JP5295800B2 - Side gutter with curb and its construction method - Google Patents

Side gutter with curb and its construction method Download PDF

Info

Publication number
JP5295800B2
JP5295800B2 JP2009012151A JP2009012151A JP5295800B2 JP 5295800 B2 JP5295800 B2 JP 5295800B2 JP 2009012151 A JP2009012151 A JP 2009012151A JP 2009012151 A JP2009012151 A JP 2009012151A JP 5295800 B2 JP5295800 B2 JP 5295800B2
Authority
JP
Japan
Prior art keywords
drainage
groove
curb
longitudinal direction
culvert
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2009012151A
Other languages
Japanese (ja)
Other versions
JP2010168801A (en
Inventor
薫生 高岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ito Yogyo Co Ltd
Original Assignee
Ito Yogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ito Yogyo Co Ltd filed Critical Ito Yogyo Co Ltd
Priority to JP2009012151A priority Critical patent/JP5295800B2/en
Publication of JP2010168801A publication Critical patent/JP2010168801A/en
Application granted granted Critical
Publication of JP5295800B2 publication Critical patent/JP5295800B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Sewage (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a gutter with curbstone capable of preventing the curbstone from moving in the transverse direction. <P>SOLUTION: A first restriction member 10 and a second restriction member 11 which restrict the movement of the curbstone 3 in the transverse direction are affixed to the upper surface 2a of a block body 2 using an expansion anchor 12. Both side surfaces of the groove section 8 of the curbstone 3 are brought into contact with the first restriction member 10 and the second restriction member 11 to restrict the movement of the curbstone 3 in the transverse direction to the block body 2. <P>COPYRIGHT: (C)2010,JPO&amp;INPIT

Description

本発明は、排水性舗装が施された道路の側縁に設置される縁石付き側溝およびその施工方法に関する。   The present invention relates to a curb-side gutter installed on a side edge of a road on which drainage pavement has been applied, and a construction method therefor.

近年、道路の排水性舗装技術として、路盤上に敷設した不透水層の上に、透水性機能を有する多孔質のアスファルト混合物よりなる排水層を配置するものがある。この排水性舗装が施工された道路では、雨水は排水層を浸透して不透水層の上を流れることで排水される。このため、道路の表面に水分が溜まらなくなり、車両の走行安全性が向上したり、排水層内の空隙によりエンジン音やタイヤのエアポンピング音が吸収され、交通騒音が低減されるという利点がある。
このような排水性舗装が施工された道路の側縁に設置する側溝として、内部に排水路を有する暗渠部材を路盤に据え付け、この暗渠部材の上面に車道と歩道とを区分けする縁石を設置したものが知られている(特許文献1参照)。
この縁石付き側溝は、暗渠部材に縁石を設置する際に、暗渠部材の上面に形成された排水溝と、縁石の下面に形成された溝部とを対向させるようになっている。これにより、排水層に浸透した雨水を排水溝および溝部に導くとともに、導水路を経て排水路へ導くようになっている。
In recent years, as a drainage pavement technique for roads, there is a technique in which a drainage layer made of a porous asphalt mixture having a water permeability function is disposed on an impermeable layer laid on a roadbed. On the road where the drainage pavement is constructed, rainwater is drained by permeating the drainage layer and flowing over the impermeable layer. For this reason, moisture does not accumulate on the surface of the road, which improves the driving safety of the vehicle, and the engine noise and the air pumping sound of the tire are absorbed by the air gap in the drainage layer, thereby reducing the traffic noise. .
As a gutter to be installed on the side edge of the road where such drainage pavement was constructed, a culvert member with a drainage channel was installed on the roadbed, and a curb that separates the roadway and the sidewalk was installed on the top surface of this culvert member. The thing is known (refer patent document 1).
When the curb is installed in the culvert member, the side groove with the curb faces the drainage groove formed on the upper surface of the culvert member and the groove formed on the lower surface of the curb member. Accordingly, rainwater that has penetrated into the drainage layer is guided to the drainage grooves and the groove portions, and is also guided to the drainage channels through the water conduits.

特開2008−133691号 公報JP 2008-133691 A

しかしながら、上記特許文献1のような縁石付き側溝にあっては、側溝の施工時における埋め戻し土圧や転圧機械による道路の横断方向への荷重、または施工後における自動車の衝突による横断方向への荷重が縁石に作用することにより、縁石が横断方向へ移動して暗渠部材からずれることがある。この縁石の移動量が大きくなると、縁石の下端部が排水溝内に落ち込んで排水溝が塞がれることにより、排水機能が低下するという問題があった。
そこで、本発明はこのような従来技術の問題点に鑑み、縁石の横断方向への移動を防止することができる縁石付き側溝を提供することを目的とする。
However, in the side groove with a curb as in the above-mentioned Patent Document 1, the load in the crossing direction of the road by the backfill earth pressure or the compaction machine at the time of construction of the side groove, or the crossing direction by the collision of the automobile after the construction. When the load on the curb acts on the curb, the curb may move in the transverse direction and deviate from the culvert member. When the amount of movement of the curb increases, the lower end of the curb falls into the drainage groove and the drainage groove is blocked, resulting in a problem that the drainage function is lowered.
Therefore, in view of the problems of the prior art, an object of the present invention is to provide a curb-attached side groove that can prevent the curb from moving in the transverse direction.

上記目的を達成するための本発明の縁石付き側溝は、縦断方向に延びる排水路を内部に有するとともに、排水性舗装の水分を当該排水路に導くべく上面に縦断方向に延びる排水溝が形成された暗渠部材と、前記暗渠部材の上方に設置されているとともに下面に縦断方向に延びる溝部が形成された縁石と、からなる縁石付き側溝であって、前記排水溝の横断方向の両端部から立ち上がるように前記暗渠部材の上面に固定されているとともに、前記縁石の前記溝部の横断方向の両側面に当接可能な一対の規制部材を備えていることを特徴とする。   The side groove with curb of the present invention for achieving the above object has a drainage channel extending in the longitudinal direction inside, and a drainage channel extending in the longitudinal direction is formed on the upper surface so as to guide moisture of the drainage pavement to the drainage channel. A side wall with a curb comprising a culvert member and a curb stone that is installed above the culvert member and has a groove extending in the longitudinal direction on the lower surface, and rises from both ends in the transverse direction of the drainage groove. As described above, a pair of regulating members that are fixed to the upper surface of the culvert member and are capable of abutting on both side surfaces in the transverse direction of the groove portion of the curb are provided.

上記本発明の縁石付き側溝では、縁石の溝部の横断方向の両側面に当接可能な一対の規制部材を暗渠部材の上面に固定するようにしたので、縁石が暗渠部材に対して横断方向へ移動するのを規制することができ、排水溝が縁石に塞がれることによって排水機能が低下するのを防止することができる。   In the side groove with a curb of the present invention, the pair of regulating members that can contact both side surfaces of the curb groove in the transverse direction are fixed to the upper surface of the culvert member, so that the curb is transverse to the culvert member. It is possible to restrict the movement, and it is possible to prevent the drainage function from being lowered by the drainage groove being blocked by the curb.

また、前記縁石は、前記暗渠部材の上面に敷設された敷きモルタルに設置されており、前記規制部材は、前記排水溝の横断方向の両端部から立ち上がるように前記暗渠部材の上面に固定されていることが好ましい。
この場合、規制部材は、排水溝の横断方向の両端部から立ち上がるように固定されているため、側溝の施工時において、暗渠部材の上面に敷設された敷きモルタルが、規制部材に堰き止められることによって排水溝内に流れ込むのを防止することができる。
Further, the curb is installed in a mortar laid on the upper surface of the culvert member, and the regulating member is fixed to the upper surface of the culvert member so as to rise from both ends in the transverse direction of the drainage groove. Preferably it is.
In this case, since the regulating member is fixed so as to rise from both ends in the transverse direction of the drainage groove, the mortar laid on the upper surface of the underdrain member is blocked by the regulating member when the side groove is constructed. Can be prevented from flowing into the drain.

また、前記縁石付き側溝は、前記規制部材を前記暗渠部材に固定するための拡張アンカーをさらに備えていることが好ましい。
この場合、特殊な工具を使用する必要がないため、規制部材を暗渠部材に容易に固定することができる。
Moreover, it is preferable that the said side wall with a curb is further equipped with the expansion anchor for fixing the said limitation member to the said culvert member.
In this case, since it is not necessary to use a special tool, the regulating member can be easily fixed to the culvert member.

また、本発明の縁石付き側溝の施工方法は、縦断方向に延びる排水路を内部に有するとともに排水性舗装の水分を当該排水路に導くべく上面に縦断方向に延びる排水溝が形成された暗渠部材を、路盤に設置する工程、前記暗渠部材の上面に、規制部材を固定する工程、下面に縦断方向に延びる溝部が形成された縁石を、当該溝部の横断方向の両側面に前記各規制部材をそれぞれ当接可能に、前記暗渠部材の上方に設置する工程、を含むことを特徴としている。
本発明の縁石付き側溝の施工方法では、縁石の溝部の横断方向の両側面に当接可能な一対の規制部材を暗渠部材の上面に固定するようにしたので、縁石が暗渠部材に対して横断方向へ移動するのを規制することができ、排水溝が縁石に塞がれることによって排水機能が低下するのを防止することができる。
In addition, the method for constructing a gutter with a curb according to the present invention includes a drainage channel having a drainage channel extending in the longitudinal direction and having a drainage channel extending in the longitudinal direction on the upper surface so as to guide moisture of the drainage pavement to the drainage channel. A step of installing the restriction member on the upper surface of the culvert member, a curb stone formed with a groove portion extending in the longitudinal direction on the lower surface, and the restriction members on both side surfaces in the transverse direction of the groove portion. A step of installing the culvert member above the culvert member so as to be able to contact each other.
In the construction method of the side groove with curb of the present invention, the pair of regulating members that can contact both side surfaces of the curb groove in the transverse direction are fixed to the upper surface of the culvert member, so the curb crosses the culvert member. The movement in the direction can be restricted, and the drainage function can be prevented from being deteriorated by the drainage groove being blocked by the curb.

