WO2022265372A1 - 건설 현장 근로자 관리 방법 및 이를 실행하는 서버 - Google Patents

건설 현장 근로자 관리 방법 및 이를 실행하는 서버 Download PDF

Info

Publication number
WO2022265372A1
WO2022265372A1 PCT/KR2022/008436 KR2022008436W WO2022265372A1 WO 2022265372 A1 WO2022265372 A1 WO 2022265372A1 KR 2022008436 W KR2022008436 W KR 2022008436W WO 2022265372 A1 WO2022265372 A1 WO 2022265372A1
Authority
WO
WIPO (PCT)
Prior art keywords
worker
training
information
career
database
Prior art date
Application number
PCT/KR2022/008436
Other languages
English (en)
French (fr)
Inventor
안재현
장현
조재연
김영환
김철민
정재웅
안예빈
이아미
허동영
홍초희
Original Assignee
에스케이에코플랜트(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 에스케이에코플랜트(주) filed Critical 에스케이에코플랜트(주)
Publication of WO2022265372A1 publication Critical patent/WO2022265372A1/ko

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/02Reservations, e.g. for tickets, services or events
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/20Education
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16HHEALTHCARE INFORMATICS, i.e. INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR THE HANDLING OR PROCESSING OF MEDICAL OR HEALTHCARE DATA
    • G16H50/00ICT specially adapted for medical diagnosis, medical simulation or medical data mining; ICT specially adapted for detecting, monitoring or modelling epidemics or pandemics
    • G16H50/30ICT specially adapted for medical diagnosis, medical simulation or medical data mining; ICT specially adapted for detecting, monitoring or modelling epidemics or pandemics for calculating health indices; for individual health risk assessment

