JPS6096138A - Generator plant automatic operation monitoring and operating device - Google Patents

Generator plant automatic operation monitoring and operating device

Info

Publication number
JPS6096138A
JPS6096138A JP58201014A JP20101483A JPS6096138A JP S6096138 A JPS6096138 A JP S6096138A JP 58201014 A JP58201014 A JP 58201014A JP 20101483 A JP20101483 A JP 20101483A JP S6096138 A JPS6096138 A JP S6096138A
Authority
JP
Japan
Prior art keywords
power generation
generation unit
breakpoint
display
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP58201014A
Other languages
Japanese (ja)
Other versions
JPS6341299B2 (en
Inventor
昭基 神谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP58201014A priority Critical patent/JPS6096138A/en
Publication of JPS6096138A publication Critical patent/JPS6096138A/en
Publication of JPS6341299B2 publication Critical patent/JPS6341299B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 [発明の技術分野] 本発明は複数発電ユニットから成る発電プラントを自動
運転するための監視操作装置に関する。
DETAILED DESCRIPTION OF THE INVENTION [Technical Field of the Invention] The present invention relates to a monitoring and operating device for automatically operating a power generation plant comprising a plurality of power generation units.

[発明の技術的背景とその問題点] 最近、発電効率の向上を目的として複合サイクル発電ユ
ニットが開発されている。この発電ユニットはガスター
ビンと蒸気タービンを結合し、ガスタービンを駆動し終
えた排ガスを利用して蒸気タービンを駆動することによ
り、熱エネルギーの有効利用を図るようにしたものであ
る。しかし、この発電ユニットは単機容量が小さいため
、系統運用上は複数台で一つの発電プラン1−が構成さ
れる。
[Technical background of the invention and its problems] Recently, combined cycle power generation units have been developed with the aim of improving power generation efficiency. This power generation unit combines a gas turbine and a steam turbine, and uses the exhaust gas that has been used to drive the gas turbine to drive the steam turbine, thereby making effective use of thermal energy. However, since this power generation unit has a small single unit capacity, one power generation plan 1- is composed of a plurality of units in terms of system operation.

このような複数台の発電ユニットから成る一つの発電プ
ラントを運転するに際して、中央操作盤には各発電ユニ
ットをそれぞれ自動運転するための監視操作装置を設け
ることが必要となる。しかし、そのために従来の自動化
コンソールをそのまま採用すると、中央操作盤が膨大な
ものとなり、監視操作が著しく困難になる。
When operating one power generation plant consisting of such a plurality of power generation units, it is necessary to provide a monitoring operation device on the central operation panel to automatically operate each power generation unit. However, if conventional automation consoles are used as they are for this purpose, the central operation panel will become enormous, making monitoring operations extremely difficult.

即ち、第1図は従来の中央操作盤に収納される自動化コ
ンソールをそのまま複数台発電ユニットから成る発電プ
ラントに適用した場合の例を示したもので、発電ユニッ
ト表示部Aは複数台の発電ユニットを識別するものであ
る。ここでは、発電ユニットの台数が金側n台ある。運
転モードPB(照光式押ボタンスイッチ)部Bによって
運転員が各発電ユニットに対して起動、停止運転モード
を選択できる。例えば、発電ユニッ1−を起動させたい
時は起動PBを押す。発電ユニットを停止させたい時は
停止PBを押す。進行表示Pa部Cは、発電ユニットの
進行状態を運転員に表示すると同時に運転員がこのPB
を押すことによって発電ユニットの進行許可を与えるも
のである。即ち、第1発電ユニットの起動PBを押すと
、その13口が点灯すると同時に起動シーケンスが作動
する。その結果、「海水系統」起動条件が成立すると、
そのfallがフリッカ−する。これにより運転員がそ
のPBを押すと、「海水系統」起動操作が開始される。
That is, Fig. 1 shows an example in which a conventional automation console housed in a central operation panel is applied as is to a power generation plant consisting of multiple power generation units. It is used to identify Here, the number of power generation units is n on the gold side. Operation mode PB (illuminated pushbutton switch) section B allows the operator to select start and stop operation modes for each power generation unit. For example, if you want to start the power generation unit 1-, press start PB. If you want to stop the power generation unit, press Stop PB. The progress display Pa section C displays the progress status of the power generation unit to the operator, and at the same time allows the operator to check this PB.
By pressing , permission is given for the power generation unit to proceed. That is, when the start PB of the first power generation unit is pressed, the 13 ports are lit and at the same time the start sequence is activated. As a result, when the "seawater system" activation conditions are met,
The fall flickers. As a result, when the operator presses the PB, the "seawater system" starting operation is started.

やがて、その操作が完了すると、そのPBは連続点灯に
変ると同時に次の「海水真空系統」起動PBがフリッカ
−する。
Eventually, when the operation is completed, that PB changes to continuous lighting and at the same time, the next "seawater vacuum system" activation PB flickers.

このようにして運転員からの進行許可指令を受番づて一
連の起動シーケンスをブレイクポイン1−毎に順次進め
ていく。尚、ここでは発電ユニットの起動操作を「海水
系統起動」から「負荷上昇」まで7つのブレイクポイン
トに分ける一方、発電ユニツ1−の停止操作を「負荷降
下」から「海水系統停止」まで5つのブレイクポイント
に分けた。
In this way, a series of startup sequences are sequentially advanced for each break point 1- by numbering the advance permission command from the operator. Here, the power generation unit startup operation is divided into seven breakpoints, from "seawater system start" to "load increase," while the power generation unit 1- stop operation is divided into five breakpoints, from "load drop" to "seawater system stoppage." Divided into break points.

このように、従来の自動化コンソールをn台発電ユニッ
トへ逍用するため、r1台の自動化コンソールを設ける
と、自動化コンソールが大きくなり、運転員の操作、監
視が難しくなる。
In this way, if r1 automation consoles are provided in order to use the conventional automation consoles for n power generation units, the automation consoles will become large and difficult for operators to operate and monitor.

[発明の目的] 本発明は、自動化コンソールをコンバグI・化し、複数
発電ユニットの運転監視操作を容易にする発電プラント
自動運転監視操作装置を提供することを目的とする。
[Object of the Invention] An object of the present invention is to provide a power generation plant automatic operation monitoring and operation device that converts an automation console into a Conbug I and facilitates operation and monitoring operations of a plurality of power generation units.

[発明の概要] このため1本発明は従来の各発電ユニット毎のPB配列
に代えて、表示装置と進行許可ボタンあるいはタッチス
クリーンを設け、各発電ユニットに対する各ブレイクポ
イントを表形式にして前記表示装置の画面上に表示し、
前記表の対応する潤1各ブレイクポイントの操作前状態
、操作開始可能状態、操作進行状態、操作完了状態の4
つの運転状態を異なる色やマークを用いて識別可能に表
示すると共に、その表示を見て前記進行許可ボタンある
いはタッチスクリーンから操作開始可能状態にあるブレ
イクポイントに対し、進行許可指令を与えるようにした
ことを特徴としている。
[Summary of the Invention] For this reason, the present invention provides a display device and a progress permission button or a touch screen in place of the conventional PB array for each power generation unit, and displays the break points for each power generation unit in a table format. displayed on the device screen,
4 of the pre-operation state, operation startable state, operation progress state, and operation completion state for each breakpoint in the corresponding Jun 1 table above.
The two operating states are displayed in a distinguishable manner using different colors and marks, and a progress permission command is given to a breakpoint in a state where operation can be started from the progress permission button or touch screen based on the display. It is characterized by

[発明の実施例コ 以下、本発明の実施例について説明するが、その詳細説
明に入る前に概要を説明しておく。
[Embodiments of the Invention] Hereinafter, embodiments of the present invention will be described, but before entering into the detailed explanation, an outline will be explained.

