WO2017056199A1 - 建設機械 - Google Patents

建設機械 Download PDF

Info

Publication number
WO2017056199A1
WO2017056199A1 PCT/JP2015/077591 JP2015077591W WO2017056199A1 WO 2017056199 A1 WO2017056199 A1 WO 2017056199A1 JP 2015077591 W JP2015077591 W JP 2015077591W WO 2017056199 A1 WO2017056199 A1 WO 2017056199A1
Authority
WO
WIPO (PCT)
Prior art keywords
pressure
regeneration
valve
oil
hydraulic
Prior art date
Application number
PCT/JP2015/077591
Other languages
English (en)
French (fr)
Inventor
聖二 土方
石川 広二
井村 進也
Original Assignee
日立建機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日立建機株式会社 filed Critical 日立建機株式会社
Priority to EP15905353.7A priority Critical patent/EP3358200B1/en
Priority to CN201580076725.1A priority patent/CN107250570B/zh
Priority to JP2017542561A priority patent/JP6467515B2/ja
Priority to PCT/JP2015/077591 priority patent/WO2017056199A1/ja
Priority to US15/556,103 priority patent/US10526767B2/en
Priority to KR1020177023019A priority patent/KR101959652B1/ko
Publication of WO2017056199A1 publication Critical patent/WO2017056199A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/42Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/425Drive systems for dipper-arms, backhoes or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2217Hydraulic or pneumatic drives with energy recovery arrangements, e.g. using accumulators, flywheels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2239Control of flow rate; Load sensing arrangements using two or more pumps with cross-assistance
    • E02F9/2242Control of flow rate; Load sensing arrangements using two or more pumps with cross-assistance including an electronic controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2264Arrangements or adaptations of elements for hydraulic drives
    • E02F9/2267Valves or distributors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2264Arrangements or adaptations of elements for hydraulic drives
    • E02F9/2271Actuators and supports therefor and protection therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2282Systems using center bypass type changeover valves
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2285Pilot-operated systems
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2292Systems with two or more pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/02Systems essentially incorporating special features for controlling the speed or actuating force of an output member
    • F15B11/024Systems essentially incorporating special features for controlling the speed or actuating force of an output member by means of differential connection of the servomotor lines, e.g. regenerative circuits
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B13/00Details of servomotor systems ; Valves for servomotor systems
    • F15B13/02Fluid distribution or supply devices characterised by their adaptation to the control of servomotors
    • F15B13/06Fluid distribution or supply devices characterised by their adaptation to the control of servomotors for use with two or more servomotors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B21/00Common features of fluid actuator systems; Fluid-pressure actuator systems or details thereof, not covered by any other group of this subclass
    • F15B21/14Energy-recuperation means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/30Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom
    • E02F3/32Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets with a dipper-arm pivoted on a cantilever beam, i.e. boom working downwardly and towards the machine, e.g. with backhoes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2232Control of flow rate; Load sensing arrangements using one or more variable displacement pumps
    • E02F9/2235Control of flow rate; Load sensing arrangements using one or more variable displacement pumps including an electronic controller
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2296Systems with a variable displacement pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/40Flow control
    • F15B2211/46Control of flow in the return line, i.e. meter-out control
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/50Pressure control
    • F15B2211/515Pressure control characterised by the connections of the pressure control means in the circuit
    • F15B2211/5153Pressure control characterised by the connections of the pressure control means in the circuit being connected to an output member and a directional control valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/50Pressure control
    • F15B2211/515Pressure control characterised by the connections of the pressure control means in the circuit
    • F15B2211/5156Pressure control characterised by the connections of the pressure control means in the circuit being connected to a return line and a directional control valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/70Output members, e.g. hydraulic motors or cylinders or control therefor
    • F15B2211/78Control of multiple output members
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/80Other types of control related to particular problems or conditions
    • F15B2211/88Control measures for saving energy

