JP2015036149A - Wire drawing device and method for manufacturing element wire - Google Patents

Wire drawing device and method for manufacturing element wire Download PDF

Info

Publication number
JP2015036149A
JP2015036149A JP2013167300A JP2013167300A JP2015036149A JP 2015036149 A JP2015036149 A JP 2015036149A JP 2013167300 A JP2013167300 A JP 2013167300A JP 2013167300 A JP2013167300 A JP 2013167300A JP 2015036149 A JP2015036149 A JP 2015036149A
Authority
JP
Japan
Prior art keywords
wire
die
wire drawing
guide die
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2013167300A
Other languages
Japanese (ja)
Inventor
久永 聡
Satoshi Hisanaga
聡 久永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Wiring Systems Ltd
Original Assignee
Sumitomo Wiring Systems Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Wiring Systems Ltd filed Critical Sumitomo Wiring Systems Ltd
Priority to JP2013167300A priority Critical patent/JP2015036149A/en
Publication of JP2015036149A publication Critical patent/JP2015036149A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Metal Extraction Processes (AREA)

Abstract

PROBLEM TO BE SOLVED: To suppress generation of a damage in a wire material when the wire material is drawn.SOLUTION: A wire drawing device 20 is disposed along a wire material feed line L between a wire material supply part 21 for supplying a wire material and a wire material take-up part 22 for taking up the wire material, and is equipped with a wire drawing die 41 in which a processing pore having a minimum diameter smaller than a wire diameter of the passing wire material 10 is formed. Further, the wire drawing device 20 is equipped with a guide die 31 which is disposed on an upstream side of the wire drawing die 41 and in which a passage pore having a minimum diameter larger than the wire diameter of the passing wire material 10 is formed.

Description

この発明は、線材を伸線する技術に関する。   The present invention relates to a technique for drawing a wire.

従来、線材を伸線する技術として、特許文献1に開示のものがある。特許文献1では、伸線の仕上げのダイスである最終仕上がりダイスの手前に、仕上がりダイスよりも加工度(線材の長手方向に垂直な断面における線材の断面減少率)の小さいガイドダイスを配置することでワイヤ放電加工用電極線用に伸線されたワイヤに真直性を持たせている。   Conventionally, there is a technique disclosed in Patent Document 1 as a technique for drawing a wire. In Patent Document 1, a guide die having a smaller degree of processing (cross-sectional reduction rate of the wire in a cross section perpendicular to the longitudinal direction of the wire) than the finished die is disposed before the final finished die which is a drawing finish die. Thus, the wire drawn for the electrode wire for wire electric discharge machining is made straight.

特開平6−154840号公報JP-A-6-154840

しかしながら、特許文献1に開示の技術によると、線材がガイドダイスへ入線するときの入線角度(線材のダイス直前での長手方向と伸線方向との角度)が大きくなることがある。例えば、線材の剛性が大きい場合、キャプスタンから出た線材は弧状の軌跡を描いてガイドダイスへ入線するため、入線角度が大きくなりやすい。ガイドダイスへの入線角度が大きくなってしまうと、加工度の小さいガイドダイスが設けられたとしても、線材が伸線加工される際に線材の表面が削られる等して、線材が傷つく恐れがある。   However, according to the technique disclosed in Patent Document 1, there is a case where a wire entry angle (an angle between a longitudinal direction and a wire drawing direction immediately before a wire die) increases when the wire enters the guide die. For example, when the rigidity of the wire rod is large, the wire rod coming out of the capstan draws an arc-shaped trajectory and enters the guide die, so that the wire entry angle tends to increase. If the angle of entry to the guide die is increased, even if a guide die with a low degree of processing is provided, the surface of the wire may be scraped when the wire is drawn, and the wire may be damaged. is there.

そこで、本発明は、線材が伸線加工される際に、線材に傷が発生するのを抑えることを目的とする。   Then, an object of this invention is to suppress that a damage | wound generate | occur | produces in a wire, when a wire is drawn.

上記課題を解決するため、第1の態様に係る伸線装置は、線材を伸線する伸線装置であって、線材を供給する線材供給部と線材を引取る線材引取部との間の線材送りラインに沿って配設され、通過する線材の線径より小さい最小径を有する加工孔部が形成された伸線ダイスと、前記線材送りラインに沿って、前記伸線ダイスの上流側に配設され、通過する線材の線径より大きい最小径を有する通過孔部が形成されたガイドダイスと、を備えるものである。   In order to solve the above-described problem, a wire drawing device according to a first aspect is a wire drawing device for drawing a wire material, and is a wire material between a wire material supply unit that supplies a wire material and a wire material take-up unit that takes up the wire material. A wire drawing die provided with a machining hole having a minimum diameter smaller than the wire diameter of the wire passing therethrough, and disposed upstream of the wire drawing die along the wire feed line. And a guide die in which a passage hole portion having a minimum diameter larger than the wire diameter of the wire to be passed is formed.

第2の態様に係る伸線装置は、第1の態様に係る伸線装置であって、前記伸線ダイスは、複数の伸線ダイスを備え、少なくとも最上流に配設された前記伸線ダイスに対して前記ガイドダイスが設けられているものである。   The wire drawing apparatus according to a second aspect is the wire drawing apparatus according to the first aspect, wherein the wire drawing die includes a plurality of wire drawing dies and is arranged at least at the most upstream side. In contrast, the guide die is provided.

第3の態様に係る伸線装置は、第1又は第2の態様に係る伸線装置であって、前記伸線ダイスは、複数の伸線ダイスを備え、前記線材送りラインに沿った中間位置よりも上流側に配設された前記伸線ダイスに対してのみ前記ガイドダイスが設けられているものである。   The wire drawing apparatus according to a third aspect is the wire drawing apparatus according to the first or second aspect, wherein the wire drawing die includes a plurality of wire drawing dies, and an intermediate position along the wire feed line. The guide die is provided only for the wire drawing die disposed on the upstream side.

第4の態様に係る伸線装置は、第1〜第3のいずれか1つの態様に係る伸線装置であって、前記ガイドダイスと前記伸線ダイスとが離れて配設されているものである。   The wire drawing device according to the fourth aspect is the wire drawing device according to any one of the first to third aspects, wherein the guide die and the wire drawing die are disposed apart from each other. is there.

第5の態様に係る素線の製造方法は、線材を伸線することによって、素線を製造する素線の製造方法であって、(a)通過する線材の線径よりも大きい最小径を有する孔に線材を通す工程と、前記工程(a)の後で、通過する線材の線径よりも小さい最小径を有する孔に線材を通す工程と、を備えるものである。   The manufacturing method of the strand which concerns on a 5th aspect is a manufacturing method of the strand which manufactures a strand by drawing a wire, Comprising: (a) The minimum diameter larger than the wire diameter of the passing wire A step of passing the wire through the hole having the step, and a step of passing the wire through the hole having a minimum diameter smaller than the wire diameter of the wire passing therethrough after the step (a).

