JPS5848451B2 - Cargo handling equipment - Google Patents

Cargo handling equipment

Info

Publication number
JPS5848451B2
JPS5848451B2 JP52064842A JP6484277A JPS5848451B2 JP S5848451 B2 JPS5848451 B2 JP S5848451B2 JP 52064842 A JP52064842 A JP 52064842A JP 6484277 A JP6484277 A JP 6484277A JP S5848451 B2 JPS5848451 B2 JP S5848451B2
Authority
JP
Japan
Prior art keywords
cargo handling
conveyor line
handling equipment
equipment according
conveyor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP52064842A
Other languages
Japanese (ja)
Other versions
JPS5417273A (en
Inventor
健次郎 笠井
浩視 郷
英輝 古宿
康夫 鍋島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP52064842A priority Critical patent/JPS5848451B2/en
Publication of JPS5417273A publication Critical patent/JPS5417273A/en
Publication of JPS5848451B2 publication Critical patent/JPS5848451B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Ship Loading And Unloading (AREA)

Description

【発明の詳細な説明】 本発明はクレー ンを主体とする荷役設備に係り、特に
鋼材などの長尺物重義物の陸揚げ作業のサイクルタイム
を縮少するに好適な荷役設備に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to cargo handling equipment mainly consisting of cranes, and particularly to cargo handling equipment suitable for reducing the cycle time of unloading work of long heavy objects such as steel materials.

従来の;−V壁クL・・−ンの側面を第1図、正面を第
2図に示{7、その動作、物流に一ついて訣明する。
The side view of a conventional V-wall crane is shown in Fig. 1, and the front view is shown in Fig. 2.

第1図、第2図において、1は岸壁クレーン本体であり
、レール2上を駆動装置3により走ヤ」シ、吊荷緊定金
具4を船5の川こトローリ7の横行動作で位置決めする
In FIGS. 1 and 2, reference numeral 1 denotes a quayside crane main body, which is moved on a rail 2 by a drive device 3, and a suspended load fixing fitting 4 is positioned by a lateral movement of a river boat trolley 7 of a ship 5. .

吊荷緊定金具4には巻−ヒD −プ6が設けられ、巻上
ロープ6はトLフ−’J7上のドラムに巻き取られてい
る。
A hoisting rope 6 is provided on the hanging load securing fitting 4, and the hoisting rope 6 is wound around a drum on a hoisting rope J7.

1へローり7と操作室8は連5ツされ、操作員が1・ロ
ーり7の位置、巻上ロープ6の長さの1調節等を行な・
う。
The rope 7 and the operation room 8 are connected together, and the operator makes adjustments to the position of the rope 7 and the length of the hoisting rope 6.
cormorant.

ト[−J IJ − 7はが−ダ9・そ嘆?iL、船か
ら陸−ヒの1・レーラ55に吊f}1「をi¥ぶ。
To[-J IJ-7 Haga-da9 Sore? iL, hang f}1' from the ship to land-hi's 1-lera 55.

ガータ゛9の1旬部は作業紹了時、船50.)−.tス
1・をかイ)−ず時lJと片持ち状に俯1印用[l−ブ
11により引き−ヒげられ、・俯仰田ロー−−プ11は
巻取ドラム12により巻き取られる。
In the first part of Gata 9, when the work was introduced, the ship was 50. )-. The rope 11 is pulled by the rope 11 in a cantilevered manner with the rope 11, and the rope 11 is wound up by the take-up drum 12. .

このよ・うに構成された岸壁ハ・−ンにおいて、船5が
着岸すると、12・壁クし・一71が走行し、ガーダ9
が水平な゛伏態に設置され、l−01J− 7が船倉人
L−1−目・こ満行−) ()l置ずる。
When the ship 5 docks at the quay harbour, constructed in this way, the wall 12 and the wall 1 71 run, and the girder 9
was set up in a horizontal, prone position, and l-01J-7 was placed in the holdman L-1-th (full line) ()l.

(ウ、6に吊荷緊定金具4を巻き−ドげ、吊夕−1の玉
掛り作業終了後、トo’) 7は巻き−ヒげ、:’F
S’f ?’j動作を行ない、陸上に待機しているト1
ノ−ラ55に向力・う.1− t.−一−ラ55に近く
まで巻き下げ、1,7冫司−動作を行ない”E4’LL
作業終了後、空荷の状態で再び船にIiJ h)う。
(C. Wrap the hanging load tensioning fitting 4 around 6, and after completing the slinging work of the hanging load 1, to o') 7 is the hanging load, :'F
S'f? 'j operation and waiting on land 1
Nora 55 and Mukori U. 1-t. - Lower it close to the 1-ra 55 and perform the 1,7 ``E4'LL'' operation.
After completing the work, return to the ship with no cargo.

(二の行程は第1図の点線に示さ石2も通りである。(The second step is shown by the dotted line in Figure 1 and is the same for Stone 2.

しかし、この方法では一台のトロリー7が船5Lから陸
1二の荷物運搬機即ちトレーラ55までの全行程を運行
することになり、荷役サイ・タノレタイムに長時間要す
ることになる。
However, in this method, one trolley 7 travels the entire journey from the ship 5L to the cargo transporter, ie, the trailer 55, on land 12, which requires a long time for cargo handling.

また吊荷緊定金具4が船倉内で玉掛作業中、トL−−−
ラ55、貨車等の運搬機が待機するため、待ち時間が沖
.み、IVむ役効率を低下させていた。
In addition, when the hanging load securing fitting 4 is being used for slinging in the hold, the
Because transportation machines such as La 55 and freight cars are on standby, the waiting time is long. However, the IV efficiency was reduced.

また、荷役サイクルを短縮するために荷役全土程の−・
部を補助荷役機械が0担ずる例もあるが、補助荷役機械
が荷を受ける際の位置合せや荷を支持する際の吊り[1
−プの荷への掛け渡しに手間を取って依然として荷役効
率が悪い。
In addition, in order to shorten the cargo handling cycle, -
There are cases where the auxiliary cargo handling machine takes on the load, but the auxiliary cargo handling machine is responsible for positioning when receiving the load and lifting [1] when supporting the load.
- Cargo handling efficiency is still poor as it takes time to load the cargo.

