JPH09160842A - Bus load test system - Google Patents

Bus load test system

Info

Publication number
JPH09160842A
JPH09160842A JP7320039A JP32003995A JPH09160842A JP H09160842 A JPH09160842 A JP H09160842A JP 7320039 A JP7320039 A JP 7320039A JP 32003995 A JP32003995 A JP 32003995A JP H09160842 A JPH09160842 A JP H09160842A
Authority
JP
Japan
Prior art keywords
test
load factor
load
test program
bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP7320039A
Other languages
Japanese (ja)
Inventor
Yoshiko Yamazaki
山▲崎▼佳子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP7320039A priority Critical patent/JPH09160842A/en
Publication of JPH09160842A publication Critical patent/JPH09160842A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Test And Diagnosis Of Digital Computers (AREA)
  • Debugging And Monitoring (AREA)

Abstract

PROBLEM TO BE SOLVED: To automatically detect the item of a test program in a high load state by providing a load factor measuring means which measures the load factor on a bus and monitoring whether the load factor is larger than a reference value, and recording a run execution state such as test items, etc., of plural test programs when the load factor exceeds the reference value. SOLUTION: A communication area 10 is provided, the test item and test conditions of a test program A are entered in an area A, and the test items and test conditions of test programs B and C are similarly entered in areas B and C. An actuation execution part 4 of a test monitor part 11 is actuated and when a test program part 12 starts the test programs A and B, the 1st test item (a) and test conditions of the test program A are entered in the area A. Similarly, the item (a) and test conditions are entered in the areas B and C. The load factor of the bus at this time is continuously measured by the load factor measurement part 1 and when the measured factor exceeds the reference value, the execution items of the respective test program are recorded.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明はデータ処理装置にお
けるバス負荷試験方式に係り、特にバスの負荷率を測
定、記録することにより、高負荷試験を有効に実施でき
るようにした実施試験プログラムの組み合わせを提供可
能としたものに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bus load test method in a data processing device, and in particular, a combination of execution test programs for effectively executing a high load test by measuring and recording the load rate of the bus. Related to what can be provided.

【0002】[0002]

【従来の技術】データ処理装置では、複数のプログラム
が同時に処理されるため、バスが高負荷率状態で使用さ
れることが多く、そのためデータ処理装置のテスト項目
としてバスの高負荷試験が行われている。ここでバスの
負荷率とは、バス上にデータ「1」の存在している割合
である。
2. Description of the Related Art In a data processing device, since a plurality of programs are processed simultaneously, the bus is often used in a high load factor state. Therefore, a high load test of the bus is performed as a test item of the data processing device. ing. Here, the load factor of the bus is the ratio of data “1” existing on the bus.

【0003】従来、データ処理装置のバスに対する高負
荷試験を実施する際には、試験プログラムの機能設計書
などからバスに対するアクセス頻度を予測し、最も高負
荷を実現する試験プログラムを組み合わせて実行してい
た。このとき、バスの負荷状態は試験実施者が、既存の
負荷率測定器を用いて手操作により測定していた。
Conventionally, when performing a high load test on a bus of a data processing device, the access frequency to the bus is predicted from a functional design document of the test program and the test programs that realize the highest load are combined and executed. Was there. At this time, the load condition of the bus was manually measured by the tester using the existing load factor measuring device.

【0004】例えば図10に示す如く、試験プログラム
A、B、Cを動作させて試験実施中のバスへの負荷率
を、実施時間中のサンプリング時間、、、にお
いて、その所々をサンプリングしていた。
For example, as shown in FIG. 10, the test programs A, B, and C are operated to sample the load factor on the bus during the test at each sampling point during the test time. .

【0005】[0005]

【発明が解決しようとする課題】このように、従来で
は、試験実施中の所々をサンプリングしていたに過ぎな
いため、図10に示す如く、時刻、におけるよう
に、最も負荷率が高くなるタイミングを厳密に得ること
が出来なかった。
As described above, in the prior art, since only the points during the test are sampled, the timing at which the load factor becomes the highest, as shown in FIG. 10, is at the time. Could not be obtained exactly.

【0006】また、試験プログラムが数多く存在する場
合、より高負荷を実現出来るプログラムの組み合わせ
を、試験プログラムの項目単位まで自動的に記録する手
段が存在せず、従来は、サンプリング時間毎にこれをマ
ニアルで書留めるしかできなかった。
Further, when there are many test programs, there is no means for automatically recording the combination of programs capable of realizing a higher load up to the item unit of the test program. I could only write it down in a manual.

【0007】従って、図10におけるサンプリング時間
の如き高負荷状態を実現しても、実際には時刻、
のようなもっと高負荷状態が存在するにもかかわらず、
これらを検知できないため、その信頼度は低いものであ
った。
Therefore, even if a high load condition such as the sampling time in FIG.
Despite the existence of higher load conditions such as
Since they could not be detected, their reliability was low.

【0008】従って本発明の目的は、試験プログラムの
動作に応じて負荷率を検出して、高負荷の状態のとき走
行している試験プログラムの項目を自動的に検知可能と
したバス負荷試験方式を提供することである。
Therefore, an object of the present invention is to detect the load factor according to the operation of the test program, and to automatically detect the items of the test program running under the high load condition. Is to provide.

【0009】[0009]

【課題を解決するための手段】前記目的を達成するた
め、本発明では、図1(B)に示す如く、試験プログラ
ムA、B、Cを動作させ、そのときのバスの負荷率を、
負荷率測定器1により連続測定し、この負荷率が予め定
められた高負荷基準値Th以上になった時刻、、
、・・・のときの各試験プログラムの実行項目を記
録する。
In order to achieve the above object, in the present invention, as shown in FIG. 1B, the test programs A, B and C are operated, and the load factor of the bus at that time is
When the load factor is continuously measured by the load factor measuring device 1 and the load factor becomes equal to or higher than a predetermined high load reference value Th,
Record the execution items of each test program when ...

【0010】このため、例えば図1(A)に示す如く、
通信領域10を設け、領域Aに試験プログラムAの試験
項目及び試験条件を記入し、領域Bに試験プログラムB
(図1(A)では省略)の試験項目及び試験条件を記入
し、領域Cに試験プログラムCの試験項目及び試験条件
を記入する。
Therefore, for example, as shown in FIG.
The communication area 10 is provided, the test items and test conditions of the test program A are entered in the area A, and the test program B is entered in the area B.
The test items and test conditions (not shown in FIG. 1A) are entered, and the test items and test conditions of the test program C are entered in area C.

【0011】図1(A)において、試験モニタ部11の
起動実行部4が起動して、試験プログラム部12におい
て、試験プログラムA、B、Cが起動されると、領域A
には試験プログラムAの最初の試験項目aと試験条件が
記入される。同様に領域B、Cにもそれぞれ項目aと試
験条件が記入される。
In FIG. 1A, when the activation execution unit 4 of the test monitor unit 11 is activated and the test programs A, B, and C are activated in the test program unit 12, the area A
The first test item a of the test program A and the test conditions are entered in. Similarly, items a and test conditions are entered in areas B and C, respectively.

【0012】例えば試験プログラムAが起動されると、
通信領域Aに試験状態を設定、つまり試験する項目aと
その試験条件(図1(A)では省略)とを設定し、それ
から試験項目aを実行する。次いで通信領域Aに試験す
る項目bとその試験条件(図1(A)では省略)とを設
定し、それから試験項目bを実行する。このようにして
最後の試験項目まで実行した後、再び初めの試験項目a
の実行に戻る。
For example, when the test program A is started,
A test state is set in the communication area A, that is, an item a to be tested and its test condition (not shown in FIG. 1A) are set, and then the test item a is executed. Next, the item b to be tested and its test condition (not shown in FIG. 1A) are set in the communication area A, and then the test item b is executed. After executing the last test item in this way, the first test item a is again executed.
Return to execution.

【0013】他の試験プログラムについても、起動され
ると、同様にして、それぞれの通信領域に試験項目とそ
の試験条件が記入され、実行される。このようなことが
繰返される。
When the other test programs are also activated, the test items and the test conditions are entered and executed in the respective communication areas in the same manner. Such a thing is repeated.

【0014】いま図1(B)における時刻になったと
き、図示省略した負荷率測定器からバスの負荷率が高負
荷基準値Thを超えた高負荷時の負荷率PA1が、試験
モニタ部11に通知されると、試験モニタ部11は、通
信領域10の領域A、B、Cを参照して、そのときの試
験項目と試験条件をそれぞれ取り出す。
At the time shown in FIG. 1B, the load rate PA1 at high load when the load rate of the bus exceeds the high load reference value Th from the load rate measuring device (not shown) is the test monitor unit 11. Then, the test monitor unit 11 refers to the areas A, B, and C of the communication area 10 and extracts the test items and test conditions at that time.

【0015】そして試験情報テーブルT1 にその測定さ
れた負荷率PA1と、各試験プログラムの試験項目と試
験条件を記入する。図1(A)では、説明簡略化のため
試験情報テーブルT1 には、高負荷時の負荷率PA1、
PA2と、そのときの試験プログラムの試験項目が示さ
れ、試験条件の表示は省略されている。
Then, the measured load factor PA1 and the test items and test conditions of each test program are entered in the test information table T 1 . In FIG. 1 (A), for simplification of description, the test information table T 1 includes a load factor PA1 at high load,
PA2 and the test items of the test program at that time are shown, and the display of the test conditions is omitted.

【0016】なお、試験モニタ部11では、前記時刻
、・・・において得られた負荷率PA1、PA2・
・・により、図1(B)に示す如き高負荷順位テーブル
2 を作成する。1回目は時刻で示す測定値のみであ
るので、その内容はそのときの試験プログラムA、B、
Cの試験項目と試験条件が記入される。図1(B)に示
すつまり高負荷順位テーブルT2 の右側に記載の如く、
時刻で実行された試験プログラムAの試験項目aとそ
の試験条件(図示省略)、試験プログラムBの試験項目
bとその試験条件(図示省略)、試験プログラムCの試
験項目bとその試験条件b(図示省略)が記入される。
In the test monitor section 11, the load factors PA1, PA2, ...
.. creates a high load rank table T 2 as shown in FIG. Since the first time is only the measured value indicated by the time, the contents are the test programs A, B,
The test items and test conditions of C are entered. As shown on the right side of the high load ranking table T 2 shown in FIG.
Test item a of test program A executed at a time and its test condition (not shown), test item b of test program B and its test condition (not shown), test item b of test program C and its test condition b ( (Not shown) is entered.