第1〜第4の態様に係る伸線装置によると、通過する線材の線径より小さい最小径を有する加工孔部が形成された伸線ダイスの上流側に通過する線材の線径より大きい最小径を有する通過孔部が形成されたガイドダイスを備える。この構成によると、線材は通過孔部を通過してから加工孔部へと入線することによって、通過孔部を通過する際に軌道が修正され、加工孔部への入線角度が小さくなり、加工孔部を通過することで行われる伸線加工の際に生じる線材の傷つきが低減する。また、線材が通過孔部を通過する際には伸線加工が行われないので、ガイドダイス通過時に線材が傷つきにくい。   According to the wire drawing device according to the first to fourth aspects, the wire diameter larger than the wire diameter of the wire passing upstream of the wire drawing die in which the machining hole portion having the minimum diameter smaller than the wire diameter of the wire passing therethrough is formed. A guide die having a through hole having a small diameter is provided. According to this configuration, the wire rod passes through the passage hole portion and then enters the machining hole portion, so that the trajectory is corrected when passing through the passage hole portion, the angle of entry to the machining hole portion is reduced, and machining is performed. Damage to the wire material that occurs during wire drawing performed by passing through the hole is reduced. Further, since the wire drawing is not performed when the wire passes through the passage hole, the wire is not easily damaged when passing through the guide die.

特に、第2の態様に係る伸線装置によると、少なくとも最上流に配設された伸線ダイスに対してガイドダイスが設けられているため、線材の傷つきをより効果的に抑えることができる。より具体的には、伸線方向の上流側に行くほど、線材の線径が大きくなり、それに伴い線材の剛性も大きくなる。このため、伸線方向の上流側に行くほど、線材の伸線ダイスへの入線角度が大きくなり、線材が傷つきやすい。したがって、少なくとも、線材の剛性が最も大きい最上流側の伸線ダイスに対してガイドダイスを設けることで、線材に傷が発生するのをより効果的に抑えることができる。   In particular, according to the wire drawing apparatus according to the second aspect, since the guide die is provided at least with respect to the wire drawing die arranged at the most upstream, damage to the wire can be more effectively suppressed. More specifically, the wire diameter increases as it goes upstream in the wire drawing direction, and the rigidity of the wire increases accordingly. For this reason, as it goes to the upstream side in the wire drawing direction, the angle of entry of the wire into the wire drawing die increases and the wire is easily damaged. Therefore, it is possible to more effectively suppress the occurrence of scratches on the wire by providing the guide die at least on the most upstream wire drawing die having the greatest rigidity of the wire.

特に、第3の態様に係る伸線装置によると、複数の伸線ダイスのうち、線材送りラインに沿った中間位置よりも上流側に配設された伸線ダイスに対してのみガイドダイスが配設される。このため、線材の剛性の大きい上流側にガイドダイスを配設することで確実に線材の傷つきを抑制できる。また、下流側の方は線材の線径が小さいため、線材によっては剛性が十分小さくなり、ガイドダイスを配設しなくてもよい場合がある。この場合、線材の剛性の小さい下流側にガイドダイスを配設しないことで、時間及びコストを抑えることができる。   In particular, according to the wire drawing apparatus according to the third aspect, the guide die is arranged only for the wire drawing die disposed upstream of the intermediate position along the wire feed line among the plurality of wire drawing dies. Established. For this reason, the damage of a wire can be reliably suppressed by arranging a guide die on the upstream side where the rigidity of the wire is large. Further, since the wire diameter of the wire on the downstream side is smaller, the rigidity may be sufficiently small depending on the wire, and the guide die may not be provided. In this case, time and cost can be suppressed by not providing the guide die on the downstream side where the rigidity of the wire is small.

特に、第4の態様に係る伸線装置によると、ガイドダイスと伸線ダイスとの間が離れているため、線材の加工孔部への入線角度の最大値を小さくできる。このため、入線角度を小さくすることがより確実にできるので、より確実に線材の傷つきを抑制できる。より具体的には、ガイドダイスを出た線材は伸線ダイスへと直進し、伸線ダイスを通過するときに、強制的に伸線ダイスの径の中心軸方向と線材の径の中心軸方向とが一致させられる。このとき、入線角度の最大値として考えられる値は、線材がガイドダイスを通過する際に孔の内周面に接触しながら進むときにとられ、その値は、伸線ダイスの孔の中心軸方向とガイドダイスを通過した直後の線材の径の中心軸方向との成す角度で与えられる。したがって、ガイドダイスと伸線ダイスとが離して配設された方がより入線角度の最大値が小さくなることによって、線材が傷つくのが抑えられる。   Particularly, according to the wire drawing device according to the fourth aspect, since the guide die and the wire drawing die are separated, the maximum value of the angle of entry of the wire into the processed hole can be reduced. For this reason, since it is possible to reduce the incoming line angle more reliably, it is possible to more reliably suppress damage to the wire rod. More specifically, the wire rod that has exited the guide die goes straight to the wire drawing die, and when passing through the wire drawing die, the wire is forcibly drawn in the central axis direction of the diameter of the wire drawing die and the central axis direction of the wire rod diameter. Is matched. At this time, the value considered as the maximum value of the incoming wire angle is taken when the wire moves while contacting the inner peripheral surface of the hole when passing through the guide die, and the value is the central axis of the hole of the wire drawing die. The angle between the direction and the central axis direction of the diameter of the wire just after passing through the guide die is given. Therefore, when the guide die and the wire drawing die are arranged apart from each other, the maximum value of the incoming wire angle is further reduced, thereby preventing the wire rod from being damaged.

第5の態様に係る素線の製造方法によると、(a)通過する線材の線径よりも大きい最小径を有する孔に線材を通す工程と、(a)の工程の後で、通過する線材の線径よりも小さい最小径を有する孔に線材を通す工程を備えるため、通過する線材の線径よりも小さい最小径を有する孔への入線角度が小さくなり傷つきが抑えられた素線を製造することができる。   According to the strand manufacturing method according to the fifth aspect, (a) a step of passing a wire through a hole having a minimum diameter larger than a wire diameter of a passing wire, and a wire passing after the step (a). Since the wire rod is passed through a hole having a minimum diameter smaller than the diameter of the wire, the angle of entry into the hole having the minimum diameter smaller than the wire diameter of the wire passing therethrough is reduced, and the wire with reduced damage is manufactured. can do.

実施形態に係る伸線装置を示す概略平面図である。It is a schematic plan view which shows the wire drawing apparatus which concerns on embodiment. 同上の伸線装置を示す概略側面図である。It is a schematic side view which shows a wire drawing apparatus same as the above. 図2の伸線ダイスとガイドダイスとが配設されているキャプスタン間の周辺部を拡大した図である。It is the figure which expanded the peripheral part between capstans in which the wire drawing die and guide die of FIG. 2 are arrange | positioned. 図3の伸線ダイスとガイドダイスの周辺部を拡大した説明図である。It is explanatory drawing which expanded the peripheral part of the wire drawing die and guide die of FIG. 伸線ダイスに入線角度を持って線材が入線した説明図である。It is explanatory drawing which the wire rod entered with a wire entry angle at the wire drawing die. 伸線ダイスとガイドダイスとが接した状態で配置された場合の伸線加工を行う例を示す説明図である。It is explanatory drawing which shows the example which performs a wire drawing process at the time of arrange | positioning in the state which the wire drawing die and the guide die contact | connected. 伸線ダイスとガイドダイスとが離して配置された場合の伸線加工を行う例を示す説明図である。It is explanatory drawing which shows the example which performs a wire drawing process when a wire drawing die and a guide die are arrange | positioned separately. 実施形態に係るガイドダイスの断面の例を示す図である。It is a figure which shows the example of the cross section of the guide die which concerns on embodiment. ガイドダイスの変形例の断面を示す図である。It is a figure which shows the cross section of the modification of a guide die.