したがって、本発明の目的は、荷役全工7程を複数の荷
役機械で分世する技術において荷役効率を従来になく向
上する荷役設備を提供する。
Therefore, an object of the present invention is to provide cargo handling equipment that improves cargo handling efficiency more than ever before in a technology that divides all seven cargo handling steps into multiple cargo handling machines.

以下に本発明の実施例を第3図から第12図に基づいて
説明する。
Embodiments of the present invention will be described below with reference to FIGS. 3 to 12.

なお、第1図、第2図中のものと同−のものには第1図
、第2図中の符号と同−な符号を付してある。
Components that are the same as those in FIGS. 1 and 2 are given the same reference numerals as those in FIGS. 1 and 2.

第3図から第11図までの各図に示す第1の実施1列で
は、従宋とおりに岸壁上を船5と平行に走行移動でき、
船5の全長にわたって散在する荷を荷役する岸壁クレー
ン10と、この岸壁クレーン10とは別体の補助クレー
ン13とをコンベアライン14で連絡した荷役設備であ
る。
In the first implementation line shown in each figure from Fig. 3 to Fig. 11, it is possible to run parallel to the ship 5 on the quay as in the Congregation Song Dynasty,
This is a cargo handling facility in which a quay crane 10 for handling cargo scattered over the entire length of a ship 5 and an auxiliary crane 13 separate from the quay crane 10 are connected by a conveyor line 14.

このようにすることにより荷役畏備を分散支持して強度
の弱い岸壁等にも荷役設備を設置町能にしている。
By doing this, cargo handling facilities are distributed and supported, making it possible to install cargo handling equipment even on quays with weak strength.

コンベアライン14は特に第8図の如く、複数条並列に
配置したチェンコンベア装置より成り長尺な鋼材等を多
点で平均して無理なく支えることのできるコンベアライ
ンを提供している。
In particular, the conveyor line 14 is made up of a chain conveyor device in which a plurality of strips are arranged in parallel, as shown in FIG. 8, and provides a conveyor line that can comfortably support long steel materials or the like at multiple points on the average.

このコンベアライン14は海側から順に、荷卸し部15
、移送部16、ス1−レージ部17とから成り、荷卸し
部15と移送部16とは長尺物を円滑に搬入できるよう
に大きく開脚した岸壁クレーン10の海1則脚18と陸
1則1卿19との間に桂ド′j′i度したコンベアガー
ダ−201に設置される。
This conveyor line 14 is arranged in order from the sea side to the unloading section 15.
, a transfer section 16, and a storage section 17, and the unloading section 15 and the transfer section 16 are connected to the sea leg 18 and land leg of the quay crane 10, which has wide legs to smoothly transport long objects. It is installed on the conveyor girder 201 which is placed between the two parts.

特にコンベアライン14の移送部16を設置する箇所の
コンベアガーダー20部は陸仰1へ向うにしたがってド
がる4頃(1をf=tltてある。
In particular, the conveyor girder 20 section at the location where the transfer section 16 of the conveyor line 14 is installed is about 4 degrees (1 is f=tlt) as it goes toward the land elevation 1.

−・力、コンベアライン14のス[・レージ部17は補
助クL/−ン13で支えたコンベ了ガーダー21に設置
される。
The storage section 17 of the conveyor line 14 is installed on the conveyor girder 21 supported by the auxiliary crane 13.

コンベアライン14の荷卸し部15を構成するコンベア
はコンベアガーダー20上において、第6図の如く、立
設した側板22でギャ60とホ・イール23をlLj]
転自在に支え、このギャ60とホイール23で無端状の
チェン24を支え、長尺重量物をヂエン24に積載した
際にある程度ホ,イール23で?=:i重を支えて無理
な荷重がチェン24に牛じることやチェン24が大きく
たわむ等の事故を防いでいる。
The conveyor constituting the unloading section 15 of the conveyor line 14 is placed on a conveyor girder 20, and as shown in FIG.
The endless chain 24 is supported by the gear 60 and the wheel 23, so that when a long heavy object is loaded on the chain 24, the gear 60 and the wheel 23 move to some extent. =: i It supports the weight and prevents accidents such as unreasonable loads being applied to the chain 24 or the chain 24 being bent greatly.

並列にした各チェンコンベ−r装置は名チェンコンベア
装置の端部のギャ60を共通軸25で連結し、この共通
軸25に減速機26を介してモーター2−7を連ね、こ
のモーター27の回転駆動力によってギャ60を回転さ
せ、チェン24を各ホイール23で案内支持して走行さ
せるようにチエンコンベア装置を駆動する。
In each of the parallel chain conveyor devices, gears 60 at the ends of the chain conveyor devices are connected by a common shaft 25, and motors 2-7 are connected to this common shaft 25 via a reducer 26, and the rotation of this motor 27 is The gear 60 is rotated by the driving force, and the chain conveyor device is driven so that the chain 24 is guided and supported by each wheel 23 and runs.

移送部16は荷卸し部15のチエンコンベア装置のモー
ター27と減速機26とを省略し、第7図の如く、5条
並列配置した各チェンコンベア装置のギャ61を共通軸
29で連結し、この共通軸29に電磁ブレーキ30を連
結してあり、このギャ61とホイール28に無端状のチ
ェン31が掛け渡されている。
In the transfer section 16, the motor 27 and reducer 26 of the chain conveyor device of the unloading section 15 are omitted, and as shown in FIG. An electromagnetic brake 30 is connected to this common shaft 29, and an endless chain 31 is stretched between the gear 61 and the wheel 28.

コンベアガーダー20上においてギャ61やホイール2
8を側板66で回転自在に支える点等は荷卸し部15と
同様である。
Gear 61 and wheel 2 on conveyor girder 20
8 is rotatably supported by a side plate 66, etc., which is similar to the unloading section 15.

この移送部16のチエンコンベア装置はコンベアガーダ
ー20と同様に傾斜しており、チェン31上に載せられ
た荷重によりチェン31は自然に駆動される。
The chain conveyor device of this transfer section 16 is inclined like the conveyor girder 20, and the chain 31 is naturally driven by the load placed on the chain 31.