本実施例の発電プラン1〜自動運転監視操作装置は、第
2図に示すように、n個の発電ユニットから成る発電プ
ラン1−1と、電子側算機2と、CRT表示器3と、自
動化コンソール4とから構成される。
As shown in FIG. 2, the power generation plan 1 to automatic operation monitoring and operation device of this embodiment includes a power generation plan 1-1 consisting of n power generation units, an electronic calculator 2, a CRT display 3, It consists of an automation console 4.

その自動化コンソール4は、第3図に示すように、発電
ユニット表示部40.起動モードPB部41.停止モー
ドPB部42および進行PB部43より構成される。そ
の発電ユニット表示部40は、第1発電ユニットから第
11発電ユニットまで表示をする。一方、起動モード表
示部41には各発電ユニット毎に起動モードを選択する
PBが設けられる。同様に停止モー128部には各発電
ユニット毎に停止モードを選択するPIlが設けられる
。また、進行PB部53には各発電ユニット毎にブレイ
クポインl−を進めるため進行許可指令を与えるPBが
設けられる。
As shown in FIG. 3, the automation console 4 includes a power generation unit display section 40. Startup mode PB section 41. It is composed of a stop mode PB section 42 and a progress PB section 43. The power generation unit display section 40 displays from the first power generation unit to the eleventh power generation unit. On the other hand, the startup mode display section 41 is provided with a PB for selecting a startup mode for each power generation unit. Similarly, the stop mode 128 section is provided with a PIl for selecting a stop mode for each power generation unit. Further, the advance PB section 53 is provided with a PB that gives a advance permission command to advance the break point l- for each power generation unit.

一方、CRT表示器3の画面には、第3図に示すように
、各発電ユニットに対する各ブレイクポイントの状態を
示す一覧表が表示される。即ち、図における30は発電
ユニット識別部、3]は起動モード表示部、32は停止
モード表示部、33ばブレイクポイント表示部、34は
進行状態表示Δ1;を示し、発電ユニット識別部30は
発電ユニツhl、2,3.・・・、+1を表わしている
。ブレイクポイン1〜表示部33は起動モードに関して
は「海水系統」から「負荷上昇」まで7つのブレイクポ
イン1−を示し、停止モードに関しては、「負荷降下」
から「海水停止」までの5つのブレイクポイン1〜を示
している。
On the other hand, on the screen of the CRT display 3, as shown in FIG. 3, a list showing the status of each breakpoint for each power generation unit is displayed. That is, in the figure, 30 is a power generation unit identification section, 3] is a start mode display section, 32 is a stop mode display section, 33 is a break point display section, and 34 is a progress state display Δ1; Units hl, 2, 3. ..., represents +1. Breakpoint 1 - The display section 33 shows seven breakpoints 1- from "seawater system" to "load increase" for the start mode, and "load drop" for the stop mode.
Five breakpoints 1 to 1 are shown from 1 to ``seawater stop''.

上記の構成で、電子計算機2は発電プラン1〜1から各
種プラント信号Slを取り込み11個の発電ユニットの
各運転状態を判定し、CRT表示信号S2としてCRT
表示器3に出力する。このときの運転状態としては、(
1)ブレイクポイン1−の操作開始条件が未だ不成立の
状態を示す操作前状態、(2)操作開始条件は成立して
いるが、運転員からの進行許可指令がない状態を示す操
作開始可能状態、(3)操作開始条件が成立し、かつ、
運転員からの進行許可指令が加えられて操作が進行して
いる状態を示す操作進行状態、(4)操作完了条件が成
立した状態を示す操作完了状態の4つあり、それぞれの
運転状態に対応して、第4図に示すように、4つの識別
符号M1〜M4を進行状態表示部34の各側に表示する
With the above configuration, the computer 2 takes in various plant signals Sl from the power generation plans 1 to 1, determines the operating status of each of the 11 power generation units, and displays the CRT display signal S2 as a CRT display signal S2.
Output to display 3. The operating state at this time is (
1) A pre-operation state indicating that the operation start conditions for break point 1- have not yet been met; (2) an operation start ready state that indicates that the operation start conditions have been met but there is no proceeding permission command from the operator. , (3) the operation start condition is satisfied, and
There are four types of operation states: (4) operation progress state, which shows the state in which the operation is in progress after a progress permission command has been added from the operator, and (4) operation completion state, which shows the state in which the operation completion conditions have been met, and each corresponds to the operation state. Then, as shown in FIG. 4, four identification codes M1 to M4 are displayed on each side of the progress display section 34.

これにより、運転員は発電プラント1における各発電ユ
ニットの運転状態を把握することができる。例えば、第
4図の表示から第1発電ユニット−は現在起動モードに
あり、「海水系統」の起動が操作完了状態にある。また
、「復水真空系統」が操作進行状態にある。更にrll
R5Gドラム水位調整」が操作開始可能状態にあり、運
転員のJN示を待ってフリッカ−している。一方、「ガ
スタービン起動」以下の各ブレイクポイン1−はいずイ
しも操作前状態にあることが判る。また、第1発電ユニ
ットへは停止モードにあり、「負荷降下」が操作完了状
態にある。
Thereby, the operator can grasp the operating status of each power generation unit in the power generation plant 1. For example, from the display in FIG. 4, the first power generation unit is currently in the start-up mode, and the start-up of the "seawater system" has been completed. Also, the "condensate vacuum system" is in operation progress. More rll
"R5G Drum Water Level Adjustment" is ready to start operation and is flickering waiting for the JN indication from the operator. On the other hand, it can be seen that each break point 1- below "gas turbine start" is in the pre-operation state. Further, the first power generation unit is in the stop mode, and the "load drop" operation has been completed.

「解列ガスタービン停止」が操作開始可能状態にありフ
リッカ−している。「真空系統j以下は未だ条件が揃わ
ずに操作前状態にあることが判る。
The "disconnect gas turbine stop" is ready to start operation and is flickering. ``It can be seen that the conditions for vacuum system J and below have not yet been met and are in a pre-operation state.

電子計算機2は各発電ユニットのブレイクポインl−に
現在操作開始可能状態にあるものかあiシば、それを運
転員に知らせるため、自動1ヒコンソール4にも信号S
3として出力する。こ社により、第3図の進行PB部4
3における第1および第1発電ユニット進行PBがフリ
ッカ−する。
The computer 2 also sends a signal S to the automatic 1hi console 4 to inform the operator if the break point l- of each power generation unit is currently ready for operation.
Output as 3. By this company, the progress PB section 4 in Figure 3
The first and first power generation unit advances PB at 3 flicker.

従って、運転員がフリッカ−しているPBを順次押し、
進行許可指令を与えれば、それらの指令は信号S4とし
て電子計算機2に加わる。
Therefore, the operator sequentially presses the flickering PBs,
If advance permission commands are given, those commands are applied to the computer 2 as a signal S4.

CRT表示器3は、それらの指令を順次受けて、第1発
電ユニットへに対してはrllllsGドラム水位調整
」操作を、また、第2発電ユニットに対しては「解列ガ
スタービン停止」操作を信号S5として発電プラント1
に加える。また、CR’1表示器3にも信号S2を出力
して操作開始可能状態表示から操作進行状態表示に変え
る。
The CRT display 3 sequentially receives these commands and instructs the first power generation unit to perform the "rllllsG drum water level adjustment" operation, and the second power generation unit to perform the "disconnect gas turbine stop" operation. Power plant 1 as signal S5
Add to. Further, the signal S2 is outputted to the CR'1 display 3 to change the operation start ready state display to the operation progress state display.

