JP5871605B2 - Load lifting device - Google Patents

Load lifting device Download PDF

Info

Publication number
JP5871605B2
JP5871605B2 JP2011280070A JP2011280070A JP5871605B2 JP 5871605 B2 JP5871605 B2 JP 5871605B2 JP 2011280070 A JP2011280070 A JP 2011280070A JP 2011280070 A JP2011280070 A JP 2011280070A JP 5871605 B2 JP5871605 B2 JP 5871605B2
Authority
JP
Japan
Prior art keywords
jib
boom
wire rope
hung
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011280070A
Other languages
Japanese (ja)
Other versions
JP2013129500A (en
Inventor
幸治 丸山
幸治 丸山
Original Assignee
株式会社加藤製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社加藤製作所 filed Critical 株式会社加藤製作所
Priority to JP2011280070A priority Critical patent/JP5871605B2/en
Publication of JP2013129500A publication Critical patent/JP2013129500A/en
Application granted granted Critical
Publication of JP5871605B2 publication Critical patent/JP5871605B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Description

本発明は、クレーンに設けられ、荷重の吊上げに用いられる荷重吊上げ装置に関する。   The present invention relates to a load lifting device provided in a crane and used for lifting a load.

特許文献1には、ブームの先端部にジブが取付けられたクレーンが開示されている。このクレーンでは、ジブは、ブームとの連結部を回動軸として、ブームに対して回動可能である。また、ブームの先端部とジブとの間には、テンションロッドが張られている。クレーンの車体からは、補巻ワイヤロープが延出されている。ジブがブームに対して起状した状態では、補巻ワイヤロープは、ブームの先端部のガイドシーブに掛けられ、ジブの先端部のシーブに掛けられる。そして、補巻ワイヤロープの延出端が、サブフックを備える軽荷重用吊り具に固定されている。軽荷重用吊り具のサブフックにより、比較的軽い荷重が吊上げられる。以上のようにして、荷重を吊上げる荷重吊上げ装置が構成されている。ここで、軽荷重用吊り具では、補巻ワイヤロープがシーブ等を用いてジブに向かって延出方向が変更されることなく、補巻ワイヤロープの延出端が直接固定されている。すなわち、軽荷重用吊り具は、補巻ワイヤロープにより単索状態でジブから吊下げられている。この荷重吊上げ装置では、ジブから軽荷重用吊り具が吊下げられているため、比較的高い位置、すなわちブームの先端より高い位置で、軽い荷重を吊上げることが可能である。   Patent Document 1 discloses a crane in which a jib is attached to the tip of a boom. In this crane, the jib can be rotated with respect to the boom about a connecting portion with the boom as a rotation axis. A tension rod is stretched between the tip of the boom and the jib. A supplementary wire rope is extended from the crane body. In a state where the jib is raised with respect to the boom, the auxiliary winding wire rope is hung on the guide sheave at the tip of the boom and hung on the sheave at the tip of the jib. And the extension end of the auxiliary winding wire rope is being fixed to the hanging tool for light loads provided with a subhook. A relatively light load is lifted by the sub-hook of the light load suspension. As described above, the load lifting device for lifting the load is configured. Here, in the light load hanging tool, the extending end of the auxiliary winding wire rope is directly fixed without changing the extending direction of the auxiliary winding wire rope toward the jib using a sheave or the like. In other words, the light load suspension is suspended from the jib in a single-wire state by the supplementary wire rope. In this load lifting device, since the light load suspension is suspended from the jib, it is possible to lift a light load at a relatively high position, that is, a position higher than the tip of the boom.

特許文献2には、ブームを備えるクレーンが開示されている。このクレーンでは、ブームの軸方向についてブームの中間部に、ガイドシーブ及びロードシーブが設けられている。また、クレーンの車体からは、主巻ワイヤロープが延出されている。ブームを起上した状態では、主巻ワイヤロープは、ブームの中間部のガイドシーブ及びロードシーブに掛けられる。そして、メインフックを備える重荷重用吊り具でシーブに掛けられ、ブームに向かって主巻ワイヤロープの延出方向が変更される。重荷重用吊り具で延出方向が変更された主巻ワイヤロープの延出端は、ブームに固定されている。重荷重用吊り具のメインフックにより、比較的重い荷重が吊上げられる。以上のようにして、荷重を吊上げる荷重吊上げ装置が構成されている。ここで、重荷重用吊り具では、ブームから延出される主巻ワイヤロープがシーブに掛けられ、シーブに掛けられることにより主巻ワイヤロープの延出方向がブームに向かって変更されている。すなわち、重荷重用吊り具は、主巻ワイヤロープにより複索状態でブームから吊下げられている。この荷重吊上げ装置では、重荷重用吊り具が主巻ワイヤロープにより複索状態でブームから吊下げられているため、重荷重用吊り具により重い荷重を吊上げることが可能である。また、ブームは、強度が高いため、重い荷重を吊上げた状態でも荷重による負荷に対するブームの耐性は高い。   Patent Document 2 discloses a crane including a boom. In this crane, a guide sheave and a load sheave are provided at an intermediate portion of the boom in the axial direction of the boom. A main wire rope is extended from the crane body. In the state where the boom is raised, the main wire rope is hung on the guide sheave and the load sheave at the middle part of the boom. Then, it is hung on the sheave by a heavy load suspension provided with a main hook, and the extending direction of the main wire rope is changed toward the boom. The extension end of the main winding wire rope whose extension direction has been changed by the heavy load suspension is fixed to the boom. A relatively heavy load is lifted by the main hook of the heavy load suspension. As described above, the load lifting device for lifting the load is configured. Here, in the heavy load suspension, the main winding wire rope extended from the boom is hung on the sheave, and the extending direction of the main winding wire rope is changed toward the boom by being hung on the sheave. That is, the heavy load suspension is suspended from the boom in a double-wired state by the main wire rope. In this load lifting device, since the heavy load lifting device is suspended from the boom in a double-wired state by the main winding wire rope, it is possible to lift a heavy load by the heavy load lifting device. In addition, since the boom has high strength, the boom has high resistance to a load caused by a load even when a heavy load is lifted.

また、特許文献2では、垂直ブームの先端部に水平ブームを取付けた構成も開示されている。この構成では、水平ブームの軸方向について水平ブームの中間部から主巻ワイヤロープにより複索状態で、メインフックを備える重荷重用吊り具が吊下げられている。   Patent Document 2 also discloses a configuration in which a horizontal boom is attached to the tip of a vertical boom. In this configuration, the heavy load suspension provided with the main hook is suspended from the middle portion of the horizontal boom in the double rope state by the main winding wire rope in the axial direction of the horizontal boom.

特開2003−267664号公報JP 2003-267664 A 特許第3521093号公報Japanese Patent No. 3521093

前記特許文献1では、軽荷重用吊り具は補巻ワイヤロープにより単索状態でジブから吊下げられ、ジブから延出される補巻ワイヤロープの延出方向は、軽荷重用吊り具でシーブ等を用いてジブに向かって変更されない。このため、軽荷重用吊り具は、複索状態で吊下げられる重荷重用吊り具とは異なり、比較的重量の荷重を吊上げることはできない。また、ジブは比較的軽量な荷重の吊上げを目的として設計されるため、ジブの強度は比較的軽量な荷重を吊上げるために必要な最低限の強度であることが一般的である。したがって、ジブの先端部から吊下げられる軽荷重用吊り具のサブフックにより重い荷重を吊上げるために必要な強度を、ジブは有さない。   In Patent Document 1, a light load suspension is suspended from a jib in a single rope state by a supplementary wire rope, and the extension direction of the supplementary wire rope extending from the jib is a sheave by a light load suspension. Will not change towards the jib. For this reason, unlike a heavy load suspension that is suspended in a double cord state, a light load suspension cannot lift a relatively heavy load. In addition, since the jib is designed for lifting a relatively light load, the jib is generally the minimum strength necessary for lifting a relatively light load. Therefore, the jib does not have the strength necessary to lift a heavy load by the sub-hook of the light load lifting tool suspended from the tip of the jib.

前記特許文献2では、ブームに取付けられるジブ等が設けられていないため、ブームの先端より高い位置で重い荷重を吊上げることができない。   In the said patent document 2, since the jib etc. which are attached to a boom are not provided, a heavy load cannot be lifted in a position higher than the front-end | tip of a boom.

したがって、使用中のクレーンのブームの先端より高い位置で重い荷重を吊上げる場合には、使用しているブームより軸方向の長さが長いブームを備えるクレーンで作業を行う必要がある。すなわち、使用中のクレーンのブームの先端より僅かに高い位置で荷重を吊上げる作業を行う場合でも、高い位置での荷重の吊上げ作業の度に使用中のクレーンとは別のクレーンを使用する必要性が生じてしまう。したがって、重い荷重を吊上げる作業において、コストが増大し、時間効率が低下してしまう。   Therefore, when a heavy load is lifted at a position higher than the tip of the boom of the crane in use, it is necessary to work with a crane having a boom that is longer in the axial direction than the boom that is being used. In other words, even when lifting the load at a position slightly higher than the tip of the boom of the crane in use, it is necessary to use a crane that is different from the crane in use every time the load is lifted at a high position. Sex will occur. Therefore, in the operation of lifting a heavy load, the cost increases and the time efficiency decreases.

ブームの先端より高い位置で重い荷重を吊上げる場合に、ブームの先端部にブームと略同一の強度の追加ブームを取付けることも考えられる。この場合、追加ブームから複索状態で重荷重用吊り具が吊下げられる。しかし、ブームの先端より高い位置で重い荷重を吊上げる場合にのみブームに追加ブームが取付けられるため、追加ブームをクレーンと作業現場に別送する必要がある。また、追加ブームをブームの先端に取付ける際には、荷重の吊上げに用いられるクレーンとは別のクレーンが必要になる。このため、重い荷重を吊上げる作業において、コストが増大し、時間効率が低下してしまう。また、不使用時における追加ブームの保管コストも必要となる。   When a heavy load is lifted at a position higher than the tip of the boom, an additional boom having substantially the same strength as the boom may be attached to the tip of the boom. In this case, the heavy load suspender is suspended from the additional boom in a double cord state. However, since the additional boom is attached to the boom only when a heavy load is lifted at a position higher than the tip of the boom, it is necessary to send the additional boom separately to the crane and the work site. Moreover, when attaching an additional boom to the front-end | tip of a boom, the crane different from the crane used for lifting of a load is needed. For this reason, in the operation | work which lifts a heavy load, cost will increase and time efficiency will fall. Moreover, the storage cost of the additional boom when not in use is also required.

また、ジブの強度をブームと略同一にすることも考えられる。この場合、強度を高くしたジブから主巻ワイヤロープにより複索状態で重荷重用吊り具を吊下げることにより、ブームの先端より高い位置で重い荷重を吊上げる。しかし、ジブの強度を高めることにより、ジブが重くなる。ジブが重くなることにより、クレーンが転倒し易くなり、荷重の吊上げ性能が低下してしまう。また、ジブの強度を高めることにより、ジブの高さ方向の寸法が大きくなる。ジブの高さ方向の寸法が大きい場合、主巻ワイヤロープをブームの先端から重荷重用吊り具まで適切に導くために、ガイドシーブ及びロードシーブの複数のシーブをジブに設ける必要がある。シーブ等の部品点数が多くなることにより、製造コストが増大してしまう。   It is also conceivable that the strength of the jib is substantially the same as that of the boom. In this case, a heavy load is lifted at a position higher than the tip of the boom by suspending a heavy load lifting tool in a double-wired state from a jib having increased strength by a main winding wire rope. However, increasing the strength of the jib increases the weight of the jib. When the jib becomes heavy, the crane is likely to fall over and the load lifting performance is lowered. Further, by increasing the strength of the jib, the dimension of the jib in the height direction is increased. When the height dimension of the jib is large, a plurality of guide sheaves and load sheaves must be provided in the jib in order to properly guide the main wire rope from the boom tip to the heavy load suspension. The production cost increases due to an increase in the number of parts such as sheaves.