そして電磁ブレーキ30の動作によりチェン31の駆動
速度を荷卸し部15やストレージ部17とは独立して制
御できる。
By operating the electromagnetic brake 30, the driving speed of the chain 31 can be controlled independently of the unloading section 15 and the storage section 17.

この移送部16と荷卸し部15との各チェンコンベア装
置は、第8図の如く、端部を櫛状に合せて長尺な荷、た
とえば鋼材等の乗り移りが円滑になるように配置されて
いる。
As shown in FIG. 8, the chain conveyor devices of the transfer section 16 and the unloading section 15 are arranged so that their ends are aligned in a comb shape so that long loads such as steel materials can be transferred smoothly. There is.

ストレージ部17は荷卸し部15と同様な構戒を備える
チェンコンベア装置を並列に移動台32上に架載し、ホ
イール44で案内支持されたストレージ部17のチェン
39をモーター33で駆動できる。
In the storage section 17, chain conveyor devices having the same configuration as the unloading section 15 are mounted on a movable table 32 in parallel, and the chain 39 of the storage section 17 guided and supported by wheels 44 can be driven by a motor 33.

この移動台32は車輪34を介してコンベアガーダー2
1上に架載される。
This moving platform 32 is connected to the conveyor girder 2 via wheels 34.
It is mounted on 1.

この移動台32を移動させる装置は、第8図の如く、移
動台32に取り付けたラツク36と、このランク36に
噛み合うピニオン37を備え、コンベアガーダー21に
取り付けたモータ38でピニオン37を回転させること
により移動台32を移送部16側へ進退自在にできる。
As shown in FIG. 8, the device for moving this moving table 32 includes a rack 36 attached to the moving table 32 and a pinion 37 that meshes with this rank 36, and rotates the pinion 37 with a motor 38 attached to the conveyor girder 21. This allows the movable table 32 to move forward and backward toward the transfer section 16 side.

移動台32が進退することにより移送部16とストレー
ジ部17の各チェンコンベア装置は、第7図の如く、互
いちがいに噛み合うことができる。
By moving the moving table 32 back and forth, the chain conveyor devices of the transfer section 16 and the storage section 17 can be engaged with each other differently, as shown in FIG.

この噛み合い位置を検出するため、コンベアガーダー2
1にコンベアガーダー20の突端に当るようにリミット
スイッチ40を取り付けてある。
In order to detect this meshing position, conveyor girder 2
A limit switch 40 is attached to the tip of the conveyor girder 20 so as to touch the tip of the conveyor girder 20.

補助クレーン13が走行することによりリミットスイッ
チ40がコンベアガーダー20に当ると、リミットスイ
ッチ40が動作し正確な噛み合せ位置であることを知る
ことができる。
When the limit switch 40 hits the conveyor girder 20 as the auxiliary crane 13 travels, the limit switch 40 operates and it can be known that the meshing position is accurate.

荷卸し部15、移送部16およびストレージ部17に設
置されたチエンコンベア装置には、第8図の如く、各チ
ェン24,3L39の駆動速度を計測する速度検出器4
L42,43が各ホイール23.28.44と連結され
て設けられる。
As shown in FIG. 8, the chain conveyor devices installed in the unloading section 15, transfer section 16, and storage section 17 are equipped with speed detectors 4 for measuring the driving speed of each chain 24, 3L39.
L42, 43 are provided connected to each wheel 23, 28, 44.

これら各速度検出器4L42,43は各ホイール23,
28.44の回転速度を検也して各ホイール23.28
.44で案内支持されるチェン24,31 ,39の速
度を検知できる。
Each of these speed detectors 4L42, 43 corresponds to each wheel 23,
Check the rotation speed of 28.44 and each wheel 23.28
.. The speed of chains 24, 31, 39 guided and supported by 44 can be detected.

さらにストレジ一部17のチエンコンベア装置には、第
8図の如く、光電スイッチ45.46が取り付けられ、
各光電スイッチ45.46の位置のチェンコンベア装置
上の荷の存否を検出することができる。
Further, as shown in FIG. 8, photoelectric switches 45 and 46 are attached to the chain conveyor device of the storage part 17.
The presence or absence of a load on the chain conveyor device at the position of each photoelectric switch 45, 46 can be detected.

ストレージ部17のチエンコンベア装置を支える補助ク
レーン13は、第3図の如く、ストレージ部17よりも
高い位置において桁47を備え、この桁47に、第10
図の如く、補助トロリー48を車輪49を介して横行自
在に設けられる。
As shown in FIG. 3, the auxiliary crane 13 that supports the chain conveyor device of the storage section 17 is provided with a girder 47 at a position higher than the storage section 17.
As shown in the figure, an auxiliary trolley 48 is provided via wheels 49 so as to be freely traverseable.

この補助トロリー48には複数本のフォーク50を上下
動自在に備えるとともに、運転室51を固定的に備えて
いる。
The auxiliary trolley 48 is equipped with a plurality of forks 50 that are movable up and down, and is also fixedly equipped with a driver's cab 51.

このフォーク50は、第9図で対応関係を示す通り、フ
ォーク50が各チェンコンベア装置の間に入れられるよ
うな間隔を有する。
The forks 50 are spaced such that the forks 50 are placed between each chain conveyor device, as shown in the correspondence in FIG.

なお、第9図、第10図において52は櫛状のストツパ
であり、チェン39で送られてきた荷が落下せぬように
止めることができる。
In addition, in FIGS. 9 and 10, 52 is a comb-shaped stopper, which can stop the load sent by the chain 39 from falling.

このフォーク50で第10図で示す荷53をすくい上げ
る時には補助トロリー48を荷53側へ走行させること
によりフォーク50を各ストツパ52の櫛目に相当する
空間から各チェンコンベア装置間の空間へ差し入れ、し
かる後フォーク50を上昇させ荷53をすくい上げるよ
うにしてフォーク50上に移載する。
When scooping up a load 53 shown in FIG. 10 with this fork 50, by moving the auxiliary trolley 48 toward the load 53, the fork 50 is inserted from the space corresponding to the comb of each stopper 52 into the space between each chain conveyor device, and then The rear fork 50 is raised and the load 53 is scooped up and transferred onto the fork 50.