以下、実施形態に係る伸線装置及び素線の製造方法について説明する。図1は、実施形態にかかる伸線装置20の概略平面図であり、図2は同伸線装置20を示す概略側面図である。   Hereinafter, the wire drawing apparatus and the manufacturing method of a strand concerning an embodiment are explained. FIG. 1 is a schematic plan view of a wire drawing device 20 according to the embodiment, and FIG. 2 is a schematic side view showing the wire drawing device 20.

この伸線装置20は、線材10を伸線ダイスにより伸線加工して所定の線径の素線を得る装置であり、線材供給部21と、線材引取部22と複数のキャプスタン23と、複数のダイスとを備えている。   This wire drawing device 20 is a device for drawing a wire 10 with a wire drawing die to obtain a strand having a predetermined wire diameter, a wire material supply unit 21, a wire material take-up unit 22, a plurality of capstans 23, With multiple dies.

線材10として、アルミ線材、アルミ合金線材、銅線材、銅合金線材等の各種材質の線材10が用いることができる。特に、アルミ線材やアルミ合金線材は傷つきやすく、なかでもアルミ合金線材は、剛性が強くかつ傷つきやすいので、本実施形態にかかる伸線装置20を用いて伸線加工を行うことによって、傷つきを抑えた素線10bを製造することができる。なお、線材10は、伸線加工の前後及び加工中のもの全てを含む総称であり、加工前のものを母線材10a、加工後の伸線されたものを素線10bと区別する場合がある。素線10bは単独で、又は撚り合わされた形態で、電線の芯線等として用いられる。   As the wire 10, the wire 10 of various materials, such as an aluminum wire, an aluminum alloy wire, a copper wire, a copper alloy wire, can be used. In particular, aluminum wires and aluminum alloy wires are easily damaged. In particular, aluminum alloy wires are strong and easily damaged. Therefore, by performing wire drawing using the wire drawing apparatus 20 according to this embodiment, the damage can be suppressed. The element wire 10b can be manufactured. In addition, the wire 10 is a general term including all before and after the wire drawing process and during the wire process, and the wire before the process may be distinguished from the bus wire 10a and the wire drawn after the process may be distinguished from the wire 10b. . The element wire 10b is used alone or in a twisted form as a core wire of an electric wire.

線材供給部21は、母線材10aを供給可能に構成されている。より具体的には、線材供給部21は、リールに母線材10aが巻回収容された構成とされている。この線材供給部21は、所定の線材送りラインLの上流側に回転自在に支持されており、この線材供給部21から母線材10aが引出し可能とされている。   The wire rod supply unit 21 is configured to be able to supply the bus wire 10a. More specifically, the wire supply part 21 is configured such that the bus wire 10a is wound and accommodated on a reel. The wire rod supply unit 21 is rotatably supported on the upstream side of a predetermined wire rod feed line L, and the bus wire 10a can be drawn out from the wire rod supply unit 21.

線材引取部22は、素線10bを引取可能に構成されている。より具体的には、線材引取部22は、素線10bを巻回収容可能なリールが、モータ等の回転駆動源によって回転駆動可能に支持されている。この線材引取部22は前記線材送りラインLの下流側に配設されており、最終の仕上がり線径に加工された素線10bが本線材引取部22によって、引取って収容されるようになっている。   The wire take-up section 22 is configured to take up the strand 10b. More specifically, the wire take-up portion 22 is supported such that a reel on which the wire 10b can be wound and accommodated is rotatably driven by a rotation drive source such as a motor. The wire rod take-up portion 22 is disposed on the downstream side of the wire rod feed line L, and the wire 10b processed to the final finished wire diameter is taken up and accommodated by the main wire rod take-up portion 22. ing.

複数のキャプスタン23は、線材供給部21と線材引取部22との間の線材送りラインLに沿って、間隔を有して並ぶように配設されている。各キャプスタン23は、円板状あるいは円柱状に形成されており、その外周に線材10を巻付可能な周溝が形成されている。また、各キャプスタン23は、それぞれ線材送りラインLに対して直交する水平方向の回転軸周りに回転可能に支持されている。そして、線材10を各キャプスタン23の周溝に巻付けた状態で、各キャプスタン23を回転駆動することで、その回転速度に応じた引抜き速度で線材10が引抜かれるようになっている。   The plurality of capstans 23 are arranged along the wire feed line L between the wire supply part 21 and the wire take-up part 22 so as to be arranged at intervals. Each capstan 23 is formed in a disk shape or a columnar shape, and a circumferential groove around which the wire 10 can be wound is formed on the outer periphery thereof. Further, each capstan 23 is supported so as to be rotatable around a horizontal rotation axis orthogonal to the wire feed line L. Then, by rotating each capstan 23 in a state where the wire 10 is wound around the circumferential groove of each capstan 23, the wire 10 is drawn at a drawing speed corresponding to the rotation speed.

なお、各キャプスタン23の回転軸は、重力方向または重力方向に対して斜め方向に沿った軸であってもよい。また、ここでは、複数のキャプスタン23は5つのキャプスタン23で構成されているが、キャプスタン23の数は、伸線ダイス41の数等に合わせて適宜変更可能である。   Note that the rotation axis of each capstan 23 may be a gravity direction or an axis along an oblique direction with respect to the gravity direction. Here, the plurality of capstans 23 are constituted by five capstans 23, but the number of capstans 23 can be appropriately changed according to the number of wire drawing dies 41 and the like.

また、各キャプスタン23は回転駆動源24により発生した回転駆動力により、回転駆動可能に構成されている。回転駆動源24は、ACモータ等のモータであり、ここでは、1つの回転駆動源24に対し1つのキャプスタン23が回転駆動可能に連結されている。なお、1つの回転駆動源24に対して、複数のキャプスタン23が回転駆動可能に連結されていてもよい。また、回転駆動源24は、回転速度を調整可能でもよい。   Each capstan 23 is configured to be rotationally driven by the rotational driving force generated by the rotational driving source 24. The rotational drive source 24 is a motor such as an AC motor. Here, one capstan 23 is connected to one rotational drive source 24 so as to be rotationally driven. A plurality of capstans 23 may be connected to one rotational drive source 24 so as to be rotationally driven. Further, the rotation drive source 24 may be capable of adjusting the rotation speed.

複数のダイスは、線材供給部21と線材引取部22との間の線材送りラインLに沿って線材10が通過可能に配設されており、少なくとも1つの伸線ダイス41と少なくとも1つのガイドダイス31とで構成されている。ここでは、4つの伸線ダイス41と2つのガイドダイス31とで構成されている合計6つのダイスが配設されているが、伸線ダイス41の数とガイドダイス31の数とは、母線材10aの断面積や素線10bの断面積や線材10の材質などの事項により、変更可能とされている。   The plurality of dies are arranged so that the wire 10 can pass along the wire feed line L between the wire supply part 21 and the wire take-up part 22, and at least one wire drawing die 41 and at least one guide die. 31. Here, a total of six dies composed of four wire drawing dies 41 and two guide dies 31 are arranged, but the number of wire drawing dies 41 and the number of guide dies 31 are determined as the bus wire. It can be changed depending on matters such as the cross-sectional area of 10a, the cross-sectional area of the wire 10b, and the material of the wire 10.

伸線ダイス41は、線材10の線径が小さくなるように縮径変形加工を施すための加工具であり、線材送りラインLに沿って、複数のキャプスタン23の各間に配設されている。より具体的には、伸線ダイス41は金属等で形成された部材であり、線材10が通過可能な加工孔部43が形成されている。   The wire drawing die 41 is a processing tool for performing a diameter-reducing deformation process so that the wire diameter of the wire 10 is reduced, and is arranged between the plurality of capstans 23 along the wire feed line L. Yes. More specifically, the wire drawing die 41 is a member formed of metal or the like, and a processing hole 43 through which the wire 10 can pass is formed.