また、本発明の縁石付き側溝の施工方法は、縦断方向に延びる排水路を内部に有するとともに排水性舗装の水分を当該排水路に導くべく上面に縦断方向に延びる排水溝が形成された暗渠部材の上面に、一対の規制部材を固定する工程、前記暗渠部材を、路盤に設置する工程、下面に縦断方向に延びる溝部が形成された縁石を、当該溝部の横断方向の両側面に前記各規制部材をそれぞれ当接可能に、前記暗渠部材の上方に設置する工程、を含むことを特徴としている。
本発明の縁石付き側溝の施工方法では、縁石の溝部の横断方向の両側面に当接可能な一対の規制部材を暗渠部材の上面に固定するようにしたので、縁石が暗渠部材に対して横断方向へ移動するのを規制することができ、排水溝が縁石に塞がれることによって排水機能が低下するのを防止することができる。また、暗渠部材を道路脇に設置する前に、規制部材を暗渠部材に固定するようにしたので、暗渠部材を現場へ搬入する前に規制部材をあらかじめ暗渠部材に固定しておくことができ、現場での施工期間を短縮することができる。
In addition, the method for constructing a gutter with a curb according to the present invention includes a drainage channel having a drainage channel extending in the longitudinal direction and having a drainage channel extending in the longitudinal direction on the upper surface so as to guide moisture of the drainage pavement to the drainage channel. A step of fixing a pair of restricting members on the upper surface, a step of installing the culvert member on the roadbed, a curbstone formed with a groove portion extending in the longitudinal direction on the lower surface, and the respective restrictors on both side surfaces in the transverse direction of the groove portion. A step of placing the members above the culvert member so as to be able to contact each other.
In the construction method of the side groove with curb of the present invention, the pair of regulating members that can contact both side surfaces of the curb groove in the transverse direction are fixed to the upper surface of the culvert member, so the curb crosses the culvert member. The movement in the direction can be restricted, and the drainage function can be prevented from being deteriorated by the drainage groove being blocked by the curb. In addition, since the regulating member is fixed to the culvert member before installing the culvert member on the side of the road, the regulating member can be fixed to the culvert member in advance before carrying the culvert member to the site, The construction period on site can be shortened.

また、本発明の縁石付き側溝の施工方法は、縦断方向に延びる排水路を内部に有するとともに排水性舗装の水分を当該排水路に導くべく上面に縦断方向に延びる排水溝が形成された暗渠部材を、路盤に設置する工程、前記暗渠部材の上面に、前記排水溝の横断方向の両端部から立ち上がるように一対の規制部材を固定する工程、前記暗渠部材の上面に敷きモルタルを敷設する工程、下面に縦断方向に延びる溝部が形成された縁石を、当該溝部の横断方向の両側面に前記各規制部材をそれぞれ当接可能に、前記敷きモルタル上に設置する工程、を含むことを特徴としている。   In addition, the method for constructing a gutter with a curb according to the present invention includes a drainage channel having a drainage channel extending in the longitudinal direction and having a drainage channel extending in the longitudinal direction on the upper surface so as to guide moisture of the drainage pavement to the drainage channel. A step of installing on the roadbed, a step of fixing a pair of regulating members so as to rise from both end portions in the transverse direction of the drainage groove on the upper surface of the underdrain member, a step of laying mortar on the upper surface of the underdrain member, A curb stone formed with a groove extending in the longitudinal direction on the lower surface, and a step of placing the curb stone on the mortar so that the regulating members can be brought into contact with both side surfaces in the transverse direction of the groove. .

本発明の縁石付き側溝の施工方法では、縁石の溝部の横断方向の両側面に当接可能な一対の規制部材を暗渠部材の上面に固定するようにしたので、縁石が暗渠部材に対して横断方向へ移動するのを規制することができ、排水溝が縁石に塞がれることによって排水機能が低下するのを防止することができる。また、規制部材は、排水溝の横断方向の両端部から立ち上がるように固定されているため、暗渠部材の上面に敷きモルタルを敷設する際に、規制部材によって敷きモルタルが排水溝内に流れ込むのを防止することができる。   In the construction method of the side groove with curb of the present invention, the pair of regulating members that can contact both side surfaces of the curb groove in the transverse direction are fixed to the upper surface of the culvert member, so the curb crosses the culvert member. The movement in the direction can be restricted, and the drainage function can be prevented from being deteriorated by the drainage groove being blocked by the curb. In addition, since the regulating member is fixed so as to rise from both ends in the transverse direction of the drainage groove, when the mortar is laid on the upper surface of the underdrain member, the mortar spread by the regulating member is allowed to flow into the drainage groove. Can be prevented.

また、本発明の縁石付き側溝の施工方法は、縦断方向に延びる排水路を内部に有するとともに排水性舗装の水分を当該排水路に導くべく上面に縦断方向に延びる排水溝が形成された暗渠部材の上面に、当該排水溝の横断方向の両端部から立ち上がるように一対の規制部材を固定する工程、前記暗渠部材を、路盤に設置する工程、前記暗渠部材の上面に敷きモルタルを敷設する工程、下面に縦断方向に延びる溝部が形成された縁石を、当該溝部の横断方向の両側面に前記各規制部材をそれぞれ当接可能に、前記敷きモルタル上に設置する工程、を含むことを特徴としている。   In addition, the method for constructing a gutter with a curb according to the present invention includes a drainage channel having a drainage channel extending in the longitudinal direction and having a drainage channel extending in the longitudinal direction on the upper surface so as to guide moisture of the drainage pavement to the drainage channel. A step of fixing a pair of regulating members so as to rise from both ends in the transverse direction of the drainage groove, a step of installing the culvert member on the roadbed, a step of laying mortar on the top surface of the culvert member, A curb stone formed with a groove extending in the longitudinal direction on the lower surface, and a step of placing the curb stone on the mortar so that the regulating members can be brought into contact with both side surfaces in the transverse direction of the groove. .

本発明の縁石付き側溝の施工方法では、縁石の溝部の横断方向の両側面に当接可能な一対の規制部材を暗渠部材の上面に固定するようにしたので、縁石が暗渠部材に対して横断方向へ移動するのを規制することができ、排水溝が縁石に塞がれることによって排水機能が低下するのを防止することができる。また、規制部材は、排水溝の横断方向の両端部から立ち上がるように固定されているため、暗渠部材の上面に敷設された敷きモルタルが、規制部材に堰き止められることによって排水溝内に流れ込むのを防止することができる。
さらに、暗渠部材を道路脇に設置する前に、規制部材を暗渠部材に固定するようにしたので、暗渠部材を現場へ搬入する前に規制部材をあらかじめ暗渠部材に固定しておくことができ、現場での施工期間を短縮することができる。
In the construction method of the side groove with curb of the present invention, the pair of regulating members that can contact both side surfaces of the curb groove in the transverse direction are fixed to the upper surface of the culvert member, so the curb crosses the culvert member. The movement in the direction can be restricted, and the drainage function can be prevented from being deteriorated by the drainage groove being blocked by the curb. In addition, since the regulating member is fixed so as to rise from both ends in the transverse direction of the drainage groove, the mortar laid on the upper surface of the culvert member flows into the drainage groove when blocked by the regulating member. Can be prevented.
Furthermore, since the regulating member is fixed to the culvert member before installing the culvert member on the side of the road, the regulating member can be fixed to the culvert member in advance before carrying the culvert member to the site, The construction period on site can be shortened.

また、前記敷きモルタルを敷設する工程において、当該敷きモルタルを敷設する前に、前記各規制部材の上端部に排水溝の上方を覆う養生カバーを取り付けることが好ましい。
この場合、敷きモルタルを敷設する前に、規制部材の上端部に排水溝の上方を覆う養生カバーを取り付けるようにしたので、敷きモルタルを暗渠部材に敷設する際に、敷きモルタルが排水溝の上方からその内部に撒かれるのを防止することができる。
Further, in the step of laying the laying mortar, it is preferable to attach a curing cover that covers the upper portion of the drainage groove to the upper end of each regulating member before laying the laying mortar.
In this case, since the curing cover that covers the upper part of the drainage groove is attached to the upper end of the regulating member before laying the mortar, when the mortar is laid on the culvert member, the mortar is placed above the drainage groove. Can be prevented from being crushed inside.

本発明の縁石付き側溝によれば、縁石が暗渠部材に対して横断方向へ移動するのを規制することができ、排水溝が縁石に塞がれることによって排水機能が低下するのを防止することができる。   According to the side groove with a curb of the present invention, the curb can be controlled to move in the transverse direction with respect to the underdrain member, and the drainage function is prevented from being deteriorated by the drainage groove being blocked by the curb. Can do.