フォーク50上に移載した荷53は補助トロリー48を
逆方向へ走行させることにより地上でトラクター54に
連結されたトレーラ55上に近づく。
The load 53 transferred onto the fork 50 approaches the trailer 55 connected to the tractor 54 on the ground by running the auxiliary trolley 48 in the opposite direction.

トレーラ55上に近づいたならばフォーク50を降下さ
せてトレーラ55上へ荷53をさらに近づけ、フォーク
間隔と同じ間隔を取ってトレーラ55上に設置した枕木
56上へ荷53を着地させる。
When approaching the top of the trailer 55, the fork 50 is lowered to bring the load 53 closer to the trailer 55, and the load 53 is landed on sleepers 56 installed on the trailer 55 with the same spacing as the fork spacing.

次に補助トロリー48をさらに走行させてフォーク50
を抜いて次の荷役作業に向う。
Next, the auxiliary trolley 48 is further run and the fork 50 is
I pulled it out and headed to the next cargo handling operation.

この間荷53に対するロープ掛けやロープはずし作業等
を含まないので荷役作業が緊くその分荷役サイクルタイ
ムの減少を期待できる。
Since this does not include rope-hanging and rope-removal work for the cargo 53, the cargo handling work is more intensive and the cargo handling cycle time can be expected to be reduced accordingly.

以上の如き動作を行なう補助クレーン13はモーター5
7(こよって自走することができる。
The auxiliary crane 13 that performs the above operations has a motor 5.
7 (This allows it to run on its own.

第12図に示す第2の実施例では、コンベアガーダー2
1と一体にしたストレージ部17と補助1・ロリー48
を備えた補助クレーン13の桁4γとを岸壁クレーン1
0に取り付けることにより補助クレーン13と岸壁クレ
ーン10とを一体化したものである。
In the second embodiment shown in FIG.
Storage part 17 integrated with 1 and auxiliary 1/roly 48
girder 4γ of the auxiliary crane 13 equipped with quay crane 1
0, the auxiliary crane 13 and quay crane 10 are integrated.

この第2の実施例の構成によると岸壁クレーン10と補
助クレーン13との位置合せ等のわずらわしさがなく、
迅速に荷役作業を開始できる。
According to the configuration of this second embodiment, there is no need for troublesome alignment of the wharf crane 10 and the auxiliary crane 13.
Cargo handling work can be started quickly.

第1の実施例において船5内の荷を地上のトレラ55に
陸揚げする場合には次のようである。
In the first embodiment, when the cargo in the ship 5 is unloaded onto the trailer 55 on the ground, the procedure is as follows.

岸壁クレーン10を人船位置へ走行させたならば、次に
補助クレーン13をモーター57で自走させて第8図中
のリミットスイッチ40が動作した時点で停止させる。
Once the quay crane 10 has been moved to the man-ship position, the auxiliary crane 13 is then driven by the motor 57 and stopped when the limit switch 40 in FIG. 8 is activated.

次に第8図中のモーター38を,駆動することによりラ
ツク36とビニオン37を介して移動台32を岸壁クレ
ーン10側へ突き出す。
Next, by driving the motor 38 in FIG. 8, the movable platform 32 is pushed out toward the wharf crane 10 via the rack 36 and pinion 37.

この突き出し作業により移動台32−ヒのストレージ部
17を構成するチェンコンベア装置と岸壁クレーン10
側の移送部16を構戒するチェンコンベア装置の各端部
を、第7図の如く櫛を噛み合せるごとく組み合せる。
Through this ejecting operation, the chain conveyor device and quay crane 10 that constitute the storage section 17 of the movable platform 32-hi are
The ends of the chain conveyor device, which connects the side transfer section 16, are assembled in a comb-like manner as shown in FIG.

この組み合せが終ったならば、第3図の如く、岸壁クレ
ーン10の吊荷緊定金具4をA−A点線の如く移動操作
して荷卸し部15のチェンコンベア装置上へ船5内の荷
を移載する。
When this combination is completed, as shown in FIG. Transfer.

この際、船5と荷卸し部15との距離が少いから、第1
1図の口で示す如く、第11図のイで示す従来の荷役作
業にくらべトロリー7の横行時間が少い。
At this time, since the distance between the ship 5 and the unloading section 15 is short, the first
As shown by the opening in FIG. 1, the traverse time of the trolley 7 is shorter than in the conventional cargo handling operation shown by the arrow A in FIG. 11.

また荷卸し部15へ荷を卸した後は、吊荷緊定金具4を
船5へ戻して、次の荷を荷卸し部15へ卸す作業に備え
る。
Further, after unloading the cargo to the unloading section 15, the hanging load securing fitting 4 is returned to the ship 5 in preparation for unloading the next cargo to the unloading section 15.

この戻り過程においても第11図の口で示す如く、第1
1図のイで示す従来の荷役作業にくらべトロリー7の横
行時間が少い。
In this return process, as shown by the mouth in Fig. 11, the first
The traversing time of the trolley 7 is shorter than in the conventional cargo handling work shown by A in Figure 1.

このため、船5側から岸壁側へ短時間で多くの荷を陸揚
げできる。
Therefore, a large amount of cargo can be unloaded from the ship 5 side to the quay side in a short time.

コンベアラインの荷卸し部15に卸された荷は、吊荷緊
定金具4が次の荷を陸揚げする間に荷卸し部15のチエ
ンコンベア装置をモーター27により,駆動することに
より荷を移送部16のチエンコンベア装置へ移載する。
The load unloaded to the unloading section 15 of the conveyor line is transferred to the transfer section by driving the chain conveyor device of the unloading section 15 by the motor 27 while the hanging load securing fitting 4 unloads the next load. Transfer to No. 16 chain conveyor device.

移載し終えたならばモーター27を停止させ、荷卸し部
15のチエンコンベア装置を止めて、次の荷を無事に卸
せるような状態とする。
When the transfer is completed, the motor 27 is stopped, and the chain conveyor device of the unloading section 15 is stopped, so that the next load can be safely unloaded.