Definitions

  • the present invention relates to a construction machine, and more particularly to a construction machine that includes a hydraulic actuator such as a hydraulic excavator and a regeneration circuit that regenerates pressure oil from the hydraulic actuator.
  • a hydraulic actuator such as a hydraulic excavator
  • a regeneration circuit that regenerates pressure oil from the hydraulic actuator.
  • Patent Document 1 In a construction machine, in order to improve the fuel efficiency of an engine and save energy, a technique for regenerating the return oil from a hydraulic actuator through a control valve is known. Examples thereof are Patent Document 1 and Patent Document 2. It is described in.
  • Patent Document 1 discloses a hydraulic control that regenerates power discharged from a bottom side oil chamber to drive another hydraulic actuator through a control valve in a boom cylinder for driving a working device in a construction machine when its own weight falls. An apparatus is described.
  • Patent Document 2 in order to efficiently use the return oil that has been discharged to the conventional tank, the high pressure of the rod side oil chamber of the boom cylinder is excavated when the excavator performs the combined operation of raising the boom and the arm cloud.
  • a hydraulic drive device for regenerating oil into the bottom oil chamber of the arm cylinder is described.
  • the return oil from the boom cylinder at the time of boom lowering operation or boom raising operation can be regenerated, so that energy saving can be achieved.
  • each of the prior arts describes only the return oil regeneration during either the boom lowering operation or the boom raising operation, and the return oil regeneration for both the boom raising operation and the boom lowering operation is described. The corresponding technology is not mentioned.
  • the present invention has been made based on the above-described matters, and an object of the present invention is to make it possible to regenerate the return oil at the time of both the boom raising operation and the boom lowering operation with a small number of valve configurations.
  • the construction machine which can ensure the favorable operativity at the time of the operation
  • the present application includes a plurality of means for solving the above-described problems.
  • a first hydraulic actuator, a second hydraulic actuator, a tank, and a second hydraulic pressure actuator that supplies pressure oil to the second hydraulic actuator.
  • a return oil selection device that selects and discharges a supply source of return oil that is generated when the first hydraulic actuator is raised or lowered, and is discharged from the return oil selection device.
  • a regeneration line for supplying and regenerating the pressurized oil between the second hydraulic actuator and the first hydraulic pump; a discharge line for discharging the pressure oil discharged from the return oil selection device to the tank; And a regeneration discharge flow rate adjusting device capable of adjusting a flow rate of the pressure oil flowing through the regeneration pipeline and a flow rate of the pressure oil flowing through the discharge pipeline.
  • 1 is a side view showing a hydraulic excavator which is a first embodiment of a construction machine of the present invention. It is the schematic of the hydraulic drive system which comprises 1st Embodiment of the construction machine of this invention. It is a characteristic view which shows the opening area characteristic of the regeneration control valve which comprises 1st Embodiment of the construction machine of this invention. It is a block diagram of the controller which constitutes a 1st embodiment of the construction machine of the present invention. It is a characteristic view which shows the opening area characteristic of the discharge valve which comprises 1st Embodiment of the construction machine of this invention. It is the schematic of the hydraulic drive system which comprises 2nd Embodiment of the construction machine of this invention. It is a block diagram of the controller which comprises 2nd Embodiment of the construction machine of this invention. It is the schematic of the hydraulic drive system which comprises 3rd Embodiment of the construction machine of this invention.
  • FIG. 1 is a side view showing a hydraulic excavator which is a first embodiment of the construction machine of the present invention
  • FIG. 2 is a schematic view of a hydraulic drive system constituting the first embodiment of the construction machine of the present invention.
  • the excavator includes a lower traveling body 201, an upper swing body 202, and a front work machine 203.
  • the lower traveling body 201 has left and right crawler traveling devices 201a and 201a (only one side is shown), and is driven by left and right traveling motors 201b and 201b (only one side is shown).
  • the upper turning body 202 is mounted on the lower traveling body 201 so as to be turnable, and is turned by a turning motor 202a.
  • the front work machine 203 is attached to the front part of the upper swing body 202 so as to be able to be raised and lowered.
  • the upper swing body 202 is provided with a cabin (operator's cab) 202b, and an operating device to be described later is disposed in the cabin 202b.
  • the front work machine 203 has an articulated structure having a boom 205 (first driven body), an arm 206 (second driven body), and a bucket 207.
  • the boom 205 is expanded and contracted by a boom cylinder 3 that is a first hydraulic actuator.
  • the arm 206 is rotated in the vertical direction with respect to the upper swing body 202, and the arm 207 is rotated in the vertical direction and the front-rear direction with respect to the boom 205 by the expansion and contraction of the arm cylinder 7 as the second hydraulic actuator.
  • the arm 206 is rotated up and down and back and forth.
  • FIG. 2 illustrates only the system related to the boom cylinder 6 and the arm cylinder 7 as the hydraulic drive system constituting the present embodiment shown in FIG.
  • pressure oil is supplied from at least one of a variable displacement first hydraulic pump 1 and a second hydraulic pump 2 driven by an engine (not shown), and the first hydraulic pump 1 and the second hydraulic pump 2.
  • Pressure oil is supplied from at least one of the boom cylinder 6 (first hydraulic actuator) that drives the boom 205 of the excavator and the return oil of the first hydraulic pump 1 and the boom cylinder 6 to drive the arm 206 of the excavator.
  • Arm cylinder 7 (second hydraulic actuator), control valve 3 for controlling the flow (flow rate and direction) of pressure oil supplied from first hydraulic pump 1 to arm cylinder 7, and boom cylinder 6 from first hydraulic pump 1
  • the discharge valve 4 that controls the flow (flow rate and direction) of the pressure oil supplied to the cylinder and the return flow of the return oil from the boom cylinder 6, and the second hydraulic pump 2
  • the return oil selection valve 5 as a return oil selection device for selecting and controlling the flow (flow rate and direction) of the pressure oil supplied to the cylinder cylinder 6 and the return oil supply source of the boom cylinder 6, the regeneration flow rate and the discharge flow rate of return oil
  • a regeneration control valve 8 that controls the operation of the first control device 9 that outputs an operation command for the boom 205 and switches between the discharge valve 4 and the return oil selection valve 5, and a first operation device 9 that outputs an operation command for the arm 206 and switches the control valve 3 2 operating device 11.
  • the first hydraulic pump 1 and the second hydraulic pump 2 are also connected to a control valve (not shown) so that pressure oil is
  • the first hydraulic pump 1 and the second hydraulic pump are variable displacement types, respectively provided with regulators 1a and 2a as discharge flow rate adjusting means, and by controlling the regulators 1a and 2a by a control signal from a controller 21 (described later).
  • the tilt angles (capacities) of the first and second hydraulic pumps 1 and 2 are controlled, and the discharge flow rate is controlled.
  • the control valve 3 and the discharge valve 4 are arranged in series from the upstream side in the first main pipe 31 that supplies the pressure oil discharged from the first hydraulic pump 1 to the boom cylinder 6 and the arm cylinder 7.
  • a return oil selection valve 5 is disposed in the second main pipeline 32 that supplies pressure oil discharged from the second hydraulic pump 2 to the boom cylinder 6.
  • the first main pipe 31 is provided with a pressure sensor 18 as a second pressure detection device that detects the pressure of the pressure oil discharged from the first hydraulic pump.
  • the discharge pressure signal of the first hydraulic pump detected by the pressure sensor 18 is input to the controller 21.
  • the control valve 3 is a three-position six-port switching control valve, and changes the opening area of the hydraulic oil flow path by switching the control valve position by the pilot pressure supplied to both the operation sections 3x and 3y. .
  • the arm cylinder 7 is driven by controlling the direction and flow rate of hydraulic oil supplied from the first hydraulic pump 1 to the arm cylinder 7.
  • the control valve 3 includes an inlet port 3c to which pressure oil from the first hydraulic pump 1 is supplied, an outlet port 3d that communicates with the hydraulic oil tank 30, a center port 3T that communicates when in the neutral position, an arm It has a connection port 3a, 3b connected to the cylinder 7 side, and is a center bypass type that communicates the pressure oil from the first hydraulic pump 1 to the hydraulic oil tank 30 when in the neutral position.
  • a check valve 15 for preventing a backflow to the first hydraulic pump 1 is provided in a pipe connecting the first main pipeline 31 and the inlet port 3c.
  • the discharge valve 4 is a 3-position 7-port switching control valve
  • the return oil selection valve 5 is a 3-position 6-port switching control valve, which is supplied with pilot pressures supplied to both operating portions 4x, 5x, 4y, 5y.
  • the control valve position is switched to change the opening area of the hydraulic oil passage. Specifically, when pilot pressure is supplied to the operation units 4y and 5y, the discharge valve 4 moves to the left, the return oil selection valve 5 moves to the right, and each is switched to the A position. Conversely, when pilot pressure is supplied to the operation units 4x and 5x, the discharge valve 4 moves to the right, the return oil selection valve 5 moves to the left, and each is switched to the B position.
  • the boom cylinder 6 is driven by controlling the direction and flow rate of hydraulic oil supplied from at least one of the first hydraulic pump 1 and the second hydraulic pump 2 to the boom cylinder 6.
  • the return oil selection valve 5 includes an inlet port 5c to which pressure oil from the second hydraulic pump 2 is supplied, a connection port 5d that communicates with a communication conduit 23 described later, and a center port that communicates when in the neutral position.
  • 5T and connection ports 5a and 5b connected to the boom cylinder 6 side, and is a center bypass type that communicates the pressure oil from the second hydraulic pump 2 to the hydraulic oil tank 30 when in the neutral position.
  • a check valve 12 for preventing a back flow to the second hydraulic pump 2 is provided in a pipe connecting the second main pipeline 32 and the inlet port 5c.
  • a throttle is provided in the internal oil passage that communicates from the connection port 5a to the connection port 5d at the position A of the return oil selection valve 5.
  • the discharge valve 4 includes an inlet port 4c to which pressure oil from the first hydraulic pump 1 is supplied, an outlet port 4d that communicates with the hydraulic oil tank 30, and a connection port 4e that communicates with a communication conduit 23 described later.
  • the center port 4T communicates at the neutral position and the connection ports 4a and 4b connected to the boom cylinder 6 side. When in the neutral position, the hydraulic oil is supplied from the first hydraulic pump 1 to the hydraulic oil tank. 30 is a center bypass type communicating with 30.
  • a check valve 13 for preventing a back flow to the first hydraulic pump 1 is provided in a pipe connecting the first main pipeline 31 and the inlet port 4c.
  • a throttle is provided in the internal oil passage communicating from the connection port 4e to the connection port 4a at the position A of the discharge valve 4. Furthermore, one end side of the communication pipe line 23 is connected to the connection port 4 e, and the other end side of the communication pipe line 23 is connected to the connection port 5 d of the return oil selection valve 5 via the regeneration control valve 8. Yes.
  • the boom cylinder 6 has a cylinder and a piston rod, and the cylinder includes a bottom side oil chamber 6a and a rod side oil chamber 6b.
  • One end side of the first pipe line 33 is connected to the bottom side oil chamber 6a, and the other end side of the first pipe line 33 is connected to the connection port 4a of the discharge valve 4 and the connection port 5a of the return oil selection valve 5. It is connected to the.
  • One end side of the second conduit 34 is connected to the rod side oil chamber 6b, and the other end side of the second conduit 34 is connected to the connection port 4b of the discharge valve 4 and the connection port 5b of the return oil selection valve 5. It is connected to the.
  • the first pipe 33 is provided with a pressure sensor 17 as a first pressure detection device that detects the pressure of the bottom side oil chamber 6a of the boom cylinder 6.
  • the pressure signal of the boom cylinder bottom side oil chamber 6 a detected by the pressure sensor 17 is input to the controller 21.
  • the arm cylinder 7 includes a cylinder and a piston rod, and the cylinder includes a bottom side oil chamber 7a and a rod side oil chamber 7b.
  • One end side of the third pipeline 35 is connected to the bottom side oil chamber 7 a, and the other end side of the third pipeline 35 is connected to the connection port 3 a of the control valve 3.
  • One end side of the fourth pipe line 36 is connected to the rod side oil chamber 7 b, and the other end side of the fourth pipe line 36 is connected to the connection port 3 b of the control valve 3.
  • the communication line 23 as a discharge line is for discharging the return oil from the bottom side oil chamber 6 a of the boom cylinder 6 to the hydraulic oil tank 30 from the return oil selection valve 5 through the discharge valve 4. .
  • a regeneration control valve 8 for switching whether to discharge or regenerate the return oil is provided at an intermediate portion of the communication conduit 23.
  • the regeneration control valve 8 is a two-position, three-port electromagnetic proportional valve, and includes an operation portion that receives a command from the controller 21, a spool portion, and a spring portion.
  • the communication conduit 23 is connected to two ports (one outlet port and an inlet port), and one end side of the regeneration conduit 24 is connected to one port (the other outlet port). .
  • the other end of the regeneration conduit 24 is connected to the inlet port 3c of the control valve 3 via a check valve 16 that permits only outflow from the regeneration conduit 24.
  • the spool When the regeneration control valve 8 does not receive a command signal from the controller 21, the spool is arranged at the communication position by a spring. Since the communication line 23 communicates, the return oil from the boom cylinder 6 is supplied to the discharge valve 4 and can be discharged to the hydraulic oil tank 30. On the other hand, the amount of return oil discharged to the hydraulic oil tank 30 is reduced by moving the spool according to a command signal from the controller 21, and the regeneration flow supplied to the control valve 3 through the regeneration conduit 24 is adjusted. To do.
  • the first operating device 9 includes an operating lever and a pilot valve 9a, and the pilot valve 9a generates a pilot pressure corresponding to the operation amount of the tilting operation of the operating lever.
  • a pilot line indicated by a broken line is connected to each operating portion 4 x, 4 y, 5 x, 5 y of the discharge valve 4 and the return oil selection valve 5.
  • a boom raising pilot pressure Pu corresponding to the operation amount of the operating lever is generated, and this boom raising pilot pressure Pu is operated by the operation portion 4x of the discharge valve 4 and the return oil selection valve 5.
  • the discharge valve 4 is switched to the boom raising direction (left position in the figure) and the return oil selection valve 5 is switched to the boom raising direction (right position in the figure) according to the pilot pressure.
  • a boom lowering pilot pressure Pd corresponding to the operation amount of the operating lever is generated, and this boom lowering pilot pressure Pd is used as the operating portion 4y of the discharge valve 4 and the return oil selection valve.
  • the discharge valve 4 is switched to the boom lowering direction (right position in the figure) and the return oil selection valve 5 is switched to the boom lowering direction (left position in the figure) according to the pilot pressure. .
  • the second operating device 10 includes an operating lever and a pilot valve 10a, and the pilot valve 10a generates a pilot pressure corresponding to the operation amount of the tilting operation of the operating lever.
  • pilot lines indicated by broken lines are connected to the operating portions 3 x and 3 y of the control valve 3.
  • a cloud pilot pressure Pc corresponding to the operation amount of the operation lever is generated, and this cloud pilot pressure Pc is supplied to the operation portion 3x of the control valve 3 and controlled according to the pilot pressure.
  • the valve 3 is switched in the cloud direction (left side position in the figure).
  • the boom lowering pilot line and the boom raising pilot line are provided with a pressure sensor 19 for detecting the boom lowering pilot pressure Pd and a pressure sensor 25 for detecting the boom raising pilot pressure Pu.
  • the pressure signals detected by these pressure sensors 19 and 25 are input to the controller 21.
  • the arm cloud pilot line and the arm dump pilot line are provided with a pressure sensor 26 for detecting the arm cloud pilot pressure Pc and a pressure sensor 20 for detecting the arm dump pilot pressure Pd.
  • the pressure signals detected by these pressure sensors 26 and 20 are input to the controller 21.
  • the controller 21 receives detection signals 118, 119, 120, 125, and 126 from the pressure sensors 18, 19, 20, 25, and 26, performs predetermined calculations based on these signals, and controls the regeneration control valve 8. Output a command.
  • the pressure sensor 19 and the pressure sensor 25 are first operation amount detectors that can detect the operation amount of the first operation device 9, and the pressure sensor 26 and the pressure sensor 20 are operation amounts of the second operation device 10. It is the 2nd operation amount detector which can detect.