本発明は前記課題に着目してなされたものであり、その目的とするところは、荷重の吊上げ性能を低下させることなく、コストを増大させることなく、ブームの先端より高い位置での重い荷重の吊上げを効率よく行なうことが可能な荷重吊上げ装置を提供することにある。   The present invention has been made paying attention to the above-mentioned problems, and the object of the present invention is to reduce the load lifting performance at a position higher than the tip of the boom without reducing the lifting performance of the load and without increasing the cost. An object of the present invention is to provide a load lifting device capable of efficiently lifting.

前記目的を達成するために、本発明のある態様では、ブームと、前記ブームの先端部に取付けられ、前記ブームとの連結部を中心に前記ブームに対して回動可能なジブであって、前記ジブの幅方向を向く2つの側面を備えるジブと、一端が前記ブームの前記先端部に接続され、他端が前記ジブに接続されるテンションロッドであって、前記ジブが前記ブームに対して起状した状態で発生した張力によって前記ジブを支持することにより、前記ジブの曲げに対する強度を高めるテンションロッドと、前記ジブの軸方向について前記ジブの中間部に設けられ、前記側面の一方に位置する第1のジブ側シーブと、前記ジブが前記ブームに対して起状した状態において、前記ブームの軸方向に沿って延設され、前記ブームの前記先端部から前記ジブの前記軸方向に沿って前記ジブの前記中間部まで延設されるワイヤロープであって、前記ジブの中間部において前記第1のジブ側シーブに掛けられるワイヤロープと、前記ジブが前記ブームに対して起状した状態において、前記ワイヤロープにより前記ジブの前記中間部から複索状態で吊下げされる吊り具であって、荷重が引掛けられるフックを備える吊り具と、前記吊り具に設けられるとともに、前記第1のジブ側シーブに掛けられた前記ワイヤロープが1回以上掛けられ、前記ワイヤロープが掛けられる度に前記吊り具に向かう状態から前記ジブの前記中間部に向かう状態に前記ワイヤロープの延設方向を変更する吊り具側シーブユニットと、前記ジブの前記軸方向について前記ジブの前記中間部に設けられ、前記第1のジブ側シーブが位置する前記側面とは反対側の前記側面に位置する第2のジブ側シーブであって、前記吊り具側シーブユニットに1回以上掛けられた前記ワイヤロープが掛けられる第2のジブ側シーブと前記ブームの前記先端部に設けられ、前記第2のジブ側シーブに掛けられた前記ワイヤロープの延出端が固定されるブームヘッドと、を備える荷重吊上げ装置を提供する。

In order to achieve the above object, in one aspect of the present invention, a boom and a jib attached to the tip of the boom and rotatable with respect to the boom around a connecting portion with the boom , A jib having two side faces facing the width direction of the jib, and a tension rod having one end connected to the tip of the boom and the other end connected to the jib, the jib being attached to the boom A tension rod that increases the strength against bending of the jib by supporting the jib by the tension generated in the raised state, and is provided at an intermediate portion of the jib with respect to the axial direction of the jib and is positioned on one of the side surfaces. a first jib sheave that, in a state in which the jib is Okoshijo to the boom, extends along the axial direction of said boom, said jib from the distal end of the boom A wire rope extending along the serial axial direction to the middle portion of the jib, and the wire rope to be applied to the first jib sheave in the middle portion of the jib, the jib to the boom in Okoshijo state Te, a hanging member which is hung in a double search condition from the intermediate portion of the jib by the wire rope, the hanger comprising a hook load is hooked, is provided on the hanging member In addition, the wire rope hung on the first jib side sheave is hung at least once, and each time the wire rope is hung, the wire rope moves from the state toward the suspension to the intermediate portion of the jib. a hanger sheave unit for changing the extending direction of the rope, for the axial direction of the jib is provided in the middle portion of the jib, the first jib side sheave position A second a jib-side sheaves, the second jib sheave that the wire rope that is wound one or more times to the hanging member sheave unit is multiplied located at the side opposite to the side surfaces, There is provided a load lifting device comprising: a boom head provided at the tip portion of the boom and to which an extended end of the wire rope hung on the second jib-side sheave is fixed .

本発明によれば、荷重の吊上げ性能を低下させることなく、コストを増大させることなく、ブームの先端より高い位置での重い荷重の吊上げを効率よく行なうことが可能な荷重吊上げ装置を提供することができる。   According to the present invention, it is possible to provide a load lifting device capable of efficiently lifting a heavy load at a position higher than the tip of the boom without reducing the load lifting performance and without increasing the cost. Can do.

本発明の第1の実施形態に係るクレーンを示す概略図。Schematic which shows the crane which concerns on the 1st Embodiment of this invention. 第1の実施形態に係る荷重吊上げ装置のブームヘッド、ジブ及びテンションロッドの構成を概略的に示す斜視図。The perspective view which shows roughly the structure of the boom head of the load lifting apparatus which concerns on 1st Embodiment, a jib, and a tension rod. 第1の実施形態に係る荷重吊上げ装置のブームヘッド、ジブ及びテンションロッドの構成を概略的に示す、図2とは異なる方向から視た斜視図。The perspective view seen from the direction different from FIG. 2 which shows schematically the structure of the boom head of the load lifting apparatus which concerns on 1st Embodiment, a jib, and a tension rod. 第1の実施形態に係るジブ側シーブユニットを取外した状態での、軸方向についてジブの中間部を概略的に示す斜視図。The perspective view which shows schematically the intermediate part of a jib about the axial direction in the state which removed the jib side sheave unit which concerns on 1st Embodiment. 第1の実施形態に係るジブ側シーブユニットと吊り具側シーブユニットとの間での主巻ワイヤの延出状態を示す概略図。Schematic which shows the extension state of the main volume wire between the jib side sheave unit and the hanger side sheave unit which concerns on 1st Embodiment. 第1の実施形態に係るジブの中間部から重荷重用吊り具を吊下げた状態でのベースジブを概略的に示す側面図。The side view which shows schematically the base jib in the state which suspended the heavy load suspender from the intermediate part of the jib which concerns on 1st Embodiment. 第1の実施形態に係るブームヘッドから重荷重用吊り具を吊下げる状態での、ブームとジブとの連結部の構成を概略的に示す斜視図。The perspective view which shows schematically the structure of the connection part of a boom and a jib in the state which suspends the heavy load suspension from the boom head which concerns on 1st Embodiment. 第1の変形例に係るジブの中間部から重荷重用吊り具を吊下げた状態でのベースジブを概略的に示す側面図。The side view which shows schematically the base jib in the state which suspended the heavy load suspender from the intermediate part of the jib which concerns on a 1st modification. 第1の変形例に係るジブ側シーブユニットと吊り具側シーブユニットとの間での主巻ワイヤロープの延出状態を示す概略図。Schematic which shows the extension state of the main volume wire rope between the jib side sheave unit which concerns on a 1st modification, and the hanger side sheave unit. 第1の変形例に係る補助シーブユニットを概略的に示す側面図。The side view which shows schematically the auxiliary sheave unit which concerns on a 1st modification. 第2の変形例に係るジブ側シーブユニットと吊り具側シーブユニットとの間での主巻ワイヤロープの延出状態を示す概略図。Schematic which shows the extension state of the main winding wire rope between the jib side sheave unit which concerns on a 2nd modification, and the hanger side sheave unit. 第3の変形例に係るジブの中間部から重荷重用吊り具を吊下げた状態でのベースジブを概略的に示す側面図。The side view which shows schematically the base jib in the state which suspended the heavy load suspension from the intermediate part of the jib which concerns on a 3rd modification.

(第1の実施形態)
本発明の第1の実施形態について図1乃至図7を参照して説明する。図1は、本実施形態のクレーン1を示す図である。図1に示すように、クレーン1は、車体2と、車体2上に取付けられる旋回体3と、を備える。旋回体3には、荷重吊上げ装置5が取付けられている。荷重吊上げ装置5は、旋回体3に基端部が連結されるブーム7を備える。また、クレーン1には、ブーム7を旋回体3に対して起伏させるブーム起伏シリンダ9が設けられている。ブーム起伏シリンダ9は、一端が旋回体3に連結され、他端がブーム7に連結されている。ブーム起伏シリンダ9を伸縮することにより、ブーム7が起伏動作を行う。
(First embodiment)
A first embodiment of the present invention will be described with reference to FIGS. FIG. 1 is a diagram illustrating a crane 1 according to the present embodiment. As shown in FIG. 1, the crane 1 includes a vehicle body 2 and a swing body 3 attached on the vehicle body 2. A load lifting device 5 is attached to the revolving structure 3. The load lifting device 5 includes a boom 7 whose base end is coupled to the revolving structure 3. Further, the crane 1 is provided with a boom hoisting cylinder 9 for hoisting the boom 7 with respect to the swing body 3. The boom hoisting cylinder 9 has one end connected to the swing body 3 and the other end connected to the boom 7. By extending and retracting the boom hoisting cylinder 9, the boom 7 performs hoisting operation.

ブーム7の先端部には、ブームヘッド11が設けられている。ブームヘッド11には、支軸部12を介して、ジブ13の基端部が連結されている。ジブ13は、支軸部12(ブーム7との連結部)を中心にブーム7に対して回動可能である。すなわち、ジブ13は、ブーム7に対して起伏可能な状態で支持されている。ジブ13の内部には、伸縮することによりジブ13をブーム7に対して起伏させるジブ起伏シリンダ(図示しない)が設けられている。   A boom head 11 is provided at the tip of the boom 7. The base end portion of the jib 13 is connected to the boom head 11 via the support shaft portion 12. The jib 13 is rotatable with respect to the boom 7 around the support shaft portion 12 (connecting portion with the boom 7). That is, the jib 13 is supported in a state in which the jib 13 can be raised and lowered. Inside the jib 13, a jib hoisting cylinder (not shown) is provided for raising and lowering the jib 13 with respect to the boom 7 by expanding and contracting.

また、ブーム7のブームヘッド11(ブーム7の先端部)には、テンションロッド15の一端が接続されている。テンションロッド15の他端は、ジブ13の先端部に接続されている。したがって、ジブ13がブーム7に対して起状した状態において、テンションロッド15はブームヘッド11とジブ13との間に張られている。ジブ13はブーム7より軽量であり、強度は低い。したがって、ジブ13がブーム7に対して起状した状態では、張られたテンションロッド15に張力が発生し、テンションロッド15は張力によりジブ13を支持する。これにより、ジブ13はブームヘッド11との連結部以外の部分で支持され、ジブ13の曲げに対する強度が高められる。   One end of a tension rod 15 is connected to the boom head 11 of the boom 7 (the tip of the boom 7). The other end of the tension rod 15 is connected to the tip of the jib 13. Therefore, the tension rod 15 is stretched between the boom head 11 and the jib 13 in a state where the jib 13 is raised relative to the boom 7. The jib 13 is lighter than the boom 7 and has a lower strength. Therefore, when the jib 13 is raised with respect to the boom 7, tension is generated in the tension rod 15 that is tensioned, and the tension rod 15 supports the jib 13 by tension. Thereby, the jib 13 is supported at a portion other than the connecting portion with the boom head 11, and the strength against bending of the jib 13 is increased.

図2及び図3は、ブームヘッド11、ジブ13及びテンションロッド15の構成を示す図である。図2及び図3に示すように、ジブ13は、基端(一端)がブーム7のブームヘッド11(ブーム7の先端部)に支軸部12で連結されるベースジブ21を備える。ベースジブ21の基端部は、2つの脚部22A,22Bを備え、二股状に形成されている。ジブ13の幅方向について脚部22A,22Bの間には、スペース23が設けられている。また、ベースジブ21では、脚部22A,22Bの先端方向側に本体部28が設けられている。   2 and 3 are diagrams showing the configuration of the boom head 11, the jib 13, and the tension rod 15. As shown in FIGS. 2 and 3, the jib 13 includes a base jib 21 whose base end (one end) is coupled to the boom head 11 of the boom 7 (the distal end portion of the boom 7) by the support shaft portion 12. The base end portion of the base jib 21 includes two leg portions 22A and 22B and is formed in a bifurcated shape. A space 23 is provided between the leg portions 22A and 22B in the width direction of the jib 13. Further, in the base jib 21, a main body portion 28 is provided on the distal direction side of the leg portions 22A and 22B.

