WO2022265371A1 - 건설 현장 안전 관리 시스템 - Google Patents

건설 현장 안전 관리 시스템 Download PDF

Info

Publication number
WO2022265371A1
WO2022265371A1 PCT/KR2022/008435 KR2022008435W WO2022265371A1 WO 2022265371 A1 WO2022265371 A1 WO 2022265371A1 KR 2022008435 W KR2022008435 W KR 2022008435W WO 2022265371 A1 WO2022265371 A1 WO 2022265371A1
Authority
WO
WIPO (PCT)
Prior art keywords
construction site
worker
information
safety management
work
Prior art date
Application number
PCT/KR2022/008435
Other languages
English (en)
French (fr)
Inventor
안재현
장현
조재연
김영환
김철민
정재웅
안예빈
이아미
허동영
홍초희
Original Assignee
에스케이에코플랜트(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 에스케이에코플랜트(주) filed Critical 에스케이에코플랜트(주)
Publication of WO2022265371A1 publication Critical patent/WO2022265371A1/ko

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/248Presentation of query results
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/02Reservations, e.g. for tickets, services or events
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry

Definitions

  • the present invention relates to a construction site safety management system, and more particularly, to a construction site safety management system capable of conducting safety management tasks at a construction site using construction site data.
  • construction sites have a fatal problem in that valuable human resources are lost due to frequent safety accidents due to hazards resulting from various environments inherent in the site itself or minor negligence of workers.
  • An object of the present invention is to provide a construction site safety management system that can lead to voluntary change by enabling safety to positively affect the economic value of workers through worker profile management.
  • an object of the present invention is to provide a construction site safety management system that can optimize the placement of workers in the site based on this after confirming the skill level through the past career registered by the worker.
  • an object of the present invention is to provide a construction site safety management system that enables a health manager to identify when and what kind of examination a worker needs to undergo by efficiently managing the history and evidence related to the worker's health examination. .
  • an object of the present invention is to provide a construction site safety management system that allows workers to receive training at an appropriate time by managing the training contents of workers.
  • an object of the present invention is to provide a construction site safety management system that can effectively conduct a safety inspection for high-risk work.
  • an object of the present invention is to provide a construction site safety management system capable of automatically generating a safety inspection log based on the checklist by providing a checklist for each of high-risk work and general work.
  • an object of the present invention is to provide a construction site safety management system capable of updating a worker profile based on the collected data after collecting unsafe behavior data of workers based on the type of accident.
  • an object of the present invention is to provide a construction site safety management system that automatically generates a safety point log by automatically reflecting unsafe behavior directly input by a manager into the worker's eye check log.
  • an object of the present invention is to provide a construction site safety management system characterized in that it provides a construction site-specific communication tool capable of automatically generating a safety inspection log by collecting risk factors generated at the construction site. .
  • an object of the present invention is to provide a construction site safety management system that can improve the reliability of work risk assessment information such as risk factors, risk levels, and safety measures for each type of work through analysis of past accident cases.
  • an object of the present invention is to provide a construction site safety management system capable of predicting the risk of accidents for each construction progress reflecting site-specific characteristics and work environments and informing dangerous situations.
  • the construction site safety management system manages workers' education completion information, license acquisition information, past career information, and health checkup information, and inputs them from the inspector terminal through an input procedure for worker unsafe behaviors.
  • the risk evaluation grade A construction site safety management server that generates and manages the corresponding evaluation result data, provides training completion information through a registration procedure for training completion information received from the construction site safety management server, and obtains a license received from the construction site safety management server.
  • a worker terminal providing certificate acquisition information and a worker training list are received and provided to the worker terminal, and after the training of workers is conducted according to the training list, a message requesting confirmation of training completion is sent to the construction site safety management and a manager terminal for receiving an experienced person guide message as a response to the experienced person search request message after providing the experienced person search request message to the construction site safety management server.
  • the health manager can identify when and what kind of examination the worker should undergo by efficiently managing the history and evidence related to the health examination of the worker.
  • a safety inspection log can be automatically generated based on the check list by providing a check list for each of high-risk work and normal work.
  • the worker's profile can be updated based on the collected data after collecting workers' unsafe behavior data based on the type of accident.
  • the safety point diary can be automatically generated by automatically reflecting the worker's eyesight check diary.
  • FIG. 1 is a network configuration diagram illustrating a construction site safety management system according to an embodiment of the present invention.
  • FIG. 2 is a network configuration diagram illustrating a construction site safety management system according to another embodiment of the present invention.
  • FIG. 3 is a network configuration diagram illustrating a construction site safety management system according to another embodiment of the present invention.
  • FIG. 4 is a network configuration diagram illustrating a construction site safety management system according to another embodiment of the present invention.
  • 5 to 9 are exemplary diagrams for explaining a worker profile management process for safety management at a construction site according to the present invention.
  • FIG. 10 is an exemplary diagram for explaining a construction site communication providing process for construction site safety management according to the present invention.
  • FIG. 1 is a network configuration diagram illustrating a construction site safety management system according to an embodiment of the present invention.
  • the construction site safety management system includes a construction site safety management server 100 , a worker terminal 200 and a manager terminal 300 .
  • the construction site safety management server 100 includes an education completion information database 110, a license database 111, a career information database 112, a worker database 113, and a health examination database 114.
  • the construction site safety management server 100 receives and stores worker profile information from the worker terminal 200 through communication with the worker terminal 200 .
  • worker profile information may include personal information, career, education history, health checkup history, and the like.
  • the construction site safety management server 100 provides a training completion information registration process to the worker terminal 200 before the worker goes to work, and receives training completion information through the training completion information registration process.
  • the education completion information may include a name, a date of birth, a registration number, a date of completion, a photograph of the certificate of completion, and the like for each certificate of education completion.
  • the above training certificate is a certificate issued after completing training on construction site safety management, and may include a basic health certificate.
  • an authenticity determination code for determining authenticity may be inserted into the above education certificate and issued. That is, when printed by an educational completion issuing institution, pixel spaces of different sizes corresponding to authenticity/counterfeit codes are output together and issued.
  • the construction site safety management server 100 can determine the authenticity of the education certificate by using the authenticity determination code received from the education certificate issuing institution server.
  • the construction site safety management server 100 analyzes the pixels in the process of scanning to determine the authenticity of the education certificate, the pixel space corresponding to the authenticity determination code can be extracted because the values of the pixels are different. .
  • the construction site safety management server 100 extracts a plurality of pixel spaces from the training certificate in the process of scanning and analyzing the training certificate, and then generates an authenticity/counterfeiting code using the binary values indicated by the dotted dots in the plurality of pixel spaces. can do.
  • the construction site safety management server 100 extracts 1 pixel space composed of 4 points and 6 pixel spaces composed of 8 points, the pixel space composed of 4 points is recognized as 1, and 8 By recognizing a pixel space made up of dots as 0, the authenticity determination code “1000000” can be generated.
  • the construction site safety management server 100 extracts 2 pixel spaces of 6 dots and 3 pixel spaces of 8 dots, the pixel space of 6 dots is recognized as 1, and 8 A pixel space composed of points is recognized as 0 to generate the authenticity determination code “11000”.
  • the construction site safety management server 100 may determine the authenticity of the training certificate by comparing the authenticity determination code and the previously received authenticity determination code.
  • the construction site safety management server 100 calculates the effective time and training time for each training using the training completion information recorded in the training completion certificate after determining whether the training completion certificate is authentic, and then lists the training types for each worker. And the authentication time is stored in the education completion information database 110 .
  • the accumulated education time is updated by reflecting the education time to the previously accumulated accumulated education time.
  • the construction site safety management server 100 generates a worker education list and provides the worker education list to the worker terminal 200 .
  • the worker training list may include a manager, company, site, date, name, date of birth, whether or not a new person has completed training, an effective period, whether to go to work, a list of required training, whether or not required training has been completed.
  • the construction site safety management server 100 receives attendance authentication information from the worker terminal 200, and after the worker's training is performed according to the worker training list from the manager terminal 300, the training proof photo and training proof information A training completion confirmation request message including a is received.
  • the attendance certification information may include the name of the worker and the name of the supervisor, and the training proof information is the training category, training target, work type name, training date, training location, training time, training manager (manager, etc.), training content etc. may be included.
  • the construction site safety management server 100 certifies attendance using the attendance authentication information in the training completion confirmation request message, extracts training evidence information, and then provides training for each worker stored in the training completion information database 110 using the training evidence information. Updates the type list and cumulative time.
  • the construction site safety management server 100 calculates the effective time and training time for each training using the training evidence information, then updates the training type list for each worker using the training type, and calculates the accumulated time using the certification time. It is updated and stored in the education completion information database 110 for each worker.
  • the construction site safety management server 100 provides a certificate acquisition information registration procedure to the worker terminal 200, receives the certificate acquisition information through the certificate acquisition information registration procedure, and stores the certificate acquisition information for each worker in the qualification database 111. save to
  • the certificate acquisition information includes essential and optional information for each certificate, and the essential information includes title, name, nationality, resident registration number, address, nationality, date of issuance, aptitude test, expiration date, license in possession, and photo evidence
  • the selection information may include an insurance policy, a business registration certificate, an equipment registration certificate (eg, a result of a non-destructive test of a crane, a pump car, etc.), a photograph of evidence, and the like.
  • the above qualification is a qualification issued after certification of technology usable at a construction site through a test, and may include a mechanical pilot and the like.
  • an authenticity determination code for determining authenticity may be inserted and issued. That is, when a certificate is issued by an institution, pixel spaces of different sizes corresponding to authenticity/counterfeiting codes are output together and issued.
  • the construction site safety management server 100 can determine the authenticity of the certificate by using the authenticity determination code received from the certificate test host organization server.
  • the pixel space of different sizes inserted in the above certificate is set to a color similar to that of the background of the certificate of education (i.e., the color corresponding to the value where the RGB value of the background is above or below a certain value), the user's eyes Although it is not visible, when the construction site safety management server 100 analyzes pixels to determine the authenticity of an evidence photo such as a license, the pixel space corresponding to the authenticity determination code can be extracted because the values of the pixels are different.
  • the construction site safety management server 100 extracts a plurality of pixel spaces from the proof photos, such as certificates, in the process of scanning and analyzing proof photos, such as certificates, and then uses binary values indicated by dotted dots in the plurality of pixel spaces. Thus, an authenticity determination code can be generated.
  • the construction site safety management server 100 extracts 1 pixel space composed of 4 points and 6 pixel spaces composed of 8 points, the pixel space composed of 4 points is recognized as 1, and 8 By recognizing a pixel space made up of dots as 0, the authenticity determination code “1000000” can be generated.
  • the construction site safety management server 100 extracts 2 pixel spaces of 6 dots and 3 pixel spaces of 8 dots, the pixel space of 6 dots is recognized as 1, and 8 A pixel space composed of points is recognized as 0 to generate the authenticity determination code “11000”.
  • the construction site safety management server 100 may compare the authenticity determination code and the previously received authenticity determination code to determine authenticity of the certificate. As described above, the construction site safety management server 100 stores certification acquisition information for each worker in the certification database 111 after determining whether the certification is authentic.
  • the construction site safety management server 100 uses the certification acquisition information for each worker stored in the certification database 111 to determine if the period remaining until the expiration date of the certification validity period or the validity period of each equipment registration certificate is less than a specific period, the worker terminal 200 ) can provide a notification message for the expiration of the validity period of the license.
  • the construction site safety management server 100 extracts career information from the past career registration request message and then stores the career information for each worker in the career information database. Save to (112).
  • the career information may include the number of days worked, type of work, ordering party (eg, company), type of project (eg, civil engineering, construction, plant, etc.), manager, detailed type of work, and the like.
  • the construction site safety management server 100 when receiving the experienced worker search request message from the manager terminal 300, extracts workers from the career information database 112 according to the experienced worker search request message and guides experienced workers including career information. provide a message. In this way, the construction site safety management server 100 provides career information together so that the operator can refer to the project arrangement of workers based on the career information.
  • the construction site safety management server 100 checks the career and updates the career information for each worker stored in the career information database 112 .
  • the construction site safety management server 100 generates a list of workers using the worker information for each worker stored in the worker database 113 and the health checkup target stored in the health checkup database 114, and then the hospital server ( Not shown) provides a health checkup reservation message for reserving a health checkup for workers on the worker list.
  • the list of workers may include a checkup type for each worker, a next checkup date, a scheduled checkup institution, a desired checkup reservation date, and the like.
  • the construction site safety management server 100 recognizes the examination result document issued by the hospital server (not shown), generates examination results from the examination result document, and then stores the examination results for each worker in the worker database 113. Save.
  • the construction site safety management server 100 when the construction site safety management server 100 receives a checkup result document issued by the hospital server from the manager terminal 300, it recognizes the checkup result document using OCR technology and then corresponds to a predetermined item The contents are extracted and stored in the worker database (113).
  • FIG. 2 is a network configuration diagram illustrating a construction site safety management system according to another embodiment of the present invention.
  • the construction site safety management system includes a construction site safety management server 100 , a manager terminal 300 and a Korea Meteorological Administration server 400 .
  • the construction site safety management server 100 includes an accident risk assessment database 120, a risk assessment standard model 121, a risk assessment database 122, a site risk characteristic prediction model 123, and an accident case database 124. .
  • the construction site safety management server 100 generates risk evaluation results for each work type based on the accident risk evaluation database 120 and the risk evaluation standard model 121 .
  • the accident risk evaluation database 120 stores accident frequency ratios for each work type, accident occurrence intensity ratios for each work type, and details for each disaster.
  • the details of each disaster may include the process, artifact, accident type, unit work, number of victims (death/injury), site location, construction type, construction amount, and completion rate.
  • Risk factors for each type of work and safety measures for each risk factor are stored in the risk evaluation standard model 121 .
  • the keywords correspond to the keywords in the accident risk assessment database 120. Extract the accident frequency rate by work type, accident intensity rate by work type, and details by disaster.
  • the above keywords may be determined by process, accident person, accident type, unit work content, and the like.
  • the construction site safety management server 100 calculates the risk evaluation result for each work type using the accident frequency ratio and accident intensity ratio for each work type.
  • the construction site safety management server 100 may calculate the risk evaluation result for each work type through the AI engine or through [Equation 1] to [Equation 6] below.
  • the process of calculating the risk evaluation result for each type of work will be described through [Equation 1] to [Equation 6].
  • the construction site safety management server 100 evaluates the risk for each work type by using the accident occurrence frequency ratio for each work type and the accident occurrence intensity ratio for each work type extracted from the risk evaluation database 122 based on [Equation 1]. grades can be calculated.
  • the risk evaluation database 122 stores the accident frequency ratio and accident intensity ratio for each work type, and may be automatically updated as the application is used.
  • Part_Danger_level Risk evaluation level for each type of work
  • the accident frequency rate (Danger_fre_rate) by work type is calculated by [Equation 2] below
  • the accident intensity rate (Danger_str_rate) by work type is calculated by [Equation 3] below
  • the weight (Danger_W) determined by the time of accident for each construction type is assigned a higher weight as the time of accident is closer to the present time for cases where the time of accident does not exceed 3 years from the present time.
  • a pre-determined weight (e.g., “1”) is assigned to cases in which the current time exceeds 3 years.
  • part_victim accident index by work type
  • the accident index (part_victim) and the total disaster index (total_victi) for each type of work may be determined by the details (ie, the number of victims) for each disaster extracted from the risk evaluation database 122.
  • part_dead_people_rate Calculated by [Equation 4] as the death rate for each type of work
  • part_injured_people_rate Calculated by [Equation 5] as the ratio of injured people by work type
  • part_dead_people_rate (part_dead_people / total_dead_people) ⁇ 100
  • part_dead_people_rate Rate of death by type of work
  • part_dead_people Number of deaths by type of work
  • total_dead_people total number of dead people
  • the number of deaths by type of work (part_dead_people) and the total number of deaths (total_dead_people) may be determined by the details of each disaster extracted from the risk assessment database 122 (ie, deaths among the number of victims).
  • part_dead_people_rate Percentage of injured people by work type
  • part_dead_people Number of injured people by type of work
  • total_dead_people total number of dead people
  • the number of injured people by work type (part_dead_people) and the total number of injured people (total_dead_people) may be determined by the details of each disaster extracted from the risk assessment database 122 (ie, the number of injured people among the number of injured people).
  • the risk evaluation grade for each type of work calculated through [Equation 1] to [Equation 5] may be as shown in [Table 1] below.
  • the construction site safety management server 100 when the risk evaluation grade for each work type is determined based on the accident risk evaluation database 120, the risk factor corresponding to the risk evaluation grade for each work type in the risk evaluation standard model 121 and safety measures for each risk factor are extracted.
  • the construction site safety management server 100 generates risk evaluation result data using risk evaluation grades, risk factors, and safety measures for each risk factor, and then stores the risk evaluation result data in a risk evaluation database.
  • the construction site safety management server 100 predicts the risk level by reflecting the risk evaluation result data, site information, and the risk evaluation index for each construction cycle based on the site risk characteristic prediction model. generate data
  • the site information above may include site address, construction type, construction scale (amount), construction period, master schedule/construction permit information for each construction cycle: site location, actual start date, main use code name, etc.
  • the site risk characteristic prediction model 123 is the site location, construction type, construction scale, weather, process progress, delay, patrol data by work type (Patrol Data), patrol data by accident type (Patrol Data), compared to all workers The safety score ratio for each site worker and work team is stored.
  • ConstructionPeriod_Danger_value PastPart_Danger_value + weight
  • ConstructionPeriod_Danger_value Risk evaluation index for each construction period
  • PastPart_Danger_value Risk evaluation index for each type of work in the past
  • the site risk characteristic weight may be changed according to fixed factors, variable factors, and field inconsistencies.
  • Fixed factors include site location, type of construction, and scale of construction, and variable factors include weather information received from the Korea Meteorological Administration server 400 and progress and delay against a predetermined schedule.
  • Site nonconformities refer to site nonconformities pointed out by the site manager.