Definitions

  • the present invention relates to a construction site worker management method and a server that executes the same, and more specifically, construction site workers that can optimize the placement of workers in the site based on the proficiency level confirmed through past careers registered by the worker. It relates to a management method and a server that executes it.
  • daily workers refer to workers who receive a daily wage or fixed-term workers whose employment contract period is fixed.
  • Daily workers are a different type of employment from temporary workers and contract workers. Although the treatment of daily workers at construction sites has improved a lot through recent law revisions, such as a rise in the minimum wage and easing of qualifications for health insurance, The reality is that it is difficult to enjoy the cost payment structure and welfare benefits at the company level.
  • Regular workers which are distinct from daily workers, are full-time workers who cannot be dismissed in general. Unlike daily workers, regular workers employed by construction companies maintain employment stability and are provided with various welfare benefits as they belong to the company. In addition, if the number of years of service increases, it is possible to increase wages according to promotion and career recognition, which is advantageous compared to daily workers.
  • Skilled workers hope to gain incentives based on skilled work careers through job change, and companies generally want to save time and money by hiring skilled workers.
  • An object of the present invention is to provide a construction site worker management method and a server executing the same, which can lead to voluntary change by enabling safety to positively affect the economic value of workers through worker profile management.
  • an object of the present invention is to provide a construction site worker management method and a server that executes the method for optimizing the placement of workers in the site based on the confirmation of the skill level through past careers registered by the worker.
  • the present invention provides a construction site worker management method that enables a health manager to identify when and what type of examination a worker needs to undergo by efficiently managing the worker's health checkup-related history and evidence, and a server running the same aims to do
  • an object of the present invention is to provide a construction site safety management system that allows workers to receive training at an appropriate time by managing the training contents of workers.
  • the construction site worker management server to achieve this purpose includes a training completion information database that stores a list of training types and cumulative hours for each worker, a license database that stores certificate acquisition information for each worker, and career information that stores career information for each worker.
  • Information database a first training completion management unit that receives training completion information from worker terminals before workers go to work and stores them in the training completion information database, creates and provides a worker training list, and trains workers according to the worker training list a second education completion management unit that updates the education type list and cumulative time for each worker in the education completion information database, a qualification management unit that receives certificate acquisition information from the worker terminal and stores it in the qualification database, and a worker terminal
  • the worker's career management unit and the manager terminal search for workers based on the career information database, education completion information database, and qualification database according to the career worker search request message received from the manager terminal.
  • a worker search department provided by
  • the construction site worker management method executed in the construction site worker management server to achieve this purpose includes receiving training completion information from a worker terminal before the worker goes to work, storing it in a training completion information database, and providing a worker training list. After generating and providing, accumulating and storing a list of training types for each worker in the training completion information database whenever the training of workers is completed according to the worker training list, receiving certificate acquisition information from worker terminals and storing the certificate in the database Storing, upon receipt of past career information from the worker terminal, storing the information in the career information database, based on the career information database, education completion information database, and qualification database according to the career search request message received from the manager terminal. and searching for and providing the information to the manager terminal.
  • the health manager can identify when and what kind of examination the worker should undergo by efficiently managing the history and evidence related to the health examination of the worker.
  • an object of the present invention is to provide a construction site safety management system that allows workers to receive training at an appropriate time by managing the training contents of workers.
  • FIG. 1 is a network configuration diagram illustrating a construction site worker management system according to an embodiment of the present invention.
  • FIG. 2 is a network configuration diagram illustrating a construction site worker management system according to another embodiment of the present invention.
  • FIG. 3 is a network configuration diagram illustrating a construction site worker management system according to another embodiment of the present invention.
  • FIG. 4 is a network configuration diagram illustrating a construction site worker management system according to another embodiment of the present invention.
  • FIG. 5 is a block diagram illustrating the internal structure of a construction site worker management server according to an embodiment of the present invention.
  • FIG. 6 is a flowchart illustrating an embodiment of a construction site worker management method according to the present invention.
  • FIG. 7 to 10 are exemplary diagrams for explaining an execution screen of a worker terminal in the execution process of FIG. 6 .
  • FIG. 11 is a flowchart illustrating an embodiment of a construction site worker management method according to the present invention.
  • FIG. 12 is a flowchart illustrating another embodiment of a construction site worker management method according to the present invention.
  • FIG. 13 is a flowchart illustrating another embodiment of a construction site worker management method according to the present invention.
  • FIG. 1 is a network configuration diagram illustrating a construction site worker management system according to an embodiment of the present invention.
  • the construction site worker management system includes a construction site worker management server 100 , a worker terminal 200 and a manager terminal 300 .
  • the construction site worker management server 100 includes an education completion information database 110, a qualification database 111, a career information database 112, a worker database 113, and a health examination database 114.
  • the construction site worker management server 100 receives and stores worker profile information from the worker terminal 200 through communication with the worker terminal 200 .
  • worker profile information may include personal information, career, education history, health checkup history, and the like.
  • the construction site worker management server 100 provides a training completion information registration procedure to the worker terminal 200 before the worker goes to work, and receives training completion information through the training completion information registration procedure.
  • the education completion information may include a name, a date of birth, a registration number, a date of completion, a photograph of the certificate of completion, and the like for each certificate of education completion.
  • the above training certificate is a certificate issued after completing training on construction site safety management, and may include a basic health certificate.
  • an authenticity determination code for determining authenticity may be inserted into the above education certificate and issued. That is, when printed by an educational completion issuing institution, pixel spaces of different sizes corresponding to authenticity/counterfeit codes are output together and issued.
  • the construction site worker management server 100 can determine the authenticity of the training certificate by using the authenticity determination code received from the training certificate issuing institution server.
  • the construction site worker management server 100 analyzes the pixels in the process of scanning to determine the authenticity of the training certificate, the pixel space corresponding to the authenticity discrimination code can be extracted because the values of the pixels are different. .
  • the construction site worker management server 100 extracts a plurality of pixel spaces from the training certificate in the process of scanning and analyzing the training certificate, and then generates an authenticity discrimination code by using the binary value indicated by the dotted dots in the plurality of pixel spaces. can do.
  • the construction site worker management server 100 extracts 1 pixel space composed of 4 points and 6 pixel spaces composed of 8 points, the pixel space composed of 4 points is recognized as 1, and 8 By recognizing a pixel space made up of dots as 0, the authenticity determination code “1000000” can be generated.
  • the construction site worker management server 100 extracts 2 pixel spaces of 6 dots and 3 pixel spaces of 8 dots, the pixel space of 6 dots is recognized as 1, and 8 A pixel space composed of points is recognized as 0 to generate the authenticity determination code “11000”.
  • the construction site worker management server 100 may determine the authenticity of the training certificate by comparing the authenticity determination code and the previously received authenticity determination code.
  • the construction site worker management server 100 calculates the effective time and training time for each training using the training completion information recorded in the training certificate, and then lists the training types for each worker. And the authentication time is stored in the education completion information database 110 .
  • the accumulated education time is updated by reflecting the education time to the previously accumulated accumulated education time.
  • the construction site worker management server 100 After that, the construction site worker management server 100 generates a worker education list and provides the worker education list to the worker terminal 200 .
  • the worker training list may include a manager, company, site, date, name, date of birth, whether or not a new person has completed training, an effective period, whether to go to work, a list of required training, whether or not required training has been completed.
  • the construction site worker management server 100 receives attendance authentication information from the worker terminal 200, and after the worker training is performed according to the worker training list from the manager terminal 300, the training proof photo and training proof information A training completion confirmation request message including a is received.
  • the attendance certification information may include the name of the worker and the name of the supervisor, and the training proof information is the training category, training target, work type name, training date, training location, training time, training manager (manager, etc.), training content etc. may be included.
  • the construction site worker management server 100 After the construction site worker management server 100 authenticates attendance using the attendance authentication information and extracts the education proof information, the education type list and accumulated time for each worker stored in the education completion information database 110 using the education proof information. update
  • the construction site worker management server 100 calculates the effective time and training time for each training using the training evidence information, updates the training type list for each worker using the training type, and calculates the accumulated time using the certification time. It is updated and stored in the education completion information database 110 for each worker.
  • the construction site worker management server 100 provides a qualification acquisition information registration procedure to the worker terminal 200, receives qualification acquisition information through the qualification acquisition information registration procedure, and stores qualification acquisition information for each worker in the qualification database 111. save to
  • the certificate acquisition information includes essential and optional information for each certificate, and the essential information includes title, name, nationality, resident registration number, address, nationality, date of issuance, aptitude test, expiration date, license in possession, and photo evidence
  • the selection information may include an insurance policy, a business registration certificate, an equipment registration certificate (eg, a result of a non-destructive test of a crane, a pump car, etc.), a photograph of evidence, and the like.
  • the above qualification is a qualification issued after certification of technology usable at a construction site through a test, and may include a mechanical pilot and the like.
  • an authenticity determination code for determining authenticity may be inserted and issued. That is, when a certificate is issued by an institution, pixel spaces of different sizes corresponding to authenticity/counterfeiting codes are output together and issued.
  • the construction site worker management server 100 can determine the authenticity of the certificate by using the authenticity determination code received from the certificate test host organization server.
  • the construction site worker management server 100 analyzes pixels to determine the authenticity of an identification photo, such as a license, the pixel space corresponding to the authenticity determination code can be extracted because the pixel values are different.
  • the construction site worker management server 100 extracts a plurality of pixel spaces from the proof photos, such as license certificates, in the process of scanning and analyzing proof photos, such as license certificates, and then uses binary values indicated by dotted dots in the plurality of pixel spaces. Thus, an authenticity determination code can be generated.
  • the construction site worker management server 100 extracts 1 pixel space composed of 4 points and 6 pixel spaces composed of 8 points, the pixel space composed of 4 points is recognized as 1, and 8 By recognizing a pixel space made up of dots as 0, the authenticity determination code “1000000” can be generated.
  • the construction site worker management server 100 extracts 2 pixel spaces of 6 dots and 3 pixel spaces of 8 dots, the pixel space of 6 dots is recognized as 1, and 8 A pixel space composed of points is recognized as 0 to generate the authenticity determination code “11000”.
  • the construction site worker management server 100 may compare the authenticity determination code and the previously received authenticity determination code to determine authenticity of the qualification certificate. As described above, the construction site worker management server 100 stores certification acquisition information for each worker in the certification database 111 after determining whether the certification is authentic.
  • the construction site worker management server 100 uses the certification acquisition information for each worker stored in the certification database 111 to determine if the period remaining until the expiration date of the certification validity period or the validity period of each equipment registration certificate is less than a specific period, the manager terminal 300 ) can provide a notification message for the expiration of the validity period of the license.
  • the construction site worker management server 100 extracts career information from the past career registration request message and converts the career information for each worker into career information data.
  • the career information may include the number of days worked, type of work, ordering party (eg, company), type of project (eg, civil engineering, construction, plant, etc.), manager, detailed type of work, and the like.
  • the construction site worker management server 100 upon receiving the experienced worker search request message from the manager terminal 300, extracts workers from the career information database 112 according to the experienced worker search request message, and then the experienced worker including the career information. Provide guidance messages. In this way, the construction site worker management server 100 provides career information together so that the business operator can refer to the project arrangement of workers based on the career information.
  • the construction site worker management server 100 checks the career and updates career information for each worker stored in the career information database 112 .
  • the construction site worker management server 100 generates a list of workers using the worker information for each worker stored in the worker database 113 and the health checkup target stored in the health checkup database 114, and then the hospital server ( Not shown) provides a health checkup reservation message for reserving a health checkup for workers on the worker list.
  • the list of workers may include a checkup type for each worker, a next checkup date, a scheduled checkup institution, a desired checkup reservation date, and the like.
  • the construction site worker management server 100 recognizes the checkup result document issued by the hospital server, generates a checkup result from the checkup result document, and stores the checkup result for each worker in the worker database 113.
  • the construction site safety management server 100 when the construction site safety management server 100 receives a checkup result document issued by the hospital server from the manager terminal 300, it recognizes the checkup result document using OCR technology and then corresponds to a predetermined item The contents are extracted and stored in the worker database (113).
  • FIG. 2 is a network configuration diagram illustrating a construction site worker management system according to another embodiment of the present invention.
  • the construction site worker management system includes a construction site worker management server 100 , a manager terminal 300 and a Korea Meteorological Administration server 400 .
  • the construction site safety management server 100 includes an accident risk assessment database 120, a risk assessment standard model 121, a risk assessment database 122, a site risk characteristic prediction model 123, and an accident case database 124. .
  • the construction site worker management server 100 generates risk evaluation results for each work type based on the accident risk evaluation database 120 and the risk evaluation standard model 121 .
  • the accident risk evaluation database 120 stores accident frequency ratios for each work type, accident occurrence intensity ratios for each work type, and details for each disaster.
  • the details of each disaster may include the process, artifact, accident type, unit work, number of victims (death/injury), site location, construction type, construction amount, and completion rate.
  • Risk factors for each type of work and safety measures for each risk factor are stored in the risk evaluation standard model 121 .
  • the keywords correspond to the keywords in the accident risk assessment database 120. Extract the accident frequency rate by work type, accident intensity rate by work type, and details by disaster.
  • the above keywords may be determined by process, accident person, accident type, unit work content, and the like.
  • the construction site worker management server 100 calculates the risk evaluation result for each work type using the accident frequency ratio and accident intensity ratio for each work type.
  • the construction site worker management server 100 may calculate the risk evaluation result for each work type through the AI engine or through [Equation 1] to [Equation 6] below.
  • the process of calculating the risk evaluation result for each type of work will be described through [Equation 1] to [Equation 6].
  • the construction site worker management server 100 evaluates the risk for each work type by using the accident occurrence frequency ratio for each work type and the accident occurrence intensity ratio for each work type extracted from the risk evaluation database 122 based on [Equation 1]. grades can be calculated.
  • the risk evaluation database 122 stores the accident frequency ratio and accident intensity ratio for each work type, and may be automatically updated as the application is used.
  • Part_Danger_level Risk evaluation level by work type
  • the accident frequency rate (Danger_fre_rate) by work type is calculated by [Equation 2] below
  • the accident intensity rate (Danger_str_rate) by work type is calculated by [Equation 3] below
  • the weight (Danger_W) determined by the time of accident for each construction type is assigned a higher weight as the time of accident is closer to the present time for cases where the time of accident does not exceed 3 years from the present time.
  • a pre-determined weight (e.g., “1”) is assigned to cases in which the current time exceeds 3 years.
  • part_victim accident index by work type
  • the accident index (part_victim) and the total disaster index (total_victi) for each type of work may be determined by the details (ie, the number of victims) for each disaster extracted from the risk evaluation database 122.
  • part_dead_people_rate Calculated by [Equation 4] as the death rate for each type of work
  • part_injured_people_rate Calculated by [Equation 5] as the ratio of injured people by work type
  • part_dead_people_rate (part_dead_people / total_dead_people) ⁇ 100
  • part_dead_people_rate Rate of death by type of work
  • part_dead_people Number of deaths by type of work
  • total_dead_people total number of dead people
  • the number of deaths by type of work (part_dead_people) and the total number of deaths (total_dead_people) may be determined by the details of each disaster extracted from the risk assessment database 122 (ie, deaths among the number of victims).
  • part_dead_people_rate Percentage of injured people by work type
  • part_dead_people Number of injured people by type of work
  • total_dead_people total number of dead people
  • the number of injured people by work type (part_dead_people) and the total number of injured people (total_dead_people) may be determined by the details of each disaster extracted from the risk assessment database 122 (ie, the number of injured people among the number of injured people).
  • the risk evaluation grade for each type of work calculated through [Equation 1] to [Equation 5] may be as shown in [Table 1] below.
  • the construction site worker management server 100 determines the risk factor corresponding to the risk evaluation grade for each work type in the risk evaluation standard model 121. and safety measures for each risk factor are extracted.
  • the construction site worker management server 100 generates risk evaluation result data using risk evaluation grades, risk factors, and safety measures for each risk factor, and then stores the risk evaluation result data in a risk evaluation database.
  • the construction site worker management server 100 predicts risk by reflecting the risk evaluation result data, site information, and risk evaluation index for each construction cycle based on the site risk characteristic prediction model. generate data
  • the site information above may include site address, construction type, construction scale (amount), construction period, master schedule/construction permit information for each construction cycle: site location, actual start date, main use code name, etc.
  • the site risk characteristic prediction model 123 is the site location, construction type, construction scale, weather, process progress, delay, patrol data by work type (Patrol Data), patrol data by accident type (Patrol Data), compared to all workers The safety score ratio for each site worker and work team is stored.
  • ConstructionPeriod_Danger_value PastPart_Danger_value + weight
  • ConstructionPeriod_Danger_value Risk evaluation index for each construction period
  • PastPart_Danger_value Risk evaluation index for each type of work in the past
  • the site risk characteristic weight may be changed according to fixed factors, variable factors, and field inconsistencies.
  • Fixed factors include site location, type of construction, and scale of construction, and variable factors include weather information received from the Korea Meteorological Administration server 400 and progress and delay against a predetermined schedule.
  • Site nonconformities refer to site nonconformities pointed out by the site manager.
  • field nonconformities may include failure to fasten safety rings.
  • the risk evaluation index for each construction cycle is changed by changing the site risk characteristic weight according to the fixed factor, the variable factor, and the field unsuitability.
  • FIG. 3 is a network configuration diagram illustrating a construction site work management system according to another embodiment of the present invention.
  • the construction site work management system includes a construction site worker management server 100 and an inspector terminal 500, and the inspector terminal 500 includes a manager terminal 300 and a supervisor terminal 600. .
  • the construction site worker management server 100 includes a work permit database 130 and a site subscriber database 131 .
  • the construction site worker management server 100 provides a work permit work procedure to the manager terminal 300 as a basis.
  • the work permit database 130 includes a checklist for each work permit, and the field subscriber database 131 stores the name and affiliation of each foreman and the name and affiliation of each worker.
  • the construction site worker management server 100 creates a work permit list using the work permit.
  • the work permit generated by the manager may include the permit number, date, company name, work details by work type, work place, input number of people, work hours, work foremen, input devices, workers, and the like.
  • the construction site worker management server 100 provides work details, work place, input number of workers, work hours, work foremen, input devices, workers, and work permit targets (ie, dangerous work permit, general work permit) for each work type of the work permit. , permit type (i.e., special, hazardous, general), manager, inspector, etc., to create a list of permits to work.
  • This list of work permits is a table in which lists are created for each type of work permit so that work permits can be intuitively checked.
  • the construction site worker management server 100 creates a work permit generation list and stores it in the work permit database 130 . After that, the manager assigns tasks to be checked by himself.
  • the construction site worker management server 100 receives the work permit checklist generated according to the work permit assignment details, it stores the work permit checklist in the work permit database 130 .
  • the work permit database 130 includes work permit inspection results, inspectors, inspection time, photos, details, and the like.
  • the construction site worker management server 100 provides a work termination request message to the manager terminal 300 when the work permit check is completed, and after the work termination is registered, the work permit termination details are stored in the work permit database 130. Save.
  • the manager terminal 300 selects a work stop or correction request through a nonconformity registration procedure when a nonconformity is found during inspection of a specific work on the work permit list received from the construction site worker management server 100 .
  • the manager terminal 300 If, after a nonconformity is found, the manager terminal 300 provides a work stop request message to different manager terminals if work stop is selected after a nonconformity is found, and if a correction request is selected after a nonconformity is found, a correction request message is sent to different administrators. provided to the terminal.
  • the manager terminal 300 stores the nonconformities for each person in the developing subscriber database 131 connected to the work permit database 130 when nonconformities are found.
  • the manager terminal 300 After receiving the work permit work procedure from the construction site worker management server 100, the manager terminal 300 generates a work permit through the work permit work procedure. At this time, the manager terminal 300 inputs the permit number, date, company name, work details for each type of work, work place, number of inputs, working hours, work foremen, input devices, and workers through the work permit work procedure to generate a work permit. can
  • the inspector terminal 500 performs inspection based on the work permit list received from the construction site worker management server 100 .
  • the inspector terminal 500 inputs a detailed check list, photos, and inspection results through an inspection result input procedure for each inspection target item for each work type based on the work permit. After that, the inspector terminal 500 may provide any one of an inspection completion message, a work stop notification message, and a work partial supplement request message to different manager terminals according to the inspection result.
  • the inspector terminal 500 may provide an inspection completion message to the corresponding work type manager terminal and worker terminals when the inspection result is "good".
  • the inspector terminal 500 may provide a work stop notification message to the corresponding process manager terminal and worker terminals when the inspection result is “defective”.
  • the inspector terminal 500 may provide a supplementary request message for part of the work to the corresponding process manager terminal and worker terminals when the inspection result is "other supplementation".
  • FIG. 4 is a network configuration diagram illustrating a construction site worker management system according to another embodiment of the present invention.
  • the construction site worker management system includes a construction site worker management server 100 and an inspector terminal 500, and the inspector terminal 500 includes a manager terminal 300 and a supervisor terminal 600. .
  • the construction site worker management server 100 provides unsafe behavior input procedures for each worker stored in the worker database 113 to the inspector terminal 500 .
  • the unsafe behavior input procedure for each worker is a procedure for inputting the unsafe behavior of the worker when a behavior corresponding to a predetermined unsafe behavior is found among the behaviors of the worker working at the construction site.
  • the predetermined unsafe behavior refers to an behavior capable of increasing the probability of occurrence of a disaster type based on the disaster type.
  • the unsafe behavior input procedure can input the manager, work team, worker, accident type, details, photos, etc. hitting an object, bumping into, unbalanced and unreasonable motion, lack of oxygen, cutting/cutting/cutting, fire/explosion), a list of unsafe behaviors corresponding to the type of accident is provided, At least one non-safety action can be selected.
  • the construction site worker management server 100 displays “1) not wearing a safety belt or not fastening a safety ring when working at a height of 2 m or more, 2 ) Arbitrary disassembly of safety facilities in the fall hazard area”, etc., so that workers can select at least one unsafe behavior corresponding to the unsafe behavior.
  • the construction site worker management server 100 provides "1) unauthorized access within the work radius of the equipment” as a list of unsafe actions corresponding to "getting in” when "getting in” is selected among the types of disasters, so that the worker's At least one unsafe behavior corresponding to the unsafe behavior may be selected.
  • the construction site worker management server 100 provides "1) trespassing to confined spaces" as a list of unsafe actions corresponding to "lack of oxygen” when "lack of oxygen” is selected among the types of disasters, thereby preventing workers from At least one unsafe behavior corresponding to the unsafe behavior may be selected.
  • the construction site worker management server 100 receives corrective action information (eg, manager, work team) from the manager terminal 300 among the inspector terminals 500. , disaster type, before and after action photos) are received and stored in the action item database 140 . Conversely, the construction site safety management server 100 provides a procedure for deregistering nonconformities when it is determined that the content pointed out as nonconformity is unreasonable.
  • corrective action information eg, manager, work team
  • the construction site safety management server 100 provides a procedure for deregistering nonconformities when it is determined that the content pointed out as nonconformity is unreasonable.
  • the construction site worker management server 100 provides a safety report report procedure to the worker terminal 1300, receives details, photos, and safety accident-related contents through the safety report report procedure and provides them to the manager terminal 300. do.
  • the inspector terminal 500 When receiving unsafe behavior input procedures for each worker from the construction site worker management server 100, the inspector terminal 500 receives the manager, work team, worker, accident type, details, photos, etc. through the unsafe behavior input procedure for each worker. do.
  • the manager terminal 300 among the inspector terminals 500 generates a corrective action document based on the information received through the unsafe behavior input procedure for each worker, and then provides the corrective action document to the manager terminal 300 .
  • the manager terminal 300 among the inspector terminals 500 generates a corrective action document for preventing the occurrence of the corresponding accident type based on the accident type received through the unsafe behavior input procedure for each worker, and then writes the corrective action document. It is provided to the manager terminal 300 .
  • the manager terminal 300 among the inspector terminals 500 creates corrective action information (eg, manager, work team, type of disaster, before and after action photos) and constructs It is provided to the field worker management server 100.
  • corrective action information eg, manager, work team, type of disaster, before and after action photos
  • the inspector terminal 500 and the manager terminal 300 generate safety inspection diaries using the unsafe behavior and input information collected through the unsafe behavior input procedure.
  • the inspector terminal 500 and the manager terminal 300 reflect the unsafe behavior input by the manager among the inspectors in the safety inspection log of the worker, and reflect the corrective actions input by the inspector group in the safety inspection log. .
  • manager terminal 300 among the inspector terminals 500 receives details, photos, and safety accident-related contents from the construction site worker management server 100 through the safety reporting report procedure, it determines whether to adopt the safety reporting report and constructs It is provided to the on-site safety management server 100.
  • the construction site safety management server 100 when adopted as a safety report, stores the contents of the safety report in the corresponding worker database 113, and the contents of the safety report (ie, site, whether or not to adopt, disaster type, details contents, photos, etc.) are stored in the safety newspaper database 411.
  • the manager terminal 300 among the inspector terminals 500 generates a corrective action document for preventing the occurrence of the corresponding disaster type based on the matched disaster type through a disaster type matching process, and then writes the corrective action document to the manager terminal ( 300) is provided.
  • the manager terminal 300 among the inspector terminals 500 creates corrective action information (eg, manager, work team, type of disaster, before and after action photos) and constructs It is provided to the field worker management server 100.
  • corrective action information eg, manager, work team, type of disaster, before and after action photos
  • the construction site worker management server 100 stores the unsafe behavior in the database of the worker providing the cause or the corresponding company entered together when the relevant negligence information is input.
  • FIG. 5 is a block diagram illustrating the internal structure of a construction site worker management server according to an embodiment of the present invention.
  • the construction site worker management server 100 includes an education completion information database 110, a qualification database 111, a career information database 112 and a worker database 113, a first education completion management unit 114 ), a second education completion management unit 115, a license management unit 116, a worker career management unit 117, a worker search unit 118, and a worker health examination management unit 119.
  • the training completion information database 110 stores a list of training types and certification hours for each worker.
  • the certification database 111 stores certification acquisition information for each worker.
  • the certificate acquisition information includes essential and optional information for each certificate, and the essential information includes title, name, nationality, resident registration number, address, nationality, date of issuance, aptitude test, expiration date, license in possession, and photo evidence
  • the selection information may include an insurance policy, a business registration certificate, an equipment registration certificate (eg, a result of a non-destructive test of a crane, a pump car, etc.), a photograph of evidence, and the like.
  • the above qualification is a qualification issued after certification of technology usable at a construction site through a test, and may include a mechanical pilot and the like.
  • an authenticity determination code for determining authenticity may be inserted and issued. That is, when a certificate is issued by an institution, pixel spaces of different sizes corresponding to authenticity/counterfeiting codes are output together and issued.
  • the career information database 112 stores career information for each worker.
  • worker information for each worker is stored.
  • the first training completion management unit 114 provides a training completion information registration process to the worker terminal 200 before the worker goes to work, and receives training completion information through the training completion information registration process.
  • the education completion information may include a name, a date of birth, a registration number, a date of completion, a photograph of the certificate of completion, and the like for each certificate of education completion.
  • the above training certificate is a certificate issued after completing training on construction site safety management, and may include a basic health certificate.
  • an authenticity determination code for determining authenticity may be inserted into the above education certificate and issued. That is, when printed by an educational completion issuing institution, pixel spaces of different sizes corresponding to authenticity/counterfeit codes are output together and issued.
  • the authenticity determination code inserted into the education completion certificate is received from the education completion issuing institution server and stored in advance. Accordingly, the first education completion management unit 114 may determine whether the education completion certificate is authentic or not by using the authenticity determination code received from the education certificate issuing institution server.
  • the construction site worker management server 100 analyzes the pixels in the process of scanning to determine the authenticity of the training certificate, the pixel space corresponding to the authenticity discrimination code can be extracted because the values of the pixels are different. .
  • the first education completion management unit 114 extracts a plurality of pixel spaces from the education certificate in the process of scanning and analyzing the education certificate, and then generates a genuine/false discrimination code using binary values indicated by the dotted dots in the plurality of pixel spaces. can do.
  • the first education completion management unit 114 extracts 1 pixel space composed of 4 points and 6 pixel spaces composed of 8 points, the pixel space composed of 4 points is recognized as 1, and 8 By recognizing a pixel space made up of dots as 0, the authenticity determination code “1000000” can be generated.
  • the first education completion management unit 114 extracts 2 pixel spaces of 6 dots and 3 pixel spaces of 8 dots, the pixel space of 6 dots is recognized as 1, and 8 A pixel space composed of points is recognized as 0 to generate the authenticity determination code “11000”.
  • the first education completion management unit 114 may determine whether the education completion certificate is authentic by comparing the authenticity determination code with the previously received authenticity determination code.
  • the first training completion management unit 114 calculates the effective time and training time for each training using the training completion information recorded in the training completion certificate after determining whether the training completion certificate is authentic, and then lists the training types for each worker. And the authentication time is stored in the education completion information database 110 .
  • the accumulated education time is updated by reflecting the education time to the previously accumulated accumulated education time.
  • the second education completion management unit 115 generates a worker education list and provides the worker education list to the worker terminal 200 through the manager terminal 300 .
  • the worker training list may include a manager, company, site, date, name, date of birth, whether or not a new person has completed training, an effective period, whether to go to work, a list of required training, whether or not required training has been completed.
  • the second education completion management unit 115 receives attendance authentication information from the worker terminal 200, and after the worker's education is conducted according to the worker education list from the manager terminal 300, the education proof picture and education proof information A training completion confirmation request message including a is received.
  • the attendance certification information may include the name of the worker and the name of the supervisor, and the training proof information is the training category, training target, work type name, training date, training location, training time, training manager (manager, etc.), training content etc. may be included.
  • the second education completion management unit 115 authenticates attendance using the attendance authentication information and extracts the education evidence information, and then lists the education type and accumulated time for each worker stored in the education completion information database 110 using the education evidence information. update
  • the second training completion management unit 115 calculates the effective time and training time for each training using the training evidence information, then updates the training type list for each worker using the training type, and calculates the accumulated time using the certification time. It is updated and stored in the education completion information database 110 for each worker.
  • the qualification management unit 116 provides a qualification acquisition information registration procedure to the worker terminal 200, receives the qualification acquisition information through the qualification acquisition information registration procedure, and stores the qualification acquisition information for each worker in the qualification database 111. .
  • the certificate acquisition information includes essential and optional information for each certificate, and the essential information includes title, name, nationality, resident registration number, address, nationality, date of issuance, aptitude test, expiration date, license in possession, and photo evidence
  • the selection information may include an insurance policy, a business registration certificate, an equipment registration certificate (eg, a result of a non-destructive test of a crane, a pump car, etc.), a photograph of evidence, and the like.
  • the above qualification is a qualification issued after certification of technology usable at a construction site through a test, and may include a mechanical pilot and the like.
  • an authenticity determination code for determining authenticity may be inserted and issued. That is, when a certificate is issued by an institution, pixel spaces of different sizes corresponding to authenticity/counterfeiting codes are output together and issued.
  • the certification management unit 116 may determine whether the certification is genuine or not by using the authenticity determination code received from the certification test host organization server.
  • the pixel space of different sizes inserted in the above certificate is set to a color similar to that of the background of the certificate of education (i.e., the color corresponding to the value where the RGB value of the background is above or below a certain value), the user's eyes Although it is not visible, when the license management unit 116 analyzes pixels to determine authenticity of an evidence photo such as a certificate, the pixel space corresponding to the authenticity determination code can be extracted because the values of the pixels are different.
  • the certification management unit 116 extracts a plurality of pixel spaces from the certification photos, such as certification documents, and determines authenticity by using binary values indicated by dotted dots in the plurality of pixel spaces. code can be generated.
  • the certificate management unit 116 extracts 1 pixel space composed of 4 dots and 6 pixel spaces composed of 8 dots, the pixel space composed of 4 dots is recognized as 1 and the pixel space composed of 8 dots is extracted. By recognizing the pixel space as 0, the authenticity determination code “1000000” can be generated.
  • the certification management unit 116 recognizes the pixel space of six dots as 1 and converts it to eight dots. By recognizing the formed pixel space as 0, the authenticity determination code "11000" is generated.
  • the certificate management unit 116 may compare the authenticity determination code and the previously received authenticity determination code to determine whether the certificate is authentic.
  • the construction site worker management server 100 stores certification acquisition information for each worker in the certification database 111 after determining whether the certification is authentic.
  • the license management unit 116 uses the certificate acquisition information for each worker stored in the certificate database 111 to display the license certificate in the manager terminal 300 when the remaining period until the expiration date of each valid period of the license certificate or the equipment registration certificate is less than a specific period. It is possible to provide a notification message about the expiry of the validity period.
  • the worker career management unit 117 When receiving a past career registration request message including career information from the worker terminal 200, the worker career management unit 117 extracts career information from the past career registration request message and stores the career information for each worker in the career information database 112. Save.
  • the career information may include the number of days worked, type of work, ordering party (eg, company), type of project (eg, civil engineering, construction, plant, etc.), manager, detailed type of work, and the like.
  • the worker search unit 118 Upon receiving the experienced worker search request message from the manager terminal 300, the worker search unit 118 extracts workers from the career information database 112 according to the experienced worker search request message, and then provides an experienced worker guide message including career information. In this way, the worker search unit 118 provides career information together so that the operator can refer to the project arrangement of workers based on the career information.
  • a worker's career management unit 117 is employed by a business operator and participates in a project, the worker's career is confirmed and the career information for each worker stored in the career information database 112 is updated.
  • the worker health checkup management unit 119 generates a list of workers subject to health checkup using the worker information for each worker stored in the worker database 113, and then sends the health checkup to the hospital server 500 of the workers on the worker list. Provides a health checkup reservation message to reserve.
  • the list of workers may include a checkup type for each worker, a next checkup date, a scheduled checkup institution, a desired checkup reservation date, and the like.
  • the worker health checkup management unit 119 recognizes the checkup result document issued by the hospital server 500 and generates a checkup result from the checkup result document, and then stores the checkup result for each worker in the worker database 113.
  • FIG. 6 is a flowchart illustrating an embodiment of a construction site worker management method according to the present invention.
  • the construction site worker management server 100 receives training completion information from the worker terminal before the worker goes to work and stores it in the training completion information database (step S620).
  • the construction site worker management server 100 creates and provides a worker training list, and updates the training type list and accumulated time for each worker in the training completion information database whenever the training of workers is completed according to the worker training list. (Step S630).
  • the construction site worker management server 100 receives certificate acquisition information from the worker terminal and stores it in the certificate database (step S640).
  • the construction site worker management server 100 receives the past career from the worker terminal, it stores it in the career information database (step S650).
  • the construction site worker management server 100 searches for and provides workers based on the career information database, training completion information database, and qualification database according to the experienced worker search request message received from the manager terminal (step S660).
  • FIG. 7 to 10 are exemplary diagrams for explaining an execution screen of a worker terminal in the execution process of FIG. 6 .
  • an application for accessing the construction site worker management server 100 may be pre-installed in the worker terminal 200 or may be downloaded and installed from an application market.
  • FIG. 7 When the worker terminal 200 executes an application for accessing the construction site worker management server 100, a screen as shown in FIG. 7 is displayed.
  • the worker terminal 200 joins as a worker member through the same process as shown in FIGS. 8 (a) and 8 (b).
  • the worker terminal 200 may check the worker profile (eg, name, cooperation, career, health checkup date, etc.) through a process as shown in FIGS. 9(a) and 8(b). In addition, the worker terminal 200 may change the worker profile (eg, career, contact information, past career, past checkup results, etc.) through the process of FIG. 10 (a).
  • the worker profile eg, name, cooperation, career, health checkup date, etc.
  • the worker terminal 200 may change the worker profile (eg, career, contact information, past career, past checkup results, etc.) through the process of FIG. 10 (a).
  • the worker terminal 200 displays the completed worker profile as shown in FIG. 10 .
  • FIG. 11 is a flowchart illustrating an embodiment of a construction site worker management method according to the present invention.
  • An embodiment disclosed in FIG. 11 relates to an embodiment in which a worker inputs a personal career and the career is automatically entered during a period of participation in a construction project.
  • the construction site worker management server 100 receives a past career registration request message including career information from the worker terminal 200 after a worker signs up as a member (step S1101), the past career registration request message After extracting career information from , the career information for each worker is stored in the career information database 112 (steps S1102 and S1103).
  • the career information may include the number of days worked, type of work, ordering party (eg, company), type of project (eg, civil engineering, construction, plant, etc.), manager, detailed type of work, and the like.
  • step S1103 When the construction site worker management server 100 uses the work permit after the worker participates in the project (step S1103), when receiving the identification code of the work permit generated by scanning the QR code of the work permit from the worker terminal 200 ( Step S1105), career information for each worker corresponding to the identification code of the work permit is stored in the career information database 112 (step S1106).
  • the construction site worker management server 100 if the worker does not use the work permit after participating in the project, if it corresponds to the project period and wants to store today's career (S1107, S1108), if it corresponds to working hours (step S1109 ) If it corresponds to the GPS range of the worker (step S1110), the career information for each worker is stored in the career information database 112 based on the project information (step S1111).
  • FIG. 12 is a flowchart illustrating another embodiment of a construction site worker management method according to the present invention.
  • An embodiment of FIG. 12 relates to an embodiment in which a user registered as a manager may register a site for the first time.
  • the manager terminal 300 receives a procedure for creating my site from the construction site worker management server 100 (step S1201), and when the manager is the original building (step S1202), the construction start report is sent to the construction site worker management server. (100) (step S1203). In contrast, the manager terminal 300 provides a subcontract contract to the field worker management server 100 in the case of a BP company (step S1204).
  • the construction site worker management server 100 examines whether the construction start report or subcontract is approved from the manager terminal 300 (step S1207), and sends an approval notification message to the manager terminal 300 when the construction start report is approved. provided to (step S1208).
  • the construction site worker management server 100 provides the construction start report to the original construction company so that the manager who requested creation is granted the construction company manager authority, or provides the construction start report to the BP company so that the manager who requested creation is granted the manager authority of the BP company.
  • FIG. 13 is a flowchart illustrating another embodiment of a construction site worker management method according to the present invention.
  • An embodiment of FIG. 13 relates to an embodiment in which the manager and workers can participate after the manager registers the site.
  • step S1303 After the manager terminal 300 participates in the site (step S1301) and has manager authority (step S1302), it is determined whether the manager terminal 300 is a construction company manager (step S1303). If the manager terminal 300 is a construction company manager, after accessing the construction site worker management server 100 through the application, it provides a my site invitation request message to other manager terminals or worker terminals (step S1305).
  • step S1306 When another manager terminal or worker terminal 100 approves the manager's invitation to the site (step S1306), the invited user joins as a manager when registering as a member, and if the construction company manager and the affiliated company are the same, they participate as the construction company manager.
  • the manager terminal 300 participates in the site as a worker regardless of affiliation when a user invited by a construction company manager registers as a worker rather than a manager.
  • manager terminal 300 If the manager terminal 300 is not the construction company manager (step S1303), after accessing the construction site worker management server 100 through the application, it provides a site invitation request message to the BP company manager (step S1305).
  • Managers of BP companies can register as managers and workers of affiliated BP companies through invitation. When invited by the manager of the BP company, if you are registered as a manager, you will participate as a manager of the BP company, and if you are a member as a worker, you will participate as a worker of the BP company (steps S1308 to S1313).
  • the present invention enables safety management work to be carried out effectively using construction site data, and is a technology that can be widely used in the construction industry to realize its practical and economical value.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Public Health (AREA)
  • Data Mining & Analysis (AREA)
  • Primary Health Care (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Biomedical Technology (AREA)
  • Databases & Information Systems (AREA)
  • Development Economics (AREA)
  • Pathology (AREA)
  • Epidemiology (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