また、ジブ13は、ベースジブ21に対してジブ13の軸方向に伸縮可能な第1の伸縮ジブ25と、第1の伸縮ジブ25に対してジブ13の軸方向に伸縮可能な第2の伸縮ジブ26と、を備える。第1の伸縮ジブ25は、ベースジブ21の本体部28の内部に収納された収縮状態とジブ13の先端方向にベースジブ21から突出する伸長状態との間で、ベースジブ21に対して伸縮可能である。第2の伸縮ジブ26は、第1の伸縮ジブ25の内部に収納された収縮状態とジブ13の先端方向に第1の伸縮ジブ25から突出する伸長状態との間で、第1の伸縮ジブ25に対して伸縮可能である。ジブ13の内部のジブ起伏シリンダ(図示しない)が伸縮することにより、第1の伸縮ジブ25がベースジブ21に対して伸縮する。また、ジブ13の内部のジブ伸縮シリンダ(図示しない)が伸縮することにより、第2の伸縮ジブ26が第1の伸縮ジブ25に対して伸縮する。   The jib 13 includes a first expansion / contraction jib 25 that can expand and contract in the axial direction of the jib 13 with respect to the base jib 21, and a second expansion / contraction that can expand and contract in the axial direction of the jib 13 relative to the first expansion / contraction jib 25. And a jib 26. The first telescopic jib 25 can be expanded and contracted with respect to the base jib 21 between a contracted state housed inside the main body 28 of the base jib 21 and an extended state protruding from the base jib 21 in the distal direction of the jib 13. . The second telescopic jib 26 is a first telescopic jib between the contracted state housed inside the first telescopic jib 25 and the extended state protruding from the first telescopic jib 25 in the distal direction of the jib 13. 25 can be expanded and contracted. When the jib hoisting cylinder (not shown) inside the jib 13 expands and contracts, the first expandable jib 25 expands and contracts with respect to the base jib 21. Further, when the jib telescopic cylinder (not shown) inside the jib 13 expands and contracts, the second telescopic jib 26 expands and contracts with respect to the first telescopic jib 25.

以上のような構成にすることにより、ベースジブ21の本体部28でのジブ13の軸方向に垂直な断面積が、第1の伸縮ジブ25でのジブ13の軸方向に垂直な断面積より大きくなる。そして、第1の伸縮ジブ25でのジブ13の軸方向に垂直な断面積が、第2の伸縮ジブ26でのジブ13の軸方向に垂直な断面積より大きくなる。以上より、ベースジブ21の本体部28は第1の伸縮ジブ25より強度が高くなり、第1の伸縮ジブ25は第2の伸縮ジブ26より強度が高くなる。   With the above configuration, the cross-sectional area perpendicular to the axial direction of the jib 13 at the main body portion 28 of the base jib 21 is larger than the cross-sectional area perpendicular to the axial direction of the jib 13 at the first telescopic jib 25. Become. The cross-sectional area perpendicular to the axial direction of the jib 13 in the first telescopic jib 25 is larger than the cross-sectional area perpendicular to the axial direction of the jib 13 in the second telescopic jib 26. As described above, the main body 28 of the base jib 21 has higher strength than the first telescopic jib 25, and the first telescopic jib 25 has higher strength than the second telescopic jib 26.

図1に示すように、旋回体3には主巻ウィンチ31が設けられている。主巻ウィンチ31から、主巻ワイヤロープ(ワイヤロープ)32が延出されている。ブーム7が起状し、かつ、ジブ13がブーム7に対して起状した状態では、主巻ワイヤロープ32はブーム7の軸方向に沿って延設されている。図2及び図3に示すように、ブームヘッド11(ブーム7の先端部)には、ガイドシーブユニット33及びトップシーブユニット35が設けられている。ガイドシーブユニット33は、トップシーブユニット35よりブーム7の起状方向側に位置している。ブーム7の軸方向に沿って延設された主巻ワイヤロープ32は、ガイドシーブユニット33に掛けられる。   As shown in FIG. 1, the revolving body 3 is provided with a main winding winch 31. A main winding wire rope (wire rope) 32 extends from the main winding winch 31. When the boom 7 is raised and the jib 13 is raised with respect to the boom 7, the main wire rope 32 extends along the axial direction of the boom 7. 2 and 3, a guide sheave unit 33 and a top sheave unit 35 are provided on the boom head 11 (the tip of the boom 7). The guide sheave unit 33 is positioned closer to the raised direction of the boom 7 than the top sheave unit 35. The main winding wire rope 32 extending along the axial direction of the boom 7 is hung on the guide sheave unit 33.

そして、ブームヘッド11(ブーム7の先端部)からジブ13の軸方向に沿って、主巻ワイヤロープ32が延設される。ベースジブ21の本体部28の側面には、ジブ側シーブユニット37が設けられている。ジブ側シーブユニット37は、ジブ13の軸方向についてジブ13の中間部に位置している。ジブ側シーブユニット37は、第1のジブ側シーブ38Aと、第2のジブ側シーブ38Bと、を備える。ジブ側シーブユニット37(第1のジブ側シーブ38A及び第2のジブ側シーブ38B)の軸C1は、ジブ13の幅方向に平行である。   A main wire rope 32 extends from the boom head 11 (the tip of the boom 7) along the axial direction of the jib 13. A jib-side sheave unit 37 is provided on the side surface of the main body 28 of the base jib 21. The jib side sheave unit 37 is located in the middle part of the jib 13 in the axial direction of the jib 13. The jib side sheave unit 37 includes a first jib side sheave 38A and a second jib side sheave 38B. The axis C1 of the jib side sheave unit 37 (the first jib side sheave 38A and the second jib side sheave 38B) is parallel to the width direction of the jib 13.

図4は、ジブ側シーブユニット37を取外した状態での軸方向についてジブ13の中間部を示す図である。図4に示すように、軸方向についてジブ13の中間部には、シーブ着脱部である第1のブラケット39A及び第2のブラケット39Bが設けられている。第1のブラケット39Aはベースジブ21の本体部28(ジブ13)の一方の側面に位置し、第2のブラケット39Bはベースジブ21の本体部28(ジブ13)の他方の側面に位置している。第1のブラケット39Aには第1のジブ側シーブ38Aが着脱可能に取付けられ、第2のブラケット39Bには第2のジブ側シーブ38Bが着脱可能に取付けられる。   FIG. 4 is a view showing an intermediate portion of the jib 13 in the axial direction with the jib side sheave unit 37 removed. As shown in FIG. 4, a first bracket 39 </ b> A and a second bracket 39 </ b> B, which are sheave detachable portions, are provided in the middle portion of the jib 13 in the axial direction. The first bracket 39A is located on one side surface of the main body portion 28 (jib 13) of the base jib 21, and the second bracket 39B is located on the other side surface of the main body portion 28 (jib 13) of the base jib 21. The first jib side sheave 38A is detachably attached to the first bracket 39A, and the second jib side sheave 38B is detachably attached to the second bracket 39B.

図2及び図3に示すように、ジブ13がブーム7に対して起状した状態では、ブームヘッド11から主巻ワイヤロープ32は、ベースジブ21の本体部28(軸方向についてジブ13の中間部)までジブ13の軸方向に沿って延設されている。そして、ベースジブ21の本体部28に設けられるジブ側シーブユニット37の第1のジブ側シーブ38Aに、主巻ワイヤロープ32が掛けられる。   As shown in FIGS. 2 and 3, when the jib 13 is raised with respect to the boom 7, the main winding wire rope 32 extends from the boom head 11 to the main body 28 of the base jib 21 (an intermediate portion of the jib 13 in the axial direction). ) Extending along the axial direction of the jib 13. Then, the main wire rope 32 is hung on the first jib sheave 38A of the jib sheave unit 37 provided on the main body 28 of the base jib 21.

荷重吊上げ装置5は、重荷重用吊り具41を備える。ジブ13がブーム7に対して起状した状態では、ベースジブ21の本体部28(軸方向についてジブ13の中間部)から主巻ワイヤロープ32により重荷重用吊り具41が吊下げられている。   The load lifting device 5 includes a heavy load lifting device 41. In a state where the jib 13 is raised with respect to the boom 7, the heavy load hanging device 41 is suspended from the main body 28 of the base jib 21 (intermediate portion of the jib 13 in the axial direction) by the main winding wire rope 32.

重荷重用吊り具41は、2つの板状部42A,42Bと、吊上げる荷重が引掛けられるメインフック(フック)43と、を備える。板状部42A,42Bの間では、吊り具側シーブユニット45が挟持されている。吊り具側シーブユニット45の軸C2は、ジブ13の幅方向に垂直、かつ、鉛直方向に垂直な方向である縦方向に対して平行である。したがって、吊り具側シーブユニット45の軸C2は、ジブ側シーブユニット37の軸C1に対して垂直である。   The heavy load lifting device 41 includes two plate-like portions 42A and 42B, and a main hook (hook) 43 on which a lifting load is hooked. A hanger-side sheave unit 45 is sandwiched between the plate-like portions 42A and 42B. The axis C2 of the lifting device side sheave unit 45 is perpendicular to the width direction of the jib 13 and parallel to the longitudinal direction which is a direction perpendicular to the vertical direction. Therefore, the axis C <b> 2 of the lifting device side sheave unit 45 is perpendicular to the axis C <b> 1 of the jib side sheave unit 37.

図5は、ジブ側シーブユニット37と吊り具側シーブユニット45との間での主巻ワイヤロープ32の延出状態を示す図である。図2、図3及び図5に示すように、ジブ側シーブユニット37の第1のジブ側シーブ38Aに掛けられた主巻ワイヤロープ32は、重荷重用吊り具41に向かって延出される。そして、吊り具側シーブユニット45に掛けられ、主巻ワイヤロープ32の延出方向がベースジブ21の本体部28(ジブ13の中間部)に向かって変更される。   FIG. 5 is a diagram showing an extended state of the main winding wire rope 32 between the jib side sheave unit 37 and the lifting tool side sheave unit 45. As shown in FIGS. 2, 3, and 5, the main wire rope 32 hung on the first jib sheave 38 </ b> A of the jib sheave unit 37 extends toward the heavy load hanger 41. And it is hung on the hanging tool side sheave unit 45, and the extending direction of the main winding wire rope 32 is changed toward the main body 28 of the base jib 21 (intermediate part of the jib 13).

そして、吊り具側シーブユニット45に掛けられた主巻ワイヤロープ32は、ベースジブ21の本体部28に向かって延出され、ジブ側シーブユニット37の第2のジブ側シーブ38Bに掛けられる。そして、図2及び図3に示すように、第2のジブ側シーブ38Bに掛けられた主巻ワイヤロープ32の延出端は、ソケット47によりブームヘッド11(ブーム7の先端部)に固定される。   Then, the main winding wire rope 32 hung on the hanger-side sheave unit 45 extends toward the main body 28 of the base jib 21 and is hung on the second jib-side sheave 38B of the jib-side sheave unit 37. 2 and 3, the extension end of the main winding wire rope 32 hung on the second jib-side sheave 38B is fixed to the boom head 11 (the tip of the boom 7) by a socket 47. The

以上のように、ジブ13の中間部から延出される主巻ワイヤロープ32は吊り具側シーブユニット45に1回以上掛けられる。そして、吊り具側シーブユニット45に主巻ワイヤロープ32が掛けられることにより、主巻ワイヤロープ32の延出方向がジブ13の中間部に向かって変更される。すなわち、重荷重用吊り具41は、ジブ13の中間部から主巻ワイヤロープ32により複索状態で吊下げられている。重荷重用吊り具41が複索状態で吊下げられることにより、ジブ13の中間部と重荷重用吊り具41との間に複数のワイヤ延設部49A,49Bが形成される。メインフック43により荷重を引掛けた際には、荷重による負荷がそれぞれのワイヤ延設部49A,49Bに分散される。このため、比較的重い荷重を吊上げることが可能となる。したがって、ブーム7の先端より高い位置で重い荷重が吊上げられる。   As described above, the main winding wire rope 32 extending from the middle part of the jib 13 is hung on the hanger side sheave unit 45 at least once. Then, the main winding wire rope 32 is hung on the lifting device side sheave unit 45, whereby the extending direction of the main winding wire rope 32 is changed toward the middle portion of the jib 13. That is, the heavy load hanger 41 is hung from the middle part of the jib 13 by the main winding wire rope 32 in a double cord state. When the heavy load hanger 41 is hung in a double cord state, a plurality of wire extending portions 49A and 49B are formed between the middle portion of the jib 13 and the heavy load hanger 41. When a load is applied by the main hook 43, the load due to the load is distributed to the wire extending portions 49A and 49B. For this reason, it is possible to lift a relatively heavy load. Therefore, a heavy load is lifted at a position higher than the tip of the boom 7.