【0017】そして時刻では、時刻との負荷率を
比較したとき、時刻の方の負荷率が高順位つまり高負
荷率であることと、時刻、における各試験プログラ
ムの試験項目と試験条件(図示省略)が記入され、時刻
では、時刻〜の負荷率を比較したとき、時刻、
、の順位であることと、時刻、、における各
試験プログラムの試験項目と試験条件(図示省略)が記
入され、時刻では、時刻〜の負荷率を比較したと
き、時刻、、、の順位であること、時刻、
、、における各試験プログラムの試験項目と試験
条件(図示省略)が記入されている。
At the time, when comparing the load factor with the time, the load factor at the time is higher, that is, the load factor is higher, and the test items and test conditions of each test program at the time (not shown) are shown. ) Is entered, and at the time, when comparing the load factors from time to time,
, And the test items and test conditions (not shown) of each test program at time, are entered, and at time, when the load ratios from time to are compared, the order of time is, Thing, time,
The test items and test conditions (not shown) of each test program in, and are described.

【0018】これにより、従来のように、バスの負荷率
の高い状態を見逃すことなく検知するとともに、そのと
き実行中の各試験プログラムの各項目、各試験条件等を
得ることができるので、バスの負荷試験をどの程度の負
荷率で行ったのか判断できるのみならず、その高負荷状
態を再現可能とするのみならず、最も高い負荷状態を
も、試験プログラムにより実行することができるので、
試験結果の信頼度を向上することができる。
As a result, it is possible to detect the high load condition of the bus without fail, as in the conventional case, and obtain each item, each test condition, etc. of each test program being executed at that time. Not only is it possible to determine at what load rate the load test was performed, but it is also possible to reproduce that high load state, and because the highest load state can be executed by the test program,
The reliability of test results can be improved.

【0019】[0019]

【発明の実施の形態】本発明の第1の実施の形態を図2
及び図3に基づき説明する。図2は本発明の第1の実施
の形態構成図を示し、図3はその動作説明図である。図
中他図と同記号部は同一部を示し、1は負荷率測定器、
2は主記憶、3はバス、4は起動実行部、5は記録部、
6は順序制御部、7は基準値保持部、8は負荷率順位保
持部、10は通信領域、11は試験モニタ部、12は試
験プログラム部、13は表示装置、14はプリンタであ
る。
FIG. 2 shows a first embodiment of the present invention.
And FIG. FIG. 2 shows a block diagram of the first embodiment of the present invention, and FIG. 3 is an operation explanatory diagram thereof. In the figure, the same symbols as in other figures indicate the same parts, 1 is a load factor measuring device,
2 is a main memory, 3 is a bus, 4 is a boot execution unit, 5 is a recording unit,
Reference numeral 6 is an order control unit, 7 is a reference value holding unit, 8 is a load factor ranking holding unit, 10 is a communication area, 11 is a test monitor unit, 12 is a test program unit, 13 is a display device, and 14 is a printer.

【0020】負荷率測定器1は、バス3上のデータが
「1」である率を測定する測定器であって、公知のもの
であり、常時バス3上の負荷率を測定している。主記憶
2は、データ処理装置の主記憶を構成するものであっ
て、例えば中央処理装置により実行されるべきプログラ
ムを記憶したり、中央処理装置がデータ処理において必
要なデータを保持するものであり、本発明では試験プロ
グラムA、B、Cを格納したり、この試験プログラム
A、B、Cの動作に基づき作成される試験情報テーブル
1 、高負荷順位テーブルT2 等が保持されている。
The load factor measuring device 1 is a well-known device for measuring the ratio of the data on the bus 3 being "1", and constantly measures the load factor on the bus 3. The main memory 2 constitutes a main memory of the data processing device, and stores, for example, a program to be executed by the central processing device, and holds data necessary for the data processing by the central processing device. In the present invention, the test programs A, B and C are stored, and the test information table T 1 , the high load rank table T 2 and the like created based on the operations of the test programs A, B and C are held.

【0021】バス3は、主記憶2と中央処理装置間を接
続するバスである。起動実行部4はプログラムを起動
し、実行するものであり、例えば試験プログラムA、
B、Cを起動し、実行する。
The bus 3 is a bus connecting the main memory 2 and the central processing unit. The start-up execution unit 4 starts and executes a program, for example, the test program A,
Start B and C and execute.

【0022】記録部5は、負荷率測定器1が常時測定し
ているバス3の負荷率が入力されるものであり、この負
荷率が予め指定された基準値Th以上でかつ負荷率が例
えば2番目までの高負荷状態のとき、これを認識して通
信領域10の領域A、B、Cをアクセスして、試験プロ
グラムA、B、Cの各試験項目及び各試験条件を読み出
し、これに基づき図1(A)に示す如き試験情報テーブ
ルT1 を作成するものである。なお試験情報テーブルT
1 では試験条件の記載を省略している。
The recording unit 5 inputs the load factor of the bus 3 which is constantly measured by the load factor measuring device 1. The load factor is equal to or more than a predetermined reference value Th and the load factor is, for example, In the second high load state, this is recognized and the areas A, B and C of the communication area 10 are accessed to read out each test item and each test condition of the test programs A, B and C. Based on this, a test information table T 1 as shown in FIG. 1 (A) is created. The test information table T
In 1 , the description of test conditions is omitted.

【0023】順序制御部6は記録部5において高負荷状
態のときの負荷率を高い方から順次並べるものであっ
て、図3(A)に示す如く、負荷率監視中の時刻、
、、・・・において、基準値Th以上の高負荷率
になったとき、そのとき測定した負荷率と、それまで測
定された負荷率とを比較して、例えば負荷率が2番目ま
でのものであるとき、負荷率の高い順に順位づけを行う
ものである。なお同率のとき、あとから測定したものが
高いものとして処理される。
The sequence control unit 6 sequentially arranges the load factors in the recording unit 5 in the high load state from the highest load factor. As shown in FIG. 3A, the load factor monitoring time,
,, ... When the load factor becomes higher than the reference value Th, the load factor measured at that time is compared with the load factor measured up to that time. In this case, the ranking is performed in descending order of load factor. When the ratio is the same, the one measured later is treated as the higher one.

【0024】図3では、時刻において測定された負荷
率PA2(図示省略)は時刻において測定した負荷率
PA1(図示省略)よりも高いので、図3(B)の高負
荷順位テーブルT2 に記入された記録数2では、、
の順位で記入される。時刻において測定した負荷率P
A3(図示省略)はPA2よりも高いので、時刻で
は、、、の順位で記入される。そして時刻にお
いて測定された負荷率PA4(図示省略)はPA2より
も高い2位であるので、時刻では、、、の順
位で記入される。図3(B)は、このようにして時刻
までに測定された場合の例を示す。そして高負荷順位テ
ーブルT2 の〜には、時刻〜において試験プロ
グラムA、B、Cの各試験項目(小文字のアルファベッ
トで表示)と、試験条件(図示省略)が記入される。図
3(B)には各試験項目について示されている。
In FIG. 3, the load factor PA2 (not shown) measured at the time is higher than the load factor PA1 (not shown) measured at the time, so that it is entered in the high load rank table T 2 of FIG. 3B. With the number of recorded records 2,
Will be filled in the order of. Load factor P measured at time
Since A3 (not shown) is higher than PA2, at the time, it is written in the order of ,,. Since the load factor PA4 (not shown) measured at the time is second higher than PA2, at the time, it is written in the order of ,. FIG. 3B shows an example of the case where the measurement is performed by the time as described above. Then, each of the test items (indicated by lowercase alphabets) of the test programs A, B, and C and the test condition (not shown) are entered in the high load rank table T 2 at time. FIG. 3B shows each test item.

【0025】基準値保持部7は、バス3上の負荷率が高
負荷状態であると判断する基準値Thを保持するもので
あり、例えばレジスタで構成され、試験開始に先立ち外
部入力装置よりその基準値Thが記入される。
The reference value holding unit 7 holds a reference value Th for judging that the load factor on the bus 3 is in a high load state, and is constituted by, for example, a register, and is set by an external input device prior to the start of the test. The reference value Th is entered.

【0026】負荷率順位保持部8は、順序制御部6で作
成された最新の負荷率順位を保持するものであり、また
負荷率の第1位、第2位のものを記録部5に通知する。
通信領域10は、試験モニタ部11と試験プログラム部
12との間の通信を行うための領域であって、試験プロ
グラム部12を構成する試験プログラムに対応する領域
を有する。この例では試験プログラムA、B、Cの場合
であるので、これに対応する領域A、B、Cが設けら
れ、この領域にはそれぞれの試験プログラムが動作して
いる項目と試験条件が記入される。
The load factor ranking holding unit 8 holds the latest load factor ranking created by the sequence control unit 6, and notifies the recording unit 5 of the first and second load factor rankings. To do.
The communication area 10 is an area for performing communication between the test monitor section 11 and the test program section 12, and has an area corresponding to a test program forming the test program section 12. Since this example is for the test programs A, B, and C, areas A, B, and C corresponding thereto are provided, and items in which each test program is operating and test conditions are entered in this area. It

【0027】試験モニタ部11は、バス3の負荷率試験
を行う試験プログラムを動作させたり、その負荷率が基
準値Th以上の場合、各試験プログラムの各試験項目、
各試験条件を通信領域10より読み出し、これらに基づ
き試験情報テーブルT1 、高負荷順位T2 を作成するも
のであり、中央処理装置CPUで構成される。
The test monitor unit 11 operates a test program for performing a load factor test on the bus 3, and when the load factor is equal to or greater than a reference value Th, each test item of each test program,
Each test condition is read from the communication area 10 and the test information table T 1 and the high load rank T 2 are created based on these, and it is composed of a central processing unit CPU.