一方、運転員は、他の発電ユニットについても起動ある
いは停止させたいものがあれば、第3図の自動化コンソ
ール上の対応する発電ユニットの起動モードPBあるい
は停止モードPBを押す。すると、電子計算eA2はこ
れらのPB倍信号受けて発電プラント1に操作を加え、
対応する発電ユニットの「海水系統」あるいは「負荷降
下」を操作前状態から操作開始可能状態表示に変える。
On the other hand, if the operator wishes to start or stop other power generation units, he or she presses the start mode PB or stop mode PB of the corresponding power generation unit on the automation console shown in FIG. Then, the electronic calculator eA2 receives these PB double signals and operates the power generation plant 1,
Change the "seawater system" or "load drop" of the corresponding power generation unit from the pre-operation state to the state ready to start operation.

このようにして、本実施例によれば、第1図の従来例に
示したように多数のPBを配列することなく、中央操作
盤上にはCRT表示器3と自動化コンソール4を配置す
るだけの簡単な構成で、11台の発電ユニットを監視操
作することが可能となる。
In this way, according to this embodiment, only the CRT display 3 and the automation console 4 are placed on the central operation panel, without arranging a large number of PBs as shown in the conventional example shown in FIG. With this simple configuration, it is possible to monitor and operate 11 power generation units.

以上は発電プラント自動運転監視操作装置の概要を説明
したが1次にその詳細を以下に説明する。
The outline of the power plant automatic operation monitoring and operation device has been described above, and first, the details thereof will be described below.

第5図は、前記電子側算機2の機能をブロック化して示
した第2図の詳細図で、電子?!]算@2は入力読込手
段21.発電プラント運転状態判定手段22゜CRT表
示手段23.コンソール表示手段24.許可PBオン検
出手段25.制御出力手段26より成る。
FIG. 5 is a detailed diagram of FIG. 2 showing the functions of the electronic calculator 2 in blocks. ! ] Calculation@2 is input reading means 21. Power plant operating state determination means 22° CRT display means 23. Console display means 24. Permission PB on detection means 25. It consists of control output means 26.

第6図は、上記発電プラント運転状態判定手段22の詳
細を示したもので、発電プラント運転状態判定手段22
は、第1発電ユニット運転状態判定部201から第1発
電ユニット運転状態判定部20nまでで構成される。尚
、同図において、第2から第(n−1)発電ユニット運
転状態判断部は省略している。
FIG. 6 shows details of the power plant operating state determining means 22.
is composed of a first power generation unit operating state determining section 201 to a first power generating unit operating state determining section 20n. In addition, in the figure, the second to (n-1)th power generation unit operating state determination units are omitted.

第7図は第6図の第1(n)発電ユニット起動ブレイク
ポイント処理(1)の内容を示したもので、第1ブレイ
クポイント処理部211から第7ブレイクポイント処理
部21nまでで構成される。同図において、第2から第
6ブレイクポイント処理部は省略している。
FIG. 7 shows the contents of the first (n) power generation unit startup breakpoint process (1) in FIG. 6, which is composed of the first breakpoint processing section 211 to the seventh breakpoint processing section 21n. . In the figure, the second to sixth breakpoint processing units are omitted.

第8図は第7図の第1(7)ブレイクポイント進行処理
7の内容を示したものである。
FIG. 8 shows the contents of the first (7) breakpoint progression process 7 in FIG.

第9図は前記CRT表示手段23の処理の詳細を示した
ものである。図にはある一つの発電ユニットのある一つ
ブレイクポイントの処理について示しているが、その他
の発電ユニットのその他のブレイクポイントについての
処理も同様である。
FIG. 9 shows details of the processing of the CRT display means 23. Although the figure shows processing for one breakpoint in one power generation unit, the processing for other breakpoints in other power generation units is similar.

第10図は、前記コンソール表示手段24の処理の詳細
を示したものである。図には、ある一つの発電ユニッi
・のブレイクポイント操作開始可能状態を自動化コンソ
ール4に表示する処理を示しているが、その他の発電ユ
ニットの処理も同様である。
FIG. 10 shows details of the processing of the console display means 24. In the figure, one power generation unit i
Although the processing for displaying the state in which breakpoint operation can be started on the automation console 4 is shown, the processing for other power generation units is similar.

次に、以上の図を参照して、前記概略説明した発電プラ
ント監視操作装置の動作の詳細を以下器こ説明する。
Next, the details of the operation of the power plant monitoring and operating device described above will be briefly explained with reference to the above figures.

電子計算機2の入力読込手段21は発電プラント1を構
成する各発電ユニツI〜の各前状態をプラン1−信号S
1として取り込む。同時に自動化コンソール4からは運
転員が操作する各発電ユニットの起動PB、停止PB、
あるいは進行PBのオン信号を取り込む。また、これら
取り込んだ信号を電子計算機で処理し易いディジタルデ
ータに変換したのち、発電プラント運転状態判定手段2
2に渡す。
The input reading means 21 of the electronic computer 2 reads each previous state of each power generation unit I~ constituting the power generation plant 1 as a plan 1 signal S.
Import as 1. At the same time, from the automation console 4, the start PB, stop PB of each power generation unit operated by the operator,
Alternatively, the ON signal of the progress PB is taken in. In addition, after converting these captured signals into digital data that can be easily processed by an electronic computer, the power plant operating state determining means 2
Pass it to 2.

次に、発電プラント運転状態判定手段22番よ、前記の
入力読込手段21によって入力された信号を使って、第
6図に示すように、プランl−の運転状態を判断する。
Next, the power plant operating state determining means 22 uses the signal inputted by the input reading means 21 to determine the operating state of plan 1-, as shown in FIG.

即ち、先ず第1発電ユニット運転状態判定部201の第
1発電ユニット運転モード判定(ア)において、前記の
入力読込手段21によって入力されたコンソール信号S
4の第1発電ユニットの起動PB、停止PB信号を判定
する。この判定結果↓こより、自動化コンソール第1発
電ユニツ1−の起動PBがオンの時、第1発電ユニット
起動ブレイクポイント処理(1)を処理する。また、停
止PBがオンの時は、停止ブレイクポイント処理(イ)
を処理する。しかし、起動PBおよび停止PBが共に選
択されない時は、発電ユニットが通常負荷運転または停
止中であるので、(つ)部において第1発電ユニットの
全操作ブレイクポイントを操作前状態として識別し、そ
の状態を記憶する。
That is, first, in the first power generation unit operation mode determination (a) of the first power generation unit operation state determination section 201, the console signal S input by the input reading means 21 is
The start PB and stop PB signals of the first power generation unit No. 4 are determined. As a result of this determination, when the startup PB of the automation console first power generation unit 1- is on, the first power generation unit startup breakpoint process (1) is processed. Also, when stop PB is on, stop breakpoint processing (a)
process. However, when both start PB and stop PB are not selected, the power generation unit is in normal load operation or stopped, so in part (1), the entire operation break point of the first power generation unit is identified as the pre-operation state, and the Remember the state.

ff1l!電ユニツト起動ブレイクポイント処理(1)
、停止ブレイクポイント処理(イ)または全操作ブレイ
クポイントの操作前状態記憶(つ)の処理が終了すると
、第1発電ユニット運転状態判定の処理を行なう。ここ
では、第2発電ユニット運転モード運転モード処理は、
第1と同様であるため、説明を省略する。
ff1l! Power unit startup breakpoint processing (1)
, When the stop break point process (a) or the pre-operation state storage process of the all-operation break point (ii) is completed, a process of determining the operating state of the first power generation unit is performed. Here, the second power generation unit operation mode operation mode processing is as follows:
Since it is the same as the first one, the explanation will be omitted.

