WO2014057613A1 - エネルギー管理装置 - Google Patents

エネルギー管理装置 Download PDF

Info

Publication number
WO2014057613A1
WO2014057613A1 PCT/JP2013/005453 JP2013005453W WO2014057613A1 WO 2014057613 A1 WO2014057613 A1 WO 2014057613A1 JP 2013005453 W JP2013005453 W JP 2013005453W WO 2014057613 A1 WO2014057613 A1 WO 2014057613A1
Authority
WO
WIPO (PCT)
Prior art keywords
unit
information
target
power
facility
Prior art date
Application number
PCT/JP2013/005453
Other languages
English (en)
French (fr)
Inventor
浩基 數野
昌史 村上
剛 椙山
知也 十河
敏章 中尾
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Priority to US14/432,063 priority Critical patent/US10175747B2/en
Publication of WO2014057613A1 publication Critical patent/WO2014057613A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00004Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • G06F1/3203Power management, i.e. event-based initiation of a power-saving mode
    • G06F1/3206Monitoring of events, devices or parameters that trigger a change in power modality
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/32Means for saving power
    • G06F1/3203Power management, i.e. event-based initiation of a power-saving mode
    • G06F1/3234Power saving characterised by the action undertaken
    • G06F1/3296Power saving characterised by the action undertaken by lowering the supply or operating voltage
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00028Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2639Energy management, use maximum of cheap power, keep peak load low
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • H02J2310/14The load or loads being home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid

Definitions

  • the present invention relates to an energy management apparatus configured to manage the operation state of a plurality of load devices arranged in a facility and suppress utility energy consumed by the load devices.
  • a contract based on an electricity supply agreement is made between a power consumer and a power company.
  • the contract power is set to the largest value among the maximum demand power of each month in the past year including the current month.
  • the maximum demand power for the current month is calculated by measuring the integrated value (demand power amount) of demand power (power consumption) for each predetermined demand period (typically 30 minutes). It is obtained by selecting the maximum demand power from the demand power.
  • Japanese Patent Application Publication No. 2009-240032 discloses a demand control system. This system is configured to control the capacity of the lighting device so that the demand value (demand power) does not exceed a preset contract power.
  • the integrated value of power consumption is appropriate even if only the integrated value of power consumption is shown. It is not possible to know whether or not Further, if the power consumption is managed according to the rules set in the energy management apparatus, the user believes that the integrated value of the power consumption is appropriately changed.
  • the energy management device performs uniform control, so load control is not necessarily preferable for facility operation.
  • load control is not necessarily preferable for facility operation.
  • a flat-type showcase is arranged as a refrigeration device, it is necessary to maintain the temperature in the showcase, so the power of the showcase must be secured. That is, the user himself / herself must make a determination when it is difficult to deal with the energy management apparatus.
  • the user has no specialized knowledge, the user cannot make the necessary response.
  • the object of the present invention is to provide an energy management apparatus that enables even a user who does not have specialized knowledge to manage a target value related to consumption of utility energy.
  • the energy management device includes an instruction unit (13), a user device (60), a target evaluation unit (16), and a presentation control unit (17).
  • the instruction unit (13) is configured to control the operation of the load device (30) according to a target power saving rate in a facility where a plurality of load devices (30) are arranged.
  • the user device (60) has a function configured to display information.
  • the target evaluation unit (16) is configured to evaluate the consumption amount of utility energy by the load device (30) against a predetermined target value.
  • a presentation control part (17) is comprised so that the icon from which a form differs according to the evaluation result of the said target evaluation part (16) may be displayed on the said user apparatus (60).
  • the target evaluation unit (16) sets a plurality of areas for determining transition of the consumption amount in the determination period based on the target value set for the end point of a predetermined determination period.
  • the presentation control unit (17) is configured to change the form of the icon according to the region to which the consumption amount belongs.
  • the target evaluation unit (16) has a function configured to determine a ratio of the consumption amount to the target value.
  • the presentation control unit (17) prompts the user device to stop a part of the load device (30) when the ratio determined by the target evaluation unit (16) exceeds a prescribed threshold. Configured to present.
  • the target evaluation unit (16) sets the minimum consumption of utility energy that does not hinder the operation of the facility as a recommended value, and the target value is set below the recommended value.
  • the user device is configured to present a message indicating that the target value cannot be realized through the presentation control unit (17).
  • the energy management device further includes an information storage unit (22) and an energy calculation unit (26).
  • the information storage unit (22) is configured to store a capacity unit obtained by dividing the utility energy consumption of the load device (30) obtained from a plurality of facilities by the floor area of the facility.
  • the energy calculator (26) is configured to calculate the recommended value of the facility by energy simulation.
  • the energy calculation unit (26) multiplies the floor area of the facility for which the recommended value is obtained by the capacity unit stored in the information storage unit (22), thereby obtaining the recommended value in the facility. It is comprised so that the consumption of utility energy by a load apparatus (30) may be calculated
  • the information storage unit (22) stores an area where the facility exists and weather information including the outside air temperature in association with each other.
  • the energy calculation unit (26) uses the area of the facility for which the recommended value is calculated to extract the highest daily outside temperature extracted from the information storage unit (22), and the load device (30 ) As an explanatory variable, and using a regression equation for calculating the maximum daily value of utility energy consumption, the maximum value is calculated by using the basic unit of capacity extracted from the information storage unit (22). It is configured to be determined as a recommended value.
  • the user is presented with contents according to the degree of expectation that the consumption amount of utility energy can achieve the target value.
  • the target value regarding the consumption amount of utility energy.
  • an embodiment (energy management device) described below includes a management device 10.
  • the facility including the management apparatus 10 includes a plurality of load devices 30, a measurement device 50, and a user device 60.
  • the energy management device further includes a remote management device 20.
  • the management device 10 is configured to manage electricity consumed by a plurality of load devices 30 (31, 32,%) Arranged in a facility (hereinafter referred to as “consumed electricity”).
  • the management device 10 is configured to manage the power consumption and the power consumption consumed by the plurality of load devices 30 arranged in the facility, respectively. That is, in the first example, the management device 10 is configured to manage the power consumption consumed by the plurality of load devices 30 arranged in the facility. In the second example, the management device 10 is configured to manage the amount of power consumed by the plurality of load devices 30 arranged in the facility.
  • the first and second examples correspond to first and second examples described later, respectively. As one embodiment, all or part of the first example can be provided. As another embodiment, all or part of the second example can be provided.
  • Facilities may be supermarkets, convenience stores, department stores, store buildings, office buildings, hotels, hospitals, and other buildings such as parks and theme parks. These are examples of facilities, and the facilities may be in any form as long as a plurality of load devices are arranged and electricity consumed by the arranged load devices is collectively managed by the consumer.
  • the facility is divided into a plurality of areas 40 (41, 42,%), And the plurality of load devices 31, 32,... Are arranged in the plurality of areas 41, 42,.
  • the plurality of load devices 30 are assumed to be electrical loads, but can include gas devices and devices using water.
  • the plurality of load devices 30 and the like are also referred to as “measurement targets”.
  • electricity supplied from the electric utility, gas supplied from the gas enterprise, and water supplied from the water utility are referred to as “utility energy”.
  • the measuring device 50 is configured to measure utility energy per unit time to be measured.
  • the measuring device 50 is configured to measure consumed electricity.
  • the measurement device 50 is configured to measure the power consumption for each unit time with respect to the measurement target.
  • the measuring device 50 may be configured to measure instantaneous power consumption every unit time, or may be configured to measure average power consumption during the unit time.
  • the measuring device 50 is configured to measure an integrated value (power consumption amount) of power consumption per unit time for a measurement target.
  • the power consumption or power consumption measured by the measurement device 50 is also referred to as “measured value”.
  • the measurement device 50 includes, for example, a function configured to acquire measurement values from the measurement target in each of the plurality of areas 40, a plurality of Is configured to acquire a measurement value for each type of load device 30 and to acquire a measurement value from each element (load device 30) of a measurement target (load devices 31, 32,). It is desirable to have a function to acquire measurement values from the measurement target in each of the plurality of areas 40, a plurality of Is configured to acquire a measurement value for each type of load device 30 and to acquire a measurement value from each element (load device 30) of a measurement target (load devices 31, 32,). It is desirable to have a function to
  • the supermarket assumed in the present embodiment includes a plurality of areas 40 such as a sales floor, a cash register, a backyard, and an office.
  • Lighting equipment 301, air conditioning equipment 302, and refrigeration equipment 303 are arranged in the sales floor and the backyard.
  • a lighting device 301 and an air conditioning device 302 are arranged in the cash register and the office.
  • the refrigeration equipment 303 means a refrigerator or a freezer that stores and displays food.
  • various types of showcases such as a flat type, a multistage type, and a reach-in type are arranged as the refrigeration equipment 303, and a large-capacity refrigerator is arranged as the refrigeration equipment 303 in the backyard.
  • the management device 10 includes a connection unit (not shown) configured to be connected to another device (hereinafter referred to as “target device”).
  • the management device 10 is configured to exchange information with the target device via the connection unit, and to monitor and control the operation of the target device.
  • the connection unit includes a device that enables electrical connection with a target device, such as a terminal and a connector, and a device for transmitting and receiving signals or a device for opening and closing an electric circuit.
  • the management apparatus 10 includes a computer that realizes functions described below as a main hardware element by executing a program. This computer means a combination of a processor and a memory, which are individual devices, and a microcomputer in which the processor and the memory are configured on a single chip.
  • the target devices connected to the connection unit of the management device 10 are the remote management device 20, the load device 30, the measurement device 50, and the user device 60.
  • other devices may be connected. Is also possible.
  • the remote management device 20 includes one or more computers and is a computer server for executing a program for realizing the functions described below. Therefore, the connection unit of the management device 10 includes an interface unit (not shown) (hereinafter referred to as “I / F unit”) for communicating with the remote management device 20 through the communication network NT1.
  • the remote management device 20 may include a plurality of computers associated with each other so as to be able to communicate with each other.
  • the communication network NT1 uses a VPN (Virtual Private Network) constructed using a public network such as the Internet.
  • the load device 30 used in the present embodiment has a function configured to communicate with the management device 10 and a function configured to operate according to an instruction for controlling the operation state of the load device 30 from the management device 10. And a function configured to notify the management apparatus 10 of the operation state. Therefore, the connection unit of the management apparatus 10 includes an I / F unit (not shown) for communicating with the load device 30.
  • the load device 30 may be configured to accept only on / off control by a communication signal from the management device 10. It is also possible to use a load device 30 that does not have a function configured to communicate with the management apparatus 10. In this case, the management apparatus 10 needs to include a switch element such as a relay for turning on and off the electric circuit that supplies power to the load device 30.
  • the measuring device 50 is configured to transmit the measurement value to the management device 10.
  • the measuring device 50 is configured to transmit information of measured power and power amount to the management device 10, respectively.
  • the connection unit of the management device 10 includes an I / F unit (not shown) for communicating with the measurement device 50.
  • the transmission path used for communication between the management apparatus 10 and the measurement apparatus 50 may be either a wired communication path or a wireless communication path.
  • a wired communication path is adopted because the distance to the measurement apparatus 50 is short, and when the management apparatus 10 is arranged away from the distribution board, wireless communication is performed. It is desirable to adopt a road.
  • the I / F unit (not shown) described above is configured to acquire a measurement value from the measurement device 50 every unit time.
  • each of the I / F units is configured to acquire information on electric power and electric energy from the measuring device 50 every unit time.
  • the unit time is selected from, for example, 1 minute, 5 minutes, and the like.
  • the user device 60 includes a display unit and an operation unit as a user interface, a function configured to display and visualize the information acquired by the management device 10 on the display unit, and use like a facility manager And a function configured to reflect the operation content of the operation unit by the user in the operation of the management apparatus 10. It is desirable that the display unit and the operation unit include an operation display having a configuration in which a touch panel is superimposed on a flat panel display screen.
  • the user device 60 can use a computer, a smartphone, a tablet terminal, etc. in addition to a dedicated device.
  • the connection unit of the management device 10 includes an I / F unit (not shown) configured to be able to use such a user device 60.
  • this computer uses a computer, a smartphone, a tablet terminal, or the like as the user device 60, specifications of a wireless LAN (Local Area Network) or Bluetooth (registered trademark) are adopted.
  • a wireless LAN Local Area Network
  • Bluetooth registered trademark
  • the management device 10 includes a target setting unit 11, an evaluation unit 12, an instruction unit 13, and the like.
  • the target setting unit 11 is configured to set a target value for electricity consumption.
  • the evaluation unit 12 is configured to compare the measurement value acquired from the measurement device 50 with the target value set in the target setting unit 11.
  • the instruction unit 13 is configured to instruct the operation of the load device 30 according to the evaluation result of the evaluation unit 12.
  • the target setting unit 11 is configured to set a power consumption target value and a power consumption target value, respectively.
  • target power the target value of power consumption and the target value of power consumption are referred to as “target power” and “target power amount”, respectively.
  • the target setting unit 11 is configured to obtain a target value by multiplying a preset reference value by the power saving rate when a power saving rate is given. This power saving rate is used to obtain the target value from the reference value. That is, the power saving rate is the ratio of the target rate to the reference value.
  • each of the target setting units 11 is configured to obtain a target power and a target power amount by multiplying a preset reference power and a reference power amount by the power saving rate when a power saving rate is given. Is done.
  • the reference power (or reference power amount) may be defined by contract power determined by a contract with an electric power company or the like, or may be obtained from the actual power consumption (or power consumption) in the facility.
  • the contract power is obtained from the annual maximum demand power, so the reference power amount can be obtained from the contract power.
  • the maximum demand power can be obtained by multiplying the annual maximum demand power by the demand time limit.
  • the target value (target power or target power amount) set in the target setting unit 11 is set so as to reduce the power consumption (power consumption or power consumption) of the facility.
  • the target value at all times is determined according to the utility of the person existing in the area 40 so as not to impair the convenience that the person existing in the area 40 enjoys by driving the load device 30 in the area 40.
  • an emergency target value such as when a power saving rate is instructed by an electric power company is determined to match the instructed power saving rate.
  • the target value (target power or target power amount) is different for each facility, it can be obtained from the past record of power consumption (power consumption or power consumption) and the power saving rate in the required power saving period.
  • the power saving period is a period during which power is to be saved, and is selected from, for example, a time period of one day, a period specified by a date and time, a period of a plurality of days, a day of the week, a year, and the like.
  • a target value may be set so as to reduce annual power consumption (power consumption or power consumption) in the facility.
  • the target value of the target setting unit 11 is set by the remote management device 20 in principle, but the user may set the target value using the user device 60.
  • a technique in which the remote management device 20 sets a target value (target power or target power amount) will be described later.
  • the target value can be set individually as a target value for the load device 30 or the area 40 in addition to being set as a target value for the entire facility.
  • the target setting unit 11 stores a first setting unit 111 configured to store a first target value set from the remote management device 20 and a second target value set using the user device 60. And a second setting unit 112 configured as described above.
  • the first setting unit 111 is configured to store a first target power and a first target power amount set from the remote management device 20, respectively.
  • the second setting unit 112 is configured to store a second target power and a second target power amount that are set using the user device 60, respectively.
  • the first setting unit 111 and the second setting unit 112 are configured to also store a power saving period in which the target value should be achieved.
  • the first setting unit 111 and the second setting unit 112 are configured by a storage device such as a semiconductor memory or a hard disk.
  • the target setting unit 11 may include a measured value storage unit 113 configured to store changes in measured values of the facility during a predetermined period.
  • the measurement value storage unit (hereinafter also referred to as “power storage unit”) 113 is configured to store a change in power consumption and a change in power consumption of the facility during a predetermined period, respectively.
  • the power storage unit 113 preferably stores changes in actual measured values (power consumption or power consumption) in the facility, but is stored in the power storage unit 113 immediately after the start of use of the management device 10. There is no track record. Therefore, it is also possible to use the power storage unit 113 by storing the power consumption or the transition of the power consumption obtained in the facility of the same scale as the facility where the management apparatus 10 is installed. Information on such other facilities can be acquired from the remote management device 20.
  • the target setting unit 11 extracts the measurement value of the period corresponding to the power saving period from the power storage unit 113, and uses the designated power saving rate and the first target value and the first target value. 2 is configured to calculate a target value.
  • the target setting unit 11 extracts the power consumption in the period corresponding to the power saving period from the power storage unit 113, and calculates the first target power and the second target power using the designated power saving rate. Configured as follows.
  • the target setting unit 11 extracts the power consumption amount during a period corresponding to the power saving period from the power storage unit 113, and uses the designated power saving rate to set the first target power amount and the second target power amount. Is configured to calculate.
  • the first target value set from the remote management device 20 may be set according to a request from an electric power company such as an electric power company, for example, and the power saving period for executing the process is urgent as the current day or the next day. May have.
  • the second target value set by the user device 60 often has a relatively long power saving period for executing processing. Therefore, the power saving period is set individually for the first target value, the application period over a relatively long period is set for the second target value, and the daily time zone in the application period is adopted as the power saving period.
  • the power saving period of the first setting unit 111 is individually set, and the power saving period of the second setting unit 112 is specified by a combination of the application period and the time zone.
  • the target setting unit 11 includes a target selection unit 114 in order to determine which of the first target value and the second target value is selected.
  • the target selection unit 114 is configured to select one of the first target value and the second target value according to an instruction from either the remote management device 20 or the user device 60.
  • the target selection unit 114 is configured to select one of the first target power and the second target power in accordance with an instruction from either the remote management device 20 or the user device 60.
  • the target selection unit 114 is configured to select one of the first target power amount and the second target power amount according to an instruction from either the remote management device 20 or the user device 60.
  • the management apparatus 10 can select a plurality of types of operation modes, and the target selection unit 114 is configured to select one of the first target value and the second target value according to the operation mode.
  • the operation mode includes a normal mode, a remote priority mode, a user priority mode, and the like. The operation mode is selected by the remote management device 20 or the user device 60.
  • the use of the first target value from the user device 60 can be prohibited in preparation for a case where a serious problem occurs in the facility when the first target value set from the remote management device 20 is used. It is an operation mode. That is, even if the remote management device 20 sets the first target value (or power saving rate) without considering the actual environmental state of the facility, the use of the first target value can be prohibited. It becomes possible to operate the load device 30 according to the environmental state of the site.
  • an example in which a serious problem occurs in operating a food supermarket is when the temperature of the refrigeration apparatus 303 is set to a high state for a long time. Therefore, when the temperature of the refrigeration apparatus 303 is higher than a predetermined value, if the user priority mode is permitted, the food priority deterioration may be caused by the temperature increase of the refrigeration apparatus 303 while preventing the abuse of the user priority mode. Can be prevented.
  • the target selection unit 114 is configured to select a target value with a large power saving rate from the first target value and the second target value in the normal mode. Therefore, when the normal mode is selected, electricity consumption satisfies both the first target value and the second target value.
  • the evaluation unit 12 obtains electricity consumed during the elapsed time from the start of the determination period based on electricity consumed measured every unit time by the measuring device 50 from the start of the judgment period, and the target value of the obtained electricity consumed Based on the ratio with respect to and the elapsed time, the transition in the determination period of the obtained electricity consumption is predicted.
  • the evaluation unit 12 is configured to determine whether the predicted transition exceeds the target value within the determination period. In the first example, the evaluation unit 12 calculates the average power consumption during the elapsed time from the start of the determination period by integrating the power consumption measured for each unit time by the measuring device 50 from the start of the determination period.
  • the transition in the determination period of the average power consumption during the elapsed time is predicted based on the ratio of the average power consumption (average value of the integrated values) to the target power and the elapsed time.
  • the measuring device 50 when the measuring device 50 is configured to measure instantaneous power consumption every unit time, in order to obtain a relatively high accuracy average power consumption, every relatively short unit time It is desirable to be configured to measure instantaneous power consumption.
  • the measuring device 50 is configured to measure the average power consumption during the unit time, the accuracy of the average power consumption during the elapsed time is affected by the unit time in the measuring device 50. Can be prevented.
  • the evaluation unit 12 calculates the power consumption during the elapsed time from the start of the determination period by integrating the power consumption measured every unit time by the measurement device 50 from the start of the determination period.
  • the transition of the power consumption amount during the elapsed time in the determination period is predicted based on the obtained power consumption amount ratio to the target power amount and the elapsed time.
  • the instruction unit 13 is configured to instruct the load device 30 so that the load device 30 performs an operation of suppressing power consumption if the evaluation unit 12 determines that the predicted transition exceeds the target value within the determination period.
  • the instruction unit 13 instructs the load device 30 to perform an operation of suppressing the power consumption of the load device 30 when the evaluation unit 12 predicts that the predicted transition of the average power consumption exceeds the target power. Configured to do.
  • the instruction unit 13 performs the operation of suppressing the power consumption of the load device 30. Configured to instruct.
  • control level The degree to which power consumption (or power consumption) is suppressed (hereinafter referred to as “control level”) varies depending on the ratio between power consumption (power consumption) and target power (target power). Therefore, the evaluation unit 12 is configured to notify the instruction unit 13 of a control level corresponding to the relationship between the predicted transition and the target value.
  • the control level can be selected from a plurality of levels (4 levels in the following description).
  • the determination period is selected from, for example, 30 minutes, 1 day, 1 month, 1 year, and the like. For example, when a charge system is adopted in which the unit price of electricity charges is determined at the maximum monthly value for electricity consumption (power consumption or power consumption) every 30 minutes, 30 minutes is selected as the determination period. In addition, when the power saving rate of monthly or annual power consumption (power consumption or power consumption) is set as a target value, the determination period is one month or one year. Electricity consumption (power consumption or power consumption) is integrated from the start of the determination period, and reset to 0 at the end of the determination period.