본 발명의 일 실시예에 따른 건설 현장 근로자 관리 서버는 근로자 별로 교육 종류 리스트 및 누적 시간이 저장되어 있는 교육 이수 정보 데이터베이스, 근로자 별 자격증 취득 정보가 저장되어 있는 자격증 데이터베이스, 근로자 별 경력 정보가 저장되어 있는 경력 정보 데이터베이스, 근로자가 출근하기 이전에 근로자 단말로부터 교육 이수 정보를 수신하여 상기 교육 이수 정보 데이터베이스에 저장하는 제1 교육 이수 관리부, 근로자 교육 리스트를 생성하여 제공한 후 상기 근로자 교육 리스트에 따라 근로자의 교육이 완료될 때마다 교육 이수 정보 데이터베이스의 상기 근로자 별로 교육 교육 종류 리스트 및 누적 시간을 갱신하는 제2 교육 이수 관리부, 상기 근로자 단말로부터 자격증 취득 정보를 수신하여 상기 자격증 데이터베이스에 저장하는 자격증 관리부, 근로자 단말로부터 과거 경력을 수신하면 상기 경력 정보 데이터베이스에 저장하는 근로자 경력 관리부 및 관리자 단말로부터 수신된 경력자 검색 요청 메시지에 따라 상기 경력 정보 데이터베이스, 교육 이수 정보 데이터베이스, 자격증 데이터베이스를 기초로 근로자를 검색하여 상기 관리자 단말에 제공하는 근로자 검색부를 포함한다.