次に、第1発電ユニット起動ブレイクポイント処理(1
)の詳細を説明する。尚、第6図の第1発電ユニッ1−
停止ブレイクポイント処理(イ)は起動ブレイクポイン
ト処理(1)と同様であるため、その詳細説明は省略す
る。この処理では、先ず、第7図に示すように、第1ブ
レイクポイント操作完了判定(力)を行なう。この判定
処理は、発電プラントlから取り込んだ各種プラント信
号の論理に基づき判定する。例えば、第2ブレイクポイ
ントの復水真空系統完了条件は、第11図に示すように
、発電プラント1から得られる復水ポンプ運転中信号S
s+と、復水器真空ポンプ運転中信号S12と、復水器
真空度S13を560mnl(gと比較して得られる信
号の3つの信号のANDで構成され、このAND条件が
成立するか否かによって復水真空系統の完了の成否が判
定さオする。
Next, the first power generation unit startup breakpoint processing (1
) will be explained in detail. In addition, the first power generation unit 1- in Fig. 6
Since the stop breakpoint process (a) is similar to the start breakpoint process (1), detailed explanation thereof will be omitted. In this process, first, as shown in FIG. 7, a first breakpoint operation completion determination (force) is performed. This determination process is performed based on the logic of various plant signals taken in from the power generation plant l. For example, the condensate vacuum system completion condition at the second breakpoint is as shown in FIG.
It is composed of the AND of three signals: s+, the condenser vacuum pump operating signal S12, and the signal obtained by comparing the condenser vacuum degree S13 with 560 mnl (g, and whether or not this AND condition is satisfied. The success or failure of completion of the condensate vacuum system is determined by

このようにして第1ブレイクポイン1〜操作が完了した
とき、第1ブレイクポイント操作完了状態機憶(キ)に
おいて、その状態を記憶し、次は第2ブレイクポイント
の処理に移る。しかし、第1ブレイクポイント操作完了
条件が成立しないときは、第1ブレイクポイント進行処
理(り)を実行する。
When the operation at the first breakpoint 1 is completed in this manner, the state is stored in the first breakpoint operation completion state memory (K), and the process then moves on to the second breakpoint. However, if the first breakpoint operation completion condition is not satisfied, the first breakpoint progress process (ri) is executed.

この進行処理(り)はその詳細を第8図に示すように、
先ず、ブレイクポイント操作条件成立判定(す)におい
て、プラント信号S1に基づいて、前述操作完了条件の
場合と同様にして、対応するブレイクポイントの操作条
件が成立しているかどうかを判定する。ブレイクポイン
1〜操作条件が成立した場合、次の進行許可PBオン判
定(シ)の処理を行なう。進行許可PBオン判定(シ)
において、自動化コンソールの進行ブツシュボタンオン
信号を判定し、進行ブツシュボタンオン信号が成立する
と、ブレイクポイン1−操作進行状態記憶(ソ)での処
理により、対応するブレイクポイントを操作進行状態と
識別し、それを記憶する。ブレイクポイント操作操作進
行状態記憶(ソ)の処理が終了すると、ブレイクポイン
1−進行処理が完了する。尚、ブレイクポイント繰作条
件成立判定(す)において、対応する操作条件が不成立
の場合、ブレイクポイント操作前状態記憶(ス)を処理
する。即ち、ブレイクポイント操作前状態記憶(ス)に
おいて、対応するブレイクポイントを操作前状態として
識別してそれを記憶し、対応するブレイクポイント進行
処理を完了する。尚、進行許可PBオン判定(シ)にお
いて、自動化コンソール4の進行ブツシュボタンオン信
号が不成立の時、ブレイクポイント操作開始可能状態記
憶(セ)を処理し、対応するブレイクポイントを操作開
始可能状態として記憶する。この処理が終了すると、対
応するブレイクポイント進行処理手順の処理が完了する
The details of this progress process are shown in Figure 8.
First, in determining whether a breakpoint operation condition is satisfied, it is determined whether the corresponding breakpoint operation condition is satisfied based on the plant signal S1 in the same manner as in the case of the operation completion condition described above. When the break point 1 to operation conditions are satisfied, the next proceeding permission PB on determination process (c) is performed. Progress permission PB on judgment (S)
, the progress button on signal of the automation console is determined, and when the progress button on signal is established, the corresponding breakpoint is set to the operation progress state by processing in breakpoint 1 - operation progress state memory (S). Identify and remember it. When the process of storing the breakpoint operation progress state (S) is completed, the breakpoint 1-progress process is completed. Note that in the breakpoint operation condition establishment determination (S), if the corresponding operation condition is not established, the breakpoint pre-operation state storage (S) is processed. That is, in the breakpoint pre-operation state storage (S), the corresponding breakpoint is identified and stored as the pre-operation state, and the corresponding breakpoint progress processing is completed. In addition, in the progress permission PB ON judgment (S), when the progress button ON signal of the automation console 4 is not established, the breakpoint operation start possible state memory (C) is processed and the corresponding breakpoint is set to the operation startable state. be memorized as . When this processing is completed, the processing of the corresponding breakpoint progress processing procedure is completed.

次に、第5図におけるCRT表示手段23の処理の詳細
について説明する。上述した発電プラント運転状態判定
手段22の各発電ユニットの各操作ブレイクポイントの
進行状態判定結果に基づいて、第9図のブレイクポイン
ト操作前状態判定(夕)において、対応するブレイクポ
イントが操作前状態である時、操作画識別符号表示(テ
)を処理し、CRT表示器3の対応するブレイクポイン
トに第4図に示したように操作画識別符号M1を出力す
る。前記の判定(夕)において、対応するブレイクポイ
ントが操作前状態でない時、次のブレイクポイン1、操
作開始可能状態判定(チ)を処理する。同判定(チ)に
おいて、対応するブレイクポイントが操作開始可能状態
である時、操作開始フリッカ−識別符号表示(ト)を処
理し、CRT表示器3の対応するブレイクポイントに操
作開始フリッカ−識別符号ト12を出力する。同判定(
チ)において、対応するブレイクポイントが操作開始可
能状態でない時、次のブレイクポイント操作進行状態(
ツ)を処理する。同判定(ツ)において、対応するブレ
イクポイントが操作進行状態である時、操作進行中識別
符号表示(す)を処理し、CRT表示器3の対応するブ
レイクポイントに操作進行中識別符号M3を出力する。
Next, details of the processing of the CRT display means 23 in FIG. 5 will be explained. Based on the progress state determination result of each operation breakpoint of each power generation unit by the power generation plant operation state determination means 22 described above, in the breakpoint pre-operation state determination (evening) of FIG. 9, the corresponding breakpoint is determined to be in the pre-operation state. When , the operation picture identification code display (te) is processed and the operation picture identification code M1 is output to the corresponding break point of the CRT display 3 as shown in FIG. In the above judgment (evening), if the corresponding breakpoint is not in the pre-operation state, the next breakpoint 1, operation start possible state judgment (h) is processed. In the same judgment (H), when the corresponding breakpoint is in the state where the operation can be started, the operation start flicker-identification code display (G) is processed, and the operation start flicker-identification code is displayed at the corresponding breakpoint on the CRT display 3. output 12. Same judgment (
In h), when the corresponding breakpoint is not in a state where operation can be started, the next breakpoint operation progress state (
). In the same judgment (T), when the corresponding breakpoint is in the operation progress state, the operation progress identification code display (S) is processed and the operation progress identification code M3 is output to the corresponding breakpoint on the CRT display 3. do.

前記の判定(ツ)において、対応するブレイクポイント
が進行状態でない時、対応する操作ブレイクポイン1−
が操作完了状態であるので、操作完了識別符号表示(ニ
)を処理し、CRT表示器3の対応するブレイクポイン
トに操作完了識別符号M4を出力する。
In the above judgment (2), when the corresponding breakpoint is not in the progress state, the corresponding operation breakpoint 1-
Since it is in the operation completion state, the operation completion identification code display (d) is processed and the operation completion identification code M4 is output to the corresponding break point of the CRT display 3.