  • the instructing unit 13 sets the load device 30 that reduces the power consumption so that the power consumption (power consumption or power consumption) of the facility is reduced to match the control level. It is configured to select and determine the operation of the selected load device 30.
  • the control level is associated with the type and operation of the load device 30, and the type and operation of the load device 30 can be changed over time.
  • control table 14 may store a control procedure for the load device 30 so that at least one of the type and operation of the load device 30 to be controlled is changed with time.
  • the instruction unit 13 refers to the contents of the control table 14 and gives an instruction to the load device 30 according to the type and operation of the load device 30 read from the control table 14. May be configured.
  • the control table 14 includes a plurality of predetermined control levels obtained from the evaluation unit 12, and a command indicating the type and operation of the load device 30 associated with each of the plurality of control levels.
  • control table 14 includes a plurality of predetermined control levels obtained from the evaluation unit 12, and the order of the types and operations of the load devices 30 associated with each of the plurality of control levels. But you can.
  • the order is set so as to limit electricity (electric power or electric energy), for example. For example, in the case of a supermarket that handles food, even if the power consumption (power consumption or power consumption) of the lighting equipment 301 and the air conditioning equipment 302 in the office is reduced, there is little influence on the operation of the store, but the consumption of the refrigeration equipment 303 It is difficult to reduce electricity.
  • the content of the control table 14 is an operation for reducing the power consumption for the lighting equipment 301 and the air conditioning equipment 302 in the office for a control level with a low ratio of reducing the power consumption.
  • the type and operation of the load device 30 are associated with the control level in order from the one with the least influence when electricity consumption is reduced.
  • the contents of the control table 14 can be rewritten, and information including the contents of the control table 14 is transmitted from the remote management device 20.
  • Information including the contents of the control table 14 transmitted from the remote management device 20 is received by the update unit 15 provided in the management device 10, and the update unit 15 receives the contents of the control table 14 according to the information transmitted from the remote management device 20. Configured to update.
  • the contents of the control table 14 can also be set using the user terminal 60.
  • the target value (or power saving rate) may become too strict when operating the target facility.
  • the first target value is unilaterally determined from the remote management device 20 without considering the environmental condition of the site, so this type of problem is likely to occur.
  • the second target value set using the user device 60 may be set too small, causing a problem in the operation of the facility.
  • the management apparatus 10 is configured to evaluate the target value (target power or target power amount) set in the target setting unit 11 so that the target value is not set to be too small (the power saving rate is too high).
  • the target evaluation unit 16 is provided.
  • the target evaluation unit 16 is set in the target setting unit 11 using a recommended value (recommended power or recommended power amount) that is the minimum power consumption (power consumption or power consumption) necessary for operating the facility without problems.
  • the target value is configured to be compared with the recommended value.
  • the target evaluation unit 16 is configured to alert the user through the user device 60.
  • the recommended value is given from the remote management device 20 in principle, but may be input from the user device 60.
  • the recommended value (recommended power or recommended power amount) is estimated for each facility using the past results of simulation of electricity consumption (power consumption or power consumption) in the facility and the result of simulation.
  • the remote management device 20 has a function of estimating an environmental state for operating a facility without problems and a function of performing a simulation of electricity consumption.
  • the technology for alerting the user through the user device 60 includes a technology for displaying a comment sentence on the display device of the user device 60, a technology for changing the background color of the display device to red, and a beep sound. Selected from technology.
  • the management device 10 includes a presentation control unit 17 configured to display information on the display device of the user device 60, and a presentation content storage unit 18 that stores display content to be displayed on the display device.
  • the presentation content storage unit 18 is a result of the evaluation by the target evaluation unit 16 as a result of the evaluation unit 12 comparing the measurement value (power or electric energy) acquired from the measurement device 50 with the target value set in the target setting unit 11.
  • the presentation control unit 17 includes a function configured to present information stored in the presentation content storage unit 18 to the user device 60.
  • the presentation control unit 17 is configured to display on the user device 60 also the content instructed to the load device 30 by the instruction unit 13.
  • the instruction unit 13 compares the control level with the control table 14 and extracts the type and operation of the load device 30 according to the control level. Configured as follows. Here, the instruction unit 13 determines the facility if the control level is higher and the power consumption (power consumption or power consumption) by the load device 30 is reduced but exceeds the target value (target power or target power consumption). In the operation, it is determined that further power saving is impossible, and the determination result is presented to the user device 60 through the presentation control unit 17. Further, the management device 10 may be configured to change the operation mode to the user priority mode using the determination result of the instruction unit 13.
  • the user priority mode it is possible to prohibit power saving or increase the power consumption of the load device 30 by operating the user device 60. That is, the user can increase the power consumption according to the actual environmental state of the facility space while accepting the first target value (or power saving rate) instructed from the remote management device 20. You will be convinced and save power.
  • the remote management device 20 is configured to communicate with a plurality of management devices 10 and holds a target power saving rate to be set in order to notify each management device 10 of the same first power saving rate. And a communication interface (not shown) configured to communicate with the management apparatus 10 through the communication network NT1.
  • the power saving period and the first power saving rate on the current day or the next day determined by the electric utility or the like are input from the information input unit 24 to the target instruction unit 21 and notified to the management device 10 at an appropriate timing.
  • the first power saving rate to be set in the management device 10 of each store is Transmission from the remote management device 20 is possible.
  • the requested first power saving rate can be transmitted to the management device 10 of each store.
  • the management device 10 in order for the management device 10 to operate the load device 30 so as to satisfy the first power saving rate, it is necessary to determine the operation of the load device 30 according to the environmental conditions of the facility where the management device 10 is disposed. is there. In other words, the relationship between the control level registered in the control table 14 and the type and operation of the load device 30 must be set appropriately.
  • the remote management device 20 is configured to communicate with a plurality of management devices 10, it is possible to collect a history of electricity consumption (power consumption or power consumption) for each management device 10.
  • the remote management device 20 of one group may collect the history of electricity consumption for each management device 10 of the second group from the remote management device 20 of the second group.
  • the data related to the history of electricity consumption collected from each of the plurality of facilities is associated with the facility information regarding the characteristics of the corresponding facility, and the information storage provided in the remote management device 20 Stored in the unit 22. That is, the remote management device 20 associates the data related to the history of electricity consumption from each of the plurality of facilities with the characteristics of the corresponding facility, and associates the data with the characteristics data of the plurality of facilities and each of the plurality of facilities.
  • a data set that is a collection of data relating to the history of electricity consumption is stored in the information storage unit 22.
  • the characteristic data of the information to be stored in the information storage unit 22 is obtained when the remote management device 20 receives facility information and setting information related to the facility characteristics from the user device 60 through the management device 10.
  • facility information and setting information to be stored in the information storage unit 22 can be input to the information storage unit 22 from an information input unit 24 provided in the remote management device 20.
  • each facility information is combined with a history of electricity consumption (power consumption or power consumption) of the corresponding facility. Configured to obtain.
  • Each facility information includes environmental information and setting information, and the environmental information includes facility information, scene information, and external environment information.
  • the facility information includes information on the area where the facility exists, information on the use of the facility, information on the size of the facility, and information on the type and power capacity of the installed load device 30.
  • the information regarding the use includes a division such as a store, an office building, and a hotel, and a division of an area 40 such as a sales floor and an office. Further, the information indicating the size is represented by the floor area of the area 40.
  • the information regarding the type of the load device 30 represents the illumination device 301, the air conditioning device 302, and the refrigeration device 303.
  • Capacity basic unit Information relating to the power capacity (power range, particularly maximum rated power [W]) is divided by the floor area [m 2 ] of the area 40, and information is stored as a power load density per unit area (hereinafter referred to as “capacity basic unit”). Stored in the unit 22.
  • capacity basic unit a power load density per unit area
  • the power load density is information that indicates the grade of the facility and the capacity for energy saving.
  • the area 40 where the power load density of the lighting device 301 is large shows a tendency that the illuminance is high, and it can be said that there is a large energy saving energy compared to the area 40 where the illuminance is low.
  • the power load density of the air conditioning equipment 302 is generally are often designed at about 110W / m 2, if the power load density is 200 W / m 2, and a large margin for energy saving I can say that.
  • the facility grade mainly represents the heat insulation performance of the area 40.
  • Scene information represents information on the environment that affects the operation of the load device 30 such as busy hours, spread times, non-business hours, and power saving hours. That is, it represents the difference in the environment mainly due to the number and attributes of the people present in the facility (different of employees and visitors).
  • External environment information represents information related to outside air temperature, humidity, and solar radiation.
  • the setting information is information on the environment realized by the operation of the load device 30, and here represents the set illuminance of the lighting device 301, the set temperature of the air conditioning device 302, and the set temperature of the refrigeration device 303.
  • the remote management device 20 is configured to generate the contents of the control table 14 provided in the management device 10 using each data stored in the information storage unit 22. Therefore, the comparison part 23 comprised so that the facility information corresponding to the management apparatus 10 and the facility information which the information storage part 22 memorize
  • the characteristics of the facility where the load device 30 managed by the management apparatus 10 is arranged are given from the information input unit 24 to the comparison unit 23.
  • the information input unit 24 includes a configuration for receiving facility characteristics input from a user device 60 provided in the management apparatus 10 in addition to a configuration for inputting facility characteristics using an operation unit such as a keyboard and a mouse. It may be. The function of the information input unit 24 will be described later.
  • the comparison unit 23 is configured to extract setting information using the environment information in the characteristics of the facility given from the information input unit 24 as a key.
  • the environment information used for the key is represented by characters, a record including information that matches the key is extracted.
  • the environmental information used for the key is expressed by a numerical value such as an electric power load density or an outside air temperature, the similarity is evaluated by a predetermined evaluation rule for each type of the load device 30 and similar for each type of the load device 30 High setting information is selected. This process will be described later. It is desirable that the environmental information used for the key includes at least the facility classification, the area 40 classification, the power load density, the scene information, and the outside temperature.
  • the comparison unit 23 extracts a group of setting information regarding the characteristics of a plurality of facilities from each data stored in the information storage unit 22, the group of setting information is transmitted to the management device 10 and presented to the user device 60. By doing so, you may make a user select desired setting information from a group of setting information regarding the characteristics of a plurality of facilities.
  • the comparison unit 23 is configured to notify the management device 10 when the data matching the key given from the information input unit 24 cannot be extracted from the information storage unit 22 and to prompt the user's intervention through the user device 60. Is done. At this time, it is desirable that the user device 60 indicates the key from which the data is extracted, and allows the user to exclude some keys.
  • the setting information can be extracted from the data stored in the information storage unit 22, the setting information set by the expert or expert can be used for the facility having similar environmental information. Therefore, by simply communicating between the management device 10 and the remote management device 20, even a user who does not have special knowledge can easily set appropriate setting information. That is, it becomes possible to determine the contents of the control table 14 in a short time using setting information suitable for the facility where the load device 30 managed by the management apparatus 10 is arranged.
  • the remote management device 20 includes a data generation unit 25 configured to generate control data that is the contents of the control table 14 based on the data extracted by the comparison unit 23. As described above, the control table 14 includes a plurality of control levels and the operation of the load device 30 associated with each of the plurality of control levels.
  • the collected information includes information that is not control information set by a skilled person or an expert. There is a possibility. In addition, there is a possibility that control information obtained with a desired result in the facility is included even though it is not control information set by an expert or expert. Therefore, when the control data selected by the management device 10 is not changed beyond a predetermined duration (for example, 1 hour), the information storage unit 22 is in a state where this operation of the load device 30 is desirable for the user. It may be judged and recorded. That is, the information storage unit 22 may be configured to store the control information of the load device 30 when the user determines that the operation is desirable, together with the facility information. Since the information stored in the information storage unit 22 in this way becomes a successful example, the possibility of being reused in other facilities becomes high.
  • the remote management device 20 determines the function configured to notify the management device 10 of the first power saving rate notified from the above-mentioned electric utility, etc., and the contents of the control table 14 provided in the management device 10 In addition to the function configured as described above, a function configured to calculate the reference power is provided. That is, the remote management device 20 includes an energy calculation unit 26 configured to determine a reference power and a recommended power to be given to the target evaluation unit 16 of the management device 10.
  • the energy calculation unit 26 is configured to estimate the power consumption of the facility by computer simulation using the same information as the facility characteristics described above. That is, the energy calculation unit 26 is realized by executing an application program for performing an energy simulation on a computer.
  • Known application programs for energy simulation include TRNSYS and Energy Plus.
  • the information regarding the facility given to the energy calculation unit 26 includes the heat insulation performance, the window area, the floor area, etc. of the facility or the area 40.
  • this type of information includes the power capacity of the load device 30, efficiency information indicating the energy efficiency of the load device 30, the set illuminance of the lighting device 301, the set temperature of the air conditioning device 302, the set temperature of the refrigeration device 303, and the load device. 30 operating hours are also included.
  • weather information such as the outside temperature, humidity, and amount of solar radiation in the area where the management device 10 is arranged.
  • the remote management device 20 includes a parameter estimation unit 27 configured to automatically generate 200 to 300 types of information to be given to the energy calculation unit 26 by only inputting about 10 types of information.
  • the parameter estimation unit 27 uses the information input by the user by the remote management device 20 communicating with the management device 10 and the information (parameters) given to the energy calculation unit 26 using the information stored in the information storage unit 22. ) Is estimated.
  • Information input to the user device 60 attached to the management device 10 is stored in a holding unit provided in the information input unit 24.
  • the information stored in the holding unit is information on basic conditions related to the facility such as floor area, age, facility usage (store, office, etc.), region, business hours (usage time zone), and type of load device 30. is there.
  • Information given to the parameter estimation unit 27 is not only input from the user device 60 to the information input unit 24 but may be directly input to the information input unit 24.
  • the information extracted and used by the parameter estimation unit 27 from the information storage unit 22 includes the power load density of the load device 30 arranged for each area 40, the grade of the facility, the energy efficiency of the load device 30, and the area where the facility exists. , Including outside air temperature, humidity, and solar radiation.
  • the parameter estimation unit 27 has a function configured to estimate the operation time of the load device 30 from business hours. In order to estimate the operation time from the business hours, a data table or an arithmetic expression is used.
  • the remote management device 20 when information related to the facility is given from the management device 10 to the information input unit 24, the remote management device 20 causes the comparison unit 23 to send information corresponding to the information given to the information input unit 24 to the information storage unit. 22 is extracted.
  • the data generation unit 25 generates the contents of the control table 14 using the information extracted from the information storage unit 22 by the comparison unit 23 and transmits the contents of the control table 14 to the update unit 15 of the management apparatus 10.
  • the update unit 15 writes the content received from the data generation unit 25 in the control table 14.
  • the information given from the management apparatus 10 to the information input unit 24 is facility information, scene information, and external environment information, and data that matches or is similar is extracted from the information storage unit 22. Therefore, setting information is extracted with the contents of these information as conditions. Since the extracted setting information is setting information set by an expert or expert, the data generation unit 25 generates the contents of the control table 14 relatively easily and appropriately by using the extracted setting information. can do.
  • the data generation unit 25 can automatically generate the contents of the control table 14 by using the past setting information.
  • the contents of the control table 14 can be corrected by the user by operating the user device 60.
  • FIG. 2 shows an example of information stored in the information storage unit 22.
  • the illustrated example assumes a food supermarket, and the case (refrigerated equipment 303) represents a refrigerated showcase.
  • the basic unit of air conditioning capacity is the basic unit of capacity of the air conditioner 302
  • the basic unit of lighting capacity is the basic unit of capacity of the lighting device 301
  • the basic unit of case capacity is the basic unit of capacity of the refrigeration device 303.
  • “Area, air conditioning capacity basic unit, lighting capacity basic unit, case capacity basic unit” is equipment information
  • "scene” is scene information
  • "outside temperature” is external environment information
  • “set temperature (air conditioning)” “set illuminance”
  • Set temperature (case)” corresponds to setting information.
  • “No” is a number for distinguishing records.
  • the capacity unit of the load device 30 is represented by the power load density, and the unit is W / m 2 .
  • the unit of the set temperature is ° C., and the unit of the set illuminance is lx.
  • Experts and experts determine the operation of the load device 30 by estimating the margin of power saving for each area 40 by considering the power load density. However, it is difficult for a general user to determine the operation of the load device 30 in consideration of the power load density.
  • the expert or expert since the expert or expert stores the setting information adopted for the condition combining the facility information, the scene information, and the external environment information in the information storage unit 22, by using this information, The setting information can be set easily and appropriately.
  • the area 40 is a sales floor, the scene is busy, the outside temperature is 29 ° C., the air conditioning capacity basic unit is 140 W / m 2 , the lighting capacity basic unit is 26 W / m 2 , and the case capacity basic unit is Assume that information of 200 W / m 2 is input. That is, it is assumed that the air conditioner 302 performs a cooling operation.
  • the comparison unit 23 attempts to extract a record from the information storage unit 22 using this information ⁇ sales floor, busy, 29, 140, 26, 200 ⁇ as a key. As described above, the comparison unit 23 generates data similar to the condition represented by the characters, and the condition represented by the numerical value is similar for each type of the load device 30.
  • the records whose “No” is “1” and “3” represent sales floors and busy hours, so the comparison unit 23 narrows down the records to be extracted to these two records.
  • the degree of similarity is evaluated using the capacity unit and the outside air temperature, and setting information corresponding to a condition with a high degree of similarity is selected, thereby setting information To decide.
  • the set illuminance of the lighting device 301 is not affected by the outside air temperature, and the set temperatures of the air conditioner 302 and the refrigeration device 303 are affected by the outside air temperature. Including and evaluating.
  • the capacity per unit of the lighting apparatus 301 are each 25W / m 2 and 20W / m 2, the instructed from the information input unit 24 26W / the degree of similarity between the lighting capacity per unit of m 2 is large is more of 25W / m 2. Therefore, 750 lx that is the set illuminance of the record “1” is adopted as the set illuminance.
  • the capacitance per unit of air conditioners 302 in the record of "1” and “3” are each 100W / m 2 and 150 W / m 2, the degree of similarity between the 140 W / m 2 has better of 150 W / m 2 large.
  • the set temperature of the air conditioner 302 is selected to be 26 ° C., which is the set temperature of the record “3”.
  • the capacity per unit of refrigeration appliance 303 in the record of "1" and “3" are each 200 W / m 2 and 250 W / m 2, the similarity between 200 W / m 2 from the information input unit 24 " 1 ”200W / m 2 is larger.
  • the set temperature of the refrigeration apparatus 303 is selected to be 5 ° C., which is the set temperature of the record “1”.
  • a value corresponding to “1” is selected as the set illuminance of the lighting device 301
  • a value corresponding to “3” is selected as the set temperature of the air conditioner 302
  • the set temperature of the refrigeration device 303 is “ The value corresponding to “1” is selected.
  • the outside air temperature is 28 ° C. for the “1” record and 30 ° C. for the “3” record, but 30 ° C., which is the worse condition, is adopted. Therefore, information ⁇ sales floor, busy, 30, 150, 25, 200, 26, 750, 5 ⁇ is delivered to the data generation unit 25.
  • the comparison unit 23 evaluates the similarity, when a plurality of setting information with substantially no difference is extracted, the average value of each setting information is adopted.
  • the number of times the extracted record has been used may be stored in the information storage unit 22, and the comparison unit 23 may employ a weighted average value weighted by the number of times the record has been used as setting information. . That is, when the comparison unit 23 extracts a plurality of records from the information storage unit 22, the comparison unit 23 uses a weighting coefficient that becomes a larger value as the actual number of times increases based on the actual number of times for each setting information extracted from these records. The weighted average value of the setting information is calculated. The weighted average value thus calculated is set as setting information to be given to the data generation unit 25. Further, when considering the utility of the user, if the user name is included in the record stored in the information storage unit 22, it is possible to narrow down the records to be selected using the user name as a key.
  • the information input unit 24 has a function configured to determine the contents of the key in advance and treat the given information as invalid when deviating from the appropriate information range. It is desirable to evaluate whether or not the information stored in the information storage unit 22 is within the appropriate information range, and to treat the information as invalid if it is in an inappropriate range.
  • numerical information included in the environmental information are used as explanatory variables.