一方、移送部16のチエンコンベア装置に移載された荷
は、荷の自重によってチェン31が1駆動されるから、
ス1ヘレージ部17側へ送られる。
On the other hand, when the load is transferred to the chain conveyor device of the transfer section 16, the chain 31 is driven once by the weight of the load.
1 is sent to the herage section 17 side.

荷がストレージ部17に着く前にあらかじめモ・一ター
33でストレージ部17のチェンコンベア装置を駆動し
ておく、そしてこの駆動速度と同じ、駆動速度を移送部
16のチエンコンベア装置に与えるため、各速度検出器
42.43から得られる速度表示に基づいて電磁ブレー
キ30を動作させることにより移送部16とストレージ
部17の各チェンコンベア装置の駆動速度を同じくし、
移送部16からストレージ部1γへの荷の移載衝撃をや
わらげている。
Before the cargo arrives at the storage section 17, the motor 33 drives the chain conveyor device in the storage section 17 in advance, and in order to give the same driving speed as this drive speed to the chain conveyor device in the transfer section 16, By operating the electromagnetic brake 30 based on the speed display obtained from each speed detector 42, 43, the driving speed of each chain conveyor device of the transfer section 16 and the storage section 17 is made the same,
This reduces the impact of transferring the load from the transfer section 16 to the storage section 1γ.

さらに移送部16とストレージ部17の各チェンコンベ
ア装置は互いに第7図の如く櫛が噛み合うようにラップ
させて組み合せてあるから一層荷の移載衝撃がすくない
Further, since the chain conveyor devices of the transfer section 16 and the storage section 17 are lapped and combined so that the combs are interlocked with each other as shown in FIG. 7, the load transfer impact is further reduced.

したがって移載時に荷くずれや荷の姿勢変化を生じない
Therefore, the load does not collapse or change its posture during transfer.

移載後はストレージ部17に移載された荷にまず光電ス
イッチ45が感応する。
After the transfer, the photoelectric switch 45 is first sensitive to the load transferred to the storage section 17.

しかし光電スイッチ46は感応しない。However, the photoelectric switch 46 is not sensitive.

したがってストレージ部17にはまだ荷を収納するスペ
ースがあることを知ることができる。
Therefore, it can be known that there is still space in the storage section 17 to store the cargo.

次の荷がストレージ部17に移載される時には、前回の
荷はストレージ部1Tのチェンコンベア装置でストツパ
52側へ送られる。
When the next load is transferred to the storage section 17, the previous load is sent to the stopper 52 side by the chain conveyor device of the storage section 1T.

したがって前回の荷に対して光電スイッチ46が感応し
、今回の荷に対して光電スイッチ45が感応する。
Therefore, the photoelectric switch 46 is sensitive to the previous load, and the photoelectric switch 45 is sensitive to the current load.

このため、両光電スイッチ45.46が同時に感応した
ことを知ってストレージ部17上で荷が満載状態にある
ことを知ることができる。
Therefore, it is possible to know that the storage section 17 is fully loaded by knowing that both photoelectric switches 45 and 46 are activated at the same time.

ス1〜レージ部17上で荷が満載状態にある時には、荷
卸し部15のチェンコンベア装置をモーター27を止め
ることでまた移送部16のチェンコンベア装置を電磁ブ
レーキ30でおのおの停止させ、ストレージ部17方向
への荷の送り作業を止める。
When the storage section 1 to the storage section 17 are fully loaded, the motor 27 of the chain conveyor device of the unloading section 15 is stopped, and the chain conveyor device of the transfer section 16 is also stopped by the electromagnetic brake 30. Stop sending loads in 17 directions.

このように各光電スイッチ45,46の各検出状態を知
ることによりストレージ部17上の満載状態を知る。
In this way, by knowing each detection state of each photoelectric switch 45, 46, the fully loaded state on the storage section 17 is known.

即ち、両光電スイッチ45 .46が同時に荷を検出し
た状態にある時には、ストレージ部1γ上に荷が満載さ
れていると判断し、いずれか一方の光電スイッチだけが
荷を検出している状態の場合には、荷を詰め寄せること
で新たに荷をストレージ部17上に受け入れることがで
きると判断している。
That is, both photoelectric switches 45. 46 are simultaneously detecting loads, it is determined that the storage section 1γ is fully loaded, and if only one of the photoelectric switches is detecting loads, it is determined that the storage section 1γ is fully loaded. It is determined that a new load can be received on the storage section 17 by moving the load closer together.

この判断をするに当り、光電スイッチの動作を知りやす
くする為、運転室に各光電スイッチ45.46と連動す
る表示灯を設置して、運転者に満載状態を知らしめ、運
転者の操作により、あるいは、運転者からのあいずを受
けた地上の作業員によってモーター27や電磁ブレーキ
30を荷の流れを止めるか低速にするように操作し、ス
トレージ部17で荷どうしが衝突することを防ぐ。
When making this judgment, in order to make it easier to understand the operation of the photoelectric switches, indicator lights that are linked to each photoelectric switch 45 and 46 are installed in the driver's cab to inform the driver of the fully loaded state, and the operation of the Alternatively, the motor 27 or the electromagnetic brake 30 is operated by a ground worker upon request from the driver to stop the flow of the load or to slow down the flow of the load, thereby preventing the loads from colliding with each other in the storage section 17. .

又、このような衝突防止を自動的に行いたい場合には、
光電スイッチ45,46のスイッチ部を電磁ブレーキ3
0のブレーキ作動条件回路に入れ、さらにモーター27
の停止条件回路にも入れる。
Also, if you want to automatically prevent collisions like this,
The switch parts of the photoelectric switches 45 and 46 are connected to the electromagnetic brake 3.
0 brake operating condition circuit, and then motor 27
It is also included in the stop condition circuit.

このことにより、光電スイッチ45.46のスイッチン
グ動作と連動して電磁ブレーキ30をブレーキ作動させ
、モーター27を止めることができ、自動的な衝突防止
が達成できる。
As a result, the electromagnetic brake 30 can be operated in conjunction with the switching operation of the photoelectric switches 45 and 46 to stop the motor 27, and automatic collision prevention can be achieved.