  • field nonconformities may include failure to fasten safety rings.
  • the risk evaluation index for each construction cycle is changed by changing the site risk characteristic weight according to the fixed factor, the variable factor, and the field unsuitability.
  • FIG. 3 is a network configuration diagram illustrating a construction site work management system according to another embodiment of the present invention.
  • the construction site work management system includes a construction site work management server 100 and an inspector terminal 500, and the inspector terminal 500 includes a manager terminal 300 and a supervisor terminal 600.
  • the construction site work management server 100 includes a work permit database 130 and a site subscriber database 131 .
  • a drone (not shown) may be further included.
  • the drone photographs a construction site surveillance target according to a control signal received from the construction site work management server 100, generates scan information and images for the monitoring target, and provides the scanned information and images to the construction site work management server 100.
  • the drone scans a "safety handrail" to be monitored for a construction phenomenon, and then provides scan information and an image to be monitored to the construction site work management server 100 .
  • the drone irradiates light to the monitoring target at the construction site to photograph the monitoring target, and then scan information and An image to be monitored is generated and provided to the construction site work management server 100 .
  • the monitoring target may include a worker's helmet, construction materials, and the like.
  • a monitoring target is made of metal
  • dot dots having different depths and widths reflect the applied light.
  • the drone provides scan information including reflected light information on the monitoring target and monitoring target image to the construction site work management server 100 by using information of light reflected from the monitoring target.
  • the drone scans the monitoring target to generate a monitoring target image, and then provides the monitoring target image to the construction site work management server 100.
  • a plurality of halftone dots corresponding to the monitoring code may be inserted into the monitoring target image in a color similar to the pattern of the monitoring target. That is, a plurality of halftone dots corresponding to the monitoring code may be inserted into the monitoring target image with pixel values higher than or lower than a specific value than the pixel value of the pattern of the monitoring target.
  • the construction site work management server 100 may extract a plurality of halftone dots by analyzing pixels of the image to be monitored, and then generate a monitoring code using binary values corresponding to the plurality of halftone dots.
  • the construction site work management server 100 includes a work permit database 130 and a site subscriber database 131 .
  • the construction site work management server 100 provides a work permit work procedure to the manager terminal 700 based on worker data.
  • the work permit database 130 includes a checklist for each work permit, and the field subscriber database 131 stores the name and affiliation of each foreman and the name and affiliation of each worker.
  • the construction site work management server 100 creates a work permit list using the work permit.
  • the work permit generated by the manager may include the permit number, date, company name, work details by work type, work place, input number of people, work hours, work foremen, input devices, workers, and the like.
  • the construction site work management server 100 provides work details, work places, input personnel, work hours, work foremen, input devices, workers, and work permit targets (ie, dangerous work permit, general work permit) for each work type of the work permit. , permit type (ie, special, hazardous, general), manager, inspector, etc., to create a list of permits to work.
  • This list of work permits is a table in which lists are created for each type of work permit so that work permits can be intuitively checked.
  • the construction site work management server 100 creates a work permit generation list and stores it in the work permit database 130 . After that, the manager assigns tasks to be checked by himself.
  • the construction site work management server 100 receives the work permit checklist generated according to the work permit assignment details, it stores the work permit checklist in the work permit database 130 .
  • the work permit database 130 includes work permit inspection results, inspectors, inspection time, photos, details, and the like.
  • the construction site work management server 100 moves to the work place based on the work stop request message when the work stop is selected through the non-conformity registration procedure after the non-conformity is found and the work stop request message is received.
  • a control command for photographing an inspection target corresponding to the details of may be provided to the drone.
  • the construction site work management server 100 is located on the 4th basement floor of Building 105.
  • a control command to move to the collecting well and photograph the upper safety ring may be provided to the drone.
  • the construction site work management server 100 receives at least one of scan information (for example, information on reflected light of building materials) and a monitoring target image for the monitoring target from the drone, and then scan information and the monitoring target image. At least one of them is used to generate a monitoring code.
  • scan information for example, information on reflected light of building materials
  • monitoring target image for the monitoring target from the drone
  • the construction site work management server 100 determines the binary value indicated by the corresponding dot according to the amount of reflected light. and through the combination of these binary values, the monitoring code can be finally generated.
  • the construction site work management server 100 refers to the binary value table to obtain a binary value according to the number indicated by the shade value corresponding to the light information. decide
  • the construction site work management server 100 may determine whether a binary value indicated by a shade value corresponding to light information is 0 or 1 by referring to the binary value table. Then, the building monitoring device 200 determines a monitoring code by sequentially combining binary values.
  • a binary value corresponding to a shade value of 24 is stored as 1, and a binary value corresponding to a shade value of 35 is stored as 0, and the construction site work management server 100 stores light information
  • the shade value corresponding to is 24, the binary value is determined as 1, and when the shade value corresponding to light information is 35, the binary value is determined as 0 to generate the monitoring code “1000000”.
  • the construction site work management server 100 determines whether the monitoring target corresponding to the monitoring code is the same as the target for which the work stop is requested, and if the result is the same, the monitoring target image is analyzed to determine the reason for the work stop request. After verification, the verification result is provided to the manager terminal 300 . Therefore, the manager terminal 300 can determine whether or not to stop the work according to the verification result by the construction site work management server 100 .
  • the construction site work management server 100 uses the worker's ID to link with the worker database 113 to record safety records in each worker's profile. update the history
  • the construction site work management server 100 when the construction site work management server 100 receives the monitoring target image, it analyzes the monitoring target image and extracts a plurality of dots having different sizes from each other. Then, the construction site work management server 100 generates a monitoring code using binary values corresponding to a plurality of halftone dots.
  • the construction site work management server 100 refers to the binary value table, extracts binary values according to the number of dotted dots, and generates a monitoring code through a combination of binary values.
  • the construction site work management server 100 provides a work termination request message to the manager terminal 300 when the work permit check is completed, and after work termination is registered, the work permit termination details are stored in the work permit database 130. Save.
  • the inspector terminal 500 selects work suspension or correction request through a nonconformity registration procedure when a nonconformity is found during inspection of a specific work on the work permit list received from the construction site work management server 100 .
  • the inspector terminal 500 provides a work stop request message to different inspector terminals, and if a correction request is selected after nonconformities are found, a correction request message is sent to different inspectors. provided to the terminal.
  • the manager terminal 300 After receiving the work permit work procedure from the construction site work management server 100, the manager terminal 300 generates a work permit through the work permit work procedure. At this time, the manager terminal 300 inputs the permit number, date, company name, work details for each type of work, work place, number of inputs, working hours, work foremen, input devices, and workers through the work permit work procedure to generate a work permit.
  • the inspector terminal 500 performs an inspection based on the work permit list received from the construction site work management server 100 .
  • the inspector terminal 500 inputs a detailed check list, photos, and inspection results through an inspection result input procedure for each inspection target item for each work type based on the work permit. Then, the inspector terminal 500 may provide any one of a job approval request message, a job suspension notification message, and a job partial supplement request message to different manager terminals according to the inspection result.
  • the inspector terminal 500 may provide a work approval request message to the corresponding work type manager terminal and worker terminal when the inspection result is “good”.
  • the inspector terminal 500 may provide a work stop notification message to the corresponding process manager terminal and worker terminals when the inspection result is “defective”.
  • the inspector terminal 500 may provide a supplementary request message for part of the work to the corresponding process manager terminal and worker terminals when the inspection result is "other supplementation".
  • FIG. 4 is a network configuration diagram illustrating a construction site communication service providing system according to another embodiment of the present invention.
  • the construction site communication service providing system includes a construction site safety management server 100 and an inspector terminal 500, and the inspector terminal 500 includes a manager terminal 300 and a supervisor terminal 600. do.
  • the construction site safety management server 100 of FIG. 4 may further include a drone (not shown).
  • the drone photographs a target to be monitored at the construction site according to a control signal received from the construction site work management server 100 and then creates a target image to be monitored and provides the image to the construction site safety management server 100 .
  • the drone irradiates light to the monitoring target at the construction site, photographs the monitoring target, and transmits scan information about the monitoring target. After generating, the monitoring code is extracted according to the scan information.
  • a monitoring target when a monitoring target is made of metal or plastic, when light is applied to the drone while scanning the monitoring target, dot dots having different depths and widths reflect the applied light.
  • the drone extracts the monitoring code using the information of the light reflected from the monitoring target.
  • the drone determines a binary value according to a number indicated by a shadow value corresponding to light information by referring to a binary value table, and then determines a monitoring code by sequentially combining the binary values.
  • the drone can determine whether the binary value indicated by the shadow value corresponding to the light information is 0 or 1 by referring to the binary value table, and determines the monitoring code by sequentially combining the binary values.
  • the binary value corresponding to the shading value of 24 is stored as 1, and the binary value corresponding to the shading value of 35 is stored as 0.
  • the shading value corresponding to light information is 24
  • the binary value is determined as 1
  • the shade value corresponding to light information is 35
  • the binary value is determined as 0 to generate the monitoring code “1000000”.
  • the drone creates a work site image by photographing the work site including the monitoring target, and then inserts dots of different sizes corresponding to the monitoring code into the work site image and provides them to the construction site safety management server 100. do.
  • the construction site safety management server 100 analyzes the work site image to extract a monitoring code when the work site image corresponds to a predetermined disaster type, and if the monitoring code indicates the worker's helmet and worker's ID, the worker It is possible to update the safety history history in the star profile.
  • the construction site safety management server 100 provides unsafe behavior input procedures for each worker stored in the worker database 113 to the inspector terminal 500 .
  • the unsafe behavior input procedure for each worker is a procedure for inputting the unsafe behavior of the worker when a behavior corresponding to a predetermined unsafe behavior is found among the behaviors of the worker working at the construction site.
  • the predetermined unsafe behavior refers to an behavior capable of increasing the probability of occurrence of a disaster type based on the disaster type.
  • the unsafe behavior input procedure can enter the partner company, work team, worker, accident type, details, photos, etc. hitting an object, bumping into, unbalanced and unreasonable motion, lack of oxygen, cutting/cutting/cutting, fire/explosion), a list of unsafe behaviors corresponding to the type of accident is provided, At least one non-safety action can be selected.
  • the construction site safety management server 100 lists “falling” as an unsafe behavior list, “1) not wearing a safety belt or not fastening a safety ring when working at a height of 2m or more, 2 ) Arbitrary disassembly of safety facilities in the fall hazard area”, etc., so that workers can select at least one unsafe behavior corresponding to the unsafe behavior.
  • the construction site safety management server 100 provides "1) unauthorized access within the working radius of the equipment” as a list of unsafe actions corresponding to "getting in” when “getting in” is selected among the types of disasters, so that workers' At least one unsafe behavior corresponding to the unsafe behavior may be selected.
  • the construction site safety management server 100 provides "1) trespassing to confined spaces" as a list of unsafe actions corresponding to "lack of oxygen” when "lack of oxygen” is selected among the types of disasters to prevent workers from At least one unsafe behavior corresponding to the unsafe behavior may be selected.
  • the construction site safety management server 100 receives corrective action information (eg, partner company, work team) from the manager terminal 300 of the inspector terminal 500 when correction is completed by the partner company based on the corrective action document. , disaster type, before and after action photos) are received and stored in the action item database 410 . Conversely, the construction site safety management server 100 provides a procedure for deregistering nonconformities when it is determined that the content pointed out as nonconformity is unreasonable.
  • corrective action information eg, partner company, work team
  • the construction site safety management server 100 provides a safety report report procedure to the worker terminal 200, receives details, photos, and safety accident-related contents through the safety report report procedure and provides them to the manager terminal 300. do.
  • the construction site safety management server 100 analyzes the work site image received from the drone and extracts a monitoring code by analyzing the work site image when the work site image corresponds to a predetermined disaster type.
  • Safety record history can be updated in worker-specific profiles.
  • the construction site safety management server 100 when the construction site safety management server 100 receives the monitoring target image from the drone, it analyzes the monitoring target image and extracts a plurality of dots having different sizes from each other. Then, the construction site safety management server 100 extracts a monitoring code using binary values corresponding to a plurality of halftone dots.
  • the construction site safety management server 100 extracts binary values according to the number of dotted dots with reference to the binary value table, and then extracts a monitoring code through a combination of binary values.
  • the construction site safety management server 100 may determine whether a binary value corresponding to a corresponding halftone dot is 0 or 1 according to the number of dots configured by referring to the binary value table. Then, the building monitoring device 200 determines a monitoring code by sequentially combining binary values.
  • the construction site safety management server 100 converts the binary value corresponding to the halftone dot made up of four dots to 1. , and recognizes the binary value corresponding to the dot made of 8 dots as 0 to generate the monitoring code “1000000”.
  • the construction site safety management server 100 outputs a binary value corresponding to the halftone dots of six dots. It is recognized as 1, and the binary value corresponding to the dot made of 8 dots is recognized as 0 to generate the monitoring code “11000”.
  • the construction site safety management server 100 uses the worker's ID to link with the worker database 113 for each worker. You can update your safety history history in your profile.
  • the inspector terminal 500 Upon receiving the unsafe behavior input procedure for each worker from the construction site safety management server 100, the inspector terminal 500 receives the subcontractor, work team, worker, accident type, details, photos, etc. through the unsafe behavior input procedure for each worker. do.
  • the inspector terminal 500 generates a corrective action document based on the information received through the unsafe behavior input procedure for each worker, and then provides the corrective action document to the manager terminal 300 .
  • the manager terminal 300 among the inspector terminals 500 generates a corrective action document for preventing the occurrence of the corresponding accident type based on the accident type received through the unsafe behavior input procedure for each worker, and then writes the corrective action document. It is provided to the manager terminal 300 .
  • the manager terminal 300 among the inspector terminals 500 When correction is completed by a partner company based on the corrective action document, the manager terminal 300 among the inspector terminals 500 generates corrective action information (eg, partner company, work team, disaster type, before and after action photos) to construct It is provided to the site safety management server 100.
  • corrective action information eg, partner company, work team, disaster type, before and after action photos
  • the inspector terminal 500 and the manager terminal 300 generate safety inspection diaries using the unsafe behavior and input information collected through the unsafe behavior input procedure.
  • the inspector terminal 500 and the manager terminal 300 reflect the unsafe behavior input by the manager among the inspectors in the safety inspection log of the worker, and reflect the corrective actions input by the inspector group in the safety inspection log. .
  • manager terminal 300 among the inspector terminals 500 receives details, photos, and safety accident-related contents from the construction site safety management server 100 through the safety reporting report procedure, it determines whether to adopt the safety reporting report and constructs It is provided to the on-site safety management server 100.
  • the construction site safety management server 100 when adopted as a safety report, stores the contents of the safety report in the corresponding worker database 113, and the contents of the safety report (ie, site, whether or not to adopt, disaster type, details contents, photos, etc.) are stored in the safety newspaper database 411.
  • the manager terminal 300 among the inspector terminals 500 generates a corrective action document for preventing the occurrence of the corresponding disaster type based on the matched disaster type through a disaster type matching process, and then writes the corrective action document to the manager terminal ( 300) is provided.
  • the manager terminal 300 among the inspector terminals 500 When correction is completed by a partner company based on the corrective action document, the manager terminal 300 among the inspector terminals 500 generates corrective action information (eg, partner company, work team, disaster type, before and after action photos) to construct It is provided to the site safety management server 100.
  • corrective action information eg, partner company, work team, disaster type, before and after action photos
  • the construction site worker management server 100 stores the unsafe behavior in the database of the worker providing the cause or the corresponding company entered together when the relevant negligence information is input.
  • 5 to 9 are exemplary diagrams for explaining a worker profile management process for safety management at a construction site according to the present invention.
  • an application for accessing the construction site worker management server 100 may be pre-installed in the worker terminal 200 or may be downloaded and installed from an application market.
  • FIG. 5 When the worker terminal 200 executes an application for accessing the construction site worker management server 100, a screen as shown in FIG. 5 is displayed.
  • the worker terminal 200 joins as a worker member through the same process as shown in FIGS. 6 (a) and 6 (b).
  • the worker terminal 200 may check the worker profile (eg, name, cooperation, career, health checkup date, etc.) through the same process as shown in FIGS. 7(a) and 7(b). In addition, the worker terminal 200 may change the worker profile (eg, career, contact information, past career, past checkup results, etc.) through the process of FIG. 8 (a).
  • the worker profile eg, name, cooperation, career, health checkup date, etc.
  • the worker terminal 200 may change the worker profile (eg, career, contact information, past career, past checkup results, etc.) through the process of FIG. 8 (a).
  • the worker terminal 200 displays the completed worker profile as shown in FIG. 9 .
  • FIG. 10 is an exemplary diagram for explaining a construction site communication providing process for construction site safety management according to the present invention.
  • the inspector terminal 500 may input partner companies, work teams, workers, types of accidents, details, photos, etc. through an unsafe behavior input procedure as shown in FIG. 7 .
  • the inspector's terminal 500 is subject to disaster type (e.g., electric shock, crushing, getting caught, falling, falling, collapsing, being hit by an object, bumping, imbalance and unreasonable motion, lack of oxygen, cutting/cutting/cutting, fire explosion) by the inspector. ) is selected, a list of unsafe behaviors corresponding to the corresponding accident type is provided, and at least one unsafe behavior corresponding to the unsafe behavior of the worker is selected from the list of unsafe behaviors.
  • disaster type e.g., electric shock, crushing, getting caught, falling, falling, collapsing, being hit by an object, bumping, imbalance and unreasonable motion, lack of oxygen, cutting/cutting/cutting, fire explosion
  • the inspector terminal 500 is a list of unsafe behaviors corresponding to “falling” and “1) Not wearing a safety belt or not fastening a safety ring when working at a height of 2m or more, 2) Arbitrary safety facility in a fall risk area dismantling”, etc. to select at least one unsafe behavior corresponding to the unsafe behavior of the worker.
  • the construction site safety management server 100 provides "1) unauthorized access within the working radius of the equipment” as a list of unsafe actions corresponding to "getting in” when “getting in” is selected among the types of disasters, so that workers' At least one unsafe behavior corresponding to the unsafe behavior may be selected.
  • the construction site safety management server 100 provides "1) trespassing to confined spaces" as a list of unsafe actions corresponding to "lack of oxygen” when "lack of oxygen” is selected among the types of disasters to prevent workers from At least one unsafe behavior corresponding to the unsafe behavior may be selected.
  • the present invention enables safety management work to be carried out effectively using construction site data, and is a technology that can be widely used in the construction industry to realize its practical and economical value.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Computational Linguistics (AREA)
  • Development Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Mathematical Physics (AREA)
  • Probability & Statistics with Applications (AREA)
  • Software Systems (AREA)
  • Educational Administration (AREA)
  • Fuzzy Systems (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