  • a regression equation using the setting information as an objective variable may be created for each type of load device 30.
  • the information is treated as invalid when the deviation between the setting information estimated by the regression equation with respect to the environment information and the setting information extracted by the comparison unit 23 deviates from the allowable range. You can do it.
  • the information determined by the comparison unit 23 is transferred to the data generation unit 25, and the data generation unit 25 generates the contents of the control table on the basis of the information transferred from the comparison unit 23. Therefore, a new control table 14 is generated on the basis of proven information created by experts and experts in the past, and a control table 14 comparable to the control table created by experts and experts is obtained. .
  • control table 14 associates operation information for each control level with respect to the lighting device 301, the air conditioning device 302, and the refrigeration device 303.
  • the control level can be selected from four levels of 0 to 3.
  • Control level 0 is a control state in which no energy-saving measures are taken
  • control level 1 is a normal energy-saving control state
  • control level 2 is the most severe control state that can be routinely put up
  • control level 3 is performed extraordinarily. This is a particularly severe control condition.
  • control level means a control state in which the convenience of using the load device 30 decreases as the numerical value increases.
  • control level 0 is a setting close to normal operation and is selected during a busy time period.
  • Control level 1 is a setting for energy saving operation, and is selected in a quiet time zone.
  • the control level 2 is selected for power saving, and the control level 3 is a so-called demand response, and is selected when responding to the second power saving rate required by an electric power company or the like. That is, the control level corresponds to the setting condition for each scene.
  • the management apparatus 10 measures and monitors the power consumption of the facility.
  • the evaluation unit 12 provided in the management device 10 includes a value of power consumption (power consumption or power consumption) measured by the measurement device 50 and a target value (target power or target power amount) set in the target setting unit 11. And predicting whether or not the value of electricity consumption is equal to or less than the target value at the end of the determination period based on the ratio of electricity consumption to the target value. In other words, the management device 10 predicts whether the value of electricity consumption exceeds the target value during the determination period.
  • the instruction unit 13 instructs to increase the control level so that the power consumption in the load device 30 is reduced.
  • the instructions are given at the time of prediction.
  • the evaluation unit 12 determines that the load device 30 An instruction to lower the control level is given to the instructing unit 13 so as to improve the convenience of use.
  • the instructing unit 13 instructs the load device 30 to operate according to the control level by checking the control level against the control table 14.
  • the evaluation unit 12 selects the control level 3
  • some of the load devices 30 are passed through the user device 60.
  • the content to be presented to the user device 60 is read from the presentation content storage unit 18 and output to the user device 60 through the presentation control unit 17.
  • the output to the user device 60 employs a format that displays a warning message on the screen of the user device 60 as “the demand will be exceeded as it is, so please stop the operation of the surrounding load devices”.
  • a plurality of characters (icons) may be switched and displayed on the screen of the user device 60 so that the urgency level can be intuitively understood according to the control level employed.
  • Operaation example 2 The operation example 1 has been described focusing on the process of generating the contents of the control table 14 based on the environment information input by the user from the user device 60.
  • the content of the control table 14 is generated based on the information extracted from the information storage unit 22 using the evaluation rule in the comparison unit 23, but the generated content is not verified.
  • the remote management device 20 inputs the control data (contents of the control table 14) generated by the data generation unit 25 to the energy calculation unit 26 together with the facility environment information.
  • the environment information input to the energy calculation unit 26 includes information necessary for energy simulation such as facility use classification, area 40 classification, external environment information, scene information, power load density, and energy efficiency of the load device 30. Including.
  • the energy calculator 26 calculates recommended power, which is the lowest power that does not cause a failure in the operation of the facility, by energy simulation.
  • the target evaluation unit 16 of the management apparatus 10 sets a recommended value (recommended power or recommended power amount) that is the minimum electricity (power or power amount) for realizing an environmental state for operating the facility without problems.
  • the target value (target power or target power amount) determined by the reference value (reference power or reference power amount) and the power saving rate is compared.
  • the target evaluation unit 16 determines that the requested power saving rate is difficult to realize, and alerts the user through the user device 60.
  • the background screen of the user device 60 is changed from blue to red, a notification sound is output from the user device 60, or displayed on the user device 60. What is necessary is just to change the form of the icon to perform.
  • the feasible recommended value (recommended power or recommended power amount) is determined using a regression equation that obtains the maximum power per day using the power load density and the maximum daily temperature of the outside temperature as explanatory variables.
  • This regression equation is obtained by extracting information on a facility having a similar use and configuration of the load device 30 managed by the management device 10 from the information storage unit 22 and using the extracted information. Determined.
  • the recommended value (recommended power or recommended power amount)
  • the predicted maximum temperature of the corresponding day is applied to the regression equation described above, whereby the maximum power load density is obtained. Since the value is predicted, the area of the facility is multiplied by the maximum value of the obtained power load density. Since the result of this calculation is considered to be the maximum power of the corresponding day at the corresponding facility, a feasible recommended value is obtained from this value. For example, the value is used as a feasible recommended power.
  • the energy calculation unit 26 predicts and obtains a recommended value (recommended power or recommended power amount) that does not hinder the facility operation by energy simulation.
  • the target evaluation unit 16 compares the target value (target power or target power amount) corresponding to the power saving rate set by using the user device 60 and the recommended value (recommended power or recommended power amount) to realize the target electricity. Assess the possibilities.
  • the presentation control unit 17 alerts the user through the user device 60, so that the user can set an appropriate power saving rate.
  • the current power consumption (electricity consumption) ratio to the target electric power (target value) as shown in FIG. It is desirable to change the screen display accordingly.
  • an icon 61 representing a face is displayed on the screen of the user device 60, and the expression of the icon 61 according to the current power consumption (power consumption or power consumption) with respect to the target value (target power or target power consumption).
  • the icon 61 represents a smile if the power consumption (power consumption or its integrated value (power consumption)) has a margin (for example, 80% or less) with respect to the target value.
  • a predetermined threshold for example, 90%
  • the target evaluation unit 16 determines the current ratio of electricity consumption to the target value.
  • a straight line whose slope is determined by the target value (target power or target power amount) and the determination period is set, and electricity consumption (power consumption or integrated value) is below the straight line in the determination period It may indicate that the target is being achieved, and that electricity consumption is on the upper side of the straight line may indicate that the target is far from being achieved.
  • two regions for determining the transition of electricity consumption by the straight line may be set as a determination period, and the display of the icon 61 may be switched depending on whether the electricity consumption is an upper region or a lower region of the straight line. .
  • a plurality of straight lines set in the determination period There may be a plurality of straight lines set in the determination period. As described above, two states can be determined by setting one straight line. On the other hand, for example, assuming that the target value (target power or target power amount) is 100%, a straight line that reaches 120% of the target value, a straight line that reaches 80% of the target value, and a straight line that reaches 100% of the target value If three straight lines are set, four states can be determined. In short, a plurality of (for example, four) icons different from each other may be associated with a plurality of areas (for example, four areas) divided by at least one (for example, three) straight lines. Further, it is not essential that the icon 61 is a facial expression, and an appropriate character may be used. The concept of the form of the icon 61 includes not only the shape but also the size and color.
  • the determination is made when the ratio of electricity consumption (power consumption or integrated value) to the target value (target power or target power amount) exceeds the threshold value. Since the target value may be exceeded at the end of the period, the user is notified to limit the operation of the appropriate load device 30. This notification is performed by displaying a message on the screen of the user device 60 or outputting a notification sound.
  • the display part 62 which shows a power saving rate (20%) is provided in the lower part of the screen of the user apparatus 60 shown in FIG.
  • the display unit 62 represents the lower limit value (recommended value) of the power saving rate by a broken-line square, and the realized power saving rate (20%) by a solid-line square.
  • the power saving rate adopted in the management device 10 needs to consider the power saving rate instructed from the remote management device 20. Therefore, in the example illustrated in FIG. 4, information indicating whether the current power saving rate is set to the management device 10 or the remote management device 20 is displayed on the screen of the user device 60 (“ “Server" indicates the power saving rate from the remote management device 20).
  • the management device 10 In order to adjust the power saving rate instructed from the remote management device 20 while allowing the facility manager to set the power saving rate using the user device 60, the management device 10 The operating state of the load device 30 to be managed is fed back. Moreover, the target value (target power or target power amount) and the power consumption (power consumption or power consumption) are set so that the power saving rate set by the user such as the facility manager from the user device 60 does not hinder the operation of the facility. The amount of power). Such an operation is performed by the target evaluation unit 16. In other words, the target evaluation unit 16 adjusts the power saving rate so that the power saving rate set by the user and the power saving rate set by the remote management device 20 are balanced, and both the power saving and the operation in the facility are compatible. Configured as follows.
  • the target setting unit 11 of the management device 10 has a first target value (first target power or first target power amount) corresponding to the power saving rate instructed from the remote management device 20. And the 2nd target value (2nd target electric power or the 2nd target electric energy) according to the power-saving rate set up by users, such as a person in charge of facilities, through user device 60 is set up. Therefore, it can be considered that the first target value and the second target value compete with each other.
  • the target setting unit 11 includes a target selection unit 114 configured to select one of the first target value and the second target value.
  • a procedure for selecting a target value (target power or target power amount) when the first target value and the second target value compete with each other will be described.
  • the remote management device 20 has an event of power saving on the current day or the next day due to a request from an electric power company or the like.
  • a power saving period (date and time) for power saving and a power saving rate are instructed from the remote management device 20 to the required management device 10.
  • the management device 10 Upon receiving the power saving rate from the remote management device 20, the management device 10 calculates a first target value (first target power or first target power amount) based on the power saving rate, and combines the first target value with the power saving period. And stored in the first setting unit 111.
  • the second target value (second target power or second target power amount) is calculated from the power saving rate. Is calculated, and the second target value is stored in the second setting unit 112 together with the power saving period.
  • the target setting unit 11 refers to the current date and time measured by a clock unit (not shown) built in the management apparatus 10, and operates the load device 30 without power saving if the referenced date and time is not a power saving period. Let Moreover, the target setting part 11 will operate the load apparatus 30 so that it may correspond to the 1st or 2nd target value according to the applicable power saving period, if the referred date and time is a power saving period.
  • the target selecting unit 114 sets both target values (target power or target power). The smaller one of the first target value and the second target value is adopted as the target value so as to satisfy (quantity). In other words, the target selection unit 114 employs a larger power saving rate.
  • the second power saving rate set using the user device 60 is considered to be smaller than the first power saving rate requested from the remote management device 20, and depending on the type of the load device 30 used in the facility, Adopting one power saving rate may cause operational problems. For example, in a food supermarket, if the electricity consumption (power consumption or power consumption) of the refrigeration equipment 303 that stores food that needs to be refrigerated or frozen is not maintained, the food will be deteriorated and operation will be hindered.
  • the target selection unit 114 has an operational obstacle.
  • the power saving rate input from the user device 60 is preferentially used. For example, when power saving is requested from the remote management device 20, the power saving rate set by the user device 60 is 15% before the start of the power saving period, but is reduced to 5% after the start of the power saving period. If saved, the power saving rate will be 5%. Note that even when the power saving rate set by the user device 60 is 0% before the start of the power saving period, the target selection unit 114 determines that power saving causes an operational obstacle and saves power. Absent.
  • the second power saving rate set by the user device 60 is always used preferentially, the second power saving rate may be abused and the first power saving rate set from the remote management device 20 may not be used. is there. Therefore, it is desirable to attach permission conditions for using the second power saving rate set from the user device 60 in preference to the first power saving rate set from the remote management device 20.
  • the permission condition is, for example, that the integrated value of power consumption within the determination period (usually 30 minutes) for determining the unit price of the electricity bill reaches 90% or more of the upper limit value set for the determination period.
  • This permission condition allows the second power saving rate to be used as a response when the demand power (demand) at the facility approaches a peak (upper limit).
  • the permission condition may be that the internal temperature of any of the refrigeration devices 303 is higher than a predetermined reference temperature.
  • This permission condition allows the use of the second power saving rate as a countermeasure for preventing deterioration of food due to an increase in the internal temperature of the refrigerator device 303. Thus, only when the permission condition is satisfied, the second power saving rate is prevented from being abused by allowing the second power saving rate to be used in preference to the first power saving rate.
  • the power saving rate can be reduced.
  • the restriction by the permission condition is added, when the first power saving rate is set from the remote management device 20 due to a social request, the second power saving rate set by the user if the permission condition is not satisfied. Is not adopted, abuse of the second power saving rate can be suppressed.
  • the remote management device 20 includes an energy calculation unit 26 that performs energy simulation by computer simulation. Depending on the scale of the facility, 200 to 300 types of information are required for the energy calculator 26 to accurately perform the energy simulation. It is difficult for general users such as facility managers to set such a large number of pieces of information correctly according to the facility, and it is difficult to perform energy simulations unless they are skilled workers or experts. .
  • the parameter estimation unit 27 provided in the remote management device 20 generates a large number of parameter information necessary for the calculation by the energy calculation unit 26 from a small number of parameter input information. Is possible. That is, it is possible to perform an energy simulation even by a user who is not an expert or expert simply by giving the parameter estimation unit 27 input information of about 10 parameters.
  • the input information given to the parameter estimation unit 27 is information that can be easily known by the user among the environmental information of the facility characteristics.
  • the input information includes, as parameters, the floor area of the facility, the age of the facility, the classification of the use of the facility, the geographical area where the facility exists, the business hours of the facility, and the type of the load device 30 arranged in the facility.
  • the enumerated parameters of the input information are the minimum necessary information and can be easily obtained by users.
  • the parameter estimation unit 27 collects information necessary for calculation by the energy calculation unit 26 from the information storage unit 22 by referring to various information stored in the information storage unit 22.
  • the information stored in the information storage unit 22 includes the power load density (or power capacity) of the load device 30 arranged for each area 40, the heat insulation performance and floor area of the area 40, and the electric device 30. Energy efficiency, facility grade, energy efficiency of electrical equipment 30, area where the facility is located, outside temperature, humidity, solar radiation, and the like.
  • the parameter estimation unit 27 has a function configured to estimate the operation time of the load device 30 from business hours. In order to estimate the operation time from the business hours, a data table or an arithmetic expression stored in the information storage unit 22 is used.
  • the information storage unit 22 can use a size (unit of length) for the refrigeration equipment 303 instead of the power capacity.
  • the refrigeration equipment 303 is often expressed in length units in industry customs, and since the power capacity of the refrigeration equipment 303 and the floor area of the area 40 are not directly related, the power load density is used rather than the power load density. Using the length unit increases the estimation accuracy of the power capacity.
  • the user may roughly estimate the size (length) of the refrigeration equipment 303 arranged in the area 40 from the floor plan of the area 40.
  • the parameter estimation unit 27 collates the input information with various information stored in the information storage unit 22 and evaluates the similarity with the input information, thereby calculating the energy calculation unit 26. Estimate the information given to. In other words, the parameter estimation unit 27 collates the input information of a small number of parameters with the information of a large number of parameters stored in the information storage unit 22, thereby converting the information of the small number of parameters into an energy simulation in the energy calculation unit 26. It expands to information of a large number of parameters necessary for.
  • the information storage unit 22 stores standard information on the ceiling height, window area ratio, and the like, and standard information on the insulation performance of walls and windows for each geographical area. is doing. Accordingly, when the parameter estimation unit 27 is given as the input information parameters the floor area of the facility, the age of the facility, the classification of the use of the facility, and the geographical area where the facility exists, the ceiling of the facility necessary for the energy simulation Information such as height, window area, and heat insulation performance can be obtained.
  • the information storage unit 22 stores external environment information such as outside air temperature, humidity, and amount of solar radiation classified for each region, and the parameter estimation unit 27 is given the region where the facility exists as input information. And is configured to output external environment information.
  • the information storage unit 22 stores setting information regarding the load device 30 in addition to the facility information, the scene information, and the external environment information. Therefore, the setting information of the load device 30 corresponding to the facility can be extracted by searching the facility information, the scene information, and the external environment information using the input information of the parameter estimation unit 27 as a key.
  • the parameter estimation unit 27 narrows down the information by majority vote if it is non-numeric information, and average value if it is numeric information Etc. are used.
  • the operating time of the load device 30 is extracted from the information storage unit 22 based on the business hours of the facility.
  • the information storage unit 22 stores a reference value for the operation time of the load device 30 and a correction value corresponding to the business hours.
  • the operation time of the load device 30 corresponding to the business hours is calculated for each area 40.
  • 1-2 hours before the start of business hours is preparation time before opening
  • 1-2 hours after the end of business hours is the time to clean up after closing become.
  • the preparation time if the lighting device 301 is turned on so as to secure an illuminance of a workable level and the air conditioning device 302 is stopped, the operation time of the air conditioning device 302 matches the business hours.
  • the device 301 must be in an operating state necessary for work for one to two hours outside business hours.
  • the refrigeration equipment 303 needs to continue operation regardless of business hours except for the interior lighting during the period in which the goods are stored in the interior.
  • the parameter estimation unit 27 sets the operation time of the load device 30 to the business hours of the facility. Can be estimated accordingly.
  • the information storage unit 22 stores energy efficiency (equipment efficiency) for each type of load device 30.
  • the energy efficiency is represented by the relationship between the outside air temperature and the device efficiency (COP: Coefficient Of Performance).
  • the parameter estimation unit 27 estimates the equipment efficiency using the outside air temperature included in the external environment information.
  • the parameter estimation unit 27 estimates information necessary for the energy simulation in the energy calculation unit 26 from the input information. Therefore, if the information amount of the input information increases, the estimation accuracy of information given to the energy calculation unit 26 increases. . Therefore, it is conceivable that a user such as a skilled person or an expert who has knowledge of energy simulation intends to directly input a large number of pieces of information to the energy calculation unit 26 in order to improve the accuracy of the energy simulation. . Therefore, the energy calculation unit 26 allows information on a large number of parameters to be directly input by a skilled person or an expert.
  • the energy calculation unit 26 uses the recommended value (recommended power or power) without using the parameters generated by the parameter estimation unit 27. (Recommended electric energy) is calculated.
  • the energy calculation unit 26 may calculate a reference value (reference power or reference power amount) together with the recommended value.
  • the contents of the information storage unit 22 can be updated.
  • the power capacity is directly input as 150 kW for the air conditioner 302 arranged on the sales floor having a floor area of 1000 m 2 to the energy calculation unit 26
  • the basic unit of the air conditioning capacity is 150 W / m 2 . .
  • the value obtained in this way is stored in the information storage unit 22. That is, information directly input to the energy calculation unit 26 by a skilled person or an expert is stored in the information storage unit 22 and used for subsequent estimation by the parameter estimation unit 27. Therefore, new information is added to the information stored in the information storage unit 22 as needed.
  • old information of a predetermined period before the added information is deleted from the information storage unit 22, the information stored in the information storage unit 22 is prevented from being obsolete.
  • the energy calculation unit 26 When the parameter estimation unit 27 generates information used for the energy simulation based on the input information, the energy calculation unit 26 performs the energy simulation using the purpose and effect of energy saving as a constraint condition. Through this simulation, the energy calculation unit 26 calculates target electricity (target power or target power amount) for the facility indicated by the input information.
  • the present embodiment includes the instruction unit 13, the user device 60, the target evaluation unit 16, and the presentation control unit 17.
  • the instruction unit 13 is configured to control the operation of the load device 30 in accordance with a target power saving rate in a facility where the plurality of load devices 30 are arranged.
  • the user device 60 has a function (display unit) configured to display information.
  • the target evaluation unit 16 is configured to evaluate the consumption amount of utility energy by the load device 30 against a predetermined target value.
  • the presentation control unit 17 is configured to display icons with different forms on the user device 60 according to the evaluation result of the target evaluation unit 16. In this embodiment, even a user who does not have specialized knowledge can manage a target value relating to utility energy consumption.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Accounting & Taxation (AREA)
  • Marketing (AREA)
  • Finance (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • General Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Tourism & Hospitality (AREA)
  • Primary Health Care (AREA)
  • Human Resources & Organizations (AREA)
  • General Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

