WO2010117037A1 - 曲げ加工装置 - Google Patents

曲げ加工装置 Download PDF

Info

Publication number
WO2010117037A1
WO2010117037A1 PCT/JP2010/056375 JP2010056375W WO2010117037A1 WO 2010117037 A1 WO2010117037 A1 WO 2010117037A1 JP 2010056375 W JP2010056375 W JP 2010056375W WO 2010117037 A1 WO2010117037 A1 WO 2010117037A1
Authority
WO
WIPO (PCT)
Prior art keywords
bending
workpiece
articulated robot
joint
die
Prior art date
Application number
PCT/JP2010/056375
Other languages
English (en)
French (fr)
Inventor
照明 與語
Original Assignee
株式会社オプトン
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社オプトン filed Critical 株式会社オプトン
Priority to US13/258,584 priority Critical patent/US9138795B2/en
Priority to EP20100761736 priority patent/EP2418025B1/en
Publication of WO2010117037A1 publication Critical patent/WO2010117037A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D7/00Bending rods, profiles, or tubes
    • B21D7/02Bending rods, profiles, or tubes over a stationary forming member; by use of a swinging forming member or abutment
    • B21D7/024Bending rods, profiles, or tubes over a stationary forming member; by use of a swinging forming member or abutment by a swinging forming member
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D7/00Bending rods, profiles, or tubes
    • B21D7/12Bending rods, profiles, or tubes with programme control