次に、コンソール表示手段8は、前述した発電プラント
運転状態判定手段22の判定結果により、対応する発電
ユニットの任意のブレイクポイントが操作開始可能状態
の時、第3図の自動化コンソール4の対応する発電ユニ
ットの進行PBのランプを点灯するコンソール出力信号
を自動化コンソールへ出力し、発電プラン1〜N転状態
判定手段22の判定結果により、対応する発電ユニット
のすべてのブレイクポイントが操作可能状態でない時、
対応する発電ユニットの進行PB点灯するコンソール出
力信号をリセットする。即ち、第10図に示すように、
起動第1ブレイクポイント操作開始可能状態判定部(ハ
)において、判定した結果が第1ブレイクポイントが操
作開始可能状態である時、コンソール出力信号出力(マ
)を実行し、第3図の対応する発電ユニットの進行PB
のランプを点灯する。判定した結果として第1ブレイク
ポイントが操作開始可能状態でない時、次のブレイクポ
イン1−の操作開始可能状態を判定する。このようにし
て、すべてのブレイクポイン1へが操作開始可能状態で
なり)時、コンソール出力信号リセツ1−(ホ)を実行
し、対応する発電ユニットの進行許可I’Bのランプを
リセットする。
Next, the console display means 8 displays the corresponding break point of the automation console 4 in FIG. A console output signal that lights up the progress PB lamp of the power generation unit is output to the automation console, and according to the determination result of the power generation plan 1 to N rotation state determination means 22, when all the break points of the corresponding power generation unit are not in an operable state. ,
Reset the console output signal that lights up the progress PB of the corresponding power generation unit. That is, as shown in FIG.
In the activation first breakpoint operation startable state determination unit (c), when the determined result is that the first breakpoint is in an operation startable state, executes console output signal output (m) and outputs the corresponding signal in FIG. Power generation unit progress PB
Turn on the lamp. If the first breakpoint is not in an operation startable state as a result of the determination, it is determined whether the next breakpoint 1- is in an operation startable state. In this way, when all break points 1 are ready to start operation, the console output signal reset 1-(e) is executed to reset the advance permission I'B lamp of the corresponding power generation unit.

第5図の許可PBオン検出手段25と制御出力手段26
においては、先ず、許可PBオン検出手段25によって
自動化コンソール4からの進行許可PBオン信号を検出
すると、次の制御出力手段26により発電プラントへ制
御信号を出力し、発電ユニッ1〜の運転制御を行なう。
Permission PB on detection means 25 and control output means 26 in FIG.
First, when the permission PB on detection means 25 detects a proceeding permission PB on signal from the automation console 4, the next control output means 26 outputs a control signal to the power generation plant and controls the operation of the power generation units 1 to 1. Let's do it.

このように、複数発電ユニットの起動、停止操作に関す
る各ブレイクポイン1−の運転状態をCRT表示器3に
表示することにより、運転員が容易に複数発電ユニット
の運転進行状況を確J、忍することができる。また、運
転員はCRT表示器で複数発電ユニツ1−の運転進行状
況を監視しながら、複数発電ユニット運転に必要な発電
ユニット起動、停止。
In this way, by displaying the operating status of each break point 1- regarding the start and stop operations of multiple power generating units on the CRT display 3, operators can easily confirm the operational progress status of multiple power generating units. be able to. Additionally, the operator starts and stops the power generation units necessary for the operation of multiple power generation units while monitoring the operating progress of the multiple power generation units 1- on the CRT display.

進行許可指令を自動化コンソール4で要求するが、自動
化コンソール4がコンバク1〜化されるため、操作性が
向上する。
A proceeding permission command is requested from the automated console 4, but since the automated console 4 is converted into a 1-1/2000 controller, operability is improved.

ところで、上記実施例では、起動モードPB、停止モー
ドPB、進行PBを各発電ユニット毎に配列した例につ
いて説明したが、これらの各PBを各発電ユニット共通
に使用することにより、自動化コンソールをよりコンバ
ク1−にすることができる。
By the way, in the above embodiment, an example was explained in which the start mode PB, stop mode PB, and progress PB are arranged for each power generation unit, but by using these PBs in common for each power generation unit, the automation console can be made more efficient. It can be made into 1-.

第12図はそのための本発明の第2実施例に係る自動化
コンソールを示したもので、発電ユニット選択部50.
起動モード部51.停止モード28部52および進行P
B部53から植成される。同図の発電ユニット選択部5
0は、発電ユニツ1−に対応する数字をセラI・できる
ものである。例えば、発電ユニット選択部に数字1をセ
ットすると、第12図の自動化コンソールは第1発電ユ
ニットとして使用される。この実施例によると、自動化
コンソールを操作する時、発電ユニット選択部50を操
作する手順が増える。また、進行PBは全発電ユニッ1
−に対し、共用しているため、発電ユニッ1〜のブレイ
クポイン1〜が操作開始可能状態にある時、運転員に進
行許可を押すように対応する発電ユニッ1−の進行許可
13Bをフリッカ−することができないが、この実施例
においては自動化コンソールをよりコンパクト化するこ
とができる利点が得られる。
FIG. 12 shows an automation console according to a second embodiment of the present invention for this purpose, in which a power generation unit selection section 50.
Startup mode section 51. Stop mode 28 part 52 and progress P
It is planted from part B 53. Power generation unit selection section 5 in the same figure
0 is a number that corresponds to the power generation unit 1-. For example, if the number 1 is set in the power generation unit selection section, the automation console of FIG. 12 will be used as the first power generation unit. According to this embodiment, when operating the automation console, the number of steps for operating the power generation unit selection section 50 is increased. In addition, the progress PB is for all power generation units 1
- is shared, so when break point 1~ of power generation unit 1~ is ready to start operation, flicker the advance permission 13B of the corresponding power generation unit 1~ to ask the operator to press advance permission. However, this embodiment has the advantage of making the automation console more compact.

第13図は本発明の第3実施例を示したもので、自動化
コンソール基本部60は第3図の自動化コンソールと同
様な構成であり、発電ユニット表示選択部61は、第1
発電ユニット〜表示選択PBから第11発電ユニット表
示選択PBより構成される。第14図はこの実施例にお
ける電子計算機の機能ブロック図を示したもので、図中
、第5図と同一符号は同一または相当部分を示し、異な
る点は発電ユニット表示選択手段27を付加した点であ
る。
FIG. 13 shows a third embodiment of the present invention, in which an automation console basic section 60 has the same configuration as the automation console shown in FIG.
It is composed of power generation unit to display selection PB to 11th power generation unit display selection PB. FIG. 14 shows a functional block diagram of the computer in this embodiment. In the figure, the same reference numerals as in FIG. 5 indicate the same or corresponding parts, and the difference is that a power generation unit display selection means 27 is added. It is.

コンソール信号S4は、複数発電ユニツ1〜の起動PB
オン、停止PBオン、および進行許可PRオンの他に、
発電ユニット表示選択PBオンを含んでいる。
The console signal S4 is the activation PB of multiple power generation units 1~
In addition to on, stop PB on, and proceed permission PR on,
Includes power generation unit display selection PB on.

また、その発電ユニット表示選択手段27の処理内容は
第15図に示される。
Further, the processing contents of the power generation unit display selection means 27 are shown in FIG.

第16図は、CrlT表示器3に表示される各発電ユニ
ットに対するブレイクポイント一覧表を示したものであ
る。
FIG. 16 shows a list of breakpoints for each power generation unit displayed on the CrlT display 3.

以上の構成で1M転員は第13図の発電ユニッ1へ表示
選択自動化コンソールを使って監視したい発電ユニット
を選択する。同コンソールの発電ユニット表示選択部6
1上のPBを押すことにより、任意に監視したい発電ユ
ニットを選択することができる。
With the above configuration, the 1M employee selects the power generation unit he wishes to monitor using the display selection automation console for the power generation unit 1 shown in FIG. Power generation unit display selection section 6 of the same console
By pressing PB above 1, you can arbitrarily select the power generation unit you wish to monitor.