【0028】試験プログラム部12は、バス3の負荷率
試験を行うために試験プログラムを具備するものであ
り、この例では試験プログラムA、B、Cを有するもの
である。
The test program section 12 is provided with a test program for carrying out a load factor test of the bus 3, and in this example, has test programs A, B, and C.

【0029】表示装置13は、試験モニタ部11で作成
した試験情報テーブルT1 、高負荷順位テーブルT2
を選択的にあるいは同時に表示し、オペレータに試験結
果を表示するものである。
The display device 13 selectively or simultaneously displays the test information table T 1 , the high load rank table T 2 and the like created by the test monitor section 11 to display the test result to the operator.

【0030】プリンタ14は、試験モニタ部11で作成
した試験情報テーブルT1 、高負荷順位テーブルT2
を選択的にあるいは同時に印刷出力し、オペレータに試
験結果を通知するもである。
The printer 14 selectively or simultaneously prints out the test information table T 1 , the high load rank table T 2 and the like created by the test monitor unit 11 to notify the operator of the test result.

【0031】試験プログラムAは、図3(A)に示す如
く、試験項目a、b、c、d、eよりなり、試験項目e
を実行した後は再び試験項目aに戻り、これを繰返す。
試験プログラムBは、同じ試験項目a〜iよりなり、試
験項目iを実行した後は再び試験項目aに戻りこれを繰
返す。そして試験プログラムCは同じく試験項目a〜m
よりなり、試験項目mを実行した後は再び試験項目aに
戻り繰返す。勿論試験プログラムは、このように繰返す
もので構成される代わりに、繰返しのない、非常に長い
ものを使用してもよく、混在してもよい。また試験プロ
グラムの数は3に限定されるものではない。
As shown in FIG. 3A, the test program A is composed of test items a, b, c, d and e.
After executing, returns to the test item a again and repeats this.
The test program B comprises the same test items a to i, and after executing the test item i, returns to the test item a again and repeats this. And the test program C has the same test items a to m
After the test item m is executed, the process returns to the test item a and is repeated. As a matter of course, the test program may use a very long non-repeating program, or may be a mixture thereof, instead of being composed of the repeating program. The number of test programs is not limited to three.

【0032】次に図2に示す本発明の第1の実施の形態
の動作を、図3に示す動作説明図に従って説明する。 (1) バス3の負荷試験を実施するとき、図2に示す起動
実行部4が試験プログラムA、B、Cを同時に起動し実
行する。このとき試験プログラム部12は、通信領域1
0の領域Aに試験プログラムAの試験項目aとその試験
条件を記入し、領域Bには試験プログラムBの試験項目
aとその試験条件を記入し、領域Cには試験プログラム
Cの試験項目aとその試験条件を記入する。
Next, the operation of the first embodiment of the present invention shown in FIG. 2 will be described with reference to the operation explanatory diagram shown in FIG. (1) When the load test of the bus 3 is performed, the activation execution unit 4 shown in FIG. 2 activates and executes the test programs A, B, and C at the same time. At this time, the test program unit 12 determines that the communication area 1
The test item a of the test program A and its test conditions are entered in the area A of 0, the test item a of the test program B and its test conditions are entered in the area B, and the test item a of the test program C is entered in the area C. And the test conditions.

【0033】(2) 時刻において、記録部5が、負荷率
測定器1の測定値が基準値保持部7に記入されている基
準値Th以上になったことを検知すると、記録部5は負
荷率順位保持部8をチェックして、これが最初であるこ
とを知り、通信領域10の領域A、B、Cを読み、領域
Aからそのときの試験プログラムAの試験項目aと試験
条件を得、領域Bからそのときの試験プログラムBの試
験項目aと試験条件を得、領域Cからそのときの試験プ
ログラムCの試験項目aと試験条件を得る。
(2) At time, when the recording unit 5 detects that the measured value of the load factor measuring device 1 exceeds the reference value Th entered in the reference value holding unit 7, the recording unit 5 loads the load. By checking the rate order holding unit 8 and knowing that this is the first one, the areas A, B and C of the communication area 10 are read, and the test item a and the test condition of the test program A at that time are obtained from the area A, The test item a and test conditions of the test program B at that time are obtained from the region B, and the test item a and test conditions of the test program C at that time are obtained from the region C.

【0034】そしてこれらを順序制御部6に伝達すると
ともに、試験情報テーブルT1 に時刻と、この測定値
PA1と、その試験情報(試験プログラム毎の試験項目
即ちA−a、B−a、C−aと試験条件)を記入する。
また順序制御部6は、高負荷順位テーブルT2 の記録数
1の区分に前記の試験情報を記入し、測定値PA1を
負荷率順位保持部8に記入する。図3(B)は高負荷順
位テーブルT2 と、その試験情報(試験条件は図示省
略)を示す。
[0034] Then while transmitting them to the sequence control unit 6, and the time in the test information table T 1, and the measured value PA1, the test information (test items for each test program namely A-a, B-a, C -A and test conditions).
Further, the sequence control unit 6 writes the test information in the record number 1 section of the high load rank table T 2 and writes the measured value PA1 in the load factor rank holding unit 8. FIG. 3B shows the high load rank table T 2 and its test information (test conditions are not shown).

【0035】(3) 時刻において、記録部5は、負荷率
が基準値Th以上であるPA2になったことを検知する
と、負荷率順位保持部8をチェックしてこれが前記PA
1より大きいことを認識し、通信領域10の領域A、
B、Cを読み、領域Aから試験プログラムAの試験項目
aと試験条件を得、領域Bより試験プログラムBの試験
項目bと試験条件を得、領域Cより試験プログラムCの
試験項目aと試験条件を得る。
(3) At the time, when the recording unit 5 detects that the load factor has become PA2 which is equal to or greater than the reference value Th, it checks the load factor ranking holding unit 8 and the PA
Recognizing that it is larger than 1, the area A of the communication area 10,
B and C are read, the test item a and the test condition of the test program A are obtained from the region A, the test item b and the test condition of the test program B are obtained from the region B, and the test item a and the test of the test program C are obtained from the region C. Get the conditions.

【0036】そしてこれらを順序制御部6に伝達すると
ともに、試験情報テーブルT1 に時刻と、この測定値
PA2と、その試験情報を記入する。また順序制御部6
は、負荷率順位保持部8に保持された前記PA1とこの
PA2とを比較してPA2が高負荷率であることを認識
してPA2、PA1の順位を負荷率順位保持部8に記入
するとともに、高負荷順位テーブルT2 の記録数2の区
分に、前記、の順位で試験情報を記入する。
Then, these are transmitted to the sequence control unit 6, and the time, this measured value PA2, and the test information thereof are entered in the test information table T 1 . Also, the sequence control unit 6
Compares the PA1 held in the load factor rank holding unit 8 with this PA2, recognizes that PA2 has a high load factor, and writes the ranks of PA2 and PA1 in the load factor rank holding unit 8. The test information is entered in the above-mentioned order in the record number 2 section of the high load order table T 2 .

【0037】(4) 時刻′において、記録部5は、負荷
率が基準値Th以上である前記におけるPA1になっ
たことを検知すると、負荷率順位保持部8をチェックし
て、これが第2位の順位であるものの、登録ずみのもの
と同率第2位であることよりその試験情報がすでに試験
情報テーブルT1 、高負荷順位テーブルT2 に登録ずみ
であることを認識し、その記入処理は行わない。
(4) At time ', when the recording unit 5 detects that the load factor is PA1 in the above case where it is equal to or greater than the reference value Th, it checks the load factor ranking holding unit 8 and this is the second highest. However, it is recognized that the test information is already registered in the test information table T 1 and the high load rank table T 2 because it is the second place with the same rate as the registered one , and the filling process is Not performed.

【0038】(5) 時刻において、記録部5は、負荷率
が基準値Th以上であるPA3(図示省略)になったこ
とを検知すると、負荷率順位保持部8をチェックして、
これがすでに登録ずみのPA2、PA1よりも高順位で
あることを認識し、通信領域10の領域A、B、Cを読
み、領域Aから試験プログラムAの試験項目bと試験条
件を得、領域Bより試験プログラムBの試験項目dと試
験条件を得、領域Cより試験プログラムCの試験項目c
と試験条件を得る。
(5) At time, when the recording unit 5 detects that the load factor is PA3 (not shown) which is equal to or greater than the reference value Th, it checks the load factor ranking holding unit 8,
Recognizing that this is higher than the already registered PA2, PA1, read areas A, B, C of communication area 10 and obtain test item b and test conditions of test program A from area A, area B The test item d and the test condition of the test program B are obtained from the region C, and the test item c of the test program C is obtained from the region C.
And get the test conditions.

【0039】そしてこれらを順序制御部6に伝達すると
ともに、試験情報テーブルT1 に時刻とこの測定値P
A3とその試験情報を記入する。また順序制御部6は、
負荷率順位保持部8に保持された前記PA2、PA1
と、このPA3との負荷率順位がPA3、PA2、PA
1の順位であることを認識し、この順位を負荷率順位保
持部8に記入するとともに、高負荷順位テーブルT2
記録数3の区分に、、の順位で試験情報を記入す
る。
Then, these are transmitted to the sequence control unit 6, and the time and the measured value P are stored in the test information table T 1.
Fill in A3 and the test information. In addition, the sequence controller 6
The PA2 and PA1 held in the load factor ranking holding unit 8
And the load factor ranking with this PA3 is PA3, PA2, PA
Recognizing that the ranking is 1, the ranking is entered in the load factor ranking holding unit 8, and the test information is entered in the ranking of 3 in the record number 3 of the high load ranking table T 2 .