また、荷重を吊上げた状態では、吊上げられた荷重によって、ジブ13の軸方向について圧縮荷重がジブ13に作用し、ジブ13の高さ方向について曲げ荷重が作用する。ジブ13の軸方向についてジブ13の中間部は、ジブ13の先端部よりジブ13とブーム7との連結部に近い。このため、ジブ13の中間部から重荷重用吊り具41が吊下げられる場合は、ジブ13の先端部から重荷重用吊り具41が吊下げられる場合より、圧縮荷重に対する座屈区間が小さくなり、座屈に対する耐性が高くなる。また、ジブ13の中間部から重荷重用吊り具41が吊下げられる場合は、ジブ13の先端部から重荷重用吊り具41が吊下げられる場合より、曲げ荷重が作用する位置がジブ13とブーム7との連結部に近くなる。このため、ジブ13の中間部から重荷重用吊り具41が吊下げられる場合は、ジブ13の先端部から重荷重用吊り具41が吊下げられる場合より、曲げモーメントが小さくなり、曲げ応力が小さくなる。したがって、ジブ13の先端部から重荷重用吊り具41が吊下げられる場合に比べ、ジブ13の中間部から重荷重用吊り具41が吊下げられる状態では、荷重からの負荷に対するジブ13の耐性は高くなる。   Further, in the state where the load is lifted, the compression load acts on the jib 13 in the axial direction of the jib 13 and the bending load acts on the height direction of the jib 13 by the lifted load. The middle part of the jib 13 in the axial direction of the jib 13 is closer to the connecting part between the jib 13 and the boom 7 than the tip part of the jib 13. For this reason, when the heavy load hanger 41 is suspended from the middle part of the jib 13, the buckling section with respect to the compressive load is smaller than when the heavy load hanger 41 is hung from the tip part of the jib 13, Increases resistance to bending. Further, when the heavy load suspension 41 is suspended from the middle portion of the jib 13, the position where the bending load acts is different from the case where the heavy load suspension 41 is suspended from the tip of the jib 13. It becomes close to the connecting part. For this reason, when the heavy load hanger 41 is suspended from the middle part of the jib 13, the bending moment is smaller and the bending stress is smaller than when the heavy load hanger 41 is hung from the tip of the jib 13. . Therefore, compared with the case where the heavy load suspension 41 is suspended from the tip of the jib 13, the resistance of the jib 13 to the load from the load is higher in the state where the heavy load suspension 41 is suspended from the middle portion of the jib 13. Become.

また、重荷重用吊り具41はベースジブ21の本体部28から吊下げられている。ここで、ベースジブ21の本体部28でのジブ13の軸方向に垂直な断面積は、第1の伸縮ジブ25でのジブ13の軸方向に垂直な断面積、及び、第2の伸縮ジブ26でのジブ13の軸方向に垂直な断面積より大きい。このため、ベースジブ21の本体部28は、第1の伸縮ジブ25及び第2の伸縮ジブ26より強度が高くなる。したがって、第1の伸縮ジブ25から重荷重用吊り具41が吊下げられる場合、及び、第2の伸縮ジブ26から重荷重用吊り具41が吊下げられる場合に比べ、ベースジブ21の本体部28から重荷重用吊り具41が吊下げられる状態では、荷重からの負荷に対するジブ13の耐性は高くなる。   Further, the heavy load suspension 41 is suspended from the main body 28 of the base jib 21. Here, the cross-sectional area perpendicular to the axial direction of the jib 13 in the main body portion 28 of the base jib 21 is the cross-sectional area perpendicular to the axial direction of the jib 13 in the first telescopic jib 25 and the second telescopic jib 26. It is larger than the cross-sectional area perpendicular to the axial direction of the jib 13 at. For this reason, the main body portion 28 of the base jib 21 has higher strength than the first telescopic jib 25 and the second telescopic jib 26. Therefore, when the heavy load suspension 41 is suspended from the first telescopic jib 25 and when the heavy load suspension 41 is suspended from the second telescopic jib 26, the heavy load is applied from the main body portion 28 of the base jib 21. In the state in which the heavy lifting device 41 is suspended, the resistance of the jib 13 to the load from the load is increased.

また、軸方向についてジブ13の中間部から重荷重用吊り具41を吊下げるため、ジブ13の先端部から重荷重用吊り具41を吊下げる場合に比べ、ジブ13の強度を高くする必要はなく、ジブ13は重くならない。したがって、クレーン1が転倒し難くなり、荷重の吊上げ性能の低下も有効に防止される。また、ジブ13の強度を高くする必要がないため、ジブ13の高さ方向の寸法を大きくする必要もない。したがって、ジブ13の中間部(ベースジブ21の本体部28)に1つのジブ側シーブユニット37を設けるだけで、ブームヘッド11から延設される主巻ワイヤ32を重荷重用吊り具41まで適切に導くことが可能となる。   Further, since the heavy load suspension 41 is suspended from the middle portion of the jib 13 in the axial direction, it is not necessary to increase the strength of the jib 13 as compared with the case where the heavy load suspension 41 is suspended from the tip of the jib 13. The jib 13 does not become heavy. Therefore, it becomes difficult for the crane 1 to fall over, and a decrease in load lifting performance is effectively prevented. Further, since it is not necessary to increase the strength of the jib 13, it is not necessary to increase the dimension of the jib 13 in the height direction. Therefore, the main winding wire 32 extended from the boom head 11 is appropriately guided to the heavy load hanger 41 only by providing one jib side sheave unit 37 at the middle portion of the jib 13 (the main body portion 28 of the base jib 21). It becomes possible.

以上のように、本実施形態の荷重吊上げ装置5では、荷重の吊上げ性能を低下させることなく、コストを増大させることなく、ブーム7の先端より高い位置で、重い荷重を効率よく吊上げることが可能となる。   As described above, the load lifting device 5 of the present embodiment can efficiently lift a heavy load at a position higher than the tip of the boom 7 without reducing the load lifting performance and without increasing the cost. It becomes possible.

図6は、ジブ13の中間部から重荷重用吊り具41を吊下げた状態でのベースジブ21を示す図である。前述のように、ジブ側シーブユニット37の軸C1は、ジブ13の幅方向に対して平行である。また、吊り具側シーブユニット45の軸C2は、ジブ13の幅方向に垂直、かつ、鉛直方向に垂直な方向である縦方向に対して、平行である。このため、図6に示すように、板状部42Bの表面が、ジブ13の伏状方向側の面と対向する。すなわち、吊り具側シーブユニット45の軸C2がジブ13と交差する。重荷重用吊り具41の構成上、重荷重用吊り具41では、吊り具側シーブユニット45の軸C2に平行な方向の寸法は、幅方向の寸法より小さくなる。このため、吊り具側シーブユニット45の軸C2がジブ13と交差する状態で重荷重用吊り具41が吊下げられるため、作業時に重荷重用吊り具41とジブ13とが干渉し難くなる。また、このような構成にすることにより、メインフック43は、ジブ側シーブユニット37の軸C1より前方側に位置する。このため、ジブ13と重荷重用吊り具41のメインフック43が干渉し難い。以上のような構成にすることにより、メインフック43をさらに高い位置まで巻上げることが可能となり、さらに高い位置まで荷重を吊上げることが可能となる。   FIG. 6 is a view showing the base jib 21 in a state where the heavy load suspension 41 is suspended from the middle portion of the jib 13. As described above, the axis C1 of the jib side sheave unit 37 is parallel to the width direction of the jib 13. In addition, the axis C2 of the lifting device side sheave unit 45 is parallel to the longitudinal direction which is perpendicular to the width direction of the jib 13 and perpendicular to the vertical direction. For this reason, as shown in FIG. 6, the surface of the plate-like portion 42 </ b> B faces the surface of the jib 13 on the prone direction side. That is, the axis C <b> 2 of the lifting device side sheave unit 45 intersects the jib 13. Due to the configuration of the heavy load hanger 41, in the heavy load hanger 41, the dimension of the hanger side sheave unit 45 in the direction parallel to the axis C2 is smaller than the dimension in the width direction. For this reason, since the heavy load hanger 41 is suspended while the axis C2 of the hanger side sheave unit 45 intersects the jib 13, the heavy load hanger 41 and the jib 13 are less likely to interfere with each other during the work. Further, with such a configuration, the main hook 43 is positioned in front of the axis C <b> 1 of the jib side sheave unit 37. For this reason, the jib 13 and the main hook 43 of the heavy load hanger 41 do not easily interfere with each other. With the above configuration, the main hook 43 can be wound up to a higher position, and the load can be lifted to a higher position.

また、図1の点線で示すように、ブームヘッド11(ブーム7の先端部)から主巻ワイヤロープ32により重荷重用吊り具41を吊下げる状態に、重荷重用吊り具41の吊下げ位置を変えることも可能である。この場合、軸方向についてジブ13の中間部から重荷重用吊り具41が吊下げられる状態とは、主巻ワイヤロープ32の延設状態、吊り具側シーブユニット45の軸C2の向き等が異なる。   Further, as shown by the dotted line in FIG. 1, the suspension position of the heavy load suspension 41 is changed from the boom head 11 (the tip of the boom 7) to the state where the heavy load suspension 41 is suspended by the main wire rope 32. It is also possible. In this case, the state in which the heavy load hanger 41 is suspended from the middle portion of the jib 13 in the axial direction differs from the extended state of the main wire rope 32, the direction of the axis C2 of the hanger side sheave unit 45, and the like.

図7は、ブームヘッド11から重荷重用吊り具41を吊下げる状態でのブーム7とジブ13との連結部の構成を示す図である。図7に示すように、ブームヘッド11から重荷重用吊り具41を吊下げる状態では、ブーム7の軸方向に沿って延設された主巻ワイヤロープ32は、ガイドシーブユニット33に掛けられる。そして、主巻ワイヤロープ32は、トップシーブユニット35に掛けられ、重荷重用吊り具41に向かって延出される。トップシーブユニット35から延出された主巻ワイヤロープ32は、重荷重用吊り具41の吊り具側シーブユニット45に掛けられる。重荷重用吊り具41の吊り具側シーブユニット45に掛けられることにより、主巻ワイヤロープ32の延出方向がブームヘッド11に向かって変更される。   FIG. 7 is a diagram illustrating a configuration of a connection portion between the boom 7 and the jib 13 in a state where the heavy load suspension 41 is suspended from the boom head 11. As shown in FIG. 7, in the state where the heavy load suspension 41 is suspended from the boom head 11, the main winding wire rope 32 extending along the axial direction of the boom 7 is hung on the guide sheave unit 33. The main wire rope 32 is hung on the top sheave unit 35 and extends toward the heavy load hanger 41. The main winding wire rope 32 extended from the top sheave unit 35 is hung on the suspension side sheave unit 45 of the heavy load suspension 41. The extending direction of the main wire rope 32 is changed toward the boom head 11 by being hung on the lifting device side sheave unit 45 of the lifting device 41 for heavy load.