第1の実施形態に係る側溝を示す横断方向断面図である。It is a transverse direction sectional view showing a side slot concerning a 1st embodiment. 上記側溝のブロック本体の斜視図である。It is a perspective view of the block main body of the said side groove. 上記側溝を道路の側縁に設置した状態を示す斜視図である。It is a perspective view which shows the state which installed the said gutter on the side edge of the road. 上記側溝の第一規制部材の取り付け構造を示す図1の要部拡大図である。It is a principal part enlarged view of FIG. 1 which shows the attachment structure of the 1st control member of the said side groove. 上記側溝の第一規制部材およびブロック本体の一部を示す斜視図である。It is a perspective view which shows the 1st control member of the said side groove, and a part of block main body. 上記側溝の施工方法の前半を示す横断方向断面図である。It is transverse direction sectional drawing which shows the first half of the construction method of the said side groove. 上記側溝の施工方法の後半を示す横断方向断面図である。It is transverse direction sectional drawing which shows the second half of the construction method of the said side groove. 第2の実施形態に係る側溝の施工方法を示す横断方向断面図である。It is a transverse direction sectional view showing the construction method of the side groove concerning a 2nd embodiment. 拡張アンカーを示す一部断面図である。It is a partial cross section figure which shows an expansion anchor. 第3の実施形態に係る側溝を示す横断方向断面図である。It is transverse direction sectional drawing which shows the side groove | channel which concerns on 3rd Embodiment. 第4の実施形態に係る側溝を示す横断方向断面図である。It is transverse direction sectional drawing which shows the side groove | channel which concerns on 4th Embodiment.

以下、図面を参照しつつ本発明の実施形態を説明する。
図1は、本発明の第1の実施形態に係る側溝1が排水性舗装30の道路脇に設置された状態を示している。
本実施形態は、排水性舗装30が施された道路に埋設される暗渠部材としてのプレキャストコンクリート製のブロック本体2よりなり、このブロック本体2の上面2aには、歩道部31と車道部32とを区分けする縁石3が設置されている。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 shows a state in which the gutter 1 according to the first embodiment of the present invention is installed on the side of the road of the drainage pavement 30.
The present embodiment includes a block body 2 made of precast concrete as a culvert member embedded in a road on which a drainable pavement 30 is applied, and an upper surface 2a of the block body 2 includes a sidewalk 31 and a roadway 32. A curb 3 is set up to separate the two.

本実施形態の道路では、車道部32に排水性舗装30が施工されている。この排水性舗装30は、路盤33上に不透水層34を敷設するとともに、この不透水層34の上に多孔質のアスファルト混合物よりなる透水機能を有する排水層35を敷設することによって構成されている。なお、不透水層34と排水層35との間は、例えばタックコートを塗布することによって接着性を向上させている。   In the road of this embodiment, the drainage pavement 30 is constructed on the roadway portion 32. The drainage pavement 30 is configured by laying an impermeable layer 34 on the roadbed 33 and laying a drainage layer 35 having a water permeable function made of a porous asphalt mixture on the impermeable layer 34. Yes. In addition, between the impermeable layer 34 and the drainage layer 35, the adhesiveness is improved, for example by apply | coating a tack coat.

図1および図2に示すように、側溝1のブロック本体2は断面方形状をなしており、その内部には長手方向(道路の縦断方向)に延びる円管状の排水路4が形成されている。この排水路4の直径は300mmであり、流れ込む多量の雨水等を排出できるようになっている。なお、上記排水路4の直径は特に限定されるものではなく、水量に応じて他の寸法としてもよい。ブロック本体2には、排水層35に浸透した水分(例えば雨水等)を排水路4に導くべく、排水路4に連通する二組の導水路5が設けられている。   As shown in FIGS. 1 and 2, the block body 2 of the side groove 1 has a rectangular cross section, and a circular drainage channel 4 extending in the longitudinal direction (longitudinal direction of the road) is formed therein. . The drainage channel 4 has a diameter of 300 mm, and can discharge a large amount of rainwater flowing in. In addition, the diameter of the said drainage channel 4 is not specifically limited, It is good also as another dimension according to the amount of water. The block body 2 is provided with two sets of water conduits 5 communicating with the drainage channel 4 in order to guide moisture (for example, rainwater) that has permeated into the drainage layer 35 to the drainage channel 4.

これら二組の導水路5は、排水路4の内面上部の車道側寄りの位置から車道側へ斜め上方に延び、車道側端部近傍に上部開口5Aaを有する内導水路5Aと、排水路4の内面上部から歩道側寄りの位置から歩道側へ斜め上方に延び、歩道側端部近傍に上部開口5Baを有する外導水路5Bとから構成されている。
また、ブロック本体2の上面2aには、上記導水路5と交差しつつ長手方向に延びる二本の排水溝6が形成されている。
The two sets of water conduits 5 extend obliquely upward from the position on the inner surface of the drainage channel 4 near the roadway side toward the roadway, and have an inner waterway 5A having an upper opening 5Aa in the vicinity of the roadway side end, and the water drainage channel 4 It is composed of an outer waterway 5B that extends obliquely upward from a position closer to the sidewalk to the sidewalk side and has an upper opening 5Ba in the vicinity of the end on the sidewalk side.
In addition, two drain grooves 6 that extend in the longitudinal direction while intersecting the water conduit 5 are formed on the upper surface 2 a of the block body 2.

これら排水溝6は、ブロック本体2の車道側寄りに配置された内側排水溝6Aと、同本体2の歩道側寄りに配置された外側排水溝6Bとからなり、これらの排水溝6A,6Bは、それぞれ上方に開口した状態で、ブロック本体2の長手方向に沿って互いに並行して直線状に延びている。
内側排水溝6Aの底部には、内導水路5Aの上部開口5Aaが連通しており、外側排水溝6Bの底部には、外導水路5Bの上部開口5Baが連通している。これら内導水路5Aと外導水路5Bは、ブロック本体2の長手方向に沿って一定間隔おきに複数配置されている(図2参照)。以上のように、道路の縦断方向の広い範囲に渡って排水溝6が形成されているので、排水層35に浸透した水分を当該排水溝6に沿った道路の広い範囲で効率よく排水することができる。
These drainage grooves 6 are composed of an inner drainage groove 6A arranged near the roadway side of the block body 2 and an outer drainage groove 6B arranged near the sidewalk side of the main body 2, and these drainage grooves 6A, 6B are In a state where they are opened upward, they extend linearly in parallel with each other along the longitudinal direction of the block body 2.
The upper opening 5Aa of the inner water conduit 5A communicates with the bottom of the inner drain groove 6A, and the upper opening 5Ba of the outer water conduit 5B communicates with the bottom of the outer drain groove 6B. A plurality of these internal water conduits 5A and external water conduits 5B are arranged at regular intervals along the longitudinal direction of the block body 2 (see FIG. 2). As described above, since the drainage groove 6 is formed over a wide range in the longitudinal direction of the road, the water that has penetrated into the drainage layer 35 is efficiently drained over a wide range of the road along the drainage groove 6. Can do.

内導水路5Aの上部開口5Aaは、樹脂製の断面筒状のメッシュ部材36により長手方向に沿って透水可能に閉塞されている。このメッシュ部材36は、排水層35が内側排水溝6Aに陥没するのを防止しつつ透水機能を確保するものであり、排水層35に浸透した水分やこれに含有する粉塵や土砂等を通過させる程度の空隙率を有している。また、メッシュ部材36は、ポリプロピレン樹脂等の合成樹脂で成形されており、高い耐圧性能を有している。
また、上記導水路5は、排水溝6の底部から排水路4に連通しているとともに、当該排水溝6に充満した水分によって排水層35に浸透した水分を下方に吸引するヘッド圧を発生させる管路長および管路径に設定されている。このため、排水溝6に水分が充満すると導水路5が上記ヘッド圧を発生させるので、このヘッド圧に伴うポンピング作用により、排水層35の内部に存在していた土砂や粉塵が水分とともに排水溝6に向かって下方に引き込まれ、排水層35の内部に土砂や粉塵が堆積する目詰まり現象を防止ないし抑制することができる。
The upper opening 5Aa of the inner water conduit 5A is closed by a resin-made cross-sectional cylindrical mesh member 36 so as to be permeable in the longitudinal direction. This mesh member 36 secures a water permeable function while preventing the drainage layer 35 from sinking into the inner drainage groove 6 </ b> A, and allows moisture that has permeated the drainage layer 35, dust or earth and sand contained therein to pass therethrough. It has a degree of porosity. The mesh member 36 is formed of a synthetic resin such as polypropylene resin and has high pressure resistance.
The water conduit 5 communicates with the drainage channel 4 from the bottom of the drainage groove 6, and generates a head pressure that sucks downward the moisture that has penetrated the drainage layer 35 by the moisture filled in the drainage groove 6. The pipe length and pipe diameter are set. For this reason, when the drainage groove 6 is filled with water, the water guide channel 5 generates the head pressure. Therefore, due to the pumping action associated with the head pressure, earth and sand and dust that existed in the drainage layer 35 together with moisture are discharged into the drainage groove. Thus, the clogging phenomenon in which earth and sand or dust accumulates inside the drainage layer 35 can be prevented or suppressed.

図1に示すように、上記縁石3は、下方へ向かうに従って片側が広がる断面略矩形状に形成されているとともに、平面状の下面を有している。この縁石3は、ブロック本体2の上面2aに敷設された敷きモルタル7の上に、当該ブロック本体2に対する横断方向の相対的な位置を変更して設置されるようになっている。
また、縁石3の横断方向の幅はブロック本体2の上面2aよりも短く設計されており、縁石3が上面2aの歩道側の端部および車道側の端部のうちいずれの位置に取り付けられた状態においても、内側排水溝6Aあるいは外側排水溝6Bのうちのいずれかが縁石3に塞がれないようになっている。
As shown in FIG. 1, the curb 3 is formed in a substantially rectangular shape with one side expanding toward the lower side, and has a flat lower surface. The curb 3 is installed on the mortar 7 laid on the upper surface 2 a of the block body 2 while changing the relative position in the transverse direction with respect to the block body 2.
Moreover, the width in the transverse direction of the curb 3 is designed to be shorter than the upper surface 2a of the block main body 2, and the curb 3 is attached to any position of the end of the upper surface 2a on the sidewalk and the end of the road. Even in the state, either the inner drainage groove 6 </ b> A or the outer drainage groove 6 </ b> B is not blocked by the curbstone 3.