【0040】(6) 時刻において、記録部5は、負荷率
が基準値Th以上であるPA4(図示省略)になったこ
とを検知すると、負荷率順位保持部8をチェックして、
これがすでに登録ずみのPA3よりも低く、PA2より
も高い、第2番目の順位のものであることを認識し、通
信領域10の領域A、B、Cを読み、領域Aから試験プ
ログラムAの試験項目bと試験条件を得、領域Bより試
験プログラムBの試験項目eと試験条件を得、領域Cよ
り試験プログラムCの試験項目eと試験条件を得る。
(6) At time, when the recording unit 5 detects that the load factor is PA4 (not shown) that is equal to or greater than the reference value Th, it checks the load factor ranking holding unit 8 and
Recognizing that this is the second rank lower than the already registered PA3 and higher than the PA2, read the areas A, B and C of the communication area 10 and test the test program A from the area A. The item b and the test condition are obtained, the test item e and the test condition of the test program B are obtained from the region B, and the test item e and the test condition of the test program C are obtained from the region C.

【0041】そしてこれらを順序制御部6に伝達すると
ともに、試験情報テーブルT1 に時刻とこの測定値P
A4とその試験情報を記入する。また順序制御部6は、
負荷率順位保持部8に保持された前記PA3、PA2、
PA1とこのPA4との負荷率順位がPA3、PA4、
PA2、PA1の順位であることを認識し、この順位を
負荷率順位保持部8に記入するとともに、高負荷順位テ
ーブルT2 の記録数4の区分に、、、の順位で
試験情報を記入する。
Then, these are transmitted to the sequence control unit 6, and the time and the measured value P are stored in the test information table T 1.
Fill in A4 and the test information. In addition, the sequence controller 6
The PA3, PA2 held in the load factor rank holding unit 8
The load factor rankings of PA1 and PA4 are PA3, PA4,
Recognizing that the order is PA2 and PA1, the order is entered in the load factor order holding unit 8, and the test information is entered in the order of, in the record number 4 section of the high load order table T 2. .

【0042】(7) このようにして、試験プログラムA、
B、Cの実行に従って、時刻、、・・・において
順次その試験情報が得られ、前記の如き処理が行われ、
試験情報テーブルT1 、高負荷順位テーブルT2 が作成
される。そしてこの試験プログラムA、B、Cの実行が
所定時間行われたときバス負荷試験が終了する。
(7) In this way, the test program A,
According to the execution of B and C, the test information is sequentially obtained at the time, ..., And the processing as described above is performed.
A test information table T 1 and a high load rank table T 2 are created. The bus load test ends when the test programs A, B, and C are executed for a predetermined time.

【0043】オペレータは、この試験終了後、例えば表
示装置13により高負荷順位テーブルT2 を表示させ、
その負荷率の高い順位の時刻、図3(B)の例では、
、、・・・を認識して各試験プログラムA、B、
Cの各試験項目とその試験条件を認識する。また試験情
報テーブルT1 を表示させ、実際の負荷率とその試験条
件を認識する。これによりオペレータはこれら試験プロ
グラムA、B、Cの各試験項目とその試験条件に基づき
負荷率の高い試験を再現することができるので、有効に
バス試験を行うことができる。
After the test, the operator displays the high load rank table T 2 on the display device 13, for example,
The time of the order with the highest load factor, in the example of FIG. 3 (B),
Recognizing ..., each test program A, B,
Recognize each test item of C and its test conditions. Further, the test information table T 1 is displayed to recognize the actual load factor and its test condition. As a result, the operator can reproduce a test having a high load factor based on each test item of these test programs A, B, and C and the test conditions thereof, so that the bus test can be effectively performed.

【0044】このバス試験に際しても、前記の如き負荷
率の監視を行い、更に高負荷状態のときの各試験プログ
ラムA、B、Cの試験情報を得ることにより、きめ細か
なバス試験を行うことができる。
In this bus test, too, a detailed bus test can be carried out by monitoring the load factor as described above and obtaining the test information of each test program A, B, C under a high load condition. it can.

【0045】本発明の第2の実施の形態を図4により説
明する。図4において、他図と同記号は同一部分を示
し、15はファイルである。第2の実施の形態では、フ
ァイル15に、図4(A)に示す如き、高負荷順位テー
ブルT3 を作成しておき、このファイル15上に記録さ
れた情報をいつでも参照可能とするものである。なお図
4において、試験プログラムA、B、Cは、図4(B)
に示す如き負荷率の動作を行うものであり、前記図2、
図3に示す試験プログラムA、B、Cとは異なるもので
ある。またこの例では、負荷率第3位までのものを高負
荷順位テーブルT3 に順次記入するものである。
A second embodiment of the present invention will be described with reference to FIG. In FIG. 4, the same symbols as in the other figures indicate the same parts, and 15 is a file. In the second embodiment, a high load rank table T 3 as shown in FIG. 4A is created in the file 15 so that the information recorded in the file 15 can be referred to at any time. is there. In FIG. 4, the test programs A, B, and C are shown in FIG.
The load factor operation as shown in FIG.
It is different from the test programs A, B and C shown in FIG. Further, in this example, the load factors up to the third rank are sequentially entered in the high load rank table T 3 .

【0046】次に図4に示す本発明の第2の実施の形態
の動作を説明する。 (1) 図4(A)に示す起動実行部4が試験プログラム
A、B、Cを同時に起動し、実行する。このとき試験プ
ログラム部12は、通信領域10の領域Aに試験プログ
ラムAの試験項目aとその試験条件を記入し、領域Bに
は試験プログラムBの試験項目aとその試験条件を記入
し、領域Cには試験プログラムCの試験項目aとその試
験条件を記入する。
Next, the operation of the second embodiment of the present invention shown in FIG. 4 will be described. (1) The activation execution unit 4 shown in FIG. 4A simultaneously activates and executes the test programs A, B, and C. At this time, the test program section 12 writes the test item a of the test program A and its test condition in the area A of the communication area 10, and the test item a of the test program B and its test condition in the area B. In C, the test item a of the test program C and its test conditions are entered.

【0047】(2) 図4(B)に示す時刻において、負
荷率測定器1の測定値PA1が基準値保持部7に記入さ
れている基準値Th以上になったことを記録部5が検知
すると、記録部5は負荷率順位保持部8をチェックして
これが最初であることを知り、通信領域10の領域A、
B、Cを読み、領域Aから試験プログラムAの試験項目
aと試験条件を得、領域Bから試験プログラムBの試験
項目bと試験条件を得、領域Cから試験プログラムCの
試験項目bと試験条件を得る。
(2) At the time shown in FIG. 4 (B), the recording unit 5 detects that the measured value PA1 of the load factor measuring device 1 has exceeded the reference value Th entered in the reference value holding unit 7. Then, the recording unit 5 checks the load factor ranking holding unit 8 and finds that this is the first, and the area A of the communication area 10,
B and C are read, the test item a and the test condition of the test program A are obtained from the region A, the test item b and the test condition of the test program B are obtained from the region B, and the test item b and the test of the test program C are obtained from the region C. Get the conditions.

【0048】そしてこれらを測定値PA1とともに順序
制御部6に伝達する。順序制御部6は、ファイル15の
高負荷順位テーブルT3 の順位1の区分に、パターンと
してを、負荷率としてPA1を、試験項目・条件の
A、B、Cにそれぞれ試験項目aと試験条件(図示省
略)、試験項目bと試験条件(図示省略)を記入し、ま
た負荷率順位保持部8に前記測定値PA1を記入する。
Then, these are transmitted to the sequence controller 6 together with the measured value PA1. The sequence control unit 6 classifies the high load rank table T 3 of the file 15 into the rank 1 as a pattern, PA1 as a load factor, and test item a and test condition A, B, and C, respectively. (Not shown), test item b and test condition (not shown) are entered, and the measured value PA1 is entered in the load factor ranking holding unit 8.

【0049】(3) 時刻において、記録部5は、負荷率
が基準値Th以上であるPA2になったことを検知する
と、負荷率順位保持部8をチェックして、これが前記P
A1より大きいことを認識し、通信領域10の領域A、
B、Cを読み、領域Aから試験プログラムAの試験項目
Cと試験条件を得、領域Bから試験プログラムBの試験
項目bと試験条件を得、領域Cから試験プログラムCの
試験項目eと試験条件を得、これらを測定値PA2とと
もに順序制御部6に伝達する。
(3) At time, when the recording unit 5 detects that the load factor is PA2 which is equal to or larger than the reference value Th, it checks the load factor ranking holding unit 8 and this is the P
Recognizing that it is larger than A1, the area A of the communication area 10,
B and C are read, the test item C and the test condition of the test program A are obtained from the region A, the test item b and the test condition of the test program B are obtained from the region B, and the test item e and the test of the test program C are obtained from the region C. Conditions are obtained, and these are transmitted to the sequence control unit 6 together with the measured value PA2.

【0050】順序制御部6は、負荷率順位保持部8に保
持されたPA1とこのPA2を比較してPA2が高負荷
率であることを認識してPA2、PA1の順位を負荷率
順位保持部8に記入するとともに、ファイル15上の高
負荷順位テーブルT3 の順位2の区分に、前記パターン
の各項目を記入し、順位1の区分にパターンの各項
目を記入する。
The sequence control unit 6 compares the PA1 held in the load factor ranking holding unit 8 with this PA2 and recognizes that PA2 has a high load factor, and determines the order of PA2 and PA1 as the load factor ranking holding unit. 8, the items of the pattern are entered in the rank 2 section of the high load rank table T 3 on the file 15, and the items of the pattern are entered in the rank 1 section.