そして、トップシーブユニット35に再び掛けられ、主巻ワイヤロープ32の延出方向が重荷重用吊り具41に向かって変更される。そして、主巻ワイヤロープ32は再び重荷重用吊り具41の吊り具側シーブユニット45に再び掛けられ、主巻ワイヤロープ32の延出方向がブームヘッド11に向かって変更される。そして、ソケット47によりブームヘッド11に主巻ワイヤロープ32の延出端が固定される。主巻ワイヤロープ32の延出端のブームヘッド11への固定位置は、重荷重用吊り具41がベースジブ21の本体部28から吊下げられる場合の主巻ワイヤロープ32の延出端のブームヘッド11への固定位置とは、異なる。   Then, it is hung on the top sheave unit 35 again, and the extending direction of the main wire rope 32 is changed toward the heavy load hanger 41. Then, the main winding wire rope 32 is again hung on the hanger side sheave unit 45 of the heavy load hanger 41, and the extending direction of the main winding wire rope 32 is changed toward the boom head 11. Then, the extension end of the main winding wire rope 32 is fixed to the boom head 11 by the socket 47. The extension position of the main winding wire rope 32 to the boom head 11 is fixed to the boom head 11 at the extension end of the main winding wire rope 32 when the heavy load suspension 41 is suspended from the main body 28 of the base jib 21. It is different from the fixed position.

以上のように、ブームヘッド11から延出される主巻ワイヤロープ32は、吊り具側シーブユニット45に1回以上掛けられる。そして、吊り具側シーブユニット45に主巻ワイヤロープ32が掛けられることにより、主巻ワイヤロープ32の延出方向がブームヘッド11に向かって変更される。すなわち、重荷重用吊り具41は、ブームヘッド11から主巻ワイヤロープ32により複索状態で吊下げられている。重荷重用吊り具41が複索状態で吊下げられることにより、ブームヘッド11と重荷重用吊り具41との間に複数のワイヤ延設部50A〜50Dが形成される。   As described above, the main wire rope 32 extending from the boom head 11 is hung at least once on the hanger-side sheave unit 45. Then, the main winding wire rope 32 is hung on the lifting device side sheave unit 45, whereby the extending direction of the main winding wire rope 32 is changed toward the boom head 11. That is, the heavy load hanger 41 is suspended from the boom head 11 by the main winding wire rope 32 in a double cord state. A plurality of wire extending portions 50 </ b> A to 50 </ b> D are formed between the boom head 11 and the heavy load hanger 41 by suspending the heavy load hanger 41 in a double cord state.

ここで、ブームヘッド11から重荷重用吊り具41を吊下げる状態では、吊り具側シーブユニット45の軸C2は、ジブ13の幅方向に対して平行となる。前述のように、重荷重用吊り具41では、吊り具側シーブユニット45の軸C2に平行な方向の寸法は、重荷重用吊り具41の幅方向の寸法より小さくなる。このため、吊り具側シーブユニット45の軸C2をジブ13の幅方向に対して平行にすることにより、ジブ13の装着作業時にブーム7に対してジブ13を振出す際に、脚部22A,22Bの間のスペース23を重荷重用吊り具41が通過し易くなる。   Here, when the heavy load suspension 41 is suspended from the boom head 11, the axis C <b> 2 of the suspension side sheave unit 45 is parallel to the width direction of the jib 13. As described above, in the heavy load hanger 41, the dimension of the hanger side sheave unit 45 in the direction parallel to the axis C2 is smaller than the dimension of the heavy load hanger 41 in the width direction. For this reason, when the axis C2 of the lifting device side sheave unit 45 is made parallel to the width direction of the jib 13, the leg portion 22A, It becomes easy for the heavy load hanger 41 to pass through the space 23 between 22B.

図1に示すように、旋回体3には補巻ウィンチ51が設けられている。補巻ウィンチ51から、補巻ワイヤロープ52が延出されている。ブーム7が起状し、かつ、ジブ13がブーム7に対して起状した状態では、補巻ワイヤロープ52はブーム7の軸方向に沿って延設されている。そして、図2及び図3に示すように、ブーム7の軸方向に沿って延設された補巻ワイヤロープ52は、ガイドシーブユニット33に掛けられる。そして、ジブ13の軸方向に沿ってジブ13の先端部まで延設される。   As shown in FIG. 1, the revolving body 3 is provided with an auxiliary winding winch 51. An auxiliary winding wire rope 52 is extended from the auxiliary winding winch 51. When the boom 7 is raised and the jib 13 is raised relative to the boom 7, the auxiliary winding wire rope 52 extends along the axial direction of the boom 7. 2 and 3, the auxiliary winding wire rope 52 extending along the axial direction of the boom 7 is hung on the guide sheave unit 33. And it extends to the tip of the jib 13 along the axial direction of the jib 13.

第2の伸縮ジブ26(ジブ13の先端部)には、シーブユニット53が設けられている。ジブ13の軸方向に沿って延設された補巻ワイヤロープ52は、シーブユニット53に掛けられる。そして、補巻ワイヤロープ52の延出端が、軽荷重用吊り具55に固定される。これにより、ジブ13の先端部(第2の伸縮ジブ26)から補巻ワイヤロープ52により、軽荷重用吊り具55が吊下げられる。軽荷重用吊り具55は、荷重を引掛けるサブフック56を備える。   A sheave unit 53 is provided on the second telescopic jib 26 (the tip of the jib 13). The auxiliary winding wire rope 52 extending along the axial direction of the jib 13 is hung on the sheave unit 53. Then, the extended end of the auxiliary winding wire rope 52 is fixed to the light load hanging tool 55. As a result, the light load suspension 55 is suspended from the tip end portion (second telescopic jib 26) of the jib 13 by the auxiliary winding wire rope 52. The light load hanger 55 includes a sub hook 56 that applies a load.

以上のように、ジブ13の先端部から延出される補巻ワイヤロープ52は、軽荷重用吊り具55でジブ13の先端部に向かって延出方向が変更されることなく、補巻ワイヤロープ52の延出端が軽荷重用吊り具55に直接固定されている。すなわち、軽荷重用吊り具55は、ジブ13の先端部から補巻ワイヤロープ52により単索状態で吊下げられている。軽荷重用吊り具55が単索状態で吊下げられることにより、ジブ13の先端部と軽荷重用吊り具55との間にワイヤ延設部57が1つのみ形成される。サブフック56により荷重を引掛けた際には、荷重による負荷がワイヤ延設部57のみに掛かり、複索状態のように荷重による負荷が分散されない。このため、軽荷重用吊り具55は、重荷重用吊り具41に比べ軽い荷重の吊上げに、用いられる。   As described above, the auxiliary winding wire rope 52 extended from the tip end portion of the jib 13 is not changed in the extension direction toward the tip end portion of the jib 13 by the light load lifting device 55. The extended end of 52 is directly fixed to the light load hanger 55. That is, the light load suspension 55 is suspended from the tip of the jib 13 by the auxiliary wire rope 52 in a single-wire state. By suspending the light load suspension 55 in a single rope state, only one wire extending portion 57 is formed between the tip of the jib 13 and the light load suspension 55. When a load is applied by the sub hook 56, the load due to the load is applied only to the wire extending portion 57, and the load due to the load is not dispersed as in the double cable state. For this reason, the light load hanger 55 is used for lifting a lighter load than the heavy load hanger 41.

そこで、前記構成の荷重吊上げ装置5では、以下の効果を奏する。すなわち、荷重吊上げ装置5では、ジブ13の中間部から延出される主巻ワイヤロープ32は、吊り具側シーブユニット45に1回以上掛けられる。そして、吊り具側シーブユニット45に主巻ワイヤロープ32が掛けられることにより、主巻ワイヤロープ32の延出方向がジブ13の中間部に向かって変更される。すなわち、重荷重用吊り具41は、ジブ13の中間部から主巻ワイヤロープ32により複索状態で吊下げられている。重荷重用吊り具41が複索状態で吊下げられることにより、ジブ13の中間部と重荷重用吊り具41との間に複数のワイヤ延設部49A,49Bが形成される。メインフック43により荷重を引掛けた際には、荷重による負荷がそれぞれのワイヤ延設部49A,49Bに分散される。このため、比較的重い荷重を吊上げることができる。したがって、ブーム7の先端より高い位置で重い荷重を吊上げることができる。   Therefore, the load lifting device 5 configured as described above has the following effects. That is, in the load lifting device 5, the main wire rope 32 extended from the middle part of the jib 13 is hung on the lifting device side sheave unit 45 at least once. Then, the main winding wire rope 32 is hung on the lifting device side sheave unit 45, whereby the extending direction of the main winding wire rope 32 is changed toward the middle portion of the jib 13. That is, the heavy load hanger 41 is hung from the middle part of the jib 13 by the main winding wire rope 32 in a double cord state. When the heavy load hanger 41 is hung in a double cord state, a plurality of wire extending portions 49A and 49B are formed between the middle portion of the jib 13 and the heavy load hanger 41. When a load is applied by the main hook 43, the load due to the load is distributed to the wire extending portions 49A and 49B. For this reason, a relatively heavy load can be lifted. Therefore, a heavy load can be lifted at a position higher than the tip of the boom 7.

また、荷重を吊上げた状態では、吊上げられた荷重によって、ジブ13の軸方向について圧縮荷重がジブ13に作用し、ジブ13の高さ方向について曲げ荷重が作用する。ジブ13の軸方向についてジブ13の中間部は、ジブ13の先端部よりジブ13とブーム7との連結部に近い。このため、ジブ13の中間部から重荷重用吊り具41が吊下げられる場合は、ジブ13の先端部から重荷重用吊り具41が吊下げられる場合より、圧縮荷重に対する座屈区間が小さくなり、座屈に対する耐性が高くなる。また、ジブ13の中間部から重荷重用吊り具41が吊下げられる場合は、ジブ13の先端部から重荷重用吊り具41が吊下げられる場合より、曲げ荷重が作用する位置がジブ13とブーム7との連結部に近くなる。このため、ジブ13の中間部から重荷重用吊り具41が吊下げられる場合は、ジブ13の先端部から重荷重用吊り具41が吊下げられる場合より、曲げモーメントが小さくなり、曲げ応力が小さくなる。したがって、ジブ13の先端部から重荷重用吊り具41が吊下げられる場合に比べ、ジブ13の中間部から重荷重用吊り具41が吊下げられる状態では、荷重からの負荷に対するジブ13の耐性を高くすることができる。   Further, in the state where the load is lifted, the compression load acts on the jib 13 in the axial direction of the jib 13 and the bending load acts on the height direction of the jib 13 by the lifted load. The middle part of the jib 13 in the axial direction of the jib 13 is closer to the connecting part between the jib 13 and the boom 7 than the tip part of the jib 13. For this reason, when the heavy load hanger 41 is suspended from the middle part of the jib 13, the buckling section with respect to the compressive load is smaller than when the heavy load hanger 41 is hung from the tip part of the jib 13, Increases resistance to bending. Further, when the heavy load suspension 41 is suspended from the middle portion of the jib 13, the position where the bending load acts is different from the case where the heavy load suspension 41 is suspended from the tip of the jib 13. It becomes close to the connecting part. For this reason, when the heavy load hanger 41 is suspended from the middle part of the jib 13, the bending moment is smaller and the bending stress is smaller than when the heavy load hanger 41 is hung from the tip of the jib 13. . Therefore, compared with the case where the heavy load hanger 41 is hung from the tip of the jib 13, in the state where the heavy load hanger 41 is hung from the middle part of the jib 13, the resistance of the jib 13 to the load from the load is increased. can do.

また、軸方向についてジブ13の中間部から重荷重用吊り具41を吊下げるため、ジブ13の先端部から重荷重用吊り具41を吊下げる場合に比べ、ジブ13の強度を高くする必要はなく、ジブ13は重くならない。したがって、クレーン1が転倒し難くなり、荷重の吊上げ性能の低下も有効に防止される。   Further, since the heavy load suspension 41 is suspended from the middle portion of the jib 13 in the axial direction, it is not necessary to increase the strength of the jib 13 as compared with the case where the heavy load suspension 41 is suspended from the tip of the jib 13. The jib 13 does not become heavy. Therefore, it becomes difficult for the crane 1 to fall over, and a decrease in load lifting performance is effectively prevented.