図1に示す本実施形態では、縁石3は、上面2aの歩道側の端部において、縁石3の歩道側側面とブロック本体2の歩道側側面とが面一となるように設置されている。そして、上部開口5Baは縁石3の下に隠れており、上部開口5Aaは、縁石3が取り付けられている部分以外の位置にあるため、縁石3に塞がれないようになっている。
縁石3の下面であって外側排水溝6Bの上方に対向する位置には、長手方向に延びる溝部8が形成されている。この溝部8は、断面矩形状に形成され、水分を縁石3内部で長手方向に流す機能を有している。なお、溝部8は本実施形態の形状に限定するものではなく他の形状としてもよい。
In the present embodiment shown in FIG. 1, the curb 3 is installed so that the sidewalk side side of the curb 3 and the sidewalk side side of the block body 2 are flush with each other at the end of the upper surface 2 a on the sidewalk. Since the upper opening 5Ba is hidden under the curb 3 and the upper opening 5Aa is located at a position other than the part to which the curb 3 is attached, the curb 3 is not blocked.
A groove portion 8 extending in the longitudinal direction is formed at a position on the lower surface of the curb 3 and facing the upper side of the outer drainage groove 6B. The groove 8 is formed in a rectangular cross section and has a function of flowing moisture in the longitudinal direction inside the curb 3. In addition, the groove part 8 is not limited to the shape of this embodiment, It is good also as another shape.

また、図3に示すように縁石3の両端部には、上記溝部8から排水性舗装側(車道側)に通じる集水口9が形成されている。
この集水口9は、隣接する縁石3の端面同士が合わさることによって構成されているものであり、側溝1を設置した状態において集水口9の上部は排水層35の表面よりも上に出ており、その下部は排水層35の表面よりも下に配置されている。従って、排水層35の表面から流れてくる水分、および排水層35の内部からその側縁にしみ出してくる水分が、集水口9から溝部8に取り込まれるようになっている。
Moreover, as shown in FIG. 3, the water collection port 9 which leads from the said groove part 8 to the drainage pavement side (roadway side) is formed in the both ends of the curb 3.
The water collection port 9 is configured by joining the end surfaces of the adjacent curbs 3, and the upper portion of the water collection port 9 protrudes above the surface of the drainage layer 35 in a state where the side groove 1 is installed. The lower part is disposed below the surface of the drainage layer 35. Accordingly, moisture flowing from the surface of the drainage layer 35 and moisture that oozes out from the inside of the drainage layer 35 to its side edge are taken into the groove 8 from the water collection port 9.

図1において、排水層35は不透水層34およびブロック本体2の上面2aに施工されており、ブロック本体2は排水性舗装30の表面に露出していない。そして、ブロック本体2の上面2aのうち縁石3が設置されている部分以外の部分には排水層35が敷設され、この排水層35の下面がブロック本体2の上面2aと一致している。   In FIG. 1, the drainage layer 35 is constructed on the impermeable layer 34 and the upper surface 2 a of the block body 2, and the block body 2 is not exposed on the surface of the drainage pavement 30. A drainage layer 35 is laid on a portion of the upper surface 2 a of the block body 2 other than the portion where the curb 3 is installed, and the lower surface of the drainage layer 35 coincides with the upper surface 2 a of the block body 2.

これにより、内側排水溝6Aの上部開口5Aaが、上記メッシュ部材36を介した状態で排水層35の下面に突き合うような状態となっており、排水層35の内部を浸透してその下面にしみ出してきた水分が内側排水溝6Aを通じて上部開口5Aaに入り、内導水路5Aを通って排水路4に流れ出されるようになっている。
また、排水層35の表面および側縁から集水口9に取り込まれた水分は、溝部8や外側排水溝6Bを通って外導水路5Bの上部開口5Baに入り、外導水路5Bを通って排水路4に流れ出るようになっている。
As a result, the upper opening 5Aa of the inner drainage groove 6A is in a state of abutting against the lower surface of the drainage layer 35 via the mesh member 36, and penetrates the interior of the drainage layer 35 to the lower surface. Moisture that has flowed out enters the upper opening 5Aa through the inner drainage groove 6A, and flows out to the drainage channel 4 through the inner water conduit 5A.
Further, the moisture taken into the water collection port 9 from the surface and side edge of the drainage layer 35 passes through the groove 8 and the outer drainage groove 6B, enters the upper opening 5Ba of the outer conduit 5B, and drains through the outer conduit 5B. It flows out to the road 4.

図1において、ブロック本体2の上面2aと縁石3との間には、縁石3がブロック本体2に対して道路の横断方向へ移動するのを規制する第一規制部材10および第二規制部材11が設けられている。第一規制部材10および第二規制部材11は、ともに断面L字型に形成されており、外側排水溝6Bの横断方向の両端部に配置されている。
図4は、第一規制部材10の取り付け構造を示す図1の要部拡大図であり、図5は、その第一規制部材10およびブロック本体2の一部を示す斜視図である。なお、第一規制部材10と第二規制部材11とは同一構成であるため、以下、第一規制部材10の構成について詳しく説明し、第二規制部材11の詳細説明については省略する。
In FIG. 1, between the upper surface 2 a of the block body 2 and the curb 3, a first restricting member 10 and a second restricting member 11 that restrict the curb 3 from moving in the crossing direction of the road with respect to the block body 2. Is provided. The first restricting member 10 and the second restricting member 11 are both formed in an L-shaped cross section, and are disposed at both ends in the transverse direction of the outer drainage groove 6B.
4 is an enlarged view of the main part of FIG. 1 showing the mounting structure of the first restricting member 10, and FIG. 5 is a perspective view showing a part of the first restricting member 10 and the block main body 2. As shown in FIG. In addition, since the 1st control member 10 and the 2nd control member 11 are the same structures, hereafter, the structure of the 1st control member 10 is demonstrated in detail, and detailed description of the 2nd control member 11 is abbreviate | omitted.

図4および図5において、第一規制部材10は、鉛直方向に延びる規制部10Aと、水平方向に延びる取付部10Bとを有し、ブロック本体2の長手方向の長さと略同一長さに形成されている。規制部10Aは、その外側(図4の左側)の側面10Aaの下端を外側排水溝6Bの車道側の上端縁と一致させており、この上端縁から立ち上がるように配置されている。また、規制部10Aは、縁石3の溝部8内に入り込み、内側(図4の右側)の側面10Abに溝部8の車道側の側面8aが当接するようになっている。   4 and 5, the first restricting member 10 has a restricting portion 10 </ b> A extending in the vertical direction and an attaching portion 10 </ b> B extending in the horizontal direction, and is formed to have substantially the same length as the length of the block body 2 in the longitudinal direction. Has been. The restricting portion 10A is arranged so that the lower end of the side surface 10Aa on the outer side (left side in FIG. 4) coincides with the upper end edge on the roadway side of the outer drainage groove 6B and rises from this upper end edge. Further, the restricting portion 10A enters the groove portion 8 of the curb 3 so that the side surface 8a on the roadway side of the groove portion 8 is in contact with the inner side surface 10Ab (right side in FIG. 4).

上記取付部10Bには、図5に示すように、該取付部10Bの縦断方向に延びる複数の長孔からなる取付孔10Baが形成されており、この取付孔10Baの下方のブロック本体2の上面2aには固定穴2bが形成されている。この固定穴2bは、ブロック本体2の長手方向に沿って一定間隔おきに複数形成されている。この各固定穴2bには、複数の拡張アンカー12が打ち込まれており、第一規制部材10がブロック本体2に固定されている。   As shown in FIG. 5, the mounting portion 10B is formed with a mounting hole 10Ba composed of a plurality of elongated holes extending in the longitudinal direction of the mounting portion 10B, and the upper surface of the block body 2 below the mounting hole 10Ba. A fixing hole 2b is formed in 2a. A plurality of the fixing holes 2 b are formed at regular intervals along the longitudinal direction of the block body 2. A plurality of expansion anchors 12 are driven into the fixing holes 2b, and the first restricting member 10 is fixed to the block body 2.

図9は、拡張アンカー12の構成を示す図である。図9において、拡張アンカー12は、取付孔10Baおよび固定穴2bに差し込まれるアンカー本体12Aと、このアンカー本体12A内に形成された中空部12Aaに挿通されている芯棒12Bとを備えている。前記アンカー本体12Aの下部にはスリット12Abが形成され、下端の断面形状が厚肉に形成された複数の拡張部12Acが形成されている。上記構成により、図9の状態から、芯棒12Bをアンカー本体12Aに対して下方に押し込むと、芯棒12Bの下端が、アンカー本体12Aの各拡張部12Acを径方向に押し広げ、図4に示すように、アンカー本体12Aを固定穴2bの壁面に圧接させることにより、第一規制部材10の取付部10Bがブロック本体2に固定される。なお、芯棒12Bは、汎用工具であるハンマ(図示せず)を用いて芯棒12Bの頭部12Baを打ち込むことにより、アンカー本体12Aに押し込まれる。   FIG. 9 is a diagram illustrating a configuration of the expansion anchor 12. In FIG. 9, the expansion anchor 12 includes an anchor main body 12A inserted into the attachment hole 10Ba and the fixing hole 2b, and a core rod 12B inserted through a hollow portion 12Aa formed in the anchor main body 12A. A slit 12Ab is formed in the lower portion of the anchor main body 12A, and a plurality of expansion portions 12Ac having a thick cross section at the lower end are formed. With the above configuration, when the core rod 12B is pushed downward with respect to the anchor main body 12A from the state of FIG. 9, the lower end of the core rod 12B expands each expansion portion 12Ac of the anchor main body 12A in the radial direction, and FIG. As shown, the anchor body 12 </ b> A is pressed against the wall surface of the fixing hole 2 b, whereby the attachment portion 10 </ b> B of the first restricting member 10 is fixed to the block body 2. The core rod 12B is pushed into the anchor main body 12A by driving a head 12Ba of the core rod 12B using a hammer (not shown) which is a general-purpose tool.