  • the regeneration control valve 8 operates according to a control command from the controller 21. Specifically, the stroke is controlled by the electric signal supplied to the operation unit, and the opening degree (opening area) is controlled.
  • FIG. 3 is a characteristic diagram showing the opening area characteristics of the regeneration control valve constituting the first embodiment of the construction machine of the present invention.
  • the horizontal axis in FIG. 3 indicates the spool stroke of the regeneration control valve 8, and the vertical axis indicates the opening area.
  • the regeneration discharge flow rate adjustment that makes it possible to adjust the flow rate of the pressure oil flowing through the regeneration conduit 24 and the flow rate of the pressure oil flowing through the communication conduit 23 as a discharge conduit connected to the hydraulic oil tank 30.
  • the apparatus includes a discharge valve 4, a return oil selection valve 5, and a regeneration control valve 8.
  • the pressure oil from the first hydraulic pump 1 passes from the inlet port 4c of the discharge valve 4 through the internal oil passage and the connection port 4a, and through the first conduit 33 to the bottom side oil chamber 6a of the boom cylinder 6.
  • the pressure oil from the second hydraulic pump 2 passes from the inlet port 5 c of the return oil selection valve 5 through the internal oil passage and the connection port 5 a, and through the first pipe 33 to the bottom side oil chamber of the boom cylinder 6. 6a.
  • the return oil discharged from the rod side oil chamber 6b of the boom cylinder 6 passes through the second pipe 34, the connection port 5b of the return oil selection valve 5, the internal oil path, and the connection port 5d, and the communication pipe line. 23.
  • the pressure oil that has flowed in is discharged from the connection port 4e of the discharge valve 4 to the hydraulic oil tank 30 via the throttle provided in the internal oil passage and the outlet port 4d.
  • the pressure oil from the first hydraulic pump 1 and the second hydraulic pump 2 flows into the bottom side oil chamber 6a of the boom cylinder 6, and the pressure oil in the rod side oil chamber 6b is selected as a return oil.
  • the oil is discharged to the hydraulic oil tank 30 through the valve 5 and the discharge valve 4.
  • the piston rod of the boom cylinder 6 extends, and the boom moves in the raising direction.
  • the pressure oil from the first hydraulic pump 1 passes through the internal oil passage and the connection port 3a from the inlet port 3c of the control valve 3, and passes through the third conduit 35 to the bottom side oil chamber 7a of the arm cylinder 7. To be supplied.
  • the return oil discharged from the rod side oil chamber 7b of the arm cylinder 7 is supplied to the hydraulic oil tank 30 via the fourth pipe 36 and the connection port 3b of the control valve 3 through the internal oil passage and the outlet port 3d.
  • the pressure oil from the first hydraulic pump 1 flows into the bottom side oil chamber 7a of the arm cylinder 7, and the pressure oil in the rod side oil chamber 7b passes through the control valve 3 to the hydraulic oil tank. 30 is discharged.
  • the piston rod of the arm cylinder 7 extends, and the arm moves in the cloud direction.
  • the boom raising pilot pressure Pu generated from the pilot valve 9a is detected by the pressure sensor 25 and input to the controller 21.
  • the arm cloud pilot pressure Pc generated from the pilot valve 10 a is detected by the pressure sensor 26 and input to the controller 21.
  • the discharge pressure of the first hydraulic pump 1 is detected by the pressure sensor 18 and input to the controller 21.
  • the controller 21 calculates a command signal for the regeneration control valve 8 based on each input signal, and controls the opening stroke of the regeneration control valve 8.
  • the controller 21 calculates a command signal for the regeneration control valve 8 based on each input signal, and controls the opening stroke of the regeneration control valve 8.
  • the opening stroke of the regeneration control valve 8 By controlling the opening stroke of the regeneration control valve 8, the rod side oil of the boom cylinder 6 that has flowed into the communication conduit 23 from the connection port 5 b of the return oil selection valve 5 through the internal oil passage and the connection port 5 d.
  • the return oil discharged from the chamber 6 b flows into the regeneration conduit 24 through the regeneration control valve 8.
  • the return oil that has flowed into the regeneration conduit 24 flows into the inlet port 3 c of the control valve 3 through the check valve 16.
  • the return oil from the boom cylinder 6 that has flowed into the communication conduit 23 flows to the discharge side of the first hydraulic pump via the regeneration control valve 8 and is regenerated to the arm cylinder 7 via the control valve 3. Since the return oil from the boom cylinder 6 is regenerated in the bottom oil chamber 7a of the arm cylinder 7, the arm cylinder 7 can be operated efficiently.
  • the pressure oil from the first hydraulic pump 1 passes from the inlet port 4c of the discharge valve 4 through the internal oil passage and the connection port 4b, and then through the second conduit 34 to the rod side oil chamber 6b of the boom cylinder 6.
  • the pressure oil from the second hydraulic pump 2 passes from the inlet port 5c of the return oil selection valve 5 through the internal oil passage and the connection port 5b, and through the second pipe 34 to the rod side oil chamber of the boom cylinder 6. 6b.
  • the return oil discharged from the bottom side oil chamber 6a of the boom cylinder 6 passes through the first conduit 33, the connection port 5a of the return oil selection valve 5, the internal oil passage, and the connection port 5d, and the communication conduit. 23.
  • the pressure oil that has flowed in is discharged from the connection port 4e of the discharge valve 4 to the hydraulic oil tank 30 via the throttle provided in the internal oil passage and the outlet port 4d.
  • the pressure oil from the first hydraulic pump 1 and the second hydraulic pump 2 flows into the rod side oil chamber 6b of the boom cylinder 6, and the pressure oil in the bottom side oil chamber 6a is selected as a return oil.
  • the oil is discharged to the hydraulic oil tank 30 through the valve 5 and the discharge valve 4.
  • the piston rod of the boom cylinder 6 is shortened, and the boom operates in the lowering direction.
  • the pressure oil from the first hydraulic pump 1 passes from the inlet port 3c of the control valve 3 through the internal oil passage and the connection port 3b, and then through the fourth pipe 36 to the rod side oil chamber 7b of the arm cylinder 7. To be supplied.
  • the return oil discharged from the bottom side oil chamber 7a of the arm cylinder 7 is supplied to the hydraulic oil tank 30 via the third pipe 35, the connection port 3a of the control valve 3 and the internal oil passage and the outlet port 3d.
  • the pressure oil from the first hydraulic pump 1 flows into the rod side oil chamber 7 b of the arm cylinder 7, and the pressure oil in the bottom side oil chamber 7 a passes through the control valve 3 and is a hydraulic oil tank. 30 is discharged.
  • the piston rod of the arm cylinder 7 is reduced and the arm moves in the dumping direction.
  • the boom lowering pilot pressure Pd generated from the pilot valve 9a is detected by the pressure sensor 19 and input to the controller 21.
  • the arm dump pilot pressure Pd generated from the pilot valve 10 a is detected by the pressure sensor 20 and input to the controller 21.
  • the discharge pressure of the first hydraulic pump 1 is detected by the pressure sensor 18 and input to the controller 21.
  • the pressure in the bottom side oil chamber 6 a of the boom cylinder 6 is detected by the pressure sensor 17 and input to the controller 21.
  • the controller 21 calculates a command signal for the regeneration control valve 8 based on each input signal, and controls the opening stroke of the regeneration control valve 8.
  • the return oil selection valve 5 is discharged from the bottom oil chamber 6a of the boom cylinder 6 flowing into the communication pipe 23 from the connection port 5a through the connection port 5d.
  • the returned oil flows into the regeneration conduit 24 through the regeneration control valve 8.
  • the return oil that has flowed into the regeneration conduit 24 flows into the inlet port 3 c of the control valve 3 through the check valve 16.
  • the return oil from the boom cylinder 6 that has flowed into the communication conduit 23 flows to the discharge side of the first hydraulic pump via the regeneration control valve 8 and is regenerated to the arm cylinder 7 via the control valve 3.
  • the arm cylinder 7 can be accelerated.
  • the flow rate of the first hydraulic pump 1 can be suppressed by controlling the regulator 1a of the first hydraulic pump 1, the output of the driving device is suppressed and energy saving can be achieved.
  • the return oil selection valve 5 and the regeneration control valve 8 are the regeneration discharge flow rate adjusting devices that can control the return oil when the boom is raised or lowered to the regeneration side or the discharge side.
  • the discharge valve 4 can be constituted by three minimum required valves. Further, since the regeneration flow rate can be adjusted by the regeneration control valve 8 and the discharge flow rate can be adjusted by the discharge valve 4, good operability can be secured.
  • FIG. 4 is a block diagram of the controller constituting the first embodiment of the construction machine of the present invention
  • FIG. 5 is a characteristic showing the opening area characteristic of the discharge valve constituting the first embodiment of the construction machine of the present invention.
  • FIG. 4 and 5 the same reference numerals as those shown in FIGS. 1 to 3 are the same parts, and the detailed description thereof is omitted.
  • the controller 21 includes a function generator 133, a function generator 134, a subtractor 135, a function generator 136, a function generator 137, a multiplier 138, a multiplier 138, a function generator 139, and a function generator.
  • the detection signal 119 is a signal (lever operation signal) detected by the pressure sensor 19 in the operation pilot pressure Pd in the boom lowering direction of the operation lever of the first operation device 9, and the detection signal 120 is the second operation device 10.
  • the detection signal 117 is the pressure in the bottom side oil chamber 6 a of the boom cylinder 6 (in the first pipe 33.
  • Pressure is a signal (bottom pressure signal) detected by the pressure sensor 17
  • the detection signal 118 is a signal (pump pressure) detected by the pressure sensor 18 of the discharge pressure of the first hydraulic pump 1 (pressure of the first main line 31). Signal).
  • the detection signal 125 is a signal (lever operation signal) obtained by detecting the operation pilot pressure Pu in the boom raising direction of the operation lever of the first operation device 9 by the pressure sensor 25, and the detection signal 126 is an operation of the second operation device 10. This is a signal (lever operation signal) detected by the pressure sensor 26 with the operation pilot pressure Pc in the lever arm cloud direction.
  • the function generator 133 calculates the opening area on the regeneration side of the regeneration control valve 8 in accordance with the lever operation signal 119 for lowering the boom.
  • the function generator 133 is based on the opening area characteristic of the regeneration control valve 8 shown in FIG. Is set.
  • the output of the function generator 133 is input to the multiplier 138.
  • the horizontal axis in FIG. 3 indicates the spool stroke of the regeneration control valve 8, and the vertical axis indicates the opening area.
  • the spool stroke is the minimum, the discharge side passage is open and the opening area on the regeneration side is closed.
  • the opening area of the discharge side passage gradually decreases and the regeneration side passage opens and the opening area gradually increases. Therefore, the pressure oil discharged from the boom cylinder 6 is regenerated. It flows into the path 24. Further, since the opening area on the regeneration side can be changed by adjusting the stroke, the regeneration flow rate can be controlled.
  • the function generator 134 calculates a coefficient used in the multiplier according to the lever operation signal 120 of the arm dump, and the lever operation signal 120 reduces the minimum value 0 from 0 to a predetermined set value. When the lever operation signal exceeds the set value, 1 is output as the maximum value. The output of the function generator 134 is input to the multiplier 138.
  • the multiplier 138 receives the opening area calculated by the function generator 133 and the coefficient calculated by the function generator 134, and outputs the multiplication value as the opening area.
  • the output of the multiplier 138 is input to the multiplier 142. Even if the boom lowering lever operation signal 119 is input by this calculation, if the arm dump lever operation signal 120 is not input, the output from the multiplier 138 is 0, and the regeneration control valve 8 remains at the stroke 0. Become. This is a calculation for preventing the return oil supply destination from being lost when the boom lowering operation is performed but the arm dump operation is not performed and the control valve 3 is in a neutral state and cannot be regenerated. It is.
  • the subtractor 135 receives the bottom pressure signal 117 and the pump pressure signal 118, calculates the differential pressure, and outputs this differential pressure signal to the function generator 139.
  • the function generator 139 calculates a coefficient used in the multiplier according to the differential pressure calculated by the subtractor 135, and outputs a minimum value 0 from a differential pressure of 0 to a predetermined set value. When the set value is exceeded, the maximum value of 1 is output. The output of the function generator 139 is input to the multiplier 142.
  • the multiplier 142 inputs the opening area calculated by the multiplier 138 and the coefficient calculated by the function generator 139, and outputs the multiplication value as the opening area.
  • the output of the multiplier 142 is input to the maximum value selector 144.
  • the opening area of the regeneration control valve 8 calculated by the function generator 133 is determined to be unreproducible when the differential pressure is lower than the set value, and a signal for setting the regeneration-side opening area to 0 is output. Generated.
  • the differential pressure is higher than the set value, it is determined that regeneration is possible, and the opening area on the regeneration side is calculated to be the value output from the function generator 133.
  • the opening area characteristics of the discharge valve 4 are shown in FIG.
  • the horizontal axis of FIG. 5 shows the stroke of the discharge valve 4, and the vertical axis shows the opening area.
  • the boom raising pilot pressure Pu or the boom lowering pilot pressure Pd is input to the operation portions 4x and 4y of the discharge valve 4, the stroke increases according to the pilot pressure. Therefore, the opening area increases as the pilot pressure increases, and the return oil flowing into the discharge valve 4 is appropriately throttled according to the lever operation amount.
  • the discharge valve 4 has two operation units 4x and 4y, and the characteristics can be set independently.
  • the function generator 136 calculates the opening area of the regeneration side of the regeneration control valve 8 in accordance with the lever operation signal 125 for raising the boom.
  • the stroke of the regeneration control valve 8 is increased to increase the regeneration-side opening area, so that the regeneration flow rate is increased.
  • the output of the function generator 136 is input to the multiplier 141.
  • the function generator 137 calculates a coefficient used in the multiplier according to the lever operation signal 126 of the arm cloud, and the lever operation signal 126 outputs a minimum value 0 from 0 to a predetermined set value. When the signal exceeds the set value, the maximum value of 1 is output. The output of the function generator 137 is input to the multiplier 141.
  • the multiplier 141 receives the opening area calculated by the function generator 136 and the coefficient calculated by the function generator 137, and outputs the multiplication value as the opening area.
  • the output of the multiplier 141 is input to the multiplier 143.
  • the function generator 140 calculates a coefficient used in the multiplier in accordance with the pump pressure signal 118, and the pump pressure signal 118 outputs a minimum value 0 from 0 to a predetermined set value. When the set value is exceeded, the maximum value of 1 is output. The output of the function generator 140 is input to the multiplier 143.
  • the multiplier 143 inputs the opening area calculated by the multiplier 141 and the coefficient calculated by the function generator 140, and outputs the multiplication value as the opening area.
  • the output of the multiplier 143 is input to the maximum value selector 144.
  • This calculation is performed to regenerate the return oil in the rod side oil chamber 6b to the arm cylinder 7 only when the excavation reaction force acts on the boom cylinder 6 and the rod side oil chamber 6b of the boom cylinder 6 becomes high pressure. It is.
  • the determination of the excavation state is determined by the pump pressure signal 118. Only when the pump pressure signal is high, the regeneration control valve 8 is connected to the regeneration line 24 according to the output of the multiplier 141. Control to connect.
  • the function generator 140 when the pump pressure signal 118 is equal to or lower than the set value, the function generator 140 outputs 0, and 0 is output from the multiplier 143 regardless of the multiplier 141 force.
  • the return oil is guided to the discharge valve 4 to perform control to reduce excess loss.
  • the determination at the time of excavation may use a pressure signal of the bottom side oil chamber 7a of the arm cylinder 7 or a pressure signal of the rod side oil chamber 6b of the boom cylinder 6.
  • the maximum value selector 144 receives the output of the multiplier 142 and the output of the multiplier 143, and outputs either maximum value.
  • the output of the maximum value selector 144 is input to the output conversion unit 146.
  • one of the output of the multiplier 142 and the output of the multiplier 143 is always zero. This is because the boom raising operation and the boom lowering operation cannot be performed at the same time, so that one of the function generators 133 and 136 is always zero.
  • the relationship between the arm cloud operation and the arm dump operation is the same.