衝突防止作用を成している間であってもこの間、荷卸し
部15が満載になるまでA−A点線で示す荷卸し作業は
停止することはない。
Even during the collision prevention action, the unloading operation shown by the dotted line A-A does not stop until the unloading section 15 is fully loaded.

ストレージ部17上に移載された荷は、ストレージ部1
7のチェンコンベア装置を停止させることにより一旦停
止させる。
The load transferred onto the storage section 17 is transferred to the storage section 1.
It is temporarily stopped by stopping the chain conveyor device No. 7.

次に、第9図の如く、フォーク50をストレージ部17
の各チェンコンベア装置間の溝状の空間に高さを合せ、
第10図で示す補助トロリー48を横行させることによ
りフォーク50をストツパ52を通過させて荷53の下
面に差し入れる。
Next, as shown in FIG.
Adjust the height to the groove-shaped space between each chain conveyor device,
By moving the auxiliary trolley 48 shown in FIG. 10 laterally, the fork 50 is passed through the stopper 52 and inserted into the lower surface of the load 53.

しかる後、第3図で示すB −B点線の如くフォーク5
0を操作して第10図で示すトレーラ55上の枕木56
上へ荷を卸す。
After that, connect the fork 5 as indicated by the B-B dotted line in Fig. 3.
0 and the sleeper 56 on the trailer 55 shown in FIG.
Unload the cargo upstairs.

この間荷53に関する玉掛ロープのはずし作業は無く迅
速な作業を行なえる。
During this time, there is no need to remove the sling rope related to the load 53, and the work can be carried out quickly.

荷53がストレージ部の途中に停止している場合には、
ストレージ部17の各チェンコンベア装置間の空間にフ
ォーク50を降下させ、補助トロリー48の横行によっ
て荷53の下方へフォーク50を差し入れ、荷53をす
くい上げる。
If the load 53 is stopped in the middle of the storage section,
The fork 50 is lowered into the space between each chain conveyor device in the storage section 17, and the fork 50 is inserted below the load 53 by the traverse movement of the auxiliary trolley 48, and the load 53 is scooped up.

このフォーク50による卸し作業中、あるいはコンベア
ライzjtこよる荷の移送中においても、第3図のA−
A点線の如く吊荷緊定金具4を操作して荷卸し部15へ
の陸揚げ作業が、第11図の口で示すデュテイサイクル
に基づいて続けられることになる。
Even during the unloading operation using the fork 50 or during the transfer of the load by the conveyor line, the A-
The unloading operation to the unloading section 15 is continued based on the duty cycle shown by the opening in FIG. 11 by operating the hanging load fastening fitting 4 as shown by the dotted line A.

またフォーク10のサイクルもB−B点線の如く短くて
すむ。
Further, the cycle of the fork 10 can be shortened as shown by the dotted line B-B.

したがって短時間で多くの荷を陸揚げできる。Therefore, a large amount of cargo can be unloaded in a short period of time.

さらにつぎつぎにトレーラ55へ荷を移載して、トレー
ラ55の待ち時間をすくなくもできる。
Furthermore, the waiting time for the trailer 55 can be reduced by transferring loads to the trailer 55 one after another.

荷の移送中、特に荷が移送部16のチエンコンベア装置
で移送されている途中で新たな荷を荷卸し部15へ移載
する時には、移送部16のチェンコンベア装置の駆動速
度を速度検出器42で、荷卸し部15のチェンコンベア
装置の駆動速度を速度検出器41でおのおの確認しなが
ら、各速度検出器41.42とが同一速度を計測するよ
うに荷卸し部15のモーター27や移送部16の電磁ブ
レーキ30を使用して各チェンコンベア装置の移送速度
を制御する。
During the transfer of a load, especially when transferring a new load to the unloading section 15 while the load is being transferred by the chain conveyor device of the transfer section 16, a speed detector detects the driving speed of the chain conveyor device of the transfer section 16. 42, while checking the driving speed of the chain conveyor device of the unloading section 15 with the speed detector 41, the motor 27 of the unloading section 15 and the transport An electromagnetic brake 30 in section 16 is used to control the transfer speed of each chain conveyor device.

このようにすることにより移送部16と荷卸し部15間
での荷の移載時に発生する衝撃や荷くずれ、および荷の
姿勢変化を防いでいる。
This prevents shocks, load collapse, and changes in the posture of the load that occur when the load is transferred between the transfer section 16 and the unloading section 15.

第12図で示す第2の実施例では、第1の実施例と同様
に吊荷緊定金具4をA−A点線に沿って操作し、フォー
ク50をB−B点線に沿って操作し、これら両操作領域
間をコンベアラインで荷を移送するので第1の実施例と
同様に第11図の口で示す短いデュテイサイクルを岸壁
クレーン10に設定できる。
In the second embodiment shown in FIG. 12, similarly to the first embodiment, the hanging load fastening fitting 4 is operated along the A-A dotted line, the fork 50 is operated along the B-B dotted line, Since the load is transferred between these two operation areas by a conveyor line, the short duty cycle shown by the opening in FIG. 11 can be set for the quay crane 10, as in the first embodiment.

したがってこの場合も短時間で多くの荷を陸揚げできる
Therefore, in this case as well, a large amount of cargo can be unloaded in a short period of time.