Description

건설 현장 근로자 관리 방법 및 이를 실행하는 서버
본 발명은 건설 현장 근로자 관리 방법 및 이를 실행하는 서버에 관한 것으로, 보다 구체적으로 근로자에 의해 등록된 과거 경력을 통해 숙련도를 확인한 후 이를 기초로 현장 내 근로자의 배치를 최적화할 수 있도록 하는 건설 현장 근로자 관리 방법 및 이를 실행하는 서버에 관한 것이다.
건설현장의 인력은 일용직의 형태로 고용되어 일하는 것이 일반적이다. 일용직은 통상 사무직과는 달리, 일당을 받는 노동자나 고용계약기간이 정해져 있는 기간제 노동자를 가리킨다.
일용직은 임시직, 계약직과는 또다른 고용의 형태이며, 최근 법개정을 통해 최저임금의 상승, 건강보험의 가입자격 완화 등 건설현장에서 일하는 일용직의 처우가 많이 개선되고 있지만, 고용형태의 특수성으로 인해서 비용지급구조, 회사차원의 복지혜택 등을 누리기 어려운 것이 현실이다.
일용직과 구별되는 정규직은 일반해고가 불가능한 전일제 근로직을 의미한다. 건설 회사에 채용된 정규직 근로자는 일용직과는 달리 고용 안정성이 유지되며, 회사에 소속되어 다양한 복지 혜택이 부여된다. 아울러, 근속 연수가 증가하게 되면 승진 및 경력 인정에 따른 임금 인상 등이 가능하게 되므로 일용직에 비하여 유리하다.
고용의 안정성과, 근속 연수의 증가에 따른 경력 인정의 방식은 일용직과 정규직의 가장 큰 차이점으로 볼 수 있다. 일용 근로자의 경우는 임시직, 계약직의 경우와 비교할 때 자신의 작업 수행 경력에 대한 경력을 입증하기 어렵기 때문에 경력에 따른 합리적 보수 산정이 어렵다.
건설 회사의 경우 대단위 사업을 수행하기 위해서는 건설의 수주를 위한 노력이 필요하고, 사업을 수행하는 동안 많은 자본이 투입되어야 하므로 실질적인 현장 작업 인력을 정규직의 형태로 고용하는 것은 큰 부담이다.
건설현장에서의 작업을 실질적으로 수행해야 하는 인력보다는 작업을 관리, 감독하는 인력을 정규직의 형태로 채용하여 회사 조직을 합리적으로 운영하는 것이 일반적이다.
건설 회사 측이 일용 근로자의 경력을 일일이 관리하여 경력을 인정해 주는 것에도 한계가 존재한다. 건설 회사의 정규직 등이 현장에서 작업을 진행하는 일용직 근로자를 관리하게 되지만, 적은 인원으로 전체 건설 현장을 완벽히 관리하고 특정 일용 근로자의 경력 인정을 위한 작업 인정 내역을 완벽히 산출하는 것은 거의 불가능에 가깝다.
작업장소, 작업내용, 작업 시기 등을 작업 후 즉시 특정하기 어려운 건설현장의 일용 근로자의 경우에도 스스로의 경력을 정리하는 것이 어렵다. 또한, 일용 근로자가 직접 자신의 작업 내용을 정리하여 이력 사항으로 정리하더라도 공신력이 낮아 이를 경력 인정의 자료로 직접 활용기에도 어려움이 존재한다.
실질적으로 건설 현장의 작업에 대한 관리, 감독 책임은 건설 회사 측에 있다 보니, 일용 근로자에게 이러한 보고 의무를 부과하더라도 정확한 업무 내용을 체크하기 위해서는 건설사 직원이 직접 작업장을 찾아다녀야 한다.
정작 작업을 한 일용 근로자는 작업이 마쳐지면 퇴근하게 되고, 건설사 직원들이 일일이 작업 현장을 찾아다니며 일용 근로자들이 작업한 내용을 촬영하여 보관해야 하는 번거로움이 발생한다.
건설사 직원들은 작업이 이루어지는 현장을 실시간으로 확인하기 어려운 경우가 많다. 따라서, 작업을 마친 후 현장을 점검하게 되는 경우가 더 많은데, 직접 작업 현장을 확인하더라도 정작 어느 일용 근로자가 해당 현장의 작업을 수행하였는지는 정확히 확인할 수 없으므로 관리, 감독의 한계가 있다.
숙련된 노동자는 이직을 통해서 숙련된 작업 커리어에 따른 인센티브를 얻기를 희망하고, 일반적으로 회사의 경우 숙련된 경력직을 채용함으로써 시간과 비용을 절감하기를 원한다.
하지만, 상술한 바와 같이 일용 근로자의 경우 상기한 바와 같이 경력 사항을 정확히 입증하기 위한 자료가 입수되기 어렵다보니, 합리적인 보수를 받지 못하는 경우가 많다. 일용 근로자를 채용하는 건설사의 입장에서도 경력 인정을 확인하거나 또는 인정하기 위한 근거가 부족하다 보니, 어떤 일용 근로자를 어느 작업에 활용해야 할지 고민하는 경우가 발생하고, 또한 일용 근로자에게 경력에 따른 적절한 인센티브를 부여하는데 한계가 존재하며 건설 현장을 관리, 감독의 어려움이 존재한다.
본 발명은 근로자의 프로필 관리를 통해 근로자의 경제적 가치에 안전이 긍정적으로 작용할 수 있도록 하여 자발적 변화를 이끌어낼 수 있도록 하는 건설 현장 근로자 관리 방법 및 이를 실행하는 서버를 제공하는 것을 목적으로 한다.
또한, 본 발명은 근로자에 의해 등록된 과거 경력을 통해 숙련도를 확인한 후 이를 기초로 현장 내 근로자의 배치를 최적화할 수 있도록 하는 건설 현장 근로자 관리 방법 및 이를 실행하는 서버를 제공하는 것을 목적으로 한다.
또한, 본 발명은 근로자의 건강 검진 관련 이력 및 증빙을 효율적으로 관리함으로써 보건 관리자로 하여금 근로자가 언제, 어떤 종류의 검진을 받아야 하는지 식별할 수 있도록 하는 건설 현장 근로자 관리 방법 및 이를 실행하는 서버를 제공하는 것을 목적으로 한다.
또한, 본 발명은 근로자의 교육 내용을 관리함으로써 근로자가 적절한 시기에 교육을 받을 수 있도록 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
본 발명의 목적들은 이상에서 언급한 목적으로 제한되지 않으며, 언급되지 않은 본 발명의 다른 목적 및 장점들은 하기의 설명에 의해서 이해될 수 있고, 본 발명의 실시예에 의해 보다 분명하게 이해될 것이다. 또한, 본 발명의 목적 및 장점들은 특허 청구 범위에 나타낸 수단 및 그 조합에 의해 실현될 수 있음을 쉽게 알 수 있을 것이다.
이러한 목적을 달성하기 위한 건설 현장 근로자 관리 서버는 근로자 별로 교육 종류 리스트 및 누적 시간이 저장되어 있는 교육 이수 정보 데이터베이스, 근로자 별 자격증 취득 정보가 저장되어 있는 자격증 데이터베이스, 근로자 별 경력 정보가 저장되어 있는 경력 정보 데이터베이스, 근로자가 출근하기 이전에 근로자 단말로부터 교육 이수 정보를 수신하여 상기 교육 이수 정보 데이터베이스에 저장하는 제1 교육 이수 관리부, 근로자 교육 리스트를 생성하여 제공한 후 상기 근로자 교육 리스트에 따라 근로자의 교육이 완료될 때마다 교육 이수 정보 데이터베이스의 상기 근로자 별로 교육 교육 종류 리스트 및 누적 시간을 갱신하는 제2 교육 이수 관리부, 상기 근로자 단말로부터 자격증 취득 정보를 수신하여 상기 자격증 데이터베이스에 저장하는 자격증 관리부, 근로자 단말로부터 과거 경력을 수신하면 상기 경력 정보 데이터베이스에 저장하는 근로자 경력 관리부 및 관리자 단말로부터 수신된 경력자 검색 요청 메시지에 따라 상기 경력 정보 데이터베이스, 교육 이수 정보 데이터베이스, 자격증 데이터베이스를 기초로 근로자를 검색하여 상기 관리자 단말에 제공하는 근로자 검색부를 포함한다.
또한, 이러한 목적을 달성하기 위한 건설 현장 근로자 관리 서버에서 실행되는 건설 현장 근로자 관리 방법은 근로자가 출근하기 이전에 근로자 단말로부터 교육 이수 정보를 수신하여 교육 이수 정보 데이터베이스에 저장하는 단계, 근로자 교육 리스트를 생성하여 제공한 후 상기 근로자 교육 리스트에 따라 근로자의 교육이 완료될 때마다 교육 이수 정보 데이터베이스의 상기 근로자 별로 교육 종류 리스트 및 누적하여 저장하는 단계, 근로자 단말로부터 자격증 취득 정보를 수신하여 상기 자격증 데이터베이스에 저장하는 단계, 상기 근로자 단말로부터 과거 경력을 수신하면 상기 경력 정보 데이터베이스에 저장하는 단계, 관리자 단말로부터 수신된 경력자 검색 요청 메시지에 따라 상기 경력 정보 데이터베이스, 교육 이수 정보 데이터베이스, 자격증 데이터베이스를 기초로 근로자를 검색하여 상기 관리자 단말에 제공하는 단계를 포함한다.
전술한 바와 같은 본 발명에 의하면, 근로자의 프로필 관리를 통해 근로자의 경제적 가치에 안전이 긍정적으로 작용할 수 있도록 하여 자발적 변화를 이끌어낼 수 있다는 장점이 있다.
또한 본 발명에 의하면, 근로자에 의해 등록된 과거 경력을 통해 숙련도를 확인한 후 이를 기초로 현장 내 근로자의 배치를 최적화할 수 있다는 장점이 있다.
또한 본 발명에 의하면, 근로자의 건강 검진 관련 이력 및 증빙을 효율적으로 관리함으로써 보건 관리자로 하여금 근로자가 언제, 어떤 종류의 검진을 받아야 하는지 식별할 수 있다는 장점이 있다.
또한, 본 발명은 근로자의 교육 내용을 관리함으로써 근로자가 적절한 시기에 교육을 받을 수 있도록 하는 건설 현장 안전 관리 시스템을 제공하는 것을 목적으로 한다.
도 1은 본 발명의 일 실시예에 따른 건설 현장 근로자 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 2는 본 발명의 다른 일 실시예에 따른 건설 현장 근로자 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 3은 본 발명의 또 다른 일 실시예에 따른 건설 현장 근로자 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 4는 본 발명의 또 다른 일 실시예에 따른 건설 현장 근로자 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 5는 본 발명의 일 실시예에 따른 건설 현장 근로자 관리 서버의 내부 구조를 설명하기 위한 블록도이다.
도 6은 본 발명에 따른 건설 현장 근로자 관리 방법의 일 실시예를 설명하기 위한 흐름도이다.
도 7 내지 도 10은 도 6의 실행 과정에서 근로자 단말의 실행 화면을 설명하기 위한 예시도이다.
도 11은 본 발명에 따른 건설 현장 근로자 관리 방법의 일 실시예를 설명하기 위한 흐름도이다.
도 12는 본 발명에 따른 건설 현장 근로자 관리 방법의 다른 일 실시예를 설명하기 위한 흐름도이다.
도 13은 본 발명에 따른 건설 현장 근로자 관리 방법의 또 다른 일 실시예를 설명하기 위한 흐름도이다.
<부호의 설명>
100: 건설 현장 근로자 관리 서버
200: 근로자 단말
300: 관리자 단말
400: 기상청 서버
500: 점검자 단말
600: 점검단 단말
전술한 목적, 특징 및 장점은 첨부된 도면을 참조하여 상세하게 후술되며, 이에 따라 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 본 발명의 기술적 사상을 용이하게 실시할 수 있을 것이다. 본 발명을 설명함에 있어서 본 발명과 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 상세한 설명을 생략한다. 이하, 첨부된 도면을 참조하여 본 발명에 따른 바람직한 실시예를 상세히 설명하기로 한다. 도면에서 동일한 참조부호는 동일 또는 유사한 구성요소를 가리키는 것으로 사용된다.
도 1은 본 발명의 일 실시예에 따른 건설 현장 근로자 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 1을 참조하면, 건설 현장 근로자 관리 시스템은 건설 현장 근로자 관리 서버(100), 근로자 단말(200) 및 관리자 단말(300)을 포함한다. 건설 현장 근로자 관리 서버(100)는 교육 이수 정보 데이터베이스(110), 자격증 데이터베이스(111), 경력 정보 데이터베이스(112), 근로자 데이터베이스(113) 및 건강 검진 데이터베이스(114)를 포함한다.
건설 현장 근로자 관리 서버(100)는 근로자 단말(200)과의 통신을 통해 근로자 단말(200)로부터 근로자 프로필 정보를 수신하여 저장한다. 이때, 근로자 프로필 정보는 신상 정보, 경력, 교육 이력 및 건강 검진 이력 등을 포함할 수 있다.
먼저, 건설 현장 근로자 관리 서버(100)는 근로자가 출근하기 이전에 근로자 단말(200)에 교육 이수 정보 등록 절차를 제공하고, 교육 이수 정보 등록 절차를 통해 교육 이수 정보를 수신한다.
이때, 교육 이수 정보는 교육 이수증 별로 이름, 생년월일, 등록번호, 이수일자, 이수증 증빙 사진 등을 포함할 수 있다. 상기의 교육 이수증은 건설 현장 안전 관리에 관한 교육을 이수한 후 발급되는 증명서로, 기초 보건 이수증 등을 포함할 수 있다.
상기의 교육 이수증에는 교육 이수 발급 기관에 의해 발급될 때 진위 여부를 판별하기 위한 진위 판별 코드가 삽입되어 발급될 수 있다. 즉, 교육 이수 발급 기관에 의해 인쇄될 때 진위 판별 코드에 해당하는 서로 다른 크기의 픽셀 공간을 함께 출력하여 발급되도록 한다.
상기와 같이, 교육 이수 발급 기관에 의해 교육 이수증이 발급될 때 교육 이수증에 삽입된 진위 판별 코드는 교육 이수 발급 기관 서버로부터 수신되어 미리 저장된다. 따라서, 건설 현장 근로자 관리 서버(100)는 교육 이수 발급 기관 서버로부터 수신된 진위 판별 코드를 이용하여 교육 이수증의 진위 여부를 판별할 수 있는 것이다.
상기의 교육 이수증에 삽입되어 있는 서로 다른 크기의 픽셀 공간은 교육 이수증의 배경 화면과 유사한 색(즉, 배경 화면의 RGB 값이 특정 값 이상이거나 이하인 값에 해당하는 색)으로 설정되어 있기 때문에 사용자의 눈에는 보이지 않지만, 건설 현장 근로자 관리 서버(100)가 교육 이수증의 진위 여부를 판단하기 위해 스캔하는 과정에서 픽셀 분석하면 픽셀의 값이 다르기 때문에 진위 판별 코드에 해당하는 픽셀 공간이 추출될 수 있는 것이다.
따라서, 건설 현장 근로자 관리 서버(100)는 교육 이수증을 스캔하여 분석하는 과정에서 교육 이수증에서 복수의 픽셀 공간을 추출한 후, 복수의 픽셀 공간이 망점이 지시하는 이진수 값을 이용하여 진위 판별 코드를 생성할 수 있다.
예를 들어, 건설 현장 근로자 관리 서버(100)는 4개의 점으로 이루어진 픽셀 공간 1개와 8개의 점으로 이루어진 픽셀 공간 6개를 추출한 경우, 4개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "1000000"를 생성할 수 있다.
다른 예를 들어, 건설 현장 근로자 관리 서버(100)는 6개의 점으로 이루어진 픽셀 공간 2개와 8개의 점으로 이루어진 픽셀 공간 3개를 추출한 경우, 6개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "11000"를 생성한다.
그런 다음, 건설 현장 근로자 관리 서버(100)는 진위 판별 코드 및 미리 ㅅ수신된 진위 판별 코드를 비교하여 교육 이수증의 진위 여부를 판별할 수 있다.
상기와 같이, 건설 현장 근로자 관리 서버(100)는 교육 이수증의 진위 여부가 판별된 후 교육 이수증을 기록된 교육 이수 정보를 이용하여 교육 별 유효 시간 및 교육 시간을 산출한 후, 근로자 별로 교육 종류 리스트 및 인증 시간을 교육 이수 정보 데이터베이스(110)에 저장한다.
이때, 교육 이수 정보 데이터베이스(110)에 근로자에 해당하는 누적 교육 시간이 존재하는 경우 기존에 누적된 누적 교육 시간에 교육 시간을 반영하여 누적 교육 시간을 갱신한다.
그 후, 건설 현장 근로자 관리 서버(100)는 근로자 교육 리스트를 생성하고, 근로자 교육 리스트를 근로자 단말(200)에 제공한다.
이때, 근로자 교육 리스트는 관리자, 업체, 현장, 날짜, 이름, 생년월일, 신규자 교육 이수 여부, 유효기간, 출근여부, 필수 교육 리스트, 필수 교육 이수 여부 등을 포함할 수 있다.
그런 다음, 건설 현장 근로자 관리 서버(100)는 근로자 단말(200)로부터 출석 인증 정보를 수신하고, 관리자 단말(300)로부터 근로자 교육 리스트에 따라 근로자의 교육이 실시된 후 교육 증빙 사진 및 교육 증빙 정보를 포함하는 교육 이수 확인 요청 메시지를 수신한다.
이때, 출석 인증 정보는 근로자 이름 및 관리 감독자 이름을 포함할 수 있고, 교육 증빙 정보는 교육 구분, 교육 대상, 작업 공종 명, 교육 일자, 교육 장소, 교육 시간, 교육 담당(관리자 등), 교육 내용 등을 포함할 수 있다.
건설 현장 근로자 관리 서버(100)는 출석 인증 정보를 이용하여 출석을 인증하고 교육 증빙 정보를 추출한 후, 교육 증빙 정보를 이용하여 교육 이수 정보 데이터베이스(110)에 저장된 근로자 별로 교육 종류 리스트 및 누적 시간을 갱신한다.
즉, 건설 현장 근로자 관리 서버(100)는 교육 증빙 정보를 이용하여 교육 별 유효 시간 및 교육 시간을 산출한 후, 교육 종류를 이용하여 근로자 별로 교육 종류 리스트를 갱신하고 인증 시간을 이용하여 누적 시간을 갱신하여 근로자 별로교육 이수 정보 데이터베이스(110)에 저장한다.
또한, 건설 현장 근로자 관리 서버(100)는 근로자 단말(200)에 자격증 취득 정보 등록 절차를 제공하고, 자격증 취득 정보 등록 절차를 통해 자격증 취득 정보를 수신하여 근로자 별 자격증 취득 정보를 자격증 데이터베이스(111)에 저장한다.
이때, 자격증 취득 정보는 자격증 별로 필수 정보 및 선택 정보를 포함하고, 필수 정보는 제호, 성명, 국적, 주민등록번호, 주소, 국적, 발급 일자, 적성 검사, 유효 기간, 소지 면허, 증빙 사진을 포함하고, 선택 정보는 보험 증권, 사업자 등록증, 장비 등록증(예를 들어, 크레인, 펌프카 등의 비파괴 검사 결과), 증빙 사진 등을 포함할 수 있다. 상기의 자격증은 건설 현장에서 활용가능한 기술을 시험을 통해 인증된 후에 발급되는 자격증으로, 기계 조종사 등을 포함할 수 있다.
상기의 자격증은 건설 현장에서 활용가능한 기술을 시험을 주관하는 기관에 의해 발급될 때 진위 여부를 판별하기 위한 진위 판별 코드가 삽입되어 발급될 수 있다. 즉, 기관에 의해 자격증이 발급될 때 진위 판별 코드에 해당하는 서로 다른 크기의 픽셀 공간을 함께 출력하여 발급되도록 한다.
상기와 같이, 자격증이 발급될 때 자격증에 삽입된 진위 판별 코드는 자격증 시험 주최 기관 서버로부터 수신되어 미리 저장된다. 따라서, 건설 현장 근로자 관리 서버(100)는 자격증 시험 주최 기관 서버로부터 수신된 진위 판별 코드를 이용하여 자격증의 진위 여부를 판별할 수 있는 것이다.
상기의 자격증에 삽입되어 있는 서로 다른 크기의 픽셀 공간은 교육 이수증의 배경 화면과 유사한 색(즉, 배경 화면의 RGB 값이 특정 값 이상이거나 이하인 값에 해당하는 색)으로 설정되어 있기 때문에 사용자의 눈에는 보이지 않지만, 건설 현장 근로자 관리 서버(100)가 자격증 등과 같은 증빙 사진의 진위 여부를 판단하기 위해 픽셀 분석하면 픽셀의 값이 다르기 때문에 진위 판별 코드에 해당하는 픽셀 공간이 추출될 수 있는 것이다.
따라서, 건설 현장 근로자 관리 서버(100)는 자격증 등과 같은 증빙 사진을 스캔하여 분석하는 과정에서 자격증 등과 같은 증빙 사진에서 복수의 픽셀 공간을 추출한 후, 복수의 픽셀 공간이 망점이 지시하는 이진수 값을 이용하여 진위 판별 코드를 생성할 수 있다.
예를 들어, 건설 현장 근로자 관리 서버(100)는 4개의 점으로 이루어진 픽셀 공간 1개와 8개의 점으로 이루어진 픽셀 공간 6개를 추출한 경우, 4개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "1000000"를 생성할 수 있다.
다른 예를 들어, 건설 현장 근로자 관리 서버(100)는 6개의 점으로 이루어진 픽셀 공간 2개와 8개의 점으로 이루어진 픽셀 공간 3개를 추출한 경우, 6개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "11000"를 생성한다.
그런 다음, 건설 현장 근로자 관리 서버(100)는 진위 판별 코드 및 미리 수신된 진위 판별 코드를 비교하여 자격증의 진위 여부를 판별할 수 있다. 상기와 같이, 건설 현장 근로자 관리 서버(100)는 자격증의 진위 여부가 판별된 후 자격증 데이터베이스(111)에 근로자 별 자격증 취득 정보를 저장한다.
따라서, 건설 현장 근로자 관리 서버(100)는 자격증 데이터베이스(111)에 저장된 근로자 별 자격증 취득 정보를 이용하여 자격증 유효 기간 또는 장비 등록증 각각의 유효 기간의 만료까지 남은 기간이 특정 기간 이하이면 관리자 단말(300)에 자격증 유효 기간 만료 안내 메시지를 제공할 수 있는 것이다.
또한, 건설 현장 근로자 관리 서버(100)는 근로자 단말(200)로부터 경력 정보를 포함하는 과거 경력 등록 요청 메시지를 수신하면, 과거 경력 등록 요청 메시지에서 경력 정보를 추출한 후 근로자 별 경력 정보를 경력 정보 데이터 베이스(112)에 저장한다. 이때, 경력 정보는 근무 일수, 공종, 발주처(예를 들어, 회사), 프로젝트 종류(예를 들어, 토목, 건축, 플랜트 등), 관리자, 세부 공종 등을 포함할 수 있다.