加工孔部43は、線材送りラインLに沿って上流側の面と下流側の面とその内部とを貫き、加工孔部43の最小径部は通過する直前の線材10の線径よりも小さくなるように形成されている。また、加工孔部43は上流側開口部から徐々に径が小さくなっていき、最小径部を経て、下流側開口部に向けて徐々に径が大きくなっていくように形成されている。   The processing hole 43 penetrates the upstream surface, the downstream surface, and the inside thereof along the wire feed line L, and the minimum diameter portion of the processing hole 43 is smaller than the wire diameter of the wire 10 just before passing. It is formed to become. Further, the processing hole portion 43 is formed such that the diameter gradually decreases from the upstream opening, passes through the minimum diameter portion, and gradually increases toward the downstream opening.

なお、ここでは、伸線ダイス41は、複数のキャプスタン23の各間すべてに配設されているが、配設されない間があってもよい。また、伸線ダイス41は、着脱可能に配設されていてもよい。その場合、伸線ダイス41の取り外し、交換、メンテナンス等を容易に行うことが可能である。   Here, the wire drawing dies 41 are disposed between all of the plurality of capstans 23, but there may be a space where they are not disposed. The wire drawing die 41 may be detachably disposed. In that case, removal, replacement, maintenance, etc. of the wire drawing die 41 can be easily performed.

ガイドダイス31は、線材10を伸線ダイス41に、入線角度を抑えつつ入線可能とするための加工具であり、線材送りラインLに沿って配設されている。より具体的には、ガイドダイス31は、複数のキャプスタン23の各間に配設されている伸線ダイス41に対してその上流側に配設されている。   The guide die 31 is a processing tool for enabling the wire 10 to be inserted into the wire drawing die 41 while suppressing the wire insertion angle, and is arranged along the wire feed line L. More specifically, the guide die 31 is disposed upstream of the wire drawing dies 41 disposed between the plurality of capstans 23.

ガイドダイス31は、金属または樹脂等で形成された部材であり、線材10が通過可能な通過孔部33が形成されている。通過孔部33は、線材送りラインLの上流側の面と下流側の面とその内部とを貫き、通過孔部33の最小径部は通過する直前の線材10の線径よりも大きくなるように形成されている。最小径部の直径は、例えば、通過する直前の線材10の外径の102〜130%とすることができる。ここで、通過孔部33の中心軸と加工孔部43の中心軸とが一致するようにガイドダイスは配設されている。   The guide die 31 is a member formed of metal, resin, or the like, and has a passage hole 33 through which the wire 10 can pass. The passage hole 33 passes through the upstream surface, the downstream surface, and the inside of the wire feed line L, and the minimum diameter portion of the passage hole 33 is larger than the wire diameter of the wire 10 immediately before passing. Is formed. The diameter of the minimum diameter portion can be, for example, 102 to 130% of the outer diameter of the wire 10 just before passing through. Here, the guide dies are arranged so that the central axis of the passage hole 33 and the central axis of the processed hole 43 coincide.

なお、通過する線材の断面が円形であるため、線材送りラインLに垂直なガイドダイス31の断面における通過孔部33の形状は円形としているが、線材10が通過可能であれば、円形でなくとも楕円形でも多角形でも構わない。   In addition, since the cross section of the wire to pass is circular, the shape of the passage hole 33 in the cross section of the guide die 31 perpendicular to the wire feed line L is circular, but if the wire 10 can pass, it is not circular. Both can be oval or polygonal.

また、通過孔部33は、上流側の面にある開口部から徐々に径が小さくなっていき、最小径部を経て、下流側の面にある開口部に向けて徐々に径が大きくなっていくように形成されている。この形状であれば、上流側の面にある開口部が広いため、通過孔部33にスムーズに線材10が入線可能になる。また、下流側の面の開口部が最小径部よりも径が大きくなっているため、通過孔部33の下流側の出口付近で、線材10が擦れて傷つくことが抑えられる。さらに、最小径部が下流側の面近くに設けられているので、できるだけ上流側の開口部を広くすることができ、通過孔部33にスムーズに線材10が入線可能となる。なお、通過孔部はこの形状に限られるものではなく、例えば同じ断面が続く直線型でもよいし、上流側の面にある開口部から縮径していき、下流側の面の開口部が最小径部であってもよい。   The diameter of the passage hole 33 gradually decreases from the opening on the upstream surface, and gradually increases toward the opening on the downstream surface via the minimum diameter portion. It is formed to go. If it is this shape, since the opening part in an upstream surface is wide, the wire 10 can enter the passage hole part 33 smoothly. Further, since the diameter of the opening on the downstream surface is larger than the minimum diameter portion, the wire 10 is prevented from being rubbed and damaged near the outlet on the downstream side of the passage hole 33. Furthermore, since the minimum diameter portion is provided near the downstream surface, the upstream opening can be made as wide as possible, and the wire 10 can smoothly enter the passage hole 33. The passage hole portion is not limited to this shape, and may be, for example, a straight type having the same cross section, or the diameter of the passage hole may be reduced from the opening on the upstream surface, and the opening on the downstream surface may be the most. A small diameter part may be sufficient.

そして、上流側の面と通過孔部33、及び、下流側の面と通過孔部33は角のないように滑らかにつながっている。また、最小径部の周辺も角のないように滑らかにつながっている。この形状であれば、線材10と通過孔部33とが擦れたときでも線材10に傷がつくことを抑えられる。   The upstream surface and the passage hole 33 and the downstream surface and the passage hole 33 are smoothly connected so as to have no corners. Also, the periphery of the smallest diameter portion is smoothly connected so as not to have corners. With this shape, even when the wire 10 and the passage hole 33 are rubbed, it is possible to prevent the wire 10 from being damaged.

また、ガイドダイス31は線材送りラインLに沿って移動可能に配設されていてもよい。その場合、線材10のガイドダイス31への入線角度及び線材10の伸線ダイス41への入線角度を最適なものへと容易に変更することが可能であることによって、より傷つきを抑えることが可能になる。   Further, the guide die 31 may be disposed so as to be movable along the wire feed line L. In that case, it is possible to easily change the angle of entry of the wire 10 into the guide die 31 and the angle of entry of the wire 10 into the wire drawing die 41 to an optimum one, thereby further suppressing damage. become.

また、ガイドダイス31は着脱可能に配設されていてもよい。その場合、ガイドダイス31の取り外し、交換、メンテナンス等を容易に行うことが可能である。   The guide die 31 may be detachably disposed. In that case, the guide die 31 can be easily removed, replaced, maintained, and the like.

また、ここでは、複数の伸線ダイス41が配設され、少なくとも、最上流に配設されている伸線ダイス41に対してガイドダイス31が配設されている。より具体的には、配設されている4つの伸線ダイス41のうち、最上流側を含む2つの伸線ダイス41に対してガイドダイス31が配設されている。もっとも、必ずしも、最上流側の伸線ダイス41に対してガイドダイス31が配設されている必要はないが、最上流側の伸線ダイス41に対してガイドダイス31が配設されていれば、後に説明するように、線材の傷つきをより効果的に抑えることができる。   Here, a plurality of wire drawing dies 41 are provided, and at least a guide die 31 is provided with respect to the wire drawing die 41 provided in the uppermost stream. More specifically, among the four wire drawing dies 41 provided, the guide die 31 is provided for the two wire drawing dies 41 including the most upstream side. Of course, the guide die 31 is not necessarily disposed with respect to the most upstream wire drawing die 41, but if the guide die 31 is disposed with respect to the most upstream wire drawing die 41. As will be described later, the wire can be more effectively prevented from being damaged.