  • the maximum value selector 144 calculates the regeneration side opening area of the regeneration control valve 8 required when the boom is raised or lowered.
  • the output conversion unit 146 converts the input regeneration-side opening area of the regeneration control valve 8 and outputs it as an electromagnetic valve command 108A that is a control command to the regeneration control valve 8. As a result, the regeneration-side opening area of the regeneration control valve 8 is controlled to a desired value.
  • the function generator 133 calculates an opening area signal on the regeneration side of the regeneration control valve 8 and outputs it to the multiplier 138.
  • the function generator 134 outputs 1 to the multiplier 138 when the arm dump operation has been entered and can be reproduced, and 0 otherwise.
  • the multiplier 138 corrects the opening area signal of the regeneration control valve 8 output from the function generator 133 and outputs the corrected signal to the multiplier 142.
  • the bottom pressure signal 117 and the pump pressure signal 118 are input to the subtractor 135 to calculate a differential pressure signal.
  • the differential pressure signal is input to the function generator 139, and the function generator 139 determines whether reproduction is possible or not, and outputs 1 to the multiplier 142 when reproduction is possible and 0 when it is impossible.
  • the multiplier 142 corrects the opening area signal of the regeneration control valve 8 output from the function generator 133 and outputs the corrected signal to the maximum value selector 144.
  • the function generator 136 calculates an opening area signal on the regeneration side of the regeneration control valve 8 and outputs it to the multiplier 141.
  • the function generator 137 outputs 1 to the multiplier 141 when the arm cloud operation is entered and can be reproduced, and 0 when it cannot.
  • the multiplier 141 corrects the opening area signal of the regeneration control valve 8 output from the function generator 136 and outputs the corrected signal to the multiplier 143.
  • the pump pressure signal 118 is input to the function generator 140, and the function generator 140 determines whether or not it is in the excavation state, and outputs 1 to the multiplier 143 when it is in the excavation state and 0 when it is not in the excavation state.
  • the multiplier 143 corrects the opening area signal of the regeneration control valve 8 output from the function generator 136 and outputs the corrected signal to the maximum value selector 144.
  • the maximum value selector 144 calculates the regeneration-side opening area of the regeneration control valve 8 required when the boom is raised or lowered, and is output to the output conversion unit 146.
  • the output converter 146 outputs and converts the input opening area of the regeneration control valve 8 and outputs it as an electromagnetic valve command 108 ⁇ / b> A that is a control command to the regeneration control valve 8. As a result, the opening area on the regeneration side of the regeneration control valve 8 can be controlled to a desired value.
  • the return oil when the boom is raised or lowered is appropriately throttled by the regeneration control valve 8 at the time of regeneration, and is appropriately throttled by the discharge valve 4 even when it is not regenerated. .
  • good operability can be ensured.
  • the return oil at the time of raising or lowering the boom can be regenerated while only adjusting the flow rate with only the three valves of the regeneration control valve 8, the return oil selection valve 5, and the discharge valve 4, it is good. Operability can be secured.
  • the return oil can be regenerated at the time of both the boom raising operation and the boom lowering operation with a small number of valve configurations. Good operability can be secured during both boom lowering operations.
  • the return oil during the boom raising operation is regenerated in the bottom oil chamber 7a of the arm cylinder 7 is described as an example.
  • This is a configuration in which an effect is obtained during gravel loading operation or horizontal pulling operation of a normal hydraulic excavator.
  • the return oil during the boom raising operation may be regenerated to the rod side oil chamber 7b of the arm cylinder 7 or another hydraulic actuator as necessary.
  • the return oil during the boom lowering operation may be regenerated to the bottom side oil chamber 7a of the arm cylinder 7 and other hydraulic actuators.
  • pressure oil is supplied to the boom cylinder 6 from the first hydraulic pump 1 that can supply pressure oil to the boom cylinder 6 and the arm cylinder 7 via the discharge valve 4, and pressure is applied to the boom cylinder 6.
  • the first hydraulic pump 1 that can supply pressure oil to the boom cylinder 6 and the arm cylinder 7 via the discharge valve 4
  • pressure oil is applied to the boom cylinder 6.
  • pressure oil may be supplied to the boom cylinder 6 from the first hydraulic pump 1 via the return oil selection valve 5 and from the second hydraulic pump 2 via the discharge valve 4. This enables, for example, a connection that is most easily configured when the valves are manufactured integrally.
  • the controller 21 calculates the differential pressure from the bottom pressure signal 117 and the pump pressure signal 118, and does not perform regeneration during the boom lowering operation when the differential pressure is equal to or less than the set value. Although control is being performed, such control is necessary in the case of a construction machine in which the return oil pressure during the boom lowering operation is necessarily higher than the pressure in the rod side oil chamber 7b of the arm cylinder 7. do not do.
  • the controller 21 takes in the pump pressure signal 118, and when the pump pressure signal 118 is equal to or lower than the set value, control is performed so that regeneration is not performed during the boom raising operation.
  • the pump pressure signal 118 is equal to or lower than the set value
  • control is performed so that regeneration is not performed during the boom raising operation.
  • FIG. 6 is a schematic diagram of a hydraulic drive system constituting a second embodiment of the construction machine of the present invention
  • FIG. 7 is a block diagram of a controller constituting the second embodiment of the construction machine of the present invention. 6 and 7, the same reference numerals as those shown in FIGS. 1 to 5 are the same parts, and detailed description thereof is omitted.
  • the outline of the hydraulic drive system is substantially the same as that of the first embodiment, except that the regeneration control valve 8 is replaced with a regeneration valve 41 and a discharge valve 42. And the point which replaced the discharge valve 4 with the 2nd control valve 40 differs from 1st Embodiment.
  • the regeneration control valve 8 of the first embodiment is used as the regeneration valve 41 and the discharge valve 42, and the opening degree is controlled by the controller 21A, so that finer flow rate control is possible.
  • the function of controlling the return oil of the discharge valve 4 in the first embodiment is performed by the discharge valve 42, the second control having only the function of switching and supplying the pressure oil of the first hydraulic pump 1 to the boom cylinder 6 is performed.
  • the valve 40 has been replaced.
  • a discharge valve 42 which is a 2-position 2-port electromagnetic proportional valve capable of adjusting the flow rate of the return oil
  • a regeneration valve 41 which is a 2-position 2-port electromagnetic proportional valve capable of adjusting the regeneration flow rate
  • the second control valve 40 is a three-position six-port switching control valve, and the control valve position is switched by the pilot pressure supplied to both pilot operation portions 40x and 40y, so that the opening area of the hydraulic oil flow path To change.
  • the second control valve 40 includes an inlet port 40c to which pressure oil from the first hydraulic pump 1 is supplied, a center port 40T communicating with the neutral position, and a connection port 40a connected to the boom cylinder 6 side. 40b, and is a center bypass type that communicates the hydraulic oil from the first hydraulic pump 1 to the hydraulic oil tank 30 when in the neutral position.
  • a check valve 13 for preventing a backflow to the first hydraulic pump 1 is provided in a pipe connecting the first main pipeline 31 and the inlet port 40c.
  • the configuration of the controller 21A in the present embodiment is different from the configuration of the controller 21 in the first embodiment in the following points.
  • (A) Function generators 133 and 136 to which a lever operation signal 119 that is a boom lowering operation amount and a lever operation signal 125 that is a boom raising operation amount are input are replaced with function generators 147 and 148.
  • function generators 134 and 137 to which a lever operation signal 120 that is an arm dump operation amount and a lever operation signal 126 that is an arm cloud operation amount are input are replaced with function generators 152 and 153.
  • the function generator 147 and the function generator 148 calculate an opening area signal that is controlled by the diaphragm on the discharge side when normal regeneration is not performed. That is, an opening area equal to the opening area of the discharge valve 4 in the first embodiment is calculated.
  • the opening area signal output from the function generator 147 and the function generator 148 is referred to as a target opening area signal.
  • the function generator 152 calculates a coefficient used in the multiplier according to the lever operation signal 120 which is an arm dump operation amount. When the lever operation signal 120 is 0, the function generator 152 outputs a minimum value of 0. The output is increased as 120 increases, and 1 is output as the maximum value. The value output from the function generator 152 is output to the multiplier 138 and corrects the target opening area.
  • the function generator 153 calculates a coefficient used in the multiplier according to the lever operation signal 126 that is the arm cloud operation amount. When the lever operation signal 126 is 0, the function generator 153 outputs a minimum value of 0, and the lever operation signal The output is increased as 126 increases, and 1 is output as the maximum value. The value output from the function generator 153 is output to the multiplier 141 to correct the target opening area.
  • the calculation based on the outputs of the function generator 152 and the function generator 153 enables finer control according to the arm operation with respect to the ON / OFF control of whether or not reproduction is possible in the first embodiment. .
  • the target opening area signal corrected by the multiplier 138, the multiplier 142, the multiplier 141, and the multiplier 143 is output to the regeneration valve 41 as the electromagnetic valve command 141A via the maximum value selector 144 and the output converter 151. Is done. As a result, the regeneration valve 41 is throttled so that the target opening area calculated by the controller 21 is obtained.
  • the second maximum value selector 149 selects either the maximum value of the output of the function generator 147 or the output of the function generator 148, and the discharge valve 42 is not regenerated when the boom is lowered or the boom is raised. An opening area signal is output.
  • the second subtractor 150 is a regeneration valve that is the output of the maximum value selector 144 based on the opening area signal of the discharge valve 42 when the boom is lowered or the boom is not regenerated when the boom is lowered, which is the output of the second maximum value selector 149.
  • the target opening area signal 41 is subtracted, calculated as a target opening area signal for the discharge valve 42, and output to the discharge valve 42 as an electromagnetic valve command 142A via the output converter 151.
  • the opening area of the discharge valve 42 is subtracted by the opening area that flows to the regeneration side by the regeneration valve 41, so that the discharge valve 42 is narrowed more than when it is not regenerated.
  • the return oil discharged to the hydraulic oil tank 30 decreases and a large flow rate flows on the regeneration side.
  • the function generator 152 or the function generator 153 outputs 1, that is, when the maximum return oil can be regenerated to the arm cylinder 7, the target opening area calculated by the function generator 147 and the function generator 148 is obtained. Since the signal is directly input to the second subtracter 150 via the maximum value selector 144, the output of the second subtracter 150 becomes zero. As a result, the discharge valve 42 is closed, so that all of the return oil is regenerated.
  • the output of the second subtractor 150 remains the output of the second maximum value selector 149, and all the return oil is discharged.
  • the oil is discharged to the hydraulic oil tank 30 through the valve 42 and is appropriately throttled with the opening area set by the function generator 147 and the function generator 148.
  • the return oil when the boom is raised or lowered is appropriately throttled by the regeneration valve 41 at the time of regeneration.
  • the aperture is controlled appropriately.
  • the return oil at the time of raising or lowering the boom can be regenerated with only the three valves of the regeneration valve 41, the return oil selection valve 5 and the discharge valve 42, the flow rate is appropriately adjusted, so that the operation is good. Sex can be secured.
  • the flow rates on the regeneration side and the discharge side can be controlled independently, so that finer adjustment is possible and good operability is achieved. Can be secured.
  • FIG. 8 is a schematic view of a hydraulic drive system constituting a third embodiment of the construction machine of the present invention.
  • the same reference numerals as those shown in FIGS. 1 to 7 are the same parts, and detailed description thereof is omitted.
  • the outline of the hydraulic drive system is substantially the same as that of the first embodiment, but the controller 21 and the pressure sensors 17, 18, 19, 20, 25, 26 are the same.
  • the regeneration control valve 8 which is an electromagnetic proportional valve are omitted, and all the electrically controlled valves are changed to hydraulically operated valves.
  • the first logic valve 27, the second logic valve 28, and the high pressure selection valve 29 are provided as corresponding to the pressure sensor and the controller 21, and the regeneration control valve 8 that is an electromagnetic proportional valve is hydraulically driven to the regeneration control valve 43. Has been replaced.
  • a regeneration control valve 43 for switching whether to return the oil to the intermediate part of the communication pipe 23 or to regenerate.
  • the regeneration control valve 43 is a two-position, three-port control valve, and includes an operation portion 43 a that receives pilot pressure from the high-pressure selection valve 29, a spool portion, and a spring portion.
  • the communication conduit 23 is connected to two ports (one outlet port and an inlet port), and one end side of the regeneration conduit 24 is connected to one port (the other outlet port). .
  • the first logic valve 27 is a 2-position 2-port switching valve, and includes an operation portion 27a to which an arm cloud pilot pressure Pc from the pilot valve 10a is supplied via a pilot oil passage, a spool portion, and a spring portion. Yes.
  • the boom raising pilot pressure Pu from the pilot valve 9 a is supplied to the inlet port of the first logic valve 27 through the pilot oil passage, and the outlet port of the first logic valve 27 is one input port of the high pressure selection valve 29. Is connected via a pilot oil passage.
  • the second logic valve 28 is a 2-position 2-port switching valve, and includes an operation portion 28a to which an arm dump pilot pressure Pd from the pilot valve 10a is supplied via a pilot oil passage, a spool portion, and a spring portion. Yes.
  • the boom lowering pilot pressure Pd from the pilot valve 9 a is supplied to the inlet port of the second logic valve 28 via the pilot oil passage, and the outlet port of the second logic valve 28 is the other input port of the high pressure selection valve 29. Is connected via a pilot oil passage.
  • the first logic valve 27 is closed in the normal position, and even if the boom raising pilot pressure Pu is applied, if the switching is not performed by supplying the arm cloud pilot pressure Pc, the first logic valve 27 is directed to the high pressure selection valve 29 that is the output of the logic valve. The supplied pilot pressure is zero. Conversely, even if the first logic valve 27 is switched by the arm cloud pilot pressure Pc, when the boom raising pilot pressure Pu is 0, the pilot pressure output from the first logic valve 27 is 0. . That is, the first logic valve 27 outputs the pilot pressure when both the boom raising pilot pressure Pu and the arm cloud pilot pressure Pc are input. This means that when a boom raising operation and an arm cloud operation are performed, a signal for switching the regeneration control valve 43 is output in order to regenerate the return oil during the boom raising operation to the bottom oil chamber 7a of the arm cylinder 7. It means that.
  • the second logic valve 28 outputs the pilot pressure when both the boom lowering pilot pressure Pd from the pilot valve 9a and the arm dump pilot pressure Pd from the pilot valve 10a are input. This means that when a boom lowering operation and an arm dumping operation are performed, a signal for switching the regeneration control valve 43 is output in order to regenerate the return oil during the boom lowering operation to the rod side oil chamber 7b of the arm cylinder 7. It means that.
  • the pilot pressure output from the first logic valve 27 and the second logic valve 28 is supplied to the high pressure selection valve 29, whichever higher pressure is supplied to the operation unit 43 a of the regeneration control valve 43. Switch. In this case, since the boom raising pilot pressure Pu and the boom lowering pilot pressure Pd are not output simultaneously, the pilot pressure is not output simultaneously from the first logic valve 27 and the second logic valve 28. That is, one of the control signal for regeneration during boom raising arm crowding or the control signal for regeneration during boom lowering arm dumping is input to the regeneration control valve 43. By switching the regeneration control valve 43, the return oil that has flowed into the communication conduit 23 is regenerated to the arm cylinder 7 via the regeneration control valve 43.
  • the boom lowering is performed as described in the first embodiment. It may be applied to a construction machine in which the return oil pressure during operation is always higher than the pressure in the rod side oil chamber 7b of the arm cylinder 7, or a construction machine in which speed is more important than efficiency when the boom is raised. .