 エネルギー管理装置は、指示部14と目標評価部16と提示制御部17と利用者装置60とを備える。指示部14は、複数の負荷機器30が配置された施設において目標とする節電率に応じて負荷機器30の動作を制御する。利用者装置60は、情報を表示する機能を有する。目標評価部16は、負荷機器30によるユーティリティ・エネルギーの消費量をあらかじめ定めた目標値に対して評価する。提示制御部17は、目標評価部16の評価結果に応じて形態の異なるアイコンを利用者装置60に表示させる。

Description

エネルギー管理装置
 本発明は、施設に配置した複数の負荷機器の動作状態を管理し、負荷機器で消費されるユーティリティ・エネルギーを抑制するように構成されるエネルギー管理装置に関するものである。
 従来、多数の負荷機器を備える施設において、負荷機器で消費されるユーティリティ・エネルギーを抑制するための技術が種々提案されている。たとえば、食品を扱うスーパーマーケットのような施設では、照明機器、空調機器、冷蔵機器(冷蔵庫または冷凍庫)のような負荷機器が多数配置され、これらの負荷機器で消費されるユーティリティ・エネルギーを抑制するために、様々な条件に応じて負荷機器の動作を制御するように構成されるエネルギー管理装置が設けられている。
 一般に電力需要家と電力会社との間で電気供給約款に基づく契約が行われている。日本の契約においては、契約電力は、当月を含む過去1年間の各月の最大需要電力のうちで最も大きい値に設定される。当月の最大需要電力は、所定のデマンド時限(典型的には30分)毎に需要電力(消費電力)の積算値(需要電力量)を計量して需要電力を求め、当月において計量された各需要電力から最大需要電力を選択することによって得られる。
 それ故に、たとえば、日本国特許出願公開番号2009-240032は、デマンド制御システムを開示する。このシステムは、デマンド値(需要電力)があらかじめ設定された契約電力を超えないように、照明機器の能力を制御するように構成される。
 上述のように、需要電力(消費電力)の積算値を管理する場合、利用者に専門的な知識がなければ、消費電力の積算値のみが示されたとしても、消費電力の積算値が適切に推移しているか否かを知ることはできない。また、消費電力の管理が、エネルギー管理装置に設定されているルールによってなされていると、利用者は消費電力の積算値が適切に推移していると信じることになる。
 ここで、外的な環境条件(たとえば、気温)に大きな変化が生じたような場合でも、エネルギー管理装置は画一的な制御を行うから、負荷制御は、施設の運営にとって必ずしも好ましいとは言えない動作を行う可能性がある。たとえば、冷蔵機器として平型のショーケースが配置されている施設では、ショーケースの庫内温度を維持する必要があるから、ショーケースの電力を確保しなければならない。つまり、エネルギー管理装置での対応が難しい場合の判断は利用者自身が行わなければならないが、利用者に専門的な知識がなければ、必要な対応をすることができない。
 本発明は、専門的な知識を持たない利用者であっても、ユーティリティ・エネルギーの消費量に関する目標値の管理を行うことを可能にしたエネルギー管理装置を提供することを目的とする。
 本発明に係るエネルギー管理装置は、指示部(13)、利用者装置(60)、目標評価部(16)および提示制御部(17)を備える。指示部(13)は、複数の負荷機器(30)が配置された施設において目標とする節電率に応じて前記負荷機器(30)の動作を制御するように構成される。利用者装置(60)は、情報を表示するように構成される機能を有する。目標評価部(16)は、前記負荷機器(30)によるユーティリティ・エネルギーの消費量をあらかじめ定めた目標値に対して評価するように構成される。提示制御部(17)は、前記目標評価部(16)の評価結果に応じて形態の異なるアイコンを前記利用者装置(60)に表示させるように構成される。
 一実施形態において、前記目標評価部(16)は、所定の判定期間の終了時点について設定された前記目標値に基づいて、前記判定期間における前記消費量の推移を判定する複数の領域を設定するように構成される。前記提示制御部(17)は、前記消費量が属する領域に応じて前記アイコンの形態を異ならせるように構成される。
 一実施形態において、前記目標評価部(16)は、前記目標値に対する前記消費量の割合を判定するように構成される機能を有する。前記提示制御部(17)は、前記目標評価部(16)が判定した前記割合が規定した閾値を超えると前記利用者装置に対して、前記負荷機器(30)の一部の停止を促すメッセージを提示させるように構成される。
 一実施形態において、前記目標評価部(16)は、前記施設の運営に支障が生じないユーティリティ・エネルギーの最小の消費量を推奨値とし、前記目標値が前記推奨値を下回って設定されたときに、前記提示制御部(17)を通して前記目標値が実現不可能であることを示すメッセージを前記利用者装置に提示させるように構成される。
 一実施形態において、エネルギー管理装置は、情報記憶部(22)およびエネルギー計算部(26)をさらに備える。情報記憶部(22)は、複数の施設から得られた前記負荷機器(30)のユーティリティ・エネルギーの消費量を当該施設の床面積で除算した容量原単位を格納するように構成される。エネルギー計算部(26)は、前記施設の前記推奨値をエネルギーシミュレーションによって算出するように構成される。また、前記エネルギー計算部(26)は、前記推奨値を求める前記施設の床面積に前記情報記憶部(22)に格納された容量原単位を乗じることにより、前記推奨値を求める前記施設における前記負荷機器(30)によるユーティリティ・エネルギーの消費量を求めるように構成される。
 一実施形態において、前記情報記憶部(22)は、施設が存在する地域と外気温を含む気象情報とが対応付けられて格納されている。前記エネルギー計算部(26)は、前記推奨値を求める前記施設の地域を用いて前記情報記憶部(22)から抽出される外気温の1日の最高温度と、前記施設における前記負荷機器(30)に関して前記情報記憶部(22)から抽出される容量原単位とを説明変数とし、ユーティリティ・エネルギーの消費量の1日の最大値を求めるための回帰式を用いることにより、当該最大値を前記推奨値として求めるように構成される。
 本発明の構成によれば、ユーティリティ・エネルギーの消費量が目標値を達成できる見込みの程度に応じた内容の提示を利用者に対して行うから、専門的な知識を持たない利用者であっても、ユーティリティ・エネルギーの消費量に関する目標値の管理を行うことが可能になるという利点がある。
 本発明の好ましい実施形態をさらに詳細に記述する。本発明の他の特徴および利点は、以下の詳細な記述および添付図面に関連して一層良く理解されるものである。
本発明の実施形態を示すブロック図である。 同上に用いる情報記憶部に格納された情報の例を示す図である。 同上に用いる制御テーブルの例を示す図である。 同上に用いる利用者装置の画面例を示す図である。
 (全体構成)
 図1に示すように、以下に説明する実施形態(エネルギー管理装置)は、管理装置10を備える。管理装置10を含む施設には、複数の負荷機器30、計測装置50および利用者装置60が具備されている。図1の例では、エネルギー管理装置は、遠隔管理装置20をさらに含んでいる。
 管理装置10は、施設に配置されている複数の負荷機器30(31,32,…)が消費する電気(以下「消費電気」という)を管理するように構成される。第1および第2例において、管理装置10は、それぞれ、施設に配置されている複数の負荷機器30が消費する消費電力および消費電力量を管理するように構成される。つまり、第1例においては、管理装置10は、施設に配置されている複数の負荷機器30が消費する消費電力を管理するように構成される。第2例において、管理装置10は、施設に配置されている複数の負荷機器30が消費する消費電力量を管理するように構成される。第1および第2例は、それぞれ、後述の第1および第2例に対応する。一実施形態として、それら第1例の全部または一部を備えることができる。別の実施形態として、それら第2例の全部または一部を備えることができる。
 施設は、食品を扱うスーパーマーケット、コンビニエンスストア、百貨店、店舗ビル、オフィスビル、ホテル、病院のような建物空間のほか、公園、テーマパークなどでもよい。これらは施設の一例であって、施設は、複数の負荷機器が配置され、かつ配置された負荷機器での消費電気が需要者に一括して管理されている空間であれば形態は問わない。施設は、複数のエリア40(41,42,…)に区分され、複数の負荷機器31,32,…は、それぞれ複数のエリア41,42,…に配置されている。
 以下の実施形態において、複数の負荷機器30は、電気負荷を想定しているが、ガス機器や水道を利用する機器を含むことが可能である。以下、複数の負荷機器30などを「計測対象」ともいう。また、電気事業体から供給される電気、ガス事業体から供給されるガスおよび水道事業体から供給される水などを、「ユーティリティ・エネルギー」という。
 計測装置50は、計測対象の単位時間のユーティリティ・エネルギーを計測するように構成される。本実施形態では、計測装置50は、消費電気を計測するように構成される。第1例において、計測装置50は、計測対象に対して単位時間ごとに消費電力を計測するように構成される。この例において、計測装置50は、単位時間ごとに瞬時消費電力を計測するように構成されてもよく、単位時間の間の平均消費電力を計測するように構成されてもよい。第2例において、計測装置50は、計測対象に対して単位時間の消費電力の積算値(消費電力量)を計測するように構成される。以下、計測装置50で計測される消費電力または消費電力量を「計測値」ともいう。計測装置50は、施設全体における計測対象から計測値を取得するように構成される機能のほか、たとえば、複数のエリア40の各々における計測対象から計測値を取得するように構成される機能、複数の負荷機器30の種類ごとに計測値を取得するように構成される機能、および計測対象(負荷機器31,32,…)の各要素(負荷機器30)から計測値を取得するように構成される機能などを備えることが望ましい。
 以下に説明する実施形態は、施設が食品を扱うスーパーマーケットである場合を例として説明する。限定する趣旨ではないが、本実施形態で想定しているスーパーマーケットには、売場、レジ、バックヤード、事務室などの複数のエリア40が存在する。売場とバックヤードには、照明機器301、空調機器302、冷蔵機器303が配置される。また、レジと事務室には、照明機器301、空調機器302が配置される。冷蔵機器303は、食品の保存と陳列とを行う冷蔵庫または冷凍庫を意味する。売場には、冷蔵機器303として平型、多段型、リーチイン型などの各種形式のショーケースが配置され、バックヤードには、冷蔵機器303として大容量の冷蔵庫が配置される。
 (管理装置)
 管理装置10は、他の装置(以下「対象機器」という)と接続されるように構成される接続部(図示せず)を備える。管理装置10は、接続部を介して対象機器との間で情報を授受したり、対象機器の動作の監視や制御を行うように構成される。接続部は、端子やコネクタのように対象機器との電気的接続を可能にする装置と、信号の授受のための装置あるいは電路の開閉を行うための装置とを備える。管理装置10は、プログラムを実行することにより以下に説明する機能を実現するコンピュータを主なハードウェア要素として備える。このコンピュータは、個別のデバイスであるプロセッサとメモリとの組合せ、プロセッサとメモリとをワンチップで構成したマイコンなどを意味する。
 管理装置10の接続部に接続される対象機器は、本実施形態では、遠隔管理装置20と負荷機器30と計測装置50と利用者装置60とを例示するが、これら以外の装置を接続することも可能である。
 遠隔管理装置20は、1台以上のコンピュータを備え、以下に説明する機能を実現するためのプログラムを実行するためのコンピュータサーバである。そのため、管理装置10の接続部は、通信ネットワークNT1を通して遠隔管理装置20と通信するための図示しないインターフェイス部(以下「I/F部」という)を備える。遠隔管理装置20は、通信可能に関連付けられた複数台のコンピュータを備えていてもよい。また、通信ネットワークNT1は、インターネットのような公衆網を用いて構築されるVPN(Virtual Private Network)が用いられる。
 本実施形態で用いる負荷機器30は、管理装置10と通信するように構成される機能と、管理装置10からの負荷機器30の動作状態を制御するための指示に従って動作するように構成される機能と、動作状態を管理装置10に通知するように構成される機能とを備える。そのため、管理装置10の接続部は、負荷機器30と通信するためのI/F部(図示せず)を備える。ただし、負荷機器30は、管理装置10からの通信信号によりオンオフの制御のみを受け付ける構成であってもよい。また、管理装置10と通信するように構成される機能を備えていない負荷機器30を用いることも可能である。この場合、管理装置10は、その負荷機器30に給電する電路のオンオフを行うためのリレーのようなスイッチ要素を備える必要がある。
 計測装置50は、計測値を管理装置10に伝送するように構成される。第1および第2例において、計測装置50は、それぞれ、計測した電力および電力量の情報を管理装置10に伝送するように構成される。管理装置10の接続部は、計測装置50と通信するためのI/F部(図示せず)を備える。管理装置10と計測装置50との間の通信に用いる伝送路は、有線通信路と無線通信路とのどちらでもよい。ただし、管理装置10が分電盤の近くに配置される場合は計測装置50との距離が短いから有線通信路を採用し、管理装置10が分電盤から離れて配置される場合は無線通信路を採用することが望ましい。上述したI/F部(図示せず)は、計測装置50から単位時間ごとに計測値を取得するように構成される。第1および第2例において、I/F部は、それぞれ、計測装置50から単位時間ごとに電力および電力量の情報を取得するように構成される。ここに、単位時間は、たとえば、1分、5分などから選択される。
 利用者装置60は、ユーザインターフェイスとしての表示部と操作部とを備え、管理装置10が取得した情報を表示部に表示して可視化するように構成される機能と、施設責任者のような利用者による操作部の操作内容を管理装置10の動作に反映させるように構成される機能とを有する。表示部と操作部とは、フラットパネルディスプレイの画面にタッチパネルを重ね合わせた構成の操作表示器を備えていることが望ましい。利用者装置60は、専用装置のほか、コンピュータ、スマートフォン、タブレット端末などを流用可能である。管理装置10の接続部は、このような利用者装置60を利用可能とする構成のI/F部(図示せず)を備える。このI/F部は、コンピュータ、スマートフォン、タブレット端末などを利用者装置60として流用する場合、無線LAN(Local Area Network)やBluetooth(登録商標)の仕様が採用される。
 管理装置10は、目標設定部11、評価部12および指示部13などを備える。目標設定部11は、消費電気の目標値を設定するように構成される。評価部12は、計測装置50から取得した計測値を目標設定部11に設定された目標値と比較するように構成される。指示部13は、評価部12の評価結果に応じて負荷機器30の動作を指示するように構成される。第1および第2例において、目標設定部11は、それぞれ、消費電力の目標値および消費電力量の目標値を設定するように構成される。以下では、消費電力の目標値および消費電力量の目標値を、それぞれ「目標電力」および「目標電力量」という。
 目標設定部11は、節電率が与えられると、あらかじめ設定された基準値に節電率を乗じて目標値を求めるように構成される。この節電率は、基準値から目標値を得るために使用される。つまり、節電率は、基準値に対する目標率の割合である。第1および第2例において、目標設定部11は、それぞれ、節電率が与えられると、あらかじめ設定された基準電力および基準電力量に節電率を乗じて目標電力および目標電力量を求めるように構成される。基準電力(または基準電力量)は、電気事業体などとの契約により定められる契約電力で規定される場合と、施設における消費電力(または消費電力量)の実績から求められる場合とがある。日本では、契約電力は、年間の最大需要電力から求められるので、契約電力から基準電力量を求めることができる。たとえば、年間の最大需要電力が年間の最大需要電力量の平均値から求められる場合、年間の最大需要電力にデマンド時限を乗じることで最大需要電力量を求めることができる。
 このように、目標設定部11に設定される目標値(目標電力または目標電力量)は、施設の消費電気(消費電力または消費電力量)の低減を図るように設定される。ここに、常時の目標値は、エリア40に存在する人がエリア40の負荷機器30の運転により享受する利便性を損なわないように、エリア40に存在する人の効用に応じて定められる。また、電気事業体から節電率が指示される場合などの非常時の目標値は、指示された節電率に見合うように定められる。
 目標値(目標電力または目標電力量)は、施設ごとに異なるから、過去の消費電気(消費電力または消費電力量)の実績と、所要の節電期間における節電率とから求められる。節電期間は、節電すべき期間であり、たとえば、1日の時間帯、日時で指定される期間、複数日にわたる期間、曜日、年などから選択される。たとえば、1日において電気(電力または電力量)の需要がピークになる時間帯、年間において電気(電力または電力量)の需要がピークになる期間などを節電期間とすれば、消費電気(消費電力または消費電力量)のピークが抑制され、結果的に、電気事業体は供給する電気のピークを抑制することが可能になる。また、施設における年間の消費電気(消費電力または消費電力量)を低減させるように目標値(目標電力または目標電力量)が設定される場合もある。
 目標設定部11の目標値は、原則として、遠隔管理装置20から設定されるが、利用者装置60を用いて利用者が目標値を設定する場合もある。遠隔管理装置20が目標値(目標電力または目標電力量)を設定する技術については後述する。利用者装置60を用いて目標値を設定する場合、目標値は、施設の全体の目標値として設定されるほか、負荷機器30あるいはエリア40の目標値として個別に設定可能である。
 目標設定部11は、遠隔管理装置20から設定される第1目標値を記憶するように構成される第1設定部111と、利用者装置60を用いて設定される第2目標値を記憶するように構成される第2設定部112とを備える。第1および第2例において、第1設定部111は、それぞれ、遠隔管理装置20から設定される第1目標電力および第1目標電力量を記憶するように構成される。第1および第2例において、第2設定部112は、それぞれ、利用者装置60を用いて設定される第2目標電力および第2目標電力量を記憶するように構成される。第1設定部111および第2設定部112は、目標値を達成すべき節電期間も併せて記憶するように構成される。第1設定部111および第2設定部112は、半導体メモリやハードディスクのような記憶装置で構成される。
 目標設定部11は、所定期間における施設の計測値の変化を記憶するように構成される計測値記憶部113を備えていてもよい。第1および第2例において、計測値記憶部(以下「電力記憶部」ともいう)113は、それぞれ、所定期間における施設の消費電力の変化および消費電力量の変化を記憶するように構成される。電力記憶部113は、施設における実際の計測値(消費電力または消費電力量)の推移を記憶していることが望ましいが、管理装置10の使用開始直後などには、電力記憶部113に記憶させる実績がない。したがって、管理装置10が設置される施設と同程度の規模の施設で得られた消費電力または消費電力量の推移を電力記憶部113に記憶させて用いることも可能である。このような他の施設の情報は、遠隔管理装置20から取得することが可能である。
 電力記憶部113が設けられている場合、目標設定部11は、節電期間に相当する期間の計測値を電力記憶部113から抽出し、指定された節電率を用いて、第1目標値および第2目標値を算出するように構成される。第1例において、目標設定部11は、節電期間に相当する期間の消費電力を電力記憶部113から抽出し、指定された節電率を用いて、第1目標電力および第2目標電力を算出するように構成される。第2例において、目標設定部11は、節電期間に相当する期間の消費電力量を電力記憶部113から抽出し、指定された節電率を用いて、第1目標電力量および第2目標電力量を算出するように構成される。
 遠隔管理装置20から設定される第1目標値は、たとえば、電力会社のような電気事業体からの要望によって設定される場合があり、処理を実行する節電期間が当日や翌日のように緊急性を有していることがある。一方、利用者装置60から設定される第2目標値は、処理を実行する節電期間が比較的長期にわたっていることが多い。そのため、第1目標値は節電期間が個別に設定され、第2目標値は比較的長期にわたる適用期間が設定され、適用期間における日々の時間帯が節電期間として採用される。言い換えると、第1設定部111の節電期間は個別に設定され、第2設定部112の節電期間は適用期間と時間帯との組合せで指定される。このように、利用者装置60で設定される節電期間が適用期間と時間帯との組合せとすれば、利用者装置60を頻繁に操作する煩わしさが解消される。
 目標設定部11は、第1目標値と第2目標値のどちらを選択するかを決めるために、目標選択部114を備える。目標選択部114は、遠隔管理装置20と利用者装置60のいずれかからの指示により、第1目標値と第2目標値の一方を選択するように構成される。第1例において、目標選択部114は、遠隔管理装置20と利用者装置60のいずれかからの指示により、第1目標電力と第2目標電力の一方を選択するように構成される。第2例において、目標選択部114は、遠隔管理装置20と利用者装置60のいずれかからの指示により、第1目標電力量と第2目標電力量の一方を選択するように構成される。
 ところで、管理装置10は、複数種類の動作モードが選択可能であり、目標選択部114は、動作モードに応じて第1目標値と第2目標値の一方を選択するように構成される。動作モードには、通常モード、遠隔優先モード、利用者優先モードなどがあり、動作モードの選択は、遠隔管理装置20あるいは利用者装置60により行われる。
 利用者優先モードは、遠隔管理装置20から設定された第1目標値を用いると施設において重大な問題が生じる場合などに備えて、利用者装置60から第1目標値の使用を禁止可能にする動作モードである。すなわち、遠隔管理装置20が施設の実際の環境状態を考慮せずに第1目標値(あるいは節電率)を設定したとしても、第1目標値の使用が禁止可能であることにより、利用者は現場の環境状態に応じた負荷機器30の運転を行うことが可能になる。
 たとえば、食品スーパーマーケットを運営する上で重大な問題が生じる例としては、冷蔵機器303の温度が長時間にわたって高い状態に設定される場合などがある。そこで、冷蔵機器303の温度が所定値よりも高くなると、利用者優先モードを許可するように構成すれば、利用者優先モードの乱用を防止しながらも、冷蔵機器303の温度上昇による食品の劣化を防止することが可能になる。
 目標選択部114は、通常モードでは、第1目標値と第2目標値とのうち節電率の大きい目標値を選択するように構成される。したがって、通常モードが選択されていると、消費電気は第1目標値と第2目標値の両方を満足することになる。
 評価部12は、判定期間の開始から計測装置50で単位時間ごとに計測された消費電気に基づいて判定期間の開始からの経過時間の間の消費電気を求め、その求めた消費電気の目標値に対する割合とその経過時間とに基づいて、その求めた消費電気の判定期間における推移を予測するように構成される。また、評価部12は、予測した推移が判定期間内に目標値を超えるか否かを判断するように構成される。第1例において、評価部12は、判定期間の開始から計測装置50で単位時間ごとに計測された消費電力を積算することにより、判定期間の開始からの経過時間の間の平均消費電力を求め、目標電力に対する平均消費電力(積算値の平均値)の割合と経過時間とに基づいて、経過時間の間の平均消費電力の判定期間における推移を予測するように構成される。この第1例において、計測装置50が、単位時間ごとに瞬時消費電力を計測するように構成される場合、相対的に高精度の平均消費電力を得るためには、相対的に短い単位時間ごとに瞬時消費電力を計測するように構成されることが望ましい。これに対して、計測装置50が単位時間の間の平均消費電力を計測するように構成される場合、経過時間の間の平均消費電力の精度が計測装置50における単位時間の影響を受けるのを防止することができる。第2例において、評価部12は、判定期間の開始から計測装置50で単位時間ごとに計測された消費電力量を積算することにより、判定期間の開始からの経過時間の間の消費電力量を求め、その求めた消費電力量の目標電力量に対する割合と経過時間とに基づいて、経過時間の間の消費電力量の判定期間における推移を予測するように構成される。
 指示部13は、予測した推移が判定期間内に目標値を超えると評価部12が判断すれば、負荷機器30が消費電気を抑制する動作を行うように負荷機器30に指示するように構成される。第1例において、指示部13は、予測した平均消費電力の推移が目標電力を超えると評価部12が予測する場合、負荷機器30の消費電力を抑制する動作を行うように負荷機器30に指示するように構成される。第2例において、指示部13は、予測した消費電力量の推移が目標電力量を超えると評価部12が予測する場合、負荷機器30の消費電力量を抑制する動作を行うように負荷機器30に指示するように構成される。消費電力(または消費電力量)を抑制させる程度(以下「制御レベル」という)は、消費電力(消費電力量)と目標電力(目標電力量)との割合によって異なる。したがって、評価部12は、予測した推移と目標値との関係に応じた制御レベルを指示部13に通知するように構成される。制御レベルは、複数段階(以下の説明では4段階)から選択可能になっている。
