-03-07 2014-09-18 현대중공업 주식회사 플랜트 공사현장 이상상황 관리장치
KR101485925B1 (ko) * 2012-12-03 2015-01-26 한국 전기안전공사 현장작업자 안전감시시스템
KR101983265B1 (ko) * 2018-10-10 2019-09-09 (주)미래산업안전기술원 작업 현장의 안전 진단 관리 시스템 및 그 구동방법
KR102235036B1 (ko) * 2020-08-14 2021-04-01 주식회사 이도 건설 현장 안전 관리 시스템
KR102247941B1 (ko) * 2020-06-09 2021-05-04 (주)클라우드랩 스마트 위험성 평가 시스템 및 이를 이용한 평가 방법
KR102363618B1 (ko) * 2021-06-17 2022-02-15 에스케이에코플랜트(주) 건설 현장 작업 관리 방법 및 이를 실행하는 시스템

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101485925B1 (ko) * 2012-12-03 2015-01-26 한국 전기안전공사 현장작업자 안전감시시스템
KR20140111124A (ko) * 2013-03-07 2014-09-18 현대중공업 주식회사 플랜트 공사현장 이상상황 관리장치
KR101983265B1 (ko) * 2018-10-10 2019-09-09 (주)미래산업안전기술원 작업 현장의 안전 진단 관리 시스템 및 그 구동방법
KR102247941B1 (ko) * 2020-06-09 2021-05-04 (주)클라우드랩 스마트 위험성 평가 시스템 및 이를 이용한 평가 방법
KR102235036B1 (ko) * 2020-08-14 2021-04-01 주식회사 이도 건설 현장 안전 관리 시스템
KR102363618B1 (ko) * 2021-06-17 2022-02-15 에스케이에코플랜트(주) 건설 현장 작업 관리 방법 및 이를 실행하는 시스템

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116432989A (zh) * 2023-06-13 2023-07-14 中天建设集团有限公司 一种基于智能建造的施工现场安全管控***
CN116432989B (zh) * 2023-06-13 2023-09-22 中天建设集团有限公司 一种基于智能建造的施工现场安全管控***

Also Published As

Publication number Publication date
KR102363618B1 (ko) 2022-02-15

Similar Documents

Publication Publication Date Title
WO2022265371A1 (ko) 건설 현장 안전 관리 시스템
WO2022265373A1 (ko) 건설 현장 작업 관리 방법 및 이를 실행하는 시스템
WO2022265375A1 (ko) 건설 현장 위험성 예측 방법 및 이를 실행하는 서버
WO2022265372A1 (ko) 건설 현장 근로자 관리 방법 및 이를 실행하는 서버
CN107615339A (zh) 门禁管理方法及***
WO2022265374A1 (ko) 건설 현장 커뮤니케이션 서비스 제공 방법 및 이를 실행하는 시스템
WO2022119052A1 (ko) 쓰레기 배출량 측정 및 수거 관리 서버, 방법 및 프로그램
WO2021095916A1 (ko) 객체의 이동경로를 추적할 수 있는 추적시스템
WO2016006977A1 (en) Apparatus, server, system and method for energy measuring
WO2021230522A1 (ko) 최종가격산정부를 갖는 토지시세 추정시스템 및 추정방법
WO2018166098A1 (zh) 数据稽核方法、装置、移动终端及计算机可读存储介质
WO2020138903A2 (ko) 일정 관리 서비스 시스템 및 방법
WO2023058973A1 (ko) 인공지능과 기계 학습 기반 해외 공공조달 맞춤형 입찰정보 제공 서비스 시스템 및 방법
KR20210122765A (ko) 드론 및 스마트글라스를 이용한 시설물 점검 시스템
WO2020080807A1 (ko) 행위패턴인식을 이용한 관리시스템
WO2020209400A1 (ko) 작업일보를 이용한 안전정보 생성 방법 및 장치
WO2018008835A1 (ko) 증권 포트폴리오를 위한 리스크 관리 방법 및 이를 위한 리스크 관리 장치.
WO2017188505A1 (ko) 중고휴대폰 인증코드 부여 장치, 중고휴대폰 인증 시스템, 및 이를 이용한 중고휴대폰 인증 방법
WO2021096081A1 (ko) 디지털 사이니지 관리 방법 및 그 장치
WO2017222125A1 (ko) 식별코드를 이용한 자필서명 검증 시스템 및 방법
WO2023210889A1 (ko) 비대면 검체 앰플 공급 키오스크 시스템 및 그 방법
JP2017045321A (ja) 情報管理システム、情報管理方法、及び情報管理プログラム
WO2022250190A1 (ko) 딥러닝 모델을 이용한 영상검사 대상체의 결함 판정시스템
WO2017222129A1 (ko) 항공기 운항 중 카드결제를 처리하는 기내 결제 서비스 제공 방법 및 장치
WO2020141745A1 (ko) 집단 지성 기반의 상호 검증을 이용한 인공지능 기반 객체인식 신뢰도 향상 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22825296

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 22825296

Country of ref document: EP

Kind code of ref document: A1