第14図の入力読込手段21において、表示選択自動化
コンソール400から運転員によって選択された発電ユ
ニット表示選択信号を入力する。同図の発電ユニッ1〜
表示選択手段27において、入力読込手段21によって
入力された発電ユニッ1−表示選択信号に基づいて、C
IIT表示器3に発電状態を表示する発電ユニットを選
択する。即ち、第15図に示すように、第1発電ユニッ
ト表示選択要求(ム)であるか否かを判定し、第1発電
ユニット−表示選択であれば、次の第1発電ユニットC
RT表示(メ)を実行する。第1発電ユニッhCRT表
示(メ)は、発電ユニット運転状態をC旧゛表示器に表
示するものであり、その詳細な処理内容は第9図で既に
説明したので、ここで省略をする。第15図において、
第1発電ユニット表示選択でない場合、第1発電ユニッ
ト−のCR1表示を実行せず、そのまま第1発電ユニッ
ト〜の処理に入る。以下、同様にして第【1発電ユニッ
1−までの発電ユニッ1〜選択処理を実行し、ここでの
処理を終了する。
The input reading means 21 shown in FIG. 14 inputs the power generation unit display selection signal selected by the operator from the display selection automation console 400. Power generation unit 1~ in the same figure
In the display selection means 27, based on the power generation unit 1 display selection signal inputted by the input reading means 21, C
Select the power generation unit whose power generation status is to be displayed on the IIT display 3. That is, as shown in FIG. 15, it is determined whether or not it is a first power generation unit display selection request (MU), and if it is a first power generation unit display selection request, the next first power generation unit C is selected.
Execute RT display (me). The first power generation unit hCRT display (me) is for displaying the power generation unit operating status on the C display, and since the detailed processing content has already been explained in FIG. 9, it will be omitted here. In Figure 15,
If the display of the first power generation unit is not selected, the CR1 display of the first power generation unit is not executed, and the processing for the first power generation unit is directly entered. Thereafter, the selection process for the power generation units 1 to 1st power generation unit 1- is executed in the same manner, and the process here ends.

例えば、運転員が発電ユニット表示選択部61の第1発
電ユニット表示選択PBおよび第5発電ユニット表示選
択PBを押せば、そのオン信号に応じて発電ユニット表
示選択手段27で表示選択処理を行なう結果、CRT表
示器3の表示画面上には、第16図に示すように、第1
発電ユニット−および第5発電ユニットのみが表示され
、他の発電ユニットは表示されない。
For example, when an operator presses the first power generation unit display selection PB and the fifth power generation unit display selection PB of the power generation unit display selection section 61, the power generation unit display selection means 27 performs display selection processing in response to the ON signal. , on the display screen of the CRT display 3, as shown in FIG.
Only the power generation unit - and the fifth power generation unit are displayed, and the other power generation units are not displayed.

このように第3実施例によれば、運転員が監視したい発
電ユニットを選択し、その運転状態をCRT表示器3に
表示することができる。一般に複数台の発電ユニットよ
り構成される発電プラントの発電ユニットの起動、停止
は、発電プラントの負荷変化に応じて行なわれ、発電プ
ラントの負荷が高い時、発電ユニットの運転台数を増加
し、発電プラントの負荷が低い時、発電ユニットの運転
台数を減少する。また、各発電ユニットの起動、停止間
隔は、発電プラントの負荷液fヒ率によって決められる
。負荷変化率が大きい時、発電ユニットの起動または停
止間隔を短くし、負荷変化率が小さい時1発電ユニット
の起動または停止間隔を長くする。従って、複数台の発
電ユニットを同時に起動、停止することがないので、任
意の発電ユニットを選択してCRT表示器に表示するこ
とは、情報を集約して表示することとなり、運転員が発
電プラントの運転監視をし易くなる。
In this way, according to the third embodiment, the operator can select the power generation unit he or she wants to monitor and display its operating status on the CRT display 3. Generally, the power generation units in a power generation plant consisting of multiple power generation units are started and stopped in response to changes in the load of the power generation plant.When the load on the power generation plant is high, the number of operating power generation units is increased and the power generation When the load on the plant is low, the number of operating power generation units is reduced. Furthermore, the start and stop intervals of each power generation unit are determined by the load fluid f ratio of the power generation plant. When the load change rate is large, the start or stop interval of the power generation unit is shortened, and when the load change rate is small, the start or stop interval of one power generation unit is lengthened. Therefore, since multiple power generation units are not started or stopped at the same time, selecting any power generation unit and displaying it on the CRT display means that the information is aggregated and displayed, and the operator can It becomes easier to monitor the operation of the vehicle.

第17図は、本発明の第4実施例を示したものである。FIG. 17 shows a fourth embodiment of the present invention.

図中、第2図と同一符号は同一部分を示し、異なる点は
自動化コンソール4の代りにタッチスクリーン装置5を
用いた点である。尚、このタッチスクリーン装置は従来
公知のようにCIIT画面の直前に置いて用いる。
In the figure, the same reference numerals as in FIG. 2 indicate the same parts, and the difference is that a touch screen device 5 is used instead of the automation console 4. Note that this touch screen device is used by being placed just in front of the CIIT screen as is conventionally known.

第18図は第17図の電子計算4!&2の詳細機能ブロ
ックを示した図である。図中、第5図と同一符号は同一
部分を示し、異なる点はコンソール表示手段24、許可
PBオン検出手段25の代りにタッチスクリーン操作位
置検出手段28を設けた点である。
Figure 18 is electronic calculation 4 of Figure 17! It is a diagram showing detailed functional blocks of &2. In the figure, the same reference numerals as in FIG. 5 indicate the same parts, and the difference is that a touch screen operation position detection means 28 is provided in place of the console display means 24 and the permission PB on detection means 25.

第19図はそのタッチスクリーン操作位置検出手段28
の詳細内容を示す図である。また、第20図はCRT表
示器孕の表示画面を示したもので、図中、第4図と同一
符号は同一部分を示し、35は起動モード選択表示部、
36は停止モード選択表示部、37は進行許可状態表示
部である。
FIG. 19 shows the touch screen operation position detection means 28.
FIG. 2 is a diagram showing detailed contents. Further, FIG. 20 shows a display screen of a CRT display device, in which the same reference numerals as in FIG. 4 indicate the same parts, and 35 is a startup mode selection display section;
36 is a stop mode selection display section, and 37 is a proceed permission state display section.

以上の構成で、第20図に示すタッチスクリーンCl1
T表示部の起動モード選択表示部35上の数字を押すこ
とにより、第6図に示した対応する発電ユニット運転モ
ード判定(ア)において、対応する発電ユニットが起動
モードであることを判定する。
With the above configuration, the touch screen Cl1 shown in FIG.
By pressing the number on the startup mode selection display section 35 of the T display section, it is determined that the corresponding power generation unit is in the startup mode in the corresponding power generation unit operation mode determination (a) shown in FIG. 6.

第20図のCRT表示部の停止モード選択表示部36上
の数字を押すことにより、第6図に示した対応する発電
ユニット運転モード判定(ア)において、対応する発電
ユニットが停止モードであることを判定する。第20図
の進行許可状態表示部37上の任意の操作開始フリッカ
−識別符号N2表示中の部分を押すと、第19図の対応
ブレイクポイン1−の進行許可のタッチ操作オン判定部
(う)において、対応する発電ユニットの進行許可がオ
ンと判定し、次の処理が行なわれる。その他の作用につ
いては、前記の実施例と同様であるため、ここでは説明
を省略する。
By pressing the number on the stop mode selection display section 36 of the CRT display section in FIG. 20, the corresponding power generation unit is in the stop mode in the corresponding power generation unit operation mode determination (a) shown in FIG. 6. Determine. When you press the arbitrary operation start flicker on the progress permission state display section 37 in FIG. 20 - the part where the identification code N2 is displayed, the touch operation ON judgment section for progress permission at the corresponding break point 1 in FIG. 19 (U) In this step, it is determined that the permission for proceeding of the corresponding power generation unit is on, and the following processing is performed. The other functions are the same as those in the previous embodiment, so their explanation will be omitted here.