본 발명의 일 실시예에 따른 건설 현장 안전 관리 시스템은 근로자의 교육 이수 정보, 자격증 취득 정보, 과거 경력 정보 및 건강 검진 정보를 관리하고, 점검자 단말로부터 근로자 불안전 행동 입력 절차를 통해 입력된 불안전 행동 정보 및 근로자 단말로부터 안전 신문고 제보 절차를 통해 안전 신문고를 수신하여 채택 여부를 결정하고, 현장의 작업 내용의 위험도 평가 정보를 이용하여 공종 별 위험도 평가 등급을 산출한 후, 위험도 평가 등급에 해당하는 평가 결과 데이터를 생성하여 관리하는 건설 현장 안전 관리 서버, 상기 건설 현장 안전 관리 서버로부터 수신된 교육 이수 정보 등록 절차를 통해 교육 이수 정보를 제공하고, 상기 건설 현장 안전 관리 서버로부터 수신된 자격증 취득 정보 등록 절차를 통해 자격증 취득 정보를 제공하는 근로자 단말 및 근로자 교육 리스트를 수신하여 상기 근로자 단말에 제공하고, 상기 교육 리스트에 따라 근로자의 교육이 실시된 후 교육 이수 확인 요청 메시지를 상기 건설 현장 안전 관리 서버에 제공하고, 경력자 검색 요청 메시지를 상기 건설 현장 안전 관리 서버에 제공한 후 상기 경력자 검색 요청 메시지에 대한 응답으로 경력자 안내 메시지를 수신하는 관리자 단말을 포함한다.