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Fluid-Pressure Circuits (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

少ない数量の弁構成で、ブーム上げ操作とブーム下げ操作の両方の操作時における戻り油の再生を可能とし、ブーム上げ操作とブーム下げ操作の両方の操作時における良好な操作性を確保できる建設機械を提供する。 第1油圧アクチュエータと、第2油圧アクチュエータと、タンクと、前記第2油圧アクチュエータに圧油を供給する第1油圧ポンプを備えた建設機械において、前記第1油圧アクチュエータの上げ操作時または下げ操作時に発生する戻り油の供給元を選択して排出する戻り油選択装置と、前記戻り油選択装置から排出された圧油を前記第2油圧アクチュエータと前記第1油圧ポンプの間に供給して再生する再生管路と、前記戻り油選択装置から排出された圧油を前記タンクに排出する排出管路と、前記再生管路を流れる圧油の流量と前記排出管路を流れる圧油の流量とを調整可能な再生排出流量調整装置とを備えた。

Description

建設機械
 本発明は、建設機械に係り、さらに詳しくは、油圧ショベル等の油圧アクチュエータを備え、油圧アクチュエータからの圧油を再生する再生回路を備えた建設機械に関する。
 建設機械において、エンジンの燃費を向上させて省エネルギ化を図るために、油圧アクチュエータからの戻り油を制御弁を介して再生する技術が知られており、その例が特許文献1と特許文献2に記載されている。
 特許文献1には、建設機械における作業装置を駆動するためのブームシリンダにおいて、その自重落下時にボトム側油室から排出される動力を制御弁を介して他の油圧アクチュエータの駆動に再生させる油圧制御装置が記載されている。
 また、特許文献2は、従来タンクに排出されていた戻り油を効率良く利用するために、油圧ショベルがブーム上げとアームクラウドの複合動作を行う掘削時において、ブームシリンダのロッド側油室の高圧油をアームシリンダのボトム側油室に再生させる油圧駆動装置が記載されている。
特許第5296570号公報 特許第4562948号公報
 上述した従来技術によれば、ブーム下げ操作時またはブーム上げ操作時における、ブームシリンダからの戻り油を再生することができるため、省エネルギ化を図ることができる。しかし、いずれの従来技術も、ブーム下げ時またはブーム上げ時のいずれかの操作時における戻り油の再生についてのみ記載されていて、ブーム上げ操作とブーム下げ操作の両方の操作における戻り油の再生に対応する技術については、言及していない。
 従来技術を基に、ブーム上げ操作とブーム下げ操作の両方の操作時に戻り油の再生を行おうとすると、ブーム上げ操作時の戻り油をタンクに排出する弁と再生する弁、ブーム下げ操作時の戻り油をタンクに排出する弁と再生する弁の合計4つの弁が必要になるので、油圧機器の大型化を招く虞がある。
 また、ブーム上げ操作時とブーム下げ操作時のタンクへの排出量と再生流量とを適切に制御することが、操作性を維持するために必要であり、例えば単純な切換回路ではオペレータに大きな違和感を与えてしまうので、回路の複雑化が必要となり、生産性を悪化させる虞がある。
 本発明は、上述の事柄に基づいてなされたもので、その目的は、少ない数量の弁構成で、ブーム上げ操作とブーム下げ操作の両方の操作時における戻り油の再生を可能とし、ブーム上げ操作とブーム下げ操作の両方の操作時における良好な操作性を確保できる建設機械を提供するものである。
 上記課題を解決するために、例えば特許請求の範囲に記載の構成を採用する。本願は、上記課題を解決する手段を複数含んでいるが、その一例を挙げるならば、第1油圧アクチュエータと、第2油圧アクチュエータと、タンクと、前記第2油圧アクチュエータに圧油を供給する第1油圧ポンプを備えた建設機械において、前記第1油圧アクチュエータの上げ操作時または下げ操作時に発生する戻り油の供給元を選択して排出する戻り油選択装置と、前記戻り油選択装置から排出された圧油を前記第2油圧アクチュエータと前記第1油圧ポンプの間に供給して再生する再生管路と、前記戻り油選択装置から排出された圧油を前記タンクに排出する排出管路と、前記再生管路を流れる圧油の流量と前記排出管路を流れる圧油の流量とを調整可能な再生排出流量調整装置とを備えたことを特徴とする。
 本発明によれば、少ない数量の弁構成で、ブーム上げ操作とブーム下げ操作の両方の操作時における戻り油の再生を可能とし、ブーム上げ操作とブーム下げ操作の両方の操作時における良好な操作性を確保できる。
本発明の建設機械の第1の実施の形態である油圧ショベルを示す側面図である。 本発明の建設機械の第1の実施の形態を構成する油圧駆動システムの概略図である。 本発明の建設機械の第1の実施の形態を構成する再生制御弁の開口面積特性を示す特性図である。 本発明の建設機械の第1の実施の形態を構成するコントローラのブロック図である。 本発明の建設機械の第1の実施の形態を構成する排出弁の開口面積特性を示す特性図である。 本発明の建設機械の第2の実施の形態を構成する油圧駆動システムの概略図である。 本発明の建設機械の第2の実施の形態を構成するコントローラのブロック図である。 本発明の建設機械の第3の実施の形態を構成する油圧駆動システムの概略図である。
 以下、本発明の建設機械の実施の形態を図面を用いて説明する。
 図1は本発明の建設機械の第1の実施の形態である油圧ショベルを示す側面図、図2は本発明の建設機械の第1の実施の形態を構成する油圧駆動システムの概略図である。 
 図1において、油圧ショベルは下部走行体201と上部旋回体202とフロント作業機203を備えている。下部走行体201は左右のクローラ式走行装置201a,201a(片側のみ図示)を有し、左右の走行モータ201b,201b(片側のみ図示)により駆動される。上部旋回体202は下部走行体201上に旋回可能に搭載され、旋回モータ202aにより旋回駆動される。フロント作業機203は上部旋回体202の前部に俯仰可能に取り付けられている。上部旋回体202にはキャビン(運転室)202bが備えられ、キャビン202b内には後述する操作装置が配置されている。
 フロント作業機203はブーム205(第1被駆動体)、アーム206(第2被駆動体)、バケット207を有する多関節構造であり、ブーム205は第1油圧アクチュエータであるブームシリンダ3の伸縮により上部旋回体202に対して上下方向に回動し、アーム206は第2油圧アクチュエータであるアームシリンダ7の伸縮によりブーム205に対して上下及び前後方向に回動し、バケット207はバケットシリンダ208の伸縮によりアーム206に対して上下及び前後方向に回動する。
 図2に示す本実施の形態を構成する油圧駆動システムは、ブームシリンダ6と、アームシリンダ7に関するシステムのみを例示している。この油圧駆動システムは、図示しないエンジンに駆動される可変容量型の第1油圧ポンプ1と第2油圧ポンプ2と、第1油圧ポンプ1及び第2油圧ポンプ2の少なくとも一方から圧油が供給され、油圧ショベルのブーム205を駆動するブームシリンダ6(第1油圧アクチュエータ)と、第1油圧ポンプ1及びブームシリンダ6の戻り油の少なくとも一方から圧油が供給され、油圧ショベルのアーム206を駆動するアームシリンダ7(第2油圧アクチュエータ)と、第1油圧ポンプ1からアームシリンダ7に供給される圧油の流れ(流量と方向)を制御する制御弁3と、第1油圧ポンプ1からブームシリンダ6に供給される圧油の流れ(流量と方向)とブームシリンダ6の戻り油の排出流量を制御する排出弁4と、第2油圧ポンプ2からブームシリンダ6に供給される圧油の流れ(流量と方向)とブームシリンダ6の戻り油の供給元を選択制御する戻り油選択装置としての戻り油選択弁5と、戻り油の再生流量と排出流量とを制御する再生制御弁8と、ブーム205の動作指令を出力し排出弁4と戻り油選択弁5を切り換える第1操作装置9と、アーム206の動作指令を出力し制御弁3を切り換える第2操作装置11とを備えている。第1油圧ポンプ1と第2油圧ポンプ2は図示しない他のアクチュエータにも圧油が供給されるように図示しない制御弁にも接続されているが、それらの回路部分は省略している。
 第1油圧ポンプ1と第2油圧ポンプは可変容量型であり、吐出流量調整手段であるレギュレータ1a,2aをそれぞれ備え、コントローラ21(後述)からの制御信号によってレギュレータ1a,2aを制御することで第1及び第2油圧ポンプ1,2の傾転角(容量)が制御され、吐出流量が制御される。
 第1油圧ポンプ1から吐出される圧油を、ブームシリンダ6、アームシリンダ7へ供給する第1主管路31には、上流側から制御弁3と排出弁4が直列に配置されている。第2油圧ポンプ2から吐出される圧油を、ブームシリンダ6へ供給する第2主管路32には、戻り油選択弁5が配置されている。なお、第1主管路31には、第1油圧ポンプの吐出する圧油の圧力を検出する第2圧力検出装置としての圧力センサ18が設けられている。圧力センサ18が検出した第1油圧ポンプの吐出圧信号は、コントローラ21に入力されている。
 制御弁3は、3位置6ポートの切替制御弁であって、その両操作部3x、3yへ供給されるパイロット圧力により、制御弁位置を切り替えて、作動油の流路の開口面積を変化させる。このことにより、第1油圧ポンプ1からアームシリンダ7へ供給される作動油の方向と流量を制御して、アームシリンダ7を駆動している。また、制御弁3は、第1油圧ポンプ1からの圧油が供給される入口ポート3cと、作動油タンク30に連通する出口ポート3dと、中立位置のときに連通するセンターポート3Tと、アームシリンダ7側に接続する接続ポート3a,3bとを有していて、中立位置のときには、第1油圧ポンプ1からの圧油を作動油タンク30に連通するセンタバイパス型である。なお、第1主管路31と入口ポート3cとを接続する配管に第1油圧ポンプ1への逆流を防止するチェック弁15が設けられている。
 排出弁4は3位置7ポートの切替制御弁であり、戻り油選択弁5は3位置6ポートの切替制御弁であって、その両操作部4x、5x、4y、5yへ供給されるパイロット圧力により、制御弁位置を切り替えて、作動油の油路の開口面積を変化させる。具体的には、操作部4yと5yにパイロット圧力が供給されると、排出弁4は左方向へ移動し、戻り油選択弁5は右方向へ移動し、それぞれA位置に切換えられる。逆に、操作部4xと5xにパイロット圧力が供給されると、排出弁4は右方向へ移動し、戻り油選択弁5は左方向へ移動し、それぞれB位置に切換えられる。これらの動作により、第1油圧ポンプ1及び第2油圧ポンプ2の少なくとも一方からブームシリンダ6へ供給される作動油の方向と流量を制御して、ブームシリンダ6を駆動している。
 また、戻り油選択弁5は、第2油圧ポンプ2からの圧油が供給される入口ポート5cと、後述する連通管路23に連通する接続ポート5dと、中立位置のときに連通するセンターポート5Tと、ブームシリンダ6側に接続する接続ポート5a,5bとを有していて、中立位置のときには、第2油圧ポンプ2からの圧油を作動油タンク30に連通するセンタバイパス型である。なお、第2主管路32と入口ポート5cとを接続する配管に第2油圧ポンプ2への逆流を防止するチェック弁12が設けられている。また、戻り油選択弁5のA位置における接続ポート5aから接続ポート5dへ連通する内部油路には絞りが設けられている。
 また、排出弁4は、第1油圧ポンプ1からの圧油が供給される入口ポート4cと、作動油タンク30に連通する出口ポート4dと、後述する連通管路23に連通する接続ポート4eと、中立位置のときに連通するセンターポート4Tと、ブームシリンダ6側に接続する接続ポート4a,4bとを有していて、中立位置のときには、第1油圧ポンプ1からの圧油を作動油タンク30に連通するセンタバイパス型である。なお、第1主管路31と入口ポート4cとを接続する配管に第1油圧ポンプ1への逆流を防止するチェック弁13が設けられている。また、排出弁4のA位置における接続ポート4eから接続ポート4aへ連通する内部油路には絞りが設けられている。更に、接続ポート4eには、連通管路23の一端側が接続されていて、連通管路23の他端側は、再生制御弁8を介して戻り油選択弁5の接続ポート5dに接続されている。
 ブームシリンダ6は、シリンダとピストンロッドとを有していて、シリンダは、ボトム側油室6aとロッド側油室6bとを備えている。ボトム側油室6aには、第1管路33の一端側が接続されていて、第1管路33の他端側は、排出弁4の接続ポート4aと戻り油選択弁5の接続ポート5aとに接続されている。ロッド側油室6bには、第2管路34の一端側が接続されていて、第2管路34の他端側は、排出弁4の接続ポート4bと戻り油選択弁5の接続ポート5bとに接続されている。なお、第1管路33には、ブームシリンダ6のボトム側油室6aの圧力を検出する第1圧力検出装置としての圧力センサ17が設けられている。圧力センサ17が検出したブームシリンダボトム側油室6aの圧力信号は、コントローラ21に入力されている。
 アームシリンダ7は、シリンダとピストンロッドとを有していて、シリンダは、ボトム側油室7aとロッド側油室7bとを備えている。ボトム側油室7aには、第3管路35の一端側が接続されていて、第3管路35の他端側は、制御弁3の接続ポート3aに接続されている。ロッド側油室7bには、第4管路36の一端側が接続されていて、第4管路36の他端側は、制御弁3の接続ポート3bに接続されている。
 排出管路としての連通管路23は、ブームシリンダ6のボトム側油室6aからの戻り油を戻り油選択弁5から排出弁4を介して、作動油タンク30に排出するためのものである。連通管路23の中間部には、戻り油を排出するか再生するかを切り換える再生制御弁8が設けられている。再生制御弁8は、2位置3ポートの電磁比例弁であって、コントローラ21からの指令を受ける操作部とスプール部とばね部とを備えている。再生制御弁8は、2つのポート(一方の出口ポートと入口ポート)に連通管路23が接続され、1つのポート(他方の出口ポート)には、再生管路24の一端側が接続されている。再生管路24の他端側は、再生管路24からの流出のみを許可するチェック弁16を介して制御弁3の入口ポート3cに接続されている。
 再生制御弁8は、コントローラ21からの指令信号がないときには、ばねによりスプールを連通位置に配置する。連通管路23が連通するので、ブームシリンダ6からの戻り油は排出弁4へ供給され作動油タンク30へ排出可能となる。一方、コントローラ21からの指令信号によって、スプールを移動させることで、戻り油の作動油タンク30への排出量を減少させて、再生管路24を介して制御弁3へ供給する再生流量を調整する。
 第1操作装置9は、操作レバーとパイロット弁9aとを備えていて、パイロット弁9aは、操作レバーの傾動操作の操作量に応じたパイロット圧を発生させている。第1操作装置9からは、破線で示すパイロットラインが排出弁4と戻り油選択弁5の各操作部4x、4y、5x、5yに接続されている。操作レバーをブーム上げ側に操作すると、操作レバーの操作量に応じたブーム上げパイロット圧Puが生成され、このブーム上げパイロット圧Puは、排出弁4の操作部4xと戻り油選択弁5の操作部5xに供給され、このパイロット圧に応じて排出弁4はブーム上げ方向(図示左側の位置)に、戻り油選択弁5はブーム上げ方向(図示右側の位置)に、それぞれ切換えられる。同様に、操作レバーをブーム下げ側に操作すると、操作レバーの操作量に応じたブーム下げパイロット圧Pdが生成され、このブーム下げパイロット圧Pdは、排出弁4の操作部4yと戻り油選択弁5の操作部5yに供給され、このパイロット圧に応じて排出弁4はブーム下げ方向(図示右側の位置)に、戻り油選択弁5はブーム下げ方向(図示左側の位置)に、それぞれ切換えられる。
 第2操作装置10は、操作レバーとパイロット弁10aとを備えていて、パイロット弁10aは、操作レバーの傾動操作の操作量に応じたパイロット圧を発生させている。第2操作装置10からは、破線で示すパイロットラインが制御弁3の操作部3x、3yに接続されている。操作レバーをクラウド側に操作すると、操作レバーの操作量に応じたクラウドパイロット圧Pcが生成され、このクラウドパイロット圧Pcは、制御弁3の操作部3xに供給され、このパイロット圧に応じて制御弁3はクラウド方向(図示左側の位置)に切換えられる。同様に、操作レバーをダンプ側に操作すると、操作レバーの操作量に応じたダンプパイロット圧Pdが生成され、このダンプパイロット圧Pdは、制御弁3の操作部3yに供給され、このパイロット圧に応じて制御弁3はダンプ方向(図示右側の位置)に切換えられる。
 ブーム下げパイロットラインとブーム上げパイロットラインには、ブーム下げパイロット圧力Pdを検出する圧力センサ19と、ブーム上げパイロット圧力Puを検出する圧力センサ25とが設けられている。これらの圧力センサ19及び25が検出した圧力信号は、コントローラ21に入力されている。同様に、アームクラウドパイロットラインとアームダンプパイロットラインには、アームクラウドパイロット圧力Pcを検出する圧力センサ26と、アームダンプパイロット圧力Pdを検出する圧力センサ20とが設けられている。これらの圧力センサ26、及び20が検出した圧力信号は、コントローラ21に入力されている。
 コントローラ21は、圧力センサ18、19、20、25,26からの検出信号118、119、120、125、126を入力し、これらの信号に基づいて所定の演算を行い、再生制御弁8に制御指令を出力する。
 ここで、圧力センサ19と圧力センサ25は、第1操作装置9の操作量を検出可能な第1操作量検出器であり、圧力センサ26と圧力センサ20は、第2操作装置10の操作量を検出可能な第2操作量検出器である。
 再生制御弁8はコントローラ21からの制御指令により動作する。具体的には、操作部に供給される電気信号により、そのストロークが制御され、開度(開口面積)が制御される。
 図3は、本発明の建設機械の第1の実施の形態を構成する再生制御弁の開口面積特性を示す特性図である。図3の横軸は再生制御弁8のスプールストロークを示し、縦軸は開口面積を示している。
 図3において、スプールストロークが最小の場合(ノーマル位置にある場合)は、排出側通路が開いており開口面積は最大であり、再生側通路が閉じ開口面積はゼロである。ストロークを徐々に増やしてゆくと、排出側通路の開口面積が徐々に減少し、再生側通路が開いて開口面積が徐々に増加してゆく。ストロークを更に増加させると、排出側通路が閉じ(開口面積がゼロとなり)、再生側通路の開口面積は更に増加してゆく。このように構成されている結果、スプールストロークが最小の場合は、ブームシリンダ6から排出された圧油は再生されることなく、全量が排出弁4側に流入し、ストロークを徐々に上方に動かしていくと、ブームシリンダ6から排出された圧油の一部が再生管路24に流入する。また、ストロークを調整することにより、排出側通路と再生管路24の開口面積を変化させることができ、再生流量を制御することができる。
