RU2022105C1 - Method for construction of embankment - Google Patents
Method for construction of embankment Download PDFInfo
- Publication number
- RU2022105C1 RU2022105C1 SU4871128A RU2022105C1 RU 2022105 C1 RU2022105 C1 RU 2022105C1 SU 4871128 A SU4871128 A SU 4871128A RU 2022105 C1 RU2022105 C1 RU 2022105C1
- Authority
- RU
- Russia
- Prior art keywords
- embankment
- layer
- track
- rail
- construction
- Prior art date
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
Description
Изобретение относится к области строительства, в частности к возведению насыпей для железнодорожных и автодорожных путей, а также насыпей в гидротехническом строительстве. The invention relates to the field of construction, in particular to the construction of embankments for railways and roads, as well as embankments in hydraulic engineering.
Известен способ сооружения насыпи железнодорожного пути, при реализации которого грунт, укладываемый в насыпь, доставляется к месту укладки железнодорожным транспортом и выгружается на смонтированный путь, поднимаемый по мере завоза грунта балластером на верхнюю отметку отсыпаемого слоя [1]. There is a method of constructing an embankment of a railway track, during the implementation of which the soil laid in the embankment is delivered to the place of laying by rail and unloaded onto the mounted track, which is raised as ballast is delivered to the upper elevation of the dumped layer [1].
Недостаток этого способа - отсутствие послойного уплотнения отсыпаемых слоев. The disadvantage of this method is the lack of layer-by-layer compaction of the poured layers.
Наиболее близким аналогом изобретения является способ возведения балластной призмы (частный случай насыпи) с применением инвентарного рельсового пути, который последовательно поднимается балластером на нижний слой из песка, а затем на верхний слой из щебня. Нижний слой уплотняется пропуском поездной нагрузки, а верхний слой - нерельсовыми средствами механизации при удаленном с насыпи рельсовом пути [2]. The closest analogue of the invention is a method of erecting a ballast prism (a special case of an embankment) using an inventory rail track, which is sequentially lifted by ballaster to the lower layer of sand, and then to the upper layer of crushed stone. The lower layer is sealed with a train load pass, and the upper layer with non-rail means of mechanization with a rail track removed from the embankment [2].
Недостаток этого способа - наличие инвентарного рельсового пути на нижнем слое насыпи, что не позволяет применить для планирования и уплотнения высокоэффективные нерельсовые средства механизации. The disadvantage of this method is the presence of an inventory rail track on the lower layer of the embankment, which does not allow the use of highly efficient non-rail means of mechanization for planning and compaction.
Цель изобретения - повышение эффективности уплотнения многослойной насыпи путем применения для планирования и уплотнения послойно укладываемого материала насыпи нерельсовыми средствами механизации. The purpose of the invention is to increase the efficiency of compaction of a multilayer embankment by using non-rail means of mechanization for planning and compaction of the layered material of the embankment.
Поставленная цель достигается тем, что рельсовый путь извлекают позвенно с последующим удалением звеньев из каждого отсыпанного слоя, а планирование и уплотнение осуществляют нерельсовыми средствами послойно. This goal is achieved by the fact that the rail track is removed indirectly with the subsequent removal of the links from each poured layer, and planning and compaction is carried out non-rail means in layers.
На фиг. 1-5 представлена последовательность операций при осуществлении способа. In FIG. 1-5 presents a sequence of operations during the implementation of the method.
На месте сооружения насыпи укладывается инвентарный рельсовый путь путеукладчиком, оснащенным комплектом звеньев, при прямом его ходе. Путеукладчик, закончив укладку пути, остается в голове укладки (фиг.1). At the place of construction of the embankment an inventory rail track is laid with a track stacker equipped with a set of links, with its direct course. The track layer, having finished laying the track, remains in the laying head (Fig. 1).
Первый слой насыпи отсыпается путем разгрузки на путь материала насыпи после его доставки по уложенному пути железнодорожным транспортом (фиг.2). The first layer of the embankment is sprinkled by unloading the embankment material onto the path after its delivery along the laid path by rail (Fig. 2).
Инвентарный рельсовый путь разбирается при обратном ходе путеукладчика с извлечением звеньев из-под отсыпанного материала и их удалением с отсыпанного слоя на платформу путеукладчика (фиг.3). Inventory rail track is disassembled during the reverse stroke of the track stacker with the extraction of links from under the sprinkled material and their removal from the spilled layer to the track stacker platform (Fig. 3).
Материал насыпи планируется и уплотняется при удаленном с насыпи инвентарном рельсовом пути неколесными средствами механизации (фиг.4). The material of the embankment is planned and compacted when the inventory rail is removed from the embankment by non-wheel means of mechanization (Fig. 4).
Инвентарный рельсовый путь укладывается на отсыпанный слой насыпи для доставки и разгрузки материала в следующий слой насыпи (фиг.5). Inventory rail track is laid on the sprinkled layer of the embankment for delivery and unloading of material in the next layer of the embankment (figure 5).