【0051】(4) 時刻において、記録部5は、負荷率
が基準値Th以上であるPA3になったことを検知する
と、負荷率順位保持部8をチェックして、このPA3が
前記PA2よりも小さいがPA1よりも大きい、第2位
のものであることを認識し、通信領域10の領域A、
B、Cを読み、領域Aから試験プログラムAの試験項目
dと試験条件を得、領域Bから試験プログラムBの試験
項目bと試験条件を得、領域Cから試験プログラムCの
項目eと試験条件を得、これらをPA3とともに順序制
御部6に伝達する。順序制御部6は負荷率順位保持部8
に保持された上位の2つであるPA2とPA1と、この
PA3とを比較してPA2、PA3、PA1の順位であ
ることを認識し、この順位を負荷率順位保持部8に記入
するとともに、ファイル15上の高負荷順位テーブルT
3 の順位3の区分に前記パターンの各項目を記入し、
順位2の区分にパターンの各項目を記入し、順位1の
区分にパターンの各項目を記入する。
(4) At time, when the recording unit 5 detects that the load factor is PA3 which is equal to or larger than the reference value Th, it checks the load factor ranking holding unit 8 and this PA3 is higher than PA2. Recognizing that it is the second largest, which is smaller than PA1 but smaller than PA1,
B and C are read, the test item d and the test condition of the test program A are obtained from the region A, the test item b and the test condition of the test program B are obtained from the region B, and the item e and the test condition of the test program C are obtained from the region C. Are obtained, and these are transmitted to the order control unit 6 together with the PA3. The order control unit 6 includes a load factor rank holding unit 8
PA2 and PA1, which are the two higher ranks held in the above, are compared with this PA3 to recognize that they are the ranks of PA2, PA3, and PA1, and this rank is entered in the load factor rank holding unit 8, and High load ranking table T on file 15
Fill in each item of the above pattern in the 3rd rank 3 division,
Each item of the pattern is entered in the rank 2 section, and each item of the pattern is entered in the rank 1 section.

【0052】(5) 時刻において、記録部5は、負荷率
が基準値Th以上であるPA4になったことを検知する
と、負荷率順位保持部8をチェックして、このPA4が
前記PA2、PA3よりも小さいが前記PA1よりも大
きい第3位のものであることを認識し、通信領域10の
区分A、B、Cを読み、領域Aから試験プログラムAの
試験項目eと試験条件を得、領域Bから試験プログラム
Bの試験項目eと試験条件を得、領域Cから試験プログ
ラムCの試験項目gと試験条件を得、これらをPA4と
ともに順序制御部6に伝達する。順序制御部6は負荷率
順位保持部8に保持された上位の2つである。PA2、
PA3、PA1とこのPA4とを比較して、PA2、P
A3、PA4、PA1の順位であることを認識し、この
順位を負荷率順位保持部8に記入するとともに、ファイ
ル15上の高負荷順位テーブルT 3 の順位4の区分に前
記パターンの各項目を記入し、順位3の区分にパター
ンの各項目を記入し、順位2の区分と順位1の区分は
それぞれパターン、パターンのそのままとする。
(5) At time, the recording unit 5 displays the load factor
Detects that PA4 is equal to or greater than the reference value Th.
Then, check the load factor ranking holding unit 8 and check that this PA4
Smaller than PA2 and PA3 but larger than PA1
Recognizing that it is the third highest threshold,
Read divisions A, B, and C, and test area A to test program A
Obtain the test item e and the test conditions, and start the test program from area B
Obtain the test item e of B and the test conditions,
Obtained test item g and test conditions for Ram C, and designated these as PA4.
Both are transmitted to the order control unit 6. The sequence control unit 6 has a load factor
These are the top two held in the order holding unit 8. PA2,
Compare PA3, PA1 with this PA4, PA2, P
Recognizing that the ranking is A3, PA4, PA1,
Enter the ranking in the load factor ranking holding unit 8 and
High load ranking table T on Rule 15 ThreeIn front of the 4th division
Fill in each item of the writing pattern and put in the pattern of rank 3
Please fill in each item of the
The pattern and the pattern are left as they are.

【0053】(6) 時刻において、記録部5は、負荷率
が基準値Th以上であるPA5になったことを検知する
と、負荷率順位保持部8をチェックして、このPA5が
前記PA2よりも大きい第1位のものであることを認識
し、通信領域10の区分A、B、Cを読み、領域Aから
試験プログラムAの試験項目fと試験条件を得、領域B
から試験プログラムBの試験項目fと試験条件を得、領
域Cから試験プログラムCの試験項目iと試験条件を
得、これらをPA5とともに順序制御部6に伝達する。
(6) At time, when the recording unit 5 detects that the load factor is PA5 which is equal to or greater than the reference value Th, it checks the load factor ranking holding unit 8 and this PA5 is higher than the PA2. Recognizing that it is the largest one, read the sections A, B, and C of the communication area 10, obtain the test item f and the test condition of the test program A from the area A, and the area B
The test item f and the test condition of the test program B are obtained from the above, the test item i and the test condition of the test program C are obtained from the region C, and these are transmitted to the sequence control unit 6 together with the PA 5.

【0054】順序制御部6は、負荷率順位保持部8に保
持されたPA2と比較してこれよりも高順位であること
を認識し、負荷率順位保持部8にPA5、PA2、PA
3、PA4、PA1の順位を記入するとともにファイル
15上の高負荷順位テーブルT3 の順位5の区分に前記
パターンの各項目を記入し、順位4の区分に前記パタ
ーンの各項目を記入し、順位3の区分にパターンの
各項目を記入し、順位2の区分にパターンの各項目を
記入し、順位1の区分にパターンの各項目を記入し、
図4(A)に示す如き内容の高負荷順位テーブルT3
得る。
The sequence control unit 6 recognizes that the load factor rank holding unit 8 has a higher rank than PA2 held in the load factor rank holding unit 8 and recognizes PA5, PA2, PA in the load factor rank holding unit 8.
3, PA4 and PA1 are entered, and each item of the pattern is entered in the rank 5 section of the high load rank table T 3 on the file 15, and each item of the pattern is entered in the rank 4 section, Fill in each item of the pattern in the division of rank 3, fill in each of the pattern in the division of rank 2, fill in each of the pattern in the division of rank 1,
A high load rank table T 3 having the contents shown in FIG. 4A is obtained.

【0055】(7) ところで、本発明では、図5に示す如
く、負荷率測定器65、66、67が、プロセッサ5
1、52と主記憶を接続するT−バス55、主記憶53
と入出力装置コントローラ54を接続するI−バス5
6、入出力装置コントローラ54と入出力装置61、6
2、63を接続するSC−バス64にそれぞれ設置さ
れ、T−バス55、I−バス56、SC−バス64の各
負荷率を測定している。なお、図5において50は、中
央処理装置51、52、主記憶53、入出力装置コント
ローラ54等が設置されたプロセッサ・メモリ・ボード
である。そして図4に示すファイル15には、各負荷率
測定器65、66、67対応に高負荷順位テーブルT3
が設けられる。また試験モニタ部11には、これまた各
負荷率測定器65、66、67対応に負荷率順位保持部
8が用意されている。
(7) By the way, in the present invention, as shown in FIG.
T-bus 55 and main memory 53 for connecting the main memories 1 and 52
I-bus 5 for connecting the I / O device controller 54 to
6. Input / output device controller 54 and input / output devices 61, 6
The load factors of the T-bus 55, the I-bus 56, and the SC-bus 64, which are respectively installed in the SC-bus 64 connecting the 2 and 63, are measured. In FIG. 5, reference numeral 50 denotes a processor memory board on which central processing units 51, 52, a main memory 53, an input / output device controller 54, etc. are installed. In the file 15 shown in FIG. 4, the high load rank table T 3 is associated with each load factor measuring device 65, 66, 67.
Is provided. The test monitor unit 11 is also provided with a load factor ranking holding unit 8 corresponding to each of the load factor measuring devices 65, 66, 67.

【0056】(8) オペレータは、このファイル15上に
記録された負荷率を、図4に示す如きモニタコマンド
を、例えばキーボードKBの如き入力装置より入力する
ことにより表示装置13又はプリンタ14により出力さ
せ、いつでも参照可能である。モニタコマンドは、コマ
ンドとして「logdisp ログ名〔負荷の種類〕」
を入力する。ログ名としては「stress」を入力
し、負荷の種類としては参照したい負荷率測定ポイン
ト、例えばT−バス55の負荷率を参照したいときは
「−t」を入力する。負荷の種類は省略可能であり、省
略した場合、全負荷率測定器の高負荷順位テーブルが出
力される。図5の例では3つの高負荷順位テーブルが出
力される。
(8) The operator outputs the load factor recorded in the file 15 on the display device 13 or the printer 14 by inputting a monitor command as shown in FIG. 4 from an input device such as a keyboard KB. And can be referred to at any time. The monitor command is "logdisp log name [load type]" as a command.
Enter Input "stress" as the log name, and input "-t" as the load type when referring to the load factor measurement point to be referred to, for example, the load factor of the T-bus 55. The type of load can be omitted, and if omitted, the high load rank table of the full load factor measuring device is output. In the example of FIG. 5, three high load rank tables are output.

【0057】本発明の第3実施の形態を図6に基づき、
図4を参照して説明する。第3の実施の形態では、オペ
レータは、モニタコマンドによりファイル15上に記録
された負荷率順位の状態を再現することができる。
A third embodiment of the present invention will be described with reference to FIG.
This will be described with reference to FIG. In the third embodiment, the operator can reproduce the state of the load factor rank recorded on the file 15 by the monitor command.

【0058】(1) ファイル15には、図4に示す如く、
高負荷順位テーブルT3 に記録された情報は、高負荷の
順に整理されている。オペレータはこのファイル15上
に記録された負荷率順位の状態を再現する場合、どの順
位のものを再現したいのかチェックするため、図4に示
すモニタコマンドを入力して、例えば負荷の種類として
T−バスの状態をチェックしたいとき、モニタコマンド
「logdisp stress−t」を入力する。
(1) In the file 15, as shown in FIG.
The information recorded in the high load rank table T 3 is arranged in the order of high load. When the operator reproduces the states of the load factor ranks recorded on the file 15, the operator inputs the monitor command shown in FIG. 4 in order to check which rank is desired to be reproduced. When the user wants to check the status of the bus, the monitor command "logdisp stress-t" is input.

【0059】(2) 試験モニタ部11は、これを解読し
て、ファイル15上よりこのT−バスの高負荷順位テー
ブルT3 を読み出して、これを表示装置13に表示す
る。これにより表示装置13には、図6に示す如き高負
荷順位テーブルT3 が表示され、参照可能となる。
(2) The test monitor section 11 decodes this, reads the high load rank table T 3 of this T-bus from the file 15, and displays it on the display device 13. As a result, the high load rank table T 3 as shown in FIG. 6 is displayed on the display device 13 and can be referred to.