 本実施の形態においては、再生管路24を流れる圧油の流量と作動油タンク30に接続する排出管路としての連通管路23を流れる圧油の流量とを調整可能とする再生排出流量調整装置を、排出弁4と戻り油選択弁5と再生制御弁8とで構成している。
 次に、上述した本発明の建設機械の第1の実施の形態の動作について説明する。まずオペレータによるブーム上げ操作について説明する。
 図2において、第1操作装置9の操作レバーによりブーム上げの操作が行われると、パイロット弁9aから発生したブーム上げパイロット圧力Puは、排出弁4の操作部4xと戻り油選択弁5の操作部5xに供給される。このことにより、排出弁4は右方向へ移動し、戻り油選択弁5は左方向へ移動し、それぞれB位置に切換えられる。
 この結果、第1油圧ポンプ1からの圧油は、排出弁4の入口ポート4cから内部油路と接続ポート4aを経由し、第1管路33を介してブームシリンダ6のボトム側油室6aに供給される。また、第2油圧ポンプ2からの圧油は、戻り油選択弁5の入口ポート5cから内部油路と接続ポート5aを経由し、第1管路33を介してブームシリンダ6のボトム側油室6aに供給される。
 一方、ブームシリンダ6のロッド側油室6bから排出される戻り油は、第2管路34と、戻り油選択弁5の接続ポート5bから内部油路と接続ポート5dを経由し、連通管路23に流入する。流入した圧油は、排出弁4の接続ポート4eから内部油路に設けられた絞りと出口ポート4dとを経由して作動油タンク30に排出される。このように、ブームシリンダ6のボトム側油室6aには、第1油圧ポンプ1と第2油圧ポンプ2からの圧油が流入すると共に、ロッド側油室6b内の圧油は、戻り油選択弁5と排出弁4とを通って作動油タンク30に排出される。この結果、ブームシリンダ6のピストンロッドが伸長し、ブームは上げ方向に動作する。
 次に、オペレータによるアームクラウド操作について説明する。 
 図2において、第2操作装置10の操作レバーによりアームクラウドの操作が行われると、パイロット弁10aから発生したアームクラウドパイロット圧力Pcは、制御弁3の操作部3xに供給される。このことにより、制御弁3は右方向へ移動し、B位置に切換えられる。
 この結果、第1油圧ポンプ1からの圧油は、制御弁3の入口ポート3cから内部油路と接続ポート3aを経由し、第3管路35を介してアームシリンダ7のボトム側油室7aに供給される。
 一方、アームシリンダ7のロッド側油室7bから排出される戻り油は、第4管路36と、制御弁3の接続ポート3bから内部油路と出口ポート3dとを経由して作動油タンク30に排出される。このように、アームシリンダ7のボトム側油室7aには、第1油圧ポンプ1からの圧油が流入すると共に、ロッド側油室7b内の圧油は、制御弁3を通って作動油タンク30に排出される。この結果、アームシリンダ7のピストンロッドが伸長し、アームはクラウド方向に動作する。
 次に、オペレータによるブーム上げ操作とアームクラウド操作を同時に行い、ブームシリンダ6からの戻り油をアームシリンダ7に再生する動作について説明する。ブームシリンダ6の戻り油をアームシリンダ7に再生する場合、上述したブーム上げ動作とアームクラウド動作とに加え、再生制御弁8がコントローラ21によって制御される。第1油圧ポンプ1、第2油圧ポンプ2、制御弁3、排出弁4、戻り油選択弁5の動作は、上記と同様のため、詳細説明は省略する。
 第1操作装置9の操作レバーによりブーム上げの操作が行われると、パイロット弁9aから発生したブーム上げパイロット圧力Puは、圧力センサ25によって検出されコントローラ21へ入力される。また、第2操作装置10の操作レバーによりアームクラウドの操作が行われると、パイロット弁10aから発生したアームクラウドパイロット圧力Pcは、圧力センサ26によって検出されコントローラ21へ入力される。また、第1油圧ポンプ1の吐出圧は、圧力センサ18によって検出されコントローラ21へ入力される。
 コントローラ21は、入力された各信号に基づいて再生制御弁8の指令信号を算出し、再生制御弁8の開度ストロークを制御する。再生制御弁8の開度ストロークが制御されることで、戻り油選択弁5の接続ポート5bから内部油路と接続ポート5dを経由し、連通管路23に流入したブームシリンダ6のロッド側油室6bから排出された戻り油が、再生制御弁8を介して再生管路24に流入する。再生管路24に流入した戻り油は、チェック弁16を介して制御弁3の入口ポート3cに流入する。この結果、連通管路23に流入したブームシリンダ6からの戻り油は、再生制御弁8を介し第1油圧ポンプの吐出側に流れ、制御弁3を介して、アームシリンダ7に再生される。ブームシリンダ6の戻り油はアームシリンダ7のボトム側油室7aに再生されるので、アームシリンダ7を効率よく動作させることが可能となる。
 次に、オペレータによるブーム下げ操作について説明する。
 図2において、第1操作装置9の操作レバーによりブーム下げの操作が行われると、パイロット弁9aから発生したブーム下げパイロット圧力Pdは、排出弁4の操作部4yと戻り油選択弁5の操作部5yに供給される。このことにより、排出弁4は左方向へ移動し、戻り油選択弁5は右方向へ移動し、それぞれA位置に切換えられる。
 この結果、第1油圧ポンプ1からの圧油は、排出弁4の入口ポート4cから内部油路と接続ポート4bを経由し、第2管路34を介してブームシリンダ6のロッド側油室6bに供給される。また、第2油圧ポンプ2からの圧油は、戻り油選択弁5の入口ポート5cから内部油路と接続ポート5bを経由し、第2管路34を介してブームシリンダ6のロッド側油室6bに供給される。
 一方、ブームシリンダ6のボトム側油室6aから排出される戻り油は、第1管路33と、戻り油選択弁5の接続ポート5aから内部油路と接続ポート5dを経由し、連通管路23に流入する。流入した圧油は、排出弁4の接続ポート4eから内部油路に設けられた絞りと出口ポート4dとを経由して作動油タンク30に排出される。このように、ブームシリンダ6のロッド側油室6bには、第1油圧ポンプ1と第2油圧ポンプ2からの圧油が流入すると共に、ボトム側油室6a内の圧油は、戻り油選択弁5と排出弁4とを通って作動油タンク30に排出される。この結果、ブームシリンダ6のピストンロッドが縮短し、ブームは下げ方向に動作する。
 次に、オペレータによるアームダンプ操作について説明する。 
 図2において、第2操作装置10の操作レバーによりアームダンプの操作が行われると、パイロット弁10aから発生したアームダンプパイロット圧力Pdは、制御弁3の操作部3yに供給される。このことにより、制御弁3は左方向へ移動し、A位置に切換えられる。
 この結果、第1油圧ポンプ1からの圧油は、制御弁3の入口ポート3cから内部油路と接続ポート3bを経由し、第4管路36を介してアームシリンダ7のロッド側油室7bに供給される。
 一方、アームシリンダ7のボトム側油室7aから排出される戻り油は、第3管路35と、制御弁3の接続ポート3aから内部油路と出口ポート3dとを経由して作動油タンク30に排出される。このように、アームシリンダ7のロッド側油室7bには、第1油圧ポンプ1からの圧油が流入すると共に、ボトム側油室7a内の圧油は、制御弁3を通って作動油タンク30に排出される。この結果、アームシリンダ7のピストンロッドが縮小し、アームはダンプ方向に動作する。
 次に、オペレータによるブーム下げ操作とアームダンプ操作を同時に行い、ブームシリンダ6からの戻り油をアームシリンダ7に再生する動作について説明する。ブームシリンダ6の戻り油をアームシリンダ7に再生する場合、上述したブーム下げ動作とアームダンプ動作とに加え、再生制御弁8がコントローラ21によって制御される。第1油圧ポンプ1、第2油圧ポンプ2、制御弁3、排出弁4、戻り油選択弁5の動作は、上記と同様のため、詳細説明は省略する。
 第1操作装置9の操作レバーによりブーム下げの操作が行われると、パイロット弁9aから発生したブーム下げパイロット圧力Pdは、圧力センサ19によって検出されコントローラ21へ入力される。また、第2操作装置10の操作レバーによりアームダンプの操作が行われると、パイロット弁10aから発生したアームダンプパイロット圧力Pdは、圧力センサ20によって検出されコントローラ21へ入力される。また、第1油圧ポンプ1の吐出圧は、圧力センサ18によって検出されコントローラ21へ入力される。更に、ブームシリンダ6のボトム側油室6aの圧力は、圧力センサ17によって検出されコントローラ21へ入力される。
 コントローラ21は、入力された各信号に基づいて再生制御弁8の指令信号を算出し、再生制御弁8の開度ストロークを制御する。再生制御弁8の開度ストロークが制御されることで、戻り油選択弁5の接続ポート5aから接続ポート5dを経由し、連通管路23に流入したブームシリンダ6のボトム側油室6aから排出された戻り油が、再生制御弁8を介して再生管路24に流入する。再生管路24に流入した戻り油は、チェック弁16を介して制御弁3の入口ポート3cに流入する。この結果、連通管路23に流入したブームシリンダ6からの戻り油は、再生制御弁8を介し第1油圧ポンプの吐出側に流れ、制御弁3を介して、アームシリンダ7に再生される。ブームシリンダ6の戻り油はアームシリンダ7のロッド側油室7bに再生されるので、アームシリンダ7を増速することが可能となる。また、第1油圧ポンプ1のレギュレータ1aを制御することにより、第1油圧ポンプ1の流量を抑えることができるので、駆動機器の出力が抑制され、省エネを図ることができる。
 上述したように、本実施の形態においては、ブーム上げ時またはブーム下げ時の戻り油を再生側または排出側に制御可能とする再生排出流量調整装置を、戻り油選択弁5と再生制御弁8と排出弁4の最小限必要な3つの弁で構成することができる。また、再生側の流量は再生制御弁8で調整可能とし、排出側の流量は排出弁4で調整可能としているので、良好な操作性が確保できる。
 次に、コントローラ21が実行する再生制御弁8の制御方法について図4及び5を用いて説明する。図4は本発明の建設機械の第1の実施の形態を構成するコントローラのブロック図、図5は本発明の建設機械の第1の実施の形態を構成する排出弁の開口面積特性を示す特性図である。図4及び図5において、図1乃至図3に示す符号と同符号のものは同一部分であるので、その詳細な説明は省略する。
 図4に示すように、コントローラ21は、関数発生器133、関数発生器134、減算器135、関数発生器136、関数発生器137、乗算器138、乗算器138、関数発生器139、関数発生器140、乗算器141、乗算器142、乗算器143、最大値選択器144、出力変換部146を有している。
 図4において、検出信号119は第1操作装置9の操作レバーのブーム下げ方向の操作パイロット圧Pdを圧力センサ19により検出した信号(レバー操作信号)であり、検出信号120は第2操作装置10の操作レバーのアームダンプ方向の操作パイロット圧Pdを圧力センサ20により検出した信号(レバー操作信号)であり、検出信号117はブームシリンダ6のボトム側油室6aの圧力(第1管路33の圧力)を圧力センサ17により検出した信号(ボトム圧信号)であり、検出信号118は第1油圧ポンプ1の吐出圧(第1主管路31の圧力)を圧力センサ18により検出した信号(ポンプ圧信号)である。また、検出信号125は第1操作装置9の操作レバーのブーム上げ方向の操作パイロット圧Puを圧力センサ25により検出した信号(レバー操作信号)であり、検出信号126は第2操作装置10の操作レバーのアームクラウド方向の操作パイロット圧Pcを圧力センサ26により検出した信号(レバー操作信号)である。
 関数発生器133は、ブーム下げのレバー操作信号119に応じて再生制御弁8の再生側の開口面積を算出するものであり、図3に示した再生制御弁8の開口面積特性を基に特性が設定されている。関数発生器133の出力は乗算器138に入力される。図3の横軸は再生制御弁8のスプールストロークを示し、縦軸は開口面積を示している。図3において、スプールストロークが最小の場合は、排出側通路が開いており、再生側の開口面積が閉じているため、再生されることはない。ストロークを徐々に増やしてゆくと、排出側通路の開口面積が徐々に減少し、再生側通路が開いて開口面積が徐々に増加してゆくため、ブームシリンダ6から排出された圧油が再生管路24に流入する。また、ストロークを調整することにより、再生側の開口面積を変化させることができるので、再生流量を制御できる。
 換言すると、ブーム下げのレバー操作信号119が大きい場合は、再生制御弁8のストロークを大きくして再生側の開口面積を増加させて、再生流量を多く流すように制御する。ブームシリンダ6のボトム側油室6aから排出される戻り油の流量が、再生されない場合と同等になるように、関数発生器133のテーブルを調整することが望ましい。
 図4に戻り、関数発生器134は、アームダンプのレバー操作信号120に応じて乗算器で用いる係数を算出するものであり、レバー操作信号120が0から予め定めた設定値まで最小値0を出力し、レバー操作信号が設定値を超えたときに最大値である1を出力する。関数発生器134の出力は乗算器138に入力される。
 乗算器138は、関数発生器133で算出された開口面積と関数発生器134で算出された係数とを入力し、乗算値を開口面積として出力する。乗算器138の出力は乗算器142に入力される。この演算により、ブーム下げのレバー操作信号119が入っていても、アームダンプのレバー操作信号120が入っていなければ、乗算器138からの出力は0となり、再生制御弁8はストローク0のままとなる。これは、ブーム下げ操作が行われても、アームダンプ操作が行われておらず、制御弁3が中立状態であって、再生できない場合に、戻り油の供給先がなくなることを防ぐための演算である。
 減算器135は、ボトム圧信号117とポンプ圧信号118を入力し、差圧を算出し、この差圧信号を関数発生器139へ出力する。
 関数発生器139は、減算器135で算出した差圧に応じて乗算器で用いる係数を算出するものであり、差圧が0から予め定めた設定値まで最小値0を出力し、差圧が設定値を超えたときに最大値である1を出力する。関数発生器139の出力は乗算器142に入力される。
 乗算器142は、乗算器138で算出された開口面積と関数発生器139で算出された係数とを入力し、乗算値を開口面積として出力する。乗算器142の出力は最大値選択器144に入力される。この演算により、関数発生器133で算出された再生制御弁8の開口面積は、差圧が設定値よりも低い場合は、再生不可能と判断して再生側の開口面積を0とする信号が生成される。一方、差圧が設定値より高い場合は、再生可能と判断して再生側の開口面積を関数発生器133から出力された値になるように演算される。
 なお、再生制御弁8が0ストロークのときは、排出側が全開となり、戻り油は排出弁4に供給され、排出弁4により適切に絞り制御がなされる。排出弁4の開口面積特性を図5に示す。図5の横軸は排出弁4のストロークを示し、縦軸は開口面積を示している。排出弁4の操作部4x,4yにブーム上げパイロット圧Puまたはブーム下げパイロット圧Pdが入力されると、パイロット圧に応じてストロークが増加することになる。したがって、パイロット圧の増加に応じて開口面積が増加する特性であり、排出弁4に流入した戻り油は、レバー操作量に応じて適切に絞り制御される。なお、排出弁4は2つの操作部4x,4yを有しており、それぞれ独立に特性を設定可能である。
 図4にもどり、関数発生器136は、ブーム上げのレバー操作信号125に応じて再生制御弁8の再生側の開口面積を算出するものである。ブーム上げのレバー操作信号125が大きい場合は、再生制御弁8のストロークを大きくして再生側の開口面積を増加させて、再生流量を多く流すように制御する。関数発生器136の出力は乗算器141へ入力する。
 関数発生器137は、アームクラウドのレバー操作信号126に応じて乗算器で用いる係数を算出するものであり、レバー操作信号126が0から予め定めた設定値まで最小値0を出力し、レバー操作信号が設定値を超えたときに最大値である1を出力する。関数発生器137の出力は乗算器141に入力される。
 乗算器141は、関数発生器136で算出された開口面積と関数発生器137で算出された係数とを入力し、乗算値を開口面積として出力する。乗算器141の出力は乗算器143に入力される。この演算により、ブーム上げのレバー操作信号125が入っていても、アームクラウドのレバー操作信号126が入っていなければ、乗算器141からの出力は0となり、再生制御弁8はストローク0のままとなる。これは、ブーム上げ操作が行われても、アームクラウド操作が行われておらず、制御弁3が中立状態であって、再生できない場合に、戻り油の供給先がなくなることを防ぐための演算である。
 関数発生器140は、ポンプ圧信号118に応じて乗算器で用いる係数を算出するものであり、ポンプ圧信号118が0から予め定めた設定値まで最小値0を出力し、ポンプ圧信号118が設定値を超えたときに最大値である1を出力する。関数発生器140の出力は乗算器143に入力される。
 乗算器143は、乗算器141で算出された開口面積と関数発生器140で算出された係数とを入力し、乗算値を開口面積として出力する。乗算器143の出力は最大値選択器144に入力される。この演算は、ブームシリンダ6に掘削反力が作用してブームシリンダ6のロッド側油室6bが高圧になったときだけ、ロッド側油室6bの戻り油をアームシリンダ7に再生するための演算である。本実施の形態では、この掘削状態の判定をポンプ圧信号118によって判断しておあり、ポンプ圧信号が高圧の場合だけ、乗算器141の出力に応じて再生制御弁8を再生管路24に接続するように制御する。
 また、空中の水平引きのように低負荷作業の場合には、ブーム上げの戻り油はアームシリンダ7に再生するよりも作動油タンク30に排出したほうが圧力損失を低減できて効率が良い。このため、本実施の形態においては、ポンプ圧信号118が設定値以下の場合には、関数発生器140が0を出力し、乗算器141の巣津力に関わらず乗算器143から0を出力させ、再生制御弁8を制御しないことにより、戻り油を排出弁4に導き、余分な損失を低減する制御を行っている。なお、掘削時の判定は、アームシリンダ7のボトム側油室7aの圧力信号やブームシリンダ6のロッド側油室6bの圧力信号を用いても良い。
 最大値選択器144は、乗算器142の出力と乗算器143の出力が入力し、いずれかの最大値を出力する。最大値選択器144の出力は出力変換部146へ入力する。本実施の形態においては、通常、乗算器142の出力と乗算器143の出力とは、必ず一方が0となっている。ブーム上げ操作とブーム下げ操作は、同時に行うことができないので、関数発生器133と136のどちらかは必ず0となるからである。アームクラウド操作とアームダンプ操作の関係も同じである。最大値選択器144により、ブーム上げ時またはブーム下げ時に必要な再生制御弁8の再生側開口面積が算出される。