 なお、判定期間は、たとえば30分、1日、1ヶ月、1年などから選択される。たとえば、30分ごとの消費電気(消費電力または消費電力量)について月間の最大値で電気料金の単価が定まる料金体系が採用されている場合には、判定期間として30分が選択される。また、月間あるいは年間の消費電気(消費電力または消費電力量)の節電率を目標値として設定している場合には、判定期間は1ヶ月あるいは1年になる。消費電気(消費電力または消費電力量)は、判定期間の開始から積算され、判定期間の終了をもって0にリセットされる。
 指示部13は、評価部12から制御レベルが通知されると、施設の消費電気(消費電力または消費電力量)が制御レベルに見合うだけ低減されるように、消費電気を低減させる負荷機器30を選択し、かつ選択した負荷機器30の動作を決定するように構成される。制御レベルは、負荷機器30の種類および動作に対応付けられ、負荷機器30の種類および動作は時間経過に伴って変化させることも可能である。
 制御レベルと負荷機器30の種類および動作との関係は、制御テーブル14に格納されている。一例として、制御テーブル14は、制御対象である負荷機器30の種類と動作との少なくとも一方を時間経過に伴って変化させるように、負荷機器30の制御手順が格納されていてもよい。たとえば、指示部13は、評価部12から制御レベルが通知されると、制御テーブル14の内容を参照し、制御テーブル14から読み出した負荷機器30の種類および動作に従って負荷機器30に指示を与えるように構成されてもよい。この場合、制御テーブル14は、評価部12から得られる予め定められた複数の制御レベルと、その複数の制御レベルの各々に対応付けられた負荷機器30の種類および動作を示すコマンドとを含む。
 別例として、制御テーブル14は、評価部12から得られる予め定められた複数の制御レベルと、その複数の制御レベルの各々に対応付けられた負荷機器30の種類および動作別の順番とを含んでもよい。順番は、たとえば電気(電力または電力量)を制限するように設定される。たとえば、食品を扱うスーパーマーケットであれば、事務室の照明機器301および空調機器302の消費電気(消費電力または消費電力量)は低減させても店舗の運営に対する影響が少ないが、冷蔵機器303の消費電気を低減させることは難しい。したがって、制御テーブル14の内容は、消費電気を低減させる割合が少ない制御レベルに対しては、事務所の照明機器301および空調機器302を対象として消費電気を低減させる動作になる。言い換えると、制御テーブルの内容は、消費電気を低減させた場合の影響が少ないほうから順に、負荷機器30の種類および動作が制御レベルに対応付けられる。
 制御テーブル14の内容は書換可能であり、制御テーブル14の内容を含む情報は、遠隔管理装置20から伝送される。遠隔管理装置20から伝送された制御テーブル14の内容を含む情報は、管理装置10に設けられた更新部15が受け取り、更新部15は遠隔管理装置20から伝送された情報に従って制御テーブル14の内容を更新するように構成される。なお、制御テーブル14の内容は、利用者端末60を用いて設定することも可能である。
 ところで、目標値(あるいは節電率)は、対象となる施設を運営する上で厳しくなりすぎる場合がある。とくに、第1目標値は、上述したように、現場の環境状態を考慮せずに遠隔管理装置20から一方的に定められるから、この種の問題が生じやすくなる。また、利用者装置60を用いて設定される第2目標値についても、過小に設定されて施設の運営に問題が生じる可能性がある。
 上述のことから、目標値が過小(節電率が過大)に設定されないように、管理装置10は、目標設定部11に設定された目標値(目標電力または目標電力量)を評価するように構成される目標評価部16を備える。目標評価部16は、施設を問題なく運営するのに最低限必要な消費電気(消費電力または消費電力量)である推奨値(推奨電力または推奨電力量)を用い、目標設定部11に設定された目標値を推奨値と比較するように構成される。目標設定部11に設定された目標値が推奨値よりも小さい場合、目標評価部16は、利用者装置60を通して利用者の注意を喚起するように構成される。推奨値は、原則として遠隔管理装置20から与えられるが、利用者装置60から入力してもよい。
 推奨値(推奨電力または推奨電力量)は、施設における消費電気(消費電力または消費電力量)の過去の実績やシミュレーションの結果を用いて、施設ごとに推定される。施設を問題なく運営するための環境状態を推定する機能、および消費電気のシミュレーションを行う機能は、後述するように、遠隔管理装置20が備える。
 また、利用者装置60を通して利用者の注意を喚起する技術は、利用者装置60の表示器にコメント文を表示する技術、表示器の背景色を赤色などに変更する技術、ビープ音を発生させる技術などから選択される。管理装置10は、利用者装置60の表示器に情報を表示するように構成される提示制御部17と、表示器に表示する表示内容を格納した提示内容記憶部18とを備える。提示内容記憶部18は、計測装置50から取得した計測値(電力または電力量)と目標設定部11に設定された目標値とを評価部12が比較した結果、目標評価部16による評価の結果など、利用者装置60に表示すべき情報を記憶するように構成される。また、提示制御部17は、提示内容記憶部18に記憶された情報を利用者装置60に提示するように構成される機能を備える。提示制御部17は、指示部13が負荷機器30に指示した内容も利用者装置60に表示するように構成される。
 上述したように、評価部12から指示部13に制御レベルが通知されると、指示部13は制御レベルを制御テーブル14に照合し、制御レベルに応じた負荷機器30の種類および動作を抽出するように構成される。ここで、指示部13は、制御レベルが高くなり負荷機器30による消費電気(消費電力または消費電力量)が低減されても目標値(目標電力または目標電力量)を上回っている場合、施設を運営する上では、それ以上の節電が不可能であると判断し、提示制御部17を通して判断結果を利用者装置60に提示するように構成される。また、管理装置10は、指示部13の判断結果を用いて、動作モードを利用者優先モードに変更するように構成されてもよい。利用者優先モードでは、利用者装置60の操作によって、節電の禁止、あるいは負荷機器30の消費電力の増加が可能になる。すなわち、利用者は、遠隔管理装置20から指示された第1目標値(あるいは節電率)を受け入れながらも、設備空間の実際の環境状態に応じて消費電気を増加させることが可能であるから、納得して節電を行うことになる。
 (遠隔管理装置)
 遠隔管理装置20は、複数台の管理装置10と通信するように構成され、それぞれの管理装置10に同じ第1節電率を通知するために、設定されるべき目標とする節電率を保持するように構成される目標指示部21と、管理装置10との間で通信ネットワークNT1を通して通信するように構成される通信インターフェイス(図示せず)とを備える。電気事業体などが定めた当日や翌日の節電期間と第1節電率は、情報入力部24から目標指示部21に入力され、適宜のタイミングで管理装置10に通知される。
 この構成により、コンビニエンスストアや食品スーパーマーケットのように本部が多数の店舗を管理しているような業態の場合、各店舗の管理装置10に設定するべき第1節電率を、店舗を管理する本部の遠隔管理装置20から送信することが可能になる。また、電気事業体などから当日や翌日の特定の日時(時間帯)に節電が要求される場合にも、要求された第1節電率を各店舗の管理装置10に送信することができる。
 ところで、管理装置10において第1節電率を満足するように負荷機器30を動作させるには、管理装置10が配置されている施設の環境条件に応じて、負荷機器30の動作を決定する必要がある。言い換えると、制御テーブル14に登録される制御レベルと負荷機器30の種類および動作との関係を適切に設定しなければならない。
 一方、遠隔管理装置20は、複数台の管理装置10と通信するように構成されるから、管理装置10ごとの消費電気(消費電力または消費電力量)の履歴を収集することが可能である。また、第1グループとしての通信対象である複数の管理装置10および遠隔管理装置20とは別に、第2グループとしての複数の管理装置10および遠隔管理装置20が存在している場合には、第1グループの遠隔管理装置20は、第2グループの遠隔管理装置20からその第2グループの管理装置10ごとの消費電気の履歴を収集してもよい。
 このように、複数の施設(複数の管理装置10)の各々から収集された消費電気の履歴に関するデータは、対応する施設の特性に関する施設情報と関連付けられ、遠隔管理装置20に設けられた情報記憶部22に保存される。すなわち、遠隔管理装置20は、複数の施設の各々からの消費電気の履歴に関するデータを、対応する施設の特性に関連付けて、複数の施設の特性データと、その複数の施設の各々に関連付けられた消費電気の履歴に関するデータの集まりであるデータセットを情報記憶部22に保存している。情報記憶部22に保存されるべき情報の特性データは、施設の特性に関する施設情報および設定情報を、利用者装置60から管理装置10を通して遠隔管理装置20が受け取ることによって得られる。また、情報記憶部22に保存されるべき施設情報および設定情報は、遠隔管理装置20に設けられた情報入力部24から情報記憶部22に入力することも可能になっている。
 遠隔管理装置20は、複数の管理装置10の各々から施設の特性データ(施設情報)を取得する場合、各施設情報を、対応する施設の消費電気(消費電力または消費電力量)の履歴と併せて取得するように構成される。各施設情報は、環境情報と設定情報とを含み、環境情報は、設備情報とシーン情報と外部環境情報とを含む。
 設備情報は、施設が存在する地域、施設の用途に関する情報、施設のサイズに関する情報、設置されている負荷機器30の種類と電力容量に関する情報を含む。用途に関する情報は、店舗、オフィスビル、ホテルなどの区分と、売場、事務所などのエリア40の区分とを含む。また、サイズを表す情報は、エリア40の床面積で表される。負荷機器30の種類に関する情報は、照明機器301、空調機器302、冷蔵機器303の別を表す。電力容量(電力範囲、特に最大定格電力[W])に関する情報は、エリア40の床面積[m2]で除算され、単位面積当たりの電力負荷密度(以下「容量原単位」という)として情報記憶部22に格納される。なお、エリア40の床面積は容積に代えることが可能であるが、以下では床面積を用いて説明する。
 電力負荷密度は、施設のグレードや省エネルギーのための余力を示す情報になる。たとえば、照明機器301の電力負荷密度が大きいエリア40は、照度が高い傾向を表し、照度の低いエリア40に比べると、省エネルギーのための余力が大きいと言える。空調機器302や冷蔵機器303も同様である。食品スーパーマーケットであれば、空調機器302の電力負荷密度は、一般に約110W/m2で設計されることが多いが、電力負荷密度が200W/m2であれば、省エネルギーのための余力が大きいと言える。なお、施設のグレードは、主として、エリア40の断熱性能を表す。
 シーン情報は、繁忙時間帯、開散時間帯、営業外時間帯、節電時間帯のように、負荷機器30の動作に影響する環境の情報を表す。すなわち、主として施設に存在する人の数や属性(従業員と来訪者の別)などによる環境の相違を表す。
 外部環境情報は、外気温、湿度、日射量などに関する情報を表す。
 一方、設定情報は、負荷機器30の動作により実現される環境の情報であり、ここでは、照明機器301の設定照度、空調機器302の設定温度、冷蔵機器303の設定温度を表す。
 遠隔管理装置20は、情報記憶部22が記憶している各データを用いて、管理装置10に設けられた制御テーブル14の内容を生成するように構成される。そのため、管理装置10に対応する施設情報と、情報記憶部22が記憶している施設情報とを比較して所定の評価ルールで類似度を評価するように構成される比較部23を備える。管理装置10により管理される負荷機器30が配置された施設の特性は、情報入力部24から比較部23に与えられる。情報入力部24は、キーボードやマウスのような操作部を用いて施設の特性を入力する構成のほか、管理装置10に設けられた利用者装置60から入力された施設の特性を受け付ける構成を備えていてもよい。情報入力部24の機能は後述する。
 比較部23は、情報入力部24から与えられた施設の特性のうちの環境情報をキーに用いて設定情報を抽出するように構成される。キーに用いる環境情報が文字で表される場合、キーと一致する情報を含むレコードが抽出される。また、キーに用いる環境情報が電力負荷密度や外気温のように数値で表される場合、負荷機器30の種類ごとに所定の評価ルールによって類似度が評価され、負荷機器30の種類ごとに類似度の高い設定情報が選択される。この処理については後述する。キーに用いる環境情報には、少なくとも、施設の区分、エリア40の区分、電力負荷密度、シーン情報、外気温が含まれていることが望ましい。
 情報記憶部22に記憶された各データから比較部23が複数の施設の特性に関する一群の設定情報を抽出した場合は、その一群の設定情報を管理装置10に伝送し、利用者装置60に提示することによって、複数の施設の特性に関する一群の設定情報から所望の設定情報を利用者に選択させてもよい。
 比較部23は、情報入力部24から与えられたキーに合致するデータが情報記憶部22から抽出できない場合は、管理装置10に通知し、利用者装置60を通して利用者の介入を促すように構成される。このとき、利用者装置60には、データを抽出したキーを示し、利用者に一部のキーを除外させることが望ましい。
 情報記憶部22が記憶しているデータから設定情報が抽出できる場合は、類似した環境情報を持つ施設について、熟練者や専門家が設定した設定情報を利用できる。そのため、管理装置10と遠隔管理装置20との間で通信するだけで、特別な知識を持たない利用者であっても、適正な設定情報を簡便に設定することができる。つまり、管理装置10に管理される負荷機器30が配置された施設に適した設定情報を用いて、制御テーブル14の内容を短時間で定めることが可能になる。遠隔管理装置20は、比較部23が抽出したデータに基づいて制御テーブル14の内容である制御データを生成するように構成されるデータ生成部25を備える。制御テーブル14は、上述したように、複数の制御レベルと、その複数の制御レベルの各々に対応付けられた負荷機器30の動作とを含んでいる。
 ところで、施設ごとの設定内容として管理装置10から収集されるすべての情報を情報記憶部22に保存しても、収集した情報には、熟練者や専門家が設定した制御情報ではない情報も含まれる可能性がある。また、熟練者や専門家が設定した制御情報ではないにもかかわらず、施設において望ましい結果が得られた制御情報が含まれる可能性もある。そこで、情報記憶部22は、管理装置10で選択されている制御データが所定の継続時間(たとえば、1時間)を超えて変更されなかった場合、負荷機器30のこの動作を利用者にとって望ましい状態と判断して記録するようにしてもよい。つまり、情報記憶部22は、利用者が望ましい動作と判断したときの負荷機器30の制御情報を、施設情報とともに格納するように構成されてもよい。このようにして情報記憶部22に格納された情報は、成功事例となるから、他の施設において再利用される可能性が高くなる。
 遠隔管理装置20は、上述した電気事業体などから通知される第1節電率を管理装置10に通知するように構成される機能、および管理装置10に設けられた制御テーブル14の内容を定めるように構成される機能のほかに、基準電力を算出するように構成される機能を備えている。すなわち、遠隔管理装置20は、管理装置10の目標評価部16に与える基準電力と推奨電力とを定めるように構成されるエネルギー計算部26を備える。
 エネルギー計算部26は、上述した施設の特性と同様の情報を用いて施設の消費電力をコンピュータシミュレーションにより推定するように構成される。すなわち、エネルギー計算部26は、エネルギーシミュレーションを行うアプリケーションプログラムをコンピュータで実行することにより実現される。エネルギーシミュレーションのためのアプリケーションプログラムとしては、TRNSYSやEnergy Plusなどが知られている。
 これらのアプリケーションプログラムを用いるために、エネルギー計算部26に与える施設に関する情報には、施設あるいはエリア40の断熱性能、窓面積、床面積などが含まれる。また、この種の情報には、負荷機器30の電力容量、負荷機器30のエネルギー効率を表す効率情報、照明機器301の設定照度、空調機器302の設定温度、冷蔵機器303の設定温度、負荷機器30の運転時間なども含まれる。さらに、エネルギー計算部26には、管理装置10が配置された地域の外気温、湿度、日射量などの気象情報も与えることが必要である。
 ところで、エネルギー計算部26は、エネルギーシミュレーションのためのアプリケーションプログラムを用いるから、エネルギー計算部26に入力すべき情報(パラメータ)は、200~300種類程度になる。このように多数の情報は、熟練者あるいは専門家でなければ、エネルギー計算部26に与えることが困難である。そのため、遠隔管理装置20は、10種類程度の情報を入力するだけで、エネルギー計算部26に与える200~300種類の情報を自動的に生成するように構成されるパラメータ推定部27を備える。
 パラメータ推定部27は、遠隔管理装置20が管理装置10と通信することにより利用者が入力した情報と、情報記憶部22に格納された情報とを用いて、エネルギー計算部26に与える情報(パラメータ)を推定するように構成される。管理装置10に付設された利用者装置60に入力された情報は、情報入力部24に設けられた保持部に記憶される。保持部が記憶する情報は、床面積、築年数、施設の用途(店舗、オフィスの別など)、地域、営業時間(利用時間帯)、負荷機器30の種類などの施設に関する基本条件の情報である。なお、パラメータ推定部27に与える情報は、利用者装置60から情報入力部24に入力されるだけではなく、情報入力部24に直接入力してもよい。
 一方、パラメータ推定部27が情報記憶部22から抽出して用いる情報は、エリア40ごとに配置された負荷機器30の電力負荷密度、施設のグレード、負荷機器30のエネルギー効率、施設が存在する地域、外気温、湿度、日射量などを含む。さらに、パラメータ推定部27は、営業時間から負荷機器30の運転時間を推定するように構成される機能を備える。営業時間から運転時間を推定するには、データテーブルあるいは演算式を用いる。
 上述した管理装置10および遠隔管理装置20と利用者装置60とを用いて施設における消費電力を低減させる動作例を以下に説明する。
 (動作例1)
 以下では、遠隔管理装置20が制御テーブル14の内容を生成する動作と、第1節電率を達成するために、管理装置10が制御テーブル14を用いて負荷機器30を制御する動作とについて説明する。
 上述したように、遠隔管理装置20は、施設に関する情報が管理装置10から情報入力部24に与えられると、比較部23において、情報入力部24に与えられた情報に対応する情報を情報記憶部22から抽出する。データ生成部25は、比較部23が情報記憶部22から抽出した情報を用いて制御テーブル14の内容を生成し、制御テーブル14の内容を管理装置10の更新部15に伝送する。更新部15は、データ生成部25から受け取った内容を制御テーブル14に書き込む。
 管理装置10から情報入力部24に与えられる情報は、上述したように、設備情報、シーン情報、外部環境情報であって、これらが一致または類似するデータが情報記憶部22から抽出される。したがって、これらの情報の内容を条件とした設定情報が抽出される。抽出された設定情報は、熟練者あるいは専門家が設定した設定情報であるから、データ生成部25は、抽出された設定情報を用いることにより、制御テーブル14の内容を比較的簡単かつ適正に生成することができる。
 このように、データ生成部25は、過去の設定情報を用いることにより、制御テーブル14の内容を自動的に生成することができる。なお、制御テーブル14の内容は、利用者装置60を操作すれば利用者が修正することもできる。
 図2に情報記憶部22に格納された情報の一例を示す。図示例は食品スーパーマーケットを想定しており、ケース(冷蔵機器303)は冷蔵ショーケースを表している。図示例では、{No、エリア、シーン、外気温、空調容量原単位、照明容量原単位、ケース容量原単位、設定温度(空調)、設定照度、設定温度(ケース)}の10項目で一組のレコードを構成している。ここで、空調容量原単位は空調機器302の容量原単位であり、照明容量原単位は照明機器301の容量原単位であり、ケース容量原単位は冷蔵機器303の容量原単位である。「エリア、空調容量原単位、照明容量原単位、ケース容量原単位」は設備情報、「シーン」はシーン情報、「外気温」は外部環境情報、「設定温度(空調)」、「設定照度」、「設定温度(ケース)」は設定情報に相当する。「No」はレコードを区別するための番号である。負荷機器30の容量原単位は電力負荷密度で表され、単位はW/m2である。また、設定温度の単位は℃であり、設定照度の単位はlxである。
 熟練者や専門家は、電力負荷密度を勘案することによりエリア40ごとに節電が可能な余裕の程度を見積もって、負荷機器30の動作を決定している。しかし、一般の利用者にとって、電力負荷密度を勘案して負荷機器30の動作を決定する作業は困難である。本実施形態では、熟練者あるいは専門家が、設備情報、シーン情報、外部環境情報を組合せた条件に対して採用した設定情報を情報記憶部22に格納しているから、この情報を用いることにより、設定情報を簡単かつ適正に設定することができる。
 いま、情報入力部24に、エリア40が売場、シーンが繁忙時間帯、外気温が29℃、空調容量原単位が140W/m2、照明容量原単位が26W/m2、ケース容量原単位が200W/m2という情報が入力されたとする。すなわち、空調機器302は冷房運転を行う場合を想定する。比較部23は、この情報{売場、繁忙、29、140、26、200}をキーとして、情報記憶部22からレコードの抽出を試みる。上述したように、比較部23は、文字で表される条件が一致し、数値で表される条件は負荷機器30の種類ごとに類似するデータを生成する。
 すなわち、図示例では、「No」が「1」と「3」のレコードは、売場かつ繁忙時間帯を表しているから、比較部23は、抽出するべきレコードをこれら2個のレコードに絞り込む。次に、抽出されたレコードを用いて負荷機器30ごとに、容量原単位と外気温とを用いて類似度を評価し、類似度が高い条件に対応する設定情報を選択することにより、設定情報を決定する。ここに、照明機器301の設定照度については外気温の影響はなく、空調機器302および冷蔵機器303の設定温度については外気温の影響があるから、設定温度を決めるための類似度は外気温を含めて評価する。
 上述した2個のレコード(「1」と「3」)では、照明機器301の容量原単位は、それぞれ25W/m2と20W/m2であり、情報入力部24から指示された上記26W/m2の照明容量原単位との類似度は25W/m2のほうが大きい。したがって、「1」のレコードの設定照度である750lxが設定照度として採用される。また、「1」と「3」のレコードにおける空調機器302の容量原単位は、それぞれ100W/m2と150W/m2であり、上記140W/m2との類似度は150W/m2のほうが大きい。したがって、空調機器302の設定温度は「3」のレコードの設定温度である26℃が選択される。さらに、「1」と「3」のレコードにおける冷蔵機器303の容量原単位は、それぞれ200W/m2と250W/m2であり、情報入力部24からの200W/m2との類似度は「1」の200W/m2のほうが大きい。したがって、冷蔵機器303の設定温度は「1」のレコードの設定温度である5℃が選択される。すなわち、この例では、照明機器301の設定照度は「1」に対応する値が選択され、空調機器302の設定温度は「3」に対応する値が選択され、冷蔵機器303の設定温度は「1」に対応する値が選択される。外気温は「1」のレコードでは28℃であり、「3」のレコードでは30℃であるが、条件が悪いほうの30℃が採用される。したがって、データ生成部25には、{売場、繁忙、30、150、25、200、26、750、5}という情報が引き渡される。
 比較部23が類似度を評価したとき、類似度に実質的に差のない複数の設定情報が抽出された場合には、それぞれの設定情報の平均値が採用される。また、抽出されたレコードが利用された実績回数を情報記憶部22に記憶しておき、比較部23において、利用された実績回数を重みとする重み付き平均値を設定情報として採用してもよい。つまり、比較部23は、情報記憶部22から複数のレコードを抽出した場合、これらのレコードから抽出される設定情報ごとの実績回数に基づき、実績回数が多いほど大きい値になる重み係数を用いて、設定情報の重み付き平均値を算出する。このようにして算出された重み付き平均値を、データ生成部25に与える設定情報とする。また、利用者の効用を考慮する場合、情報記憶部22に記憶させるレコードに利用者名を含めておけば、利用者名をキーに用いて選択するレコードを絞り込むことが可能である。