그 후, 건설 현장 근로자 관리 서버(100)는 관리자 단말(300)로부터 경력자 검색 요청 메시지를 수신하면, 경력자 검색 요청 메시지에 따라 경력 정보 데이터 베이스(112)에서 근로자를 추출한 후 경력 정보를 포함하는 경력자 안내 메시지를 제공한다. 이와 같이, 건설 현장 근로자 관리 서버(100)는 경력 정보를 함께 제공함으로써 사업자가 경력 정보를 기초로 근로자의 프로젝트 배치 시 참고할 수 있도록 한다.
만일, 건설 현장 근로자 관리 서버(100)는 근로자가 사업자에 의해 고용되어 프로젝트에 참여하게 되면, 경력을 확인하여 경력 정보 데이터베이스(112)에 저장된 근로자 별 경력 정보를 갱신한다.
또한, 건설 현장 근로자 관리 서버(100)는 근로자 데이터베이스(113)에 저장되어 있는 근로자 별 근로자 정보 및 건강 검진 데이터베이스(114)에 저장되어 있는 건강 검진 대상을 이용하여 근로자 리스트를 생성한 후 병원 서버(미도시됨)에 근로자 리스트 상의 근로자의 건강 검진을 예약하는 건강 검진 예약 메시지를 제공한다. 이때, 근로자 리스트는 근로자 별 검진 종류, 다음 검진 일자, 예정 검진 기관, 희망 검진 예약일 등을 포함할 수 있다.
그 후, 건설 현장 근로자 관리 서버(100)는 병원 서버에 의해 발급된 검진 결과 문서를 인식하여 검진 결과 문서에서 검진 결과를 생성한 후 근로자 별 검진 결과를 근로자 데이터베이스(113)에 저장한다.
일 실시예에서, 건설 현장 안전 관리 서버(100)는 관리자 단말(300)로부터병원 서버에 의해 발급된 검진 결과 문서를 수신하면, OCR 기술을 이용하여 검진 결과 문서를 인식한 후 미리 결정된 항목에 해당하는 내용을 추출하여 근로자 데이터베이스(113)에 저장한다.
도 2는 본 발명의 다른 일 실시예에 따른 건설 현장 근로자 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 2를 참조하면, 건설 현장 근로자 관리 시스템은 건설 현장 근로자 관리 서버(100), 관리자 단말(300) 및 기상청 서버(400)를 포함한다. 건설 현장 안전 관리 서버(100)는 사고 위험도 평가 데이터베이스(120), 위험성 평가 표준 모델(121), 위험도 평가 데이터베이스(122), 현장 위험 특성 예측 모델(123) 및 사고 사례 데이터베이스(124)를 포함한다.
건설 현장 근로자 관리 서버(100)는 사고 위험도 평가 데이터베이스(120) 및 위험성 평가 표준 모델(121)을 기초로 공종 별 위험성 평가 결과를 생성한다.
상기의 사고 위험도 평가 데이터베이스(120)에는 공종 별 사고발생빈도 비율, 공종 별 사고발생강도 비율, 재해 별 세부 내용이 저장되어 있다. 이때, 재해 별 세부 내용은 공정, 기인물, 사고유형, 단위작업, 재해자수(사망/부상), 현장위치, 공사종류, 공사금액, 공정율을 포함할 수 있다. 상기의 위험성 평가 표준 모델(121)에는 공종 별 위험 요인 및 위험 요인 별 안전 대책이 저장되어 있다.
먼저, 건설 현장 근로자 관리 서버(100)는 건설 현장 상황(즉, 공사 규모,공사 유형, 공정률, 기후 등) 및 작업 내용 각각에 해당하는 키워드를 수신하면 사고 위험도 평가 데이터베이스(120)에서 키워드에 해당하는 공종 별 사고발생빈도 비율, 공종 별 사고발생강도 비율 및 재해 별 세부 내용을 추출한다. 상기의 키워드는 공정, 사고기 인물, 사고 유형, 단위 작업 내용 등으로 결정될 수 있다.
그런 다음, 건설 현장 근로자 관리 서버(100)는 공종 별 사고발생빈도 비율 및 공종 별 사고발생강도 비율을 이용하여 공종 별 위험도 평가 결과를 산출한다.
이때, 건설 현장 근로자 관리 서버(100)는 AI 엔진을 통해 공종 별 위험도 평가 결과를 산출하거나 하기의 [수학식 1] 내지 [수학식 6]을 통해 산출할 수 있다. 이하에서는 [수학식 1] 내지 [수학식 6]을 통해 공종 별 위험도 평가 결과를 산출하는 과정을 설명하기로 한다.
일 실시예에서, 건설 현장 근로자 관리 서버(100)는 [수학식 1]을 기초로 위험도 평가 데이터베이스(122)에서 추출한 공종 별 사고발생빈도 비율 및 공종 별 사고발생강도 비율을 이용하여 공종 별 위험도 평가 등급을 산출할 수 있다. 이때, 위험도 평가 데이터베이스(122)에는 공종 별 사고발생빈도 비율 및 공종 별 사고발생강도 비율이 저장되어 있으며, 어플리케이션을 사용함에 따라 자동으로 업데이트될 수 있다.
[수학식 1]
Part_Danger_level = (Danger_fre_rate + Danger_str_rate) * Danger_W
Part_Danger_level: 공종 별 위험도 평가 등급
Danger_fre_rate: 공종 별 사고발생빈도 비율로서 [수학식 2]에 의해 산출,
Danger_str_rate: 공종 별 사고발생강도 비율로서 [수학식 3]에 의해 산출,
Danger_W: 공종 별 사고발생 시기에 따라 결정되는 가중치
[수학식 1]에서 공종 별 사고발생빈도 비율(Danger_fre_rate)은 하기의 [수학식 2]에 의해 산출되고, 공종 별 사고발생강도 비율(Danger_str_rate)은 하기의 [수학식 3]에 의해 산출되고, 공종 별 사고발생시기에 따라 결정되는 가중치(Danger_W)는 사고발생시기가 현재 시점을 기준으로 3년을 초과하지 않는 사례에 대해서 사고발생시기가 현재 시점에 가까울수록 높은 가중치가 할당되며, 사고발생시기가 현재 시점을 기준으로 3년를 초과한 사례에 대해서는 미리 결정된 가중치(예를 들어, “1”)가 할당된다.
[수학식 2]
Danger_fre_rate = (part_victim / total_victim) ×100
Danger_fre_rate: 공종 별 사고발생빈도 비율,
part_victim: 공종 별 재해지수,
total_victim: 전체 재해지수
[수학식 2]에서 공종 별 재해지수(part_victim) 및 전체 재해지수(total_victi)는 위험도 평가 데이터베이스(122)에서 추출한 재해 별 세부 내용(즉, 재해자수)에 의해 결정될 수 있다.
[수학식 3]
Danger_str_rate
= (part_dead_people_rate × 3) + part_injured_people_rate
Danger_str_rate: 공종 별 사고발생강도 비율,
part_dead_people_rate: 공종 별 사망자 비율로서 [수학식 4]에 의해 산출,
part_injured_people_rate: 공종 별 부상자 비율로서 [수학식 5]에 의해 산출,
[수학식 3]에서 공종 별 사망자 비율(part_dead_people_rate)은 [수학식 4]에 의해 산출되고, 공종 별 부상자 비율(part_injured_people_rate)은 [수학식 5]에 의해 산출된다.
[수학식 4]
part_dead_people_rate = (part_dead_people / total_dead_people) ×100
part_dead_people_rate: 공종 별 사망자 비율,
part_dead_people: 공종 별 사망자 수,
total_dead_people: 전체 사망자 수
[수학식 4]에서 공종 별 사망자 수(part_dead_people) 및 전체 사망자 수(total_dead_people)는 위험도 평가 데이터베이스(122)에서 추출한 재해 별 세부 내용(즉, 재해자수 중 사망자)에 의해 결정될 수 있다.
[수학식 5]
part_injured_people_rate
= (part_injured_people / total_injured_people) ×100
part_dead_people_rate: 공종 별 부상자 비율,
part_dead_people: 공종 별 부상자 수,
total_dead_people: 전체 부상자 수
[수학식 5]에서 공종 별 부상자 수(part_dead_people) 및 전체 부상자 수(total_dead_people)는 위험도 평가 데이터베이스(122)에서 추출한 재해 별 세부 내용(즉, 재해자수 중 부상자)에 의해 결정될 수 있다.
상기의 [수학식 1] 내지 [수학식 5]를 통해 산출된 공종 별 위험도 평가 등급은 하기의 [표 1]과 같을 수 있다.
[표 1]
Figure PCTKR2022008436-appb-I000001
상기와 같이, 건설 현장 근로자 관리 서버(100)는 사고 위험도 평가 데이터베이스(120)를 기초로 공종 별 위험도 평가 등급이 결정되면, 위험성 평가 표준 모델(121)에서 공종 별 위험도 평가 등급에 해당하는 위험 요인 및 위험 요인 별 안전 대책을 추출한다.
그 후, 건설 현장 근로자 관리 서버(100)는 위험도 평가 등급, 위험 요인 및 위험 요인 별 안전 대책을 이용하여 위험성 평가 결과 데이터를 생성한 후, 위험성 평가 결과 데이터를 위험성 평가 데이터베이스에 저장한다.
상술한 과정을 통해 위험성 평가 결과 데이터를 생성한 후, 건설 현장 근로자 관리 서버(100)는 현장 위험 특성 예측 모델을 기초로 위험성 평가 결과 데이터, 현장 정보 및 공사 주기 별 위험도 평가 지수를 반영하여 위험도 예측 데이터를 생성한다.
상기의 현장 정보는 현장주소, 공사종류, 공사규모(금액), 공사기간, 공사주기별 Master Schedule/ 건축인허가 정보: 대지위치, 실제착공일, 주용도코드명 등을 포함할 수 있다.
이때, 현장 위험 특성 예측 모델(123)은 현장 위치, 공사 종류, 공사 규모, 날씨, 공정 진척도, 지연도, 공종 별 순찰 데이터(Patrol Data), 사고 유형 별 순찰 데이터(Patrol Data), 전 근로자 대비 현장 근로자 및 작업팀 별 안전 스코어(safety score) 비율이 저장되어 있다.
[수학식 6]
ConstructionPeriod_Danger_value = PastPart_Danger_value + weight
ConstructionPeriod_Danger_value: 공사 주기 별 위험도 평가 지수,
PastPart_Danger_value: 과거 공종 별 위험도 평가 지수,
weight: 현장 위험 특성 가중치
상기의 [수학식 6]에서 현장 위험 특성 가중치는 고정 요인, 변동 요인 및현장 부적합 사항에 따라 변경될 수 있다. 고정 요인은 현장 위치, 공사 종류, 공사 규모를 포함하고, 변동 요인은 기상청 서버(400)로부터 수신된 날씨 정보, 미리 결정된 스케쥴 대비 진척도 및 지연도를 포함한다.
현장 부적합 사항은 현장을 관리하는 관리자에 의해 지적된 현장의 부적합 사항을 의미한다. 예를 들어, 현장 부적합 사항은 안전고리 미체결 등을 포함할 수 있다. 상기와 같이, 고정 요인, 및 변동 요인 및 현장 부적합 사항에 따라 현장 위험 특성 가중치를 변경함으로써 공사 주기 별 위험도 평가 지수가 변경되도록 한다.
도 3은 본 발명의 또 다른 일 실시예에 따른 건설 현장 작업 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 3을 참조하면, 건설 현장 작업 관리 시스템은 건설 현장 근로자 관리 서버(100) 및 점검자 단말(500)을 포함하고, 점검자 단말(500)은 관리자 단말(300) 및 감시단 단말(600)을 포함한다.
건설 현장 근로자 관리 서버(100)는 작업 허가서 데이터베이스(130) 및 현장 가입자 데이터베이스(131)를 포함한다.
건설 현장 근로자 관리 서버(100)는 기초로 작업 허가서 작업 절차를 관리자 단말(300)에 제공한다. 이때, 작업 허가서 데이터베이스(130)에는 작업 허가서 별 체크리스트를 포함하고, 현장 가입자 데이터베이스(131)에는 작업 반장 별 이름 및 소속 그리고 근로자 별 이름 및 소속이 저장되어 있다.
그 후, 건설 현장 근로자 관리 서버(100)는 관리자 단말(300)로부터 작업 허가서 작업 절차를 통해 작업 허가서가 생성되면, 작업 허가서를 이용하여 작업 허가서 목록표를 생성한다. 이때, 관리자에 의해 생성된 작업 허가서는 허가서 번호, 일자, 업체명, 공종 별 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 반장, 투입 장치, 근로자 등을 포함할 수 있다.
따라서, 건설 현장 근로자 관리 서버(100)는 작업 허가서의 공종 별로 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 반장, 투입 장치, 근로자, 작업 허가서 대상(즉, 위험작업허가, 일반작업허가), 허가서 종류(즉, 특별, 위험, 일반), 관리자 점검 담당자 등을 이용하여 작업 허가서 목록표를 생성한다. 이러한 작업 허가서 목록표는 작업 허가서를 직관적으로 확인 가능하도록 작업 허가서의 공종 별로 목록들이 표로 생성된 것이다.
이때, 건설 현장 근로자 관리 서버(100)는 관리자에 의해 작업 허가서 목록표가 생성되면, 작업 허가서 생성 목록을 생성하여 작업 허가서 데이터베이스(130)에 저장한다. 이후, 관리자가 스스로 점검할 작업을 배정한다.
만일, 건설 현장 근로자 관리 서버(100)는 작업 허가서 배정 내역에 따라 생성된 작업 허가서 점검표를 수신하면, 작업 허가서 점검표를 작업 허가서 데이터베이스(130)에 저장한다. 이때, 작업 허가서 데이터베이스(130)에는 작업 허가서 점검 결과, 점검자, 점검 시간, 사진, 세부 내용 등을 포함한다.
그 후, 건설 현장 근로자 관리 서버(100)는 작업 허가서 점검이 완료되면 작업 종결 요청 메시지를 관리자 단말(300)에 제공하여 작업 종결이 등록된 후 작업 허가서의 종결 내용을 작업 허가서 데이터베이스(130)에 저장한다.
관리자 단말(300)은 건설 현장 근로자 관리 서버(100)로부터 수신된 작업 허가서 목록표 상의 특정 작업에 대한 점검 시 부적합 사항이 발견되면 부적합 사항 등록 절차를 통해 작업 중지 또는 시정 요청을 선택한다.
만일, 관리자 단말(300)은 부적합 사항이 발견된 후 작업 중지가 선택되면 작업 중지 요청 메시지를 서로 다른 관리자 단말에 제공하고, 부적합 사항이 발견된 후 시정 요청이 선택되면 시정 요청 메시지를 서로 다른 관리자 단말에 제공한다.
한편, 관리자 단말(300)은 부적합 사항이 발견이 발견되면 해당 부적합 사항을 작업 허가서 데이터베이스(130)와 연결된 현상 가입자 데이터베이스(131)에 각 인원별로 저장한다.
관리자 단말(300)은 건설 현장 근로자 관리 서버(100)로부터 작업 허가서 작업 절차를 수신한 후, 작업 허가서 작업 절차를 통해 작업 허가서를 생성한다. 이때, 관리자 단말(300)은 작업 허가서 작업 절차를 통해 허가서 번호, 일자, 업체명, 공종 별 작업 내용, 작업 장소, 투입 인원, 작업 시간, 작업 반장, 투입 장치 및 근로자를 입력하여 작업 허가서를 생성할 수 있다.
점검자 단말(500)은 건설 현장 근로자 관리 서버(100)로부터 수신된 작업 허가서 목록표를 기초로 점검을 진행한다.
먼저, 점검자 단말(500)은 작업 허가서를 기초로 공종 별 점검 대상 항목 각각에 대한 점검 결과 입력 절차를 통해 상세 체크 리스트, 사진 및 점검 결과를 입력한다. 그 후, 점검자 단말(500)은 점검 결과에 따라 서로 다른 관리자 단말에 점검 완료 메시지, 작업 중지 알림 메시지 및 작업 일부 보완 요청 메시지 중 어느 하나의 메시지를 제공할 수 있다.
예를 들어, 점검자 단말(500)은 점검 결과 “양호 시”, 해당 공종 관리자 단말 및 근로자 단말에 점검 완료 메시지를 제공할 수 있다.
다른 예를 들어, 점검자 단말(500)은 점검 결과 “불량 시”, 해당 공정 관리자 단말 및 근로자 단말에 작업 중지 알림 메시지를 제공할 수 있다.
또 다른 예를 들어, 점검자 단말(500)은 점검 결과 “기타 보완 시”, 해당 공정 관리자 단말 및 근로자 단말에 작업 일부 보완 요청 메시지를 제공할 수 있다.
도 4는 본 발명의 또 다른 일 실시예에 따른 건설 현장 근로자 관리 시스템을 설명하기 위한 네트워크 구성도이다.
도 4를 참조하면, 건설 현장 근로자 관리 시스템은 건설 현장 근로자 관리 서버(100) 및 점검자 단말(500)을 포함하고, 점검자 단말(500)은 관리자 단말(300) 및 감시단 단말(600)을 포함한다.
건설 현장 근로자 관리 서버(100)는 근로자 데이터베이스(113)에 저장되어 있는 근로자 별 불안전 행동 입력 절차를 점검자 단말(500)에 제공한다. 이때, 근로자 별 불안전 행동 입력 절차는 건설 현장에 근무하는 근로자의 행동 중 미리 결정된 불안전 행동에 해당하는 행동이 발견되면 해당 근로자의 불안전 행동을 입력하는 절차이다. 상기의 미리 결정된 불안전 행동은 재해 유형을 기초로 재해 유형이 발생될 확률을 높일 수 있는 행동을 의미한다.
즉, 불안전 행동 입력 절차는 관리자, 작업팀, 근로자, 재해 유형, 상세 내용, 사진 등을 입력할 수 있으며, 점검자에 의해 재해 유형(예를 들어, 감전, 깔림, 끼임, 넘어짐, 떨어짐, 무너짐, 물체에 맞음, 부딪힘, 불균형 및 무리한 동작, 산소결핍, 절단/베임/잘림, 화재폭발)이 선택되면 해당 재해 유형에 해당하는 불안전 행동 리스트를 제공하여 불안전 안전 행동 리스트 중 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
예를 들어, 건설 현장 근로자 관리 서버(100)는 재해 유형 중 “떨어짐”이 선택되면, “떨어짐”에 해당하는 불안전 행동 리스트로 “1) 2m 이상 고소 작업 시 안전대 미착용 또는 안전고리 미체결, 2) 추락 위험 구간 안전 시설물 임의 해체” 등을 제공하여 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
다른 예를 들어, 건설 현장 근로자 관리 서버(100)는 재해 유형 중 “끼임”이 선택되면, “끼임”에 해당하는 불안전 행동 리스트로 “1) 장비 작업반경 내 무단출입”등을 제공하여 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
또 다른 예를 들어, 건설 현장 근로자 관리 서버(100)는 재해 유형 중 “산소 결핍”이 선택되면 “산소 결핍”에 해당하는 불안전 행동 리스트로 “1) 밀폐공간 무단출입”등을 제공하여 근로자의 불안전 행동에 해당하는 적어도 하나의 불안전 안전 행동을 선택하도록 할 수 있다.
그 후, 건설 현장 근로자 관리 서버(100)는 시정 조치서에 의거하여 관리자에 의해 시정이 완료되면, 점검자 단말(500) 중 관리자 단말(300)로부터 시정 조치 정보(예를 들어, 관리자, 작업팀, 재해 유형, 조치 전후 사진)를 수신하여 조치 사항 데이터베이스(140)에 저장한다. 반대로, 건설 현장 안전 관리 서버(100)는 부적합 사항으로 지적된 내용이 합당하지 않다고 판단되는 경우 부적합 사항 등록 취소 절차를 제공한다.
또한, 건설 현장 근로자 관리 서버(100)는 안전 신문고 제보 절차를 근로자 단말(1300)에 제공하고, 안전 신문고 제보 절차를 통해 세부내용, 사진, 안전 사고 관련 내용을 수신하여 관리자 단말(300)에 제공한다.
점검자 단말(500)은 건설 현장 근로자 관리 서버(100)로부터 근로자 별 불안전 행동 입력 절차를 수신하면, 근로자 별 불안전 행동 입력 절차를 통해 관리자, 작업팀, 근로자, 재해 유형, 상세 내용, 사진 등을 수신한다.
그 후, 점검자 단말(500) 중 관리자 단말(300)은 근로자 별 불안전 행동 입력 절차를 통해 수신된 정보를 기초로 시정 조치서를 생성한 후 시정 조치서를 관리자 단말(300)에 제공한다.
일 실시예에서, 점검자 단말(500) 중 관리자 단말(300)은 근로자 별 불안전 행동 입력 절차를 통해 수신된 재해 유형을 기초로 해당 재해 유형의 발생을 예방하기 위한 시정 조치서를 생성한 후 시정 조치서를 관리자 단말(300)에 제공한다.
점검자 단말(500) 중 관리자 단말(300)은 시정 조치서에 의거하여 관리자에 의해 시정이 완료되면, 시정 조치 정보(예를 들어, 관리자, 작업팀, 재해 유형, 조치 전후 사진)을 생성하여 건설 현장 근로자 관리 서버(100)에 제공한다.
그 후, 점검자 단말(500) 및 관리자 단말(300)은 불안전 행동 입력 절차를 통해 수집된 불안전 행동 및 입력 정보를 이용하여 안전 점검 일지를 생성한다. 이때, 점검자 단말(500) 및 관리자 단말(300)은 점검자 중 관리자가 입력한 불안전 행동은 해당 근로자의 안전점검일지에 반영하고, 점검자 중 감시단이 입력한 시정 조치한 내용을 안전점검일지에 반영한다.
또한, 점검자 단말(500) 중 관리자 단말(300)은 건설 현장 근로자 관리 서버(100)로부터 안전 신문고 제보 절차를 통해 세부내용, 사진, 안전 사고 관련 내용을 수신하면, 안전 신문고 채택 여부를 결정하여 건설 현장 안전 간리 서버(100)에 제공한다.