 出力変換部146は、入力された再生制御弁8の再生側開口面積を出力変換し、再生制御弁8への制御指令である電磁弁指令108Aとして出力する。このことにより、再生制御弁8の再生側開口面積は所望の値に制御される。
 次に、コントローラ21の動作について説明する。 
 ブーム下げ操作のレバー操作信号119が入力されると、関数発生器133は、再生制御弁8の再生側の開口面積信号を算出し、乗算器138へ出力する。アームダンプ操作のレバー操作信号120が入力されると、関数発生器134は、アームダンプ操作が入っていて、再生可能なときは1を、不可能なときは0を乗算器138へ出力する。乗算器138は関数発生器133から出力される再生制御弁8の開口面積信号を補正して乗算器142へ出力する。
 ボトム圧信号117とポンプ圧信号118とが減算器135に入力され、差圧信号を算出する。差圧信号は関数発生器139に入力され、関数発生器139は再生の可能または不可能の判断を行い、再生可能なときは1を、不可能なときは0を乗算器142へ出力する。乗算器142は関数発生器133から出力される再生制御弁8の開口面積信号を補正して最大値選択器144へ出力する。
 ブーム上げ操作のレバー操作信号125が入力されると、関数発生器136は、再生制御弁8の再生側の開口面積信号を算出し、乗算器141へ出力する。アームクラウド操作のレバー操作信号126が入力されると、関数発生器137は、アームクラウド操作が入っていて、再生可能なときは1を、不可能なときは0を乗算器141へ出力する。乗算器141は関数発生器136から出力される再生制御弁8の開口面積信号を補正して乗算器143へ出力する。
 ポンプ圧信号118が関数発生器140に入力され、関数発生器140は掘削状態か否かの判断を行い、掘削状態のときは1を、掘削状態でないときは0を乗算器143へ出力する。乗算器143は関数発生器136から出力される再生制御弁8の開口面積信号を補正して最大値選択器144へ出力する。
 最大値選択器144により、ブーム上げ時またはブーム下げ時に必要な再生制御弁8の再生側開口面積が算出され、出力変換部146へ出力される。出力変換部146では、入力された再生制御弁8の開口面積を出力変換し、再生制御弁8への制御指令である電磁弁指令108Aとして出力する。このことにより、再生制御弁8の再生側の開口面積を所望の値に制御できる。
 以上の動作により、ブーム上げ時または下げ時の戻り油は、再生時において再生制御弁8により適切に絞り制御されると共に、再生しない場合であっても、排出弁4で適切に絞り制御される。このことにより、良好な操作性を確保することができる。また、ブーム上げ時または下げ時の戻り油を、再生制御弁8と戻り油選択弁5と排出弁4の3個の弁だけで、適切に流量調整しながら再生することができるので、良好な操作性が確保できる。
 上述した本発明の建設機械の第1の実施の形態によれば、少ない数量の弁構成で、ブーム上げ操作とブーム下げ操作の両方の操作時における戻り油の再生を可能とし、ブーム上げ操作とブーム下げ操作の両方の操作時における良好な操作性を確保できる。
 なお、本実施の形態においては、ブーム上げ操作時の戻り油をアームシリンダ7のボトム側油室7aに再生する場合を例に説明している。これは、通常の油圧ショベルの砂利積み動作または水平引き動作の際に、効果が得られる構成である。しかし、これに限るものではない。必要に応じてブーム上げ操作時の戻り油をアームシリンダ7のロッド側油室7bや、他の油圧アクチュエータに再生するように構成しても良い。またブーム下げ操作時の戻り油をアームシリンダ7のボトム側油室7aや他の油圧アクチュエータに再生するように構成しても良い。
 また、本実施の形態においては、ブームシリンダ6とアームシリンダ7に圧油を供給可能な第1油圧ポンプ1から排出弁4を介してブームシリンダ6に圧油を供給し、ブームシリンダ6に圧油を供給可能な第2油圧ポンプ2から戻り油選択弁5を介してブームシリンダ6に圧油を供給する構成としているが、これに限るものではない。例えば、第1油圧ポンプ1から戻り油選択弁5を介して、第2油圧ポンプ2から排出弁4を介して、ブームシリンダ6に圧油を供給する構成としても良い。このことは、例えば、弁を一体で製作する場合に、最も構成しやすい接続を可能とする。
 さらに、本実施の形態においては、コントローラ21にて、ボトム圧信号117とポンプ圧信号118により、差圧を演算して、差圧が設定値以下の場合にはブーム下げ操作時の再生をさせない制御を行っているが、ブーム下げ操作時の戻り油の圧力が、アームシリンダ7のロッド側油室7bの圧力よりも必ず高くなるような建設機械の場合には、このような制御を必要としない。
 また、本実施の形態においては、コントローラ21にて、ポンプ圧信号118を取り込み、ポンプ圧信号118が設定値以下の場合にはブーム上げ操作時に再生をさせない制御を行っているが、これは必須ではなく、効率よりも速度が重要視される建設機械では、負荷に関係なく再生を行っても動作上問題は無い。さらに、この場合には圧力センサ18が不要となり、コスト低減が図れる。
 以下、本発明の建設機械の第2の実施の形態を図面を用いて説明する。図6は本発明の建設機械の第2の実施の形態を構成する油圧駆動システムの概略図、図7は本発明の建設機械の第2の実施の形態を構成するコントローラのブロック図である。図6及び図7において、図1乃至図5示す符号と同符号のものは同一部分であるので、その詳細な説明は省略する。
 本発明の建設機械の第2の実施の形態において、油圧駆動システムの概略は、第1の実施の形態と大略同じであるが、再生制御弁8を再生弁41と排出弁42に置換した点と、排出弁4を第2制御弁40に置換した点が第1の実施の形態と異なる。本実施の形態では、第1の実施の形態の再生制御弁8を再生弁41と排出弁42にして、コントローラ21Aによってそれぞれ開度を制御するようにしたので、より細かな流量制御が可能になる。また、第1の実施の形態における排出弁4の戻り油を制御する機能を排出弁42で行うため、第1油圧ポンプ1の圧油をブームシリンダ6に切換え供給する機能だけを有する第2制御弁40に置き換えられている。
 具体的には、図6に示すように連通管路23の中間部に戻り油の流量を調整可能な2位置2ポートの電磁比例弁である排出弁42が設けられている。また、再生管路24の中間部には、再生流量を調整可能な2位置2ポートの電磁比例弁である再生弁41が設けられている。連通管路23における排出弁42と戻り油選択弁5との間には再生管路24の一端側が接続された分岐部が設けられている。
第2制御弁40は、3位置6ポートの切替制御弁であって、その両パイロット操作部40x、40yへ供給されるパイロット圧力により、制御弁位置を切り替えて、作動油の流路の開口面積を変化させる。このことにより、第1油圧ポンプ1からブームシリンダ6へ供給される作動油の方向と流量を制御して、ブームシリンダ7を駆動している。また、第2制御弁40は、第1油圧ポンプ1からの圧油が供給される入口ポート40cと、中立位置のときに連通するセンターポート40Tと、ブームシリンダ6側に接続する接続ポート40a,40bとを有していて、中立位置のときには、第1油圧ポンプ1からの圧油を作動油タンク30に連通するセンタバイパス型である。なお、第1主管路31と入口ポート40cとを接続する配管に第1油圧ポンプ1への逆流を防止するチェック弁13が設けられている。
 次に、本実施の形態におけるコントローラ21Aが実行する再生弁41と排出弁42の制御方法について図7を用いて説明する。
 図7に示すように、本実施の形態におけるコントローラ21Aの構成は、第1の実施の形態におけるコントローラ21の構成に対して、以下の点が異なる。 
(a)ブーム下げ操作量であるレバー操作信号119と、ブーム上げ操作量であるレバー操作信号125が入力される関数発生器133,136が、関数発生器147,148に置き換えられている。また、アームダンプ操作量であるレバー操作信号120と、アームクラウド操作量であるレバー操作信号126が入力される関数発生器134,137が、関数発生器152,153に置き換えられている。 
(b)関数発生器147の出力と関数発生器148の出力とが入力され、最大値を選択する第2最大値選択器149と、第2最大値選択器149の出力から最大値選択器144の出力を減算する第2減算器150と、最大値選択器144の出力と第2減算器150の出力とが入力され、再生弁41の指令である電磁弁指令141Aと排出弁42の指令である電磁弁指令142Aを出力する出力変換部151とが追加されている。
 本実施の形態では、関数発生器147と関数発生器148により、通常再生しない場合における排出側の絞り制御される開口面積信号を算出する。すなわち、第1の実施の形態における排出弁4の開口面積と等しい開口面積が算出される。なお、関数発生器147と関数発生器148から出力される開口面積信号を目標開口面積信号という。
 関数発生器152は、アームダンプ操作量であるレバー操作信号120に応じて乗算器で用いる係数を算出するものであり、レバー操作信号120が0のときに最小値0を出力し、レバー操作信号120の増加に伴って出力を増大させ最大値として1を出力する。関数発生器152から出力される値は、乗算器138に出力され、目標開口面積を補正する。
 関数発生器153は、アームクラウド操作量であるレバー操作信号126に応じて乗算器で用いる係数を算出するものであり、レバー操作信号126が0のときに最小値0を出力し、レバー操作信号126の増加に伴って出力を増大させ最大値として1を出力する。関数発生器153から出力される値は、乗算器141に出力され、目標開口面積を補正する。
 関数発生器152と関数発生器153の出力による演算は、第1の実施の形態における再生可能か不可能かのON/OFF的な制御に対し、アーム操作に応じたより細やかな制御を可能にする。
 乗算器138と乗算器142と乗算器141と乗算器143とで補正された目標開口面積信号は、最大値選択器144と出力変換部151を介して、電磁弁指令141Aとして再生弁41に出力される。このことにより、コントローラ21で演算された目標開口面積になるように再生弁41が絞り制御される。
 一方、第2最大値選択器149は、関数発生器147の出力と関数発生器148の出力のいずれか最大値を選択して、ブーム下げ時またはブーム上げ時の再生しない場合における排出弁42の開口面積信号を出力する。
 第2減算器150は、第2最大値選択器149の出力であるブーム下げ時またはブーム上げ時の再生しない場合における排出弁42の開口面積信号から、最大値選択器144の出力である再生弁41の目標開口面積信号が減算され、排出弁42の目標開口面積信号として算出され、出力変換部151を介して、電磁弁指令142Aとして排出弁42に出力される。この演算により、再生弁41で再生側に流す開口面積分、排出弁42の開口面積が減算されることにより、排出弁42は再生しない場合よりも絞られる。この結果、作動油タンク30に排出される戻り油が減少し、再生側に多くの流量が流れることになる。
 更に、関数発生器152または関数発生器153が1を出力する場合、すなわちアームシリンダ7に最大限戻り油を再生可能な場合は、関数発生器147と関数発生器148で算出された目標開口面積信号がそのまま最大値選択器144を介して第2減算器150に入力されるので、第2減算器150の出力は0になる。この結果、排出弁42は閉止されることから、戻り油の全てが再生されることになる。
 逆に、再生不可能と判断され再生弁41の目標開口面積信号が0の場合は、第2減算器150の出力は第2最大値選択器149の出力のままとなり、全ての戻り油が排出弁42を介して作動油タンク30に排出され、関数発生器147と関数発生器148で設定した開口面積で適切に絞り制御される。
 以上の動作により、本実施の形態においては、ブーム上げ時または下げ時の戻り油は、再生時において再生弁41により適切に絞り制御されると共に、再生しない場合であっても、排出弁42で適切に絞り制御される。このことにより、良好な操作性を確保することができる。また、ブーム上げ時または下げ時の戻り油を、再生弁41と戻り油選択弁5と排出弁42の3個の弁だけで、適切に流量調整しながら再生することができるので、良好な操作性が確保できる。
 上述した本発明の建設機械の第2の実施の形態によれば、上述した第1の実施の形態と同様の効果を得ることができる。
 また、上述した本発明の建設機械の第2の実施の形態によれば、再生側と排出側の流量をそれぞれ独立して制御可能であるので、より細やかな調整が可能となり、良好な操作性を確保できる。
 以下、本発明の建設機械の第3の実施の形態を図面を用いて説明する。図8は本発明の建設機械の第3の実施の形態を構成する油圧駆動システムの概略図である。図8において、図1乃至図7示す符号と同符号のものは同一部分であるので、その詳細な説明は省略する。
 本発明の建設機械の第3の実施の形態において、油圧駆動システムの概略は、第1の実施の形態と大略同じであるが、コントローラ21と圧力センサ17,18,19,20,25,26と電磁比例弁である再生制御弁8とを省略し、電気的に制御されるものを全て油圧的に動作するものに変えている点が異なる。圧力センサやコントローラ21に該当するものとして、第1ロジック弁27と第2ロジック弁28と高圧選択弁29とが設けられ、電磁比例弁であった再生制御弁8を油圧駆動の再生制御弁43に置き換えている。
 具体的には、図8に示すように連通管路23の中間部に戻り油を排出するか再生するかを切り換える再生制御弁43が設けられている。再生制御弁43は、2位置3ポートの制御弁であって、高圧選択弁29からのパイロット圧を受ける操作部43aとスプール部とばね部とを備えている。再生制御弁43は、2つのポート(一方の出口ポートと入口ポート)に連通管路23が接続され、1つのポート(他方の出口ポート)には、再生管路24の一端側が接続されている。
 第1ロジック弁27は2位置2ポートの切換弁であって、パイロット弁10aからのアームクラウドパイロット圧Pcがパイロット油路を介して供給される操作部27aとスプール部とばね部とを備えている。第1ロジック弁27の入口ポートには、パイロット弁9aからのブーム上げパイロット圧Puがパイロット油路を介して供給され、第1ロジック弁27の出口ポートは、高圧選択弁29の一方の入力ポートにパイロット油路を介して接続されている。
 第2ロジック弁28は2位置2ポートの切換弁であって、パイロット弁10aからのアームダンプパイロット圧Pdがパイロット油路を介して供給される操作部28aとスプール部とばね部とを備えている。第2ロジック弁28の入口ポートには、パイロット弁9aからのブーム下げパイロット圧Pdがパイロット油路を介して供給され、第2ロジック弁28の出口ポートは、高圧選択弁29の他方の入力ポートにパイロット油路を介して接続されている。
 第1ロジック弁27は、ノーマル位置では閉止しており、ブーム上げパイロット圧Puが作用しても、アームクラウドパイロット圧Pcの供給による切換えがされないと、ロジック弁の出力である高圧選択弁29へ供給するパイロット圧は0となる。また、逆に、アームクラウドパイロット圧Pcによって、第1ロジック弁27が切換えられていても、ブーム上げパイロット圧Puが0の場合は、第1ロジック弁27から出力されるパイロット圧は0となる。すなわち、第1ロジック弁27は、ブーム上げパイロット圧Puとアームクラウドパイロット圧Pcとが両方入力された場合にパイロット圧を出力する。このことは、ブーム上げ操作とアームクラウド操作とが入った場合に、ブーム上げ操作時の戻り油をアームシリンダ7のボトム側油室7aに再生するために再生制御弁43を切り換える信号が出力されることを意味している。
 第2ロジック弁28も第1ロジック弁27と同様に、パイロット弁9aからのブーム下げパイロット圧Pdとパイロット弁10aからのアームダンプパイロット圧Pdとが両方入力された場合にパイロット圧を出力する。このことは、ブーム下げ操作とアームダンプ操作とが入った場合に、ブーム下げ操作時の戻り油をアームシリンダ7のロッド側油室7bに再生するために再生制御弁43を切り換える信号が出力されることを意味している。
 第1ロジック弁27と第2ロジック弁28から出力されるパイロット圧は、高圧選択弁29に供給され、いずれか高い方の圧力が再生制御弁43の操作部43aに供給され、再生制御弁43を切り換える。この場合、ブーム上げパイロット圧Puとブーム下げパイロット圧Pdは、同時に出力されることは無いため、第1ロジック弁27と第2ロジック弁28から同時にパイロット圧が出力されることは無い。すなわち、ブーム上げアームクラウド時の再生のための制御信号、またはブーム下げアームダンプ時の再生のための制御信号のどちらか一方が再生制御弁43に入力されることになる。再生制御弁43を切り換えることにより、連通管路23に流れた戻り油は、再生制御弁43を介してアームシリンダ7に再生される。
 なお、本実施の形態では、ブームシリンダ6のボトム側油室6aの圧力と第1油圧ポンプ1の吐出圧を検知していないことから、第1の実施の形態で説明したように、ブーム下げ操作時の戻り油の圧力が、アームシリンダ7のロッド側油室7bの圧力よりも必ず高くなるような建設機械や、ブーム上げ時において効率よりも速度が重要視される建設機械に適用すると良い。
 上述した本発明の建設機械の第3の実施の形態によれば、上述した第1の実施の形態と同様の効果を得ることができる。
 また、上述した本発明の建設機械の第3の実施の形態によれば、油圧駆動装置を全て油圧的に制御するので、コスト低減が図れる。
 なお、本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。例えば、上記した実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。
 1:第1油圧ポンプ、2:第2油圧ポンプ、3:制御弁、4:排出弁(再生排出流量調整装置)、5:戻り油選択弁(再生排出流量調整装置)、6:ブームシリンダ、7:アームシリンダ、8:再生制御弁(再生排出流量調整装置)、9:第1操作装置、10:第2操作装置、12:チェック弁、13:チェック弁、14:チェック弁、15:チェック弁、16:チェック弁、17:圧力センサ、18:圧力センサ、19:圧力センサ、20:圧力センサ、21:コントローラ、21A:コントローラ、23:連通管路(排出管路)、24:再生管路、25:圧力センサ、26:圧力センサ、27:第1ロジック弁、28:第2ロジック弁、29:高圧選択弁、30:作動油タンク、31:第1主管路、32:第2主管路、33:第1管路、34:第2管路、35:第3管路、36:第4管路、40:第2制御弁、41:再生弁(再生排出流量調整装置)、42:排出弁(再生排出流量調整装置)、43:再生制御弁(再生排出流量調整装置)。