【0060】(3) これにより、オペレータが例えば負荷
率順位の1位のものを再現実行したいと希望したとき、
図6に示すモニタコマンドを入力する。この場合、負荷
の種類としてT−バスを、負荷率順位として1位を選択
するので、モニタコマンド「stress−t 1」を
入力する。
(3) As a result, when the operator desires to reproduce and execute the first load factor rank, for example,
Input the monitor command shown in FIG. In this case, since the T-bus is selected as the load type and the first rank is selected as the load factor rank, the monitor command “stress-t 1” is input.

【0061】(4) 試験モニタ部11は、これを解読し
て、高負荷順位テーブルT3 より順位1の区分を読み出
し、この場合の試験プログラムAの試験項目fとその試
験条件、試験プログラムBの試験項目fとその試験条
件、試験プログラムCの試験項目iとその試験条件を得
て、これに基づき試験プログラム部12より各試験プロ
グラムの各試験項目を読み出し、前記により得た試験条
件によりこれらを実行する。これにより、図6に示す如
き、時刻の状態のテストを連続して行うことができる
ので、指定されたバスを指定の順位の負荷率の状態で試
験を行うことができる。
(4) The test monitor section 11 decodes this, reads the section of rank 1 from the high load rank table T 3 , and in this case, the test item f of the test program A, its test conditions, and the test program B. Of the test item f and its test condition, the test item i of the test program C and its test condition, and based on this, read each test item of each test program from the test program section 12, To execute. As a result, as shown in FIG. 6, it is possible to continuously perform the test in the state of time, and thus it is possible to perform the test in the state of the load ratio of the designated bus on the designated bus.

【0062】本発明の第4の実施の形態を図7に基づ
き、説明する。第4の実施の形態では、複数の試験プロ
グラムを試験モニタ部11が自動的に選択し、自動的に
高負荷状態を作り出す試験プログラムを組み合わせるよ
うにしたものである。
A fourth embodiment of the present invention will be described with reference to FIG. In the fourth embodiment, the test monitor unit 11 automatically selects a plurality of test programs and combines the test programs that automatically create a high load state.

【0063】図7に示す如く、例えば試験プログラムA
〜試験プログラムGを試験モニタ部12に用意し、負荷
の種類としてT−バスを選択し、その負荷率が高くなる
試験プログラムの組み合わせを自動的に得るものであ
る。
As shown in FIG. 7, for example, the test program A
The test program G is prepared in the test monitor unit 12, the T-bus is selected as the type of load, and a combination of test programs with a high load factor is automatically obtained.

【0064】(1) オペレータは、例えば負荷の種類とし
て、T−バスを記入した、モニタコマンド「stres
s−t」を入力する。試験モニタ部11はこれを解読し
て、自動負荷試験であることを認識し、まず試験プログ
ラムA、B、Cの起動実行を起動実行部4の試験プログ
ラム選択部42に指示する。これに基づき試験プログラ
ムA、B、Cが動作する。
(1) The operator enters a monitor command "stress" in which T-bus is entered as the type of load, for example.
Enter "s-t". The test monitor unit 11 decodes this, recognizes that it is an automatic load test, and first instructs the test program selection unit 42 of the start execution unit 4 to start and execute the test programs A, B, and C. Based on this, the test programs A, B, C operate.

【0065】(2) 負荷率監視部41は、図4に示す記録
部5から伝達される負荷率と、各試験プログラムの試験
項目、試験条件を負荷率保持部43に記録する。 (3) 試験プログラムA、B、Cが起動後、予め定められ
た時刻において、試験プログラム選択部42は、試験
プログラムBを停止し試験プログラムDを起動する。
(2) The load factor monitoring unit 41 records the load factor transmitted from the recording unit 5 shown in FIG. 4, the test items and test conditions of each test program in the load factor holding unit 43. (3) At the predetermined time after the test programs A, B, and C are activated, the test program selection unit 42 stops the test program B and activates the test program D.

【0066】(4) また時刻の経過後予め定められた時
刻において、試験プログラム選択部42は、試験プロ
グラムAを停止し試験プログラムEを起動する。 (5) ところで負荷率監視部41は、前記時刻において
試験プログラムBを停止し試験プログラムDを起動した
ときに、負荷率の低下したことより、試験プログラムB
が試験プログラムDよりも負荷率の大きいことを認識
し、また前記時刻において試験プログラムAを停止し
試験プログラムEを起動したとき、負荷率の低下したこ
とより、試験プログラムAの負荷率が大きく、試験プロ
グラムEの負荷率が小さいことを認識する。
(4) At a predetermined time after the lapse of time, the test program selecting section 42 stops the test program A and starts the test program E. (5) By the way, when the load factor monitoring unit 41 stops the test program B and activates the test program D at the time, the load factor decreases, so that the test program B
Recognizes that the load factor is larger than the test program D, and when the test program A is stopped and the test program E is started at the time, the load factor of the test program A is large due to the decrease of the load factor, Recognize that the load factor of test program E is small.

【0067】(6) 予め定められた時刻において、試験
プログラム選択部42は、負荷率監視部41からの制御
信号により試験プログラムCを停止し試験プログラムB
を再開させる。これにより負荷率が相当上がったことを
負荷率監視部41は認識する。
(6) At a predetermined time, the test program selecting section 42 stops the test program C by the control signal from the load factor monitoring section 41 and stops the test program B.
To restart. As a result, the load factor monitor 41 recognizes that the load factor has increased considerably.

【0068】(7) 予め定められた時刻において、試験
プログラム選択部42は、負荷率監視部41からの制御
信号により試験プログラムDを停止させ、試験プログラ
ムFを起動する。これにより負荷率の下がったことを負
荷率監視部41は認識する。
(7) At a predetermined time, the test program selecting section 42 stops the test program D and activates the test program F by the control signal from the load factor monitoring section 41. As a result, the load factor monitoring unit 41 recognizes that the load factor has decreased.

【0069】(8) 予め定められた時刻において、試験
プログラム選択部42は、負荷率監視部41からの制御
信号により試験プログラムAを再開させ、試験プログラ
ムEを停止する。これにより、負荷率監視部41は負荷
率が相当向上し、基準値Thを超えたことを認識する。
(8) At a predetermined time, the test program selecting section 42 restarts the test program A and stops the test program E by the control signal from the load factor monitoring section 41. As a result, the load factor monitoring unit 41 recognizes that the load factor is considerably improved and exceeds the reference value Th.

【0070】(9) 予め定められた時刻において、試験
プログラム選択部42は、負荷率監視部41からの制御
信号により、試験プログラムGを起動し、試験プログラ
ムFを停止させる。これにより負荷率監視部41は負荷
率が相当向上したことを認識する。
(9) At a predetermined time, the test program selecting section 42 activates the test program G and stops the test program F by the control signal from the load factor monitoring section 41. As a result, the load factor monitoring unit 41 recognizes that the load factor has improved considerably.

【0071】(10)オペレータは、この負荷率自動テスト
中の負荷率を表示装置で監視し、高負荷率が安定したと
き、この試験プログラムの種類、試験項目、試験条件を
記録指示し、これらを保持する。勿論これらを表示装置
上で表示させることもできる。
(10) The operator monitors the load factor during the automatic load factor test on the display device, and when the high load factor is stable, instructs the operator to record the type, test item, and test condition of this test program. Hold. Of course, these can be displayed on the display device.

【0072】このようにして、負荷率を高める試験プロ
グラムを自動的に組み合わせることができる。なお、モ
ニタコマンドにおいて、負荷の種類を省略したときは、
システム全体の負荷率(例えば図5に示す負荷率測定器
65、66、67の測定した各負荷率の総和)を高める
試験プログラムを組み合わせるものとなる。
In this way, test programs for increasing the load factor can be automatically combined. If the load type is omitted in the monitor command,
A test program for increasing the load factor of the entire system (for example, the sum of the load factors measured by the load factor measuring devices 65, 66, 67 shown in FIG. 5) is combined.

【0073】本発明の第5の実施の形態を図8、図9に
基づき説明する。図8は本発明の第5の実施の形態図を
示し、図9はその記録結果を参照、再現するためのモニ
タコマンド説明図である。第5の実施の形態では、負荷
率の測定ポイントを複数箇所設定してそれぞれの負荷率
を測定し、システム全体の負荷を評価し試験プログラム
の組み合わせを評価するものである。
A fifth embodiment of the present invention will be described with reference to FIGS. FIG. 8 shows a fifth embodiment of the present invention, and FIG. 9 is an explanatory diagram of a monitor command for referring to and reproducing the recording result. In the fifth embodiment, a plurality of load factor measurement points are set, the respective load factors are measured, the load of the entire system is evaluated, and the combination of test programs is evaluated.

【0074】図8に示す如く、第5の実施の形態では、
負荷率測定器65、66、67をT−バス55、I−バ
ス56、SC−バス64にそれぞれ設置するとともに、
試験モニタ部11には、負荷率測定器65の測定値が入
力され、図2等の記録部5、順序制御部6、基準値保持
部7、負荷率順位保持部8と同様の記録部81、順序制
御部82、基準値保持部83、負荷率順位保持部84を
有する第1モニタ部71と、負荷率測定器66の測定値
が入力され、第1モニタ部71と同様に構成された第2
モニタ部72と、負荷率測定器67の測定値が入力さ
れ、第1モニタ部71と同様に構成された第3モニタ部
73を設ける。
As shown in FIG. 8, in the fifth embodiment,
The load factor measuring devices 65, 66, 67 are installed on the T-bus 55, I-bus 56, SC-bus 64, respectively, and
The measurement value of the load factor measuring device 65 is input to the test monitor unit 11, and a recording unit 81 similar to the recording unit 5, the sequence control unit 6, the reference value holding unit 7, and the load factor ranking holding unit 8 in FIG. , A first control unit 71 having a sequence control unit 82, a reference value holding unit 83, and a load factor ranking holding unit 84, and a measurement value of the load factor measuring device 66 are input, and the configuration is similar to that of the first monitor unit 71. Second
A monitor unit 72 and a third monitor unit 73 to which the measured values of the load factor measuring device 67 are input and which are configured similarly to the first monitor unit 71 are provided.