이에 따라, 건설 현장 안전 간리 서버(100)는 안전 신문고로 채택된 경우 해당 안전 신문고의 내용을 해당 근로자 데이터베이스(113)에 저장하고, 안전 신문고의 내용(즉, 현장, 채택 여부, 재해 유형, 상세 내용, 사진 등)을 안전 신문고 데이터베이스(411)에 저장한다.
그 후, 점검자 단말(500) 중 관리자 단말(300)은 재해 유형의 매칭 과정을 통해 매칭되는 재해 유형을 기초로 해당 재해 유형의 발생을 예방하기 위한 시정 조치서를 생성한 후 시정 조치서를 관리자 단말(300)에 제공한다.
점검자 단말(500) 중 관리자 단말(300)은 시정 조치서에 의거하여 관리자에 의해 시정이 완료되면, 시정 조치 정보(예를 들어, 관리자, 작업팀, 재해 유형, 조치 전후 사진)을 생성하여 건설 현장 근로자 관리 서버(100)에 제공한다.
따라서, 건설 현장 근로자 관리 서버(100)는 불안전 행동 입력이 발생되면, 해당 부적항 사항 내용 입력 시 함께 입력한 원인 제공 근로자 또는 해당 업체의 데이터베이스에 불안전 행동을 저장한다.
도 5는 본 발명의 일 실시예에 따른 건설 현장 근로자 관리 서버의 내부 구조를 설명하기 위한 블록도이다.
도 5를 참조하면, 건설 현장 근로자 관리 서버(100)는 교육 이수 정보 데이터베이스(110), 자격증 데이터베이스(111), 경력 정보 데이터 베이스(112) 및 근로자 데이터베이스(113), 제1 교육 이수 관리부(114), 제2 교육 이수 관리부(115), 자격증 관리부(116), 근로자 경력 관리부(117), 근로자 검색부(118), 근로자 건강 검진 관리부(119)를 포함한다.
교육 이수 정보 데이터베이스(110)에는 근로자 별로 교육 종류 리스트 및 인증 시간이 저장되어 있다.
자격증 데이터베이스(111)에는 근로자 별 자격증 취득 정보가 저장되어 있다.
이때, 자격증 취득 정보는 자격증 별로 필수 정보 및 선택 정보를 포함하고, 필수 정보는 제호, 성명, 국적, 주민등록번호, 주소, 국적, 발급 일자, 적성 검사, 유효 기간, 소지 면허, 증빙 사진을 포함하고, 선택 정보는 보험 증권, 사업자 등록증, 장비 등록증(예를 들어, 크레인, 펌프카 등의 비파괴 검사 결과), 증빙 사진 등을 포함할 수 있다. 상기의 자격증은 건설 현장에서 활용가능한 기술을 시험을 통해 인증된 후에 발급되는 자격증으로, 기계 조종사 등을 포함할 수 있다.
상기의 자격증은 건설 현장에서 활용가능한 기술을 시험을 주관하는 기관에 의해 발급될 때 진위 여부를 판별하기 위한 진위 판별 코드가 삽입되어 발급될 수 있다. 즉, 기관에 의해 자격증이 발급될 때 진위 판별 코드에 해당하는 서로 다른 크기의 픽셀 공간을 함께 출력하여 발급되도록 한다.
경력 정보 데이터 베이스(112)에는 근로자 별 경력 정보가 저장되어 있다.
근로자 데이터베이스(113)에는 근로자 별 근로자 정보가 저장되어 있다.
제1 교육 이수 관리부(114)는 근로자가 출근하기 이전에 근로자 단말(200)에 교육 이수 정보 등록 절차를 제공하고, 교육 이수 정보 등록 절차를 통해 교육 이수 정보를 수신한다.
이때, 교육 이수 정보는 교육 이수증 별로 이름, 생년월일, 등록번호, 이수일자, 이수증 증빙 사진 등을 포함할 수 있다. 상기의 교육 이수증은 건설 현장 안전 관리에 관한 교육을 이수한 후 발급되는 증명서로, 기초 보건 이수증 등을 포함할 수 있다.
상기의 교육 이수증에는 교육 이수 발급 기관에 의해 발급될 때 진위 여부를 판별하기 위한 진위 판별 코드가 삽입되어 발급될 수 있다. 즉, 교육 이수 발급 기관에 의해 인쇄될 때 진위 판별 코드에 해당하는 서로 다른 크기의 픽셀 공간을 함께 출력하여 발급되도록 한다.
상기와 같이, 교육 이수 발급 기관에 의해 교육 이수증이 발급될 때 교육 이수증에 삽입된 진위 판별 코드는 교육 이수 발급 기관 서버로부터 수신되어 미리 저장된다. 따라서, 제1 교육 이수 관리부(114)는 교육 이수 발급 기관 서버로부터 수신된 진위 판별 코드를 이용하여 교육 이수증의 진위 여부를 판별할 수 있는 것이다.
상기의 교육 이수증에 삽입되어 있는 서로 다른 크기의 픽셀 공간은 교육 이수증의 배경 화면과 유사한 색(즉, 배경 화면의 RGB 값이 특정 값 이상이거나 이하인 값에 해당하는 색)으로 설정되어 있기 때문에 사용자의 눈에는 보이지 않지만, 건설 현장 근로자 관리 서버(100)가 교육 이수증의 진위 여부를 판단하기 위해 스캔하는 과정에서 픽셀 분석하면 픽셀의 값이 다르기 때문에 진위 판별 코드에 해당하는 픽셀 공간이 추출될 수 있는 것이다.
따라서, 제1 교육 이수 관리부(114)는 교육 이수증을 스캔하여 분석하는 과정에서 교육 이수증에서 복수의 픽셀 공간을 추출한 후, 복수의 픽셀 공간이 망점이 지시하는 이진수 값을 이용하여 진위 판별 코드를 생성할 수 있다.
예를 들어, 제1 교육 이수 관리부(114)는 4개의 점으로 이루어진 픽셀 공간 1개와 8개의 점으로 이루어진 픽셀 공간 6개를 추출한 경우, 4개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "1000000"를 생성할 수 있다.
다른 예를 들어, 제1 교육 이수 관리부(114)는 6개의 점으로 이루어진 픽셀 공간 2개와 8개의 점으로 이루어진 픽셀 공간 3개를 추출한 경우, 6개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "11000"를 생성한다.
그런 다음, 제1 교육 이수 관리부(114)는 진위 판별 코드 및 미리 ㅅ수신된 진위 판별 코드를 비교하여 교육 이수증의 진위 여부를 판별할 수 있다.
상기와 같이, 제1 교육 이수 관리부(114)는 교육 이수증의 진위 여부가 판별된 후 교육 이수증을 기록된 교육 이수 정보를 이용하여 교육 별 유효 시간 및 교육 시간을 산출한 후, 근로자 별로 교육 종류 리스트 및 인증 시간을 교육 이수 정보 데이터베이스(110)에 저장한다.
이때, 교육 이수 정보 데이터베이스(110)에 근로자에 해당하는 누적 교육 시간이 존재하는 경우 기존에 누적된 누적 교육 시간에 교육 시간을 반영하여 누적 교육 시간을 갱신한다.
제2 교육 이수 관리부(115)는 근로자 교육 리스트를 생성하고, 근로자 교육 리스트를 관리자 단말(300)을 통해 근로자 단말(200)에 제공한다.
이때, 근로자 교육 리스트는 관리자, 업체, 현장, 날짜, 이름, 생년월일, 신규자 교육 이수 여부, 유효기간, 출근여부, 필수 교육 리스트, 필수 교육 이수 여부 등을 포함할 수 있다.
그런 다음, 제2 교육 이수 관리부(115)는 근로자 단말(200)로부터 출석 인증 정보를 수신하고, 관리자 단말(300)로부터 근로자 교육 리스트에 따라 근로자의 교육이 실시된 후 교육 증빙 사진 및 교육 증빙 정보를 포함하는 교육 이수 확인 요청 메시지를 수신한다.
이때, 출석 인증 정보는 근로자 이름 및 관리 감독자 이름을 포함할 수 있고, 교육 증빙 정보는 교육 구분, 교육 대상, 작업 공종 명, 교육 일자, 교육 장소, 교육 시간, 교육 담당(관리자 등), 교육 내용 등을 포함할 수 있다.
제2 교육 이수 관리부(115)는 출석 인증 정보를 이용하여 출석을 인증하고 교육 증빙 정보를 추출한 후, 교육 증빙 정보를 이용하여 교육 이수 정보 데이터베이스(110)에 저장된 근로자 별로 교육 종류 리스트 및 누적 시간을 갱신한다.
즉, 제2 교육 이수 관리부(115)는 교육 증빙 정보를 이용하여 교육 별 유효 시간 및 교육 시간을 산출한 후, 교육 종류를 이용하여 근로자 별로 교육 종류 리스트를 갱신하고 인증 시간을 이용하여 누적 시간을 갱신하여 근로자 별로교육 이수 정보 데이터베이스(110)에 저장한다.
또한, 자격증 관리부(116)는 근로자 단말(200)에 자격증 취득 정보 등록 절차를 제공하고, 자격증 취득 정보 등록 절차를 통해 자격증 취득 정보를 수신하여 근로자 별 자격증 취득 정보를 자격증 데이터베이스(111)에 저장한다.
이때, 자격증 취득 정보는 자격증 별로 필수 정보 및 선택 정보를 포함하고, 필수 정보는 제호, 성명, 국적, 주민등록번호, 주소, 국적, 발급 일자, 적성 검사, 유효 기간, 소지 면허, 증빙 사진을 포함하고, 선택 정보는 보험 증권, 사업자 등록증, 장비 등록증(예를 들어, 크레인, 펌프카 등의 비파괴 검사 결과), 증빙 사진 등을 포함할 수 있다. 상기의 자격증은 건설 현장에서 활용가능한 기술을 시험을 통해 인증된 후에 발급되는 자격증으로, 기계 조종사 등을 포함할 수 있다.
상기의 자격증은 건설 현장에서 활용가능한 기술을 시험을 주관하는 기관에 의해 발급될 때 진위 여부를 판별하기 위한 진위 판별 코드가 삽입되어 발급될 수 있다. 즉, 기관에 의해 자격증이 발급될 때 진위 판별 코드에 해당하는 서로 다른 크기의 픽셀 공간을 함께 출력하여 발급되도록 한다.
상기와 같이, 자격증이 발급될 때 자격증에 삽입된 진위 판별 코드는 자격증 시험 주최 기관 서버로부터 수신되어 미리 저장된다. 따라서, 자격증 관리부(116)는 자격증 시험 주최 기관 서버로부터 수신된 진위 판별 코드를 이용하여 자격증의 진위 여부를 판별할 수 있는 것이다.
상기의 자격증에 삽입되어 있는 서로 다른 크기의 픽셀 공간은 교육 이수증의 배경 화면과 유사한 색(즉, 배경 화면의 RGB 값이 특정 값 이상이거나 이하인 값에 해당하는 색)으로 설정되어 있기 때문에 사용자의 눈에는 보이지 않지만, 자격증 관리부(116)가 자격증 등과 같은 증빙 사진의 진위 여부를 판단하기 위해 픽셀 분석하면 픽셀의 값이 다르기 때문에 진위 판별 코드에 해당하는 픽셀 공간이 추출될 수 있는 것이다.
따라서, 자격증 관리부(116)는 자격증 등과 같은 증빙 사진을 스캔하여 분석하는 과정에서 자격증 등과 같은 증빙 사진에서 복수의 픽셀 공간을 추출한 후, 복수의 픽셀 공간이 망점이 지시하는 이진수 값을 이용하여 진위 판별 코드를 생성할 수 있다.
예를 들어, 자격증 관리부(116)는 4개의 점으로 이루어진 픽셀 공간 1개와 8개의 점으로 이루어진 픽셀 공간 6개를 추출한 경우, 4개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "1000000"를 생성할 수 있다.
다른 예를 들어, 자격증 관리부(116)는 6개의 점으로 이루어진 픽셀 공간 2개와 8개의 점으로 이루어진 픽셀 공간 3개를 추출한 경우, 6개의 점으로 이루어진 픽셀 공간을 1로 인식하고, 8개의 점으로 이루어진 픽셀 공간을 0으로 인식하여 진위 판별 코드 "11000"를 생성한다.
그런 다음, 자격증 관리부(116)는 진위 판별 코드 및 미리 수신된 진위 판별 코드를 비교하여 자격증의 진위 여부를 판별할 수 있다. 상기와 같이, 건설 현장 근로자 관리 서버(100)는 자격증의 진위 여부가 판별된 후 자격증 데이터베이스(111)에 근로자 별 자격증 취득 정보를 저장한다.
따라서, 자격증 관리부(116)는 자격증 데이터베이스(111)에 저장된 근로자 별 자격증 취득 정보를 이용하여 자격증 유효 기간 또는 장비 등록증 각각의 유효 기간의 만료까지 남은 기간이 특정 기간 이하이면 관리자 단말(300)에 자격증 유효 기간 만료 안내 메시지를 제공할 수 있는 것이다.
근로자 경력 관리부(117)는 근로자 단말(200)로부터 경력 정보를 포함하는 과거 경력 등록 요청 메시지를 수신하면, 과거 경력 등록 요청 메시지에서 경력 정보를 추출한 후 근로자 별 경력 정보를 경력 정보 데이터베이스(112)에 저장한다. 이때, 경력 정보는 근무 일수, 공종, 발주처(예를 들어, 회사), 프로젝트 종류(예를 들어, 토목, 건축, 플랜트 등), 관리자, 세부 공종 등을 포함할 수 있다.
근로자 검색부(118)는 관리자 단말(300)로부터 경력자 검색 요청 메시지를 수신하면, 경력자 검색 요청 메시지에 따라 경력 정보 데이터베이스(112)에서 근로자를 추출한 후 경력 정보를 포함하는 경력자 안내 메시지를 제공한다. 이와 같이, 근로자 검색부(118)는 경력 정보를 함께 제공함으로써 사업자가 경력 정보를 기초로 근로자의 프로젝트 배치 시 참고할 수 있도록 한다.
만일, 근로자 경력 관리부(117)는 근로자가 사업자에 의해 고용되어 프로젝트에 참여하게 되면, 경력을 확인하여 경력 정보 데이터베이스(112)에 저장된 근로자 별 경력 정보를 갱신한다.
근로자 건강 검진 관리부(119)는 근로자 데이터베이스(113)에 저장되어 있는 근로자 별 근로자 정보를 이용하여 건강 검진 대상에 해당하는 근로자 리스트를 생성한 후 병원 서버(500)에 근로자 리스트 상의 근로자의 건강 검진을 예약하는 건강 검진 예약 메시지를 제공한다. 이때, 근로자 리스트는 근로자 별 검진 종류, 다음 검진 일자, 예정 검진 기관, 희망 검진 예약일 등을 포함할 수 있다.
그 후, 근로자 건강 검진 관리부(119)는 병원 서버(500)에 의해 발급된 검진 결과 문서를 인식하여 검진 결과 문서에서 검진 결과를 생성한 후 근로자 별 검진 결과를 근로자 데이터베이스(113)에 저장한다.
도 6은 본 발명에 따른 건설 현장 근로자 관리 방법의 일 실시예를 설명하기 위한 흐름도이다.
도 6을 참조하면, 건설 현장 근로자 관리 서버(100)는 근로자가 출근하기 이전에 근로자 단말로부터 교육 이수 정보를 수신하여 교육 이수 정보 데이터베이스에 저장한다(단계 S620).
건설 현장 근로자 관리 서버(100)는 근로자 교육 리스트를 생성하여 제공한 후, 상기 근로자 교육 리스트에 따라 근로자의 교육이 완료될 때마다 교육 이수 정보 데이터베이스의 상기 근로자 별로 교육 종류 리스트 및 누적 시간을 갱신한다(단계 S630).
건설 현장 근로자 관리 서버(100)는 근로자 단말로부터 자격증 취득 정보를 수신하여 상기 자격증 데이터베이스에 저장한다(단계 S640).
건설 현장 근로자 관리 서버(100)는 근로자 단말로부터 과거 경력을 수신하면 상기 경력 정보 데이터베이스에 저장한다(단계 S650).
건설 현장 근로자 관리 서버(100)는 관리자 단말로부터 수신된 경력자 검색 요청 메시지에 따라 상기 경력 정보 데이터베이스, 교육 이수 정보 데이터베이스, 자격증 데이터베이스를 기초로 근로자를 검색하여 제공한다(단계 S660).
도 7 내지 도 10은 도 6의 실행 과정에서 근로자 단말의 실행 화면을 설명하기 위한 예시도이다.
도 7 내지 도 10을 참조하면, 근로자 단말(200)에는 건설 현장 근로자 관리 서버(100)에 접속하기 위한 어플리케이션이 미리 설치되어 있거나, 어플리케이션 마켓에서 다운로드하여 설치될 수 있다.
근로자 단말(200)은 건설 현장 근로자 관리 서버(100)에 접속하기 위한 어플리케이션을 실행하면 도 7과 같은 화면을 표시한다. 근로자 단말(200)은 도 8(a) 및 도 8(b)와 같은 과정을 통해 근로자 회원으로 가입한다.
근로자 단말(200)은 도 9(a) 및 도 8(b)와 같은 과정을 통해 근로자 프로필(예를 들어, 이름, 공조, 경력, 건강 검진일 등)을 확인할 수 있다. 또한, 근로자 단말(200)은 도 10(a)의 과정을 통해 근로자 프로필(예를 들어, 경력, 연락처, 과거 경력, 과거 검진 결과 등을 변경될 수 있다.
근로자 단말(200)은 상술한 과정을 통해 근로자 프로필의 작성이 완료되면 도 10과 같은 완성된 근로자 프로필을 표시한다.
한정된 실시예와 도면에 의해 설명되었으나, 본 발명은 상기의 실시예에 한정되는 것은 아니며, 이는 본 발명이 속하는 분야에서 통상의 지식을 가진 자라면 이러한 기재로부터 다양한 수정 및 변형이 가능하다. 따라서, 본 발명 사상은 아래에 기재된 특허청구범위에 의해서만 파악되어야 하고, 이의 균등 또는 등가적 변형 모두는 본 발명 사상의 범주에 속한다고 할 것이다.
도 11은 본 발명에 따른 건설 현장 근로자 관리 방법의 일 실시예를 설명하기 위한 흐름도이다. 도 11에 개시된 일 실시예는 근로자가 개인 경력을 입력하고 건설 프로젝트에 참여 기간 동안은 경력이 자동으로 입력되는 일 실시예에 관한 것이다.
도 11을 참조하면, 건설 현장 근로자 관리 서버(100)는 근로자가 회원 가입하고(단계 S1101), 근로자 단말(200)로부터 경력 정보를 포함하는 과거 경력 등록 요청 메시지를 수신하면, 과거 경력 등록 요청 메시지에서 경력 정보를 추출한 후 근로자 별 경력 정보를 경력 정보 데이터 베이스(112)에 저장한다(단계 S1102, 단계 S1103). 이때, 경력 정보는 근무 일수, 공종, 발주처(예를 들어, 회사), 프로젝트 종류(예를 들어, 토목, 건축, 플랜트 등), 관리자, 세부 공종 등을 포함할 수 있다.
건설 현장 근로자 관리 서버(100)는 근로자가 프로젝트에 참여한 후 작업 허가서를 사용하면(단계 S1103), 근로자 단말(200)로부터 작업 허가서의 QR 코드를 스캔하여 생성한 작업 허가서의 식별 코드를 수신하면(단계 S1105), 작업 허가서의 식별 코드에 해당하는 근로자 별 경력 정보를 경력 정보 데이터 베이스(112)에 저장한다(단계 S1106).
한편, 건설 현장 근로자 관리 서버(100)는 근로자가 프로젝트에 참여한 후 작업 허가서를 사용하지 않으면, 프로젝트 기간에 해당하고 금일 경력을 저장하고자 하는 경우(S1107, S1108), 근무 시간에 해당하면(단계 S1109) 근로자의 GPS 범위에 해당하면(단계 S1110) 프로젝트 정보를 기초로 근로자 별 경력 정보를 경력 정보 데이터 베이스(112)에 저장한다(단계 S1111).
도 12는 본 발명에 따른 건설 현장 근로자 관리 방법의 다른 일 실시예를 설명하기 위한 흐름도이다. 도 12의 일 실시예는 관리자로 회원 가입된 사용자가 최초 현장을 등록할 수 있는 일 실시예에 관한 것이다.
도 12를 참조하면, 관리자 단말(300)은 건설 현장 근로자 관리 서버(100)로부터 내 현장 생성 절차를 수신하고(단계 S1201), 관리자가 원청사인 경우(단계 S1202) 착공 신고서를 건설 현장 근로자 관리 서버(100)에 제공한다(단계 S1203). 이에 반하여, 관리자 단말(300)은 BP사인 경우 하도급 계약서를 현장 근로자 관리 서버(100)에 제공한다(단계 S1204).
그 후, 건설 현장 근로자 관리 서버(100)는 관리자 단말(300)로부터 착공 신고서 또는 하도급 계약서에 대한 승인 여부를 검토한 후(단계 S1207), 착공 신고서가 승인되면 승인 알림 메시지를 관리자 단말(300)에 제공한다(단계 S1208). 건설 현장 근로자 관리 서버(100)는 착공 신고서를 원청사에 제공하여 생성 요청한 관리자에게 시공사 관리자 권한이 부여되도록 하거나 착공 신고서를 BP 사에 제공하여 생성 요청한 관리자에게 BP사 관리자 권한이 부여되도록 한다.
도 13은 본 발명에 따른 건설 현장 근로자 관리 방법의 또 다른 일 실시예를 설명하기 위한 흐름도이다. 도 13의 일 실시예는 관리자가 현장을 등록한 후 관리자 및 근로자를 참여시킬 수 일 실시예에 관한 것이다.
도 13을 참조하면, 관리자 단말(300)은 현장에 참여한 후(단계 S1301), 관리자 권한이 있으면(단계 S1302), 시공사 관리자 인지 여부를 판단한다(단계 S1303). 관리자 단말(300)은 시공사 관리자이면 어플리케이션을 통해 건설 현장 근로자 관리 서버(100)에 접속한 후, 내 현장 초대 요청 메시지를 다른 관리자 단말 또는 근로자 단말에 제공한다(단계 S1305).
다른 관리자 단말 또는 근로자 단말(100)은 관리자의 현장 초대를 승인하면(단계 S1306), 초대받은 사용자가 회원 가입시 관리자로 회원 가입되었고, 시공사 관리자와 소속 회사가 같은 경우 시공사 관리자로 참여된다.
이에 반하여, 관리자 단말(300)은 시공사 관리자로부터 초대받은 사용자가 관리자가 아닌 근로자로 회원 가입되었을 경우 소속 구별없이 근로자로 현장에 참여 된다.
관리자 단말(300)은 시공사 관리자가 아니면(단계 S1303), 어플리케이션을 통해 건설 현장 근로자 관리 서버(100)에 접속한 후, 내 현장 초대 요청 메시지를 BP사 관리자에 제공한다(단계 S1305).
BP사 관리자는 초대를 통하여 소속 BP사 관리자 및 근로자로 등록이 가능하다. BP사 관리자가 초대하였을 때 관리자로 회원 가입되었을 경우는 BP사 관리자로, 근로자로 회원 가입되었을 경우 BP사 근로자로 참여하게 된다(단계 S1308 내지 S1313).
본 발명은, 건설 현장의 데이터를 이용하여 효과적으로 안전관리 업무를 진행할 수 있도록 한 것으로, 건설업 분야에서 널리 이용하여 그 실용적이고 경제적인 가치를 실현할 수 있는 기술이다.