この第4実施例によれば、複数台の発電ユニツトより構
成する発電プラン1への運転において、自動化コンソー
ルを削除することができる。複数台発電ユニットの総合
運転を行なうため、監視計器の集約化はプラントの安全
運転に重要であるので、自動化コンソールを削除できる
ことは大きな効果がある。また、CRT表示器に表示さ
れている図形」−に、運転操作を行なうので、監視と操
作と力1一体となり、マンマシンインタフェースの性能
が向上し、誤操作による事故を少なくすることができる
According to the fourth embodiment, it is possible to eliminate the automation console when operating the power generation plan 1 which is composed of a plurality of power generation units. Since the integration of monitoring instruments is important for safe operation of the plant in order to perform comprehensive operation of multiple power generation units, being able to eliminate the automation console has a great effect. In addition, since driving operations are performed based on the graphics displayed on the CRT display, monitoring, operation, and force are integrated, improving the performance of the man-machine interface and reducing accidents caused by erroneous operations.

尚、以上の実施例では表示装置としてCRI″表示器を
用いた例で説明したが、これ以外の例えば液晶表示器等
任意の表示装置を用い得ることは勿論のことである。
Although the above embodiments have been described using the CRI'' display as the display device, it is of course possible to use any other display device such as a liquid crystal display.

[発明の効果] 以上のように本発明によれば、従来の自動化コンソール
に比べてコンソール部分が極めてコンノくクトになり、
監視操作性が向上し、確認ミス等力1無くなり、複数ユ
ニットから成る発電プラントを安全に運転することがで
きるようになる。
[Effects of the Invention] As described above, according to the present invention, the console part is extremely streamlined compared to conventional automation consoles, and
Monitoring operability is improved, confirmation errors, etc. are eliminated, and power plants consisting of multiple units can be operated safely.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来の自動化コンソール表面構成図、第2図は
本発明の第1実施例に係る発電プラン1へ自動運転監視
操作装置の全体構成図、第3図は本発明の第1実施例に
係る自動化コンソール表面構成図、第4図は第2図のC
RT表示器表示部構成図、第5図は第2図の電子計算機
部分の詳細構成図、第6図は第5図の発電プラント運転
状態判定処理図、第7図は第6図の発電ユニツ1〜起動
ブレイクポイント処理図、第8図は第7図のブレイクポ
イント進行処理図、第9図は第5図のCRT表示手段の
処理図、第10図は第5図のコンソール表示手段の処理
図、第11図は復水真空系統完了条件図、第12図は本
発明の第2実施例に係る発電ユニット表示選択自動化コ
ンソール表面構成図、第13図は本発明の第3実施例に
係る発電ユニット表示選択自動化コンソール表面構成図
、第14図は本発明の第3実施例に係る発電ユニット表
示選択手段および電子計算機部分の詳細構成図、第15
図は本発明の第3実施例に係る発電ユニット表示選択手
段処理図、第16図は本発明の第3実施例に係る選択表
示CRT表示器表示部構成図、第17図は本発明の第4
実施例に係る発電プラント自動運転監視操作装置の全体
構成図、第18図は本発明の第4実施例に係るタッチス
クリーンおよび電子計算機部分の詳細構成図、第19図
は第18図のタッチスクリーンブレイクポイン1−進行
処理図、第20図は本発明の第4実施例に係るタッチス
クリーンCRT表示器表示部構成図である。 21・・・入力読込手段、22・・・発電プラント運転
状態判定手段、23・・・CRT表示手段、24・・・
コンソール表示手段、25・・・許可PBオン検出手段
、26・・・制御出力手段、27・・・発電ユニツ1へ
表示選択手段、30・・・発電ユニツ1へ識別部、31
・・・起動モード表示部、32・・・停止モード表示部
、33・・・ブレイクポイント表示部、34・・ 進行
状態表示部、35・・・起動モード選択表示部、36・
・・停−化モード選択表示部、37・・・進行許可状態
表示部、40・・・発電ユニット表示部、41・・・起
動モード表示部、42・・−停止モートPB部、43・
・・進行PLI部、50・・・発電ユニッ1へ選択部、
51・・・起動モードpn、52・・・停止モードPB
、53・・・進行PB、400−・・・−表示選択自動
化コンソール。 第1図 A 第2図 第3図 第4図 第5図 第6図 第8図 第9図 第14図 第15図
FIG. 1 is a surface configuration diagram of a conventional automation console, FIG. 2 is an overall configuration diagram of an automatic operation monitoring and operation device for power generation plan 1 according to a first embodiment of the present invention, and FIG. 3 is a diagram of a first embodiment of the present invention. Figure 4 is a diagram showing the surface configuration of the automation console related to C in Figure 2.
5 is a detailed configuration diagram of the electronic computer part of FIG. 2, FIG. 6 is a diagram of the power generation plant operation status determination processing diagram of FIG. 5, and FIG. 7 is a diagram of the power generation unit of FIG. 6. 1 to startup breakpoint processing diagram, FIG. 8 is a breakpoint progress processing diagram of FIG. 7, FIG. 9 is a processing diagram of the CRT display means of FIG. 5, and FIG. 10 is a processing diagram of the console display means of FIG. 5. Fig. 11 is a condensing vacuum system completion condition diagram, Fig. 12 is a surface configuration diagram of the power generation unit display selection automation console according to the second embodiment of the present invention, and Fig. 13 is a diagram of the surface configuration of the power generation unit display selection automation console according to the third embodiment of the present invention. FIG. 14 is a surface configuration diagram of the power generation unit display selection automation console, and FIG. 14 is a detailed configuration diagram of the power generation unit display selection means and computer portion according to the third embodiment of the present invention.
16 is a diagram showing the process of the power generation unit display selection means according to the third embodiment of the present invention, FIG. 16 is a configuration diagram of the selection display CRT display unit according to the third embodiment of the present invention, and FIG. 4
18 is a detailed configuration diagram of the touch screen and computer portion according to the fourth embodiment of the present invention, and FIG. 19 is the touch screen of FIG. 18. Breakpoint 1 - Progress Processing Diagram FIG. 20 is a diagram showing the configuration of the display section of a touch screen CRT display according to a fourth embodiment of the present invention. 21... Input reading means, 22... Power plant operating state determining means, 23... CRT display means, 24...
Console display means, 25... Permission PB ON detection means, 26... Control output means, 27... Display selection means for power generation unit 1, 30... Identification section for power generation unit 1, 31
... Start mode display section, 32... Stop mode display section, 33... Break point display section, 34... Progress status display section, 35... Start mode selection display section, 36.
... Stop mode selection display section, 37... Progress permission state display section, 40... Power generation unit display section, 41... Start mode display section, 42... - Stop mode PB section, 43.
... Progress PLI section, 50... Selection section to power generation unit 1,
51...Start mode pn, 52...Stop mode PB
, 53...Progress PB, 400-...-Display selection automation console. Figure 1 A Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 8 Figure 9 Figure 14 Figure 15

Claims (1)