以上の如く、本発明によれば、主補各荷役機械で全荷役
工程を分担するものにおいて、各荷役機械の荷役領域間
のコンベアラインの荷受渡し端が各荷役機械に対し荷役
機械の移動によっては相対的に位置変化せず位置合せせ
ずとも荷の受け渡しが達成できる上に、補助荷役機械は
複数条並列配置したコンベアラインの間に入れたフォー
クで荷をすくい取り下方へ荷降しでき、吊りロープを掛
け渡す手間をかけず荷役できるので荷役効率が極めて向
上する効果が得られる。
As described above, according to the present invention, in a system in which the entire cargo handling process is shared between main and auxiliary cargo handling machines, the cargo delivery end of the conveyor line between the cargo handling areas of each cargo handling machine is In addition, the auxiliary cargo handling machine can scoop up loads with forks inserted between multiple conveyor lines arranged in parallel and unload them downward. , cargo handling can be carried out without the hassle of hanging ropes, resulting in an extremely improved cargo handling efficiency.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は従来の陸揚げクレーンの側面図、第2図は第1
図のクレーンの正面図である。 第3図は本発明の第1の実施例による陸揚げ設備の側面
図、第4図は左側を第3図のアーア矢視から、そして右
側を第3図のイーイ矢視から見た図、第5図は第3図中
のコンベアライン部分の拡大側面図、第6図は第3図中
に示されたコンベアラインの荷卸し部の拡大斜視図、第
7図は第3図に示されたコンベアラインの移送部とスト
レージ部との連ね方を示した拡大斜視図、第8図は第3
図に示されたコンベアライン部分の斜視図、第9図は第
3図で示したストレージ部とフォークとの取合い関係を
示す拡大斜視図、第10図は第3図で示した補助クレー
ンとトレーラとの取合い関係を示す拡大斜視図、第11
図のイは第1園に示した従来のクレーンによるテユテイ
サイクル表示図、第11図の口は第3図に示した岸壁ク
レーンのデュテイサイクル表示図、第12図は本発明の
第2の実施例による陸揚げ設備の側面図である。 4・・・・・・吊荷緊定金具、5・・・・・・船、6・
・・・・・巻上ロープ、7・・・・・・トロリー、10
・・・・・・岸壁クレーン、13・・・・・・補助クレ
ーン、14・・・・・・コンベアライン、15・・・・
・・荷卸し部、16・・・・・・移送部、17・・・・
・・ストレージ部、23,28.44・・・・・・ホイ
ール、24,31.39・・・・・・チェン、30・・
・・・・電磁ブレーキ、32・・・・・・移動台、34
・・・・・・車輪、36・・・・・・ラック、37・・
・・・・ピニオン、40・・・・・・リミットスイッチ
、4L42,43・・・・・・速度検出器、45,46
・・・・・・光電スイッチ、47・・・・・・桁、48
・・・・・・補助トロリー 50・・・・・・フォーク
、52・・・・・・ストツパ、53・・・・・・荷、5
5・・・・・・トレーラ、56・・・・・・枕木。
Figure 1 is a side view of a conventional landing crane, and Figure 2 is a side view of a conventional landing crane.
FIG. 2 is a front view of the crane shown in FIG. 3 is a side view of the landing equipment according to the first embodiment of the present invention, FIG. 4 is a view of the left side seen from arrow A in FIG. Figure 5 is an enlarged side view of the conveyor line portion shown in Figure 3, Figure 6 is an enlarged perspective view of the unloading section of the conveyor line shown in Figure 3, and Figure 7 is the same as shown in Figure 3. Figure 8 is an enlarged perspective view showing how the transfer section and storage section of the conveyor line are connected.
Figure 9 is an enlarged perspective view showing the relationship between the storage section and fork shown in Figure 3, and Figure 10 is the auxiliary crane and trailer shown in Figure 3. Enlarged perspective view showing the relationship between
A in the figure is a duty cycle display diagram of the conventional crane shown in the first garden, the mouth of FIG. 11 is a duty cycle display diagram of the quay crane shown in FIG. FIG. 2 is a side view of the landing equipment according to the embodiment. 4... Hanging load securing bracket, 5... Ship, 6...
...Hoisting rope, 7...Trolley, 10
... Quay crane, 13 ... Auxiliary crane, 14 ... Conveyor line, 15 ...
...Unloading Department, 16...Transfer Department, 17...
... Storage part, 23, 28.44 ... Wheel, 24, 31.39 ... Chain, 30 ...
...Electromagnetic brake, 32...Moving table, 34
...Wheel, 36...Rack, 37...
...Pinion, 40...Limit switch, 4L42, 43...Speed detector, 45,46
...Photoelectric switch, 47... Digit, 48
...Auxiliary trolley 50...Fork, 52...Stopper, 53...Load, 5
5...Trailer, 56...Sleeper.

Claims (1)