 ところで、情報入力部24で指定したキーを用いて情報記憶部22からレコードを抽出する際に、入力ミスなどによりキーに不適切な情報が含まれる可能性がある。このような不適切な情報によって情報記憶部22から情報を抽出しようとしても、適切な設定情報を得ることはできない。そのため、情報入力部24は、キーの内容を事前に判定し、適切な情報の範囲から逸脱する場合に、与えられた情報を無効として扱うように構成される機能を備えていることが望ましい。情報記憶部22に記憶される情報についても適切な情報の範囲内か否かを評価し、不適切な範囲であれば情報を無効として扱うことが望ましい。
 なお、キーの内容あるいは情報記憶部22に記憶する情報が適切か否かを判断するために、環境情報に含まれる数値の情報(図示例では、外気温および容量原単位)を説明変数とし、設定情報を目的変数とした回帰式を、負荷機器30の種類ごとに作成してもよい。回帰式を用いる場合、環境情報に対して回帰式で推定される設定情報と、比較部23が抽出した設定情報との乖離度が許容範囲を逸脱しているときに、情報を無効として扱うようにすればよい。
 比較部23が定めた情報は、データ生成部25に引き渡され、データ生成部25は、比較部23から引き渡された情報を基準として、制御テーブルの内容を生成する。したがって、熟練者や専門家が過去に作成した実績のある情報に基づいて新たな制御テーブル14が生成され、熟練者や専門家が作成した制御テーブルに匹敵する制御テーブル14が得られることになる。
 制御テーブル14は、図3に示すように、照明機器301と空調機器302と冷蔵機器303とについて、制御レベルごとに動作の情報が対応付けられている。本実施形態では、制御レベルは0~3の4段階から選択可能になっている。制御レベル0は省エネルギーの対策を行わない制御状態、制御レベル1は通常の省エネルギーの制御状態、制御レベル2は常習的に我慢できる範囲ではもっとも厳しい制御状態、制御レベル3は非日常的に実施される特別に厳しい制御状態である。
 言い換えると、制御レベルは、数値が大きくなるほど、負荷機器30の使用による利便性が低下する制御状態であることを意味する。食品スーパーマーケットでは、制御レベル0は、通常運転に近い設定であり、繁忙時間帯に選択される。また、制御レベル1は、省エネルギー運転の設定であり、閑散時間帯に選択される。制御レベル2は節電のために選択され、制御レベル3は、いわゆるデマンドレスポンスであって、電気事業体などから要求される第2節電率に応える場合に選択される。つまり、制御レベルはシーン別の設定条件に相当する。
 上述したように、制御テーブル14の内容が決定されると、管理装置10は、施設の消費電力を計測して監視する。管理装置10に設けられた評価部12は、計測装置50が計測した消費電気(消費電力または消費電力量)の値と、目標設定部11に設定された目標値(目標電力または目標電力量)とを比較し、目標値に対する消費電気の割合に基づいて、判定期間の終了時点で消費電気の値が目標値以下であるか否かを予測する。換言すると、管理装置10は、判定期間の間に消費電気の値が目標値を超えるか否かを予測する。
 評価部12は、判定期間の間に消費電気の値が目標値を超えることを予測する場合は、負荷機器30での消費電力が低減されるように、制御レベルを高くする指示を指示部13に与える。たとえば、指示は予測時点で与えられる。一方、評価部12は、判定期間の終了時点での消費電気の値が目標値を下回り、かつ目標値と消費電気との差が所定値以上になることが予測される場合は、負荷機器30の使用による利便性を向上させるように制御レベルを低くする指示を指示部13に与える。
 指示部13は、制御テーブル14に制御レベルを照合することによって、制御レベルに応じた動作状態を負荷機器30に指示する。ここで、評価部12が制御レベル3を選択しても、依然として消費電気の値が判定期間の間に目標値を超えることが予測される場合、利用者装置60を通して一部の負荷機器30の停止を促す内容を利用者に提示する。利用者装置60に提示する内容は提示内容記憶部18から読み出され、提示制御部17を通して利用者装置60に出力される。利用者装置60への出力は、たとえば、「このままではデマンドを超過するので、周囲の負荷機器の運転を停止させてください」という内容の警告を利用者装置60の画面に表示する形式を採用する。また、採用されている制御レベルに応じて緊急度が直観的に理解できるように、複数のキャラクタ(アイコン)を切り替えて利用者装置60の画面に表示してもよい。
 (動作例2)
 動作例1は、利用者装置60から利用者が入力した環境情報に基づいて制御テーブル14の内容を生成する処理を中心として説明した。この動作では、情報記憶部22から比較部23における評価ルールを用いて抽出した情報に基づいて制御テーブル14の内容を生成しているが、生成された内容は検証されていない。
 以下では、データ生成部25が生成した制御テーブル14の内容をエネルギー計算部26に与えてエネルギーシミュレーションを行う動作について説明する。すなわち、遠隔管理装置20は、データ生成部25で生成された制御データ(制御テーブル14の内容)を、施設の環境情報と併せてエネルギー計算部26に入力する。エネルギー計算部26に入力される環境情報は、施設の用途の区分、エリア40の区分、外部環境情報、シーン情報、電力負荷密度、負荷機器30のエネルギー効率のようなエネルギーシミュレーションに必要な情報を含む。エネルギー計算部26は、エネルギーシミュレーションにより、施設の運営上で障害が生じない最低の電力である推奨電力を算出する。
 管理装置10の目標評価部16は、施設を問題なく運営するための環境状態を実現するための最小限の電気(電力または電力量)である推奨値(推奨電力または推奨電力量)の値を、基準値(基準電力または基準電力量)と節電率とにより決まる目標値(目標電力または目標電力量)と比較する。目標評価部16は、目標値が推奨値よりも小さい場合には、要求された節電率を実現困難と判断し、利用者装置60を通して利用者の注意を喚起する。利用者装置60により注意を喚起するには、たとえば、利用者装置60の背景画面を青色系から赤色系に変更するか、利用者装置60から報知音を出力するか、利用者装置60に表示するアイコンの形態を変更すればよい。
 実行可能な推奨値(推奨電力または推奨電力量)は、電力負荷密度と外気温の1日の最高温度とを説明変数として1日の最大電力を求める回帰式を用いて決定する。この回帰式は、管理装置10により管理される負荷機器30が配置された施設と用途および負荷機器30の構成が類似した施設の情報を情報記憶部22から抽出し、抽出した情報を用いることにより定められる。実際に推奨値(推奨電力または推奨電力量)を求めるには、管理装置10が設置された施設において、該当する日の予想最高気温を上述した回帰式に当て嵌めることにより、電力負荷密度の最大値が予測されるから、求められた電力負荷密度の最大値を施設の面積に乗じる。この計算の結果は、該当する施設において該当する日の最大電力と考えられるから、この値から実行可能な推奨値が得られる。たとえば、その値が実行可能な推奨電力として用いられる。
 上述のように、エネルギー計算部26は、施設の運営上で支障が生じない推奨値(推奨電力または推奨電力量)をエネルギーシミュレーションにより予測して求める。目標評価部16は、利用者装置60を用いて設定した節電率に対応した目標値(目標電力または目標電力量)と推奨値(推奨電力または推奨電力量)とを比較し、目標電気の実現可能性を評価する。上述したように、目標電気が実現困難であれば、提示制御部17が、利用者装置60を通して利用者に注意を喚起するから、利用者は適切な節電率の設定が可能になる。
 また、利用者装置60には、利用者に対して直観的でわかりやすい情報を提供するために、図4に示すように、目標電力(目標値)に対する現在の消費電力(消費電気)の割合に応じて画面の表示を変更することが望ましい。たとえば、利用者装置60の画面に顔を表すアイコン61を表示しておき、目標値(目標電力または目標電力量)に対する現在の消費電気(消費電力または消費電力量)に応じてアイコン61の表情を変更する。この例では、アイコン61は、目標値に対して消費電気(消費電力またはその積算値(消費電力量))に余裕があれば(たとえば、80%以下であれば)笑顔を表し、目標値に対して消費電気が所定の閾値(たとえば、90%)を超えると泣き顔を表すようにすればよい。目標値に対する現在の消費電気の割合は、目標評価部16が判定する。
 また、目標値(目標電力または目標電力量)と判定期間とによって傾きが決まる直線を設定し、判定期間の中で、消費電気(消費電力または積算値)が当該直線の下側である場合に目標達成に近付いていることを示し、消費電気が当該直線の上側である場合に目標達成から遠ざかっていることを示してもよい。つまり、上記直線によって消費電気の推移を判定する2領域を判定期間に設定し、消費電気が上記直線の上側の領域か下側の領域かに応じてアイコン61の表示を切り替えるようにしてもよい。
 判定期間に設定する直線は複数本であってもよい。上述のように、1本の直線を設定すれば2状態を判断することができる。これに対して、たとえば、目標値(目標電力または目標電力量)を100%として、目標値の120%に達する直線と、目標値の80%に達する直線と、目標値の100%に達する直線との3本の直線を設定すれば、4状態を判断することができる。要するに、少なくとも1本(たとえば3本)の直線で分割された複数の領域(たとえば4つの領域)にそれぞれ互いに異なる複数(たとえば4つ)のアイコンを対応付ければよい。また、アイコン61が顔の表情であることは必須ではなく適宜のキャラクタを用いてもよい。なお、アイコン61の形態の概念には、形状だけではなく、サイズや色も含まれる。
 また、上述した判定期間の開始から判定期間より短い時間が経過した時点で、目標値(目標電力または目標電力量)に対する消費電気(消費電力または積算値)の割合が上記閾値を超えると、判定期間の終了時点で目標値を超過する可能性があるから、利用者に対して適宜の負荷機器30の動作を制限するように通知する。この通知は、利用者装置60の画面へのメッセージの表示や報知音の出力により行われる。
 以上説明したように、アイコン61の形態を変化させることによって目標値(目標電力または目標電力量)に対する消費電気(消費電力または消費電力量)の余裕の程度を通知すれば、利用者に直観的にわかりやすい通知が可能になる。なお、図4に示す利用者装置60の画面の下部には、節電率(20%)を示す表示部62が設けられている。表示部62は、節電率の下限値(推奨値)を破線の四角で表しており、実現されている節電率(20%)を実線の四角で表している。
 管理装置10において採用する節電率は、遠隔管理装置20から指示された節電率も考慮する必要がある。そこで、図4に示す例では、利用者装置60の画面に、現在の節電率が管理装置10と遠隔管理装置20とのどちらに設定された節電率かを示す情報が表示されている(「サーバ」は、遠隔管理装置20からの節電率であることを示している)。
 動作例2では、施設責任者が利用者装置60を用いて節電率を設定することを可能にしながらも、遠隔管理装置20から指示された節電率との調節を図るために、管理装置10が管理する負荷機器30の動作状態をフィードバックしている。また、施設責任者のような利用者が利用者装置60から設定した節電率が、施設の運営に支障を与えないように目標値(目標電力または目標電力量)と消費電気(消費電力または消費電力量)との関係を判断している。このような動作は目標評価部16により行われる。すなわち、目標評価部16は、利用者が設定する節電率と遠隔管理装置20から設定される節電率とのバランスがとれ、施設における節電と運営とが両立されるように、節電率を調節するように構成される。
 (動作例3)
 管理装置10の構成として説明したように、管理装置10の目標設定部11は、遠隔管理装置20から指示された節電率に応じた第1目標値(第1目標電力または第1目標電力量)と、利用者装置60を通して施設責任者のような利用者が設定した節電率に応じた第2目標値(第2目標電力または第2目標電力量)とが設定される。したがって、第1目標値と第2目標値とが互いに競合することが考えられる。競合を回避するために、目標設定部11は、第1目標値と第2目標値との一方を選択するように構成される目標選択部114を備えている。以下では、第1目標値と第2目標値とが競合する場合に目標値(目標電力または目標電力量)を選択する手順について説明する。
 いま、遠隔管理装置20において電気事業体などからの要請によって、当日や翌日の節電を行う事象が生じたとする。この場合、節電を行う節電期間(日時)と節電率とが遠隔管理装置20から所要の管理装置10に指示される。管理装置10は、遠隔管理装置20から節電率を受け取ると、節電率に基づいて第1目標値(第1目標電力または第1目標電力量)を算出し、第1目標値を節電期間と併せて第1設定部111に保存する。
 一方、施設管理者のような利用者が利用者装置60を用いて節電期間と節電率とを入力していると、節電率から第2目標値(第2目標電力または第2目標電力量)が算出され、第2目標値は節電期間と併せて第2設定部112に保存される。
 目標設定部11は、管理装置10に内蔵された時計部(図示せず)が計時している現在日時を参照し、参照した日時が節電期間でなければ、節電することなく負荷機器30を動作させる。また、目標設定部11は、参照した日時が節電期間であれば、該当する節電期間に応じた第1または第2目標値に見合うように負荷機器30を動作させる。
 ここで、第1設定部111に設定された節電期間と第2設定部112に設定された節電期間とが重複していると、目標選択部114は、両方の目標値(目標電力または目標電力量)を満足するように、第1目標値と第2目標値とのうち小さいほうを目標値として採用する。言い換えると、目標選択部114は、より大きいほうの節電率を採用する。
 一般に、利用者装置60を用いて設定した第2節電率は、遠隔管理装置20から要請される第1節電率よりも小さいと考えられ、施設で用いている負荷機器30の種類によっては、第1節電率を採用すると運営上の障害が生じることがある。たとえば、食品スーパーマーケットでは、冷蔵あるいは冷凍を要する食品を保存している冷蔵機器303の消費電気(消費電力または消費電力)を維持しなければ、食品が劣化し、運営に支障をきたすことになる。
 そのため、遠隔管理装置20から要請された節電率が実施される節電期間に、利用者装置60を用いて意図的に小さい節電率が入力された場合、目標選択部114は、運営上の障害があったと判断し、利用者装置60から入力された節電率を優先的に用いる。たとえば、遠隔管理装置20から節電が要請された場合において、利用者装置60により設定された節電率が節電期間の開始前に15%であったのに対して節電期間の開始後に5%に引き下げられた場合、節電率は5%になる。なお、利用者装置60により設定された節電率が節電期間の開始前から0%である場合も、目標選択部114は、節電することが運営上の障害を生じる場合と判断して節電を行わない。
 ただし、利用者装置60により設定される第2節電率を、つねに優先的に使用させると、第2節電率が乱用され、遠隔管理装置20から設定する第1節電率が使用されなくなる可能性がある。そこで、利用者装置60から設定される第2節電率を遠隔管理装置20から設定される第1節電率に優先して用いるための許可条件を付しておくことが望ましい。
 許可条件は、たとえば、電気料金の単価を決める判定期間(通常、30分)内での消費電力の積算値が、判定期間について設定された上限値の90%以上に達したこととする。この許可条件は、施設での需要電力(デマンド)がピーク(上限値)に近くなった場合の対応として第2節電率を用いることを許容する。また、許可条件は、いずれかの冷蔵機器303の庫内温度が所定の基準温度よりも高いことであってもよい。この許可条件は、冷蔵機器303の庫内温度の上昇による食品の劣化を防止する場合の対応として第2節電率を用いることを許容する。このように許可条件が成立したときにのみ、第1節電率に優先して第2節電率を用いることを許容することにより、第2節電率の乱用が防止される。
 以上説明した動作により、現場運営を任されている施設責任者のような利用者が、施設の運営上、遠隔管理装置20から指示された節電率での節電が難しいと判断した場合には、節電率を引き下げることができる。しかも、許可条件による制約を付加していることにより、社会的要請によって遠隔管理装置20から第1節電率が設定されているときには、許可条件が成立しなければ利用者が設定した第2節電率が採用されないようにして、第2節電率の乱用を抑制することができる。
 (動作例4)
 遠隔管理装置20は、コンピュータシミュレーションによってエネルギーシミュレーションを行うエネルギー計算部26を備えている。施設の規模にもよるが、エネルギー計算部26においてエネルギーシミュレーションを精度よく行うには、200~300種類の情報が必要である。このような多数個の情報を施設に合わせて正しく設定することは、施設管理者のような一般の利用者には困難であって、熟練者や専門家でなければエネルギーシミュレーションを行うことは難しい。
 これに対して本実施形態は、遠隔管理装置20に設けられたパラメータ推定部27によって少数個のパラメータの入力情報からエネルギー計算部26での計算に必要な多数個のパラメータの情報を生成することを可能にしている。つまり、パラメータ推定部27に10個程度のパラメータの入力情報を与えるだけで、熟練者や専門家ではない利用者でもエネルギーシミュレーションを行うことが可能になっている。
 パラメータ推定部27に与える入力情報は、施設の特性の環境情報のうち利用者が容易に知ることのできる情報である。入力情報は、パラメータとして、施設の床面積、施設の築年数、施設の用途の区分、施設が存在する地理上の地域、施設の営業時間、施設に配置された負荷機器30の種類を含む。列挙した入力情報のパラメータは、必要最小限の情報であり、利用者であれば容易に入手可能である。
 パラメータ推定部27は、入力情報が与えられると、情報記憶部22に格納された種々の情報を参照することにより、エネルギー計算部26での計算に必要な情報を情報記憶部22から収集する。
 情報記憶部22に格納されている情報は、上述したように、エリア40ごとに配置された負荷機器30の電力負荷密度(あるいは電力容量)、エリア40の断熱性能や床面積、電気機器30ごとのエネルギー効率、施設のグレード、電気機器30のエネルギー効率、施設が存在する地域、外気温、湿度、日射量などを含む。さらに、パラメータ推定部27は、営業時間から負荷機器30の運転時間を推定するように構成される機能を備える。営業時間から運転時間を推定するには、情報記憶部22に格納されたデータテーブルあるいは演算式を用いる。
 情報記憶部22は、冷蔵機器303については、電力容量に代えてサイズ(長さ単位)を用いることが可能である。冷蔵機器303は、業界習慣では長さ単位で表現されることが多く、また、冷蔵機器303の電力容量とエリア40の床面積とは直接的な関係がないから、電力負荷密度を用いるよりも長さ単位を用いるほうが、電力容量の推定精度が高くなる。利用者は、冷蔵機器303について長さ単位を用いる場合、エリア40の間取りからエリア40に配置される冷蔵機器303のサイズ(長さ)を大まかに推定すればよい。
 すなわち、パラメータ推定部27は、上述した入力情報が与えられると、入力情報を情報記憶部22に格納された各種情報と照合し、入力情報との類似度を評価することによって、エネルギー計算部26に与える情報を推定する。言い換えると、パラメータ推定部27は、少数のパラメータの入力情報を情報記憶部22に格納された多数のパラメータの情報と照合することにより、少数個のパラメータの情報をエネルギー計算部26でのエネルギーシミュレーションに必要な多数個のパラメータの情報に展開する。
 情報記憶部22は、設備情報として、上述した情報のほかに、天井高さや窓面積率などについて標準的な情報、地理上の地域ごとの壁や窓の断熱性能について標準的な情報などを格納している。したがって、パラメータ推定部27に入力情報のパラメータとして、施設の床面積、施設の築年数、施設の用途の区分、施設が存在する地理上の地域が与えられると、エネルギーシミュレーションに必要な施設の天井高さ、窓面積、断熱性能などの情報を求めることができる。
 また、情報記憶部22は、外気温、湿度、日射量のような外部環境情報を地域ごとに分類して格納しており、パラメータ推定部27は、施設が存在する地域が入力情報として与えられると、外部環境情報を出力するように構成される。
 さらに、情報記憶部22には、設備情報、シーン情報、外部環境情報のほかに、負荷機器30に関する設定情報が格納されている。したがって、パラメータ推定部27の入力情報をキーに用いて、設備情報、シーン情報、外部環境情報の検索を行うことによって、施設に相当する負荷機器30の設定情報を抽出することができる。
 なお、パラメータ推定部27は、入力情報に対して情報記憶部22から複数の情報が抽出された場合には、非数値の情報であれば多数決によって情報を絞り込み、数値の情報であれば平均値などを用いる。負荷機器30の運転時間は、施設の営業時間に基づいて情報記憶部22から抽出される。情報記憶部22には、負荷機器30の運転時間について基準値と、営業時間に応じた補正値とが格納されており、パラメータ推定部27は、施設の営業時間が入力情報として与えられると、エリア40ごとに営業時間に応じた負荷機器30の運転時間を算出する。
 たとえば、営業時間が午前8時から午後10時である店舗では、営業時間の開始前1~2時間は開店前の準備時間であり、営業時間の終了後1~2時間は閉店後の後片付け時間になる。ここで、準備時間において、照明機器301は作業可能な程度の照度を確保するように点灯させ、空調機器302は停止させるとすれば、空調機器302の運転時間は営業時間と一致するが、照明機器301は営業時間外の1~2時間は作業に必要な動作状態としなければならない。また、冷蔵機器303は、商品が庫内に収納されている期間には、庫内照明を除いて営業時間とは無関係に運転を継続する必要がある。
 一方、24時間営業の店舗では、営業時間と関係なく来客の少ない夜間(午前0時から午前5時)において、来客が増加する時間帯に向けて商品補充や清掃のような準備を行っている。そのため、照明機器301および空調機器302についても停止させることなく運転を継続すればよい。
 このことから、24時間営業ではない店舗について、営業時間に応じた補正値が情報記憶部22に保存されていれば、パラメータ推定部27は、負荷機器30の運転時間を、施設の営業時間に応じて推定することができる。
 情報記憶部22は、負荷機器30の種類別にエネルギー効率(機器効率)を格納している。エネルギー効率は、たとえば、空調機器302であれば、外気温と機器効率(COP:Coefficient Of Performance)の関係で表されている。したがって、パラメータ推定部27は、施設の地域から外部環境情報を推定すると、外部環境情報に含まれる外気温を用いて機器効率を推定する。
 ところで、パラメータ推定部27は、入力情報からエネルギー計算部26でのエネルギーシミュレーションに必要な情報を推定するから、入力情報の情報量が増加すれば、エネルギー計算部26に与える情報の推定精度が高まる。そのため、エネルギーシミュレーションの知識を有する熟練者や専門家のような利用者であれば、エネルギーシミュレーションの精度を高めるために、多数個の情報をエネルギー計算部26に直接入力しようとすることが考えられる。そこで、エネルギー計算部26は、熟練者や専門家などによって多数個のパラメータの情報が直接入力されることを許容している。つまり、エネルギー計算部26は、情報入力部24から施設情報に含まれるすべてのパラメータの入力情報が入力されると、パラメータ推定部27で生成されるパラメータを用いることなく、推奨値(推奨電力または推奨電力量)を算出する。また、エネルギー計算部26は、推奨値と併せて基準値(基準電力または基準電力量)を算出してもよい。
 また、熟練者や専門家により多数個のパラメータの情報がエネルギー計算部26に直接入力された場合には、情報記憶部22の内容を更新することを可能にしている。たとえば、エネルギー計算部26に対して、床面積が1000m2である売場に配置された空調機器302について電力容量が150kWとして直接入力された場合、この空調容量原単位は、150W/m2にある。このようにして求められた値は情報記憶部22に格納される。つまり、熟練者や専門家がエネルギー計算部26に直接入力した情報は、情報記憶部22に格納され、パラメータ推定部27による以後の推定に採用される。したがって、情報記憶部22に格納された情報に新たな情報が随時追加される。ここで、追加された情報に対して所定期間前の古い情報を情報記憶部22から削除すれば、情報記憶部22に格納されている情報の陳腐化が防止される。
 パラメータ推定部27が入力情報に基づいてエネルギーシミュレーションに用いる情報を生成すると、エネルギー計算部26は、省エネルギーの目的や効果を制約条件として、エネルギーシミュレーションを行う。このシミュレーションにより、エネルギー計算部26は、入力情報で示された施設に対する目標電気(目標電力または目標電力量)を算出する。
 上記のように、本実施形態は、指示部13、利用者装置60、目標評価部16および提示制御部17を備える。指示部13は、複数の負荷機器30が配置された施設において目標とする節電率に応じて負荷機器30の動作を制御するように構成される。利用者装置60は、情報を表示するように構成される機能(表示部)を有する。目標評価部16は、負荷機器30によるユーティリティ・エネルギーの消費量をあらかじめ定めた目標値に対して評価するように構成される。提示制御部17は、目標評価部16の評価結果に応じて形態の異なるアイコンを利用者装置60に表示させるように構成される。この実施形態では、専門的な知識を持たない利用者であっても、ユーティリティ・エネルギーの消費量に関する目標値の管理を行うことができる。