また、3つめのキャプスタン23がある位置を中間位置としたとき、4つの伸線ダイスのうち中間位置より上流側に配設された2つの伸線ダイス41に対してのみその上流側にガイドダイス31が配設され、中間位置より下流側に配設された2つの伸線ダイス41に対してはその上流側にガイドダイス31が配設されていない。もっとも、中間位置は3つめのキャプスタン23がある位置である必要はなく、最上流に配設された伸線ダイス41と最下流に配設された伸線ダイス41との間に配設されたいずれかのキャプスタン23のある位置にあればよい。線材送りラインLに沿った中間位置よりも上流側に配設された伸線ダイス41に対してのみガイドダイス31が設けられていれば、後に説明するように、中間位置よりも上流側の伸線ダイス41では、線材10の傷つきを確実に抑えつつ、中間位置よりも下流側では、ガイドダイス31の設置に係る時間やコストを抑えることができる。   In addition, when the position where the third capstan 23 is located is the intermediate position, only the two wire drawing dies 41 disposed upstream of the intermediate position among the four wire drawing dies are guided upstream thereof. A die 31 is disposed, and the guide wire 31 is not disposed on the upstream side of the two wire drawing dies 41 disposed on the downstream side of the intermediate position. However, the intermediate position does not have to be the position where the third capstan 23 is located, and is disposed between the wire drawing die 41 disposed on the most upstream side and the wire drawing die 41 disposed on the most downstream side. Any one of the capstans 23 may be located. If the guide die 31 is provided only for the wire drawing die 41 disposed on the upstream side of the intermediate position along the wire feed line L, as will be described later, the extension on the upstream side of the intermediate position is performed. With the wire die 41, it is possible to reduce the time and cost associated with the installation of the guide die 31 on the downstream side of the intermediate position while reliably suppressing damage to the wire 10.

また、ここでは、伸線ダイス41とガイドダイス31とは、離れて配設されている。より具体的には、連続する2つのキャプスタン23の間のうち、伸線ダイス41とガイドダイス31とが両方配設されている最上流側の2つの間において、それぞれ、伸線ダイス41とガイドダイス31とが、接することなく配設されている。伸線ダイス41とガイドダイス31とが離れて配設されている場合、線材10の伸線ダイス41への入線角度を小さくすることができる。もっとも、伸線ダイス41とガイドダイス31とは、接触した状態で配設されていてもよい。伸線ダイス41とガイドダイス31とが接触して配設されている場合、伸線ダイス41の中心軸とガイドダイス31の中心軸とを合わせる調整が容易となる。   Here, the wire drawing die 41 and the guide die 31 are disposed apart from each other. More specifically, between the two continuous capstans 23, between the two on the most upstream side where both the wire drawing die 41 and the guide die 31 are disposed, A guide die 31 is disposed without contact. When the wire drawing die 41 and the guide die 31 are arranged apart from each other, the angle of wire entry of the wire 10 into the wire drawing die 41 can be reduced. However, the wire drawing die 41 and the guide die 31 may be arranged in contact with each other. When the wire drawing die 41 and the guide die 31 are arranged in contact with each other, it is easy to adjust the center axis of the wire drawing die 41 and the center axis of the guide die 31.

なお、ここでは、ガイドダイス31は伸線ダイス41と同じ素材で形成されてもよいし違う素材で形成されてもよいが、伸線ダイス41よりも柔らかい素材で形成されるのが好ましい。   Here, the guide die 31 may be formed of the same material as the wire drawing die 41 or a different material, but is preferably formed of a material softer than the wire drawing die 41.

また、最下流側の伸線ダイス41と線材引取部22との間に一対のローラを備える線速差吸収機構部が設けられていてもよい。線速差吸収機構部は、いわゆるダンサローラ等とも呼ばれ、一方の固定ローラに対して、可動側ローラが近接離間移動可能に支持された構成とされている。そして、キャプスタン23と線材引取部22との間の線速差に応じて両ローラ間距離が調整されることで、最下流側の伸線ダイス41を通過した線材10を巻付けるキャプスタン23と線材引取部22との間における線材10の弛み及び線材10の過大な引張り力の作用等が抑制されるようになっている。   Further, a linear speed difference absorbing mechanism portion including a pair of rollers may be provided between the most downstream drawing wire 41 and the wire material take-up portion 22. The linear velocity difference absorbing mechanism is also called a so-called dancer roller or the like, and is configured such that a movable roller is supported so as to be able to move close to and away from one fixed roller. And the capstan 23 which winds the wire 10 which passed the most downstream wire drawing die 41 by adjusting the distance between both rollers according to the linear velocity difference between the capstan 23 and the wire drawing part 22. The slack of the wire 10 between the wire and the wire take-up portion 22 and the action of an excessive tensile force of the wire 10 are suppressed.

また、最下流側の伸線ダイス41と線材引取部22との間に、素線10bをアニールする焼鈍機や素線10bに絶縁層等を被覆する押出被覆機等が設けられ、線材10が伸線加工を施されたのちにアニールや押出被覆等の別の加工が施されてから、線材引取部22に巻付け収容されてもよい。   Further, an annealing machine for annealing the wire 10b and an extrusion coating machine for covering the wire 10b with an insulating layer or the like are provided between the wire drawing die 41 on the most downstream side and the wire take-up portion 22, and the wire 10 is After the wire drawing process is performed, another process such as annealing or extrusion coating may be performed, and then wound around the wire take-up portion 22 to be accommodated.

<伸線装置の動作>
ここで、伸線装置20における伸線加工の流れについて説明する。
<Operation of wire drawing device>
Here, the flow of wire drawing in the wire drawing apparatus 20 will be described.

まずは、引き続き図1及び図2を用いて、全体の流れについて説明する。線材供給部21に巻付け収容されていた線材10が引出されたのち、予め線材送りラインLに沿って配設されている、キャプスタン23とガイドダイス31と伸線ダイス41とに線材10を通して、線材10が線材引取部22へセットされる。   First, the overall flow will be described with reference to FIGS. After the wire rod 10 wound and accommodated in the wire rod supply unit 21 is drawn, the wire rod 10 is passed through the capstan 23, the guide die 31 and the wire drawing die 41, which are arranged along the wire rod feed line L in advance. The wire 10 is set in the wire take-up section 22.

次に、各キャプスタン23に連結されているモータ等の回転駆動源24と線材引取部22のモータ等の回転駆動源を動かすことによって、各キャプスタン23と線材引取部22とが、回転駆動を始める。各キャプスタン23と線材引取部22とが回転駆動を始めると、線材供給部21からキャプスタン23に順次、線材10が送られ始める。   Next, each capstan 23 and the wire rod take-up section 22 are driven to rotate by moving a rotation drive source 24 such as a motor connected to each capstan 23 and a rotation drive source such as a motor of the wire rod take-up section 22. Begin. When each capstan 23 and the wire take-up unit 22 start to rotate, the wire 10 starts to be sequentially sent from the wire supply unit 21 to the capstan 23.