【特許請求の範囲】 (1) 発電ユニットの起動時および停止時に行なわれ
る一連の運転操作を複数のブレイクポイントに分け、更
に、それぞれのブレイクポイントを操作前状態、操作開
始可能状態、操作進行状態、操作完了状態の4つの運転
状態に分りで表示する一方、運転員の確認操作の下に前
記各ブレイクポイントの運転操作を順次進めていく複数
発電ユニットから成る発電プラント自動運転監視操作装
置において、表示装置を設け、その表示画面上に各発電
ユニツ1−に対する各ブレイクポイントの運転状態を表
形式にして表示すると共に、その表の対応する欄に前記
4つの運転状態を識別可能な符号で表示する一方、各発
電ユニット毎に起動、停止、操作進行許可を与える各押
ボタンを設け、前記表示画面上の表示と、これら押ボタ
ンにより各ブレイクポイント運転操作の確認操作を行な
うことを特徴とする発電プラント自動運転監視操作装置
。 (2、特許請求の範囲第1項記載において、ブレイクポ
イントが操作開始可能状態の時、前記操作進行状態押ボ
タンをフリッカ−させる一方、その押ボタンが押された
ときブレイクポイントの操作を進めることを特徴とする
発電プラント自動運転監視操作装置。 (3)特許請求の範囲第1項記載において、前記起動、
停止、操作進行許可を与える押ボタンを各発電ユニット
共通に一組設けたことを特徴とする発電プラント自動運
転監視操作装置。 (4)特許請求の範囲第1項記載において1発電ユニッ
1−の各ブレイクポイントの運転状態を選択的に表示す
るための表示選択押ボタンを設け、この押ボタンを押す
ことにより、必要な表示のみを行なうことを特徴とする
発電プラント自動運転監視操作装置。 (5)発電ユニットの起動時および停止時に行なわれる
一連の運転操作を複数のブレイクポイントに分け、更に
、それぞれのブレイクポイントを操作前状態、操作開始
可能状態、操作進行状態、操作完了状態の4つの運転状
態に分けて表示する一方、運転員の確認操作の下に前記
各ブレイクポイントの運転操作を順次進めていく複数発
電ユニッl−から成る発電プラント自動運転監視操作装
置において、表示装置を設け、その表示画面上に各発電
ユニットに対する各ブレイクポイントの運転状態を表形
式にして表示すると共に、その表の対応する欄に前記4
つの運転状態を識別可能な符号で表示する一方、その表
示装置の表示画面の直前にタッチスクリーンを設け、表
示画面を見ながらタッチスクリーンを押すことにより、
各ブレイクポイント運転操作の確認操作を行なうことを
特徴とする発電プラント自動運転監視操作装置。
[Claims] (1) A series of operating operations performed when starting and stopping the power generation unit is divided into a plurality of break points, and each break point is divided into a pre-operation state, an operation ready state, and an operation progress state. , in a power generation plant automatic operation monitoring and operation device consisting of a plurality of power generation units that displays four operating states including an operation completion state and sequentially proceeds with the operation at each break point under the operator's confirmation operation, A display device is provided, and the operating status of each breakpoint for each power generation unit 1- is displayed in a table format on the display screen, and the four operating statuses are displayed in the corresponding columns of the table with distinguishable codes. On the other hand, each power generation unit is provided with pushbuttons for starting, stopping, and permitting operation progress, and the display on the display screen and confirmation of each breakpoint operation are performed using these pushbuttons. Power plant automatic operation monitoring and operation device. (2. In claim 1, when the breakpoint is ready to start operation, the operation progress state push button is flickered, and when the push button is pressed, the operation of the breakpoint is advanced. A power generation plant automatic operation monitoring and operating device characterized by: (3) In claim 1, the activation;
A power generation plant automatic operation monitoring and operation device characterized in that a set of push buttons for giving permission to stop and proceed with operation are provided in common to each power generation unit. (4) In claim 1, a display selection push button for selectively displaying the operating status of each break point of one power generation unit 1- is provided, and by pressing this push button, necessary display can be performed. A power generation plant automatic operation monitoring and operation device that performs only the following functions. (5) Divide the series of operating operations performed when starting and stopping the power generation unit into multiple breakpoints, and further divide each breakpoint into four states: pre-operation state, operation ready state, operation progress state, and operation completion state. A display device is installed in an automatic operation monitoring and operation system for a power generation plant consisting of multiple power generation units, which displays the operating status of each breakpoint in sequence while displaying the operating status separately. , the operating status of each breakpoint for each power generation unit is displayed in a table format on the display screen, and the above-mentioned 4.
While displaying two operating conditions with distinguishable codes, a touch screen is provided just in front of the display screen of the display device, and by pressing the touch screen while looking at the display screen,
A power generation plant automatic operation monitoring and operating device characterized by performing a confirmation operation for each breakpoint operation.
JP58201014A 1983-10-28 1983-10-28 Generator plant automatic operation monitoring and operating device Granted JPS6096138A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP58201014A JPS6096138A (en) 1983-10-28 1983-10-28 Generator plant automatic operation monitoring and operating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP58201014A JPS6096138A (en) 1983-10-28 1983-10-28 Generator plant automatic operation monitoring and operating device

Publications (2)

Publication Number Publication Date
JPS6096138A true JPS6096138A (en) 1985-05-29
JPS6341299B2 JPS6341299B2 (en) 1988-08-16

Family

ID=16434045

Family Applications (1)

Application Number Title Priority Date Filing Date
JP58201014A Granted JPS6096138A (en) 1983-10-28 1983-10-28 Generator plant automatic operation monitoring and operating device

Country Status (1)

Country Link
JP (1) JPS6096138A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62110447A (en) * 1985-11-07 1987-05-21 株式会社東芝 Monitor and control of power system
JPS6415794A (en) * 1987-07-10 1989-01-19 Fuji Electric Co Ltd Operation guide of operation panel for controller
JPH04265625A (en) * 1991-02-18 1992-09-21 Yamatake Honeywell Co Ltd Plant managing device
JP2005346562A (en) * 2004-06-04 2005-12-15 Yokogawa Electric Corp Plant operation support apparatus

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62110447A (en) * 1985-11-07 1987-05-21 株式会社東芝 Monitor and control of power system
JPS6415794A (en) * 1987-07-10 1989-01-19 Fuji Electric Co Ltd Operation guide of operation panel for controller
JPH04265625A (en) * 1991-02-18 1992-09-21 Yamatake Honeywell Co Ltd Plant managing device
JP2005346562A (en) * 2004-06-04 2005-12-15 Yokogawa Electric Corp Plant operation support apparatus
JP4517342B2 (en) * 2004-06-04 2010-08-04 横河電機株式会社 Plant operation support device

Also Published As

Publication number Publication date
JPS6341299B2 (en) 1988-08-16

Similar Documents

Publication Publication Date Title
KR20040044929A (en) Programme-controlled domestic appliance comprising a display device
JPS6096138A (en) Generator plant automatic operation monitoring and operating device
CN108806378A (en) Ship oil separator automatic control system simulator
EP0275192A2 (en) Reconfigurable integrated controls and displays for a turbomachine
JPH0668692B2 (en) Power plant automatic operation monitoring controller
JP2010048683A (en) Device testing system
JP2618964B2 (en) Plant progress monitoring device
JP2001290532A (en) Power generating operation management system, power generating operation system total operation managing device, and storage medium
JPH09160842A (en) Bus load test system
JPS5958507A (en) Display device for operating state of plant
JP2528386B2 (en) Failure diagnosis method
JPS63191180A (en) Plant simulator
JPS6386039A (en) Display device for simulation result
JPS58217007A (en) Monitor and control equipment of electric power plant
JPS6352209A (en) Display/operation system for man-machine interface
JPS62262611A (en) Computer system for centralized monitoring and control of steam plant
JPS61263484A (en) Method for selectively controlling operation mode of washingmachine
JPH0738122B2 (en) Plant operating equipment
JP3530628B2 (en) Water heater
JPS588311A (en) Sequence controller
JPH05223982A (en) Plant monitoring apparatus
JPH0650035Y2 (en) High frequency heating device
JPH024023B2 (en)
JPH09244736A (en) Plant operation monitor device
JPH0244198B2 (en)