次に、第1の実施形態に係る側溝1の施工方法について、図6および図7を参照しながら説明する。まず、ブロック本体2を道路脇の路盤33に設置する(図6(a))。ついで、このブロック本体2の上面2aに、第一規制部材10および第二規制部材11を、それぞれ外側排水溝6Bの幅方向の両上端縁から立ち上がるように配置するとともに、各規制部材10,11の取付孔10Ba,11Baをブロック本体2の固定穴2bの上方に位置させるように配置する(図6(a))。
各規制部材10,11を配置した後は、拡張アンカー12により各規制部材10,11をブロック本体2に固定する。具体的には、取付孔10Ba,11Baおよび固定穴2bにアンカー本体12Aを挿入したあと、ハンマを用いて芯棒12Bをアンカー本体12Aに押し込む(図6(b))。
Next, the construction method of the side groove 1 according to the first embodiment will be described with reference to FIGS. 6 and 7. First, the block body 2 is installed on the roadside 33 on the roadside (FIG. 6A). Next, the first restricting member 10 and the second restricting member 11 are arranged on the upper surface 2a of the block body 2 so as to rise from both upper end edges in the width direction of the outer drainage groove 6B, and the restricting members 10, 11 are provided. The mounting holes 10Ba and 11Ba are arranged so as to be positioned above the fixing hole 2b of the block main body 2 (FIG. 6A).
After the restricting members 10 and 11 are arranged, the restricting members 10 and 11 are fixed to the block body 2 by the expansion anchor 12. Specifically, after inserting the anchor main body 12A into the mounting holes 10Ba and 11Ba and the fixing hole 2b, the core rod 12B is pushed into the anchor main body 12A using a hammer (FIG. 6B).

各規制部材10,11を固定した後は、各規制部10A,11Aの上端部間に、断面半円弧状の養生カバー13を被せ、外側排水溝6Bの上方を覆う。この状態で各規制部材10,11の取付部10B,11Bの上およびブロック本体2の上面2aに敷きモルタル7を敷設する(図7(c))。
敷きモルタル7を敷設した後、養生カバー13を取り外し、縁石3を敷きモルタル7の上に設置する。その際、各規制部材10,11の規制部10A,11Aが、縁石3の溝部8内に挿入されるように縁石3を設置する(図7(d))。
そして、所定期間養生した後に、路盤33上に不透水層34を敷設する。その後、この不透水層34の上およびブロック本体2の上面2aに排水層35を敷設し、ブロック本体2を埋設することで、側溝1の施工が完了する(図1参照)。
After fixing the restricting members 10 and 11, a curing cover 13 having a semicircular cross section is placed between the upper ends of the restricting portions 10A and 11A to cover the upper side of the outer drainage groove 6B. In this state, the mortar 7 is laid on the mounting portions 10B and 11B of the restricting members 10 and 11 and on the upper surface 2a of the block body 2 (FIG. 7C).
After laying the mortar 7, the curing cover 13 is removed and the curb 3 is laid and placed on the mortar 7. At that time, the curb 3 is installed so that the restricting portions 10A and 11A of the restricting members 10 and 11 are inserted into the groove 8 of the curb 3 (FIG. 7D).
Then, after curing for a predetermined period, an impermeable layer 34 is laid on the roadbed 33. Thereafter, the drainage layer 35 is laid on the water-impermeable layer 34 and the upper surface 2a of the block body 2, and the block body 2 is buried, whereby the construction of the side groove 1 is completed (see FIG. 1).

以上のように、第1の実施形態に係る側溝1によれば、ブロック本体2の上面2aに固定した第一規制部材10および第二規制部材11の各規制部10A,11Aに、縁石3の溝部8の横断方向の両側面8aを当接させることができる。したがって、側溝1の施工時における埋め戻し土圧や転圧機械による道路の横断方向への荷重、または施工後における自動車の衝突による横断方向への荷重が作用しても、縁石3がブロック本体2に対して横断方向へ移動するのを規制することができ、外側排水溝6Bが縁石3に塞がれることによって排水機能が低下するのを防止することができる。
また、各規制部材10,11は、その規制部10A,11Aが外側排水溝6Bの横断方向の両端部から立ち上がるように固定されているため、側溝1の施工時において、ブロック本体2の上面2aに敷設された敷きモルタル7が、上記規制部10A,11Aに堰き止められることによって、外側排水溝6B内に流れ込むのを防止することができる。
As described above, according to the side groove 1 according to the first embodiment, the curb stone 3 is attached to the restricting portions 10A and 11A of the first restricting member 10 and the second restricting member 11 fixed to the upper surface 2a of the block body 2. Both side surfaces 8a in the transverse direction of the groove 8 can be brought into contact with each other. Therefore, even if the load in the crossing direction of the road by the backfill earth pressure or the compaction machine at the time of construction of the gutter 1 or the load in the crossing direction due to the collision of the automobile after the construction is applied, the curb 3 is fixed to the block body 2. The movement in the transverse direction can be restricted, and the drainage function can be prevented from deteriorating when the outer drainage groove 6B is blocked by the curb 3.
Further, since the restricting members 10A and 11A are fixed so that the restricting portions 10A and 11A rise from both ends in the transverse direction of the outer drainage groove 6B, the upper surface 2a of the block main body 2 when the side groove 1 is constructed. It is possible to prevent the mortar 7 laid on the outside from flowing into the outer drainage groove 6B by being dammed by the restriction portions 10A and 11A.

さらに、拡張アンカー12を用いて各規制部材10,11をブロック本体2に固定するようにしたので、各規制部材10,11を特殊な工具を使用することなく容易に固定することができる。
また、各規制部材10,11の取付孔10Ba,11Baを縦断方向に延びる長孔により形成するようにしたので、この取付孔10Ba,11Baとブロック本体2の固定穴2bとの縦断方向の位置合わせを容易に行うことができる。
また、敷きモルタル7をブロック本体2に敷設する前に、各規制部材10,11の規制部10A,11Aの上端部に、ブロック本体2の外側排水溝6Bの上方を覆う養生カバー13を被せるようにしたので、敷きモルタル7をブロック本体2に敷設する際に、敷きモルタル7が外側排水溝6Bの上方からその内部に撒かれるのを防止することができる。
Further, since the restricting members 10 and 11 are fixed to the block body 2 using the expansion anchor 12, the restricting members 10 and 11 can be easily fixed without using a special tool.
Further, since the mounting holes 10Ba, 11Ba of the restricting members 10, 11 are formed by long holes extending in the longitudinal direction, alignment of the mounting holes 10Ba, 11Ba and the fixing hole 2b of the block body 2 in the longitudinal direction. Can be easily performed.
Further, before laying the mortar 7 on the block main body 2, the curing cover 13 that covers the upper side of the outer drainage groove 6 </ b> B of the block main body 2 is placed on the upper ends of the restriction portions 10 </ b> A and 11 </ b> A of the restriction members 10 and 11. Therefore, when laying the mortar 7 on the block main body 2, it is possible to prevent the mortar 7 from being sown from the upper side of the outer drainage groove 6B.

図8は、第2の実施形態に係る側溝の施工方法を示す図である。以下、この第2の実施形態に係る側溝の施工方法について、図8を参照しながら説明する。なお、第2実施形態の側溝の構成は、第1の実施形態に係る側溝1と同様であるため、以下の説明では、第1の実施形態と同一符号で示す。   FIG. 8 is a diagram illustrating a method for constructing a side groove according to the second embodiment. Hereinafter, the construction method of the side groove according to the second embodiment will be described with reference to FIG. In addition, since the structure of the side groove | channel of 2nd Embodiment is the same as that of the side groove | channel 1 which concerns on 1st Embodiment, in the following description, it shows with the same code | symbol as 1st Embodiment.

まず、ブロック本体2の上面2aに、第一規制部材10および第二規制部材11を、それぞれ外側排水溝6Bの幅方向の両上端縁から立ち上がるように配置するとともに、各規制部材10,11の取付孔10Ba,11Baをブロック本体2の固定穴2bの上方に位置させるように配置する(図8(a))。
ついで、拡張アンカー12により各規制部材10,11をブロック本体2に固定する。具体的には取付孔10Ba,11Baおよび固定穴2bにアンカー本体12Aを差し込んだあと、ハンマを用いて芯棒12Bをアンカー本体12Aに押し込む(図8(a))。
First, the first restricting member 10 and the second restricting member 11 are arranged on the upper surface 2a of the block body 2 so as to rise from both upper end edges in the width direction of the outer drainage groove 6B. The mounting holes 10Ba and 11Ba are arranged so as to be positioned above the fixing hole 2b of the block main body 2 (FIG. 8A).
Next, the restricting members 10 and 11 are fixed to the block body 2 by the expansion anchor 12. Specifically, after inserting the anchor main body 12A into the mounting holes 10Ba and 11Ba and the fixing hole 2b, the core rod 12B is pushed into the anchor main body 12A using a hammer (FIG. 8A).