次に、キャプスタン23からガイドダイス31の通過孔部33を経て伸線ダイス41の加工孔部43を通り次のキャプスタン23に送られる工程を2回繰り返す。そして、キャプスタン23を出た線材10は、ガイドダイス31を経ずに直接伸線ダイス41へと入線し、伸線加工を施されたのち次のキャプスタン23に送られる工程を2回繰り返して、素線10bが線材引取部22へと巻きつけ収容される。   Next, the process of sending from the capstan 23 to the next capstan 23 through the processing hole 43 of the wire drawing die 41 through the passage hole 33 of the guide die 31 is repeated twice. Then, the wire 10 that has exited the capstan 23 directly enters the wire drawing die 41 without passing through the guide die 31, is subjected to wire drawing processing, and is then sent twice to the next capstan 23. Thus, the strand 10b is wound around the wire take-up portion 22 and accommodated.

図3は、図2の最上流側の連続する2つのキャプスタン23の間の拡大図であり、キャプスタン23から出た線材10の軌跡の様子を模式的に示した図である。キャプスタン23に送られた線材10が、キャプスタン23を周回したのちキャプスタン23を出ると、弧状の軌跡を描いて、次のダイスへと入線する。この軌跡の形状は、線材10の剛性に応じて変わり、一般的には、線材10の剛性が大きいほど線材送りラインLから離れるように大きく湾曲する軌跡を描き、線材10の剛性が小さくなるほど次のキャプスタンの引抜き力によって、線材送りラインLに沿った直線状の軌跡を描くようになる。これは、線材10の剛性が大きいほど、キャプスタン23から線材送りラインLと角度を持って出た線材10がより真っ直ぐ進もうとすることによるものである。   FIG. 3 is an enlarged view between two continuous capstans 23 on the uppermost stream side of FIG. 2, and is a diagram schematically showing the trajectory of the wire 10 that has come out of the capstan 23. When the wire rod 10 sent to the capstan 23 goes around the capstan 23 and then exits the capstan 23, it draws an arc-shaped trajectory and enters the next die. The shape of this trajectory changes according to the rigidity of the wire 10. In general, as the rigidity of the wire 10 increases, a trajectory that curves more greatly away from the wire feed line L is drawn. The pulling force of the capstan draws a linear locus along the wire feed line L. This is because, as the rigidity of the wire 10 increases, the wire 10 coming out of the capstan 23 at an angle with the wire feed line L tends to move straighter.

ここで、軌跡に関与する、線材10の剛性を決める数値の1つとして、線材10の線径があげられる。より具体的には、同じ素材の線材10であれば、一般的には、線材10の線径が大きくなるほど剛性は大きくなる。ここで、本実施形態にかかる伸線装置20では、線材10を順次縮径加工していくものであることから、上流側にいくほど、線材10の線径は大きくなる。したがって、上流側の線材10の方が剛性は大きいため、上流側のキャプスタン23から出た線材10の軌跡の方が、線材送りラインLから離れるように大きく湾曲する軌跡になり、次のダイスへの入線角度が大きくなる。そのため、上述したように、中間位置よりも上流側の伸線ダイス41に対して、特に最上流側の伸線ダイス41に対して、ガイドダイス31が配設されることでより効果的に傷つきを抑えることができる。   Here, the wire diameter of the wire 10 is given as one of the numerical values that determine the rigidity of the wire 10 involved in the trajectory. More specifically, in the case of the wire 10 made of the same material, generally, the rigidity increases as the wire diameter of the wire 10 increases. Here, in the wire drawing apparatus 20 according to the present embodiment, the diameter of the wire 10 is sequentially reduced, so that the wire diameter of the wire 10 increases as it goes upstream. Accordingly, since the upstream wire rod 10 has higher rigidity, the trajectory of the wire rod 10 coming out of the upstream capstan 23 becomes a trajectory that curves greatly away from the wire rod feed line L, and the next die Increases the angle of entry to. Therefore, as described above, the guide die 31 is disposed more effectively with respect to the wire drawing die 41 on the upstream side than the intermediate position, particularly with respect to the wire drawing die 41 on the most upstream side. Can be suppressed.

図4は、図3のガイドダイス31と伸線ダイス41との周辺部を拡大した説明図で、線材10がガイドダイス31と伸線ダイス41とを通過する様子を模式的に示した図である。なお図4では、分かり易くするため、伸線ダイス41とガイドダイス31とは送りラインLに平行な断面図で示されている(以下、図5〜図9のダイスもそれぞれ同様の断面図で示されている)。弧状の軌跡を描いてガイドダイス31の通過孔部33へと入線した線材10は、通過孔部33と接触することで軌道が修正され、通過孔部33を出ると、ほぼ直線状に伸線ダイス41の加工孔部43へと入線し伸線加工が施される。   FIG. 4 is an explanatory diagram in which the peripheral portion between the guide die 31 and the wire drawing die 41 in FIG. 3 is enlarged, and is a diagram schematically showing how the wire 10 passes through the guide die 31 and the wire drawing die 41. is there. In FIG. 4, for the sake of clarity, the wire drawing die 41 and the guide die 31 are shown in a cross-sectional view parallel to the feed line L (hereinafter, the dies shown in FIGS. It is shown). The wire 10 that has drawn an arc-shaped locus and has entered the passage hole 33 of the guide die 31 is corrected by contacting the passage hole 33, and when the wire 10 exits the passage hole 33, the wire 10 is drawn almost linearly. Wires are drawn into the processing hole 43 of the die 41 and subjected to wire drawing.

図5は、線材10の剛性が大きい時に、線材10が、弧状の軌跡を描いて、ガイドダイス31を経ずに直接伸線ダイス41の加工孔部43へと入線し、伸線加工が行われる説明図である。このとき、線材10の剛性が大きいと入線角度αが大きくなる。入線角度αが大きくなると、線材10が加工孔部43に接触し曲がりが生じる線材10の表面付近の一部分である曲り部Cに応力が集中する。曲り部Cに応力が集中すると、曲り部Cが加工孔部43へと押し付けられる力が大きくなる。そして、曲り部Cが加工孔部43へと押し付けられる力が大きくなると、曲り部Cが加工孔部43と擦れた状態で引っ張られることにより、曲り部C近傍の線材10の表面が削られる等して、線材10に傷が生じることになる。   FIG. 5 shows that when the rigidity of the wire 10 is large, the wire 10 draws an arc-shaped locus and directly enters the machining hole 43 of the wire drawing die 41 without passing through the guide die 31 and wire drawing is performed. FIG. At this time, when the rigidity of the wire 10 is large, the incoming line angle α increases. When the incoming angle α increases, the stress concentrates on the bent portion C, which is a part of the vicinity of the surface of the wire 10 where the wire 10 comes into contact with the processed hole portion 43 and is bent. When stress concentrates on the bent portion C, the force with which the bent portion C is pressed against the processing hole portion 43 increases. Then, when the force with which the bent portion C is pressed against the processing hole 43 is increased, the surface of the wire 10 in the vicinity of the bent portion C is scraped by pulling the bent portion C while being rubbed against the processing hole 43, etc. As a result, the wire 10 is damaged.