【特許請求の範囲】 1 荷を上下および水平移動させる主たる荷役機械と、
フォークを上下および水平移動自在に備えた補助荷役機
械とを備え、前記各荷役機械の各荷役領域間に複数条並
列配置したコンベアラインを配置し、前記コンベアライ
ンの一端を前記主たる荷役機械全体の移動と一体に移動
自在に備え、前記コンベアラインの他端を前記補助荷役
機械と一体に移動自在に備え、前記補助荷役機械のフォ
ークを前記コンベアラインの並列間隔間に対向できるフ
ォーク間隔に配置したことを特徴とする荷役設備。 2 前記コンベアラインを独立制御できる複数のコンベ
ア装置を連ねて構成したことを特徴とする特許請求の範
囲の第1項に記載の荷役設備。 3 前記コンベアラインの端部はストレージ装置とした
ことを特徴とする特許請求の範囲の第1項または第2項
に記載の荷役設備。 4 前記ストレージ装置は、荷の流れ方向に間隔をあけ
て荷を検出する複数個の検出器を検出方向をストレージ
領域内に向けて備えることを特徴とした特許請求の範囲
の第3項に記載の荷役設備。 5 前記ストレージ装置はコンベアラインの終端部に、
コンベアラインの荷架載面よりも上方へ突き出したスト
ツパを備えていることを特徴とする特許請求の範囲の第
3項に記載の荷役設備。 6 前記コンベアラインは自重式コンベア装置を備える
ことを特徴とする特許請求の範囲の第1項または第2項
に記載の荷役設備。 7 前記主たる荷役機械と補助荷役機械とは一体である
ことを特徴とする特許請求の範囲の第1項または第2項
に記載の荷役設備。 前記主たる荷役t=P=”4と補助荷役機械とは別体で
あることを特徴とする特許請求の範囲の第1項または第
2項に記載の荷役設備。 9 前記コンベアラインの一部を補助荷役機械へ主たる
荷役機械側のコンベアラインに向けて進退自在に取り付
けたことを特徴とする特許請求の範囲の第8項に記載の
荷役設備。 10 前記コンベアラインの進退移動のストローク長さ
は、主たる荷役機械側のコンベアライン水平方向に重な
ることのできる長さに設定してあることを特徴とする特
許請求の範囲の第9項に記載の荷役設備。 11 前記補助荷役機械に主たる荷役機械の位置を検
出する位置検出器を取り付けたことを特徴とする特許請
求の範囲の第8項または第9項に記載の荷役設備。 12 前記コンベアラインを構或ずるコンベア装置は、
前記コンベアラインの流れ方向に沿って設置した回転ホ
イールにチェンを案内支持して成るチェンコンベア装置
であることを特徴とする特許請求の範囲の第1項に記載
の荷役設備。
[Claims] 1. A main cargo handling machine that moves cargo vertically and horizontally;
An auxiliary cargo handling machine equipped with a fork that can be moved vertically and horizontally, a plurality of conveyor lines arranged in parallel between each cargo handling area of each of the cargo handling machines, and one end of the conveyor line connected to the main cargo handling machine as a whole. The other end of the conveyor line is movable together with the auxiliary cargo handling machine, and the fork of the auxiliary cargo handling machine is arranged at a spacing between the forks that can face the parallel spacing of the conveyor line. Cargo handling equipment characterized by: 2. The cargo handling equipment according to claim 1, characterized in that it is constructed by connecting a plurality of conveyor devices that can independently control the conveyor line. 3. The cargo handling equipment according to claim 1 or 2, wherein an end of the conveyor line is a storage device. 4. According to claim 3, the storage device includes a plurality of detectors for detecting loads at intervals in the flow direction of the loads, with the detection direction facing inside the storage area. cargo handling equipment. 5. The storage device is located at the end of the conveyor line,
The cargo handling equipment according to claim 3, further comprising a stopper projecting upward from the cargo loading surface of the conveyor line. 6. The cargo handling equipment according to claim 1 or 2, wherein the conveyor line is equipped with a self-weight conveyor device. 7. The cargo handling equipment according to claim 1 or 2, wherein the main cargo handling machine and the auxiliary cargo handling machine are integrated. The cargo handling equipment according to claim 1 or 2, characterized in that the main cargo handling machine t=P="4 and the auxiliary cargo handling machine are separate bodies. 9. A part of the conveyor line is The cargo handling equipment according to claim 8, characterized in that the cargo handling equipment is attached to the auxiliary cargo handling machine so that it can move forward and backward toward the conveyor line on the main cargo handling machine side.10 The stroke length of the forward and backward movement of the conveyor line is The cargo handling equipment according to claim 9, characterized in that the conveyor line on the main cargo handling machine side is set to a length that can be overlapped in the horizontal direction.11. 12. The cargo handling equipment according to claim 8 or 9, characterized in that a position detector is attached to detect the position of the conveyor line.
The cargo handling equipment according to claim 1, characterized in that it is a chain conveyor device in which a chain is guided and supported by rotating wheels installed along the flow direction of the conveyor line.
JP52064842A 1977-06-03 1977-06-03 Cargo handling equipment Expired JPS5848451B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP52064842A JPS5848451B2 (en) 1977-06-03 1977-06-03 Cargo handling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP52064842A JPS5848451B2 (en) 1977-06-03 1977-06-03 Cargo handling equipment

Publications (2)

Publication Number Publication Date
JPS5417273A JPS5417273A (en) 1979-02-08
JPS5848451B2 true JPS5848451B2 (en) 1983-10-28

Family

ID=13269875

Family Applications (1)

Application Number Title Priority Date Filing Date
JP52064842A Expired JPS5848451B2 (en) 1977-06-03 1977-06-03 Cargo handling equipment

Country Status (1)

Country Link
JP (1) JPS5848451B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5988090U (en) * 1982-12-02 1984-06-14 三井造船株式会社 container crane

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4710494U (en) * 1971-03-04 1972-10-07
JPS5172077A (en) * 1974-12-18 1976-06-22 Rengo Co Ltd
JPS5214508A (en) * 1975-07-26 1977-02-03 Shuji Umano Iron manufacturing process
JPS5216303U (en) * 1975-07-23 1977-02-04

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4710494U (en) * 1971-03-04 1972-10-07
JPS5172077A (en) * 1974-12-18 1976-06-22 Rengo Co Ltd
JPS5216303U (en) * 1975-07-23 1977-02-04
JPS5214508A (en) * 1975-07-26 1977-02-03 Shuji Umano Iron manufacturing process

Also Published As

Publication number Publication date
JPS5417273A (en) 1979-02-08

Similar Documents

Publication Publication Date Title
US5909817A (en) Method and apparatus for controlling and operating a container crane or other similar cranes
US3717263A (en) Apparatus for loading bagged mail from a loading dock into a highway vehicle
CN106828250B (en) Multifunctional self-loading and unloading equipment
US3198353A (en) Bulk material loading system
RU2093447C1 (en) Device for reloading the unit loads in form of shipment packages
WO1995018741A1 (en) Cargo container transfer system for cranes
CA2184558C (en) Guide chute for cargo container handling cranes
JPS5848451B2 (en) Cargo handling equipment
CN201177983Y (en) Conveying and storing apparatus for radioactive or dangerous articles
JP2991156B2 (en) Cargo handling equipment using cranes
US2226361A (en) Combination cargo and material handling machine
US3051322A (en) Ship or barge unloaders
JPH09150918A (en) Three dimensional storage facility for container
EP0827934B1 (en) A guide chute for cargo container handling cranes
CN210191913U (en) Online automatic transferring and warehousing device for steel pipe bundles
US3464572A (en) Apparatus for loading bagged mail from a loading dock into a highway vehicle
CN218579106U (en) Multipurpose bank ship unloader
CN207257662U (en) A kind of intelligent track transport vehicle for place orbit transports
JP2744745B2 (en) Traverse type continuous unloader
JPH0234879B2 (en) HASHIGATAANROODA
JPS61248827A (en) Insertion handling gear
JPH05179633A (en) Method for carrying concrete of dam
US3464571A (en) Apparatus for loading bagged mail from a loading dock into a highway vehicle
JPH0668165B2 (en) Concrete transport method and device
JP2001193400A (en) Retrieving device for multi-tier automatic warehouse