各規制部材10,11を固定した後は、ブロック本体2を道路脇の路盤33に設置する(図8(b))。ついで、ブロック本体2の上面2aに敷きモルタル7を敷設した後、敷きモルタル7の上に縁石3を設置する。この施工方法の詳細については、第1の実施形態の施工法(図7(c),(d))と同様であるため、詳しい説明は省略する。その後、所定期間養生した後に、路盤33上に不透水層34、排水層35をそれぞれ敷設し、側溝1の施工が完了する(図1参照)。   After the restricting members 10 and 11 are fixed, the block body 2 is installed on the roadside 33 on the roadside (FIG. 8B). Next, the mortar 7 is laid on the upper surface 2 a of the block body 2, and then the curb 3 is set on the mortar 7. The details of this construction method are the same as the construction method of the first embodiment (FIGS. 7 (c) and (d)), and a detailed description thereof will be omitted. Then, after curing for a predetermined period, the impermeable layer 34 and the drainage layer 35 are respectively laid on the roadbed 33, and the construction of the gutter 1 is completed (see FIG. 1).

以上、第2の実施形態に係る側溝の施工方法によれば、ブロック本体2を道路脇に設置する前に、第一規制部材10および第二規制部材11をブロック本体2に固定するようにしたので、ブロック本体2を現場に搬入する前にあらかじめ各規制部材10,11をブロック本体2に固定しておくことができ、現場での施工期間を短縮することができる。   As described above, according to the side groove construction method according to the second embodiment, the first regulating member 10 and the second regulating member 11 are fixed to the block body 2 before the block body 2 is installed on the side of the road. Therefore, before the block main body 2 is carried into the site, the regulating members 10 and 11 can be fixed to the block main body 2 in advance, and the construction period at the site can be shortened.

図10は、第3の実施形態に係る側溝が道路脇に設置された状態を示している。第3の実施形態は、第1の実施形態における側溝の変形例を示すものである。なお、第3実施形態のその他の構成は、第1の実施形態と同様であるため、以下の説明では、第1の実施形態と同一符号で示す。
第3の実施形態に係る側溝14のブロック本体15は断面方形状をなしており、その内部には長手方向(道路の縦断方向)に延びる円管状の排水路16が形成されている。この排水路16により、流れ込む多量の雨水等を排出できるようになっている。ブロック本体15の上面15aには、長手方向に延びる単一の排水溝17が形成されている。この排水溝17は、排水層35に浸透した水分(例えば雨水等)を排水路16に導くべく、排水路16に連通されている。また、排水溝17は、排水路16の内面上部の横断方向の中央部から上方へ鉛直方向に延び、上面15aの横断方向中央部に開口した上部開口17Aを有している。この上部開口17Aは、ブロック本体15の長手方向に沿って直線状に延びている。以上のように、道路の縦断方向の広い範囲に渡って排水溝17が形成されているので、排水層35に浸透した水分を当該排水溝17に沿った道路の広い範囲で効率よく排水することができる。
FIG. 10 shows a state in which the gutter according to the third embodiment is installed on the side of the road. The third embodiment shows a modification of the side groove in the first embodiment. In addition, since the other structure of 3rd Embodiment is the same as that of 1st Embodiment, in the following description, it shows with the same code | symbol as 1st Embodiment.
The block body 15 of the side groove 14 according to the third embodiment has a rectangular cross section, and a circular drainage channel 16 extending in the longitudinal direction (the longitudinal direction of the road) is formed therein. The drainage channel 16 can discharge a large amount of rainwater flowing in. A single drainage groove 17 extending in the longitudinal direction is formed on the upper surface 15 a of the block body 15. The drainage channel 17 communicates with the drainage channel 16 in order to guide moisture (for example, rainwater) that has penetrated into the drainage layer 35 to the drainage channel 16. Further, the drainage groove 17 has an upper opening 17A that extends vertically upward from the central part in the transverse direction of the upper part of the inner surface of the drainage channel 16 and opens in the central part in the transverse direction of the upper surface 15a. The upper opening 17 </ b> A extends linearly along the longitudinal direction of the block body 15. As described above, since the drainage grooves 17 are formed over a wide range in the longitudinal direction of the road, the water that has penetrated into the drainage layer 35 can be efficiently drained over a wide area of the road along the drainage grooves 17. Can do.

ブロック本体15の上面15aの横断方向中央部には、敷きモルタル7を介して縁石3が設置されている。縁石3は、その下面に形成された溝部8が、排水溝17の上方に対向する位置となるように設置されている。
ブロック本体15の上面15aと縁石3との間には、縁石3がブロック本体15に対して道路の横断方向へ移動するのを規制する第一規制部材10および第二規制部材11が設けられている。第一規制部材10および第二規制部材11の水平方向に延びる取付部10B,11Bは、それぞれ拡張アンカー12をブロック本体15の上面15aに形成された固定穴15bに打ち込むことにより固定されている。また、第一規制部材10および第二規制部材11の鉛直方向に延びる規制部10A,11Aは、排水溝17の横断方向の両端部から立ち上がるように配置されている。また、規制部10A,11Aは、縁石3の溝部8内に入り込み、規制部10A,11Aに溝部8の横断方向の両側面8aが当接するようになっている。
A curbstone 3 is installed in the center in the transverse direction of the upper surface 15 a of the block body 15 via a mortar 7. The curb 3 is installed such that the groove 8 formed on the lower surface thereof is positioned above the drain groove 17.
Between the upper surface 15 a of the block body 15 and the curb 3, a first restricting member 10 and a second restricting member 11 that restrict the curb 3 from moving in the crossing direction of the road with respect to the block body 15 are provided. Yes. The attaching portions 10B and 11B extending in the horizontal direction of the first restricting member 10 and the second restricting member 11 are fixed by driving the expansion anchor 12 into fixing holes 15b formed in the upper surface 15a of the block main body 15, respectively. Further, the restricting portions 10 </ b> A and 11 </ b> A extending in the vertical direction of the first restricting member 10 and the second restricting member 11 are disposed so as to rise from both ends of the drainage groove 17 in the transverse direction. Further, the restricting portions 10A and 11A enter the groove portion 8 of the curb 3 so that both side surfaces 8a in the transverse direction of the groove portion 8 abut against the restricting portions 10A and 11A.

以上のように、第3の実施形態に係る側溝14によれば、ブロック本体15の上面15aに固定した第一規制部材10および第二規制部材11の各規制部10A,11Aに、縁石3の溝部8の横断方向の両側面8aを当接させることができる。したがって、側溝14の施工時における埋め戻し土圧や転圧機械による道路の横断方向への荷重、または施工後における自動車の衝突による横断方向への荷重が作用しても、縁石3がブロック本体15に対して横断方向へ移動するのを規制することができ、排水溝17が縁石3に塞がれることによって排水機能が低下するのを防止することができる。
また、各規制部材10,11は、その規制部10A,11Aが排水溝17の横断方向の両端部から立ち上がるように固定されているため、側溝14の施工時において、ブロック本体15の上面15aに敷設された敷きモルタル7が、上記規制部10A,11Aに堰き止められることによって、排水溝17内に流れ込むのを防止することができる。
As described above, according to the side groove 14 according to the third embodiment, the curb stone 3 is attached to the restricting portions 10A and 11A of the first restricting member 10 and the second restricting member 11 fixed to the upper surface 15a of the block body 15. Both side surfaces 8a in the transverse direction of the groove 8 can be brought into contact with each other. Therefore, even if the load in the crossing direction of the road by the backfill earth pressure or the rolling machine at the time of the construction of the side groove 14 or the load in the crossing direction by the collision of the automobile after the construction is applied, the curb 3 is fixed to the block main body 15. Therefore, it is possible to prevent the drainage function from deteriorating due to the drainage groove 17 being blocked by the curb 3.
In addition, each regulating member 10, 11 is fixed so that its regulating portion 10 </ b> A, 11 </ b> A rises from both ends in the transverse direction of the drainage groove 17, so that when the side groove 14 is constructed, The laid mortar 7 that has been laid can be prevented from flowing into the drain groove 17 by being dammed by the restriction portions 10A and 11A.

図11は、第4の実施形態に係る側溝が道路脇に設置された状態を示している。第4の実施形態は、第1の実施形態における側溝の変形例を示すものである。なお、第4実施形態のその他の構成は、第1の実施形態と同様であるため、以下の説明では、第1の実施形態と同一符号で示す。
第4の実施形態に係る側溝18のブロック本体19は、U字型に形成された本体部19Aとこの本体部19Aの上部にその上部開口を閉鎖するように固定された蓋部19Bとから構成されており、この本体部19Aおよび蓋部19Bの各壁面によって囲まれた内部空間に、長手方向(道路の縦断方向)に延びる矩形管状の排水路20が形成されている。この排水路20により、流れ込む多量の雨水等を排出できるようになっている。蓋部19Bには、排水層35に浸透した水分(例えば雨水等)を排水路20に導くべく、排水路20に連通する導水路21が蓋部19Bの長手方向に沿って一定間隔おきに複数設けられている。この導水路21は、排水路20の内面上部の横断方向中央部の位置から上方へ鉛直方向に延び、横断方向中央部に上部開口21Aを有している。
FIG. 11 shows a state in which the gutter according to the fourth embodiment is installed on the side of the road. The fourth embodiment shows a modification of the side groove in the first embodiment. In addition, since the other structure of 4th Embodiment is the same as that of 1st Embodiment, in the following description, it shows with the same code | symbol as 1st Embodiment.
The block main body 19 of the side groove 18 according to the fourth embodiment includes a main body portion 19A formed in a U-shape and a lid portion 19B fixed to the upper portion of the main body portion 19A so as to close the upper opening. A rectangular tubular drainage channel 20 extending in the longitudinal direction (the longitudinal direction of the road) is formed in the internal space surrounded by the wall surfaces of the main body 19A and the lid 19B. The drainage channel 20 can discharge a large amount of rainwater flowing in. In the lid portion 19B, a plurality of water conduits 21 communicating with the drainage channel 20 are provided at regular intervals along the longitudinal direction of the lid portion 19B in order to guide moisture (for example, rainwater) that has penetrated into the drainage layer 35 to the drainage channel 20. Is provided. The water conduit 21 extends vertically from the position of the central portion in the transverse direction of the upper part of the inner surface of the drainage channel 20 and has an upper opening 21A in the central portion in the transverse direction.