Definitions

  • the present invention relates to a bending apparatus that performs bending by moving a bending mechanism around a workpiece when a long workpiece, for example, a pipe or a rod-like material is bent in a predetermined direction.
  • the bending apparatus disclosed in Patent Document 1 includes a chuck mechanism for gripping a workpiece. Further, the bending apparatus includes a plurality of bending joints whose bending axes extend in a direction orthogonal to the link direction of the two members connected by the joints, and the link of the two members connected by the joints. An articulated robot having a plurality of rotary joints whose turning axes extend in the same direction as the direction is provided, and a bending mechanism is attached to the tip of the articulated robot. In this bending apparatus, the robot rotates each joint to move the bending mechanism, and moves the workpiece toward the chuck mechanism. The robot causes the workpiece to be gripped by the chuck mechanism, while rotating each joint to move the bending mechanism to bend the workpiece at a plurality of locations.
  • An object of the present invention is to provide a bending apparatus that can improve yield and can perform bending without cutting work.
  • a bending apparatus includes a bending mechanism, a fixing base, an articulated robot, and a control means.
  • the bending mechanism sandwiches a long workpiece by a bending die and a clamping die that can revolve around the bending die, and revolves the clamping die to bend the workpiece.
  • a chuck mechanism for holding the workpiece is attached to the solid table.
  • the articulated robot is provided with the bending mechanism, and the articulated robot moves the bending mechanism.
  • the control means controls the articulated robot, the bending mechanism, and the chuck mechanism.
  • the control executed by the control means is to hold the workpiece by the bending mechanism, move the bending mechanism by the articulated robot to move the workpiece, and move the workpiece.
  • it includes bending / movement control for bending the workpiece by the bending mechanism.
  • the articulated robot includes a plurality of bending joints having bending axes extending in a direction orthogonal to a link direction of two members connected by the joint, and a link direction of the two members connected by the joint. It is preferable to have a plurality of rotary joints having pivot axes extending in the same direction.
  • the bending / movement control includes holding the workpiece by the bending mechanism, moving the bending mechanism by the articulated robot to move the workpiece toward the chuck mechanism, and bending the workpiece. Control may be included in which the workpiece is bent by a mechanism and the workpiece is gripped by the chuck mechanism.
  • the gripping mechanism is released while the workpiece is held by the bending mechanism, and the workpiece is moved by moving the bending mechanism by the articulated robot.
  • it may include a control for bending the workpiece by the bending mechanism and unloading the workpiece.
  • the bending / moving control releases the gripping by the chuck mechanism while the workpiece is held by the bending mechanism, and moves the workpiece by moving the bending mechanism by the articulated robot.
  • the workpiece may be gripped by the chuck mechanism.
  • the bending apparatus of the present invention can improve yield and can be bent without performing a cutting operation.
  • FIGS. 1 to 4 an articulated robot 2 is placed on the machine base 1.
  • a bending mechanism 30 (described later) for bending a long workpiece 4 such as a pipe is attached to the articulated robot 2, and the articulated robot 2 is connected to the link direction of two members connected by a joint.
  • the swivel axis extends in the same direction as the link direction of the three members of the first to third bending joints 6, 8, and 10 in which the bending axis extends in a direction perpendicular to each other and the two members connected by the joint
  • Two sets of first and second rotary joints 12 and 14 are provided.
  • the joint-type robot 2 includes a fixed portion 16 attached to the machine base 1, and the fixed portion 16 and the first swivel base 18 are connected by a first rotary joint 12.
  • the first rotary joint 12 has a known mechanism that drives the first swivel base 18 to rotate at a predetermined angle around a vertical axis CV1.
  • the first bending joint 6 has a known mechanism for driving the first arm 20 to rotate at a predetermined angle around a horizontal axis CH1.
  • the horizontal axis CH1 of the first bending joint 6 and the vertical axis CV1 of the first rotary joint 12 are orthogonal to each other.
  • the other end of the first arm 20 and one end of the second arm 22 are connected via the second bending joint 8.
  • the second bending joint 8 has a known mechanism for rotating the second arm 22 at a predetermined angle around an axis CH2 parallel to the horizontal axis CH1 of the first bending joint 6.
  • a second swivel base 24 is connected to the other end of the second arm 22 via the second rotary joint 14.
  • the second rotary joint 14 has a well-known mechanism for rotating the second swivel base 24 at a predetermined angle around an axis CV2 orthogonal to the horizontal axes CH1 and CH2 of the first and second bending joints 6 and 8. Is.
  • One end of a tip arm 26 is connected to the second swivel base 24 via the third bending joint 10.
  • the third bending joint 10 rotates the tip arm 26 about an axis CH3 parallel to the horizontal axes CH1 and CH2 of the first and second bending joints 6 and 8.
  • an auxiliary joint 28 is provided at the tip of the tip arm 26, and a bending mechanism 30 is attached to the auxiliary joint 28.
  • the auxiliary joint 28 is mechanically synchronized with the third bending joint 10, and when the third bending joint 10 rotates the tip arm 26 by 360 degrees, the auxiliary joint 28 rotates the bending mechanism 30 by 360 degrees. Note that the auxiliary joint 28 may pivot independently of the third bending joint 10.
  • the bending mechanism 30 includes a bending die 32.
  • the bending die 32 is formed by laminating three grooves 34, 36, and 38 corresponding to three kinds of bending radii in the axial direction.
  • the bending mechanism 30 is provided with a clamping die 42 that is driven by the cylinder 40 to move toward the bending die 32 and clamps the workpiece 4 together with the bending die 32.
  • the clamping die 42 is configured to revolve around the bending die 32 in a state where the workpiece 4 is sandwiched, and to be bent by rotating the clamping die 42 by a predetermined angle.
  • a pressure die 44 is provided alongside the clamping die 42 to receive a reaction force during bending.
  • the bending process is not limited to compression bending, and may be draw bending.
  • a chuck mechanism 46 for holding the rear end of the workpiece 4 is provided, and the chuck mechanism 46 is attached to a fixed base 48.
  • the chuck mechanism 46 is configured to hold the workpiece 4 so as to be horizontal and perpendicular to the vertical axis CV1 of the first rotary joint 12.
  • a carry-in cradle 50 and a carry-out cradle 52 are provided on both sides of the articulated robot 2.
  • the articulated robot 2 turns the first to third bending joints 6, 8, 10 and the first and second rotary joints 12 and 14 as shown in FIGS. 11A, 11B and 12A-12E.
  • the posture and moving position of the mechanism 30 can be controlled.
  • the articulated robot 2 is configured so that the bending direction of the workpiece 4 matches the direction of the groove 34 of the bending die 32 according to the bending direction of the workpiece 4.
  • the bending mechanism 30 can be moved.
  • the tip arm 26 and the work piece 4 are brought into contact with each other by bringing the groove 34 into contact with the workpiece 4.
  • the position of the third bending joint 10 is determined.
  • the position of the second bending joint 8 is on an arc whose center is the first bending joint 6 and whose radius is the distance between the first bending joint 6 and the second bending joint 8.
  • the center is on an arc whose radius is the distance between the second bending joint 8 and the third bending joint 10. Therefore, if the second bending joint 8 is at the intersection of these two arcs, the position of the bending die 32 is determined. At this time, there may be two intersecting points. In this case, the second arm 22 interferes with the workpiece 4, or the tip of the workpiece 4 after bending interferes with the second arm 22. Select intersections that you don't want to do.
  • the angle formed by the fixed portion 16 and the first arm 20 the angle formed by the first arm 20 and the second arm 22
  • the angles formed by the two arms 22 and the tip arm 26 are respectively determined.
  • the first arm 20, the second arm 22, and the tip arm 26 are turned to a predetermined angle by the first to third bending joints 6, 8, and 10 according to the obtained angles. Accordingly, the groove 34 of the bending die 32 is moved so as to contact the workpiece 4.
  • the first to third bending joints 6 are used. , 8 and 10 can be rotated to move the bending mechanism 30 around the workpiece 4 so that the bending direction becomes a predetermined direction as shown in FIGS. 11A and 11B.
  • the first rotary joint 12 when bending is performed at a bending position close to the chuck mechanism 46, the first rotary joint 12 is similarly driven to move the bending mechanism 30 to the bending position.
  • the second rotary joint 14 is driven to the opposite side of the first rotary joint 12 to move the tip arm 26 so that the axial direction of the tip arm 26 is orthogonal to the workpiece 4, and the first to third bending joints.
  • the above-described operation is repeated from the bending position on the tip side of the workpiece 4 toward the bending position near the chuck mechanism 46.
  • the object 4 is bent in order.
  • the workpiece 4 is gripped by the bending die 32 and the clamping die 42, and the bending mechanism 30 is turned around the workpiece 4 to twist the workpiece 4 and change the bending direction. Also good. Thereby, the bent workpiece 4 can be prevented from interfering with the apparatus and the floor.
  • the articulated robot 2, the bending mechanism 30, and the chuck mechanism 46 are connected to a control circuit 54 as an example of a control unit, and the articulated robot 2 and the bending mechanism 30 are controlled by the control circuit 54.
  • the driving of the chuck mechanism 46 is controlled.
  • FIG. 8 shows the flowcharts shown in FIGS. 8 to 10 showing the flow of bending control processing performed in the control circuit 54.
  • the workpiece 4 cut in advance to a predetermined length is transported onto the carry-in cradle 50. Then, when the bending control process is started, it is determined whether or not the workpiece 4 is loaded while being bent (S100 (S means a step)). Whether or not to load while bending is set in advance as bending data, and the bending portion of the workpiece 4 cannot be bent when the chuck mechanism 46 holds the workpiece 4 or the bending is not possible. It is set in advance when the location is difficult to process. Alternatively, it is set in a case where a bracket or the like is attached to the workpiece 4 before bending and the workpiece 4 is restricted when the workpiece 4 is gripped by the chuck mechanism 46.
  • the bending angle for the bending mechanism 30 is read from the bending data (S110). Then, loading is started to move the workpiece 4 toward the chuck mechanism 46 in order to hold the workpiece 4 by the bending mechanism 30 and cause the chuck mechanism 46 to grip the workpiece 4 (S120).
  • the first rotary joint 12 of the articulated robot 2 is driven so that the articulated robot 2 faces the workpiece 4 of the loading cradle 50. Further, the first to third bending joints 6, 8, and 10 of the joint type robot 2 are driven to move the bending mechanism 30 so that the workpiece 4 is brought into contact with the groove 34 of the bending die 32.
  • the clamping die 42 and the pressure die 44 are moved, and the workpiece 4 is clamped by the bending mechanism 30.
  • the articulated robot 2 is controlled to drive the first to third bending joints 6, 8, 10 and the first and second rotating joints 12, 14.
  • the workpiece 4 is moved toward the chuck mechanism 46.
  • the bending mechanism 30 clamps a bending portion to be bent at the bending angle read in the process of S ⁇ b> 110.
  • the bending mechanism 30 is driven to start bending the workpiece 4 (S130).
  • the bending process is performed by revolving the clamping die 42 around the bending die 32 in accordance with the bending angle read by the processing of S110.
  • the first to third bending joints 6, 8, 10 and the first and second rotary joints 12, 14 are driven to move the workpiece 4 toward the chuck mechanism 46.
  • the movement of the workpiece 4 may be temporarily stopped to perform bending.
  • the workpiece 4 on the loading cradle 50 is moved toward the chuck mechanism 46 so that the workpiece 4 can be gripped by the chuck mechanism 46. Then, after moving the workpiece 4 to the chuck mechanism 46 and inserting the workpiece 4 into the chuck mechanism 46, the chuck mechanism 46 is controlled so that the workpiece 4 is gripped by the chuck mechanism 46. It is determined whether or not the bending process and the loading are completed (S140). If the bending process and the loading process are not completed, the process waits for the completion of the bending process and the loading process.
  • the loading is started first as in the process of S120 (S150). If it is determined that loading is completed and the workpiece 4 is gripped by the chuck mechanism 46 (S160), then bending is performed (S170) as in the processing of S110 and S130.
  • the articulated robot 2 is controlled, the bending mechanism 30 is moved to the next bending position of the workpiece 4, and the clamping die 42, the pressure die 44 is driven, the clamping die 42 and the pressure die 44 are abutted against the workpiece 4, and the workpiece 4 is clamped by the bending mechanism 30 (S190).
  • the gripping of the workpiece 4 by the chuck mechanism 46 is released (S220), and the drawing amount of the workpiece 4 is read (S230).
  • the amount of pull-in is preset in bending data.
  • the first to third bending joints 6, 8, 10 and the first and second rotary joints 12, 14 are driven to move the bending mechanism 30 in the longitudinal direction of the workpiece 4, thereby drawing in. Start (S240).
  • the workpiece 4 is moved in the longitudinal direction and pulled from the chuck mechanism 46.
  • the bending angle by the bending mechanism 30 is read (S250). Then, the bending mechanism 30 is driven to start bending the workpiece 4 (S260). The bending process is performed by revolving the clamping die 42 around the bending die 32 according to the bending angle read by the process of S250. During the bending process, the first to third bending joints 6, 8, 10 and the first and second rotary joints 12, 14 are driven to pull the workpiece 4 from the chuck mechanism 46.
  • the processing from S190 is repeated, and the bending mechanism 30 is processed by driving the first to third bending joints 6, 8, 10 and the first and second rotating joints 12, 14.
  • the workpiece 4 is moved to the next bending position.
  • the clamping die 42 is revolved around the bending die 32 according to a preset bending angle. And bending is performed (S300).
  • the clamping die 42 is revolved around the bending die 32 according to a preset bending angle to perform bending (S360). ), The process of S290 is executed.
  • the process from S190 is repeated, and the bending mechanism 30 is moved to the bending position set in the bending data in advance, and the workpiece 4 is bent.
  • it is determined whether or not unloading is performed while bending (S370). Whether or not unloading while bending is set in the bending data in advance. For example, when the workpiece 4 is bent at a position where the workpiece 4 cannot be bent or is difficult to bend in a state where the workpiece 4 is gripped by the chuck mechanism 46, the workpiece 4 is unfolded while being bent. Loading. Alternatively, a bracket or the like is attached to the workpiece 4 before bending, and when the workpiece 4 is gripped by the chuck mechanism 46, unloading is performed while bending when the workpiece 4 is restricted.
  • the first to third bending joints 6, 8, 10 and the first and second rotary joints 12, 14 of the articulated robot 2 are driven to move the bending mechanism 30, and the groove of the bending mold 32 is moved.
  • the workpiece 4 is brought into contact with 34.
  • the clamping die 42 and the pressure die 44 are moved, and the workpiece 4 is clamped by the bending mechanism 30.
  • the articulated robot 2 is controlled to drive the first to third bending joints 6, 8, 10 and the first and second rotating joints 12, 14.
  • the workpiece 4 is moved toward the unloading cradle 52.
  • the bending portion is sandwiched by the bending mechanism 30.
  • the bending mechanism 30 is driven while moving the workpiece 4 by unloading toward the unloading cradle 52, and the final bending of the workpiece 4 is started (S400).
  • the bending process is performed by revolving the clamping die 42 around the bending die 32 according to the bending angle read by the process of S380.
  • the first to third bending joints 6, 8, 10 and the first and second rotary joints 12, 14 are driven to move the workpiece 4 toward the unloading cradle 52.
  • the movement of the workpiece 4 may be temporarily stopped to perform bending.
  • the joint type robot 2 is controlled to move the bending mechanism 30 to the final bending position, and then the clamping die 42 and the pressure die 44 are driven.
  • the clamping die 42 and the pressure die 44 are abutted against the workpiece 4, and the clamping die 42 is revolved around the pressure die 44 according to a predetermined bending angle to perform the final bending process (S430).
  • the articulated robot 2 is controlled to move the bending mechanism 30 to a position where, for example, the left and right balance of the workpiece 4 after bending is taken.
  • the clamping die 42 of the bending mechanism 30 is driven, the workpiece 4 is clamped by the clamping die 42 and the bending die 32, the chuck mechanism 46 is opened, and the workpiece 4 is moved toward the unloading base 52. Unloading is performed (S440). After the workpiece 4 is moved onto the unloading cradle 52, the clamping of the workpiece 4 by the bending mechanism 30 is released, and the workpiece 4 is placed on the unloading cradle 52 (S420). ), This control process is temporarily terminated.
  • loading is performed while bending, retraction is performed while bending, or unloading is performed while bending. Therefore, work efficiency is improved, and the workpiece 4 is gripped by the chuck mechanism 46 and cannot be bent. Even if it exists, a bending process can be performed, the cutting
  • the present invention is not limited to such an embodiment, and can be implemented in various modes without departing from the gist of the present invention.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bending Of Plates, Rods, And Pipes (AREA)
  • Manipulator (AREA)

Abstract

 曲げ加工装置は、曲げ機構と、固定台と、関節型ロボットと、制御手段とを備える。制御手段によって実行される制御は、被加工物を曲げ機構により挟持し、関節型ロボットにより曲げ機構を移動させて被加工物を移動させると共に、被加工物を移動させながら曲げ機構により被加工物を曲げ加工する曲げ・移動制御を含んでいる。

Description

曲げ加工装置
 本発明は、長尺状の被加工物、例えばパイプや棒状材を所定の方向に曲げ加工する際に、曲げ機構を被加工物の廻りに移動させて曲げ加工する曲げ加工装置に関する。
 特許文献1に開示されている曲げ加工装置は、被加工物を把持するチャック機構を備える。さらに、この曲げ加工装置は、関節で接続された2つの部材のリンク方向に対して直交する方向に曲げ軸が延在している複数の曲げ関節と、関節で接続された2つの部材のリンク方向と同じ方向に旋回軸が延在している複数の回転関節とを有する関節型ロボットを備え、関節型ロボットの先端に曲げ機構が取り付けられている。この曲げ加工装置では、ロボットが各関節を回動させて曲げ機構を移動させ、被加工物をチャック機構に向かって移動させる。そして、このロボットは、被加工物をチャック機構に把持させる一方で、各関節を回動させて曲げ機構を移動させ、複数箇所で被加工物を曲げ加工する。
特開2006-116604号公報
 上述の曲げ加工装置では、被加工物をチャック機構により把持するので、チャック機構による把持のためのチャック代を必要とする。このため、チャック機構が把持する被加工物のチャック代に対応する箇所は曲げ加工ができず、加工終了後にチャック代に対応する箇所を切断する必要がある。このため、上述の曲げ加工装置では、歩留まりが損なわれている上、曲げ加工後の切断作業が繁雑であるという問題があった。
 本発明の課題は、歩留まりを改善できると共に、切断作業をすることなく曲げ加工できる曲げ加工装置を提供することにある。
 かかる課題を達成すべく、本発明に係る曲げ加工装置は、曲げ機構と、固定台と、関節型ロボットと、制御手段とを備えている。
 曲げ機構は、曲げ型と、該曲げ型の周りを公転可能な締め型とにより長尺状の被加工物を挟持し、前記締め型を公転させ前記被加工物を曲げ加工する。固体台には、前記被加工物を把持するチャック機構が取り付けられている。関節型ロボットには、前記曲げ機構が取り付けられ、関節型ロボットは、前記曲げ機構を移動させる。制御手段は、前記関節型ロボット、前記曲げ機構及び前記チャック機構を制御する。
 前記制御手段によって実行される制御は、前記被加工物を前記曲げ機構により挟持し、前記関節型ロボットにより前記曲げ機構を移動させて前記被加工物を移動させると共に、前記被加工物を移動させながら前記曲げ機構により前記被加工物を曲げ加工する曲げ・移動制御を含んでいる。
 前記関節型ロボットは、関節で接続された2つの部材のリンク方向に対して直交する方向に曲げ軸が延在している複数の曲げ関節と、関節で接続された2つの部材のリンク方向と同じ方向に旋回軸が延在している複数の回転関節とを有するものが好ましい。また、前記曲げ・移動制御は、前記被加工物を前記曲げ機構により挟持し、前記関節型ロボットにより前記曲げ機構を移動させて前記被加工物を前記チャック機構に向かって移動させながら、前記曲げ機構により前記被加工物を曲げ加工して、前記被加工物を前記チャック機構に把持させる制御を含んでもよい。
 あるいは、前記曲げ・移動制御は、前記被加工物を前記曲げ機構により挟持した状態で前記チャック機構による把持を解除させ、前記関節型ロボットにより前記曲げ機構を移動させて前記被加工物を移動させながら、前記曲げ機構により前記被加工物を曲げ加工して、前記被加工物を搬出させる制御を含んでもよい。更に、前記曲げ・移動制御は、前記被加工物を前記曲げ機構により挟持した状態で前記チャック機構による把持を解除させ、前記関節型ロボットにより前記曲げ機構を移動させて前記被加工物を移動させながら、前記曲げ機構により前記被加工物を曲げ加工した後、前記被加工物を前記チャック機構により把持させる制御を含んでもよい。
 本発明の曲げ加工装置は、歩留まりを改善できると共に、切断作業をすることなく曲げ加工できるという効果を奏する。
本発明の一実施形態としての曲げ加工装置の正面図である。 実施形態の曲げ加工装置の左側面図である。 実施形態の曲げ加工装置の平面図である。 実施形態の関節型ロボットの左側面図である。 実施形態の曲げ機構の拡大側面図である。 実施形態の曲げ機構の拡大平面図である。 実施形態の曲げ加工装置の制御系統を示すブロック図である。 実施形態の制御回路で行われる曲げ制御処理の前半部の一例を示すフローチャートである。 実施形態の制御回路で行われる曲げ制御処理の中間部の一例を示すフローチャートである。 実施形態の制御回路で行われる曲げ制御処理の後半部の一例を示すフローチャートである。 実施形態の関節型ロボットの側面方向からの動作説明図である。 実施形態の関節型ロボットの平面方向からの動作説明図である。 実施形態の関節型ロボットの平面方向からの曲げながらローディングする際の動作説明図である。 実施形態の関節型ロボットの平面方向からの曲げながら引き込む際の動作説明図である。
1…機台       2…関節型ロボット
4…被加工物     6,8,10…曲げ関節
12,14…回転関節 30…曲げ機構
32…曲げ型     42…締め型
44…圧力型     46…チャック機構
48…固定台     50…搬入用受け台
52…搬出用受け台  54…制御回路
 以下本発明を実施するための形態を図面に基づいて詳細に説明する。
 図1~図4に示すように、機台1上には関節型ロボット2が載置されている。関節型ロボット2には、パイプ等の長尺状の被加工物4を曲げ加工する後述する曲げ機構30が取り付けられ、関節型ロボット2は、関節で接続された2つの部材のリンク方向に対して直交する方向に曲げ軸が延在している3組の第1~第3曲げ関節6,8,10と、関節で接続された2つの部材のリンク方向と同じ方向に旋回軸が延在している2組の第1、第2回転関節12,14とを備えている。
 関節型ロボット2は、機台1に取り付けられた固定部16を備え、固定部16と第1旋回台18とは、第1回転関節12により接続されている。第1回転関節12は、鉛直な軸CV1の廻りで第1旋回台18を所定角度で回動駆動する周知の機構を有するものである。
 第1旋回台18には、第1アーム20の一端が第1曲げ関節6を介して接続されている。第1曲げ関節6は水平な軸CH1の廻りで第1アーム20を所定角度で回動駆動する周知の機構を有するものである。第1曲げ関節6の水平な軸CH1と第1回転関節12の鉛直な軸CV1とは直交している。
 第1アーム20の他端と第2アーム22の一端とが第2曲げ関節8を介して接続されている。第2曲げ関節8は第1曲げ関節6の水平な軸CH1と平行な軸CH2の廻りで第2アーム22を所定角度で回動駆動する周知の機構を有するものである。
 第2アーム22の他端には、第2旋回台24が第2回転関節14を介して接続されている。第2回転関節14は、第1、第2曲げ関節6,8の水平な軸CH1,CH2と直交する軸CV2の廻りで第2旋回台24を所定角度で回動駆動する周知の機構を有するものである。第2旋回台24には、先端アーム26の一端が第3曲げ関節10を介して接続されている。第3曲げ関節10は、先端アーム26を第1、第2曲げ関節6,8の水平な軸CH1,CH2と平行な軸CH3の廻りに回動するものである。
 また、図4に示すように、先端アーム26の先端に補助関節28が設けられており、補助関節28に曲げ機構30が取り付けられている。補助関節28は、第3曲げ関節10と機械的に同期しており、第3曲げ関節10が先端アーム26を360度旋回させると、補助関節28は、曲げ機構30を360度旋回させる。尚、補助関節28は、第3曲げ関節10とは独立して旋回してもよい。
 曲げ機構30は、図5、図6に示すように、曲げ型32を備え、曲げ型32はその軸方向に3種類の曲げ半径に応じた3つの溝34,36,38が積層されて形成されている。また、曲げ機構30には、シリンダ40により駆動されて曲げ型32に向かって移動し、曲げ型32と共に被加工物4を挟持する締め型42が設けられている。この締め型42は被加工物4を挟持した状態で曲げ型32の廻りを公転し、締め型42が所定の角度回転することで、曲げ加工できるように構成されている。そして、この締め型42に並んで曲げ加工時の反力を受ける圧力型44が設けられている。尚、曲げ加工は、コンプレッション曲げに限らず、ドロー曲げであってもよい。
 また、図1に示すように、被加工物4の後端を把持するチャック機構46が設けられており、チャック機構46は固定台48に取り付けられている。チャック機構46は、被加工物4を水平、且つ、第1回転関節12の鉛直な軸CV1と直交するように把持するように構成されている。更に、関節型ロボット2の両側には、搬入用受け台50と搬出用受け台52とがそれぞれ設けられている。
 関節型ロボット2は、第1~第3曲げ関節6,8,10、第1、第2回転関節12,14を旋回することにより、図11A,11B,図12A-12Eに示すように、曲げ機構30の姿勢や移動位置を制御できる。
 例えば、図11A,11Bに示すように、関節型ロボット2は、被加工物4の曲げ方向に応じて、被加工物4の曲げ方向と曲げ型32の溝34の方向とが一致するように曲げ機構30を移動できる。本実施形態では、第3曲げ関節10と補助関節28とは同期した一定の関係があるので、曲げ方向が定まれば、溝34を被加工物4と当接させることにより、先端アーム26及び第3曲げ関節10の位置は定まる。
 第2曲げ関節8の位置は、第1曲げ関節6を中心とし、第1曲げ関節6と第2曲げ関節8との間の距離を半径とする円弧上にあると共に、第3曲げ関節10を中心とし、第2曲げ関節8と第3曲げ関節10との間の距離を半径とする円弧上にある。よって、第2曲げ関節8はこれらの両円弧の交点にあれば、曲げ型32の位置が定まる。このとき、交点は2点存在する場合があるが、その場合には、第2アーム22が被加工物4と干渉したり、曲げ加工後の被加工物4の先端が第2アーム22と干渉したりしない交点を選択する。
 こうして、各第1~第3曲げ関節6,8,10の位置が定まることにより、固定部16と第1アーム20とのなす角度、第1アーム20と第2アーム22とのなす角度、第2アーム22と先端アーム26とのなす角度が各々求められる。この求めた各角度に応じて、各第1~第3曲げ関節6,8,10により第1アーム20、第2アーム22、先端アーム26を所定の角度に旋回する。これにより、曲げ型32の溝34が被加工物4に当接するように移動される。
 図12Aに示すように、被加工物4と直交する平面内に、関節型ロボット2の第1アーム20、第2アーム22、先端アーム26がある場合には、第1~第3曲げ関節6,8,10を旋回させて、図11A,11Bに示すように、曲げ方向が所定の方向となるように、曲げ機構30を被加工物4の廻りに移動できる。
 また、図12Bに示すように、被加工物4の先端側に曲げ加工位置がある場合、第1回転関節12を駆動すると共に、第2回転関節14を第1回転関節12とは反対側に駆動して、先端アーム26の軸方向が被加工物4と直交するように移動させると共に、第1~第3曲げ関節6,8,10を駆動する。第1回転関節12を旋回させると、曲げ機構30が被加工物4から離れるので、その分、第1~第3曲げ関節6,8,10を駆動して、曲げ型32の溝34を被加工物4と当接させる。他の溝36,38と当接させることにより、曲げ形状を変えることもできる。
 また、図12Cに示すように、チャック機構46に接近した曲げ加工位置で曲げ加工する場合も、同様に、第1回転関節12を駆動して、曲げ加工位置に曲げ機構30を移動させる。その際、第2回転関節14を第1回転関節12とは反対側に駆動して、先端アーム26の軸方向が被加工物4と直交するように移動させると共に、第1~第3曲げ関節6,8,10を駆動する。
 複数箇所で曲げ加工する場合には、図12Bに示すように、被加工物4の先端側の曲げ加工位置から、チャック機構46付近の曲げ加工位置に向かって、前述した動作を繰り返して被加工物4を順に曲げ加工する。尚、曲げ型32と締め型42とにより被加工物4を掴んだ状態で、被加工物4の廻りに曲げ機構30を旋回させて、被加工物4をひねり、曲げ方向を変えるようにしてもよい。これにより、曲げた被加工物4が装置や床と干渉しないようにすることもできる。
 関節型ロボット2、曲げ機構30、チャック機構46は、図7に示すように、それぞれ制御手段の一例としての制御回路54に接続されており、制御回路54により、関節型ロボット2、曲げ機構30、チャック機構46の駆動がそれぞれ制御される。
 次に、制御回路54において行われる曲げ制御処理の流れを示す図8~図10に示すフローチャートを参照しながら、前述した本実施形態の曲げ加工装置の動作について説明する。
 まず、所定の長さに予め切断された被加工物4が搬入用受け台50上に搬送される。そして、曲げ制御処理が開始されると、被加工物4を曲げながらローディングするか否かを判断する(S100(Sはステップを意味する))。曲げながらローディングするか否かは予め曲げ加工データとして設定され、被加工物4の曲げ加工箇所が、チャック機構46に被加工物4を把持させた状態では、曲げ加工できないような、あるいは、曲げ加工し難いような箇所である場合に予め設定される。あるいは、被加工物4に曲げ加工前にブラケット等が取り付けられ、被加工物4をチャック機構46により把持する際に、制限を受けるような場合に設定される。
 曲げながらローディングする場合には、曲げ加工データから曲げ機構30のための曲げ角度を読み込む(S110)。そして、曲げ機構30により被加工物4を挟持して、被加工物4をチャック機構46に把持させるために、被加工物4をチャック機構46に向かって移動させるローディングを開始する(S120)。
 ローディングでは、図12Dに示すように、関節型ロボット2の第1回転関節12を駆動して、関節型ロボット2を搬入用受け台50の被加工物4と対向させる。また、関節型ロボット2の第1~第3曲げ関節6,8,10を駆動して、曲げ機構30を移動させ、曲げ型32の溝34に被加工物4を当接させる。
 次に、締め型42、圧力型44を移動させて、曲げ機構30により被加工物4を挟持する。曲げ機構30により被加工物4を挟持した後、関節型ロボット2を制御して、各第1~第3曲げ関節6,8,10及び第1、第2回転関節12,14を駆動して、被加工物4をチャック機構46に向かって移動させる。曲げ機構30により被加工物4を挟持する際には、S110の処理により読み込んだ曲げ角度で曲げ加工する曲げ加工箇所を曲げ機構30により挟持する。
 そして、ローディングにより被加工物4をチャック機構46に向かって移動させながら、曲げ機構30を駆動して、被加工物4の曲げ加工を開始する(S130)。図13に示すように、曲げ加工は、締め型42を曲げ型32の廻りにS110の処理により読み込んだ曲げ角度に応じて公転させて行なう。曲げ加工中も、各第1~第3曲げ関節6,8,10及び第1、第2回転関節12,14を駆動して、被加工物4をチャック機構46に向かって移動させる。尚、ローディング中に、被加工物4の移動を一時停止して、曲げ加工を行うようにしてもよい。
 また、ローディングの際には、図12Aに示すように、被加工物4をチャック機構46で把持できるように、搬入用受け台50上の被加工物4をチャック機構46に向かって移動させる。そして、被加工物4をチャック機構46に移動させて被加工物4をチャック機構46に挿入した後、チャック機構46を制御して、被加工物4をチャック機構46により把持する。曲げ加工及びローディングが完了したか否かを判断し(S140)、完了していないときには、曲げ加工及びローディングの完了を待つ。
 一方、前述したS100の処理により、曲げながらローディングをしないと判断したときには、まず、S120の処理と同様、ローディングを開始する(S150)。そして、ローディングが完了して、被加工物4をチャック機構46により把持したと判断すると(S160)、次に、S110及びS130の処理と同様、曲げ加工を行う(S170)。
 前述したS140あるいはS170の処理により、最初の曲げ加工が終了すると、次の工程は最終の曲げ工程であるか否かを判断する(S180)。曲げ箇所が3箇所以上あるときには、まだ最終の曲げ工程ではないと判断して、関節型ロボット2を制御して、曲げ機構30を被加工物4の次の曲げ加工位置に移動させ、締め型42、圧力型44を駆動して、締め型42、圧力型44を被加工物4に突き当て、曲げ機構30により被加工物4を挟持する(S190)。
 続いて、被加工物4を引き込むか否かを予め設定された曲げ加工データに基づいて判断する(S200)。図14Aに示すように、チャック機構46に把持された被加工物4の次の曲げ箇所に曲げ機構30を移動させると、チャック機構46と曲げ機構30とが接近して、その次の曲げ加工の際には、被加工物4をチャック機構46から引き込まなければならない。
 このような場合には、引き込みを行うと判断して、次に、被加工物4を曲げ加工しながら、被加工物4を引き込むか否かを判断する(S210)。図14Aに示すように、曲げ機構30を次の曲げ箇所に移動させても、チャック機構46と曲げ機構30とが干渉しない場合等には、被加工物4を曲げ加工しながら、被加工物4を引き込む。
 そして、チャック機構46による被加工物4の把持を解除し(S220)、被加工物4の引き込み量を読み込む(S230)。引き込み量は予め曲げ加工データに設定されている。次に、各第1~第3曲げ関節6,8,10及び第1、第2回転関節12,14を駆動して、曲げ機構30を被加工物4の長手方向に移動させて、引き込みを開始する(S240)。これにより、被加工物4が長手方向に移動されてチャック機構46から引き込まれる。
 続いて、曲げ機構30による曲げ角度を読み込む(S250)。そして、曲げ機構30を駆動して、被加工物4の曲げ加工を開始する(S260)。曲げ加工は、締め型42を曲げ型32の廻りにS250の処理により読み込んだ曲げ角度に応じて公転させて行なう。曲げ加工中も、各第1~第3曲げ関節6,8,10及び第1、第2回転関節12,14を駆動して、被加工物4のチャック機構46からの引き込みを行う。
 曲げ加工及び引き込みが完了したか否かを判断し(S270)、完了していないときには、曲げ加工及び引き込みの完了を待つ。図14Bに示すように、曲げ加工及び引き込みが完了したときには、チャック機構46により被加工物4を把持する(S280)。
 そして、次の工程は最終の曲げ工程であるか否かを判断する(S290)。最終の曲げ工程ではないときには、S190以下の処理を繰り返し、各第1~第3曲げ関節6,8,10及び第1、第2回転関節12,14を駆動して、曲げ機構30を被加工物4の次の曲げ加工位置に移動させる。
 一方、前述したS210の処理により、被加工物4を曲げながらの被加工物4の引き込みは行わないと判断すると、締め型42を曲げ型32の廻りに予め設定された曲げ角度に応じて公転させて曲げ加工を行なう(S300)。
 次に、チャック機構46による被加工物4の把持を解除し(S310)、被加工物4の引き込み量を読み込む(S320)。次に、各第1~第3曲げ関節6,8,10及び第1、第2回転関節12,14を駆動して、曲げ機構30を被加工物4の長手方向に移動させて、引き込みを開始する(S330)。これにより、被加工物4が長手方向に移動されてチャック機構46から引き込まれる。
 引き込みが完了したか否かを判断し(S340)、完了していないときには、引き込みの完了を待つ。引き込みが完了したときには、チャック機構46により被加工物4を把持し(S350)、S290の処理を実行する。
 また、前述したS200の処理により、被加工物4の引き込みをしないと判断したときには、締め型42を曲げ型32の廻りに予め設定された曲げ角度に応じて公転させて曲げ加工を行ない(S360)、S290の処理を実行する。
 次工程が最終工程でないときには、S190以下の処理を繰り返して、予め曲げ加工データに設定された曲げ加工箇所に曲げ機構30を移動させて、被加工物4を曲げ加工する。そして、次工程が最終工程であるときには、曲げながらアンローディングするか否かを判断する(S370)。曲げながらアンローディングするか否かは予め曲げ加工データに設定されている。例えば、被加工物4の曲げ加工箇所が、チャック機構46に被加工物4を把持させた状態では、曲げ加工できないような、あるいは、曲げ加工し難いような箇所である場合に、曲げながらアンローディングする。あるいは、被加工物4に曲げ加工前にブラケット等が取り付けられ、被加工物4をチャック機構46により把持する際に、制限を受けるような場合に曲げながらアンローディングする。
 曲げながらアンローディングする場合には、曲げ機構30による曲げ角度を読み込む(S380)。そして、曲げ機構30により被加工物4を挟持して、チャック機構46を開放し、被加工物4を搬出用受け台52に向かって移動させて、アンローディングを開始する(S390)。
 アンローディングでは、関節型ロボット2の各第1~第3曲げ関節6,8,10及び第1、第2回転関節12,14を駆動して、曲げ機構30を移動させ、曲げ型32の溝34に被加工物4を当接させる。
 次に、締め型42、圧力型44を移動させて、曲げ機構30により被加工物4を挟持する。曲げ機構30により被加工物4を挟持した後、関節型ロボット2を制御して、各第1~第3曲げ関節6,8,10及び第1、第2回転関節12,14を駆動して、被加工物4を搬出用受け台52に向かって移動させる。曲げ機構30により被加工物4を挟持する際には、曲げ加工箇所を曲げ機構30により挟持する。
 そして、アンローディングによる被加工物4を搬出用受け台52に向かって移動させながら、曲げ機構30を駆動して、被加工物4の最終曲げ加工を開始する(S400)。曲げ加工は、締め型42を曲げ型32の廻りにS380の処理により読み込んだ曲げ角度に応じて公転させて行なう。曲げ加工中も、各第1~第3曲げ関節6,8,10及び第1、第2回転関節12,14を駆動して、被加工物4を搬出用受け台52に向かって移動させる。尚、アンローディング中に、被加工物4の移動を一時停止して、曲げ加工を行うようにしてもよい。
 曲げ加工及びアンローディングが完了したか否かを判断し(S410)、完了していないときには、曲げ加工及びアンローディングの完了を待つ。曲げ加工及びアンローディングが完了すると、曲げ機構30による被加工物4の挟持を解除して、被加工物4を搬出用受け台52上に載置し(S420)、一旦本制御処理を終了する。
 一方、S370の処理により、曲げながらアンローディングしないと判断すると、関節型ロボット2を制御して、曲げ機構30を最終曲げ加工位置に移動した後、締め型42、圧力型44を駆動して、締め型42、圧力型44を被加工物4に突き当て、締め型42を圧力型44の廻りに所定の曲げ角度に応じて公転させて、最終の曲げ加工を行なう(S430)。
 そして、関節型ロボット2を制御して、例えば、曲げ加工した後の被加工物4の左右のバランスが取れる位置に曲げ機構30を移動させる。曲げ機構30の締め型42を駆動して、被加工物4を締め型42と曲げ型32とにより挟持し、チャック機構46を開放し、被加工物4を搬出用受け台52に向かって移動させるアンローディングを行なう(S440)。被加工物4を搬出用受け台52上に移動させた後、曲げ機構30による被加工物4の挟持を解除して、被加工物4を搬出用受け台52上に載置して(S420)、一旦本制御処理を終了する。
 前述したように、曲げながらローディング、曲げながら引き込み、あるいは、曲げながらアンローディングを実行するので、作業効率が向上すると共に、チャック機構46により被加工物4を把持した状態では、曲げ加工できない箇所であっても、曲げ加工することができ、曲げ加工後の切断等が不要で、歩留まりを改善できる。
 以上、本発明はこの様な実施形態に何等限定されるものではなく、本発明の要旨を逸脱しない範囲において種々なる態様で実施し得る。

Claims (5)

  1.  曲げ加工装置であって、
     曲げ型と、該曲げ型の周りを公転可能な締め型とにより長尺状の被加工物を挟持し、前記締め型を公転させ前記被加工物を曲げ加工する曲げ機構と、
     前記被加工物を把持するチャック機構を取り付けた固定台と、
     前記曲げ機構が取り付けられ、前記曲げ機構を移動させる関節型ロボットと、
     前記関節型ロボット、前記曲げ機構及び前記チャック機構を制御する制御手段と、
     を備え、
     前記制御手段によって実行される制御は、前記被加工物を前記曲げ機構により挟持し、前記関節型ロボットにより前記曲げ機構を移動させて前記被加工物を移動させると共に、前記被加工物を移動させながら前記曲げ機構により前記被加工物を曲げ加工する曲げ・移動制御を含む
     ことを特徴とする曲げ加工装置。
  2.  請求項1に記載の曲げ加工装置であって、
     前記関節型ロボットは、
     関節で接続された2つの部材のリンク方向に対して直交する方向に曲げ軸が延在している複数の曲げ関節と、
     関節で接続された2つの部材のリンク方向と同じ方向に旋回軸が延在している複数の回転関節と
     を有する
     ことを特徴とする曲げ加工装置。
  3.  請求項1または請求項2に記載の曲げ加工装置であって、
     前記曲げ・移動制御は、前記被加工物を前記曲げ機構により挟持し、前記関節型ロボットにより前記曲げ機構を移動させて前記被加工物を前記チャック機構に向かって移動させながら、前記曲げ機構により前記被加工物を曲げ加工して、前記被加工物を前記チャック機構に把持させる制御を含む
     ことを特徴とする曲げ加工装置。
  4.  請求項1~3のいずれかに記載の曲げ加工装置であって、
     前記曲げ・移動制御は、前記被加工物を前記曲げ機構により挟持した状態で前記チャック機構による把持を解除させ、前記関節型ロボットにより前記曲げ機構を移動させて前記被加工物を移動させながら、前記曲げ機構により前記被加工物を曲げ加工して、前記被加工物を搬出させる制御を含む
     ことを特徴とする曲げ加工装置。
  5.  請求項1~4のいずれかに記載の曲げ加工装置であって、
     前記曲げ・移動制御は、前記被加工物を前記曲げ機構により挟持した状態で前記チャック機構による把持を解除させ、前記関節型ロボットにより前記曲げ機構を移動させて前記被加工物を移動させながら、前記曲げ機構により前記被加工物を曲げ加工した後、前記被加工物を前記チャック機構により把持させる制御を含む
     ことを特徴とする曲げ加工装置。
PCT/JP2010/056375 2009-04-08 2010-04-08 曲げ加工装置 WO2010117037A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US13/258,584 US9138795B2 (en) 2009-04-08 2010-04-08 Bending device
EP20100761736 EP2418025B1 (en) 2009-04-08 2010-04-08 Bending device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009-094094 2009-04-08
JP2009094094A JP5405878B2 (ja) 2009-04-08 2009-04-08 曲げ加工装置