また、ジブ13の強度を高くする必要がないため、ジブ13の高さ方向の寸法を大きくする必要もない。このため、ジブ13の中間部にガイドシーブ及びトップシーブを別個に設ける必要がなく、ジブ13の中間部(ベースジブ21の本体部28)に1つのジブ側シーブユニット37を設けるだけで、ブームヘッド11から延設される主巻ワイヤロープ32を重荷重用吊り具41まで適切に導くことができる。シーブユニット等の部品点数を少なくすることにより、製造コストを削減することができる。また、部品点数を少なくすることにより、ジブ13の下面からの部品の突出が有効に防止される。このため、ジブ13をブームの下面に格納する際に、ジブ13とブーム7との干渉を有効に防止することができる。   Further, since it is not necessary to increase the strength of the jib 13, it is not necessary to increase the dimension of the jib 13 in the height direction. For this reason, it is not necessary to separately provide a guide sheave and a top sheave in the middle part of the jib 13, and only by providing one jib side sheave unit 37 in the middle part of the jib 13 (the main body part 28 of the base jib 21), the boom head The main wire rope 32 extended from 11 can be appropriately guided to the heavy load hanger 41. Manufacturing cost can be reduced by reducing the number of parts such as the sheave unit. Further, by reducing the number of parts, the protrusion of the parts from the lower surface of the jib 13 is effectively prevented. For this reason, when the jib 13 is stored on the lower surface of the boom, the interference between the jib 13 and the boom 7 can be effectively prevented.

以上のように、本実施形態の荷重吊上げ装置5では、荷重の吊上げ性能を低下させることなく、コストを増大させることなく、ブーム7の先端より高い位置で、重い荷重を効率よく吊上げることができる。   As described above, the load lifting device 5 of the present embodiment can efficiently lift a heavy load at a position higher than the tip of the boom 7 without reducing the load lifting performance and without increasing the cost. it can.

(変形例)
第1の実施形態では、ジブ13の中間部から延出される主巻ワイヤロープ32が吊り具側シーブユニット45に1回だけ掛けられているが、これに限るものではない。例えば、第1の変形例として図8及び図9に示すように、吊り具側シーブユニット45に主巻ワイヤロープ32が3回掛けられてもよい。本変形例では、ベースジブ21の本体部28(ジブ13の中間部)に、補助シーブユニット61が設けられている。補助シーブユニット61の軸C3は、ジブ13の幅方向に垂直、かつ、鉛直方向に垂直な方向である縦方向に対して平行である。すなわち、吊り具側シーブユニット45の軸C2と補助シーブユニット61の軸C3は、平行である。
(Modification)
In the first embodiment, the main wire rope 32 extended from the middle part of the jib 13 is hung only once on the hanger-side sheave unit 45, but is not limited thereto. For example, as shown in FIGS. 8 and 9 as a first modified example, the main wire rope 32 may be hung three times on the hanger side sheave unit 45. In this modification, an auxiliary sheave unit 61 is provided on the main body 28 of the base jib 21 (intermediate part of the jib 13). The axis C3 of the auxiliary sheave unit 61 is perpendicular to the width direction of the jib 13 and parallel to the longitudinal direction which is a direction perpendicular to the vertical direction. That is, the axis C2 of the lifting device side sheave unit 45 and the axis C3 of the auxiliary sheave unit 61 are parallel.

ジブ側シーブユニット37の第1のジブ側シーブ38Aに掛けられた主巻ワイヤ32は、重荷重用吊り具41に向かって延出される。そして、吊り具側シーブユニット45に掛けられ、主巻ワイヤロープ32の延出方向がベースジブ21の本体部28(ジブ13の中間部)に向かって変更される。ジブ13の中間部に向かって延出方向が変更された主巻ワイヤロープ32は、補助シーブユニット61に掛けられ、主巻ワイヤロープ32の延出方向が重荷重用吊り具(吊り具)41に向かって変更される。そして、吊り具側シーブユニット45に掛けられ、主巻ワイヤロープ32の延出方向がジブ13の中間部に向かって変更される。ジブ13の中間部に向かって延出方向が変更された主巻ワイヤロープ32は、再び補助シーブユニット61に掛けられ、主巻ワイヤロープ32の延出方向が重荷重用吊り具41に向かって変更される。そして、再び吊り具側シーブユニット45に掛けられ、主巻ワイヤロープ32はベースジブ21の本体部28に向かって延出される。ベースジブ21の本体部28に向かって延出された主巻ワイヤロープ32は、ジブ側シーブユニット37の第2のジブ側シーブ38Bに掛けられ、延出端がソケット47によりブームヘッド11に固定される。   The main winding wire 32 hung on the first jib-side sheave 38A of the jib-side sheave unit 37 extends toward the heavy load hanger 41. And it is hung on the hanging tool side sheave unit 45, and the extending direction of the main winding wire rope 32 is changed toward the main body 28 of the base jib 21 (intermediate part of the jib 13). The main winding wire rope 32 whose extension direction is changed toward the middle part of the jib 13 is hung on the auxiliary sheave unit 61, and the extension direction of the main winding wire rope 32 is changed to a heavy load hanging tool (hanging tool) 41. Will be changed. Then, it is hung on the lifting device side sheave unit 45, and the extending direction of the main winding wire rope 32 is changed toward the middle portion of the jib 13. The main winding wire rope 32 whose extension direction is changed toward the middle part of the jib 13 is again hung on the auxiliary sheave unit 61, and the extension direction of the main winding wire rope 32 is changed toward the heavy load hanging device 41. Is done. Then, it is again hung on the hanger-side sheave unit 45, and the main winding wire rope 32 extends toward the main body 28 of the base jib 21. The main winding wire rope 32 extended toward the main body portion 28 of the base jib 21 is hung on the second jib side sheave 38B of the jib side sheave unit 37, and the extending end is fixed to the boom head 11 by the socket 47. The

以上のように、重荷重用吊り具41は、ジブ13の中間部から主巻ワイヤロープ32により複索状態で吊下げられている。重荷重用吊り具41が複索状態で吊下げられることにより、ジブ13の中間部と重荷重用吊り具41との間に6つ(複数)のワイヤ延設部49A〜49Fが形成される。   As described above, the heavy load suspension 41 is suspended from the middle portion of the jib 13 by the main winding wire rope 32 in a double cord state. When the heavy load hanger 41 is hung in a double cord state, six (plural) wire extending portions 49 </ b> A to 49 </ b> F are formed between the middle portion of the jib 13 and the heavy load hanger 41.

また、本変形例においても、ジブ側シーブユニット37の軸C1は、ジブ13の幅方向に対して平行である。また、吊り具側シーブユニット45の軸C2は、ジブ13の幅方向に垂直、かつ、鉛直方向に垂直な方向である縦方向に対して平行である。このため、図8に示すように、板状部42Bの表面が、ジブ13の伏状方向側の面と対向する。すなわち、吊り具側シーブユニット45の軸C2がジブ13と交差する。前述のように、重荷重用吊り具41では、吊り具側シーブユニット45の軸C2に平行な方向の寸法は、吊り具側シーブユニット45の幅方向の寸法より小さくなる。このため、吊り具側シーブユニット45の軸C2がジブ13と交差する状態で重荷重用吊り具41が吊下げられるため、作業時に重荷重用吊り具41とジブ13とが干渉し難くなる。また、このような構成にすることにより、メインフック43は、ジブ側シーブユニット37の軸C1より前方側に位置する。このため、ジブ13と重荷重用吊り具41のメインフック43が干渉し難い。以上のような構成にすることにより、メインフック43をさらに高い位置まで巻上げることが可能となり、さらに高い位置まで荷重を吊上げることが可能となる。   Also in this modified example, the axis C 1 of the jib side sheave unit 37 is parallel to the width direction of the jib 13. In addition, the axis C2 of the lifting device side sheave unit 45 is parallel to the longitudinal direction which is perpendicular to the width direction of the jib 13 and perpendicular to the vertical direction. For this reason, as shown in FIG. 8, the surface of the plate-like portion 42 </ b> B faces the surface of the jib 13 on the prone direction side. That is, the axis C <b> 2 of the lifting device side sheave unit 45 intersects the jib 13. As described above, in the heavy load hanger 41, the dimension of the hanger side sheave unit 45 in the direction parallel to the axis C2 is smaller than the dimension of the hanger side sheave unit 45 in the width direction. For this reason, since the heavy load hanger 41 is suspended while the axis C2 of the hanger side sheave unit 45 intersects the jib 13, the heavy load hanger 41 and the jib 13 are less likely to interfere with each other during the work. Further, with such a configuration, the main hook 43 is positioned in front of the axis C <b> 1 of the jib side sheave unit 37. For this reason, the jib 13 and the main hook 43 of the heavy load hanger 41 do not easily interfere with each other. With the above configuration, the main hook 43 can be wound up to a higher position, and the load can be lifted to a higher position.

図10は、第1の変形例の補助シーブユニット61を示す図である。図10に示すように、補助シーブユニット61は、ベースジブ21との連結部を回動軸として、ジブ13に対して回動可能である。補助シーブユニット61は、ジブ13の対地角度の変化に対応して、ジブ13が水平な状態での位置(図10の実線で示す位置)と、ジブ13が起状した状態での位置(図10の点線で示す位置)と、の間で回動する。ジブ13の使用後にジブ13をブーム7の側面又は下面に収納する際には、補助シーブユニット61は取外される。このため、ジブ13を収納する際に、ジブ13とブーム7との干渉が、有効に防止される。   FIG. 10 is a diagram showing an auxiliary sheave unit 61 according to the first modification. As shown in FIG. 10, the auxiliary sheave unit 61 is rotatable with respect to the jib 13 with a connecting portion with the base jib 21 as a rotation axis. The auxiliary sheave unit 61 corresponds to the change in the ground angle of the jib 13, the position when the jib 13 is horizontal (the position indicated by the solid line in FIG. 10), and the position when the jib 13 is raised (see FIG. And a position indicated by a dotted line 10). When the jib 13 is stored on the side surface or the lower surface of the boom 7 after the jib 13 is used, the auxiliary sheave unit 61 is removed. For this reason, when the jib 13 is stored, interference between the jib 13 and the boom 7 is effectively prevented.

また、第2の変形例として図11に示すように、吊り具側シーブユニット45に主巻ワイヤロープ32が2回掛けられてもよい。本変形例でも、第1の変形例と同様に、ベースジブ21の本体部28(ジブ13の中間部)に、補助シーブユニット61が設けられている。   Moreover, as shown in FIG. 11 as a 2nd modification, the main winding wire rope 32 may be hung around the hanger side sheave unit 45 twice. Also in this modification, the auxiliary sheave unit 61 is provided in the main body 28 of the base jib 21 (intermediate part of the jib 13) as in the first modification.

ジブ側シーブユニット37の第1のジブ側シーブ38Aに掛けられた主巻ワイヤロープ32は、メインブロック41に向かって延出される。そして、ブロック側シーブユニット45に掛けられ、主巻ワイヤロープ32の延出方向がベースジブ21の本体部28(ジブ13の中間部)に向かって変更される。ジブ13の中間部に向かって延出方向が変更された主巻ワイヤロープ32は、補助シーブユニット61に掛けられ、主巻ワイヤロープ32の延出方向が重荷重用吊り具(吊り具)41に向かって変更される。そして、吊り具側シーブユニット45に掛けられ、主巻ワイヤロープ32の延出方向がジブ13の中間部に向かって変更される。ジブ13の中間部に向かって延出方向が変更された主巻ワイヤロープ32は、ジブ側シーブユニット37の第2のジブ側シーブ38Bに掛けられ、延出端がソケット47によりブームヘッド11に固定される。   The main wire rope 32 hung on the first jib sheave 38A of the jib sheave unit 37 extends toward the main block 41. And it is hung on the block side sheave unit 45, and the extending direction of the main winding wire rope 32 is changed toward the main body portion 28 of the base jib 21 (intermediate portion of the jib 13). The main winding wire rope 32 whose extension direction is changed toward the middle part of the jib 13 is hung on the auxiliary sheave unit 61, and the extension direction of the main winding wire rope 32 is changed to a heavy load hanging tool (hanging tool) 41. Will be changed. Then, it is hung on the lifting device side sheave unit 45, and the extending direction of the main winding wire rope 32 is changed toward the middle portion of the jib 13. The main winding wire rope 32 whose extension direction is changed toward the middle part of the jib 13 is hung on the second jib side sheave 38B of the jib side sheave unit 37, and the extension end is attached to the boom head 11 by the socket 47. Fixed.