また、蓋部19Bの上面19Baには、上記導水路21と交差しつつ長手方向に延びる単一の排水溝22が形成されている。排水溝22は、それぞれ上方に開口した状態で、ブロック本体19の長手方向に沿って直線状に延びている。また、排水溝22の底部には、導水路21の上部開口21Aが連通している。以上のように、道路の縦断方向の広い範囲に渡って排水溝22が形成されているので、排水層35に浸透した水分を当該排水溝22に沿った道路の広い範囲で効率よく排水することができる。   In addition, a single drainage groove 22 extending in the longitudinal direction while intersecting the water conduit 21 is formed on the upper surface 19Ba of the lid portion 19B. The drain grooves 22 are linearly extended along the longitudinal direction of the block main body 19 in a state of opening upward. An upper opening 21 </ b> A of the water conduit 21 communicates with the bottom of the drainage groove 22. As described above, since the drainage grooves 22 are formed over a wide range in the longitudinal direction of the road, the water that has penetrated into the drainage layer 35 is efficiently drained over a wide range of roads along the drainage grooves 22. Can do.

蓋部19Bの上面19Baの横断方向中央部には、敷きモルタル7を介して縁石3が設置されている。縁石3は、その下面に形成された溝部8が、排水溝22の上方に対向する位置となるように設置されている。
蓋部19Bの上面19Baと縁石3との間には、縁石3がブロック本体19に対して道路の横断方向へ移動するのを規制する第一規制部材10および第二規制部材11が設けられている。第一規制部材10および第二規制部材11の水平方向に延びる取付部10B,11Bは、それぞれ拡張アンカー12を蓋部19Bの上面19Baに形成された固定穴19Bbに打ち込むことにより固定されている。また、第一規制部材10および第二規制部材11の鉛直方向に延びる規制部10A,11Aは、排水溝22の横断方向の両端部から立ち上がるように配置されている。また、規制部10A,11Aは、縁石3の溝部8内に入り込み、規制部10A,11Aに溝部8の横断方向の両側面8aが当接するようになっている。
The curbstone 3 is installed through the mortar 7 in the center in the transverse direction of the upper surface 19Ba of the lid 19B. The curb 3 is installed so that the groove 8 formed on the lower surface of the curb 3 faces a position above the drain groove 22.
Between the upper surface 19Ba of the lid portion 19B and the curb 3 are provided a first restricting member 10 and a second restricting member 11 that restrict the curb 3 from moving in the crossing direction of the road with respect to the block body 19. Yes. The attaching portions 10B and 11B extending in the horizontal direction of the first restricting member 10 and the second restricting member 11 are fixed by driving the expansion anchor 12 into a fixing hole 19Bb formed in the upper surface 19Ba of the lid portion 19B. Further, the restricting portions 10 </ b> A and 11 </ b> A extending in the vertical direction of the first restricting member 10 and the second restricting member 11 are arranged so as to rise from both ends of the drainage groove 22 in the transverse direction. Further, the restricting portions 10A and 11A enter the groove portion 8 of the curb 3 so that both side surfaces 8a in the transverse direction of the groove portion 8 abut against the restricting portions 10A and 11A.

以上のように、第4の実施形態に係る側溝18によれば、ブロック本体19の上面19Baに固定した第一規制部材10および第二規制部材11の各規制部10A,11Aに、縁石3の溝部8の横断方向の両側面8aを当接させることができる。したがって、側溝18の施工時における埋め戻し土圧や転圧機械による道路の横断方向への荷重、または施工後における自動車の衝突による横断方向への荷重が作用しても、縁石3がブロック本体19に対して横断方向へ移動するのを規制することができ、排水溝22が縁石3に塞がれることによって排水機能が低下するのを防止することができる。
また、各規制部材10,11は、その規制部10A,11Aが排水溝22の横断方向の両端部から立ち上がるように固定されているため、側溝18の施工時において、ブロック本体19の上面19Baに敷設された敷きモルタル7が、上記規制部10A,11Aに堰き止められることによって、排水溝22内に流れ込むのを防止することができる。
As described above, according to the side groove 18 according to the fourth embodiment, the curb stone 3 is attached to the restricting portions 10 </ b> A and 11 </ b> A of the first restricting member 10 and the second restricting member 11 fixed to the upper surface 19 </ b> Ba of the block body 19. Both side surfaces 8a in the transverse direction of the groove 8 can be brought into contact with each other. Therefore, even if the load in the crossing direction of the road by the backfill earth pressure or the rolling machine during the construction of the side groove 18 or the load in the crossing direction due to the collision of the automobile after the construction is applied, the curb stone 3 remains in the block main body 19. Therefore, it is possible to prevent the drainage function from deteriorating due to the drainage groove 22 being blocked by the curb 3.
In addition, each regulating member 10, 11 is fixed so that its regulating portion 10 </ b> A, 11 </ b> A rises from both ends in the transverse direction of the drainage groove 22, so that when the side groove 18 is constructed, it is attached to the upper surface 19 </ b> Ba of the block body 19. The laid mortar 7 that has been laid can be prevented from flowing into the drainage groove 22 by being dammed by the restriction portions 10A and 11A.

なお、本発明は上記各実施形態に限定するものではない。例えば、各規制部材10,11は、ブロック本体2の長手方向の全範囲に渡って延設されていなくてもよく、長手方向中途で分断していてもよい。
また、第1の実施形態および第2の実施形態では、縁石3の取り付け位置は、外側排水溝6Bであるが、内側排水溝6Aに変更することも可能である。この場合、各規制部材10,11は内側排水溝6Aの横断方向の両端部から立ち上がるように配置すればよい。
さらに、上記各実施形態では、養生カバー13は、断面半円弧状に形成しているが、平面状に形成するものであってもよい。
The present invention is not limited to the above embodiments. For example, the regulating members 10 and 11 may not extend over the entire longitudinal range of the block body 2 and may be divided in the middle of the longitudinal direction.
In the first embodiment and the second embodiment, the mounting position of the curb stone 3 is the outer drainage groove 6B, but can be changed to the inner drainage groove 6A. In this case, the regulating members 10 and 11 may be arranged so as to rise from both ends in the transverse direction of the inner drain groove 6A.
Furthermore, in each said embodiment, although the curing cover 13 is formed in the cross-sectional semicircular arc shape, you may form in planar shape.

また、上記各実施形態では、縁石3は、ブロック本体2,15,19の上面2a,15a,19Baに敷設された敷きモルタル7上に設置されているが、縁石3をブロック本体2,15,19の上面2a,15a,19Baに直接設置し、拡張アンカーを、縁石3の上面から下方へ貫通するとともに、各規制部材10,11の取付孔10Ba,11Ba、およびブロック本体2,15,19の固定穴2b,15b,19Baに差し込むことにより、縁石3をブロック本体2,15,19に固定するようにしてもよい。この場合は、縁石3と各規制10,11とを、同時にブロック本体2,15,19に固定することができるので、現場での施工期間を短縮することができる。   Moreover, in each said embodiment, although the curb 3 is installed on the mortar 7 laid in the upper surfaces 2a, 15a, 19Ba of the block main bodies 2, 15, 19, 19, the curb 3 is attached to the block main bodies 2, 15, 19 is installed directly on the upper surface 2a, 15a, 19Ba, and the expansion anchor penetrates downward from the upper surface of the curb 3 and the mounting holes 10Ba, 11Ba of the restricting members 10, 11 and the block bodies 2, 15, 19 The curb 3 may be fixed to the block bodies 2, 15, 19 by being inserted into the fixing holes 2 b, 15 b, 19 Ba. In this case, the curb 3 and the respective regulations 10 and 11 can be fixed to the block bodies 2, 15 and 19 at the same time, so that the construction period on site can be shortened.