Изобретение позволяет возводить насыпи с уменьшенными осадками и эффективно использовать путеукладчик, помимо его основной функции, для извлечения звеньев инвентарного рельсового пути из-под материала слоя насыпи. EFFECT: invention makes it possible to erect embankments with reduced precipitation and efficiently use the track stacker, in addition to its main function, for extracting links of the inventory rail track from under the material of the embankment layer.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU4871128 RU2022105C1 (en) | 1990-09-03 | 1990-09-03 | Method for construction of embankment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU4871128 RU2022105C1 (en) | 1990-09-03 | 1990-09-03 | Method for construction of embankment |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2022105C1 true RU2022105C1 (en) | 1994-10-30 |
Family
ID=21538797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU4871128 RU2022105C1 (en) | 1990-09-03 | 1990-09-03 | Method for construction of embankment |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2022105C1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19706032A1 (en) * | 1996-12-05 | 1998-06-18 | Felix Kunzewitsch | Method for erecting fixed line for laying railway, etc. |
DE19724785A1 (en) * | 1997-06-05 | 1998-12-17 | Felix Kunzewitsch | Method for laying transport rail tracks on compressed bed of sand and gravel |
DE19630543C2 (en) * | 1996-07-16 | 1999-07-29 | Felix Kunzewitsch | Method and device for erecting dams reinforced with insulating material |
DE19649985C2 (en) * | 1996-11-19 | 1999-11-04 | Felix Kunzewitsch | Procedure for the construction of dams |
DE10005677A1 (en) * | 2000-02-07 | 2001-08-16 | Felix Kunzewitsch | Method to construct railway lines and embankments; involves assembling transport rail using railway construction train, delivering construction materials and disassembling transport rail |
DE10307753B4 (en) * | 2003-02-19 | 2015-10-29 | Felix Kunzewitsch | Method and device for laying pipelines |
-
1990
- 1990-09-03 RU SU4871128 patent/RU2022105C1/en not_active IP Right Cessation
Non-Patent Citations (2)
Title |
---|
1. Технические указания по технологии сооружения железнодорожного земляного полотна ВСН-186-75. М.: Оргтрансстрой, 1975, с.157-159. * |
2. Технические указания по устройству и укладке верхнего строения железнодорожного пути ВСН-94-63. М.: Оргтрансстрой, 1964, с.134. * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19630543C2 (en) * | 1996-07-16 | 1999-07-29 | Felix Kunzewitsch | Method and device for erecting dams reinforced with insulating material |
DE19649985C2 (en) * | 1996-11-19 | 1999-11-04 | Felix Kunzewitsch | Procedure for the construction of dams |
DE19706032A1 (en) * | 1996-12-05 | 1998-06-18 | Felix Kunzewitsch | Method for erecting fixed line for laying railway, etc. |
DE19706032C2 (en) * | 1996-12-05 | 2003-05-15 | Felix Kunzewitsch | Process for the construction of paved routes and device for this process |
DE19724785A1 (en) * | 1997-06-05 | 1998-12-17 | Felix Kunzewitsch | Method for laying transport rail tracks on compressed bed of sand and gravel |
DE19724785C2 (en) * | 1997-06-05 | 1999-10-21 | Felix Kunzewitsch | Method and device for building dams and routes |
DE10005677A1 (en) * | 2000-02-07 | 2001-08-16 | Felix Kunzewitsch | Method to construct railway lines and embankments; involves assembling transport rail using railway construction train, delivering construction materials and disassembling transport rail |
DE10005677C2 (en) * | 2000-02-07 | 2003-08-14 | Felix Kunzewitsch | Method and device for building routes and dams |
DE10307753B4 (en) * | 2003-02-19 | 2015-10-29 | Felix Kunzewitsch | Method and device for laying pipelines |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102392447B (en) | Given force variable stiffness discrete material pile ramming and expanding machine and application thereof | |
RU2102550C1 (en) | Method and device for repair of lower course of railway track ballast prism | |
RU2022105C1 (en) | Method for construction of embankment | |
CN110206034A (en) | Annular method of excavation of deep foundation pit | |
CN1184379C (en) | Operation method of screen scarifier and screened ballast | |
CN111778941A (en) | High-standard farmland channel construction method and structure | |
CN116043624A (en) | Construction method and construction device for filling carbonaceous mudstone roadbed | |
EP1127980A2 (en) | Method for replacement or renewal of a railway track and apparatus therefor | |
US3621785A (en) | Ballast spreader and compactor | |
US4047256A (en) | Bridge construction method | |
RU2224837C2 (en) | Process of erection of roadbed | |
RU2068042C1 (en) | Method for erecting bank reinforced with geotextile | |
KELSON | The Construction of Silvan Dam, Melbourne Water-Supply. | |
CN216584404U (en) | Cross-pool conveying layered filling system for vibration screening of filter materials of composite vertical flow constructed wetland | |
JPS58168722A (en) | Treatment work for sloped subgrade of railroad | |
RU165702U1 (en) | EARTHWEAR MAIN AREA HEALTH MACHINE | |
Jacobsen | Track elevation in Chicago | |
COODE | MARITIME PAPER NO. 37: DESIGN AND CONSTRUCTION OF THE APAPA WHARF EXTENSION, LAGOS. | |
DE19706032C2 (en) | Process for the construction of paved routes and device for this process | |
JP2001262501A (en) | Track switchover method | |
SU1008447A1 (en) | Method for stock piling in working mineral deposits | |
Cao et al. | Research and application of key technologies for Roller Compacted Concrete cofferdam in Three Gorges Project | |
RU1773976C (en) | Method of erecting embankment on weak foundation | |
SU1622556A1 (en) | Method of reconstructing concrete floor | |
CN116397527A (en) | Construction method of wetland trestle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20030904 |