したがって、線材10の剛性が大きいことによる線材10の傷つきを抑えるためにガイドダイス31を設ける場合、上流側に行くほど線材10の剛性が大きくなることから、下流側よりも上流側にガイドダイス31を設けることでより線材10の傷つきを抑えることができる。つまり、最上流側の伸線ダイス41から順にその上流側にガイドダイス31を配設するのが好ましい。そして、下流側では、線材10の剛性が十分小さくなり、ガイドダイス31を設けなくてもよい場合がある。その場合、中間位置よりも下流側にはガイドダイス31を設けないことで、ガイドダイス31の設置にかかる時間及びコストを抑えることができる。   Therefore, when the guide die 31 is provided in order to suppress damage to the wire 10 due to the high rigidity of the wire 10, since the rigidity of the wire 10 increases toward the upstream side, the guide die 31 is disposed upstream rather than downstream. It is possible to suppress damage to the wire rod 10 by providing the wire. That is, it is preferable to arrange the guide die 31 on the upstream side in order from the wire drawing die 41 on the most upstream side. And on the downstream side, the rigidity of the wire 10 becomes sufficiently small, and the guide die 31 may not be provided. In that case, by not providing the guide die 31 on the downstream side of the intermediate position, the time and cost required for the installation of the guide die 31 can be suppressed.

図6は、連続する2つのキャプスタン23の間において、伸線ダイス41とガイドダイス31とが接触した状態で配設された説明図であり、図7は、連続する2つのキャプスタン23の間において、伸線ダイス41とガイドダイス31とが、接触していない状態で配設された説明図である。ガイドダイス31の通過孔部33と接触することによって軌道を修正した線材10は、直線状に伸線ダイス41の加工孔部43へと入線する。このとき図6及び図7からも明らかなように、同じガイドダイス31を用いた場合、伸線ダイス41とガイドダイス31とが離れて配設された方が、伸線ダイス41の加工孔部43への線材10の入線角度の最大値が小さくなる。   FIG. 6 is an explanatory diagram in which the wire drawing die 41 and the guide die 31 are arranged in contact with each other between two continuous capstans 23, and FIG. 7 is a diagram of two continuous capstans 23. It is explanatory drawing arrange | positioned in the state which the wire drawing die | dye 41 and the guide die | dye 31 are not contacting in the middle. The wire 10 whose trajectory has been corrected by coming into contact with the passage hole portion 33 of the guide die 31 enters the processing hole portion 43 of the wire drawing die 41 linearly. At this time, as apparent from FIGS. 6 and 7, when the same guide die 31 is used, it is more preferable that the wire drawing die 41 and the guide die 31 are disposed apart from each other. The maximum value of the incoming angle of the wire 10 to 43 becomes smaller.

より具体的には、入線角度の最大値は、加工孔部43の最小径部から通過孔部33の最小径部までの距離と、通過孔部33の最小径とによって決まる。すなわち、加工孔部43の最小径部から通過孔部33の最小径部までの距離が長いほど、また、通過孔部33の最小径が小さいほど入線角度の最大値は小さくなる。このため、同じガイドダイス31を用いた場合、通過孔部33の最小径は変わらないため、加工孔部43の最小径部から通過孔部33の最小径部までの距離が大きいほど、すなわち、伸線ダイス41とガイドダイス31とがより離して配設されるほど、より確実に入線角度の最大値を小さくすることができる。そして、このことによって、より確実に線材10の傷つきを抑えることができる。ここで、通常、ガイドダイス31を配設できる範囲は工場の大きさ等により制限されるため、どの程度離すかは剛性(線材10の物性、太さ)等に応じて実験的、経験的に決定される。   More specifically, the maximum value of the entry angle is determined by the distance from the minimum diameter portion of the processing hole portion 43 to the minimum diameter portion of the passage hole portion 33 and the minimum diameter of the passage hole portion 33. That is, as the distance from the minimum diameter portion of the processed hole portion 43 to the minimum diameter portion of the passage hole portion 33 is longer, and as the minimum diameter of the passage hole portion 33 is smaller, the maximum value of the incoming line angle becomes smaller. For this reason, when the same guide die 31 is used, the minimum diameter of the passage hole portion 33 does not change. Therefore, as the distance from the minimum diameter portion of the processing hole portion 43 to the minimum diameter portion of the passage hole portion 33 increases, that is, The farther the wire drawing die 41 and the guide die 31 are arranged, the more reliably the maximum value of the incoming wire angle can be reduced. And the damage of the wire 10 can be suppressed more reliably by this. Here, since the range in which the guide die 31 can be disposed is usually limited by the size of the factory, how much the guide die 31 is separated is determined experimentally and empirically depending on the rigidity (physical properties and thickness of the wire 10) and the like. It is determined.

こうして、通過する線材10の線径よりも大きい最小径を有する通過孔部33に線材10を通す工程と、通過する線材10の線径よりも小さい加工孔部43に線材10を通す工程とを備える製造方法により製造された素線10bは、傷つきが抑えられ、断線しにくくなる。   Thus, the step of passing the wire 10 through the passage hole 33 having the minimum diameter larger than the wire diameter of the wire 10 passing through, and the step of passing the wire 10 through the machining hole 43 smaller than the wire diameter of the wire 10 passing through. The strand 10b manufactured by the manufacturing method provided is suppressed from being damaged and is difficult to be disconnected.

図8は、本実施形態にかかるガイドダイス31を示す概略断面図である。ガイドダイス31には、上述したような通過孔部33が設けられている。このガイドダイス31を製造するには、例えば以下のようにすればよい。   FIG. 8 is a schematic cross-sectional view showing the guide die 31 according to the present embodiment. The guide die 31 is provided with the passage hole 33 as described above. In order to manufacture the guide die 31, for example, the following may be performed.

まずは、上流側の面と下流側の面との2つの面を持つ直方体や立方体等の柱状体を用意し、上流側の面及び下流側の面からそれぞれテーパ状に縮径するように貫通するまで孔を開ける。そして上流側の面と孔の連結部分(孔の上流側の開口縁部)と、上流側から開けた孔と下流側から開けた孔の連結部分(最小径部)と、下流側の面と孔の連結部分(孔の下流側の開口縁部)とをそれぞれ角がなく滑らかになるように削ることで、通過孔部33を備えるガイドダイス31が形成される。   First, columnar bodies such as a rectangular parallelepiped and a cube having two surfaces, an upstream surface and a downstream surface, are prepared and penetrated so as to reduce the diameter in a tapered shape from the upstream surface and the downstream surface, respectively. Drill holes until. And an upstream surface and a hole connecting portion (opening edge on the upstream side of the hole), a hole opened from the upstream side, a hole connecting portion (minimum diameter portion) opened from the downstream side, and a downstream surface The guide die 31 including the passage hole portion 33 is formed by cutting the hole connection portion (opening edge portion on the downstream side of the hole) so as to be smooth without any corners.

ガイドダイス31の素材は上述のように金属でもよいし、樹脂でもよいが、伸線ダイス41よりも柔らかい素材で形成されると、線材10がガイドダイス31と接触した時に生じる恐れのある傷つきを抑えることができる。さらにガイドダイス31が、通過する線材10よりも柔らかい素材で形成されると、線材10がガイドダイス31と接触した時に生じる恐れのある傷つきをさらに確実に抑えることができる。   The material of the guide die 31 may be a metal or a resin as described above. However, if the guide die 31 is made of a material softer than the wire drawing die 41, the wire 10 may be damaged when it comes into contact with the guide die 31. Can be suppressed. Furthermore, if the guide die 31 is formed of a material softer than the wire 10 passing therethrough, damage that may occur when the wire 10 comes into contact with the guide die 31 can be more reliably suppressed.

また、入線角度が60度で、ある線材10に対して伸線加工した際に傷がつき、同じ線材10に対して、入線角度が30度となるようにして伸線加工を施したところ、傷はつかなかったことが、発明者らによって確認されている。このように、入線角度の小さい方が線材10の傷つきを抑えることができることが判明した。   Also, when the wire drawing angle is 60 degrees, the wire 10 is scratched when drawn, and the wire 10 is drawn so that the wire angle is 30 degrees with respect to the same wire 10. The inventors have confirmed that there was no damage. Thus, it was found that the smaller the incoming angle, the more the wire 10 can be prevented from being damaged.