【0075】第5の実施の形態では、さらに負荷率測定
器65、66、67の各測定値が入力される加算部85
と、図2、図4等の記録部5、順序制御部6、基準値保
持部7、負荷率順位保持部8と同様の記録部86、順序
制御部87、基準値保持部88、負荷率順位保持部89
を有する総合モニタ部74と、主記憶53に保持されて
いる試験プログラム部12の試験プログラムA、B、C
(図示省略)を前記第1モニタ部71、第2モニタ部7
2、第3モニタ部73、総合モニタ部74からの制御信
号に応じて起動実行する起動実行部75を設ける。第1
モニタ部71〜第3モニタ部73、総合モニタ部74に
設けた各基準値保持部に適宜の値(異なる値でも、同一
の値でもよい)を設定する。
In the fifth embodiment, the addition section 85 to which the respective measured values of the load factor measuring devices 65, 66 and 67 are further input.
2, the recording unit 5, the order control unit 6, the reference value holding unit 7, the recording unit 86 similar to the load ratio rank holding unit 8, the order control unit 87, the reference value holding unit 88, and the load ratio. Rank holding unit 89
And the test programs A, B and C of the test program unit 12 held in the main memory 53.
(Not shown) are the first monitor unit 71 and the second monitor unit 7.
2, a start-up execution unit 75 that starts and executes in response to control signals from the third monitor unit 73 and the general monitor unit 74 is provided. First
Appropriate values (different values or the same value may be set) are set in the reference value holding units provided in the monitor units 71 to 73 and the comprehensive monitor unit 74.

【0076】(1) まず負荷率を保持する場合について説
明する。オペレータは、起動実行部75を起動させ、試
験プログラム部12の試験プログラムA、B、C、(図
示省略)を動作させる。これによりT−バス55の負荷
率が負荷率測定器65により測定されて第1モニタ部7
1に伝達され、I−バス56の負荷率が負荷率測定器6
6により測定されて第2モニタ部72に伝達され、SC
−バス64の負荷率が負荷率測定器67により測定され
て第3モニタ部73に伝達される。また各負荷率測定器
65、66、67の測定値は、総合モニタ部74に伝達
され、加算部85により加算される。
(1) First, the case of holding the load factor will be described. The operator activates the activation execution unit 75 and operates the test programs A, B, C (not shown) of the test program unit 12. As a result, the load factor of the T-bus 55 is measured by the load factor measuring device 65, and the first monitor unit 7
1, the load factor of the I-bus 56 is transmitted to the load factor measuring device 6
6 and is transmitted to the second monitor unit 72, and SC
The load factor of the bus 64 is measured by the load factor measuring device 67 and transmitted to the third monitor unit 73. Further, the measured values of the load factor measuring devices 65, 66, 67 are transmitted to the total monitor unit 74 and added by the adding unit 85.

【0077】第1モニタ部71〜総合モニタ部74に
は、例えばそれぞれ異なる値の基準値が設定されてお
り、第1モニタ部71では負荷率測定器65の測定値が
その基準値Th以上になったとき前記図4と同様に、そ
の記録部81がそのときの試験プログラムA、B、Cの
試験項目と試験条件を読み取り、その測定値とともに負
荷率順位保持部8、順位制御部6を動作させ、負荷率の
大きさの順位毎に図4に示す如きT−バス55用の高負
荷順位テーブルT3 を作成し、ファイル15に記入す
る。
For example, different reference values are set in the first monitor section 71 to the general monitor section 74. In the first monitor section 71, the measured value of the load factor measuring device 65 is equal to or larger than the reference value Th. As in FIG. 4, the recording unit 81 reads the test items and test conditions of the test programs A, B, and C at that time, and the load factor rank holding unit 8 and the rank control unit 6 together with the measured values. It is operated, and a high load rank table T 3 for the T-bus 55 as shown in FIG. 4 is created for each rank of load factor magnitude, and is written in the file 15.

【0078】同様に、第2モニタ部72では負荷率測定
器66の測定値がその基準値以上になったとき、I−バ
ス56用の高負荷順位テーブルを作成し、ファイル15
に記入し、第3モニタ部73では負荷率測定器67の測
定値がその基準値以上になったとき、SC−バス64用
の高負荷順位テーブルを作成し、ファイル15に記入す
る。
Similarly, when the measured value of the load factor measuring device 66 exceeds the reference value, the second monitor section 72 creates a high load rank table for the I-bus 56, and stores it in the file 15
When the measured value of the load factor measuring device 67 exceeds the reference value, the third monitor section 73 creates a high load rank table for the SC-bus 64 and writes it in the file 15.

【0079】そして総合モニタ部74では、加算部85
で加算された負荷率測定器65、66、67の和が基準
値Th0 以上になったとき、システム全体の負荷率を示
す高負荷順位テーブルを作成し、ファイル15に記入す
る。
Then, in the total monitor unit 74, the adding unit 85
When the sum of the load factor measuring devices 65, 66, 67 added in step 2 becomes equal to or greater than the reference value Th 0 , a high load rank table showing the load factor of the entire system is created and written in the file 15.

【0080】(2) 次にこのように記録した結果を参照す
る場合について説明する。記録結果を参照したいとき、
図9(A)に示すモニタコマンドを入力する。この場
合、ログ名としては「stress」を記入し、負荷の
種類としては、負荷率を参照したりバス名を記入する。
例えばT−バスの負荷状況を参照したいときは負荷の種
類を「−t」と記入したモニタコマンド「logdis
p stress−t」を入力すればよい。これにより
T−バスの高負荷順位テーブルが、例えば表示装置13
に表示される。
(2) Next, the case of referring to the results thus recorded will be described. When you want to refer to the recorded result,
The monitor command shown in FIG. 9A is input. In this case, "stress" is entered as the log name, and the load factor is referred to and the bus name is entered as the type of load.
For example, when it is desired to refer to the load status of the T-bus, the monitor command "logdis" in which the type of load is "-t" is written.
"p stress-t". Thereby, the high load rank table of the T-bus is displayed, for example, on the display device 13.
Will be displayed.

【0081】もし、システム全体の負荷率を参照したい
ときは、図9(A)において負荷の種類を省略したモニ
タコマンドを入力すればよい。これによりシステム全体
の負荷率を示す高負荷順位テーブルが例えば表示装置1
3に表示される。
If it is desired to refer to the load factor of the entire system, a monitor command in which the type of load is omitted in FIG. 9A may be input. As a result, a high load ranking table showing the load factor of the entire system is displayed, for example, on the display device 1.
3 is displayed.

【0082】(3) また記録した結果を再現する場合に
は、図9(B)に示すモニタコマンドを入力する。この
場合負荷の種類としては基準値以上の高負荷率を再現し
たいバス名を記入する。例えばT−バスの高負荷率状態
を再現したいときは負荷の種類を「−t」と記入したモ
ニタコマンド「stress−t」を入力すればよい。
これによりT−バスの高負荷順位テーブルが読み出さ
れ、高負荷率のときの各試験プログラムA、B、Cの試
験項目と試験条件が認識され、これらを組み合わせて実
行することにより、高負荷状態が再現できる。
(3) When reproducing the recorded result, the monitor command shown in FIG. 9B is input. In this case, enter the bus name for which you want to reproduce a high load factor above the reference value as the type of load. For example, when it is desired to reproduce the high load factor state of the T-bus, the monitor command "stress-t" in which the type of load is "-t" may be input.
As a result, the high load rank table of the T-bus is read, the test items and test conditions of each test program A, B, C at the time of the high load rate are recognized, and by executing them in combination, the high load is obtained. The state can be reproduced.

【0083】もし、システム全体の高負荷率状態を再現
したいときは、負荷の種類を省略したモニタコマンドを
入力すればよい。これによりシステム全体用の高負荷順
位テーブルが読み出され、高負荷率のときの各試験プロ
グラムA、B、Cの試験項目と試験条件が認識され、こ
れらを組み合わせて実行することにより、システム全体
の高負荷状態が再現できる。
If it is desired to reproduce the high load factor state of the entire system, the monitor command with the load type omitted may be input. As a result, the high load ranking table for the entire system is read, the test items and test conditions of each test program A, B, C at the time of a high load rate are recognized, and by executing them in combination, the entire system is executed. The high load state of can be reproduced.

【0084】以上説明したように、本発明によれば、正
確な負荷率を測定することが可能になり、負荷試験の再
現試験を容易に実施することができる。また、自動的
に、試験プログラムを高負荷試験状態に組み合わせるこ
とが可能となり、オペレータによる高負荷用の試験プロ
グラムの組み合わせ作成作業を大幅に簡素化することが
できる。
As described above, according to the present invention, it is possible to accurately measure the load factor, and it is possible to easily carry out the load test reproduction test. Further, it becomes possible to automatically combine the test programs with the high load test state, and it is possible to greatly simplify the operator's work of creating the combination of the high load test programs.

【0085】[0085]

【発明の効果】請求項1に記載された発明によれば、バ
ス上の負荷率を測定する負荷率測定手段を設けて負荷率
が基準値以上か否かを監視し、基準値以上の場合の複数
の試験プログラムの試験項目等の走行実施状態を記録す
るので、負荷率が高負荷状態になったことを見落とすこ
とのない、正確な高負荷状態を把握し、これを再現可能
とすることができる。
According to the first aspect of the present invention, the load factor measuring means for measuring the load factor on the bus is provided to monitor whether the load factor is equal to or higher than the reference value. Since the running conditions such as the test items of multiple test programs are recorded, it is possible to grasp and accurately reproduce the high load state without overlooking that the load factor has become high load. You can

【0086】請求項2に記載された発明によれば、高負
荷率を測定した際の記録を高負荷の順位に並べ替え、複
数の走行実施状況や、負荷率を記録、保持することによ
り、次に負荷試験を実施する際に、試験プログラムの選
択作業及び試験内容の絞り込みを容易にすることが可能
になる。
According to the invention described in claim 2, the records when the high load factor is measured are rearranged in the order of the high load, and a plurality of running conditions and the load factors are recorded and held. Next, when carrying out a load test, it becomes possible to facilitate the work of selecting a test program and narrowing down the test contents.