Description

건설 현장 안전 관리 시스템
본 발명은 건설 현장 안전 관리 시스템에 관한 것으로, 보다 구체적으로 건설 현장에 대한 데이터를 이용하여 건설 현장의 안전 관리 업무를 진행할 수 있도록 하는 건설 현장 안전 관리 시스템에 관한 것이다.
일반적으로 건설산업은 노동집약적인 산업으로서, 다양한 공종과 수많은 작업 인력이 투입되어 동시에 여러 작업이 진행되므로 투입되는 인력에 대한 체계적이며 효과적인 관리와 운용, 그리고 이러한 투입인력에 대한 확실한 안전관리가 무엇보다도 중요하다.
그러나, 건설현장은 현장 자체에 내재되어 있는 다양한 환경으로부터 기인하는 위험성이나 작업자의 사소한 부주의로 인하여 안전사고가 빈번하게 발생하여 귀중한 인적자원이 손실되는 치명적인 문제점을 가지고 있다.
또한, 건설현장에는 다양한 분야의 작업자들이 배치되어져서 각자의 작업을 수행하게 되는데, 이러한 작업자들의 수에 비해서 상대적으로 관리자의 수가 극히 적고, 실외 작업시 현장 관리자의 통제와 관리가 제한되는 영역이 발생하게 되어 건설현장의 인력에 대한 효율적이고 정확한 관리가 이루어지지 않는 문제점도 있다.
이러한 건설현장 인력에 대한 안전사고나 비효율적인 인력관리는 전체적인 공사비의 상승과 생산성의 저하 그리고 공사기간의 연장 등의 문제점을 발생시킨다.
이러한 건설현장이 가지는 문제점들을 극복하기 위하여 다양한 시도가 이루어져 왔다. 이를 줄이기 위해, 건설사들은 발달된 IoT 기술을 이용하여 각종 센서, 웨어러블 카메라 및 드론 등을 통한 정보 전달 및 관제를 실시하고 있다. 하지만, 이러한 IoT 솔루션을 도입했음에도 불구하고 여전히 사고는 다발하고 있다.
왜냐하면, 안전 사고를 방지하기 위해서는 환경통제 뿐만 아니라 근로자의 자발적인 안전행동 유도와 근로자 개개인의 특성에 맞는 안전 관리가 필요함에도 불구하고 독립적인 IoT 솔루션의 경우 근로자의 이력/경력 등 안전 사고와 연관성이 높은 개인 특성의 추적이 불가하여 그 사전적 예방 효과가 미미하기 때문이다.
최근, 이러한 개인 특성의 중요성이 대두되면서 일부 관련한 발명이 제시되고 있으나, 각 발명의 효율성이나 효과성 측면에서는 아직 발전가능한 부분이 다수 존재한다. 또한, 관련 발명 간 유기적인 관계가 성립될 시 얻을 수 있는 이점이 명확함에도 불구하고 현재까지 제시된 바 없다는 문제점이 있다.
본 발명은 근로자의 프로필 관리를 통해 근로자의 경제적 가치에 안전이 긍정적으로 작용할 수 있도록 하여 자발적 변화를 이끌어낼 수 있도록 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 근로자에 의해 등록된 과거 경력을 통해 숙련도를 확인한 후 이를 기초로 현장 내 근로자의 배치를 최적화할 수 있도록 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 근로자의 건강 검진 관련 이력 및 증빙을 효율적으로 관리함으로써 보건 관리자로 하여금 근로자가 언제, 어떤 종류의 검진을 받아야 하는지 식별할 수 있도록 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 근로자의 교육 내용을 관리함으로써 근로자가 적절한 시기에 교육을 받을 수 있도록 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 고위험 작업에 대한 안전 점검을 효과적으로 진행할 수 있도록 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 고위험 작업 및 일반 작업 각각에 대한 체크 리스트를 제공함으로써 체크 리스트를 기초로 안전 점검 일지를 자동으로 생성할 수 있도록 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 재해 유형을 기초로 근로자의 불안전한 행동 데이터를 수집한 후 수집된 데이터를 기반으로 근로자 프로필을 업데이트할 수 있도록 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 관리자가 직접 입력한 불안전 행동의 경우 해당 근로자의 안점 점검 일지로 자동 반영되도록 하여 자동으로 안전 점점 일지를 생성할 수 있도록 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 건설 현장에서 발생된 위험 요인을 수집하여 안전 점검 일지까지 자동으로 생성할 수 있는 건설 현장에 특화된 커뮤니케이션 툴을 제공하는 것을 특징으로 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 과거 사고 사례 분석을 통해 공종 별 위험 요인, 위험도, 안전 대책 등과 같은 작업 위험성 평가 정보의 신뢰성을 향상시킬 수 있도록 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
또한, 본 발명은 현장 별 특성과 작업 환경을 반영한 공사 진척도 별 사고 위험도를 예측하고 위험 상황을 알릴 수 있도록 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
본 발명의 목적들은 이상에서 언급한 목적으로 제한되지 않으며, 언급되지 않은 본 발명의 다른 목적 및 장점들은 하기의 설명에 의해서 이해될 수 있고, 본 발명의 실시예에 의해 보다 분명하게 이해될 것이다. 또한, 본 발명의 목적 및 장점들은 특허 청구 범위에 나타낸 수단 및 그 조합에 의해 실현될 수 있음을 쉽게 알 수 있을 것이다.
이러한 목적을 달성하기 위한 건설 현장 안전 관리 시스템은 건설 현장 안전 관리 시스템은 근로자의 교육 이수 정보, 자격증 취득 정보, 과거 경력 정보 및 건강 검진 정보를 관리하고, 점검자 단말로부터 근로자 불안전 행동 입력 절차를 통해 입력된 불안전 행동 정보 및 근로자 단말로부터 안전 신문고 제보 절차를 통해 안전 신문고를 수신하여 채택 여부를 결정하고, 현장의 작업 내용의 위험도 평가 정보를 이용하여 공종 별 위험도 평가 등급을 산출한 후, 위험도 평가 등급에 해당하는 평가 결과 데이터를 생성하여 관리하는 건설 현장 안전 관리 서버, 상기 건설 현장 안전 관리 서버로부터 수신된 교육 이수 정보 등록 절차를 통해 교육 이수 정보를 제공하고, 상기 건설 현장 안전 관리 서버로부터 수신된 자격증 취득 정보 등록 절차를 통해 자격증 취득 정보를 제공하는 근로자 단말 및 근로자 교육 리스트를 수신하여 상기 근로자 단말에 제공하고, 상기 교육 리스트에 따라 근로자의 교육이 실시된 후 교육 이수 확인 요청 메시지를 상기 건설 현장 안전 관리 서버에 제공하고, 경력자 검색 요청 메시지를 상기 건설 현장 안전 관리 서버에 제공한 후 상기 경력자 검색 요청 메시지에 대한 응답으로 경력자 안내 메시지를 수신하는 관리자 단말을 포함한다.
전술한 바와 같은 본 발명에 의하면, 근로자의 프로필 관리를 통해 근로자의 경제적 가치에 안전이 긍정적으로 작용할 수 있도록 하여 자발적 변화를 이끌어낼 수 있다는 장점이 있다.
또한 본 발명에 의하면, 근로자에 의해 등록된 과거 경력을 통해 숙련도를 확인한 후 이를 기초로 현장 내 근로자의 배치를 최적화할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 근로자의 건강 검진 관련 이력 및 증빙을 효율적으로 관리함으로써 보건 관리자로 하여금 근로자가 언제, 어떤 종류의 검진을 받아야 하는지 식별할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 근로자의 교육 내용을 관리함으로써 근로자가 적절한 시기에 교육을 받을 수 있다는 장점이 있다.
또한 본 발명에 의하면, 고위험 작업에 대한 안전 점검을 효과적으로 진행할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 고위험 작업 및 일반 작업 각각에 대한 체크 리스트를 제공함으로써 체크 리스트를 기초로 안전 점검 일지를 자동으로 생성할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 재해 유형을 기초로 근로자의 불안전한 행동 데이터를 수집한 후 수집된 데이터를 기반으로 근로자의 프로필을 업데이트할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 관리자가 직접 입력한 불안전 행동의 경우 해당 근로자의 안점 점검 일지로 자동 반영되도록 하여 자동으로 안전 점점 일지를 생성할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 건설 현장에서 발생된 위험 요인을 수집하여 안전 점검 일지까지 자동으로 생성할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 과거 사고 사례 분석을 통해 공종 별 위험 요인, 위험도, 안전 대책 등과 같은 작업 위험성 평가 정보의 신뢰성을 향상시킬 수 있다는 장점이 있다.
또한 본 발명에 의하면, 현장 별 특성과 작업 환경을 반영한 공사 진척도 별 사고 위험도를 예측하고 위험 상황을 알릴 수 있다는 장점이 있다.
도 1은 본 발명의 일 실시예에 따른 건설 현장 안전 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 2는 본 발명의 다른 일 실시예에 따른 건설 현장 안전 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 3은 본 발명의 또 다른 일 실시예에 따른 건설 현장 안전 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 4는 본 발명의 또 다른 일 실시예에 따른 건설 현장 안전 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 5 내지 도 9는 본 발명에 따른 건설 현장 안전 관리를 위한 근로자 프로필 관리 과정을 설명하기 위한 예시도이다.
도 10은 본 발명에 따른 건설 현장 안전 관리를 위한 건설 현장 커뮤니케이션 제공 과정을 설명하기 위한 예시도이다.
<부호의 설명>
100: 건설 현장 안전 관리 서버
200: 근로자 단말
300: 관리자 단말
400: 기상청 서버
500: 점검자 단말
600: 점검단 단말
전술한 목적, 특징 및 장점은 첨부된 도면을 참조하여 상세하게 후술되며, 이에 따라 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 본 발명의 기술적 사상을 용이하게 실시할 수 있을 것이다. 본 발명을 설명함에 있어서 본 발명과 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 상세한 설명을 생략한다. 이하, 첨부된 도면을 참조하여 본 발명에 따른 바람직한 실시예를 상세히 설명하기로 한다. 도면에서 동일한 참조부호는 동일 또는 유사한 구성요소를 가리키는 것으로 사용된다.
도 1은 본 발명의 일 실시예에 따른 건설 현장 안전 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 1을 참조하면, 건설 현장 안전 관리 시스템은 건설 현장 안전 관리 서버(100), 근로자 단말(200) 및 관리자 단말(300)를 포함한다. 건설 현장 안전 관리 서버(100)는 교육 이수 정보 데이터베이스(110), 자격증 데이터베이스(111), 경력 정보 데이터베이스(112), 근로자 데이터베이스(113) 및 건강 검진 데이터베이스(114)를 포함한다.
건설 현장 안전 관리 서버(100)는 근로자 단말(200)과의 통신을 통해 근로자 단말(200)로부터 근로자 프로필 정보를 수신하여 저장한다. 이때, 근로자 프로필 정보는 신상 정보, 경력, 교육 이력 및 건강 검진 이력 등을 포함할 수 있다.
먼저, 건설 현장 안전 관리 서버(100)는 근로자가 출근하기 이전에 근로자 단말(200)에 교육 이수 정보 등록 절차를 제공하고, 교육 이수 정보 등록 절차를 통해 교육 이수 정보를 수신한다.
이때, 교육 이수 정보는 교육 이수증 별로 이름, 생년월일, 등록번호, 이수일자, 이수증 증빙 사진 등을 포함할 수 있다. 상기의 교육 이수증은 건설 현장 안전 관리에 관한 교육을 이수한 후 발급되는 증명서로, 기초 보건 이수증 등을 포함할 수 있다.
상기의 교육 이수증에는 교육 이수 발급 기관에 의해 발급될 때 진위 여부를 판별하기 위한 진위 판별 코드가 삽입되어 발급될 수 있다. 즉, 교육 이수 발급 기관에 의해 인쇄될 때 진위 판별 코드에 해당하는 서로 다른 크기의 픽셀 공간을 함께 출력하여 발급되도록 한다.
상기와 같이, 교육 이수 발급 기관에 의해 교육 이수증이 발급될 때 교육 이수증에 삽입된 진위 판별 코드는 교육 이수 발급 기관 서버로부터 수신되어 미리 저장된다. 따라서, 건설 현장 안전 관리 서버(100)는 교육 이수 발급 기관 서버로부터 수신된 진위 판별 코드를 이용하여 교육 이수증의 진위 여부를 판별할 수 있는 것이다.
상기의 교육 이수증에 삽입되어 있는 서로 다른 크기의 픽셀 공간은 교육 이수증의 배경 화면과 유사한 색(즉, 배경 화면의 RGB 값이 특정 값 이상이거나 이하인 값에 해당하는 색)으로 설정되어 있기 때문에 사용자의 눈에는 보이지 않지만, 건설 현장 안전 관리 서버(100)가 교육 이수증의 진위 여부를 판단하기 위해 스캔하는 과정에서 픽셀 분석하면 픽셀의 값이 다르기 때문에 진위 판별 코드에 해당하는 픽셀 공간이 추출될 수 있는 것이다.
따라서, 건설 현장 안전 관리 서버(100)는 교육 이수증을 스캔하여 분석하는 과정에서 교육 이수증에서 복수의 픽셀 공간을 추출한 후, 복수의 픽셀 공간이 망점이 지시하는 이진수 값을 이용하여 진위 판별 코드를 생성할 수 있다.
예를 들어, 건설 현장 안전 관리 서버(100)는 4개의 점으로 이루어진 픽셀 공간 1개와 8개의 점으로 이루어진 픽셀 공간 6개를 추출한 경우, 4개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "1000000"를 생성할 수 있다.
다른 예를 들어, 건설 현장 안전 관리 서버(100)는 6개의 점으로 이루어진 픽셀 공간 2개와 8개의 점으로 이루어진 픽셀 공간 3개를 추출한 경우, 6개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "11000"를 생성한다.
그런 다음, 건설 현장 안전 관리 서버(100)는 진위 판별 코드 및 미리 ㅅ수신된 진위 판별 코드를 비교하여 교육 이수증의 진위 여부를 판별할 수 있다.
상기와 같이, 건설 현장 안전 관리 서버(100)는 교육 이수증의 진위 여부가 판별된 후 교육 이수증을 기록된 교육 이수 정보를 이용하여 교육 별 유효 시간 및 교육 시간을 산출한 후, 근로자 별로 교육 종류 리스트 및 인증 시간을 교육 이수 정보 데이터베이스(110)에 저장한다.
이때, 교육 이수 정보 데이터베이스(110)에 근로자에 해당하는 누적 교육 시간이 존재하는 경우 기존에 누적된 누적 교육 시간에 교육 시간을 반영하여 누적 교육 시간을 갱신한다.
그 후, 건설 현장 안전 관리 서버(100)는 근로자 교육 리스트를 생성하고, 근로자 교육 리스트를 근로자 단말(200)에 제공한다.
이때, 근로자 교육 리스트는 관리자, 업체, 현장, 날짜, 이름, 생년월일, 신규자 교육 이수 여부, 유효기간, 출근여부, 필수 교육 리스트, 필수 교육 이수 여부 등을 포함할 수 있다.
그런 다음, 건설 현장 안전 관리 서버(100)는 근로자 단말(200)로부터 출석 인증 정보를 수신하고, 관리자 단말(300)로부터 근로자 교육 리스트에 따라 근로자의 교육이 실시된 후 교육 증빙 사진 및 교육 증빙 정보를 포함하는 교육 이수 확인 요청 메시지를 수신한다.
이때, 출석 인증 정보는 근로자 이름 및 관리 감독자 이름을 포함할 수 있고, 교육 증빙 정보는 교육 구분, 교육 대상, 작업 공종 명, 교육 일자, 교육 장소, 교육 시간, 교육 담당(관리자 등), 교육 내용 등을 포함할 수 있다.
건설 현장 안전 관리 서버(100)는 교육 이수 확인 요청 메시지 중 출석 인증 정보를 이용하여 출석을 인증하고 교육 증빙 정보를 추출한 후, 교육 증빙 정보를 이용하여 교육 이수 정보 데이터베이스(110)에 저장된 근로자 별로 교육 종류 리스트 및 누적 시간을 갱신한다.
즉, 건설 현장 안전 관리 서버(100)는 교육 증빙 정보를 이용하여 교육 별 유효 시간 및 교육 시간을 산출한 후, 교육 종류를 이용하여 근로자 별로 교육 종류 리스트를 갱신하고 인증 시간을 이용하여 누적 시간을 갱신하여 근로자 별로교육 이수 정보 데이터베이스(110)에 저장한다.
또한, 건설 현장 안전 관리 서버(100)는 근로자 단말(200)에 자격증 취득 정보 등록 절차를 제공하고, 자격증 취득 정보 등록 절차를 통해 자격증 취득 정보를 수신하여 근로자 별 자격증 취득 정보를 자격증 데이터베이스(111)에 저장한다.
이때, 자격증 취득 정보는 자격증 별로 필수 정보 및 선택 정보를 포함하고, 필수 정보는 제호, 성명, 국적, 주민등록번호, 주소, 국적, 발급 일자, 적성 검사, 유효 기간, 소지 면허, 증빙 사진을 포함하고, 선택 정보는 보험 증권, 사업자 등록증, 장비 등록증(예를 들어, 크레인, 펌프카 등의 비파괴 검사 결과), 증빙 사진 등을 포함할 수 있다. 상기의 자격증은 건설 현장에서 활용가능한 기술을 시험을 통해 인증된 후에 발급되는 자격증으로, 기계 조종사 등을 포함할 수 있다.
상기의 자격증은 건설 현장에서 활용가능한 기술을 시험을 주관하는 기관에 의해 발급될 때 진위 여부를 판별하기 위한 진위 판별 코드가 삽입되어 발급될 수 있다. 즉, 기관에 의해 자격증이 발급될 때 진위 판별 코드에 해당하는 서로 다른 크기의 픽셀 공간을 함께 출력하여 발급되도록 한다.
상기와 같이, 자격증이 발급될 때 자격증에 삽입된 진위 판별 코드는 자격증 시험 주최 기관 서버로부터 수신되어 미리 저장된다. 따라서, 건설 현장 안전 관리 서버(100)는 자격증 시험 주최 기관 서버로부터 수신된 진위 판별 코드를 이용하여 자격증의 진위 여부를 판별할 수 있는 것이다.
상기의 자격증에 삽입되어 있는 서로 다른 크기의 픽셀 공간은 교육 이수증의 배경 화면과 유사한 색(즉, 배경 화면의 RGB 값이 특정 값 이상이거나 이하인 값에 해당하는 색)으로 설정되어 있기 때문에 사용자의 눈에는 보이지 않지만, 건설 현장 안전 관리 서버(100)가 자격증 등과 같은 증빙 사진의 진위 여부를 판단하기 위해 픽셀 분석하면 픽셀의 값이 다르기 때문에 진위 판별 코드에 해당하는 픽셀 공간이 추출될 수 있는 것이다.
따라서, 건설 현장 안전 관리 서버(100)는 자격증 등과 같은 증빙 사진을 스캔하여 분석하는 과정에서 자격증 등과 같은 증빙 사진에서 복수의 픽셀 공간을 추출한 후, 복수의 픽셀 공간이 망점이 지시하는 이진수 값을 이용하여 진위 판별 코드를 생성할 수 있다.