Claims (10)

  1. 근로자 별로 교육 종류 리스트 및 누적 시간이 저장되어 있는 교육 이수 정보 데이터베이스;
    근로자 별 자격증 취득 정보가 저장되어 있는 자격증 데이터베이스;
    근로자 별 경력 정보가 저장되어 있는 경력 정보 데이터베이스;
    근로자가 출근하기 이전에 근로자 단말로부터 교육 이수 정보를 수신하여 상기 교육 이수 정보 데이터베이스에 저장하는 제1 교육 이수 관리부;
    근로자 교육 리스트를 생성하여 제공한 후 상기 근로자 교육 리스트에 따라 근로자의 교육이 완료될 때마다 교육 이수 정보 데이터베이스의 상기 근로자 별로 교육 교육 종류 리스트 및 누적 시간을 갱신하는 제2 교육 이수 관리부;
    상기 근로자 단말로부터 자격증 취득 정보를 수신하여 상기 자격증 데이터베이스에 저장하는 자격증 관리부;
    근로자 단말로부터 과거 경력을 수신하면 상기 경력 정보 데이터베이스에 저장하는 근로자 경력 관리부; 및
    관리자 단말로부터 수신된 경력자 검색 요청 메시지에 따라 상기 경력 정보 데이터베이스, 교육 이수 정보 데이터베이스, 자격증 데이터베이스를 기초로 근로자를 검색하여 상기 관리자 단말에 제공하는 근로자 검색부를 포함하는 것을 특징으로 하는
    건설 현장 근로자 관리 서버.
  2. 제1항에 있어서,
    근로자 별 근로자 정보가 저장되어 있는 근로자 데이터베이스; 및
    상기 근로자 별 근로자 정보를 이용하여 건강 검진 대상에 해당하는 근로자 리스트를 생성한 후 병원 서버에 근로자 리스트 상의 근로자의 건강 검진을 예약하는 건강 검진 예약 메시지를 제공하고, 병원 서버에 의해 발급된 검진 결과 문서를 인식하여 검진 결과 문서에서 검진 결과를 생성한 후 근로자 별 검진 결과를 근로자 데이터베이스에 저장하는 근로자 건강 검진 관리부를 포함하는 것을 특징으로 하는
    건설 현장 근로자 관리 서버.
  3. 제1항에 있어서,
    상기 자격증 관리부는
    상기 자격증 데이터베이스에 저장된 근로자 별 자격증 취득 정보를 이용하여 자격증 유효 기간 또는 장비 등록증 각각의 유효 기간의 만료까지 남은 기간이 특정 기간 이하이면 관리자 단말에 자격증 유효 기간 만료 안내 메시지를 제공하는 것을 특징으로 하는
    건설 현장 근로자 관리 서버.
  4. 제1항에 있어서,
    상기 제2 교육 이수 관리부는
    근로자 단말로부터 출석 인증 정보를 수신하고, 상기 관리자 단말로부터 근로자 교육 리스트에 따라 근로자의 교육이 실시된 후 교육 증빙 사진 및 교육 증빙 정보를 포함하는 교육 이수 확인 요청 메시지를 수신하고, 상기 출석 인증 정보를 이용하여 출석을 인증하고 교육 증빙 정보를 추출한 후, 상기 교육 증빙 정보를 이용하여 교육 이수 정보 데이터베이스에 저장된 근로자 별로 교육 종류 리스트 및 누적 시간을 갱신하는 것을 특징으로 하는
    건설 현장 근로자 관리 서버.
  5. 제1항에 있어서,
    상기 근로자 경력 관리부는
    상기 근로자 검색부를 통해 근로자 별 경력 정보를 제공한 후 근로자가 사업자에 의해 고용되어 프로젝트에 참여하게 되면, 상기 프로젝트에 참여한 경력을 확인하여 상기 경력 정보 데이터베이스에 저장된 근로자 별 경력 정보를 갱신하는 것을 특징으로 하는
    건설 현장 근로자 관리 서버.
  6. 건설 현장 근로자 관리 서버에서 실행되는 건설 현장 근로자 관리 방법에 있어서,
    근로자가 출근하기 이전에 근로자 단말로부터 교육 이수 정보를 수신하여 교육 이수 정보 데이터베이스에 저장하는 단계;
    근로자 교육 리스트를 생성하여 제공한 후 상기 근로자 교육 리스트에 따라 근로자의 교육이 완료될 때마다 교육 이수 정보 데이터베이스의 상기 근로자 별로 교육 종류 리스트 및 누적하여 저장하는 단계;
    근로자 단말로부터 자격증 취득 정보를 수신하여 상기 자격증 데이터베이스에 저장하는 단계;
    상기 근로자 단말로부터 과거 경력을 수신하면 상기 경력 정보 데이터베이스에 저장하는 단계;
    관리자 단말로부터 수신된 경력자 검색 요청 메시지에 따라 상기 경력 정보 데이터베이스, 교육 이수 정보 데이터베이스, 자격증 데이터베이스를 기초로 근로자를 검색하여 상기 관리자 단말에 제공하는 단계를 포함하는 것을 특징으로 하는
    건설 현장 근로자 관리 방법.
  7. 제6항에 있어서,
    근로자 데이터베이스에 저장되어 있는 근로자 별 근로자 정보를 이용하여 건강 검진 대상에 해당하는 근로자 리스트를 생성한 후 병원 서버에 근로자 리스트 상의 근로자의 건강 검진을 예약하는 건강 검진 예약 메시지를 병원 서버에 제공하는 단계; 및
    상기 병원 서버에 의해 발급된 검진 결과 문서를 인식하여 검진 결과 문서에서 검진 결과를 생성한 후 근로자 별 검진 결과를 근로자 데이터베이스에 저장하는 단계를 더 포함하는 것을 특징으로 하는
    건설 현장 근로자 관리 방법.
  8. 제6항에 있어서,
    상기 자격증 데이터베이스에 저장된 근로자 별 자격증 취득 정보를 이용하여 자격증 유효 기간 또는 장비 등록증 각각의 유효 기간의 만료까지 남은 기간이 특정 기간 이하이면 관리자 단말에 자격증 유효 기간 만료 안내 메시지를 제공하는 단계를 더 포함하는 것을 특징으로 하는
    건설 현장 근로자 관리 방법.
  9. 제6항에 있어서,
    상기 관리자 단말로부터 근로자 교육 리스트에 따라 근로자의 교육이 실시된 후 교육 증빙 사진 및 교육 증빙 정보를 포함하는 교육 이수 확인 요청 메시지를 수신하는 단계;
    상기 근로자 단말로부터 수신된 출석 인증 정보를 이용하여 출석을 인증하고 교육 증빙 정보를 추출하는 단계; 및
    상기 교육 증빙 정보를 이용하여 교육 이수 정보 데이터베이스에 저장된 근로자 별로 교육 종류 리스트 및 누적 시간을 갱신하는 단계를 포함하는 것을 특징으로 하는
    건설 현장 근로자 관리 방법.
  10. 제6항에 있어서,
    상기 경력자 검색 요청 메시지에 따라 근로자 별 경력 정보를 제공한 후 근로자가 사업자에 의해 고용되어 프로젝트에 참여하게 되면, 상기 프로젝트에 참여한 경력을 확인하여 상기 경력 정보 데이터베이스에 저장된 근로자 별 경력 정보를 갱신하는 단계를 포함하는 것을 특징으로 하는
    건설 현장 근로자 관리 방법.
PCT/KR2022/008436 2021-06-17 2022-06-14 건설 현장 근로자 관리 방법 및 이를 실행하는 서버 WO2022265372A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2021-0079025 2021-06-17
KR1020210079025A KR102370043B1 (ko) 2021-06-17 2021-06-17 건설 현장 근로자 관리 방법 및 이를 실행하는 서버