Claims (9)

  1.  第1油圧アクチュエータと、第2油圧アクチュエータと、タンクと、前記第2油圧アクチュエータに圧油を供給する第1油圧ポンプを備えた建設機械において、
     前記第1油圧アクチュエータの上げ操作時または下げ操作時に発生する戻り油の供給元を選択して排出する戻り油選択装置と、
     前記戻り油選択装置から排出された圧油を前記第2油圧アクチュエータと前記第1油圧ポンプの間に供給して再生する再生管路と、
     前記戻り油選択装置から排出された圧油を前記タンクに排出する排出管路と、
     前記再生管路を流れる圧油の流量と前記排出管路を流れる圧油の流量とを調整可能な再生排出流量調整装置とを備えた
     ことを特徴とする建設機械。
  2.  請求項1に記載の建設機械において、
     前記第1油圧アクチュエータを上げ方向または下げ方向に操作するための第1操作装置と、前記第2油圧アクチュエータを操作するための第2操作装置と、前記第1操作装置の操作量を検出可能な第1操作量検出器と、前記第2操作装置の操作量を検出可能な第2操作量検出器とを更に備え、
     前記戻り油選択装置は前記第1操作装置の操作量に応じて前記戻り油の供給元と排出流量とを制御し、
     前記再生排出流量調整装置は、前記第1操作量検出器と前記第2操作量検出器によって検出されたそれぞれの操作量に応じて前記再生管路を流れる圧油の流量と前記排出管路を流れる圧油の流量とを制御する制御装置を備えた
     ことを特徴とする建設機械。
  3.  請求項2に記載の建設機械において、
     前記第1操作装置が油圧パイロット式の操作装置であり、
     前記再生排出流量調整装置は、前記戻り油選択装置から排出された圧油を前記再生管路と前記排出管路に分流または切換え可能な再生制御弁と、前記再生制御弁の下流に設けられ前記タンクに排出される圧油の流量を前記第1操作装置から出力されるパイロット圧によって調整可能とする排出弁とを有し、
     前記制御装置は、前記第1操作量検出器と前記第2操作量検出器によって検出されたそれぞれの操作量信号を入力し、これらの信号に応じて前記再生制御弁の開度を制御する
     ことを特徴とする建設機械。
  4.  請求項3に記載の建設機械において、
     前記第1油圧アクチュエータの下げ操作時の戻り油の圧力を検出する第1圧力検出器と、
     前記第1油圧ポンプと前記第2油圧アクチュエータの間の圧力を検出する第2圧力検出器とを備え、
     前記制御装置は、前記第1圧力検出器が検出した前記第1油圧アクチュエータの下げ操作時の戻り油の圧力信号と前記第2圧力検出器が検出した前記第1油圧ポンプと前記第2油圧アクチュエータの間の圧力信号を入力し、これらの信号に応じて前記再生制御弁の開度を制御する
     ことを特徴とする建設機械。
  5.  請求項2に記載の建設機械において、
     前記再生排出流量調整装置は、前記戻り油選択装置から排出された圧油を前記再生管路に再生する再生弁と、
     前記戻り油選択装置から排出された圧油を前記タンクに排出する排出弁とを有し、
     前記制御装置は、前記第1操作量検出器と前記第2操作量検出器によって検出されたそれぞれの操作量信号を入力し、これらの信号に応じて前記再生弁の開度と前記排出弁の開度を制御する
     ことを特徴とする建設機械。
  6.  請求項5に記載の建設機械において、
     前記第1油圧アクチュエータの下げ操作時の戻り油の圧力を検出する第1圧力検出器と、
     前記第1油圧ポンプと前記第2油圧アクチュエータの間の圧力を検出する第2圧力検出器とを備え、
     前記制御装置は、前記第1圧力検出器が検出した前記第1油圧アクチュエータの下げ操作時の戻り油の圧力信号と前記第2圧力検出器が検出した前記第1油圧ポンプと前記第2油圧アクチュエータの間の圧力信号を入力し、これらの信号に応じて前記再生弁の開度と前記排出弁の開度を制御する
     ことを特徴とする建設機械。
  7.  請求項1に記載の建設機械において、
     前記第1油圧アクチュエータを上げ方向または下げ方向に操作するための油圧パイロット式の第1操作装置と、前記第2油圧アクチュエータを操作するための油圧パイロット式の第2操作装置とを備え、
     前記再生排出流量調整装置は、前記戻り油選択装置から排出された圧油を前記再生管路と前記排出管路に分流または切換え可能な再生制御弁と、前記再生制御弁の下流に設けられ前記タンクに排出される圧油の流量を前記第1操作装置から出力されるパイロット圧によって調整可能な排出弁とを有し、
     さらに、前記第1操作装置が供給するパイロット圧油と前記第2操作装置が供給するパイロット圧油との両方が入力された場合にパイロット圧油を出力する一対のロジック弁と、前記一対のロジック弁の出力のうちの高い方の圧力を選択する高圧選択弁とを備え、
     前記再生制御弁は、前記高圧選択弁を介して出力されるパイロット圧油により駆動される
     ことを特徴とする建設機械。
  8.  請求項3に記載の建設機械において、
     第2油圧ポンプをさらに備え、
     前記排出弁には、前記第1油圧アクチュエータの上げ操作時または下げ操作時に、前記第1油圧ポンプ又は前記第2油圧ポンプの少なくとも1つの油圧ポンプが吐出した圧油を前記第1油圧アクチュエータへ供給するための油路が設けられている
     ことを特徴とする建設機械。
  9.  請求項1に記載の建設機械において、
     第2油圧ポンプをさらに備え、
     前記戻り油選択装置には、前記第1油圧アクチュエータの上げ操作時または下げ操作時に、前記第1油圧ポンプ又は前記第2油圧ポンプの少なくとも1つの油圧ポンプが吐出した圧油を前記第1油圧アクチュエータへ供給するための油路が設けられている
     ことを特徴とする建設機械。
PCT/JP2015/077591 2015-09-29 2015-09-29 建設機械 WO2017056199A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
EP15905353.7A EP3358200B1 (en) 2015-09-29 2015-09-29 Construction machine
CN201580076725.1A CN107250570B (zh) 2015-09-29 2015-09-29 工程机械
JP2017542561A JP6467515B2 (ja) 2015-09-29 2015-09-29 建設機械
PCT/JP2015/077591 WO2017056199A1 (ja) 2015-09-29 2015-09-29 建設機械
US15/556,103 US10526767B2 (en) 2015-09-29 2015-09-29 Construction machine
KR1020177023019A KR101959652B1 (ko) 2015-09-29 2015-09-29 건설 기계

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2015/077591 WO2017056199A1 (ja) 2015-09-29 2015-09-29 建設機械

Publications (1)

Publication Number Publication Date
WO2017056199A1 true WO2017056199A1 (ja) 2017-04-06

Family

ID=58422846

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/077591 WO2017056199A1 (ja) 2015-09-29 2015-09-29 建設機械

Country Status (6)

Country Link
US (1) US10526767B2 (ja)
EP (1) EP3358200B1 (ja)
JP (1) JP6467515B2 (ja)
KR (1) KR101959652B1 (ja)
CN (1) CN107250570B (ja)
WO (1) WO2017056199A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019124049A (ja) * 2018-01-16 2019-07-25 住友建機株式会社 ショベル
WO2021025170A1 (ja) * 2019-08-08 2021-02-11 住友重機械工業株式会社 ショベル
JP7382792B2 (ja) 2019-10-31 2023-11-17 川崎重工業株式会社 再生装置、それを備える液圧駆動システム、及びその制御装置

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6316776B2 (ja) * 2015-06-09 2018-04-25 日立建機株式会社 作業機械の油圧駆動システム
JP6797015B2 (ja) * 2016-12-22 2020-12-09 川崎重工業株式会社 油圧ショベル駆動システム
ES2848577T3 (es) * 2017-02-24 2021-08-10 Sandvik Intellectual Property Sistema de control hidráulico de regulación para máquina de minería
CN107724455B (zh) * 2017-11-22 2023-07-07 江苏恒立液压科技有限公司 工程机械的液压回路、具有其的工程机械及控制方法
JP6924161B2 (ja) * 2018-02-28 2021-08-25 川崎重工業株式会社 建設機械の油圧システム
JP7342018B2 (ja) * 2018-10-03 2023-09-11 住友重機械工業株式会社 ショベル
CN109706997A (zh) * 2019-02-15 2019-05-03 青岛雷沃工程机械有限公司 一种挖掘机用液压控制***及工作方法
JP2021038787A (ja) * 2019-09-03 2021-03-11 川崎重工業株式会社 建設機械の油圧システム
JP7236596B2 (ja) * 2020-06-19 2023-03-09 日立建機株式会社 建設機械
CN112109801B (zh) * 2020-09-15 2022-09-16 广西柳工机械股份有限公司 转向液压***及装载机

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004346485A (ja) * 2003-04-17 2004-12-09 Hitachi Constr Mach Co Ltd 油圧駆動装置
JP2008150860A (ja) * 2006-12-18 2008-07-03 Hitachi Constr Mach Co Ltd 油圧ショベルの油圧駆動装置
JP4213473B2 (ja) * 2001-04-17 2009-01-21 キャタピラージャパン株式会社 流体圧回路
JP2015137714A (ja) * 2014-01-22 2015-07-30 住友重機械工業株式会社 建設機械

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5296570A (en) 1976-02-09 1977-08-13 Citizen Watch Co Ltd Power saving method of crystal wristwatch
US6378301B2 (en) * 1996-09-25 2002-04-30 Komatsu Ltd. Pressurized fluid recovery/reutilization system
JP4562948B2 (ja) 2001-05-17 2010-10-13 日立建機株式会社 油圧駆動装置
JP2006336306A (ja) * 2005-06-02 2006-12-14 Shin Caterpillar Mitsubishi Ltd 作業機械
JP2006336432A (ja) * 2005-06-06 2006-12-14 Shin Caterpillar Mitsubishi Ltd 作業機械
JP5296570B2 (ja) 2009-02-16 2013-09-25 株式会社神戸製鋼所 作業機械の油圧制御装置及びこれを備えた作業機械
JP5687150B2 (ja) * 2011-07-25 2015-03-18 日立建機株式会社 建設機械
JP2014118985A (ja) * 2012-12-13 2014-06-30 Kobelco Contstruction Machinery Ltd 建設機械の油圧回路
CN104919116B (zh) * 2013-01-18 2017-12-19 沃尔沃建造设备有限公司 用于工程机械的控流装置和控流方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4213473B2 (ja) * 2001-04-17 2009-01-21 キャタピラージャパン株式会社 流体圧回路
JP2004346485A (ja) * 2003-04-17 2004-12-09 Hitachi Constr Mach Co Ltd 油圧駆動装置
JP2008150860A (ja) * 2006-12-18 2008-07-03 Hitachi Constr Mach Co Ltd 油圧ショベルの油圧駆動装置
JP2015137714A (ja) * 2014-01-22 2015-07-30 住友重機械工業株式会社 建設機械

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019124049A (ja) * 2018-01-16 2019-07-25 住友建機株式会社 ショベル
JP7062445B2 (ja) 2018-01-16 2022-05-06 住友建機株式会社 ショベル
WO2021025170A1 (ja) * 2019-08-08 2021-02-11 住友重機械工業株式会社 ショベル
JP7382792B2 (ja) 2019-10-31 2023-11-17 川崎重工業株式会社 再生装置、それを備える液圧駆動システム、及びその制御装置

Also Published As

Publication number Publication date
EP3358200B1 (en) 2021-06-23
CN107250570A (zh) 2017-10-13
EP3358200A4 (en) 2019-05-22
CN107250570B (zh) 2019-04-09
EP3358200A1 (en) 2018-08-08
US20180274208A1 (en) 2018-09-27
KR20170106424A (ko) 2017-09-20
KR101959652B1 (ko) 2019-03-18
JP6467515B2 (ja) 2019-02-13
JPWO2017056199A1 (ja) 2017-11-24
US10526767B2 (en) 2020-01-07

Similar Documents

Publication Publication Date Title
JP6467515B2 (ja) 建設機械
KR101942603B1 (ko) 건설 기계
JP6291394B2 (ja) 作業機械の油圧駆動システム
JP6317656B2 (ja) 作業機械の油圧駆動システム
WO2014091685A1 (ja) 建設機械の油圧回路
JPH09177139A (ja) 油圧ショベルの油圧回路
JPWO2005047709A1 (ja) 建設機械の油圧制御装置
JP4410512B2 (ja) 油圧駆動装置
US10041228B2 (en) Construction machine
WO2019049435A1 (ja) 建設機械
KR20180033266A (ko) 작업 기계
JP2017226492A (ja) 液圧駆動システム
JP2013079552A (ja) 作業車両
CN114555957A (zh) 再生装置、具备该再生装置的液压驱动***及其控制装置
JP2004346485A (ja) 油圧駆動装置
JP7404258B2 (ja) 流体回路
WO2020188920A1 (ja) 油圧ショベル
US11692332B2 (en) Hydraulic control system
JP2019528415A (ja) 建設機械の制御システム及び建設機械の制御方法
JP6782852B2 (ja) 建設機械
JP2017015130A (ja) 流体回路
JP2012021311A (ja) 建設機械の油圧駆動装置
JP5642620B2 (ja) 作業機械のエネルギ回生装置
JP2015031377A (ja) 油圧駆動装置
US11408145B2 (en) Work vehicle and hydraulic control method

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15905353

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2017542561

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 20177023019

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 15556103

Country of ref document: US

REEP Request for entry into the european phase

Ref document number: 2015905353

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE