WO2007013675A1 - 鍛造用金型、鍛造成形品製造方法とその鍛造成形品 - Google Patents

鍛造用金型、鍛造成形品製造方法とその鍛造成形品 Download PDF

Info

Publication number
WO2007013675A1
WO2007013675A1 PCT/JP2006/315349 JP2006315349W WO2007013675A1 WO 2007013675 A1 WO2007013675 A1 WO 2007013675A1 JP 2006315349 W JP2006315349 W JP 2006315349W WO 2007013675 A1 WO2007013675 A1 WO 2007013675A1
Authority
WO
WIPO (PCT)
Prior art keywords
forging
mold
gas
opening
hole
Prior art date
Application number
PCT/JP2006/315349
Other languages
English (en)
French (fr)
Inventor
Koji Watanabe
Original Assignee
Showa Denko K.K.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Showa Denko K.K. filed Critical Showa Denko K.K.
Priority to JP2007526945A priority Critical patent/JPWO2007013675A1/ja
Publication of WO2007013675A1 publication Critical patent/WO2007013675A1/ja

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J13/00Details of machines for forging, pressing, or hammering
    • B21J13/02Dies or mountings therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J13/00Details of machines for forging, pressing, or hammering
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/18Making machine elements pistons or plungers

Definitions

  • the present invention relates to a forging die, a forging molded product manufacturing method, a forging device, and a forged molded product for manufacturing a forged molded product having a complicated shape without lack of thickness.
  • Japanese Laid-Open Patent Publication No. 10-1 1 8 7 3 4 discloses a forged product that prevents the forging material from being blocked by air trapped in the cavity and has good dimensional accuracy.
  • a method of providing an air vent in a mold for the purpose of obtaining the above is disclosed.
  • the diameter of the hole is preferably 1 mm or more, and the maximum thickness can be taken at that position. If the hole diameter of the air vent does not reach 1 mm, the forging material force pushed into the hole during forging may break when the forged product is taken out from the mold and remain in ⁇ L. As a result, the air vent that releases the air in the cavity at the next forging can no longer be expected. However, if the hole has a diameter larger than the wall thickness, the volume of the forging material flowing into the hole becomes too large, and it is easy for a hole to be formed near the hole.
  • the position at which the air vent is opened is determined according to the product shape. However, as long as air is likely to accumulate, the corners of the product, dead ends, thick parts, thick parts with large thickness changes, etc. It may be possible.
  • the hole of the air vent can be used as a forging material reservoir so that the plastic flow of the forging material in each part is constant.
  • the air vent depends on the punch speed (forging speed), the air vent in the cavity needs to be large enough to escape to the outside without being compressed. Since the forging is performed using a die provided with an air vent, the forging material protrudes like a wart in the resulting forged product corresponding to the opening position of the air vent. This protrusion is removed from the forged product by belt sanding, machining, or the like.
  • Japanese Patent Application Laid-Open No. 10-2 7 2 5 3 2 discloses that a fitting portion of a mold dividing portion (which is fixed by a shaft and does not slide again), The clearance at the contact portion may be used as a gas vent passage.
  • Japanese Patent Application Laid-Open No. Sho 61-1515 727 also discloses a method in which a mold sliding portion composed of a die and a knockout pin is used as a gas vent hole.
  • the mold dividing part indicates a boundary part of the divided body when the mold is divided into a plurality of divided bodies.
  • the mold sliding portion indicates a boundary portion of the mold in which at least one of the divided bodies slides.
  • an air vent hole such as a conventional forging die
  • the hole diameter is simply ⁇ 1 mm or more, and as a result, the amount of forging material pushed into the air vent hole becomes large.
  • an air pin a pin-like shape
  • This is particularly likely to occur when forging a product that requires a high forging load, or when it is installed at a location close to the mold dividing position.
  • the clearance with the knockout pin which is the die sliding portion, is used as a gas vent passage, the forging material easily enters the clearance portion.
  • the gas includes a gas in the atmosphere of the forging process, for example, air, an inert gas, or a vaporized lubricant, for example, water vapor, vaporized oil, or the like.
  • the present invention has been completed in view of such a situation, and even if it has a complicated shape, it suppresses the occurrence of thinning due to air confined in the molding hole of the mold, and is sufficiently forged in the molding hole.
  • the purpose is to obtain a forged product with good dimensional accuracy by flowing the material. Disclosure of the invention
  • the present invention relates to (1) a forging die having a gas vent passage for discharging gas trapped in a molding hole of a forging die at the time of molding, wherein the gas vent passage is perpendicular to the gas flow direction.
  • the opening area of the first step portion facing the molding hole wall surface is smaller than the opening area of the second step portion connected to the step portion, and the opening
  • the forging die is characterized in that the portion is provided on a wall surface formed of a mold dividing portion or a wall surface formed of an integral mold portion.
  • the above-mentioned mold dividing part is a part of the boundary part of the divided body when the mold is divided into a plurality of divided bodies, and is a part fixed so that the divided body does not slide due to a flail or the like. That is.
  • the above-mentioned integral part is a part constituted by mold components that are not divided. This includes the case where the entire mold is manufactured as a single unit.
  • a forging die according to the cross-sectional area of the opening formed in the molded hole wall is 0. 0 1 ⁇ 1 mm 2 ( 1).
  • the length of the shape part on the opening side formed in the wall surface of the molding hole is 1 to 15 times the area value on the opening side, The above (1) to (4) This is a forging die.
  • the opening is provided at a position where a gas reservoir recovery confined in a recess and / or a groove formed in the mold wall of the forming hole and the forging material becomes a closed space.
  • the present invention uses the forging die according to any one of the above (1) to (6), throws the forging material into the forming hole, and forms the concave portion and groove or groove portion of the forming element L.
  • This is a manufacturing method of a molded product that forges while allowing the gas confined in the gas to escape through the gas vent passage.
  • the above forging material is any one kind of metal selected from aluminum, iron, magnesium, and titanium, or an alloy containing these as a main component. This is a method for producing a forged product.
  • the present invention includes a forged product manufactured by the method described in (7).
  • the present invention includes a forging device having the forging die described in any one of (1) to (6).
  • the gas vent passage is perpendicular to the gas flow direction. It has a plurality of stepped portions having different cross-sectional areas, and the opening area of the first stepped portion facing the molding hole wall surface is smaller than the opening area of the second stepped portion connected thereto. Since it is provided on the wall consisting of the mold part or the wall consisting of the integral part, even if a part of the forging material that has entered the gas vent passage breaks in the gas vent passage when the product is discharged, The pressure is pushed to the next stage, clogging is eliminated, and the gas vent passage is not blocked.
  • the shape of the air pin is narrowed and shortened, so that the removal work from the product can be reduced.
  • the cross-sectional area of the opening formed in the wall surface of the molding hole is 0.01 to 1 mm 2 , the shape of the air pin is thin and short, so the removal work from the product can be reduced.
  • the diameter of the inscribed circle in the cross-sectional shape of the opening formed in the wall surface of the molding hole is 0.1 "to 1 mm, the air pin shape is thin and short, and the removal work from the product can be reduced.
  • the wall surface of the passage should be in contact with the air pin. It is possible to reduce the resistance when clogging is eliminated.
  • FIG. 1 is a perspective view showing an example of a forged product suitable for manufacturing with the forging die of the present invention.
  • FIG. 2 is a perspective view showing another example of a forged product suitable for manufacturing with the forging die of the present invention.
  • FIG. 3 is a perspective view showing another example of a forged product suitable for manufacturing with the forging die of the present invention.
  • FIG. 4 is a longitudinal sectional view showing an example of a forging die according to the present invention.
  • FIGS. 5 (A) to (E) are enlarged longitudinal sectional views showing an example of a gas vent passage used in the forging die.
  • FIGS. 6 (A) to (D) are a plan view and a cross-sectional view of an essential part of a gas vent passage used for the forging die.
  • FIG. 7 is an enlarged cross-sectional view of the gas reservoir portion of the forging die shown in FIG.
  • FIGS. 8 (A) to (C) are explanatory views showing respective forming steps of the forging material using the forging die of the present invention.
  • Fig. 9 (A) to (F) show each molding of the forging material using the forging die of the present invention. It is explanatory drawing which shows a process.
  • FIGS. 10 (A) to (E) are explanatory views showing respective forming steps of a forging material using the forging die of the present invention.
  • FIG. 11 is an explanatory view showing an embodiment of a forging device used in the present invention.
  • FIG. 12 is an enlarged longitudinal sectional view showing an example of a gas vent passage provided with a control pin.
  • FIG. 13 is a longitudinal sectional view showing an example of a mold for forging the forged product of FIG.
  • FIG. 14 is a longitudinal sectional view showing an example of a mold for forging the forged product of FIG.
  • FIG. 15 is an enlarged sectional view of the mold shown in FIG. Best Mode for Carrying Out the Invention ''
  • the forging die of the present invention has a plurality of step portions having different cross-sectional areas, and the opening area of the first step portion facing the forming hole wall surface is smaller than the opening area of the second step portion connected thereto.
  • a gas vent passage whose opening is provided on the wall surface made of the mold dividing portion or the wall surface made of the integral mold portion, clogging of the gas vent passage is prevented and the occurrence of thinning is prevented. It is possible to produce a forged molded article having a reduced dimensional accuracy.
  • the complicated shape of the molded product that is the subject of the present invention is the shape in which the rib 11 is raised as shown in FIG. 1, and the periphery is a recess as shown in FIG. 3 has a shape in which the convexity 12 is substantially increased, or a shape like a piston of an internal combustion engine as shown in FIG.
  • the part of the mold corresponding to such a shape becomes a concave part and Z or groove part that becomes a closed space on the mold wall surface and the forging material, and gas is confined there, and it is easy for gas accumulation to occur. It is.
  • products having such a shape include a double-headed piston for a swash plate compressor, a vortex housing for a scroll compressor, and an internal combustion engine piston.
  • the present invention directly molds products having these shapes. In this case, it is also intended to form primary processed molded products having these shapes.
  • Fig. 1 3 shows a second embodiment of a forging die for forging a forged product from a metal material. Like the die in Fig.
  • the die 30 is a lower die 3 1 and The upper mold 3 2 and the knockout pin 3 3 for taking out the formed product from the lower mold 3 1 or the gas vent path 3 4 are configured.
  • the lower die 3 1 and the upper die 3 2 are each provided with a forging hole 35 at the center.
  • This forging die is preferably used for forming a scroll compressor spiral body composed of a base plate surface 13 and blades 14 as shown in FIG.
  • FIG. 14 shows a third embodiment of the forging die according to the present invention. Like the die shown in FIG. 13, the die 30 of this embodiment is vented to the lower die 31. Passage 3 4 is provided.
  • This forging die 30 is preferably used for molding a piston of an internal combustion engine having a head surface 15, a skirt portion 16, a rib portion 17 and a pin boss portion 18 as shown in FIG. I can.
  • the forging die 30 of the present invention includes a lower die 3 1 and an upper die 3 2 for forging a forged molded product from a metal material, and a knockout pin for taking out the molded product from the lower die 3 1. 3 3 and a gas vent passage 34.
  • the molds 3 1 and 3 2 are provided with forging holes 35 at the center.
  • This forging die is used, for example, for forging a double-headed piston as a forging product having ribs 11 parallel to the operation direction axis of the upper die as shown in FIG. It is a mold.
  • description will be made based on the forging of this double-headed piston.
  • the material of the forging die 30 for example, die steel can be used.
  • the gas vent passage 34 of the present invention has, for example, at least a two-part configuration of a first stage part X and a second stage part Y in the gas flow direction as shown in FIG. 5 (A). It is also possible to use a multi-stage configuration.
  • the first step XI is a part provided on the molding hole 35 side.
  • the connecting portion Z1 between the first step portion XI and the second step portion Y1 only needs to be connected such that the cross-sectional area of the second step portion Y1 is larger than the cross-sectional area of the first step portion XI. . Further, it may partially have a cross-sectional area larger than the second step portion Y1.
  • the cross-sectional area of the opening 36 formed in the wall surface of the forming hole of the forging die 30 is, for example, 0.1 to 1 mm 2 . Further, the diameter of the opening 36 may be 0.1 to 1 mm.
  • the gas vent passage 34 may be formed at any time before or after the split molds are combined. However, in consideration of the accuracy of the gas vent passage, it is preferably formed after the merge. Further, even in the integrated type, the gas vent passage 3 4 may be created before or after the forging hole 3 5 is created. However, in consideration of the accuracy of the gas vent passage, the forging hole is formed. It is preferable to form it after producing 35.
  • the shape of the second step portion Y 1 is not particularly limited.
  • the forging die 30 can be formed in a shape having an opening on the outer surface.
  • the cross-sectional area of the first step portion X 1 is preferably 0.1 to 1 mm 2 (more preferably 0.0 3 to 0.2 mm 2 ).
  • the cross-sectional area of the second step portion Y 1 is preferably 1.04 times or more (more preferably 1.3 to 3 times) the cross-sectional area of the first step portion.
  • the air pin breaks in the gas vent passage because it does not contact the intruding forging material. After forging, it does not become (friction) resistance when the air pin is pushed and moved by the gas pressure.
  • the diameter of the circumscribed circle of the cross section of the opening 36 is 1 mm or less, preferably 0.1 to 1 mm, more preferably 0.2 mm to 0.5 mm. Below that, drilling is difficult. If it exceeds that, the inflow of the forging material will increase, and the air pin after forging may be too long.
  • the length of the first step portion XI is preferably 1 to 15 times (more preferably 5 to 10 times) the area value of the first step portion X1.
  • the length of the first step portion X1 is preferably 1 to 10 mm.
  • the length of the second step portion Y 1 is preferably a length penetrating to the lower side of the lower mold 31 or the upper mold 32.
  • the length of the first step X 1 By making the length of the first step X 1 in this way, it is possible to control the (friction) resistance when the air pin is pushed and moved by the gas pressure during forging after the air pin is broken. preferable. Further, if the length of the first step portion XI is made less than 1 times the area value of the first step portion XI, the forging die may be short due to its short length. Furthermore, if the area value of the first stage X1 is 15 times or more, the (friction) resistance is large and the air pin may not be pulled out.
  • the length of the second step Y 1 is set in this way. If the effective length is determined, the clogged air pins may accumulate up to the first step X 1 and the air pin clogging It is because the effect of cancellation is lost.
  • FIG. 5 shows an example of a cross section substantially parallel to the gas flow direction in the passage shape example.
  • the first step X1 and the second step are formed so that the cross-sectional area of the first step X1 on the molding hole side is smaller than that of the second step Y1, as described above.
  • the connecting part Z "I of the part Y" 1 is a straight step.
  • FIG. 5 (B) shows another embodiment, in which the angle condition (0) of the connecting portion Z 2 between the first step portion X 2 and the second step portion Y 2 is given (0 Degrees ⁇ 90 degrees). Better Preferably it is 1 degree or more. This is because the air pin can be easily broken by the same effect as FIG. 5 (C) described later. In addition, there is no resistance when clogging is resolved. Further, 10 degrees or more is even more preferable.
  • the reason why the angle condition (0) is preferably 10 degrees or more is that if the angle condition (0) is 10 degrees or more, the forging material that has flowed in at the connecting portion Z 2 can be kept out of contact with the wall surface of the gas vent passage 3 4. Even in the case of contact, as a result, the forging process after clogging becomes easier to eliminate.
  • FIG. 5 (C) shows another embodiment, which is an example in which the first step portion X3 is formed in a tapered shape.
  • the air pin is easy to break at the opening 37 when the product is discharged, and the air pin hardly remains on the product side, and it is a shape that is actively clogged. .
  • FIG. 5 (D) shows another embodiment, in which the first step portion X4 is formed in a tapered taper shape.
  • the air pin tends to break at the second step Y4 when the product is discharged, and the pin length is controlled.
  • the root on the side of the opening portion 38 is thickened, the first step portion X4 hardly clogs, and a preferable result can be obtained.
  • FIG. 5 (E) shows another embodiment of the present invention, in which the shape of the first step portion X5 is made uneven with different diameters, and the cross-sectional shape of the gas vent passage is changed midway. .
  • the forging material is prevented from entering the first step portion X5, and the intruding forging material is easily cut.
  • the unevenness of the first step X5 is set to 0.01 to 0.3 mm, clogging can be achieved without hindering the forging material that has entered due to the gas pressure from being pushed down to the lower step. Can be resolved.
  • the contour of the uneven shape can be a rectangular shape, a triangular shape, a sawtooth shape, or the like.
  • FIGS. 6 (A), (C), and (D) are plan views of essential parts of the gas vent passage 34 used in the forging die of the present invention.
  • the cross-sectional shape is not particularly limited as long as a gas passage can be ensured, and the cross-sectional shape is not particularly limited, but a circular shape is preferable from the viewpoint of ease of manufacture.
  • Fig. 6 (A) shows a circular cross section.
  • the center O of the first step X and the second step Y are made to coincide.
  • the difference in size between the first step X and the second step Y is half.
  • the diameter is preferably 0.2 to 1 mm.
  • the difference is small, and the air pin may come into contact with the inner circumference of the second step Y, and there is a risk of (friction) resistance when the air pin is pushed and moved by the gas pressure. Because there is.
  • FIG. 6 (C) shows a case where the cross-sectional shape of the gas vent passage 34 is a square.
  • the second step portion Y has a shape in which the shape of the first step portion X is offset by 0.2 to “! Mm”.
  • FIG. 6 (D) shows the cross-sectional shape of the first step portion X as a circular shape. This is the case where the cross-sectional shape of the second step portion Y is square, and the distance between the cross-section shapes of the first step portion X and the second step portion Y should be 0.2 to 1 mm.
  • the cross-sectional shape is square, but it can be polygonal or elliptical.
  • the shape of the first step X and the second step Y is a circle, polygon, or ellipse as long as the size difference (distance) is in the range of 0.2 to 1 mm. Any combination is possible.
  • the position of the opening 3 6 in the gas vent passage 3 4 with respect to the die forging hole 3 5 is determined according to the product shape. It may be any of a part, a dead end, a part with a large thickness, or a part with a large change in thickness. In particular, it is preferable to provide the portion formed at the end in the forming order because such a portion has a large degree of the occurrence of thinning due to trapped air, and can eliminate the occurrence.
  • the installation site of the gas vent passage 3 4 can be determined, for example, as follows.
  • the knockout pin 33 is provided at a position where gas accumulation is likely to occur.
  • the target gas reservoir can be narrowed down from eight to four (b), (c), (O, (g).
  • FIG. 7 shows an enlarged view of the gas reservoir of the forging die 30 shown in FIG.
  • the last part to be molded is expected to be (I), (J). Therefore, it is preferable to provide them at these two locations (I) and (J).
  • the die is provided at the position where the gas reservoir (where the die and the forging material have become a closed space) force ⁇ contains the opening in the recess and Z or groove of the forming hole.
  • the gas vent passage 34 according to the present invention may be disposed in a die dividing portion (not shown) of the forging die.
  • the gas vent passage 34 according to the present invention does not need to be provided in the boundary portion of the sliding type in which the opening 36 is sliding with at least one of the divided bodies.
  • the direction of the gas vent passage 34 according to the present invention is not limited to being parallel to the forging direction (mold moving direction).
  • the mold can be designed easily.
  • the air pin when it is not parallel to the product discharge direction, the air pin can be easily cut, which is preferable.
  • the oblique direction (for example, 45 to 90 degrees, preferably 45 to 70 degrees with respect to the main forging direction or the moving direction of the mold) ) Is preferably set.
  • a mechanism for inserting the control pin 90 into the second step portion Y after discharging clogging during forging may be provided.
  • the control pin 90 is not retracted from the second stage Y when clogged and does not hinder the discharge of the air pin, and also enters (rises) the second stage Y during normal (not clogged).
  • the forging material is prevented from entering the next stage (second stage Y) in the gas vent passage 3 4.
  • the control pin diameter should be larger than the upper hole diameter and smaller than the lower hole, and the length should be shorter than the lower hole length, preferably at the first decimal place, for example, preferably 0 from the lower step length. . 0 1 to 1 mm shorter.
  • the degassing passage 34 can also function as a passage for discharging the lubricant applied in the mold forming hole. Since it may be used for the purpose of eliminating the lack of lubrication residue, the shape accuracy of the molded product is improved synergistically.
  • FIGS. 8 to 10 show the respective steps of material charging, molding, plugging, discharging, and next molding using the forging die of the present invention.
  • FIG. 8 (A) shows a process of placing the forging material 3 9 in the forging hole 35 and press forging.
  • the upper die 3 2 is lowered and molding is performed.
  • the molding is started from the shape part close to the mold part.
  • a closed space is formed in the forging material 39 and the die. In the closed space, the gas fills while being compressed.
  • FIGS. 9 (A), (B), and (C) the gas in the closed space formed by the forging die 30 and the forging material 39 is formed while being discharged from the degassing passage 3 4.
  • the In Fig. 9 (D) the molded product is discharged from the forging die with a knockout pin. At that time, the plug (air pin) 40 is broken and stays in the first step X of the gas vent passage 3 4 and clogging occurs.
  • Fig. 9 (E), (F) and Fig. 10 (A) show the case where clogging is avoided by gas pressure during the next forging.
  • Figures 10 (B), (C), (D), and (E) show the case where clogging is avoided by the gas pressure and the force of material forming during the next forging.
  • the forged molded product can be continuously manufactured stably by repeating the above operation.
  • the length of the first step portion X is clogged by setting so as to be eliminated by the patterns shown in FIGS. 10 (B), (C), (D), and (E). Resolution is more stable.
  • the forging die 30 of the present invention has at least one gas vent passage 34 described above.
  • a conventionally known gas vent passage may be combined. Even in such a case, the object of the present invention can be achieved by having the above-described gas vent passage.
  • the method for producing the forging material 39 used in the present invention may be any of continuous forging, extrusion, rolling and the like.
  • a round bar that is continuously manufactured is preferred because it is inexpensive.
  • SHOTIC material (registered trademark) manufactured by Showa Denko KK can be cited.
  • round bars that are continuously forged by the gas-pressed hot-top forging method have excellent internal soundness, fine crystal grains, and different crystal grains due to plastic working. Since there is no directionality, the resistance effect of the frictional resistance portion can be obtained stably, which is preferable.
  • the rod-shaped material is further cut into a predetermined length, and if necessary, is subjected to chamfering treatment and sent to the next process.
  • the forging device includes a forging machine 8 1, an upper die 8 3 attached to the upper bolster 8 2, and a lower die 8 5 attached to the lower polster 8 4.
  • An example of the mold used in the present invention is shown in FIG.
  • the forging die 30 includes a lower die 3 1 and an upper die 3 2 for forging a forged molded product from a metal material, and a knockout pin 3 3 for taking out the molded product from the lower die 3 2. It is configured to include a gas vent passage 3 4.
  • the molds 31 and 32 are provided with a forging hole 35 at the center. Also, the forged molded product has a rib 11 11 shape parallel to the operation direction axis of the upper mold as shown in FIG. Then, if necessary, a lubricant spray nozzle (not shown) equipped with a spray rotating device (not shown), a spray rotating device (not shown), and attached to the spraying device before and after the shaft (not shown). It is possible to install a lubricant applicator with (not shown).
  • the gas vent passage 34 is a gas vent passage having a plurality of step portions having different cross-sectional areas perpendicular to the forging direction (moving direction of the mold).
  • the present invention can be applied regardless of whether it is hot, warm, or cold.
  • the fluidity of the forging material changes depending on the temperature conditions of forging, and the behavior of the forging material and the penetration of the forging material into the gas vent passage changes.Therefore, it is necessary to design the mold according to it.
  • the clogging phenomenon can be solved regardless of the behavior of the forging material entering.
  • the prepared forging material 3 9 is pushed into the space (molding hole) 3 5 formed by the upper die 3 2 and the lower die 3 1, and the molded product is forged. Further, the molded material is taken out from the lower mold 3 2 by the knockout pin 3 3.
  • forging is preferably performed after applying a lubricant to the inner periphery of the mold.
  • the forging material 39 is preferably subjected to a lubricant treatment as necessary. Further, since the gas vent passage 3 4 is provided, the gas vent passage 3 4 also functions as a lubricant vent. Therefore, a synergistic effect can be obtained even if the gas vent passage 34 is installed in a place where there is a concern of seizing or lack of lubrication residue.
  • the shape of the air pin 40 to be formed is thin and short. For this reason, the rate of defective products can be reduced when they are removed in the post-treatment process. Also, the number of removal man-hours can be reduced.
  • FIG. 1 is an example in which a molded product having the shape of the rib 11 in FIG. 1 is manufactured using a forging die according to the present invention. Further, as the gas vent passage 34, the one shown in FIGS. 5 (A) and (B) was used.
  • the mold temperature was 1800 ° C
  • the temperature of the forging material was 4 10 ° C.
  • a 400 0 series AL alloy was used as the forging material.
  • Table 2 shows the forging results.
  • Example 2 the load is 2800 t, the diameter of the first step portion X is 0. 3 mm, the length of the first step portion X is 5.0 mm, the second step. Diameter of part Y is ⁇ 1. O m m, angle of connection Z 90 degrees, air pin length 1.5 mm, there was no clogging phenomenon.
  • Example 2 the load is 280 t, the diameter of the first step X is 00.5 mm, the length of the first step X is 5. Omm, the diameter of the second step Y is ⁇ 1.0 mm, the connection Z angle 90 degrees, air pin length 3. Omm, no clogging phenomenon.
  • Example 3 the load is 280 t, the diameter of the first step X is 00.5 mm, the length of the first step X is 1 2. Omm, the diameter of the second step Y is ⁇ 1.0 mm, connection The angle of part Z was 90 degrees, the air pin length was 3 mm, and it was not solved in the forging process immediately after clogging, but it was eliminated in the next forging process.
  • the load is 280 t
  • the diameter of the first step portion X is 0. 5 mm
  • the diameter of the second step portion Y is 0. 5 mm (no step portion).
  • the angle was 0 degree
  • the air pin length was 3 mm, and there was a clogging phenomenon.
  • the load is 280 t
  • the diameter of the first step part X is 0. 1 mm
  • the diameter of the second step part Y is 0. 1 mm (no step part)
  • the connection part The angle of Z was 0 degree
  • the air pin length was 14 mm, and there was no clogging phenomenon.
  • the air pins were long and defective products were generated in the next trimming process.
  • Fig. 13 shows a second embodiment of a forging die for forging a metal material and a forged molded product.
  • the die 30 includes a lower die 31 and an upper die.
  • Knockout pin 33 for removing mold 32 and molded product from inside lower mold 31 or venting It is composed of passages 3 and 4.
  • the lower die 3 1 and the upper die 3 2 are each provided with a forging hole 35 at the center.
  • This forging die is preferably used for forming a scroll compressor vortex body comprising a base plate surface 13 and a blade 14 force as shown in FIG.
  • the material is plastically flowed to the blade portion 14 to complete the forming.
  • Gas is confined in the part 12 when the convex part 12 is formed.
  • the gas vent passage is preferably provided at a location where the gas is confined. As a result, it is possible to suppress the occurrence of thinning due to trapped air.
  • the gas vent passage 34 is installed at a position corresponding to the convex portion 12 which is a portion where the gas is confined.
  • Fig. 14 shows a third embodiment of the forging die according to the present invention. Like the die shown in Fig. 13, the die 30 of this embodiment is vented to the lower die 31. Passage 3 4 is provided.
  • This forging die 30 is preferably used for molding a piston of an internal combustion engine having a head surface 15, a skirt portion 16, a rib portion 17 and a pin boss portion 18 as shown in FIG. It is done.
  • FIG. 15 is an enlarged cross-sectional view of the air reservoir during molding in the vicinity of the gas vent passage at the rib section 17 and the skirt section 16 of the internal combustion engine, and the appearance of the air reservoir Is a schematic.
  • the material is plastically flowed to the rib portion 17, the scar flange portion 16, and the pin boss portion 18, and the forming is completed.
  • the degassing passage 3 4 is preferably provided at the last part to be formed in the forming order. As a result, it is possible to suppress the occurrence of thinning due to trapped air.
  • the gas vent passage 34 is the part to be molded last. It is installed on the rib, skirt and pin boss. Industrial applicability
  • the forged molded product according to the present invention suppresses the occurrence of thinning due to air trapped in the molding hole of the mold even if it has a complicated shape, and is sufficiently forged in the molding hole. It is possible to obtain molded products with good dimensional accuracy by allowing the building materials to flow.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

成形時に鍛造金型の成形孔内(35)に閉じ込められたガスを排出するためのガス抜き通路(34)を有する鍛造用命型(30)において、前記ガス抜き通路は、ガス流方向と垂直方向の断面積が異なる複数の段部を有し、前記成形孔壁面に臨む第1段部(X)の開口部面積がこれに接続する第2段部(Y)の開口部面積より小さく、かつ、その開口部が型分割部からなる壁面又は一体型部からなる壁面に設けられているので、ガス抜き通路に進入した鍛造用素材が製品排出時に折れても、次の鍛造時にガスの圧力により次段まで押され、ガス抜き通路が塞がれることがない。したがって、複雑な金型形状であっても成形孔内に閉じ込められたガスをスムーズに逃がし、欠肉の発生を抑えた寸法精度の良好な鍜造成形品を製造することができる。

Description

明 細 書 鍛造用金型、 鍛造成形品製造方法とその鍛造成形品 技術分野
本発明は、 複雑形状をもつ鍛造成形品を欠肉なく製造する鍛造用金型、 鍛造成 形品製造方法および鍛造装置とその鍛造成形品に関する。 ' 背景技術
鍛造により、 複雑形状の製品を製造する場合、 製品各部の肉や寸法が十分に確 保することが重要である。
たとえば、 複雑形状の製品の一例である、 アルミ合金製のスクロールを鍛造成 形する場合、 特に渦巻状の羽根の成形に困難性があり、 均一な高さ及び肉厚をも つ渦巻状の羽根を成形することが課題となっていた。 その困難性の原因として、 キヤビティに閉じ込められた空気により鍛造用素材の流入が阻止された結果、 寸 法精度の良好な鍛造品を得ることが困難と考えられていた。
そこで、 日本特開平 1 0— 1 1 8 7 3 4号公報には、 キヤビティに閉じ込めら れた空気によつて鍛造用素材の流入が阻止されることを防止し、 寸法精度の良好 な鍛造品を得ることを目的として、 金型にエアベントを設ける方法が開示されて いる。
また、 エアベットの孔径、 開口位置などについては次のように開示している。 孔径は、 直径 1 mm以上が好ましく、 最大その位置の肉厚の幅までとることが できる。 エアベントの孔径が直径 1 mmに達しないと、 鍛造中に孔内に押し込ま れた鍛造用素材力《鍛造品を金型から取り出す際に折れ、 孑 L内に残留する虞れがあ る。 その結果、 次の鍛造時にキヤビティ内の空気を逃がすエアベントの作用が期 待できなくなる。 しかし、 肉厚よりも大きな直径の孔では、 流入する鍛造用素材 の容積が大きくなりすぎ、 孔の近傍で欠肉が生じ易くなる。 また、 比較的大きな 突起部が形成されるため、 鍛造後に製品から突起部を削り取る作業力《困難になり、 製品歩留りも低下する。 エアベントを開口させる位置は、 製品形状に応じて決定されるが、 空気溜りが 生じ易い箇所である限り、 製品のコーナー部, 行き止まり部, 肉厚の大きな部分, 肉厚変化の大きな部分等のィ可れであっても良い。 また、 製品に対して対称的にェ ァベントを開口させるとき、 鍛造用素材の流動がスムーズになり、 鍛造品の寸法 精度が一層向上する。 更に、 各部における鍛造用素材の塑性流動が一定になるよ うに、 エアベントの孔部を鍛造用素材溜めとしても利用できる。 エアベントは、 ポンチ速度 (鍛造速度) にもよるが、 キヤビティ内の空気^圧縮されることなく スムーズに外部に逃げる程度の個数及び大きさが必要である。 エアベン卜を設け た金型を使用して鍛造しているので、 得られる鍛造品には、 エアベントの開口位 置に対応してイボのように鍛造用素材が突出している。 この突起部は、 ベルトサ ンダ一、 機械加工等によつて鍛造品から取リ除かれる。
また、 上記の問題に対する対策として、 日本特開平 1 0— 2 7 2 5 3 2号公報 には、 型分割部 (但しャキバメ等で固定されておリ摺動しない。 ) の嵌め合わせ 部、 当接部のクリアランスをガス抜き通路として利用する場合もある。 また、 曰 本特開昭 6 1— 1 5 4 7 2 7号公報には、 ダイスとノックアウトピンとから構成 される型摺動部をガス抜き穴として併用する方法も開示されている。 型分割部と は、 金型を複数の分割体に分割したときの分割体の境界部を示す。 また、 型摺動 部とは、 分割体の少なくとも一つが摺動しており、 摺動する型の境界部を示す。 従来の鍛造用金型のようなエアベント用孔を設けると、 孔径を単に Φ 1 mm 以上としたものであるので、 その結果、 エアベント用孔に押し込まれた鍛造用素 材の量が多〈なり、 その結果、 製品にピン状の形状 (以後、 エアーピンと呼ぶ) が付与されてしまうという点で不具合が発生した。 特に高い鍛造荷重を必要とす る製品を鍛造するとき、 また型分割位置に近い箇所に設置したときに発生し易い。 また、 型摺動部であるノックアウトピンとのクリアランスをガス抜き通路とし て利用した場合は、 クリアランス部に鍛造用素材が侵入しやすくなる。 その結果 バリが発生しやすくなるために、 ノックァゥト時にその侵入したバリが取れてク リアランス部に堆積するのでノックアウトピンが摺動しづらくなるという点で不 具合が生じ、 積極的にガス抜きとして利用するには問題が多かった。 また、 ガス 抜き穴を併用した場合は、 その傾向は顕著となる。 さらに、 摺動部を利用する場 合は、 摺動部を配置する場所に制約があるので金型設計に自由度がない。
また、 型分割部 (ャキバメ等にょリ摺動しない部位) を利用した場合は、 型同 土のクリアランスが小さい又はャキバメ量 (締め代) が大きい場合は、 必要な通 路が確保できずに充分なガス抜き効果が得られなくガスが残るために、 欠肉が発 生し成形が不良になる可能性がある。 逆に、 型同士のクリアランスが大きい又は ャキバメ量 (締め代) が小さい場合は、 鍛造用素材が侵入しやすくなるので、 バ リの発生が大きくなつてしまう。
そこで、 特に、 高い鍛造荷重を必要とする製品および型分割位置に近い箇所に ガス抜き穴を設ける必要があるような形状を、 精度よく成形する際に設けるに適 したガス抜き通路が求められている。 なお、 本明細書においてガスとは、 鍛造ェ 程の雰囲気の気体、 例えば、 空気、 不活性ガス、 または潤滑剤の気化したもの、 例えば、 水蒸気、 気化した油などを含むものとする。
本発明は、 このような状況に鑑み完成されたもので、 複雑な形状であっても金 型の成形孔内に閉じ込められた空気による欠肉の発生を抑え、 成形孔内に十分に 鍛造用素材を流動させ、 寸法精度の良好な鍛造成形品を得ることを目的とする。 発明の開示
本発明は、 (1 ) 成形時に鍛造金型の成形孔内に閉じ込められたガスを排出す るためのガス抜き通路を有する鍛造用金型において、 前記ガス抜き通路は、 ガス 流方向と垂直方向の断面積が異なる複数の段部を有し、 前記成形孔壁面に臨む第 1段部の開口部面積がこれに接続する第 2段部の開口部面積よリ小さく、 力、つ、 その開口部が型分割部からなる壁面又は一体型部からなる壁面に設けられている ことを特徴とする鍛造用金型である。
なお、 上記の型分割部とは、 金型を複数の分割体に分割したときの分割体の境 界部の部位であってャキバメ等によりその分割体が摺動しないように固定された 部位のことである。 また、 上記の一体型部とは、 分割されていない金型構成部品 で構成された部位のことである。 金型全体が一体物で製作された場合を含む。
( 2 ) 上記成形孔壁面に形成された開口部の断面積が 0 . 0 1〜 1 mm2である 前記 (1 ) に記載の鍛造用金型である。 (3) 上記成形孔壁面に形成された開口部の断面形状の内接円の直径が 0. 1〜 1 mmである前記 (1 ) または (2) に記載の鍛造用金型である。
(4) 上記成形孔壁面に形成された開口部のガス抜き通路の次の段以降の面積 が、 開口部側の面積の 1. 04倍以上である前記 (1 ) 〜 (3) のいずれか 1に 記載の鍛造用金型である。
(5) 上記成形孔壁面に形成された開口部側の形状部の長さが、 開口部側の面積 値の 1〜 1 5倍である前記 (1 ) 〜 (4) のいずれか 1に記載の鍛造用金型であ る。
(6) 本発明は、 前記開口部を成形孔の金型壁面と鍛造用素材にょリ閉空間とな つた凹部及び 又は溝部に閉じ込められたガス溜リカ発生する位置に設けた前記
(1 ) 〜 (5) のいずれか 1に記載の鍛造用金型である。
(7) 本発明は、 前記 (1 ) 〜 (6) のいずれか 1に記載の鍛造用金型を使用 し、 成形孔内に鍛造用素材を投入し、 成形子 Lの凹部及びノ又は溝部に閉じ込めら れるガスをガス抜き通路を介して逃がしながら鍛造する成形品の製造方法であ る。
(8) 上記鍛造用素材は、 アルミニウム、 鉄、 マグネシウム、 チ^ンから選ばれ る何れか 1種の金属または、 これらを主成分とする合金であることを特徴とする 前記 (7) に記載の鍛造成形品の製造方法である。
(9) 本発明は、 前記 (7) に記載の方法で製造された鍛造品を含む。
( 1 0) 本発明は、 前記 (1 ) 〜 (6) のいずれか 1に記載の鍛造用金型を有す る鍛造装置を含む。
本発明によれば、 成形時に鍛造金型の成形孔内に閉じ込められたガスを排出す るためのガス抜き通路を有する鍛造用金型において、 前記ガス抜き通路は、 ガス 流方向と垂直方向の断面積が異なる複数の段部を有し、 前記成形孔壁面に臨む第 1段部の開口部面積がこれに接続する第 2段部の開口部面積より小さく、 力、つ、 その開口部が型分割部からなる壁面又は一体型部からなる壁面に設けられている ので、 ガス抜き通路に進入した鍛造用素材の一部が製品排出時にガス抜き通路内 で折れても、 次の鍛造時にガスの圧力により次段部まで押され、 詰りが解消され ガス抜き通路が塞がれない。 したがって、 複雑な形状であっても金型の成形孔内 に閉じ込められたガスをスムーズに逃がし、 成形孔内に十分に鍛造用素材を流動 させることができる。 その結果、 閉じ込められたガスによる欠肉の発生を抑えた 寸法精度の良好な鍛造成形品を製造することができる。
また、 成形孔壁面に形成された開口部の面積を小さくしてあるので、 エアーピ ンの形状が細く短くなるため、 製品からの除去作業を軽減することができる。 また、 成形孔壁面に形成された開口部の断面積が 0. 0 1〜 1 mm2であるの でエアーピンの形状が細く短ぐなるため、 製品からの除去作業を軽減することが できる。 また、 成形孔壁面に形成された開口部の断面形状の内接円の直径が 0 . "!〜 1 mmであるので、 エアーピンの形状が細く短くなリ、 製品からの除去作業 を軽減できる。 また、 成形孔壁面に形成された開口部のガス抜き通路の次の段以 降の面積が、 開口部側の面積の 1 . 0 4倍以上であるので、 通路壁面がエアピン と接角することなく目詰まり解消時に低抵抗とすることができる。 図面の簡単な説明
第 1図は、 本発明の鍛造用金型によって製造するのに適した鍛造製品の一例を 示す斜視図である。
第 2図は、 本発明の鍛造用金型によって製造するのに適した鍛造製品の他の例 を示す斜視図である。
第 3図は、 本発明の錶造用金型によって製造するのに適した錶造品の他の例を 示す斜視図である。
第 4図は、 本発明の鍛造用金型の一例を示す縦断面図である。
第 5図 (A) 〜 (E ) は、 同鍛造用金型に使用されるガス抜き通路の例を示す 拡大縦断面図である。
第 6図 (A) 〜 (D ) は、 同鍛造用金型に使用されるガス抜き通路の要部平面 図、 断面図である。
第 7図は、 第 4図に示す鍛造用金型のガス溜リ部の拡大断面図である。
第 8図 (A) 〜 (C) は、 本発明の鍛造用金型を使用した鍛造用素材の各成形 工程を示す説明図である。
第 9図 (A ) 〜 (F) は、 本発明の鍛造用金型を使用した鍛造用素材の各成形 工程を示す説明図である。
第 1 0図 (A ) 〜 (E ) は、 本発明の鍛造用金型を使用した鍛造用素材の各成 形工程を示す説明図である。
第 1 1図は、 本発明に用いる鍛造装置の一実施例を示す説明図である。
第 1 2図は、 制御ピンを備えたガス抜き通路の一例を示す拡大縦断面図である。 第 1 3図は、 第 2図の鍛造品を鍛造するための金型の一例を示す縦断面図であ る。
第 1 4図は、 第 3図の鍛造品を鍛造するための金型の一例を示す縦断面図であ る。
第 1 5図は、 第 1 4図に示す金型の拡大断面図である。 発明を実施するための最良の形態 '
本発明の鍛造用金型は、 断面積が異なる複数の段部を有し、 成形孔壁面に臨む 第 1段部の開口部面積がこれに接続する第 2段部の開口部面積よリ小さく、 かつ、 その開口部が型分割部からなる壁面又は一体型部からなる壁面に設けられている ガス抜き通路を備えたことにより、 ガス抜き通路の目詰まりを防止して、 欠肉の 発生を抑えた寸法精度の良好な鍛造成形品を製造することができる。
実施例
以下にこの発明の実施の形態の一例を説明する。
<成形品の説明 >
本発明で対象としている成形品の有する複雑な形状とは、 第 1図に示したよう な、 リブ 1 1が高くなつている形状、 第 2図に示したような、 周囲が凹部である ために実質的に凸 1 2が高くなつている形状、 或いは、 第 3図に示したような内 燃機関のピストンのような形状を有しているものである。
このような形状に対応した金型の部位は、 金型壁面と鍛造用素材にょリ閉空間 となった凹部及び Z又は溝部となり、 そこにガスが閉じ込められ、 ガス溜りが発 生し易くなるからである。 そのような形状を有する製品としては、 たとえば、 斜 板式コンプレッサーの双頭ピストン、 スクロール式コンプレッサーの渦卷体、 内 燃機関ピストンなどがある。 本発明は、 それらの形状を有する製品を直接成形す る場合、 それらの形状を有する一次加工成形品を成形する場合も対象としている。 第 1 3図は、 金属素材から鍛造形成品を鍛造する為の鍛造用金型の第 2実施例 を示し、 第 4図の金型と同様に金型 3 0は、 下金型 3 1と上金型 3 2および形成 品を下金型 3 1内から取り出すためのノックアウトピン 3 3、 またはガス抜き通 路 3 4を含んで構成される。 また、 下金型 3 1及び上金型 3 2は、 中心部に鍛造 成形孔 3 5がそれぞれ設けられている。
この鍛造用金型は第 2図に示すような、 ベースプレート面 1 3と羽根部 1 4か ら成るスクロール式コンプレッサーの渦巻体を成形するのに好的に用いられる。 第 1 4図は、 本発明による鍛造用金型の第 3実施例を示し、 第 1 3図の金型と 同様に、 本実施例の金型 3 0は、 下金型 3 1にガス抜き通路 3 4が設けられてい る。
この鍛造用金型 3 0は第 3図に示すようなヘッド面 1 5、 スカート部 1 6、 リ ブ部 1 7、 ピンボス部 1 8を有する内燃機関のピストンを成形するのに好的に用 いられる。
<鍛造用金型の説明 >
ガス抜き通路を設ける金型の一実施例について第 4図を基に説明する。
本発明の鍛造用金型 3 0は、 金属素材から鍛造成形品を鍛造するための下金型 3 1と上金型 3 2および成形品を下金型 3 1内から取り出すためのノックアウトピ ン 3 3、 またガス抜き通路 3 4を含んで構成されている。 また、 金型 3 1、 3 2 は、 中心部に鍛造成形孔 3 5がそれぞれ設けられている。
この鍛造用金型は、 例えば、 第 1図に示すような上金型の動作方向軸に対し平 行なリブ 1 1を有している鍛造成形品として双頭ピストンを鍛造するのに用いる 鍛造用金型である。 以降、 この双頭ピストンの鍛造に基づいて説明する。 鍛造用 金型 3 0の材質は、 例えば、 ダイス鋼等を使用することができる。
<ガス抜き通路の説明 >
ガス抜き通路の形状
本発明のガス抜き通路 3 4は、 例えば、 第 5図 (A ) に示すようにガス流方向に、 少なくとも第 1段部 X、 第 2段部 Yの 2部構成を有している。 さらに多段の構成 とすることも可能である。 第 1段部 X Iは、 成形孔 3 5側に設けられる部位であ る。 ここで、 第 1段部 X I と第 2段部 Y 1の接続部 Z 1は、 第 1段部 X Iの断面 積より第 2段部 Y 1の断面積が大きくなるよう接続されていれば良い。 また、 部 分的に第 2段部 Y 1より大きい断面積を有していても良い。
鍛造用金型 3 0の成形孔壁面に形成された開口部 3 6の断面積は、 例えば、 0 . 0 1〜 1 mm2に形成する。 また、 開口部 3 6の直径を 0. 1〜 1 mmとしても よい。
本発明に係る金型の加工、 組上げは従来公知の方法を用いることができる。 こ こで、 ガス抜き通路 3 4は、 分割型を合体させる前でも後でも、 何れの時に形成 しても良いが、 ガス抜き通路の精度を考慮すると、 合体後に形成するのが好まし い。 更に、 一体型においても、 ガス抜き通路 3 4は、 鍛造成形孔 3 5を作製する 前に作成しても、 後に作成してもよいが、 ガス抜き通路の精度を考慮すると、 鍛 造成形孔 3 5を作製した後に形成した方が好ましい。
第 2段部 Y 1の形状は特に限定されない。 例えば、 後述するような動作におい てエアーピンを押出したガスを一時的に溜め込むガスダンパーとして充分な長さ を有し、 押出されたエアーピンを溜め込むに充分な長さを有している形状、 また は、 ガスを大気中に放出すると同時に、 排出されたエアーピンを除去するための 開放口が設けられている形状とすることができる。 例えば、 鍛造金型 3 0を貫通 して外面に開放口を有している形状とすることができる。
<ガス抜き通路の断面積 >
第 1段部 X 1の断面積は、 0 . 0 1〜 1 mm2 (より好ましくは 0 . 0 3〜0 . 2 mm2) であることが好ましい。 一方、 第 2段部 Y 1の断面積は、 第 1段部の 断面積の 1 . 0 4倍以上 (より好ましくは 1 . 3 ~ 3倍) であることが好まししゝ。 第 1段部 X 1の断面積をこのように構成することで孔径が小さくなリ、 鍛造用 素材の進入を抑制できるので好ましい。
第 2段部 Y 1の断面積を第 1段部 X 1の断面積の 1 . 0 4倍以上にすることに より、 侵入した鍛造用素材に接触しないので、 ガス抜き通路内でエアーピンが折 れた後の鍛造時、 ガスの圧力によりエアーピンが押されて動く際の (摩擦) 抵抗 とならない。
また、 開口部 3 6の断面の外接円の直径が 1 mm以下、 好ましくは 0 . 1〜 1 mm、 さらに好ましくは 0. 2 mm〜0. 5 mmです。 それ未満では孔開け加工 が困難。 それを超えると鍛造用素材の流入が多くなるため、 鍛造後のエアーピン が長くなリすぎる可能性があるからである。
<ガス抜き通路の長さ >
第 1段部 X Iの長さは、 第 1段部 X 1の面積値の 1 ~ 1 5倍 (より好ましくは 5〜 1 0倍) であることが好ましい。 例えば、 第 1段部 X 1の長さは、 1〜 1 0 mmであることが好ましい。 また、 第 2段部 Y 1の長さは、 下金型 3 1の下側或 いは上金型 3 2の上まで貫通した長さであることが好ましい。
第 1段部 X 1の長さをこのようにすることにより、 エアーピンが折れた後の鍛 造時、 ガスの圧力によりエアーピンが押されて動く際の (摩擦) 抵抗を小さく制 御できる点から好ましい。 また、 第 1段部 X Iの長さを第 1段部 X Iの面積値の 1倍未満にすると、 長さが短く鍛造用金型が欠ける可能性がある。 更に、 第 1段 部 X 1の面積値の 1 5倍以上にすると、 (摩擦) 抵抗が大きく、 エアーピンが抜 けない可能性があるからである。
第 2段部 Y 1の長さをこのようにするのは、 有効長さが決まっていると詰まつ たエアーピンが第 1段部 X 1まで堆積してしまう可能性があり、 エアーピン詰ま リの解消の効果がなくなるからである。
このような形状としたので、 連続的に成形品を製造した際、 進入した鍛造用素 材が製品排出時にガス抜き通路 3 4内で折れても、 次の鍛造時、 ガスの圧力によ リ次段部まで押され、 詰りが解消されガス抜き孔が塞がれない。 したがって、 複 雑な形状であっても金型の鍛造成形孔 3 5内に閉じ込められた空気をスムーズに 逃がし、 成形孔内に充分に鍛造用素材 3 9を流動させることができる。
次に、 ガス抜き通路の形状の具体例を図で説明する。
第 5図は、 通路形状の例のガスの流れる方向に略平行な断面の例を示す。 第 5図 (A) は、 前述したように成形孔側の第 1段部 X 1の断面積を第 2段部 Y 1の断面積より小さく形成し、 第 1段部 X 1と第 2段部 Y "1の接続部 Z "Iを、 直 角な段部としたものである。
第 5図 (B) は、 別の実施例を示すもので、 第 1段部 X 2と第 2段部 Y 2の接 続部 Z 2の角度条件 (0 ) を付与したものである (0度 < θ≤9 0度) 。 より好 ましくは、 1度以上である。 後述する第 5図 (C ) と同効果でエアーピンを折れ やすくすることができるからである。 さらに、 目詰まり解消時には抵抗とならな し、。 また、 1 0度以上がさらにより好ましい。
角度条件 (0 ) を 1 0度以上を好ましいとした理由は、 1 0度以上だと接続部 Z 2でも流入した鍛造用素材がガス抜き通路 3 4の壁面に接触しない状態とする ことができ、 接触した場合でも、 その結果、 目詰まりした後の鍛造工程で排除が より容易となるからである。
第 5図 (C) は、 他の実施例を示すもので、 第 1段部 X 3を先太りのテーパ状 に形成した例である。 本実施例のように角度違いの、 先太りに形成した場合、 製 品排出時に開口部 3 7でエアーピンが折れやすく、 製品側にエアーピンが残りに くく、 積極的に目詰まりさせた形状である。
第 5図 (D ) は、 他の実施例を示すもので、 第 1段部 X 4の形成を先細りのテ ーパ状に形成した例である。 本実施例のように角度違いの、 先細りに形成した場 合、 製品排出時に第 2段部 Y 4でエアーピンが折れやすくピン長さの制御を意図 している。 また、 開口部 3 8側での根本を太くしているので第 1段部 X 4では目 詰まりし難く、 好ましい結果を得ることができる。
第 5図 (E ) は、 本発明の他の実施例を示すもので、 第 1段部 X 5の形状を径 の異なる凹凸として、 ガス抜き通路の断面形状を途中で変化させたものである。 本実施例のように構成した場合、 第 1段部 X 5への鍛造用素材の侵入の抑制す るとともに、 侵入した鍛造用素材を切れやすくする。
また、 第 1段部 X 5の凹凸量を 0 . 0 1〜0. 3 mmとしたのでガスの圧力に よリ侵入した鍛造用素材が下段まで押し出されるのを阻害することなく、 目詰り が解消できる。 更に、 凹凸とした形状の輪郭は、 矩形状、 三角状、 のこぎり歯状 などにすることもできる。
第 6図 (A ) 、 ( C) 、 ( D ) は、 本発明の鍛造用金型に使用されるガス抜き 通路 3 4の要部平面図である。 ここで断面形状は、 ガスの通り道が確保できれば 良く、 特に断面形状の制限はないが、 作製し易さの点からは円形状が好ましい。 第 6図 (A) は、 断面形状を円形状としたものである。 第 1段部 Xと第 2段部 Yの中心 Oを一致させている。 また、 第 1段部 Xと第 2段部 Yの大きさの差は半 径で 0. 2〜 1 mmが好ましい。 0. 2 mm未満では、 差が小さく、 エアーピン が第 2段部 Y内周と接触する可能性があリ、 ガスの圧力によりエアーピンが押さ れて動く際の (摩擦) 抵抗となる虞れがある為である。
また、 第 6図 (B) に示す様に、 径が 1 mmを超える差を有する場合では、 第 1段部 Xと第 2段部 Yの差が大きい。 つまり、 第 1段部 Xの張り出し量が大きく、 破損しまう可能性があるからである。
第 6図 (C) は、 ガス抜き通路 3 4の断面形状を四角とした場合である。 第 2 段部 Yは、 第 1段部 Xの形状を 0. 2〜 "! mm外側にオフセットした形状である。 第 6図 (D ) は、 第 1段部 Xの断面形状を円形状、 第 2段部 Yの断面形状を四 角にした場合である。 第 1段部 Xと第 2段部 Yの断面形状の距離は 0. 2〜 1 m mでめ 。
第 6図 (C) 、 ( D ) では断面形状を四角としたが多角形でも楕円でも可能で ある。 つまり、 第 1段部 Xと第 2段部 Yの形状は、 大きさの差 (距離) が好まし い範囲である 0 . 2〜 1 mmの範囲であれば、 円、 多角形、 楕円のどの組み合わ せでも可能である。
<ガス抜き通路の位置 >
金型の鍛造成形孔 3 5に対して、 ガス抜き通路 3 4の開口部 3 6の位置は、 製 品形状に応じて決定されるが、 空気溜りが生じ易い箇所である限り、 製品のコー ナ一部, 行き止まり部, 肉厚の大きな部分, 肉厚変化の大きな部分等の何れであ つても良い。 特に、 成形順序で最後に成形される箇所に設けるのが そのような 箇所は閉じ込められた空気による欠肉の発生度合いが大きいので、 その発生を解 消できる点から好ましい。
ガス抜き通路 3 4の設置部位は、 例えば、 次のように考えて決めることが出来 る。
1 ) 成形時、 鍛造用金型 3 0と鍛造用素材によって密閉されるような場所でガ ス溜りが発生すると予想される箇所。 ガス溜りは、 鍛造欠陥 (未成形) の原因と なるからである。 例えば、 第 1図に示す成形品に対応した第 4図に示した鍛造用 金型 3 0では、 符号 (a ) 〜 (h ) で示す 8部位にその可能性がある。
2 ) ノックアウトピン 3 3の位置が設置される箇所 (型摺動部) は、 型のノッ ク穴とノックアウトピン 3 3にクリアランス (ノックアウトピンが摺動するため に必要) があるため、 そこからガスが抜けて、 ガス溜りとなりにくし、。 そこで、 鍛造欠陥の発生を検討、 考慮した上で、 まずはガス溜りになりそうな位置にノッ クアウトピン 3 3を設ける。 第 4図では、 ノックアウトピン 3 3を 4箇所設置す ることで、 対象のガス溜り部を 8部位から 4部位 (b ) 、 (c ) 、 (O 、 ( g ) に絞り込むことができる。
3 ) 次に、 ガス抜き通路 3 4をガス溜り部のどこに配置するかを検討する。 先 ず、 鍛造用素材のフローを考慮し、 ガス溜り部の内どこが最後に成形されるかを 判断基準とする。
第 7図に第 4図に示す鍛造用金型 3 0のガス溜り部の拡大図を示す。 図中、 最 後に成形される部位は (I ) 、 (J ) となることが予想される。 したがって、 こ の 2箇所 (I ) 、 (J ) に設けるのが好ましい。
以上の結果、 第 1図に示した製品に対する鍛造用金型 3 0では 8箇所 (= 2箇 所ノ部位 X 4部位) にガス抜き通路 3 4を設置する必要がある。
その結果、 開口部を成形孔の凹部及び Z又は溝部に閉じ込められるガス溜り (型 と鍛造用素材によリ閉空間となつた箇所) 力《発生する位置に設された金型となる。 なお、 本発明のガス抜き通路 3 4は、 鍛造用金型の型分割部 (図示せず) に配 置しても良い。 但し、 本発明のガス抜き通路 3 4は、 開口部 3 6が分割体の少な くとも一つが摺動している摺動型の境界部に設ける必要はない。
<ガス抜き通路の向き >
本発明のガス抜き通路 3 4の向きは、 鍛造方向 (金型の移動方向〉 に平行であ ることに限定されない。 そのために、 金型設計の自由度が大きくなるので、複雑 な形状の金型を容易に設計できる。
特に、 製品排出方向に平行でない場合は、 エアーピンを容易に切断することが できるので好ましい。
また、 素材進入の抑制する効果をより高める場合には、 斜め方向 (例えば、 主 鍛造方向、 もしくは金型の移動方向に対して 4 5〜 9 0度、 好ましくは 4 5〜7 0度の範囲) に設定することが好ましい。
<ガス抜き通路内に制御ピンを入れる実施例 > 第 1 2図に示すように、 鍛造成形時に目詰まりを排出した後に第 2段部 Yに制 御ピン 9 0を挿入する機構を設けてもよい。 制御ピン 9 0とは、 目詰まり時に第 2段部 Yから退避してエアーピン排出の妨げにならないとともに、 通常 (目詰ま りしていない) 時に第 2段部 Yに進入 (上昇) することにより鍛造用素材がガス 抜き通路 3 4内の次段 (第 2段部 Y ) まで侵入するのを阻止する。 また、 制御ピ ン径は、 上段穴径ょリ大きく下段穴より小さいものとし、 長さは、 下段長さより 短く、 好ましくは小数点第一位のレベルで短く、 例えば、 好ましくは下段部長さ より 0. 0 1〜1 mm短くする。
第 1段部 Xに鍛造用素材が進入しても制御ピン 9 0が存在することにより差込 ピン長さ及び差込み量を制御、 抑制できるからである。
第 5図 (D ) に示すガス抜き通路の形状と併用すれば、 制御ピン 9 0の移動な しでも使用できる。 開口部が広くエアーピンが折れにくいからである。
<潤滑剤排出との関係 >
ガス抜き通路 3 4は、 金型成形孔内に塗布した潤滑剤を排出させる通路として も機能させることが出来る。 潤滑カス溜りによる欠肉の解消目的にも使える可能 性があるので相乗的に成形品の形状精度が向上する。
くガス抜き通路が詰まらない成形工程の説明 >
第 8図〜第 1 0図に本発明の鍛造用金型を使用した、 素材投入〜成形〜差込バ リ状況〜排出〜次の成形の各工程を示す。
先ず、 第 8図 (A) では、 鍛造成形孔 (キヤビティ) 3 5内に鍛造用素材 3 9 を置き、 プレス鍛造する工程を示す。 上金型 3 2が下降し成形が実施される。 第 8図 (B) 、 ( C) では、 金型割に近い形状部より成形されて行く。 ガス抜 き穴周辺の凹形状部では、 鍛造用素材 3 9と型にょリ閉空間が形成される。 閉空 間には、 ガスは圧縮されながら充満することになる。
第 9図 (A) 、 ( B) 、 ( C) では、 鍛造用金型 3 0と鍛造用素材 3 9により 形成された閉空間内のガスは、 ガス抜き通路 3 4より排出されながら成形される。 第 9図 (D ) では、 成形された製品を鍛造用金型からノックアウトピンによつ て排出する。 その時、 差込張り (エアーピン) 4 0が折れ、 ガス抜き通路 3 4の 第 1段部 X内に滞在し目詰まりが発生する。 第 9図 (E ) 、 (F ) 、 第" 1 0図 (A) では、 次の鍛造時、 ガス圧により目詰 まリが回避される場合を示す。
目詰まりにより、 閉空間内のガスは排出されない状態で残っているが、 成形ェ 程が進行するにつれて、 さらにガスが圧縮されていく。 成形終了の直前の時点で ついに、 エアーピン 4 0とガス抜き通路 3 4との (摩擦) 抵抗力より大きな圧縮 力が発生し、 その力で先に目詰まりしているエアーピン 4 0を第 2段部 Yまで押 し動かし、 そこでエアーピン 4 0は排出され、 目詰まりは解消され、 ガスが抜け る。
また、 第 1 0図 (B) 、 ( C) 、 ( D ) 、 ( E ) では、 次の鍛造時、 ガス圧と 素材成形による力により目詰まりが回避される場合を示す。
前述の第 9図 (E) 、 (F ) 、 第 1 0図 (A) に示す、 圧縮空気圧では、 下段 までエアーピン 4 0を移動できなくても、 2回目の成形時の鍛造用素材がフロー することによリガスの圧縮率がより上がるので下段まで先のエアーピン (目詰ま リピン) 4 0は押し動かされる。 さらに、 鍛造用素材自体がガス抜通路 3 4へ侵 入することにより、 直接、 下段まで先のエアーピン (目詰まリピン) 4 0カ《押し 動かされる。
本発明の鍛造成形品の製造方法では、 以上の操作を繰リ返すことによリ安定し て鍛造成形品を連続して製造することができる。
ここで、 第 1段部 Xの長さは、 上記した第 1 0図 (B ) 、 ( C) 、 ( D ) 、 ( E ) に示すパターンで解消されるように設定することにより、 目詰まり解消が より安定する。
<他の実施例 >
本発明の鍛造用金型 3 0は、 上記説明したガス抜き通路 3 4を少なくとも 1つ 有するものである。 他に従来公知のガス抜き通路を組み合わせて有していても良 し、。 そのような場合でも、 上記説明したガス抜き通路を有していることにより、 本発明の目的は達せられるからである。
く鍛造用素材の説明 >
本発明に用いる鍛造用素材 3 9の製法は、 連続錶造、 押出、 圧延等いずれであ つても良い。 アルミニウムやアルミニウム合金の場合、 連続錶造された丸棒材が安価で好ま しい。 例えば、 昭和電工株式会社製 S H O T I C材 (登録商標) 力挙げられる。 アルミニウム合金においては、 気体加圧式ホットトップ錶造法で連続錶造された 丸棒材が、 優れた内部健全性を持ち、 結晶粒が微細であり、 かつ、 塑性加工によ る結晶粒の異方性がないため、 摩擦抵抗部の抵抗効果を安定的に得ることができ るので好ましい。
棒状材は、 さらに所定の長さに切断され、 必要に応じて面削処理を施して、 次 工程に送られる。
<鍛造成形工程 >
本発明での鍛造は型鍛造であり、 本発明に用いる鍛造装置の構成の一例を、 第 1 1図をもとに説明する。 鍛造装置は、 鍛造機 8 1と、 上ボルスター 8 2に取り つけられた上金型 8 3と、 下ポルスター 8 4に取り付けられた下金型 8 5とを含 むものである。 また、 本発明に用いる金型の一例を第 4図に示す。 鍛造用金型 3 0は、 金属素材から鍛造成形品を鍛造するための下金型 3 1と上金型 3 2および 成形品を下金型 3 2内から取り出すためのノックアウトピン 3 3、 またガス抜き 通路 3 4を含んで構成されている。
前記金型 3 1、 3 2は、 中心部に鍛造成形孔 3 5が設けられている。 また、 鍛 造成形品は第 1図に示すような上金型の動作方向軸に対し平行なリブ 1 1形状を 有している。 そして、 必要に応じて、 スプレー前後移送装置 (表示せず) スプレ 一回転装置 (表示せず) を備えシャフト (表示せず) を介して、 スプレー前後装 置に取りつけられた潤滑剤スプレーノズル (表示せず) を有している潤滑剤塗布 装置を設置することができる。
ここでガス抜き通路 3 4は、 鍛造方向 (金型の移動方向) と垂直方向の断面積 力異なる複数の段部を有するガス抜き通路である。
本発明は、 熱間、 温間、 冷間を問わないで適用することができる。 一般には、 鍛造の温度条件により、 鍛造用素材の流動性が変わり、 差込バリや、 ガス抜き通 路への鍛造用素材の侵入の挙動が変わるので、 それに合わせた金型の設計をする 必要があるが、 本発明では、 鍛造用素材の進入の挙動の如何によらずに、 目詰ま リ現象を解消できる。 準備した鍛造用素材 3 9を上金型 3 2、 下金型 3 1により形成される空間 (成 形孔) 3 5に押し込み、 成形品を鍛造成形する。 また、 成形された素形材はノッ クアウトピン 3 3により下金型 3 2から取出される。 なお、 鍛造に際しては金型 内周に潤滑剤を塗布してから実施するのが好ましい。
鍛造用素材 3 9には、 必要に応じて、 潤滑剤処理を施すのが好ましい。 更に、 ガス抜き通路 3 4を設けているので、 ガス抜き通路 3 4が潤滑剤抜きとしても機 能する。 したがって、 焼き付きまたは潤滑カス溜りによる欠肉が懸念される箇所 にガス抜き通路 3 4を設置しても相乗的な効果的を有する。
<成形品の特徴 >
また、 本発明の鍛造用金型により鍛造した場合、 形成されるエアーピン 4 0の 形状が細く短くなる。 このため、 後処理工程で除去する際に、 不良品の発生率を 低減できる。 また、 除去作業の作業工数が軽減できる。
以下、 具体例を示して本発明の作用効果を明確にするが、 本発明はこれに限定 されるものではない。
第 1図のリブ 1 1の形状を有した成形品を、 本発明に係る鍛造用金型を用いて 製造した例である。 また、 ガス抜き通路 3 4は、 第 5図 (A ) 、 ( B) に示した ものを用いた。
鍛造用素材の潤滑処理、 金型の潤滑剤、 金型温度、 鍛造用素材の温度の各条件 は、 表 1に示すように鍛造用素材の潤滑処理はなし、 金型の潤滑剤は油性潤滑剤、 金型温度は 1 8 0 °C、 鍛造用素材の温度は 4 1 0 °Cとした。 また、 鍛造用素材は、 4 0 0 0系 A L合金を用いた。
表 1
鍛造条件
Figure imgf000018_0001
鍛造結果は、 表 2に示す。
表 2より明らかなように、 実施例 1では、 荷重 2 8 0 t、 第 1段部 Xの径は 0 0 . 3 mm、 第 1段部 Xの長さは 5 . 0 mm、 第 2段部 Yの径は ø 1 . O m m、 接続部 Zの角度 90度、 エアーピン長さ 1. 5mm、 目詰まり現象は無しで あった。
実施例 2では、 荷重 280 t、 第 1段部 Xの径は 00. 5mm、 第 1段部 X の長さは 5. Omm、 第 2段部 Yの径は ø 1. 0 mm、 接続部 Zの角度 90度、 エア一ピン長さ 3. Omm, 目詰まり現象は無しであった。
実施例 3では、 荷重 280 t、 第 1段部 Xの径は 00. 5mm, 第 1段部 X の長さは 1 2. Omm、 第 2段部 Yの径は ø 1. 0 mm、 接続部 Zの角度 90 度、 エアーピン長さ 3mm、 目詰まり直後の鍛造工程では解消されず、 その次の 3回目の鍛造工程で解消した。
比較例 1 (従来) では、 荷重 280 t、 第 1段部 Xの径は 00. 5mm、 第 2段部 Yの径は 00. 5mm (段部を有していない。 ) 、 接続部 Zの角度 0度、 エアーピン長さ 3mm、 目詰まり現象は存在した。
比較例 2 (従来) では、 荷重 280 t、 第 1段部 Xの径は 01. 1 mm、 第 2段部 Yの径は 01. 1 mm (段部を有していない。 ) 、 接続部 Zの角度 0度、 エア一ピン長さ 1 4mm、 目詰まり現象は無しであった。 しかし、 エアーピンが 長く、 次のトリム工程で不良品が発生した。
表 2
Figure imgf000019_0001
Figure imgf000019_0002
第 1 3図は、 金属素材かつ鍛造成形品を鍛造するための鍛造用金型の第 2実施 例を示し、 第 4図の金型と同様に金型 30は、 下金型 31と上金型 32および成 形品を下金型 31内から取り出すためのノックアウトピン 33、 またはガス抜き 通路 3 4を含んで構成されている。 また、 下金型 3 1及び上金型 3 2は、 中心部 に鍛造成形孔 3 5がそれぞれ設けられている。
この鍛造用金型は、 第 2図に示すようなベースプレートド面 1 3と羽根部 1 4 力、ら成るスクロール式コンプレッサーの渦卷体を成形するのに好的に用いられる。
この渦巻体の成形は、 凸部 1 2を有するベースプレート面 1 3が成形された後 に、 羽根部 1 4に素材が塑性流動して成形が完了する。 この凸部 1 2の成形時に、 その部位にガスが閉じ込められる。 ガス抜き通路は、 ガス 閉じ込められる箇所 に設けるのが好ましい。 その結果、 閉じ込められた空気による欠肉の発生を抑え ることが出来るからである。
従って、 本実施例ではガス抜き通路 3 4は、 ガスの閉じ込められる部位である、 凸部 1 2に対応した位置に設置している。
第 1 4図は本発明による鍛造用金型の第 3実施例を示し、 第 1 3図の金型と同 様に、 本実施例の金型 3 0は、 下金型 3 1にガス抜き通路 3 4が設けられている。 この鍛造用金型 3 0は、 第 3図に示すようなヘッド面 1 5, スカート部 1 6, リブ部 1 7、 ピンボス部 1 8を有する内燃機関のピストンを成形するのに好的に 用いられる。
第 1 5図は、 上記内燃機関のビストンのリブ部 1 7、 スカー卜部 1 6でのガス 抜き通路付近の成形時の空気の溜まり部の拡大断面図であって、 空気溜まりの発 生する様子を模式的にしたものです。
内燃機関ビストンの成形は、 へッド面 1 5が成形された後に、 リブ部 1 7、 ス カー卜部 1 6、 ピンボス部 1 8に素材が塑性流動して成形が完了する。 ガス抜き 通路 3 4は成形順序で最後に成形される箇所に設けるのが好ましい。 その結果、 閉じ込められた空気による欠肉の発生を抑えることが出来るからである。
従って、 本実施例ではガス抜き通路 3 4は、 最後に成形される部位である。 リ ブ部、 スカート部、 ピンボス部に設置している。 産業上の利用可能性
以上のように、 この発明にかかわる鍛造成形品は、 複雑な形状であっても金型 の成形孔内に閉じ込められた空気による欠肉の発生を抑え、 成形孔内に十分に鍛 造用素材を流動させ、 寸法精度の良好な成形品を得ることができる。

Claims

請 求 の 範 囲
1 . 成形時に鍛造金型の成形孔内に閉じ込められたガスを排出するためのガス 抜き通路 3 4を有する鍛造用金型 3 0において、
前記ガス抜き通路は、 ガス流方向と垂直方向の断面積が異なる複数の段 部を有し、 前記成形孔壁面に臨む第 1段部の開口部面積がこれに接続する 第 2段部の開口部面積より小さく、 かつ、 その開口部が型分割部からなる 壁面又は一体型部からなる壁面に設けられていることを特徴とする鍛造用 金型。
2 . 前記成形孔壁面に形成された開口部の断面積が 0. 0 1〜 1 mm2である 請求の範囲第 1項記載の鍛造用金型。
3 . 記^形孔壁面に形成された開口部の断面形状の内接円の直径が 0 . 1〜
1 mmである請求の範囲第 1項又は第 2項記載の鍛造用金型。
4. 前記成形孔壁面に形成された開口部のガス抜き通路の次の段以降の面積が、 開口部側の面積の 1 . 0 4倍以上である請求の範囲第 1項〜第 3項のいずれ か 1項に記載の鍛造用金型。
5 . 前記成形孔壁面に形成された開口部側の形状部の長さが、 開口部側の面積 値の 1〜 1 5倍である請求の範囲第 1項〜第 4項のいずれか 1項に記載の鍛 造用金型。
6 . 前記開口部を成形孔の金型壁面と素材にょリ閉空間となった凹部及びノ 又は溝部に閉じ込められたガス溜りが発生する位置に設けた請求の範囲第 1項〜第 5項のいずれか 1項に記載の鍛造用金型。
7 . 請求の範囲第 1項〜第 6項のいずれか 1項に記載の鍛造用金型を使用し、 成形孔内に鍛造用素材を投入し、 成形孔の凹部及び 又は溝部に閉じ込めら れるガスをガス抜き通路を介して逃がしながら鍛造する成形品の製造方法。
8 . 鍛造用素材は、 アルミニウム、 鉄、 マグネシウム、 チタンから選ばれる何 れか 1種の金属または、 これらを主成分とする合金であることを特徴とする 請求の範囲第 7項に記載の鍛造成形品の製造方法。
9. 請求の範囲第 7項に記載の方法で製造された鍛造品。 請求の範囲第 1項〜第 6項のいずれか 1項に記載の鍛造用金型を有する 鍛造装置。
PCT/JP2006/315349 2005-07-29 2006-07-27 鍛造用金型、鍛造成形品製造方法とその鍛造成形品 WO2007013675A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007526945A JPWO2007013675A1 (ja) 2005-07-29 2006-07-27 鍛造用金型、鍛造成形品製造方法とその鍛造成形品

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2005-220307 2005-07-29
JP2005220307 2005-07-29

Publications (1)

Publication Number Publication Date
WO2007013675A1 true WO2007013675A1 (ja) 2007-02-01

Family

ID=37683549

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2006/315349 WO2007013675A1 (ja) 2005-07-29 2006-07-27 鍛造用金型、鍛造成形品製造方法とその鍛造成形品

Country Status (2)

Country Link
JP (2) JPWO2007013675A1 (ja)
WO (1) WO2007013675A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014237179A (ja) * 2014-08-08 2014-12-18 榎本機工株式会社 フランジ付長軸部品の鍛造加工方法
JP2016112565A (ja) * 2014-12-11 2016-06-23 三菱自動車工業株式会社 鍛造プレス装置
KR20160136005A (ko) * 2015-05-19 2016-11-29 김춘식 차량용 배터리 단자 클램프 제조장치 및 제조방법

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51134630U (ja) * 1975-04-21 1976-10-30
JPS63165038A (ja) * 1986-12-26 1988-07-08 Aichi Steel Works Ltd 熱間鍛造型
JPH08187541A (ja) * 1994-12-30 1996-07-23 Kawasaki Yukou Kk 半溶融金属の鍛造用金型装置

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6138733A (ja) * 1984-07-31 1986-02-24 Rizumu Jidosha Buhin Seizo Kk ボールスタッドの製造方法
JPH01202333A (ja) * 1988-02-05 1989-08-15 Sakamura Kikai Seisakusho:Kk 円錐案内部をもつロボット用ボルトの製造方法
JPH0615399A (ja) * 1992-06-29 1994-01-25 Mazda Motor Corp 鍛造金型装置
JPH0715133U (ja) * 1993-08-24 1995-03-14 武蔵精密工業株式会社 鍛造用金型
JPH09136133A (ja) * 1995-11-13 1997-05-27 Kobe Steel Ltd 鍛造金型

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51134630U (ja) * 1975-04-21 1976-10-30
JPS63165038A (ja) * 1986-12-26 1988-07-08 Aichi Steel Works Ltd 熱間鍛造型
JPH08187541A (ja) * 1994-12-30 1996-07-23 Kawasaki Yukou Kk 半溶融金属の鍛造用金型装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014237179A (ja) * 2014-08-08 2014-12-18 榎本機工株式会社 フランジ付長軸部品の鍛造加工方法
JP2016112565A (ja) * 2014-12-11 2016-06-23 三菱自動車工業株式会社 鍛造プレス装置
KR20160136005A (ko) * 2015-05-19 2016-11-29 김춘식 차량용 배터리 단자 클램프 제조장치 및 제조방법
KR101695870B1 (ko) * 2015-05-19 2017-01-13 김춘식 차량용 배터리 단자 클램프 제조장치 및 제조방법

Also Published As

Publication number Publication date
JP2012232347A (ja) 2012-11-29
JP5510683B2 (ja) 2014-06-04
JPWO2007013675A1 (ja) 2009-02-12

Similar Documents

Publication Publication Date Title
JP6535584B2 (ja) コンプレッサハウジングの製造方法
KR101627878B1 (ko) 로터 소재 단조용 금형 및 로터 소재의 단조 방법
EP3466559B1 (en) Forging device and forging method
DE10209347B4 (de) Herstellungsverfahren für einen Turbinenradläufer
JP5510683B2 (ja) 鍛造用金型
DE102006022413B4 (de) Ringträgerkühlkanal
JP2012232347A5 (ja)
US20080250839A1 (en) Method and apparatus for manufacturing a legged annular member
JP5291557B2 (ja) 棒状素材の鍛造方法
JP4843302B2 (ja) 鍛造成形品、その製造方法および鍛造用金型
EP2719483B1 (en) Vent for mould for permanent aluminium casting
KR100491297B1 (ko) 로터의 단조용 금형, 그 단조생산시스템, 그 단조방법 및로터
JP2006212849A (ja) タイヤ成形用金型の製造方法
JP5483292B2 (ja) 金属鍛造製品の製造方法
JPH0857573A (ja) スクロール部材の成形方法
JP2001096334A (ja) 矯正加工用金型装置
JP3746828B2 (ja) 円筒状部品の製造方法
JP7056422B2 (ja) 歯車の鍛造成形方法及びその装置
EP1954424B1 (de) Einteiliger stahlkolben als feinguss-variante mit kern für die feingusstechnische herstellung eines kühlkanales
JP4856889B2 (ja) 冷間鍛造方法
JP3947433B2 (ja) 鍛造用金型、閉塞鍛造生産システム、アルミニウム合金製ローターの鍛造方法および鍛造製アルミニウム合金ローター
KR101534122B1 (ko) 터보챠저용 컴프레셔 휠 가공을 위한 엔드밀
JP2009148792A (ja) コンロッドの製造方法及びコンロッド鍛造用金型
JP2007314856A (ja) 焼結部品の製造方法
JPH0857572A (ja) スクロール部材の成形型及びその成形方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2007526945

Country of ref document: JP

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 06782217

Country of ref document: EP

Kind code of ref document: A1