Publications (1)

Publication Number Publication Date
WO2022265372A1 true WO2022265372A1 (ko) 2022-12-22

Family

ID=80815314

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2022/008436 WO2022265372A1 (ko) 2021-06-17 2022-06-14 건설 현장 근로자 관리 방법 및 이를 실행하는 서버

Country Status (2)

Country Link
KR (1) KR102370043B1 (ko)
WO (1) WO2022265372A1 (ko)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102370043B1 (ko) * 2021-06-17 2022-03-02 에스케이에코플랜트(주) 건설 현장 근로자 관리 방법 및 이를 실행하는 서버
KR102608703B1 (ko) * 2023-06-29 2023-12-04 (주)씨엠잡매칭 건축 및 건설 직무별 경력관리 시스템 및 이를 이용한경력관리 방법

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040082598A (ko) * 2003-03-19 2004-09-30 주식회사 에스원 스마트카드를 이용한 건설 노무자 정보 관리시스템 및 그방법
KR20150051598A (ko) * 2013-11-05 2015-05-13 두산중공업 주식회사 용접사 자격관리 시스템 및 그의 제어방법
KR20170020400A (ko) * 2017-02-13 2017-02-22 김광연 건강검진 예약 및 건강관리 시스템 및 그의 제어 방법
KR101944219B1 (ko) * 2018-08-29 2019-01-30 이준화 건설현장 일자리 제공 시스템
KR101944847B1 (ko) * 2017-10-30 2019-02-01 건설근로자공제회 공공기관과 연계된 건설근로자 전자인력관리 방법 및 시스템
KR102370043B1 (ko) * 2021-06-17 2022-03-02 에스케이에코플랜트(주) 건설 현장 근로자 관리 방법 및 이를 실행하는 서버

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040082598A (ko) * 2003-03-19 2004-09-30 주식회사 에스원 스마트카드를 이용한 건설 노무자 정보 관리시스템 및 그방법
KR20150051598A (ko) * 2013-11-05 2015-05-13 두산중공업 주식회사 용접사 자격관리 시스템 및 그의 제어방법
KR20170020400A (ko) * 2017-02-13 2017-02-22 김광연 건강검진 예약 및 건강관리 시스템 및 그의 제어 방법
KR101944847B1 (ko) * 2017-10-30 2019-02-01 건설근로자공제회 공공기관과 연계된 건설근로자 전자인력관리 방법 및 시스템
KR101944219B1 (ko) * 2018-08-29 2019-01-30 이준화 건설현장 일자리 제공 시스템
KR102370043B1 (ko) * 2021-06-17 2022-03-02 에스케이에코플랜트(주) 건설 현장 근로자 관리 방법 및 이를 실행하는 서버

Also Published As

Publication number Publication date
KR102370043B1 (ko) 2022-03-02

Similar Documents

Publication Publication Date Title
WO2022265371A1 (ko) 건설 현장 안전 관리 시스템
WO2022265372A1 (ko) 건설 현장 근로자 관리 방법 및 이를 실행하는 서버
WO2022265373A1 (ko) 건설 현장 작업 관리 방법 및 이를 실행하는 시스템
WO2022265375A1 (ko) 건설 현장 위험성 예측 방법 및 이를 실행하는 서버
WO2017222172A1 (ko) 카드 이용 내역에 따라 모바일 쿠폰 서비스를 제공하는 방법 및 서버
WO2019050074A1 (ko) 클라우드 기반의 디지털 문항 저작 솔루션 제공 및 유통 서비스 플랫폼이 가능한 학습시스템과, 그 제어방법
WO2020022611A1 (ko) 재능경력중심 학점인정 학사관리 시스템 및 방법과 이를 이용하는 재능기부은행 서비스 제공 시스템
WO2020138903A2 (ko) 일정 관리 서비스 시스템 및 방법
WO2020022605A1 (ko) 인력 및 건설 공사 중개 시스템 및 그 방법
WO2021006505A1 (ko) 전문가 경력 관리 방법, 장치 및 프로그램
WO2018084326A1 (ko) 실시간 상담을 제공하기 위한 방법 및 서버
WO2021230522A1 (ko) 최종가격산정부를 갖는 토지시세 추정시스템 및 추정방법
WO2022265374A1 (ko) 건설 현장 커뮤니케이션 서비스 제공 방법 및 이를 실행하는 시스템
WO2020080590A1 (ko) 블록체인 기반의 기업투자 시스템 및 그 제어방법
WO2023058973A1 (ko) 인공지능과 기계 학습 기반 해외 공공조달 맞춤형 입찰정보 제공 서비스 시스템 및 방법
WO2023075245A1 (ko) 시각장애인용 이료 서비스 관리 시스템 및 그 방법
WO2015130129A1 (ko) 서고 관리 시스템
WO2017043847A1 (ko) 관리비 절감 시스템 그리고 플랫폼 서버 연동 클라우드 기반 결재 서비스 방법
WO2017222125A1 (ko) 식별코드를 이용한 자필서명 검증 시스템 및 방법
WO2022045844A1 (ko) 파이낸셜 플래너 모집을 위한 정보 제공 방법 및 이를 이용한 전자 장치
WO2012064026A2 (ko) 전자영수증 발급방법
WO2018131807A1 (ko) 회원의 출석 및 관리 서비스 제공 시스템
WO2022060161A1 (ko) 이미지 출력기반의 수익형 apc 스마트 시스템
WO2017222129A1 (ko) 항공기 운항 중 카드결제를 처리하는 기내 결제 서비스 제공 방법 및 장치
WO2020141745A1 (ko) 집단 지성 기반의 상호 검증을 이용한 인공지능 기반 객체인식 신뢰도 향상 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22825295

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 22825295

Country of ref document: EP

Kind code of ref document: A1