以上のように、重荷重用吊り具41は、ジブ13の中間部から主巻ワイヤロープ32により複索状態で吊下げられている。重荷重用吊り具41が複索状態で吊下げられることにより、ジブ13の中間部と重荷重用吊り具41との間に4つ(複数)のワイヤ延設部49A〜49Dが形成される。   As described above, the heavy load suspension 41 is suspended from the middle portion of the jib 13 by the main winding wire rope 32 in a double cord state. When the heavy load hanger 41 is hung in a double cord state, four (plural) wire extending portions 49 </ b> A to 49 </ b> D are formed between the intermediate portion of the jib 13 and the heavy load hanger 41.

第1の実施形態、第1の変形例及び第2の変形例で前述したように、本発明では、ジブ13の中間部から延出される主巻ワイヤロープ32が、吊り具側シーブユニット45に1回以上掛けられていればよい。そして、吊り具側シーブユニット45に主巻ワイヤロープ32が掛けられることにより、主巻ワイヤロープ32の延出方向がジブ13の中間部に向かって変更されればよい。これにより、重荷重用吊り具41は、ジブ13の中間部から主巻ワイヤロープ32により複索状態で吊下げられる。重荷重用吊り具41が複索状態で吊下げられることにより、ジブ13の中間部と重荷重用吊り具41との間に複数のワイヤ延設部(第1の実施形態では49A,49B、第1の変形例では49A〜49F、第2の変形例では49A〜49D)が形成される。メインフック43により荷重を引掛けた際には、荷重による負荷がそれぞれのワイヤ延設部に分散される。このため、ブーム7の先端より高い位置で比較的重い荷重を吊上げることが可能となる。   As described above in the first embodiment, the first modification, and the second modification, in the present invention, the main wire rope 32 extending from the middle portion of the jib 13 is attached to the lifting device side sheave unit 45. It only needs to be hung once or more. Then, the extension direction of the main wire rope 32 may be changed toward the middle portion of the jib 13 by the main wire rope 32 being hung on the lifting device side sheave unit 45. As a result, the heavy load hanger 41 is suspended from the middle part of the jib 13 by the main wire rope 32 in a double cord state. When the heavy load hanger 41 is suspended in a double cord state, a plurality of wire extending portions (49A, 49B, 1st in the first embodiment) are provided between the middle portion of the jib 13 and the heavy load hanger 41. 49A to 49F are formed in the modified example, and 49A to 49D) are formed in the second modified example. When a load is applied by the main hook 43, the load due to the load is distributed to each wire extending portion. For this reason, it is possible to lift a relatively heavy load at a position higher than the tip of the boom 7.

また、第1の変形例及び第2の変形例のように、ジブ13の中間部に補助シーブユニット61が設けられる場合は、重荷重用吊り具41から延出される主巻ワイヤロープ32が補助シーブユニット61に1回以上掛けられる。そして、主巻ワイヤロープ32が補助シーブユニット61に掛けられる度に、主巻ワイヤロープ32の延出方向が重荷重用吊り具41に向かって変更される。また、第1の変形例及び第2の変形例のように、ジブ13の中間部に補助シーブユニット61が設けられる場合は、吊り具側シーブユニット45に最後に掛けられた位置からジブ13の中間部に延出された主巻ワイヤロープ32は、ジブ側シーブユニット37の第2のジブ側シーブ38Bに掛けられる。そして、主巻ワイヤロープ32の延出端が、ブームヘッド11に固定される。   Further, when the auxiliary sheave unit 61 is provided in the middle portion of the jib 13 as in the first and second modifications, the main wire rope 32 extended from the heavy load suspension 41 is used as the auxiliary sheave. The unit 61 is hung once or more. Each time the main wire rope 32 is hung on the auxiliary sheave unit 61, the extending direction of the main wire rope 32 is changed toward the heavy load hanger 41. Moreover, when the auxiliary sheave unit 61 is provided in the middle part of the jib 13 as in the first and second modifications, the jib 13 is moved from the position where it is last hung on the lifting device side sheave unit 45. The main wire rope 32 extended to the intermediate portion is hung on the second jib side sheave 38B of the jib side sheave unit 37. Then, the extended end of the main winding wire rope 32 is fixed to the boom head 11.

また、第1の実施形態では、吊り具側シーブユニット45の軸C2は、ジブ13の幅方向に垂直、かつ、鉛直方向に垂直な方向である縦方向に対して平行であるが、これに限るものではない。例えば、第3の変形例として図12に示すように、吊り具側シーブユニット45の軸C2が、ジブ13の幅方向に対して平行であってもよい。本変形例では、第1の実施形態と同様に、ベースジブ21の本体部28(ジブ13の中間部)から主巻ワイヤロープ32により複索状態で重荷重用吊り具41が吊下げされ、ジブ13の中間部と重荷重用吊り具41との間に複数のワイヤ延設部49A,49Bが形成される。ただし、本変形例では、第1の実施形態とは異なり、重荷重用吊り具41の板状部42A表面及び板状部42Bの表面の両方がジブ13の伏状方向側の面と対向せず、吊り具側シーブユニット45の軸C2がジブ13と交差しない。このため、第1の実施形態に比べ、作業時に重荷重用吊り具41とジブ13とが干渉し易い。また、本変形例では、ジブ側シーブユニット37の軸C1から鉛直下方向に延びる直線Lに吊り具側シーブユニット45の軸C2(メインフック43)が交わる。以上のような構成であるため、本変形例では、第1の実施形態に比べ、重荷重用吊り具41とジブ13が干渉し易い。したがって、重荷重用吊り具41とジブ13との干渉を防止する必要があるため、高い位置まで荷重を吊上げる際の作業性が低下してしまう。   In the first embodiment, the axis C2 of the lifting device side sheave unit 45 is perpendicular to the width direction of the jib 13 and parallel to the longitudinal direction that is perpendicular to the vertical direction. It is not limited. For example, as shown in FIG. 12 as a third modification, the axis C <b> 2 of the lifting device side sheave unit 45 may be parallel to the width direction of the jib 13. In this modification, similarly to the first embodiment, the heavy load suspension 41 is suspended from the main body portion 28 of the base jib 21 (intermediate portion of the jib 13) by the main winding wire rope 32 in a double cable state, and the jib 13 A plurality of wire extending portions 49 </ b> A and 49 </ b> B are formed between the intermediate portion and the heavy load hanger 41. However, in the present modification, unlike the first embodiment, both the surface of the plate-like portion 42A and the surface of the plate-like portion 42B of the heavy load hanger 41 do not face the surface of the jib 13 on the prone direction side. The axis C <b> 2 of the lifting device side sheave unit 45 does not intersect the jib 13. For this reason, compared with 1st Embodiment, the heavy load hanger 41 and the jib 13 are easy to interfere at the time of work. In this modification, the axis C2 (main hook 43) of the lifting device side sheave unit 45 intersects the straight line L extending vertically downward from the axis C1 of the jib side sheave unit 37. Because of the configuration as described above, in this modification, the heavy load hanger 41 and the jib 13 are likely to interfere with each other as compared with the first embodiment. Therefore, since it is necessary to prevent the heavy load hanger 41 and the jib 13 from interfering with each other, workability when lifting the load to a high position is lowered.

また、第1の実施形態では、ジブ13は、ベースジブ21、第1の伸縮ジブ25及び第2の伸縮ジブ26を備えるが、これに限るものではない。例えば、伸縮ジブが1つのみ設けられる構成であってもよい。この場合、ベースジブの内部に収納された収縮状態とジブの先端方向にベースジブから突出する伸長状態との間で、ベースジブに対してジブの軸方向に伸縮ジブは伸縮可能である。また、伸縮ジブが設けられず、ジブの軸方向の寸法が変化しない構成であってもよい。また、ジブ13の伸縮において、テンションロッド15の長さが変化しない構成であってもよい。   In the first embodiment, the jib 13 includes the base jib 21, the first telescopic jib 25, and the second telescopic jib 26, but is not limited thereto. For example, a configuration in which only one telescopic jib is provided may be used. In this case, the telescopic jib can be expanded and contracted in the axial direction of the jib between the contracted state housed inside the base jib and the extended state protruding from the base jib in the direction of the tip of the jib. Moreover, the structure by which an expansion-contraction jib is not provided and the dimension of the axial direction of a jib does not change may be sufficient. Moreover, the structure which the length of the tension rod 15 does not change in expansion / contraction of the jib 13 may be sufficient.

また、第1の実施形態では、主巻ワイヤロープ32の延出端は、ブームヘッド11に固定されているが、これに限るものではない。例えば、ジブ13に主巻ワイヤロープ32の延出端が固定されてもよい。この場合、ジブ側シーブユニット37は第2のジブ側シーブ38Bを備えない。そして、主巻ワイヤロープ32は、吊り具側シーブユニット45によりジブ13の中間部に向かって延出方向が変更され、ソケット47を介して延出端がジブ13に固定される。   Moreover, in 1st Embodiment, although the extension end of the main winding wire rope 32 is being fixed to the boom head 11, it is not restricted to this. For example, the extended end of the main wire rope 32 may be fixed to the jib 13. In this case, the jib side sheave unit 37 does not include the second jib side sheave 38B. Then, the extending direction of the main wire rope 32 is changed toward the middle portion of the jib 13 by the lifting device side sheave unit 45, and the extending end is fixed to the jib 13 through the socket 47.

また、第1の実施形態では、ジブ13の中間部から主巻ワイヤロープ32により、重荷重用吊り具41が吊下げられているが、ジブ13の中間部から補巻ワイヤロープ52により、重荷重用吊り具41が吊下げられていてもよい。この場合も、複索状態で重荷重用吊り具41が吊下げられる。   In the first embodiment, the heavy load suspension 41 is suspended from the intermediate portion of the jib 13 by the main wire rope 32, but the heavy load rope 41 is suspended from the intermediate portion of the jib 13 by the auxiliary wire rope 52. The hanging tool 41 may be hung. Also in this case, the heavy load hanger 41 is suspended in the double cord state.

以上、本発明の実施形態について説明したが、本発明は前記の実施形態に限定されるものではなく、本発明の要旨を逸脱しない範囲で種々の変形ができることは勿論である。   Although the embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and various modifications can be made without departing from the scope of the present invention.

以下、本発明の他の特徴的な技術事項を下記の通り付記する。

(付記項1)
ブームと、
前記ブームの先端部に取付けられ、前記ブームとの連結部を中心に前記ブームに対して回動可能なジブと、
一端が前記ブームの前記先端部に接続され、他端が前記ジブに接続されるテンションロッドであって、前記ジブが前記ブームに対して起状した状態で発生した張力によって前記ジブを支持することにより、前記ジブの曲げに対する強度を高めるテンションロッドと、
前記ジブの軸方向について前記ジブの中間部の側面に設けられるジブ側シーブユニットと、
前記ジブが前記ブームに対して起状した状態で、前記ブームの軸方向に沿って延設され、前記ブームの前記先端部から前記ジブの前記軸方向に沿って前記ジブの前記中間部まで延設されるワイヤロープであって、前記ジブ側シーブユニットに掛けられるワイヤロープと、
前記ジブが前記ブームに対して起状した状態で、前記ワイヤロープにより前記ジブの前記中間部から複索状態で吊下げされる吊り具であって、荷重が引掛けられるフックと、前記ジブの前記中間部から延出される前記ワイヤロープが1回以上掛けられ、前記ワイヤロープが掛けられる度に前記ワイヤロープの延出方向を前記ジブの前記中間部に向かって変更する吊り具側シーブユニットと、を備える吊り具と、
を具備する荷重吊上げ装置。
Hereinafter, other characteristic technical matters of the present invention are appended as follows.
Record
(Additional item 1)
The boom,
A jib attached to the tip of the boom and rotatable with respect to the boom around a connecting portion with the boom;
A tension rod having one end connected to the tip of the boom and the other end connected to the jib, and supporting the jib with tension generated when the jib is raised relative to the boom. By means of a tension rod that increases the strength against bending of the jib,
A jib-side sheave unit provided on a side surface of an intermediate portion of the jib in the axial direction of the jib;
In a state where the jib is raised with respect to the boom, the jib extends along the axial direction of the boom, and extends from the tip end portion of the boom to the intermediate portion of the jib along the axial direction of the jib. A wire rope installed on the jib-side sheave unit;
A hook that is hung from the intermediate part of the jib in a double-wired state by the wire rope in a state where the jib is raised with respect to the boom, and a hook on which a load is hooked, A suspension side sheave unit that hangs the wire rope extending from the intermediate portion one or more times, and changes the extending direction of the wire rope toward the intermediate portion of the jib each time the wire rope is hooked. A hanging tool comprising:
A load lifting device.