Claims (6)

  1.  複数の負荷機器が配置された施設において目標とする節電率に応じて前記負荷機器の動作を制御するように構成される指示部と、
     情報を表示するように構成される機能を有した利用者装置と、
     前記負荷機器によるユーティリティ・エネルギーの消費量をあらかじめ定めた目標値に対して評価するように構成される目標評価部と、
     前記目標評価部の評価結果に応じて形態の異なるアイコンを前記利用者装置に表示させるように構成される提示制御部と
     を備えることを特徴とするエネルギー管理装置。
  2.  前記目標評価部は、所定の判定期間の終了時点について設定された前記目標値に基づいて、前記判定期間における前記消費量の推移を判定する複数の領域を設定するように構成され、
     前記提示制御部は、前記消費量が属する領域に応じて前記アイコンの形態を異ならせるように構成される
     ことを特徴とする請求項1記載のエネルギー管理装置。
  3.  前記目標評価部は、前記目標値に対する前記消費量の割合を判定するように構成される機能を有し、
     前記提示制御部は、前記目標評価部が判定した前記割合が規定した閾値を超えると前記利用者装置に対して、前記負荷機器の一部の停止を促すメッセージを提示させるように構成される
     ことを特徴とする請求項1又は2記載のエネルギー管理装置。
  4.  前記目標評価部は、前記施設の運営に支障が生じないユーティリティ・エネルギーの最小の消費量を推奨値とし、前記目標値が前記推奨値を下回って設定されたときに、前記提示制御部を通して前記目標値が実現不可能であることを示すメッセージを前記利用者装置に提示させるように構成されることを特徴とする請求項1~3のいずれか1項に記載のエネルギー管理装置。
  5.  複数の施設から得られた前記負荷機器のユーティリティ・エネルギーの消費量を当該施設の床面積で除算した容量原単位を格納するように構成される情報記憶部と、
     前記施設の前記推奨値をエネルギーシミュレーションによって算出するように構成されるエネルギー計算部とをさらに備え、
     前記エネルギー計算部は、前記推奨値を求める前記施設の床面積に前記情報記憶部に格納された容量原単位を乗じることにより、前記推奨値を求める前記施設における前記負荷機器によるユーティリティ・エネルギーの消費量を求めるように構成される
     ことを特徴とする請求項4記載のエネルギー管理装置。
  6.  前記情報記憶部は、施設が存在する地域と外気温を含む気象情報とが対応付けられて格納されており、
     前記エネルギー計算部は、前記推奨値を求める前記施設の地域を用いて前記情報記憶部から抽出される外気温の1日の最高温度と、前記施設における前記負荷機器に関して前記情報記憶部から抽出される容量原単位とを説明変数とし、ユーティリティ・エネルギーの消費量の1日の最大値を求める回帰式を用いることにより、当該最大値を前記推奨値として求める
     ことを特徴とする請求項5記載のエネルギー管理装置。
PCT/JP2013/005453 2012-10-12 2013-09-13 エネルギー管理装置 WO2014057613A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US14/432,063 US10175747B2 (en) 2012-10-12 2013-09-13 Energy management system configured to manage operation states of load apparatuses installed in facility

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012227252A JP5914860B2 (ja) 2012-10-12 2012-10-12 管理装置
JP2012-227252 2012-10-12

Publications (1)

Publication Number Publication Date
WO2014057613A1 true WO2014057613A1 (ja) 2014-04-17

Family

ID=50477097

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/005453 WO2014057613A1 (ja) 2012-10-12 2013-09-13 エネルギー管理装置

Country Status (3)

Country Link
US (1) US10175747B2 (ja)
JP (1) JP5914860B2 (ja)
WO (1) WO2014057613A1 (ja)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5758536B1 (ja) * 2014-10-31 2015-08-05 日本テクノ株式会社 アラーム情報出力装置、アラーム情報出力方法、及びアラーム情報出力プログラム
JP2016010292A (ja) * 2014-06-26 2016-01-18 株式会社日立製作所 電力需要抑制制御装置
CN105511272A (zh) * 2014-10-10 2016-04-20 Lg电子株式会社 中央控制装置、设备控制***及方法
JP2019113912A (ja) * 2017-12-21 2019-07-11 東京瓦斯株式会社 環境管理のシステム、プログラム、装置および方法
CN111839101A (zh) * 2020-06-28 2020-10-30 珠海格力电器股份有限公司 一种陈列柜控制方法、装置、存储介质及陈列柜
CN112823370A (zh) * 2018-10-19 2021-05-18 三菱电机株式会社 能量收支的可视化***

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6547631B2 (ja) 2014-01-29 2019-07-24 日本電気株式会社 監視装置、監視システム、監視方法、補正情報作成装置、補正情報作成方法及びプログラム
JP6079803B2 (ja) 2015-03-20 2017-02-15 ダイキン工業株式会社 デマンドレスポンス制御結果提示装置
JP2016178824A (ja) * 2015-03-20 2016-10-06 ダイキン工業株式会社 機器制御装置
WO2017033387A1 (ja) * 2015-08-26 2017-03-02 パナソニックIpマネジメント株式会社 電力管理装置、及び、プログラム
US10248146B2 (en) 2015-10-14 2019-04-02 Honeywell International Inc. System for dynamic control with interactive visualization to optimize energy consumption
WO2017127373A1 (en) * 2016-01-22 2017-07-27 Johnson Controls Technology Company Building energy management system with energy analytics and ad hoc dashboard
US10514670B2 (en) * 2016-05-25 2019-12-24 Kabushiki Kaisha Toshiba Energy management apparatus, management system, power consumption monitoring method and program
JP7081070B2 (ja) * 2018-06-27 2022-06-07 三菱電機ビルソリューションズ株式会社 消費電力推定装置
JP7152678B2 (ja) * 2020-09-30 2022-10-13 ダイキン工業株式会社 電力制御システムおよびプログラム
JP2022080767A (ja) * 2020-11-18 2022-05-30 トヨタ自動車株式会社 制御装置、プログラム及び制御方法
US20230148149A1 (en) * 2021-11-08 2023-05-11 Johnson Controls Tyco IP Holdings LLP Building automation system with resource consumption tracking features

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001327076A (ja) * 2000-03-10 2001-11-22 Mark Tec:Kk 電気料金管理装置およびその記録媒体
JP2009180741A (ja) * 2004-03-26 2009-08-13 Cosmo Life Kk 使用電力監視システム
WO2010029845A1 (ja) * 2008-09-11 2010-03-18 日本電気株式会社 活動データ提示装置、活動データ提示方法および記録媒体
JP2011078226A (ja) * 2009-09-30 2011-04-14 Sanyo Electric Co Ltd 電気機器管理システム
JP2011187030A (ja) * 2010-03-11 2011-09-22 Omron Corp 環境情報提供装置、環境情報提供装置連携システム、環境情報提供方法、および、表示装置
JP2011220647A (ja) * 2010-04-14 2011-11-04 Yazaki Corp 削減燃料費算出装置及び太陽熱給湯システム
JP2012068494A (ja) * 2010-09-24 2012-04-05 Konica Minolta Business Technologies Inc 画像形成装置および運転計画作成方法
JP4962813B1 (ja) * 2012-01-23 2012-06-27 日本テクノ株式会社 アラーム出力装置、アラーム出力方法

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004280618A (ja) * 2003-03-18 2004-10-07 Hitachi Ltd エネルギー管理システム
US7216021B2 (en) * 2003-10-30 2007-05-08 Hitachi, Ltd. Method, system and computer program for managing energy consumption
US7379791B2 (en) * 2004-08-03 2008-05-27 Uscl Corporation Integrated metrology systems and information and control apparatus for interaction with integrated metrology systems
US20070203860A1 (en) * 2006-02-24 2007-08-30 Gridpoint, Inc. Energy budget manager
US7541941B2 (en) * 2007-03-16 2009-06-02 Greenbox Technology Inc. System and method for monitoring and estimating energy resource consumption
JP2009240032A (ja) 2008-03-26 2009-10-15 Panasonic Electric Works Co Ltd デマンド制御システム
US7873485B2 (en) * 2008-05-08 2011-01-18 International Business Machines Corporation Indicating physical site energy usage through a virtual environment
US20090319905A1 (en) * 2008-06-23 2009-12-24 Tellemotion, Inc. System and method for realtime monitoring of resource consumption and interface for the same
KR101708028B1 (ko) * 2010-04-13 2017-02-20 삼성전자주식회사 소비 전력 표시 방법 및 장치
US9633320B2 (en) * 2011-03-15 2017-04-25 Kabushiki Kaisha Toshiba Energy demand prediction apparatus and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001327076A (ja) * 2000-03-10 2001-11-22 Mark Tec:Kk 電気料金管理装置およびその記録媒体
JP2009180741A (ja) * 2004-03-26 2009-08-13 Cosmo Life Kk 使用電力監視システム
WO2010029845A1 (ja) * 2008-09-11 2010-03-18 日本電気株式会社 活動データ提示装置、活動データ提示方法および記録媒体
JP2011078226A (ja) * 2009-09-30 2011-04-14 Sanyo Electric Co Ltd 電気機器管理システム
JP2011187030A (ja) * 2010-03-11 2011-09-22 Omron Corp 環境情報提供装置、環境情報提供装置連携システム、環境情報提供方法、および、表示装置
JP2011220647A (ja) * 2010-04-14 2011-11-04 Yazaki Corp 削減燃料費算出装置及び太陽熱給湯システム
JP2012068494A (ja) * 2010-09-24 2012-04-05 Konica Minolta Business Technologies Inc 画像形成装置および運転計画作成方法
JP4962813B1 (ja) * 2012-01-23 2012-06-27 日本テクノ株式会社 アラーム出力装置、アラーム出力方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016010292A (ja) * 2014-06-26 2016-01-18 株式会社日立製作所 電力需要抑制制御装置
CN105511272A (zh) * 2014-10-10 2016-04-20 Lg电子株式会社 中央控制装置、设备控制***及方法
US10156834B2 (en) 2014-10-10 2018-12-18 Lg Electronics Inc. Central control apparatus for controlling facilities, facility control system comprising the same, and facility control method
JP5758536B1 (ja) * 2014-10-31 2015-08-05 日本テクノ株式会社 アラーム情報出力装置、アラーム情報出力方法、及びアラーム情報出力プログラム
JP2019113912A (ja) * 2017-12-21 2019-07-11 東京瓦斯株式会社 環境管理のシステム、プログラム、装置および方法
CN112823370A (zh) * 2018-10-19 2021-05-18 三菱电机株式会社 能量收支的可视化***
CN111839101A (zh) * 2020-06-28 2020-10-30 珠海格力电器股份有限公司 一种陈列柜控制方法、装置、存储介质及陈列柜
CN111839101B (zh) * 2020-06-28 2021-11-23 珠海格力电器股份有限公司 一种陈列柜控制方法、装置、存储介质及陈列柜

Also Published As

Publication number Publication date
JP2014082811A (ja) 2014-05-08
US10175747B2 (en) 2019-01-08
US20160004297A1 (en) 2016-01-07
JP5914860B2 (ja) 2016-05-11

Similar Documents

Publication Publication Date Title
WO2014057613A1 (ja) エネルギー管理装置
JP5979546B2 (ja) エネルギー管理装置、管理装置、プログラム
JP5967541B2 (ja) エネルギー管理装置、管理装置、遠隔管理装置、エネルギー管理方法、プログラム
JP5834252B2 (ja) エネルギー管理装置、プログラム
US10907844B2 (en) Multi-function home control system with control system hub and remote sensors
US8571717B2 (en) Group management apparatus and group management system
US9171274B2 (en) Method and system for energy management
US20120130924A1 (en) System and method for analyzing energy use
JP6635419B2 (ja) 情報端末の制御方法および省エネ支援システム
JP2008025908A (ja) 最適化制御支援システム
US20130197708A1 (en) Method and apparatus for managing energy by analyzing energy usage pattern of electric device
JP2011248568A (ja) エネルギー管理システム
JP5945826B2 (ja) エネルギー管理装置、遠隔管理装置
WO2014057614A1 (ja) エネルギー管理装置、管理装置、遠隔管理装置
JP5360090B2 (ja) 多店舗型施設の設備運用システムとその処理方法とプログラム
WO2013190603A1 (ja) 電気機器制御システム
JP6614866B2 (ja) 空気調和システム、空気調和方法、及び制御装置
JP6757915B2 (ja) 情報端末の制御方法および情報システム
JP2018026913A (ja) 電力管理システム
KR102572325B1 (ko) 다중제어 시나리오에 기반한 건물 에너지 관리정보를 표시하는 방법 및 시스템
JP6919995B2 (ja) デマンドレスポンスにおける電力管理方法および電力管理装置
JP6093292B2 (ja) 行動予測システム、機器制御方法、行動支援方法およびプログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13844644

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 14432063

Country of ref document: US

122 Ep: pct application non-entry in european phase

Ref document number: 13844644

Country of ref document: EP

Kind code of ref document: A1