예를 들어, 건설 현장 안전 관리 서버(100)는 4개의 점으로 이루어진 픽셀 공간 1개와 8개의 점으로 이루어진 픽셀 공간 6개를 추출한 경우, 4개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "1000000"를 생성할 수 있다.
다른 예를 들어, 건설 현장 안전 관리 서버(100)는 6개의 점으로 이루어진 픽셀 공간 2개와 8개의 점으로 이루어진 픽셀 공간 3개를 추출한 경우, 6개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "11000"를 생성한다.
그런 다음, 건설 현장 안전 관리 서버(100)는 진위 판별 코드 및 미리 수신된 진위 판별 코드를 비교하여 자격증의 진위 여부를 판별할 수 있다. 상기와 같이, 건설 현장 안전 관리 서버(100)는 자격증의 진위 여부가 판별된 후 자격증 데이터베이스(111)에 근로자 별 자격증 취득 정보를 저장한다.
따라서, 건설 현장 안전 관리 서버(100)는 자격증 데이터베이스(111)에 저장된 근로자 별 자격증 취득 정보를 이용하여 자격증 유효 기간 또는 장비 등록증 각각의 유효 기간의 만료까지 남은 기간이 특정 기간 이하이면 근로자 단말(200)에 자격증 유효 기간 만료 안내 메시지를 제공할 수 있는 것이다.
또한, 건설 현장 안전 관리 서버(100)는 근로자 단말(200)로부터 경력 정보를 포함하는 과거 경력 등록 요청 메시지를 수신하면, 과거 경력 등록 요청 메시지에서 경력 정보를 추출한 후 근로자 별 경력 정보를 경력 정보 데이터베이스(112)에 저장한다. 이때, 경력 정보는 근무 일수, 공종, 발주처(예를 들어, 회사), 프로젝트 종류(예를 들어, 토목, 건축, 플랜트 등), 관리자, 세부 공종 등을 포함할 수 있다.
그 후, 건설 현장 안전 관리 서버(100)는 관리자 단말(300)로부터 경력자 검색 요청 메시지를 수신하면, 경력자 검색 요청 메시지에 따라 경력 정보 데이터베이스(112)에서 근로자를 추출한 후 경력 정보를 포함하는 경력자 안내 메시지를 제공한다. 이와 같이, 건설 현장 안전 관리 서버(100)는 경력 정보를 함께 제공함으로써 사업자가 경력 정보를 기초로 근로자의 프로젝트 배치 시 참고할 수 있도록 한다.
만일, 건설 현장 안전 관리 서버(100)는 근로자가 사업자에 의해 고용되어 프로젝트에 참여하게 되면, 경력을 확인하여 경력 정보 데이터베이스(112)에 저장된 근로자 별 경력 정보를 갱신한다.
또한, 건설 현장 안전 관리 서버(100)는 근로자 데이터베이스(113)에 저장되어 있는 근로자 별 근로자 정보 및 건강 검진 데이터베이스(114)에 저장되어 있는 건강 검진 대상을 이용하여 근로자 리스트를 생성한 후 병원 서버(미도시됨)에 근로자 리스트 상의 근로자의 건강 검진을 예약하는 건강 검진 예약 메시지를 제공한다. 이때, 근로자 리스트는 근로자 별 검진 종류, 다음 검진 일자, 예정 검진 기관, 희망 검진 예약일 등을 포함할 수 있다.
그 후, 건설 현장 안전 관리 서버(100)는 병원 서버(미도시됨)에 의해 발급된 검진 결과 문서를 인식하여 검진 결과 문서에서 검진 결과를 생성한 후 근로자 별 검진 결과를 근로자 데이터베이스(113)에 저장한다.
일 실시예에서, 건설 현장 안전 관리 서버(100)는 관리자 단말(300)로부터병원 서버에 의해 발급된 검진 결과 문서를 수신하면, OCR 기술을 이용하여 검진 결과 문서를 인식한 후 미리 결정된 항목에 해당하는 내용을 추출하여 근로자 데이터베이스(113)에 저장한다.
도 2는 본 발명의 다른 일 실시예에 따른 건설 현장 안전 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 2를 참조하면, 건설 현장 안전 관리 시스템은 건설 현장 안전 관리 서버(100), 관리자 단말(300) 및 기상청 서버(400)를 포함한다. 건설 현장 안전 관리 서버(100)는 사고 위험도 평가 데이터베이스(120), 위험성 평가 표준 모델(121), 위험도 평가 데이터베이스(122), 현장 위험 특성 예측 모델(123) 및 사고 사례 데이터베이스(124)를 포함한다.
건설 현장 안전 관리 서버(100)는 사고 위험도 평가 데이터베이스(120) 및 위험성 평가 표준 모델(121)을 기초로 공종 별 위험성 평가 결과를 생성한다.
상기의 사고 위험도 평가 데이터베이스(120)에는 공종 별 사고발생빈도 비율, 공종 별 사고발생강도 비율, 재해 별 세부 내용이 저장되어 있다. 이때, 재해 별 세부 내용은 공정, 기인물, 사고유형, 단위작업, 재해자수(사망/부상), 현장위치, 공사종류, 공사금액, 공정율을 포함할 수 있다. 상기의 위험성 평가 표준 모델(121)에는 공종 별 위험 요인 및 위험 요인 별 안전 대책이 저장되어 있다.
먼저, 건설 현장 안전 관리 서버(100)는 건설 현장 상황(즉, 공사 규모,공사 유형, 공정률, 기후 등) 및 작업 내용 각각에 해당하는 키워드를 수신하면 사고 위험도 평가 데이터베이스(120)에서 키워드에 해당하는 공종 별 사고발생빈도 비율, 공종 별 사고발생강도 비율 및 재해 별 세부 내용을 추출한다. 상기의 키워드는 공정, 사고기 인물, 사고 유형, 단위 작업 내용 등으로 결정될 수 있다.
그런 다음, 건설 현장 안전 관리 서버(100)는 공종 별 사고발생빈도 비율 및 공종 별 사고발생강도 비율을 이용하여 공종 별 위험도 평가 결과를 산출한다.
이때, 건설 현장 안전 관리 서버(100)는 AI 엔진을 통해 공종 별 위험도 평가 결과를 산출하거나 하기의 [수학식 1] 내지 [수학식 6]을 통해 산출할 수 있다. 이하에서는 [수학식 1] 내지 [수학식 6]을 통해 공종 별 위험도 평가 결과를 산출하는 과정을 설명하기로 한다.
일 실시예에서, 건설 현장 안전 관리 서버(100)는 [수학식 1]을 기초로 위험도 평가 데이터베이스(122)에서 추출한 공종 별 사고발생빈도 비율 및 공종 별 사고발생강도 비율을 이용하여 공종 별 위험도 평가 등급을 산출할 수 있다. 이때, 위험도 평가 데이터베이스(122)에는 공종 별 사고발생빈도 비율 및 공종 별 사고발생강도 비율이 저장되어 있으며, 어플리케이션을 사용함에 따라 자동으로 업데이트될 수 있다.
[수학식 1]
Part_Danger_level = (Danger_fre_rate + Danger_str_rate) * Danger_W
Part_Danger_level: 공종 별 위험도 평가 등급,
Danger_fre_rate: 공종 별 사고발생빈도 비율로서 [수학식 2]에 의해 산출,
Danger_str_rate: 공종 별 사고발생강도 비율로서 [수학식 3]에 의해 산출,
Danger_W: 공종 별 사고발생 시기에 따라 결정되는 가중치
[수학식 1]에서 공종 별 사고발생빈도 비율(Danger_fre_rate)은 하기의 [수학식 2]에 의해 산출되고, 공종 별 사고발생강도 비율(Danger_str_rate)은 하기의 [수학식 3]에 의해 산출되고, 공종 별 사고발생시기에 따라 결정되는 가중치(Danger_W)는 사고발생시기가 현재 시점을 기준으로 3년을 초과하지 않는 사례에 대해서 사고발생시기가 현재 시점에 가까울수록 높은 가중치가 할당되며, 사고발생시기가 현재 시점을 기준으로 3년를 초과한 사례에 대해서는 미리 결정된 가중치(예를 들어, “1”)가 할당된다.
[수학식 2]
Danger_fre_rate = (part_victim / total_victim) ×100
Danger_fre_rate: 공종 별 사고발생빈도 비율,
part_victim: 공종 별 재해지수,
total_victim: 전체 재해지수
[수학식 2]에서 공종 별 재해지수(part_victim) 및 전체 재해지수(total_victi)는 위험도 평가 데이터베이스(122)에서 추출한 재해 별 세부 내용(즉, 재해자수)에 의해 결정될 수 있다.
[수학식 3]
Danger_str_rate
= (part_dead_people_rate × 3) + part_injured_people_rate
Danger_str_rate: 공종 별 사고발생강도 비율,
part_dead_people_rate: 공종 별 사망자 비율로서 [수학식 4]에 의해 산출,
part_injured_people_rate: 공종 별 부상자 비율로서 [수학식 5]에 의해 산출
[수학식 3]에서 공종 별 사망자 비율(part_dead_people_rate)은 [수학식 4]에 의해 산출되고, 공종 별 부상자 비율(part_injured_people_rate)은 [수학식 5]에 의해 산출된다.
[수학식 4]
part_dead_people_rate = (part_dead_people / total_dead_people) ×100
part_dead_people_rate: 공종 별 사망자 비율,
part_dead_people: 공종 별 사망자 수,
total_dead_people: 전체 사망자 수
[수학식 4]에서 공종 별 사망자 수(part_dead_people) 및 전체 사망자 수(total_dead_people)는 위험도 평가 데이터베이스(122)에서 추출한 재해 별 세부 내용(즉, 재해자수 중 사망자)에 의해 결정될 수 있다.
[수학식 5]
part_injured_people_rate
= (part_injured_people / total_injured_people) ×100
part_dead_people_rate: 공종 별 부상자 비율,
part_dead_people: 공종 별 부상자 수,
total_dead_people: 전체 부상자 수
[수학식 5]에서 공종 별 부상자 수(part_dead_people) 및 전체 부상자 수(total_dead_people)는 위험도 평가 데이터베이스(122)에서 추출한 재해 별 세부 내용(즉, 재해자수 중 부상자)에 의해 결정될 수 있다.
상기의 [수학식 1] 내지 [수학식 5]를 통해 산출된 공종 별 위험도 평가 등급은 하기의 [표 1]과 같을 수 있다.
[표 1]
Figure PCTKR2022008435-appb-I000001
상기와 같이, 건설 현장 안전 관리 서버(100)는 사고 위험도 평가 데이터베이스(120)를 기초로 공종 별 위험도 평가 등급이 결정되면, 위험성 평가 표준 모델(121)에서 공종 별 위험도 평가 등급에 해당하는 위험 요인 및 위험 요인 별 안전 대책을 추출한다.
그 후, 건설 현장 안전 관리 서버(100)는 위험도 평가 등급, 위험 요인 및 위험 요인 별 안전 대책을 이용하여 위험성 평가 결과 데이터를 생성한 후, 위험성 평가 결과 데이터를 위험성 평가 데이터베이스에 저장한다.
상술한 과정을 통해 위험성 평가 결과 데이터를 생성한 후, 건설 현장 안전 관리 서버(100)는 현장 위험 특성 예측 모델을 기초로 위험성 평가 결과 데이터, 현장 정보 및 공사 주기 별 위험도 평가 지수를 반영하여 위험도 예측 데이터를 생성한다.
상기의 현장 정보는 현장주소, 공사종류, 공사규모(금액), 공사기간, 공사주기별 Master Schedule/ 건축인허가 정보: 대지위치, 실제착공일, 주용도코드명 등을 포함할 수 있다.
이때, 현장 위험 특성 예측 모델(123)은 현장 위치, 공사 종류, 공사 규모, 날씨, 공정 진척도, 지연도, 공종 별 순찰 데이터(Patrol Data), 사고 유형 별 순찰 데이터(Patrol Data), 전 근로자 대비 현장 근로자 및 작업팀 별 안전 스코어(safety score) 비율이 저장되어 있다.
[수학식 6]
ConstructionPeriod_Danger_value = PastPart_Danger_value + weight
ConstructionPeriod_Danger_value: 공사 주기 별 위험도 평가 지수,
PastPart_Danger_value: 과거 공종 별 위험도 평가 지수,
weight: 현장 위험 특성 가중치
상기의 [수학식 6]에서 현장 위험 특성 가중치는 고정 요인, 변동 요인 및현장 부적합 사항에 따라 변경될 수 있다. 고정 요인은 현장 위치, 공사 종류, 공사 규모를 포함하고, 변동 요인은 기상청 서버(400)로부터 수신된 날씨 정보, 미리 결정된 스케쥴 대비 진척도 및 지연도를 포함한다.
현장 부적합 사항은 현장을 관리하는 관리자에 의해 지적된 현장의 부적합 사항을 의미한다. 예를 들어, 현장 부적합 사항은 안전고리 미체결 등을 포함할 수 있다. 상기와 같이, 고정 요인, 및 변동 요인 및 현장 부적합 사항에 따라 현장 위험 특성 가중치를 변경함으로써 공사 주기 별 위험도 평가 지수가 변경되도록 한다.
도 3은 본 발명의 또 다른 일 실시예에 따른 건설 현장 작업 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 3을 참조하면, 건설 현장 작업 관리 시스템은 건설 현장 작업 관리 서버(100) 및 점검자 단말(500)을 포함하고, 점검자 단말(500)은 관리자 단말(300) 및 감시단 단말(600)을 포함한다. 건설 현장 작업 관리 서버(100)는 작업 허가서 데이터베이스(130) 및 현장 가입자 데이터베이스(131)를 포함한다. 도 3의 일 실시예에서는 드론(미도시됨)을 더 포함할 수 있다.
드론은 건설 현장 작업 관리 서버(100)로부터 수신된 제어 신호에 따라 공사 현장의 감시 대상을 촬영한 후 감시 대상에 대한 스캔 정보 및 이미지를 생성하여 건설 현장 작업 관리 서버(100)에 제공한다. 예를 들어, 드론은 공사 현상의 감시 대상 “안전 난간대”를 스캔한 후 스캔 정보 및 감시 대상 이미지를 건설 현장 작업 관리 서버(100)에 제공한다.
이를 위해, 드론은 건설 현장 작업 관리 서버(100)로부터 수신된 제어 신호에 따라 공사 현장을 스캔하는 과정에서 공사 현장의 감시 대상에 빛을 조사하여 감시 대상을 촬영한 후 감시 대상에 대한 스캔 정보 및 감시 대상 이미지를 생성하여 건설 현장 작업 관리 서버(100)에 제공한다. 이때, 감시 대상은 작업자의 헬맷, 건축 자재 등을 포함할 수 있다.
일 실시에에서, 드론은 감시 대상이 금속으로 이루어진 경우 감시 대상을 스캔하는 과정에서 빛이 인가되면 서로 다른 깊이와 넓이의 망점은 인가된 빛을 반사하게 된다.
이때, 감시 대상에 형성되어 있는 망점의 깊이 및 넓이는 서로 다르기 때문에 반사되는 빛의 양이 상이하게 될 것이다. 따라서, 드론은 감시 대상에서 반사되는 빛의 정보를 이용하여 감시 대상에 대한 반사 빛의 정보를 포함하는 스캔 정보 및 감시 대상 이미지를 건설 현장 작업 관리 서버(100)에 제공한다.
다른 일 실시예에서, 드론은 감시 대상이 인쇄 과정을 통해 생성된 무늬가 있는 경우 감시 대상을 스캔하여 감시 대상 이미지를 생성한 후, 감시 대상 이미지를 건설 현장 작업 관리 서버(100)에 제공한다.
이때, 감시 대상 이미지에는 감시 대상의 무늬와 유사한 색상으로 감시 코드에 해당하는 복수의 망점이 삽입되어 있을 수 있다. 즉, 감시 대상 이미지에는 감시 대상의 무늬의 픽셀 값보다 특정 값 이상 또는 특정 값 이하에 해당하는 픽셀 값으로 감시 코드에 해당하는 복수의 망점이 삽입되어 있을 수 있다.
따라서, 건설 현장 작업 관리 서버(100)는 감시 대상 이미지의 픽셀을 분석하여 복수의 망점을 추출한 후, 복수의 망점에 해당하는 이진수 값을 이용하여 감시 코드를 생성할 수 있는 것이다.
건설 현장 작업 관리 서버(100)는 작업 허가서 데이터베이스(130) 및 현장 가입자 데이터베이스(131)를 포함한다.
건설 현장 작업 관리 서버(100)는 근로자 데이터를 기초로 작업 허가서 작업 절차를 관리자 단말(700)에 제공한다. 이때, 작업 허가서 데이터베이스(130)에는 작업 허가서 별 체크 리스트를 포함하고, 현장 가입자 데이터베이스(131)에는 작업 반장 별 이름 및 소속 그리고 근로자 별 이름 및 소속이 저장되어 있다.
그 후, 건설 현장 작업 관리 서버(100)는 관리자 단말(300)로부터 작업 허가서 작업 절차를 통해 작업 허가서가 생성되면, 작업 허가서를 이용하여 작업 허가서 목록표를 생성한다. 이때, 관리자에 의해 생성된 작업 허가서는 허가서 번호, 일자, 업체명, 공종 별 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 반장, 투입 장치, 근로자 등을 포함할 수 있다.
따라서, 건설 현장 작업 관리 서버(100)는 작업 허가서의 공종 별로 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 반장, 투입 장치, 근로자, 작업 허가서 대상(즉, 위험작업허가, 일반작업허가), 허가서 종류(즉, 특별, 위험, 일반), 관리자 점검 담당자 등을 이용하여 작업 허가서 목록표를 생성한다. 이러한 작업 허가서 목록표는 작업 허가서를 직관적으로 확인 가능하도록 작업 허가서의 공종 별로 목록들이 표로 생성된 것이다.
이때, 건설 현장 작업 관리 서버(100)는 관리자에 의해 작업 허가서 목록표가 생성되면, 작업 허가서 생성 목록을 생성하여 작업 허가서 데이터베이스(130)에 저장한다. 이후, 관리지가 스스로 점검할 작업을 배정한다.
만일, 건설 현장 작업 관리 서버(100)는 작업 허가서 배정 내역에 따라 생성된 작업 허가서 점검표를 수신하면, 작업 허가서 점검표를 작업 허가서 데이터베이스(130)에 저장한다. 이때, 작업 허가서 데이터베이스(130)에는 작업 허가서 점검 결과, 점검자, 점검 시간, 사진, 세부 내용 등을 포함한다.
이때, 건설 현장 작업 관리 서버(100)는 부적합 사항이 발견된 후 부적합 사항 등록 절차를 통해 작업 중지가 선택되어 작업 중지 요청 메시지를 수신하면, 작업 중지 요청 메시지를 기초로 작업 장소로 이동하여 부적합 사항의 상세 내용에 해당하는 점검 대상을 촬영하는 제어 명령을 드론에 제공할 수 있다.
예를 들어, 부적합 사항의 상세 내용이 “상부 안전 고리 미체결”이고, 작업 장소가 “105동 지하 4층 집수정”에 해당하는 경우, 건설 현장 작업 관리 서버(100)는 105동 지하 4층 집수정으로 이동하여 상부 안전 고리를 촬영하는 제어 명령을 드론에 제공할 수 있다.
그 후, 건설 현장 작업 관리 서버(100)는 드론으로부터 감시 대상에 대한 스캔 정보(예를 들어, 건축 자재 반사 빛의 정보) 및 감시 대상 이미지 중 적어도 하나를 수신한 후, 스캔 정보 및 감시 대상 이미지 중 적어도 하나를 이용하여 감시 코드를 생성한다.
즉, 건설 현장 작업 관리 서버(100)는 스캔 정보 및 감시 대상 이미지를 모두 수신한 경우, 스캔 정보가 감시 대상 반사 빛의 정보이기 때문에 반사되는 빛의 양에 따라 해당 망점이 지시하는 이진수 값을 결정할 수 있으며, 이러한 이진수 값의 조합을 통해 최종적으로 감시 코드를 생성할 수 있는 것이다.
보다 구체적으로, 건설 현장 작업 관리 서버(100)는 드론으로부터 수신된 스캔 정보가 감시 대상 반사 빛의 정보인 경우, 이진수 값 테이블 참조하여 빛의 정보에 해당하는 음영 값이 지시하는 숫자에 따라 이진수 값을 결정한다.
즉, 건설 현장 작업 관리 서버(100)는 이진수 값 테이블을 참조하여 빛의 정보에 해당하는 음영 값이 지시하는 이진수 값이 0 또는 1인지 판단할 수 있다. 그런 다음, 건축물 감리 장치(200)는 이진수 값을 순차적으로 결합하여 감시 코드를 결정한다.
예를 들어, 이진수 값 테이블에 음영 값 24에 해당하는 이진수 값이 1로 저장되어 있고, 음영 값 35에 해당하는 이진수 값이 0으로 저장되어 있으며, 건설 현장 작업 관리 서버(100)는 빛의 정보에 해당하는 음영 값이 24인 경우 이진수 값을 1로 결정하고, 빛의 정보에 해당하는 음영 값이 35인 경우 이진수 값을 0을 결정하여 감시 코드 "1000000"를 생성할 수 있다.
그 후, 건설 현장 작업 관리 서버(100)는 감시 코드에 해당하는 감시 대상이 작업 중지 요청된 대상과 동일한지 여부를 판단한 후, 상기 판단 결과 동일하면 감시 대상 이미지를 분석하여 작업 중지 요청된 이유를 검증한 후 검증 결과를 관리자 단말(300)에 제공한다. 따라서, 관리자 단말(300)은 건설 현장 작업 관리 서버(100)에 의한 검증 결과에 따라 작업 중지 여부를 결정할 수 있는 것이다.
상기의 실시예에서, 감시 코드가 작업자의 헬맷 및 근로자의 ID를 지시하는 경우, 건설 현장 작업 관리 서버(100)는 근로자의 ID를 이용하여 근로자 데이터베이스(113)와 연동하여 근로자 별 프로필에 안전 이력 히스토리를 업데이트한다.
한편, 건설 현장 작업 관리 서버(100)는 감시 대상 이미지를 수신한 경우 감시 대상 이미지를 분석하여 다수의 점으로 이루어진 서로 다른 크기의 복수의 망점을 추출한다. 그런 다음, 건설 현장 작업 관리 서버(100)는 복수의 망점에 해당하는 이진수 값을 이용하여 감시 코드를 생성한다.
즉, 건설 현장 작업 관리 서버(100)는 이진수 값 테이블을 참조하여 망점이 구성된 점의 개수에 따라 이진수 값을 추출한 후 이진수 값의 조합을 통해 감시 코드를 생성한다.
그 후, 건설 현장 작업 관리 서버(100)는 작업 허가서 점검이 완료되면 작업 종결 요청 메시지를 관리자 단말(300)에 제공하여 작업 종결이 등록된 후 작업 허가서의 종결 내용을 작업 허가서 데이터베이스(130)에 저장한다.
점검자 단말(500)은 건설 현장 작업 관리 서버(100)로부터 수신된 작업 허가서 목록표 상의 특정 작업에 대한 점검 시 부적합 사항이 발견되면 부적합 사항 등록 절차를 통해 작업 중지 또는 시정 요청을 선택한다.
만일, 점검자 단말(500)은 부적합 사항이 발견된 후 작업 중지가 선택되면 작업 중지 요청 메시지를 서로 다른 점검자 단말에 제공하고, 부적합 사항이 발견된 후 시정 요청이 선택되면 시정 요청 메시지를 서로 다른 점검자 단말에 제공한다.
관리자 단말(300)은 건설 현장 작업 관리 서버(100)로부터 작업 허가서 작업 절차를 수신한 후, 작업 허가서 작업 절차를 통해 작업 허가서를 생성한다. 이때, 관리자 단말(300)은 작업 허가서 작업 절차를 통해 허가서 번호, 일자, 업체명, 공종 별 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 반장, 투입 장치 및 근로자를 입력하여 작업 허가서를 생성할 수 있다.
점검자 단말(500)은 건설 현장 작업 관리 서버(100)로부터 수신된 작업 허가서 목록표를 기초로 점검을 진행한다.
먼저, 점검자 단말(500)은 작업 허가서를 기초로 공종 별 점검 대상 항목 각각에 대한 점검 결과 입력 절차를 통해 상세 체크 리스트, 사진 및 점검 결과를 입력한다. 그 후, 점검자 단말(500)은 점검 결과에 따라 서로 다른 관리자 단말에 작업 승인 요청 메시지, 작업 중지 알림 메시지 및 작업 일부 보완 요청 메시지 중 어느 하나의 메시지를 제공할 수 있다.
예를 들어, 점검자 단말(500)은 점검 결과 “양호 시”, 해당 공종 관리자 단말 및 근로자 단말에 작업 승인 요청 메시지를 제공할 수 있다.
다른 예를 들어, 점검자 단말(500)은 점검 결과 “불량 시”, 해당 공정 관리자 단말 및 근로자 단말에 작업 중지 알림 메시지를 제공할 수 있다.
또 다른 예를 들어, 점검자 단말(500)은 점검 결과 “기타 보완 시”, 해당 공정 관리자 단말 및 근로자 단말에 작업 일부 보완 요청 메시지를 제공할 수 있다.
도 4는 본 발명의 또 다른 일 실시예에 따른 건설 현장 커뮤니케이션 서비스 제공 시스템을 설명하기 위한 네트워크 구성도이다.
도 4를 참조하면, 건설 현장 커뮤니케이션 서비스 제공 시스템은 건설 현장 안전 관리 서버(100) 및 점검자 단말(500)을 포함하고, 점검자 단말(500)은 관리자 단말(300) 및 감시단 단말(600)을 포함한다. 실시예에 따라 도 4의 건설 현장 안전 관리 서버(100)는 드론(미도시됨)을 더 포함할 수 있다.
드론은 건설 현장 작업 관리 서버(100)로부터 수신된 제어 신호에 따라 공사 현장의 감시 대상을 촬영한 후 감시 대상 이미지를 생성하여 건설 현장 안전 관리 서버(100)에 제공한다.
이를 위해, 드론은 건설 현장 작업 관리 서버(100)로부터 수신된 제어 신호에 따라 공사 현장을 스캔하는 과정에서 공사 현장의 감시 대상에 빛을 조사하여 감시 대상을 촬영한 후 감시 대상에 대한 스캔 정보를 생성한 후, 스캔 정보에 따라 감시 코드를 추출한다.
일 실시예에서, 드론은 감시 대상이 금속 또는 플라스틱으로 이루어진 경우 감시 대상을 스캔하는 과정에서 빛이 인가되면 서로 다른 깊이와 넓이의 망점은 인가된 빛을 반사하게 된다.
이때, 감시 대상에 형성되어 있는 망점의 깊이 및 넓이는 서로 다르기 때문에 반사되는 빛의 양이 상이하게 될 것이다. 따라서, 드론은 감시 대상에서 반사되는 빛의 정보를 이용하여 감시 코드를 추출한다.
보다 구체적으로, 드론은 이진수 값 테이블 참조하여 빛의 정보에 해당하는 음영 값이 지시하는 숫자에 따라 이진수 값을 결정한 후, 이진수 값을 순차적으로 결합하여 감시 코드를 결정한다.
즉, 드론은 이진수 값 테이블을 참조하여 빛의 정보에 해당하는 음영 값이 지시하는 이진수 값이 0 또는 1인지 판단할 수 있고, 이진수 값을 순차적으로 결합하여 감시 코드를 결정한다.
예를 들어, 이진수 값 테이블에 음영 값 24에 해당하는 이진수 값이 1로 저장되어 있고, 음영 값 35에 해당하는 이진수 값이 0으로 저장되어 있으며, 드론은 빛의 정보에 해당하는 음영 값이 24인 경우 이진수 값을 1로 결정하고, 빛의 정보에 해당하는 음영 값이 35인 경우 이진수 값을 0을 결정하여 감시 코드 "1000000"를 생성할 수 있다.
그런 다음, 드론은 감시 대상이 포함된 작업 현장을 촬영하여 작업 현장 이미지를 생성한 후, 감시 코드에 해당하는 서로 다른 크기의 망점을 작업 현장 이미지에 삽입하여 건설 현장 안전 관리 서버(100)에 제공한다.
따라서, 건설 현장 안전 관리 서버(100)는 작업 현장 이미지가 미리 결정된 재해 유형에 해당되면, 작업 현장 이미지를 분석하여 감시 코드를 추출하고, 감시 코드가 작업자의 헬맷 및 근로자의 ID를 지시하는 경우 로자 별 프로필에 안전 이력 히스토리를 업데이트할 수 있는 것이다.
건설 현장 안전 관리 서버(100)는 근로자 데이터베이스(113)에 저장되어 있는 근로자 별 불안전 행동 입력 절차를 점검자 단말(500)에 제공한다. 이때, 근로자 별 불안전 행동 입력 절차는 건설 현장에 근무하는 근로자의 행동 중 미리 결정된 불안전 행동에 해당하는 행동이 발견되면 해당 근로자의 불안전 행동을 입력하는 절차이다. 상기의 미리 결정된 불안전 행동은 재해 유형을 기초로 재해 유형이 발생될 확률을 높일 수 있는 행동을 의미한다.
즉, 불안전 행동 입력 절차는 협력사, 작업팀, 근로자, 재해 유형, 상세 내용, 사진 등을 입력할 수 있으며, 점검자에 의해 재해 유형(예를 들어, 감전, 깔림, 끼임, 넘어짐, 떨어짐, 무너짐, 물체에 맞음, 부딪힘, 불균형 및 무리한 동작, 산소결핍, 절단/베임/잘림, 화재폭발)이 선택되면 해당 재해 유형에 해당하는 불안전 행동 리스트를 제공하여 불안전 안전 행동 리스트 중 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
예를 들어, 건설 현장 안전 관리 서버(100)는 재해 유형 중 “떨어짐”이 선택되면, “떨어짐”에 해당하는 불안전 행동 리스트로 “1) 2m 이상 고소 작업 시 안전대 미착용 또는 안전고리 미체결, 2) 추락 위험 구간 안전 시설물 임의 해체” 등을 제공하여 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
다른 예를 들어, 건설 현장 안전 관리 서버(100)는 재해 유형 중 “끼임”이 선택되면, “끼임”에 해당하는 불안전 행동 리스트로 “1) 장비 작업반경 내 무단출입”등을 제공하여 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
또 다른 예를 들어, 건설 현장 안전 관리 서버(100)는 재해 유형 중 “산소 결핍”이 선택되면 “산소 결핍”에 해당하는 불안전 행동 리스트로 “1) 밀폐공간 무단출입”등을 제공하여 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
그 후, 건설 현장 안전 관리 서버(100)는 시정 조치서에 의거하여 협력사에 의해 시정이 완료되면, 점검자 단말(500) 중 관리자 단말(300)로부터 시정 조치 정보(예를 들어, 협력사, 작업팀, 재해 유형, 조치 전후 사진)를 수신하여 조치 사항 데이터베이스(410)에 저장한다. 반대로, 건설 현장 안전 관리 서버(100)는 부적합 사항으로 지적된 내용이 합당하지 않다고 판단되는 경우 부적합 사항 등록 취소 절차를 제공한다.
또한, 건설 현장 안전 관리 서버(100)는 안전 신문고 제보 절차를 근로자 단말(200)에 제공하고, 안전 신문고 제보 절차를 통해 세부내용, 사진, 안전 사고 관련 내용을 수신하여 관리자 단말(300)에 제공한다.
또한, 건설 현장 안전 관리 서버(100)는 드론으로부터 수신된 작업 현장 이미지를 분석하여 작업 현장 이미지가 미리 결정된 재해 유형에 해당되면, 작업 현장 이미지를 분석하여 감시 코드를 추출한다.
그런 다음, 건설 현장 안전 관리 서버(100)는 감시 코드가 작업자의 헬멧 및 근로자의 ID를 지시하는 경우, 건설 현장 작업 관리 서버(100)는 근로자의 ID를 이용하여 근로자 데이터베이스(113)와 연동하여 근로자 별 프로필에 안전 이력 히스토리를 업데이트할 수 있다.
이를 위해, 건설 현장 안전 관리 서버(100)는 드론으로부터 감시 대상 이미지를 수신하면, 감시 대상 이미지를 분석하여 다수의 점으로 이루어진 서로 다른 크기의 복수의 망점을 추출한다. 그런 다음, 건설 현장 안전 관리 서버(100)는 복수의 망점에 해당하는 이진수 값을 이용하여 감시 코드를 추출한다.
즉, 건설 현장 안전 관리 서버(100)는 이진수 값 테이블을 참조하여 망점이 구성된 점의 개수에 따라 이진수 값을 추출한 후 이진수 값의 조합을 통해 감시 코드를 추출한다.
보다 구체적으로, 건설 현장 안전 관리 서버(100)는 이진수 값 테이블을 참조하여 망점이 구성된 점의 개수에 따라 해당 망점에 해당하는 이진수 값이 0 또는 1인지 판단할 수 있다. 그런 다음, 건축물 감리 장치(200)는 이진수 값을 순차적으로 결합하여 감시 코드를 결정한다.
예를 들어, 감시 대상 이미지에서 4개의 점으로 이루어진 망점 1개와 8개의 점으로 이루어진 망점 6개를 추출한 경우, 건설 현장 안전 관리 서버(100)는 4개의 점으로 이루어진 망점에 해당하는 이진수 값을 1로 인식하고, 8개의 점으로 이루어진 망점에 해당하는 이진수 값을 0으로 인식하여 감시 코드 “1000000”를 생성한다.
다른 예를 들어, 감시 대상 이미지에서 6개의 점으로 이루어진 망점 2개와 8개의 점으로 이루어진 망점 3개를 추출한 경우, 건설 현장 안전 관리 서버(100)는 6개의 점으로 이루어진 망점에 해당하는 이진수 값을 1로 인식하고, 8개의 점으로 이루어진 망점에 해당하는 이진수 값을 0으로 인식하여 감시 코드 “11000”을 생성한다.
상기와 같이, 감시 코드를 생성한 후 감시 코드가 작업자의 헬멧 및 근로자의 ID를 지시하는 경우, 건설 현장 안전 관리 서버(100)는 근로자의 ID를 이용하여 근로자 데이터베이스(113)와 연동하여 근로자 별 프로필에 안전 이력 히스토리를 업데이트할 수 있다.
점검자 단말(500)은 건설 현장 안전 관리 서버(100)로부터 근로자 별 불안전 행동 입력 절차를 수신하면, 근로자 별 불안전 행동 입력 절차를 통해 협력사, 작업팀, 근로자, 재해 유형, 상세 내용, 사진 등을 수신한다.
그 후, 점검자 단말(500)은 근로자 별 불안전 행동 입력 절차를 통해 수신된 정보를 기초로 시정 조치서를 생성한 후 시정 조치서를 관리자 단말(300)에 제공한다.
일 실시예에서, 점검자 단말(500) 중 관리자 단말(300)은 근로자 별 불안전 행동 입력 절차를 통해 수신된 재해 유형을 기초로 해당 재해 유형의 발생을 예방하기 위한 시정 조치서를 생성한 후 시정 조치서를 관리자 단말(300)에 제공한다.
점검자 단말(500) 중 관리자 단말(300)은 시정 조치서에 의거하여 협력사에 의해 시정이 완료되면, 시정 조치 정보(예를 들어, 협력사, 작업팀, 재해 유형, 조치 전후 사진)을 생성하여 건설 현장 안전 관리 서버(100)에 제공한다.
그 후, 점검자 단말(500) 및 관리자 단말(300)은 불안전 행동 입력 절차를 통해 수집된 불안전 행동 및 입력 정보를 이용하여 안전 점검 일지를 생성한다. 이때, 점검자 단말(500) 및 관리자 단말(300)은 점검자 중 관리자가 입력한 불안전 행동은 해당 근로자의 안전점검일지에 반영하고, 점검자 중 감시단이 입력한 시정 조치한 내용을 안전점검일지에 반영한다.
또한, 점검자 단말(500) 중 관리자 단말(300)은 건설 현장 안전 관리 서버(100)로부터 안전 신문고 제보 절차를 통해 세부내용, 사진, 안전 사고 관련 내용을 수신하면, 안전 신문고 채택 여부를 결정하여 건설 현장 안전 간리 서버(100)에 제공한다.
이에 따라, 건설 현장 안전 간리 서버(100)는 안전 신문고로 채택된 경우 해당 안전 신문고의 내용을 해당 근로자 데이터베이스(113)에 저장하고, 안전 신문고의 내용(즉, 현장, 채택 여부, 재해 유형, 상세 내용, 사진 등)을 안전 신문고 데이터베이스(411)에 저장한다.
그 후, 점검자 단말(500) 중 관리자 단말(300)은 재해 유형의 매칭 과정을 통해 매칭되는 재해 유형을 기초로 해당 재해 유형의 발생을 예방하기 위한 시정 조치서를 생성한 후 시정 조치서를 관리자 단말(300)에 제공한다.
점검자 단말(500) 중 관리자 단말(300)은 시정 조치서에 의거하여 협력사에 의해 시정이 완료되면, 시정 조치 정보(예를 들어, 협력사, 작업팀, 재해 유형, 조치 전후 사진)을 생성하여 건설 현장 안전 관리 서버(100)에 제공한다.
따라서, 건설 현장 근로자 관리 서버(100)는 불안전 행동 입력이 발생되면, 해당 부적항 사항 내용 입력 시 함께 입력한 원인 제공 근로자 또는 해당 업체의 데이터베이스에 불안전 행동을 저장한다.
도 5 내지 도 9는 본 발명에 따른 건설 현장 안전 관리를 위한 근로자 프로필 관리 과정을 설명하기 위한 예시도이다.
도 5 내지 도 9를 참조하면, 근로자 단말(200)에는 건설 현장 근로자 관리 서버(100)에 접속하기 위한 어플리케이션이 미리 설치되어 있거나, 어플레케이션 마켓에서 다운로드하여 설치될 수 있다.
근로자 단말(200)은 건설 현장 근로자 관리 서버(100)에 접속하기 위한 어플리케이션을 실행하면 도 5과 같은 화면을 표시한다. 근로자 단말(200)은 도 6(a) 및 도 6(b)와 같은 과정을 통해 근로자 회원으로 가입한다.
근로자 단말(200)은 도 7(a) 및 도 7(b)와 같은 과정을 통해 근로자 프로필(예를 들어, 이름, 공조, 경력, 건강 검진일 등)을 확인할 수 있다. 또한, 근로자 단말(200)은 도 8(a)의 과정을 통해 근로자 프로필(예를 들어, 경력, 연락처, 과거 경력, 과거 검진 결과 등을 변경될 수 있다.
근로자 단말(200)은 상술한 과정을 통해 근로자 프로필의 작성이 완료되면 도 9와 같은 완성된 근로자 프로필을 표시한다.
도 10은 본 발명에 따른 건설 현장 안전 관리를 위한 건설 현장 커뮤니케이션 제공 과정을 설명하기 위한 예시도이다.
도 10을 참조하면, 점검자 단말(500)은 도 7과 같이 불안전 행동 입력 절차를 통해 협력사, 작업팀, 근로자, 재해 유형, 상세 내용, 사진 등을 입력할 수 있다.
점검자 단말(500)은 점검자에 의해 재해 유형(예를 들어, 감전, 깔림, 끼임, 넘어짐, 떨어짐, 무너짐, 물체에 맞음, 부딪힘, 불균형 및 무리한 동작, 산소결핍, 절단/베임/잘림, 화재폭발)이 선택되면, 해당 재해 유형에 해당하는 불안전 행동 리스트를 제공하여 불안전 안전 행동 리스트 중 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택한다.
점검자 단말(500)은 재해 유형 중 “떨어짐”이 선택되면, “떨어짐”에 해당하는 불안전 행동 리스트로 “1) 2m 이상 고소 작업 시 안전대 미착용 또는 안전고리 미체결, 2) 추락 위험 구간 안전 시설물 임의 해체” 등을 제공하여 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
다른 예를 들어, 건설 현장 안전 관리 서버(100)는 재해 유형 중 “끼임”이 선택되면, “끼임”에 해당하는 불안전 행동 리스트로 “1) 장비 작업반경 내 무단출입”등을 제공하여 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
또 다른 예를 들어, 건설 현장 안전 관리 서버(100)는 재해 유형 중 “산소 결핍”이 선택되면 “산소 결핍”에 해당하는 불안전 행동 리스트로 “1) 밀폐공간 무단출입”등을 제공하여 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
한정된 실시예와 도면에 의해 설명되었으나, 본 발명은 상기의 실시예에 한정되는 것은 아니며, 이는 본 발명이 속하는 분야에서 통상의 지식을 가진 자라면 이러한 기재로부터 다양한 수정 및 변형이 가능하다. 따라서, 본 발명 사상은 아래에 기재된 특허청구범위에 의해서만 파악되어야 하고, 이의 균등 또는 등가적 변형 모두는 본 발명 사상의 범주에 속한다고 할 것이다.
본 발명은, 건설 현장의 데이터를 이용하여 효과적으로 안전관리 업무를 진행할 수 있도록 한 것으로, 건설업 분야에서 널리 이용하여 그 실용적이고 경제적인 가치를 실현할 수 있는 기술이다.

Claims (11)

  1. 근로자의 교육 이수 정보, 자격증 취득 정보, 과거 경력 정보 및 건강 검진 정보를 관리하고, 점검자 단말로부터 근로자 불안전 행동 입력 절차를 통해 입력된 불안전 행동 정보 및 근로자 단말로부터 안전 신문고 제보 절차를 통해 안전 신문고를 수신하여 채택 여부를 결정하고, 현장의 작업 내용의 위험도 평가 정보를 이용하여 공종 별 위험도 평가 등급을 산출한 후, 위험도 평가 등급에 해당하는 평가 결과 데이터를 생성하여 관리하는 건설 현장 안전 관리 서버;
    상기 건설 현장 안전 관리 서버로부터 수신된 교육 이수 정보 등록 절차를 통해 교육 이수 정보를 제공하고, 상기 건설 현장 안전 관리 서버로부터 수신된 자격증 취득 정보 등록 절차를 통해 자격증 취득 정보를 제공하는 근로자 단말; 및
    근로자 교육 리스트를 수신하여 상기 근로자 단말에 제공하고, 상기 교육 리스트에 따라 근로자의 교육이 실시된 후 교육 이수 확인 요청 메시지를 상기 건설 현장 안전 관리 서버에 제공하고, 경력자 검색 요청 메시지를 상기 건설 현장 안전 관리 서버에 제공한 후 상기 경력자 검색 요청 메시지에 대한 응답으로 경력자 안내 메시지를 수신하는 관리자 단말을 포함하는 것을 특징으로 하는
    건설 현장 안전 관리 시스템.
  2. 제1항에 있어서,
    상기 건설 현장 안전 관리 서버는
    상기 근로자 별 근로자 정보를 이용하여 건강 검진 대상에 해당하는 근로자 리스트를 생성한 후 병원 서버에 근로자 리스트 상의 근로자의 건강 검진을 예약하는 건강 검진 예약 메시지를 제공하고, 병원 서버에 의해 발급된 검진 결과 문서를 인식하여 검진 결과 문서에서 검진 결과를 생성한 후 근로자 별 검진 결과를 근로자 데이터베이스에 저장하는 것을 특징으로 하는
    건설 현장 안전 관리 시스템.
  3. 제1항에 있어서,
    상기 건설 현장 안전 관리 서버는
    상기 자격증 데이터베이스에 저장된 근로자 별 자격증 취득 정보를 이용하여 자격증 유효 기간 또는 장비 등록증 각각의 유효 기간의 만료까지 남은 기간이 특정 기간 이하이면 관리자 단말에 자격증 유효 기간 만료 안내 메시지를 제공하는 것을 특징으로 하는
    건설 현장 안전 관리 시스템.
  4. 제1항에 있어서,
    상기 건설 현장 안전 관리 서버는
    상기 관리자 단말에 근로자 별 경력 정보를 제공한 후 근로자가 사업자에 의해 고용되어 프로젝트에 참여하게 되면, 상기 프로젝트에 참여한 경력을 확인하여 상기 경력 정보 데이터베이스에 저장된 근로자 별 경력 정보를 갱신하는 것을 특징으로 하는
    건설 현장 안전 관리 시스템.
  5. 제1항에 있어서,
    상기 건설 현장 안전 관리 서버는
    작업 허가 대상 항목에 대한 작업 허가서 작업 절차를 제공하고, 상기 작업 허가서 작업 절차를 통해 정보를 입력받으면 작업 허가서를 생성하여 제공하고, 상기 작업 허가서 검토 요청 메시지에 대한 응답 메시지에 따라 상기 작업 허가서를 이용하여 작업 허가서 목록표를 생성하고, 상기 작업 허가서에 대한 점검 결과를 수신하면 상기 작업을 종결 처리하는 것을 특징으로 하는
    건설 현장 안전 관리 시스템.
  6. 제1항에 있어서,
    상기 건설 현장 안전 관리 서버는
    근로자 불안전 행동 입력 절차를 점검자 단말에 제공하고, 상기 불안전 행동 입력 절차를 통해 입력된 불안전 행동 정보 및 상기 불안전 행동 정보의 시정 조치서에 따른 시정 조치 완료 사항을 안전 점검 일지 양식에 적용하여 안전 점검 일지를 생성하는 것을 특징으로 하는
    건설 현장 안전 관리 시스템.
  7. 제1항에 있어서,
    상기 건설 현장 안전 관리 서버는
    안전 신문고 제보 절차를 근로자 단말에 제공하고, 상기 안전 신문고 제보 절차를 통해 세부내용, 사진, 안전 사고 관련 내용을 수신하여 점검자 단말 중 관리자 단말에 제공하고,
    상기 점검자 단말 중 관리자 단말은
    상기 안전 신문고 제보 절차를 통해 세부내용, 사진, 안전 사고 관련 내용을 수신하면, 안전 신문고 채택 여부를 결정하고, 상기 안전 신문고의 채택 여부에 따라 안전 신문고의 내용을 상기 건설 현장 안전 관리 서버에 제공하는 것을 특징으로 하는
    건설 현장 안전 관리 시스템.
  8. 제1항에 있어서,
    상기 건설 현장 안전 관리 서버는
    건설 현장 상황 및 작업 내용 각각에 해당하는 키워드를 수신하면 사고 위험도 평가 데이터베이스에서 키워드에 해당하는 위험도 평가 정보를 추출한 후 상기 위험도 평가 정보를 이용하여 공종 별 위험도 평가 등급을 산출하고, 위험성 평가 표준 모델에서 상기 위험도 평가 등급에 해당하는 위험 요인 및 안전 대책을 추출하여 평가 결과 데이터를 생성한 후 신규 위험성 평가 데이터베이스에 저장하는 것을 특징으로 하는
    건설 현장 안전 관리 시스템.
  9. 제8항에 있어서,
    상기 건설 현장 안전 관리 서버는
    현장 별 위험 특성 정보가 저장되어 있는 현장 위험 특성 예측 모델을 기초로 상기 위험성 평가 데이터에 현장 정보 및 공사 주기 별 위험성 평가 지수를 반영하여 위험도 예측 데이터를 생성하는 것을 특징으로 하는
    건설 현장 안전 관리 시스템.
  10. 제9항에 있어서,
    상기 건설 현장 안전 관리 서버는
    고정 요인 및 변동 요인에 따라 변경되는 현장 위험 특성 가중치 및 과거 공종 별 위험도 평가 지수를 이용하여 상기 공사 주기 별 위험성 평가 지수를 산출하는 것을 특징으로 하는
    건설 현장 안전 관리 시스템.
  11. 제8항에 있어서,
    상기 건설 현장 안전 관리 서버는
    상기 사고 위험도 평가 데이터베이스에서 공종 별 사고발생빈도 비율 및 공종 별 사고발생강도 비율을 포함하는 위험도 평가 정보를 추출하고, 상기 공종 별 사고발생빈도 비율 및 상기 공종 별 사고발생강도 비율을 이용하여 공종 별 위험도 평가 등급을 산출하는 것을 특징으로 하는
    건설 현장 안전 관리 시스템.
PCT/KR2022/008435 2021-06-17 2022-06-14 건설 현장 안전 관리 시스템 WO2022265371A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020210079024A KR102382648B1 (ko) 2021-06-17 2021-06-17 건설 현장 안전 관리 시스템
KR10-2021-0079024 2021-06-17