1,14,18 側溝
2,15,19 ブロック本体(暗渠部材)
3 縁石
4,16,20 排水路
6,17,22 排水溝
7 敷きモルタル
8 溝部
8A 側面
10 第一規制部材
11 第二規制部材
12 拡張アンカー
13 養生カバー
30 排水性舗装
1,14,18 Side groove 2,15,19 Block body (dark culvert member)
3 Curbstone 4,16,20 Drainage channel 6,17,22 Drainage channel 7 Laying mortar 8 Groove 8A Side 10 First regulating member 11 Second regulating member 12 Expansion anchor 13 Curing cover 30 Drainable pavement

Claims (8)

縦断方向に延びる排水路を内部に有するとともに、排水性舗装の水分を当該排水路に導くべく上面に縦断方向に延びる排水溝が形成された暗渠部材と、
前記暗渠部材の上方に設置されているとともに下面に縦断方向に延びる溝部が形成された縁石と、からなる縁石付き側溝であって、
前記暗渠部材の上面に固定されているとともに、前記縁石の前記溝部の横断方向の両側面に当接可能な一対の規制部材を備えていることを特徴とする縁石付き側溝。
A culvert member having a drainage channel extending in the longitudinal direction and having a drainage groove extending in the longitudinal direction on the upper surface so as to guide moisture of the drainage pavement to the drainage channel,
A curbstone side groove formed of a curbstone that is installed above the underdrain member and is formed with a groove extending in the longitudinal direction on the lower surface,
A curb-attached side groove characterized by comprising a pair of restricting members fixed to the upper surface of the culvert member and capable of abutting on both lateral sides of the groove portion of the curb stone.
前記縁石は、前記暗渠部材の上面に敷設された敷きモルタルに設置されており、
前記規制部材は、前記排水溝の横断方向の両端部から立ち上がるように前記暗渠部材の上面に固定されている請求項1に記載の縁石付き側溝。
The curb is installed in a mortar laid on the top surface of the culvert member,
The side groove with curb according to claim 1, wherein the regulating member is fixed to an upper surface of the culvert member so as to rise from both end portions in a transverse direction of the drainage groove.
前記規制部材を前記暗渠部材に固定するための拡張アンカーをさらに備えている請求項1または2に記載の縁石付き側溝。   The side groove with a curb according to claim 1 or 2, further comprising an expansion anchor for fixing the restriction member to the culvert member. 縦断方向に延びる排水路を内部に有するとともに排水性舗装の水分を当該排水路に導くべく上面に縦断方向に延びる排水溝が形成された暗渠部材を、路盤に設置する工程、
前記暗渠部材の上面に、規制部材を固定する工程、
下面に縦断方向に延びる溝部が形成された縁石を、当該溝部の横断方向の両側面に前記各規制部材をそれぞれ当接可能に、前記暗渠部材の上方に設置する工程、
を含むことを特徴とする縁石付き側溝の施工方法。
A step of installing a culvert member having a drainage channel extending in the longitudinal direction on the upper surface in order to guide the moisture of the drainage pavement to the drainage channel and having a drainage channel extending in the longitudinal direction on the roadbed,
Fixing the regulating member on the upper surface of the culvert member;
A step of installing a curb stone formed with a groove portion extending in the longitudinal direction on the lower surface above the culvert member so that each regulating member can be brought into contact with both side surfaces in the transverse direction of the groove portion,
The construction method of the gutter with a curb characterized by including.
縦断方向に延びる排水路を内部に有するとともに排水性舗装の水分を当該排水路に導くべく上面に縦断方向に延びる排水溝が形成された暗渠部材の上面に、一対の規制部材を固定する工程、
前記暗渠部材を、路盤に設置する工程、
下面に縦断方向に延びる溝部が形成された縁石を、当該溝部の横断方向の両側面に前記各規制部材をそれぞれ当接可能に、前記暗渠部材の上方に設置する工程、
を含むことを特徴とする縁石付き側溝の施工方法。
A step of fixing a pair of regulating members on the upper surface of the culvert member having a drainage channel extending in the longitudinal direction and having a drainage groove extending in the longitudinal direction on the upper surface so as to guide the moisture of the drainage pavement to the drainage channel.
Installing the culvert member on the roadbed,
A step of installing a curb stone formed with a groove portion extending in the longitudinal direction on the lower surface above the culvert member so that each regulating member can be brought into contact with both side surfaces in the transverse direction of the groove portion,
The construction method of the gutter with a curb characterized by including.
縦断方向に延びる排水路を内部に有するとともに排水性舗装の水分を当該排水路に導くべく上面に縦断方向に延びる排水溝が形成された暗渠部材を、路盤に設置する工程、
前記暗渠部材の上面に、前記排水溝の横断方向の両端部から立ち上がるように一対の規制部材を固定する工程、
前記暗渠部材の上面に敷きモルタルを敷設する工程、
下面に縦断方向に延びる溝部が形成された縁石を、当該溝部の横断方向の両側面に前記各規制部材をそれぞれ当接可能に、前記敷きモルタル上に設置する工程、
を含むことを特徴とする縁石付き側溝の施工方法。
A step of installing a culvert member having a drainage channel extending in the longitudinal direction on the upper surface in order to guide the moisture of the drainage pavement to the drainage channel and having a drainage channel extending in the longitudinal direction on the roadbed,
Fixing a pair of restricting members on the top surface of the culvert member so as to rise from both ends in the transverse direction of the drainage groove;
Laying mortar on the upper surface of the culvert member,
A step of installing the curb stone formed with a groove extending in the longitudinal direction on the lower surface on the mortar so that each regulating member can be brought into contact with both side surfaces in the transverse direction of the groove,
The construction method of the gutter with a curb characterized by including.
縦断方向に延びる排水路を内部に有するとともに排水性舗装の水分を当該排水路に導くべく上面に縦断方向に延びる排水溝が形成された暗渠部材の上面に、当該排水溝の横断方向の両端部から立ち上がるように一対の規制部材を固定する工程、
前記暗渠部材を、路盤に設置する工程、
前記暗渠部材の上面に敷きモルタルを敷設する工程、
下面に縦断方向に延びる溝部が形成された縁石を、当該溝部の横断方向の両側面に前記各規制部材をそれぞれ当接可能に、前記敷きモルタル上に設置する工程、
を含むことを特徴とする縁石付き側溝の施工方法。
Both ends of the drainage channel in the transverse direction are formed on the upper surface of the culvert member having drainage channels extending in the longitudinal direction and drainage pavement extending in the longitudinal direction on the upper surface so as to guide moisture of the drainage pavement to the drainage channel. Fixing a pair of restricting members so as to stand up from,
Installing the culvert member on the roadbed,
Laying mortar on the upper surface of the culvert member,
A step of installing the curb stone formed with a groove extending in the longitudinal direction on the lower surface on the mortar so that each regulating member can be brought into contact with both side surfaces in the transverse direction of the groove,
The construction method of the gutter with a curb characterized by including.
前記敷きモルタルを敷設する工程において、当該敷きモルタルを敷設する前に、前記各規制部材の上端部に排水溝の上方を覆う養生カバーを取り付ける請求項6または7に記載の縁石付き側溝の施工方法。   The method for constructing a gutter with a curbstone according to claim 6 or 7, wherein, in the step of laying the mortar, before the mortar is laid, a curing cover that covers the upper portion of the drainage groove is attached to the upper end of each regulating member. .
JP2009012151A 2009-01-22 2009-01-22 Side gutter with curb and its construction method Active JP5295800B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009012151A JP5295800B2 (en) 2009-01-22 2009-01-22 Side gutter with curb and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009012151A JP5295800B2 (en) 2009-01-22 2009-01-22 Side gutter with curb and its construction method

Publications (2)

Publication Number Publication Date
JP2010168801A JP2010168801A (en) 2010-08-05
JP5295800B2 true JP5295800B2 (en) 2013-09-18

Family

ID=42701192

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009012151A Active JP5295800B2 (en) 2009-01-22 2009-01-22 Side gutter with curb and its construction method

Country Status (1)

Country Link
JP (1) JP5295800B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6643941B2 (en) * 2016-04-01 2020-02-12 株式会社イトーヨーギョー Buried gutter and method of assembling the buried gutter

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0753185B2 (en) * 1991-09-19 1995-06-07 新興工材株式会社 Curb mounting structure on athletics stadium
JP4206006B2 (en) * 2003-07-16 2009-01-07 昭和興業株式会社 Side groove block for permeable pavement
JP2006257739A (en) * 2005-03-17 2006-09-28 Ito Yogyo Co Ltd Water channel block with curbstone, and drain structure of paved road surface using the same
JP4472587B2 (en) * 2005-06-22 2010-06-02 株式会社イトーヨーギョー Circular gutter with curb and drainage structure using it
JP4331744B2 (en) * 2006-11-29 2009-09-16 株式会社イトーヨーギョー Road drainage structure and buried ditches used for this

Also Published As

Publication number Publication date
JP2010168801A (en) 2010-08-05

Similar Documents

Publication Publication Date Title
CN108239905B (en) Water accumulation preventing road and construction method thereof
JP4690067B2 (en) Boundary block set for drainage pavement, drainage structure using the same, and construction method thereof
JP4331744B2 (en) Road drainage structure and buried ditches used for this
JP5295800B2 (en) Side gutter with curb and its construction method
JP2003074008A (en) Boundary block for draining type pavement
JP2007146653A (en) Concrete block with plugging preventive material
JP4125834B2 (en) Gutter, gutter lid member, and boundary block
KR100932106B1 (en) Drainage sheet and drainage method using the same
JP4445850B2 (en) Construction method of curb block for drainage pavement
JP4142949B2 (en) Drainage structure of paved road using drain block
JP2003253611A (en) Boundary block
KR20080005134U (en) Precast panel for construction of retaining wall
JP2009074363A (en) Drain structure of road and buried gutter used therefor
JP4080269B2 (en) Drainage structure of the sidewalk
JP4504220B2 (en) Drainage channel
JP4206006B2 (en) Side groove block for permeable pavement
KR20070103983A (en) The drainage plate for dranining underground water of public works and construction method using thesame
JP5785049B2 (en) Side groove block
JP2000328641A (en) Side drain with lid slab having curb
JP2002212909A (en) Boundary block between sidewalk and roadway for water permeable pavement and drainage structure of the water permeable pavement
JP2000080605A (en) Curbstone and drainage structure for road
JP2007239424A (en) Overflow infiltration and drainage block construction
JP3089183U (en) Pedestrian road boundary block and pedestrian road boundary structure using it
JP3334947B2 (en) Structure of permeable pavement culvert and culvert block
JP2006057308A (en) Shorter drain block and drainage structure of pavement making use thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20111117

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121120

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130528

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130612

R150 Certificate of patent or registration of utility model

Ref document number: 5295800

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250