【0087】請求項3に記載された発明によれば、高負
荷率を測定した際の記録をオペレータの指示により容易
に再現することが可能になり、効率的に高負荷状態の再
現試験を実施することが可能になる。
According to the invention described in claim 3, it is possible to easily reproduce the record when the high load factor is measured according to the instruction of the operator, and efficiently carry out the reproduction test in the high load state. It becomes possible to do.

【0088】請求項4に記載された発明によれば、高負
荷率を記録する試験プログラムを試験モニタが自動的に
選択実行することにより、人手によるオペレーションを
省略することができ、試験効率を上げることができる。
According to the invention described in claim 4, the test monitor automatically selects and executes the test program for recording the high load factor, whereby the manual operation can be omitted and the test efficiency is improved. be able to.

【0089】請求項5に記載された発明によれば、負荷
率の測定ポイントを複数設定することにより、単一箇所
の負荷率のみを着目することではなく、データ処理装置
のシステム全体としての負荷率を総合的に評価すること
が可能となる。
According to the invention described in claim 5, by setting a plurality of load factor measurement points, not only the load factor at a single location is focused, but the load of the entire system of the data processing device is increased. It becomes possible to evaluate the rate comprehensively.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の原理説明図である。FIG. 1 is a diagram illustrating the principle of the present invention.

【図2】本発明の第1の実施の形態構成図である。FIG. 2 is a configuration diagram of a first embodiment of the present invention.

【図3】本発明の第1の実施の形態の動作説明図であ
る。
FIG. 3 is an operation explanatory diagram of the first embodiment of the present invention.

【図4】本発明の第2の実施の形態構成図である。FIG. 4 is a configuration diagram of a second embodiment of the present invention.

【図5】本発明のシステム構成図である。FIG. 5 is a system configuration diagram of the present invention.

【図6】本発明の第3の実施の形態説明図である。FIG. 6 is an explanatory diagram of the third embodiment of the present invention.

【図7】本発明の第4の実施の形態構成図である。FIG. 7 is a configuration diagram of a fourth embodiment of the present invention.

【図8】本発明の第5の実施の形態構成図である。FIG. 8 is a configuration diagram of a fifth embodiment of the present invention.

【図9】本発明の第5の実施の形態の記録結果、参照・
再現用コマンド説明図である。
FIG. 9 is a recording result of the fifth embodiment of the present invention, refer to
It is an explanatory view of a command for reproduction.

【図10】従来例説明図である。FIG. 10 is an explanatory diagram of a conventional example.

【符号の説明】[Explanation of symbols]

1 負荷率測定器 2 主記憶 3 バス 4 起動実行部 5 記録部 6 順序制御部 7 基準値保持部 10 通信領域 11 試験モニタ部 12 試験プログラム 13 表示装置 14 プリンタ 1 Load Factor Measuring Device 2 Main Memory 3 Bus 4 Startup Execution Unit 5 Recording Unit 6 Sequence Control Unit 7 Reference Value Holding Unit 10 Communication Area 11 Test Monitor Unit 12 Test Program 13 Display Device 14 Printer

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】複数の試験プログラムを保持する試験プロ
グラム部と、 この試験プログラムを実行する実行手段と、 バス上の負荷率を測定する負荷率測定手段と、 負荷率が基準値以上か否かを監視して基準値以上のとき
に前記複数の試験プログラムの走行状態を記録する記録
手段を具備したことを特徴とするバス負荷試験方式。
1. A test program section for holding a plurality of test programs, an executing means for executing the test programs, a load factor measuring means for measuring a load factor on a bus, and whether or not the load factor is a reference value or more. And a recording means for recording the running states of the plurality of test programs when the value is equal to or more than a reference value.
【請求項2】基準値以上の負荷率測定値を一定の順序に
整理する順序制御手段と、 この一定の順序に整理された負荷率測定値を保持する負
荷率順位保持手段を具備したことを特徴とする請求項1
記載のバス負荷試験方式。
2. A sequence control means for arranging load factor measurement values equal to or higher than a reference value in a fixed order, and a load factor ranking holding means for holding the load factor measurement values arranged in this fixed order. Claim 1 characterized by
Bus load test method described.
【請求項3】基準値以上の負荷率順位と、そのときの試
験プログラムの試験項目を保持する保持手段と、 この保持手段に保持された所定の順位の負荷率の試験プ
ログラムの試験項目を読み出し、これを再現可能に実行
する実行手段を具備したことを特徴とする請求項1記載
のバス負荷試験方式。
3. A load factor rank equal to or higher than a reference value, holding means for holding test items of a test program at that time, and test items of a test program having a load rank of a predetermined rank held by this holding means are read out. The bus load test method according to claim 1, further comprising an execution unit that reproducibly executes this.
【請求項4】測定された負荷率を保持する負荷率保持手
段と、 試験プログラムを動作又は停止することにより負荷率の
変動を監視して、負荷率が高くなる試験プログラムを認
識する負荷率監視手段と、 試験プログラムを選択的に起動停止する試験プログラム
選択手段を具備したことを特徴とする請求項1記載のバ
ス負荷試験方式。
4. A load factor holding means for holding the measured load factor, and a load factor monitor for recognizing a test program having a high load factor by monitoring fluctuations in the load factor by operating or stopping the test program. 2. The bus load test method according to claim 1, further comprising means and test program selection means for selectively starting and stopping the test program.
【請求項5】データ処理装置を構成する複数のバスに設
けられた負荷率測定手段と、 この負荷率測定手段の測定した負荷率を加算する加算手
段と、 この加算手段の演算した値が基準値以上の場合、複数の
試験プログラムの走行状態を記録する記録手段を具備し
たことを特徴とする請求項1記載のバス負荷試験方式。
5. A load factor measuring means provided on a plurality of buses constituting the data processing device, an adding means for adding the load factors measured by the load factor measuring means, and a value calculated by the adding means as a reference. 2. The bus load test system according to claim 1, further comprising a recording unit for recording the running states of a plurality of test programs when the value is equal to or more than the value.
JP7320039A 1995-12-08 1995-12-08 Bus load test system Withdrawn JPH09160842A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7320039A JPH09160842A (en) 1995-12-08 1995-12-08 Bus load test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7320039A JPH09160842A (en) 1995-12-08 1995-12-08 Bus load test system

Publications (1)

Publication Number Publication Date
JPH09160842A true JPH09160842A (en) 1997-06-20

Family

ID=18117066

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7320039A Withdrawn JPH09160842A (en) 1995-12-08 1995-12-08 Bus load test system

Country Status (1)

Country Link
JP (1) JPH09160842A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6384941B1 (en) * 1997-11-04 2002-05-07 Samsung Electronics Co., Ltd. Apparatus for image correction of multifunctional peripherals and method therefor
US7275020B2 (en) 2003-12-23 2007-09-25 Hewlett-Packard Development Company, L.P. Method and system for testing a computer system by applying a load
JP2009070288A (en) * 2007-09-14 2009-04-02 Fujitsu Ltd Load test program, load test method, and information processor executing the load test program
JP2010122998A (en) * 2008-11-20 2010-06-03 Nec Computertechno Ltd Computer system inspection device, computer system provided with the same and computer system inspection method
JP2011210048A (en) * 2010-03-30 2011-10-20 Kyocera Mita Corp Semiconductor device
JP2012043172A (en) * 2010-08-19 2012-03-01 Fujitsu Ltd Device verification program, performance measurement method, and performance measurement device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6384941B1 (en) * 1997-11-04 2002-05-07 Samsung Electronics Co., Ltd. Apparatus for image correction of multifunctional peripherals and method therefor
US7275020B2 (en) 2003-12-23 2007-09-25 Hewlett-Packard Development Company, L.P. Method and system for testing a computer system by applying a load
JP2009070288A (en) * 2007-09-14 2009-04-02 Fujitsu Ltd Load test program, load test method, and information processor executing the load test program
US8296603B2 (en) 2007-09-14 2012-10-23 Fujitsu Limited Load test method and load test apparatus
JP2010122998A (en) * 2008-11-20 2010-06-03 Nec Computertechno Ltd Computer system inspection device, computer system provided with the same and computer system inspection method
JP2011210048A (en) * 2010-03-30 2011-10-20 Kyocera Mita Corp Semiconductor device
JP2012043172A (en) * 2010-08-19 2012-03-01 Fujitsu Ltd Device verification program, performance measurement method, and performance measurement device

Similar Documents

Publication Publication Date Title
US6928542B2 (en) Method and system for starting a multiple PDA operating system through a menu
JP4205178B2 (en) Graphic key management method and mechanism
CZ9302178A3 (en) Hypertext network intended for use in interactive system for data processing and representation method of user selectable information modules in such hypertext network
CN112035376B (en) Method, device, equipment and storage medium for generating coverage rate report
JPS59216256A (en) Operation analyzing device of microprocessor
US6480974B1 (en) Method for use of bus parking states to communicate diagnostic information
JPH09160842A (en) Bus load test system
JP2007207139A (en) Information processor
JP6870664B2 (en) Control systems, controls and programs
KR20000054516A (en) Method for Editing Circuit of Wiring Harness, and Multi Functional System for Testing Erroneous Wiring of Wiring Harness and Method thereof Using the Same
TWI381176B (en) Apparatus and method for testing electronic apparatus
US6112316A (en) System for use of bus parking states to communicate diagnostic information
JP2002024052A (en) Error reproduction test method of computer peripheral equipment
JPS63273954A (en) Information processor
JPH06274381A (en) Bus monitoring device
JPH1165888A (en) Software testing device and storage medium
JP2002312198A (en) Program test supporting device
JPS62226356A (en) Initial program loading system
JPH04268640A (en) Program loading system
CN117851150A (en) GPIO drive test system, method, device and storage medium
JP2001202272A (en) Debugging method, debugging device using this method and recording medium with debugging method recorded thereon
JPS61199131A (en) Testing method for microcomputer
JPH0512063A (en) Logic circuit design device
JPH07182113A (en) Data input device
JPS59140749A (en) Analyzer of time-division multiplex transmission system

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20030304