Publications (1)

Publication Number Publication Date
WO2010117037A1 true WO2010117037A1 (ja) 2010-10-14

Family

ID=42936318

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/056375 WO2010117037A1 (ja) 2009-04-08 2010-04-08 曲げ加工装置

Country Status (5)

Country Link
US (1) US9138795B2 (ja)
EP (1) EP2418025B1 (ja)
JP (1) JP5405878B2 (ja)
KR (1) KR101632458B1 (ja)
WO (1) WO2010117037A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0569613B2 (ja) * 1985-10-23 1993-10-01 Kyoho Seisakusho Kk
JPH0713851Y2 (ja) * 1990-11-28 1995-04-05 株式会社山本水圧工業所 チューブ曲げ装置
JP2006116604A (ja) * 2004-09-27 2006-05-11 Opton Co Ltd 曲げ加工装置
JP2007237195A (ja) * 2006-03-06 2007-09-20 Maruyasu Industries Co Ltd 曲げ加工装置

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3431759A (en) * 1966-02-02 1969-03-11 Walker Mfg Co Forming apparatus
SE8503058L (sv) * 1985-06-19 1986-12-20 Asea Ab Forfarande och installation for bockning av stangformigt material
US4945747A (en) * 1989-05-11 1990-08-07 Chuo Electric Manufacturing Co., Ltd. Apparatus for bending elongated materials in any direction
JPH02299723A (ja) * 1989-05-11 1990-12-12 Chuo Electric Mfg Co Ltd 曲げ加工装置
JP3716949B2 (ja) * 1996-05-17 2005-11-16 臼井国際産業株式会社 多連式パイプ曲げ加工装置
JP3912885B2 (ja) * 1998-02-03 2007-05-09 株式会社オプトン 曲げ加工装置
DE69939499D1 (de) * 1998-02-03 2008-10-16 Opton Kk Biegevorrichtung
JP4319314B2 (ja) * 2000-01-31 2009-08-26 株式会社オプトン 曲げ加工装置
EP1291094B1 (en) * 2001-10-02 2003-03-26 FABBRICA MACCHINE CURVATUBI CRIPPA AGOSTINO S.p.A. Draw-bending machine
EP1350577A1 (de) * 2002-04-03 2003-10-08 Trumpf Pulzer GmbH + Co. KG Biegemaschine zum Biegen von stangen- und/oder von stabartigen Werkstücken, insbesondere von Rohren
EP1651367B1 (de) * 2003-08-05 2007-04-18 Rosenberger AG Verfahren zum biegen von werkstücken
DE602005003524T2 (de) 2004-09-27 2008-10-23 Kabushiki Kaisha Opton Biegevorrichtung
WO2006049165A1 (ja) * 2004-11-01 2006-05-11 Kabushiki Kaisha Opton 曲げ加工装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0569613B2 (ja) * 1985-10-23 1993-10-01 Kyoho Seisakusho Kk
JPH0713851Y2 (ja) * 1990-11-28 1995-04-05 株式会社山本水圧工業所 チューブ曲げ装置
JP2006116604A (ja) * 2004-09-27 2006-05-11 Opton Co Ltd 曲げ加工装置
JP2007237195A (ja) * 2006-03-06 2007-09-20 Maruyasu Industries Co Ltd 曲げ加工装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2418025A4 *

Also Published As

Publication number Publication date
JP5405878B2 (ja) 2014-02-05
EP2418025A4 (en) 2013-01-16
US20120006088A1 (en) 2012-01-12
EP2418025B1 (en) 2014-01-08
US9138795B2 (en) 2015-09-22
KR20110137808A (ko) 2011-12-23
JP2010240714A (ja) 2010-10-28
EP2418025A1 (en) 2012-02-15
KR101632458B1 (ko) 2016-06-21

Similar Documents

Publication Publication Date Title
JP4851341B2 (ja) 曲げ加工装置
WO2016167301A1 (ja) 曲げ加工装置
JP5090636B2 (ja) 曲げ加工装置
JPH0929346A (ja) パイプの曲げ加工装置
US20200353523A1 (en) Bending machine
KR101063266B1 (ko) 굽힘 가공 장치
JP2007237195A (ja) 曲げ加工装置
JP5330064B2 (ja) 曲げ加工装置
JP5405879B2 (ja) 曲げ加工装置
JP4319314B2 (ja) 曲げ加工装置
WO2010117037A1 (ja) 曲げ加工装置
JP2008036676A (ja) 曲げ加工装置
JP4625320B2 (ja) 曲げ加工装置
JPH0335820A (ja) 曲げ加工装置
JPH10146619A (ja) チューブの曲げ装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10761736

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 13258584

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 20117024793

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 2010761736

Country of ref document: EP