Publications (1)

Publication Number Publication Date
WO2022265371A1 true WO2022265371A1 (ko) 2022-12-22

Family

ID=81183823

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2022/008435 WO2022265371A1 (ko) 2021-06-17 2022-06-14 건설 현장 안전 관리 시스템

Country Status (2)

Country Link
KR (1) KR102382648B1 (ko)
WO (1) WO2022265371A1 (ko)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117853078A (zh) * 2024-03-08 2024-04-09 西安迈远科技有限公司 基于无人机的建筑工程施工现场动态安全报警***及方法

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102382648B1 (ko) * 2021-06-17 2022-04-01 에스케이에코플랜트(주) 건설 현장 안전 관리 시스템
CN114638544A (zh) * 2022-04-12 2022-06-17 江苏核电有限公司 一种用于核电厂维修业务的安全管理方法及***
KR102421223B1 (ko) * 2022-05-24 2022-07-14 송예식 중대 산업현장 원격감독 및 안전규정 이행 유도방법 및 이를 수행하는 중대 산업재해 예방시스템
KR102535697B1 (ko) 2022-10-14 2023-05-26 대한민국 안전 신문고를 활용한 위험처리 우선순위 대상의 선정 시스템
CN116307531B (zh) * 2023-02-22 2023-11-03 中电建建筑集团有限公司 一种基于5g+物联网的数字监管指挥调度方法
CN116777699A (zh) * 2023-08-15 2023-09-19 福建新值科技有限公司 一种用于校园实训的实训室智能安全管理***

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040082598A (ko) * 2003-03-19 2004-09-30 주식회사 에스원 스마트카드를 이용한 건설 노무자 정보 관리시스템 및 그방법
KR20150051598A (ko) * 2013-11-05 2015-05-13 두산중공업 주식회사 용접사 자격관리 시스템 및 그의 제어방법
KR102235036B1 (ko) * 2020-08-14 2021-04-01 주식회사 이도 건설 현장 안전 관리 시스템
KR102382648B1 (ko) * 2021-06-17 2022-04-01 에스케이에코플랜트(주) 건설 현장 안전 관리 시스템

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040082598A (ko) * 2003-03-19 2004-09-30 주식회사 에스원 스마트카드를 이용한 건설 노무자 정보 관리시스템 및 그방법
KR20150051598A (ko) * 2013-11-05 2015-05-13 두산중공업 주식회사 용접사 자격관리 시스템 및 그의 제어방법
KR102235036B1 (ko) * 2020-08-14 2021-04-01 주식회사 이도 건설 현장 안전 관리 시스템
KR102382648B1 (ko) * 2021-06-17 2022-04-01 에스케이에코플랜트(주) 건설 현장 안전 관리 시스템

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JUNG, CHANGHOON ; JANG, JIYOUNG ; PARK, SANGWON ; HAN, SEUNGWOO: "Development of a Quantified Risk Prediction Process for Workers in Construction Projects ConsideringSite Conditions and Accident Cases", PROCEEDINGS OF THE KOREAN INSTITUTE OF BUILDING CONSTRUCTION CONFERENCE, vol. 19, no. 2, 1 January 2019 (2019-01-01), pages 94 - 95, XP093015872 *
KOH, SEONG-SUK ET AL.: "A Study on the Hazard of Work Types for Building Construction. ", JOURNAL OF THE ARCHITECTURAL INSTITUTE OF KOREA STRUCTURE & CONSTRUCTION, vol. 20, no. 5, 1 May 2004 (2004-05-01), KR, pages 137 - 143, XP009542136, ISSN: 1226-9107 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117853078A (zh) * 2024-03-08 2024-04-09 西安迈远科技有限公司 基于无人机的建筑工程施工现场动态安全报警***及方法
CN117853078B (zh) * 2024-03-08 2024-05-28 西安迈远科技有限公司 基于无人机的建筑工程施工现场动态安全报警***及方法

Also Published As

Publication number Publication date
KR102382648B1 (ko) 2022-04-01

Similar Documents

Publication Publication Date Title
WO2022265371A1 (ko) 건설 현장 안전 관리 시스템
WO2022265373A1 (ko) 건설 현장 작업 관리 방법 및 이를 실행하는 시스템
WO2022265375A1 (ko) 건설 현장 위험성 예측 방법 및 이를 실행하는 서버
WO2022265372A1 (ko) 건설 현장 근로자 관리 방법 및 이를 실행하는 서버
WO2018070667A1 (ko) 전자문서 내용기반의 위변조 방지 장치와 시스템 및 그 방법
WO2022265374A1 (ko) 건설 현장 커뮤니케이션 서비스 제공 방법 및 이를 실행하는 시스템
WO2016006977A1 (en) Apparatus, server, system and method for energy measuring
CN107615339A (zh) 门禁管理方法及***
WO2021230522A1 (ko) 최종가격산정부를 갖는 토지시세 추정시스템 및 추정방법
WO2018166098A1 (zh) 数据稽核方法、装置、移动终端及计算机可读存储介质
WO2017018562A1 (ko) 모바일을 이용한 현장 관리 방법
WO2020168606A1 (zh) 广告视频优化方法、装置、设备及计算机可读存储介质
WO2017116215A1 (ko) 평가지표 자율제안에 의한 연구개발과제 선정 시스템 및 방법
WO2021070983A1 (ko) Vr 훈련 시스템 및 방법
KR20200024083A (ko) 시설물 유지 관리 시스템 및 이의 실행 방법
WO2023191129A1 (ko) 법안 및 법규정에 대한 모니터링 방법 및 이를 위한 프로그램
WO2021070984A1 (ko) Vr 훈련 시스템 및 방법
WO2022158628A1 (ko) 머신러닝 모델에 기반한 디스플레이 패널의 결함 판정 시스템
WO2021096081A1 (ko) 디지털 사이니지 관리 방법 및 그 장치
WO2019083155A1 (ko) 보험 정보 처리 장치 및 방법, 보험 정보 처리 방법을 구현하기 위한 프로그램이 저장된 기록매체 및 보험 정보 처리 방법을 구현하기 위한 매체에 저장된 프로그램
WO2017222125A1 (ko) 식별코드를 이용한 자필서명 검증 시스템 및 방법
WO2023210889A1 (ko) 비대면 검체 앰플 공급 키오스크 시스템 및 그 방법
JP2017045321A (ja) 情報管理システム、情報管理方法、及び情報管理プログラム
WO2019093674A1 (ko) 디스플레이 장치, 재생 판단 장치, 컨텐츠 재생 확인 방법
WO2022250190A1 (ko) 딥러닝 모델을 이용한 영상검사 대상체의 결함 판정시스템

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22825294

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 22825294

Country of ref document: EP

Kind code of ref document: A1