(付記項2)
前記ジブ側シーブユニットは、前記ジブの幅方向に軸が平行であり、
前記吊り具側シーブユニットは、前記ジブの前記幅方向に垂直、かつ、鉛直方向に垂直な方向である縦方向に対して軸が平行である、
付記項1の荷重吊上げ装置。
(Appendix 2)
The jib side sheave unit has an axis parallel to the width direction of the jib,
The lifting device side sheave unit has an axis parallel to a longitudinal direction that is perpendicular to the width direction of the jib and is perpendicular to the vertical direction.
Item 1. The load lifting device of item 1.

(付記項3)
前記吊り具側シーブユニットに最後に掛けられた位置から前記ジブの前記中間部に延出された前記ワイヤロープは、前記ジブ側シーブユニットに掛けられ、延出端が前記ブームに固定される付記項1の荷重吊上げ装置。
(Additional Item 3)
The wire rope extended from the position last hung on the lifting device side sheave unit to the middle portion of the jib is hung on the jib side sheave unit, and the extending end is fixed to the boom. Item 1. A load lifting device according to item 1.

(付記項4)
前記ジブの前記中間部に設けられる補助シーブユニットであって、前記吊り具から延出される前記ワイヤロープが1回以上掛けられ、前記ワイヤロープが掛けられる度に前記ワイヤロープの延出方向を前記吊り具に向かって変更する補助シーブユニットをさらに具備する付記項1の荷重吊上げ装置。
(Appendix 4)
An auxiliary sheave unit provided at the intermediate portion of the jib, wherein the wire rope extending from the suspension is hung at least once, and the wire rope extends in the extending direction each time the wire rope is hung. The load lifting device according to Additional Item 1, further comprising an auxiliary sheave unit that changes toward the lifting tool.

(付記項5)
前記ジブは、
基端部が前記ブームの前記先端部に連結され、前記ジブ側シーブユニットが配置されるベースジブと、
前記ベースジブの内部に収納された収縮状態と、前記ジブの先端方向に前記ベースジブから突出する伸長状態との間で、前記ベースジブに対して前記ジブの軸方向に伸縮可能な伸縮ジブと、
を備える付記項1の荷重吊上げ装置。
(Appendix 5)
The jib is
A base jib in which a base end is connected to the tip of the boom and the jib-side sheave unit is disposed;
An expansion / contraction jib that can be expanded and contracted in the axial direction of the jib between the contracted state housed inside the base jib and an extended state protruding from the base jib in the tip direction of the jib,
The load lifting device according to Supplementary Note 1, comprising:

(付記項6)
前記ジブは、前記ジブ側シーブユニットが着脱可能に取付けられるシーブ着脱部を備える付記項1の荷重吊上げ装置。
(Appendix 6)
The load lifting device according to item 1, wherein the jib includes a sheave detachable portion to which the jib side sheave unit is detachably attached.

5…荷重吊上げ装置、7…ブーム、13…ジブ、15…テンションロッド、32…主巻ワイヤロープ、37…ジブ側シーブユニット、41…重荷重用吊り具、45…吊り具側シーブユニット。   DESCRIPTION OF SYMBOLS 5 ... Load lifting apparatus, 7 ... Boom, 13 ... Jib, 15 ... Tension rod, 32 ... Main winding wire rope, 37 ... Jib side sheave unit, 41 ... Heavy load lifting device, 45 ... Lifting device side sheave unit.

Claims (3)

ブームと、
前記ブームの先端部に取付けられ、前記ブームとの連結部を中心に前記ブームに対して回動可能なジブであって、前記ジブの幅方向を向く2つの側面を備えるジブと、
一端が前記ブームの前記先端部に接続され、他端が前記ジブに接続されるテンションロッドであって、前記ジブが前記ブームに対して起状した状態で発生した張力によって前記ジブを支持することにより、前記ジブの曲げに対する強度を高めるテンションロッドと、
前記ジブの軸方向について前記ジブの中間部に設けられ、前記側面の一方に位置する第1のジブ側シーブと、
前記ジブが前記ブームに対して起状した状態において、前記ブームの軸方向に沿って延設され、前記ブームの前記先端部から前記ジブの前記軸方向に沿って前記ジブの前記中間部まで延設されるワイヤロープであって、前記ジブの中間部において前記第1のジブ側シーブに掛けられるワイヤロープと、
前記ジブが前記ブームに対して起状した状態において、前記ワイヤロープにより前記ジブの前記中間部から複索状態で吊下げされる吊り具であって、荷重が引掛けられるフックを備える吊り具と
前記吊り具に設けられるとともに、前記第1のジブ側シーブに掛けられた前記ワイヤロープが1回以上掛けられ、前記ワイヤロープが掛けられる度に前記吊り具に向かう状態から前記ジブの前記中間部に向かう状態に前記ワイヤロープの延設方向を変更する吊り具側シーブユニットと、
前記ジブの前記軸方向について前記ジブの前記中間部に設けられ、前記第1のジブ側シーブが位置する前記側面とは反対側の前記側面に位置する第2のジブ側シーブであって、前記吊り具側シーブユニットに1回以上掛けられた前記ワイヤロープが掛けられる第2のジブ側シーブと
前記ブームの前記先端部に設けられ、前記第2のジブ側シーブに掛けられた前記ワイヤロープの延出端が固定されるブームヘッドと
を具備する荷重吊上げ装置。
The boom,
A jib that is attached to the tip of the boom and is rotatable with respect to the boom around a connecting portion with the boom, the jib having two side faces facing the width direction of the jib ;
A tension rod having one end connected to the tip of the boom and the other end connected to the jib, and supporting the jib with tension generated when the jib is raised relative to the boom. By means of a tension rod that increases the strength against bending of the jib,
A first jib-side sheave provided at an intermediate portion of the jib in the axial direction of the jib and located on one of the side surfaces ;
In a state in which the jib is Okoshijo to the boom, extends along the axial direction of the boom, extending from said distal end of said boom to said middle portion of the jib along the axial direction of the jib A wire rope installed on the first jib side sheave at an intermediate portion of the jib ;
In a state in which the jib is Okoshijo to the boom, a hanging member which is hung in a double search condition from the intermediate portion of the jib by the wire rope, the hanger comprising a hook load is hooked ,
The intermediate portion of the jib is provided on the hanging tool, and the wire rope hung on the first jib-side sheave is hung at least once, and each time the wire rope is hung, the intermediate portion of the jib a hanger sheave unit for changing the extending direction of the wire rope to a state directed to,
A second jib-side sheave located on the side opposite to the side where the first jib-side sheave is located, in the axial direction of the jib, A second jib-side sheave on which the wire rope hung at least once on the lifting-unit-side sheave unit is hung ;
A boom head provided at the tip of the boom, to which an extended end of the wire rope hung on the second jib sheave is fixed ;
A load lifting device.
前記第1のジブ側シーブ及び前記第2のジブ側シーブのそれぞれは、前記ジブの前記幅方向に対して平行な軸を有し
前記吊り具側シーブユニットは、前記ジブの前記幅方向に垂直、かつ、鉛直方向に垂直な縦方向に対して平行な軸を有する
請求項1の荷重吊上げ装置
Each of the first jib side sheave and the second jib side sheave has an axis parallel to the width direction of the jib ,
The lifting device side sheave unit has an axis perpendicular to the width direction of the jib and parallel to a longitudinal direction perpendicular to the vertical direction .
The load lifting device according to claim 1 .
前記ジブの前記中間部に設けられるとともに、前記第1のジブ側シーブと前記第2のジブ側シーブとの間において前記ワイヤロープが1回以上掛けられ、前記ワイヤロープが掛けられる度に前記ジブの中間部に向かう状態から前記吊り具に向かう状態に前記ワイヤロープの前記延設方向を変更する補助シーブユニットをさらに具備する、請求項1の荷重吊り上げ装置 The wire rope is provided at the intermediate portion of the jib and is hung at least once between the first jib side sheave and the second jib side sheave, and each time the wire rope is hung, the jib The load lifting device according to claim 1, further comprising an auxiliary sheave unit that changes the extending direction of the wire rope from a state toward the intermediate portion to a state toward the suspension .
JP2011280070A 2011-12-21 2011-12-21 Load lifting device Active JP5871605B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011280070A JP5871605B2 (en) 2011-12-21 2011-12-21 Load lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011280070A JP5871605B2 (en) 2011-12-21 2011-12-21 Load lifting device

Publications (2)

Publication Number Publication Date
JP2013129500A JP2013129500A (en) 2013-07-04
JP5871605B2 true JP5871605B2 (en) 2016-03-01

Family

ID=48907398

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011280070A Active JP5871605B2 (en) 2011-12-21 2011-12-21 Load lifting device

Country Status (1)

Country Link
JP (1) JP5871605B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106115499A (en) * 2016-08-18 2016-11-16 四川远星橡胶有限责任公司 A kind of sucked type crane with Double-sucker
JP7167618B2 (en) * 2018-10-17 2022-11-09 株式会社タダノ Lateral pulling detection device and crane
CN109607406B (en) * 2019-01-09 2024-03-29 中国人民解放军海军航空大学 Separate-hanging stacked lifting device and lifting method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5316129Y2 (en) * 1971-10-19 1978-04-27
DE3425604C2 (en) * 1984-07-12 1995-10-19 Krupp Ag Hoesch Krupp Mobile crane with multi-part boom
JPS6213989U (en) * 1985-07-11 1987-01-28
JP3521093B2 (en) * 1994-12-28 2004-04-19 株式会社小松製作所 Road sheave structure
JP3227535B2 (en) * 1998-10-01 2001-11-12 住友重機械建機クレーン株式会社 Lifting mechanism at the middle of the crane's boom
JP5422367B2 (en) * 2009-12-22 2014-02-19 株式会社加藤製作所 Crane jib overhanging device

Also Published As

Publication number Publication date
JP2013129500A (en) 2013-07-04

Similar Documents

Publication Publication Date Title
WO2020026842A1 (en) Crane
JP5871605B2 (en) Load lifting device
JP2016222359A (en) crane
JP5635331B2 (en) Mobile crane
JP6645222B2 (en) How to attach a crane jib
JP5649870B2 (en) Mobile crane
JP4402923B2 (en) Tower crane
JP7287030B2 (en) Telescopic cylinder assembly for telescopic boom
JP7298419B2 (en) Crane assembly method and crane
JP6620334B2 (en) Boom deflection prevention device
JP2012051713A (en) Mobile crane
JP6638434B2 (en) Crane boom mounting method
JP6586858B2 (en) Boom deflection prevention device
JP4956286B2 (en) Winding drum wire winding method at crane installation
JP2016037342A (en) crane
JP4836476B2 (en) Telescopic boom for self-propelled crane
JP2020104998A (en) Disassembling structure and method of crane
JP2012051692A (en) Mobile crane
JP7110601B2 (en) Jib retracting device and jib retracting method
JP7025692B2 (en) Boom head
JP4625163B2 (en) Mobile crane hoisting cylinder load reduction device
JP6579172B2 (en) Crane and crane strut raising method
JP4708067B2 (en) Crane equipment
JP2022120477A (en) Derricking assist device
JP2660838B2 (en) Attachment structure such as jib for crane

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20141114

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150608

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150616

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150724

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20151215

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160112

R150 Certificate of patent or registration of utility model

Ref document number: 5871605

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250