また、発明者らが、ある環境下でガイドダイスを用いずに伸線加工を行うと線材1トン当たり平均して30.1回の断線が確認された。一方、同じ環境下で、ガイドダイスを用いて伸線加工を行った場合に、線材1トン当たり平均して0.0回の断線まで改善された。   In addition, when the inventors performed wire drawing without using a guide die in a certain environment, an average of 30.1 disconnections per ton of wire was confirmed. On the other hand, when wire drawing was performed using a guide die under the same environment, the average was improved to 0.0 disconnection per ton of wire.

<効果>
以上のように構成された伸線装置20によると、伸線ダイス41に対してその上流側にガイドダイス31が配設されているため、ガイドダイス31が配設されていない場合に比べて、線材10の伸線ダイス41への入線角度を小さくでき、傷つきを抑えることができる。また、ガイドダイス31通過時には伸線加工が行われないため、ガイドダイス31通過時に生じる線材10の傷つきを抑えることができる。
<Effect>
According to the wire drawing device 20 configured as described above, the guide die 31 is disposed on the upstream side of the wire drawing die 41. Therefore, compared to the case where the guide die 31 is not disposed, The angle of entry of the wire 10 into the wire drawing die 41 can be reduced, and damage can be suppressed. In addition, since the wire drawing is not performed when the guide die 31 passes, it is possible to suppress damage to the wire 10 that occurs when the guide die 31 passes.

また、線材10の剛性が最も大きい最上流側の伸線ダイス41に対してガイドダイス31が配設されているため、線材10の傷つきをより効果的に抑えることができる。   Further, since the guide die 31 is disposed with respect to the wire drawing die 41 on the most upstream side where the rigidity of the wire 10 is the largest, the damage to the wire 10 can be more effectively suppressed.

また、線材10の剛性が大きい上流側に配設された伸線ダイス41に対してガイドダイス31が設けられ、線材10の剛性が小さい下流側に配設された伸線ダイス41に対してガイドダイス31が設けられていないため、上流側の伸線ダイス41での傷つきをより確実に抑えつつ、下流側でのガイドダイス31の設置にかかる時間及びコストを抑えることができる。   A guide die 31 is provided for the wire drawing die 41 disposed on the upstream side where the rigidity of the wire 10 is large, and a guide is provided for the wire drawing die 41 disposed on the downstream side where the rigidity of the wire 10 is small. Since the die 31 is not provided, it is possible to reduce the time and cost required to install the guide die 31 on the downstream side while more reliably suppressing damage on the upstream drawing die 41.

また、連続する2つのキャプスタン23の間において、伸線ダイス41とガイドダイス31とが離れて配設されているため、接した状態で配設されている場合に比べて、線材10の伸線ダイス41への入線角度の最大値を小さくすることができ、より確実に線材10の傷つきを抑えることができる。   Further, since the wire drawing die 41 and the guide die 31 are arranged apart from each other between the two continuous capstans 23, the wire 10 is drawn more than in the case where the wires 10 are arranged in contact with each other. The maximum value of the incoming angle to the wire die 41 can be reduced, and damage to the wire 10 can be more reliably suppressed.

<変形例>
図9は、変形例に係るガイドダイス32を示す概略断面図である。ガイドダイス32は、例えば伸線用のダイスの孔部を通過孔部34として代用し、通過孔部34に伸線ダイス41よりも柔らかい素材で形成された被覆部36が設けられたものである。この被覆部36は、例えば、上流側から最小径部の中間位置までの通過孔部34の形状に加工した樹脂製のキャップと、下流側から最小径部の中間位置までの通過孔部34の形状に加工した樹脂製のキャップとを嵌め合わせて形成することができる。
<Modification>
FIG. 9 is a schematic cross-sectional view showing a guide die 32 according to a modification. In the guide die 32, for example, a hole portion of a wire drawing die is used as a passage hole portion 34, and a covering portion 36 formed of a material softer than the wire drawing die 41 is provided in the passage hole portion 34. . The covering portion 36 includes, for example, a resin cap processed into the shape of the passage hole 34 from the upstream side to the intermediate position of the minimum diameter portion, and the passage hole 34 from the downstream side to the intermediate position of the minimum diameter portion. It can be formed by fitting a resin cap processed into a shape.

この形状のガイドダイス32であれば、被覆部36を容易に外すことが可能であるため、被覆部36を取り外して伸線用のダイスに戻したり、被覆部36が損傷したときに、被覆部36を変えたりすることを容易にすることができる。なお、ガイドダイス31の通過孔部33に被覆部36を設けてもよい。この場合でも、被覆部36を容易に外すことが可能であるため、被覆部36を取り外してガイドダイス31に戻したり、被覆部36が損傷したときに、被覆部36を変えたりすることを容易にすることができる。   With the guide die 32 having this shape, the covering portion 36 can be easily removed. Therefore, when the covering portion 36 is removed and returned to a wire drawing die or when the covering portion 36 is damaged, the covering portion 36 is removed. 36 can be easily changed. A covering portion 36 may be provided in the passage hole portion 33 of the guide die 31. Even in this case, since the covering portion 36 can be easily removed, it is easy to remove the covering portion 36 and return it to the guide die 31 or to change the covering portion 36 when the covering portion 36 is damaged. Can be.

なお、本実施形態では、1本の母線材10aに対して伸線加工が施されているが、複数の母線材10aのそれぞれに対して伸線加工が施されてもよい。この場合、母線材10aの本数に応じて、線材供給部21と線材引取部22とが設けられることが望ましい。   In addition, in this embodiment, although the wire drawing process is performed with respect to the one bus bar 10a, the wire drawing process may be performed with respect to each of the plurality of bus bars 10a. In this case, it is desirable that the wire rod supply unit 21 and the wire rod take-up unit 22 are provided according to the number of the bus wires 10a.

複数本の母線材10aに対して伸線加工が施される場合、線材送りラインLに沿って、最下流側に配設された伸線ダイス41と線材引取部22との間に、複数の素線10bを撚り合わせる、撚り合わせ機構部が設けられていてもよい。この場合、撚り合わされた線を1本だけ引取る線材引取部22が1つだけ設けられていてもよい。   When wire drawing is performed on the plurality of bus bars 10 a, a plurality of wire draw lines 41 disposed on the most downstream side along the wire feed line L and between the wire take-up portions 22 are arranged. A twisting mechanism for twisting the strands 10b may be provided. In this case, only one wire rod take-up portion 22 that takes only one twisted wire may be provided.

また、ここでは、加工する線材10が1本であるため、加工孔部43は1つであるが、複数本の母線材10aに対して伸線加工が施される場合、加工対象の線材10の数に応じて複数の加工孔部43が形成されるのが望ましい。また、この場合、複数の加工孔部43は並列状に形成されていてもよい。   Here, since the number of the wire 10 to be processed is one, the number of the processing hole portions 43 is one. However, when the wire drawing is performed on the plurality of bus wires 10a, the wire 10 to be processed is processed. It is desirable that a plurality of processed hole portions 43 be formed according to the number of holes. In this case, the plurality of processed hole portions 43 may be formed in parallel.

同様に、ここでは、通過する線材10が1本であるため、通過孔部33は1つであるが、複数本の母線材10aに対して伸線加工が施される場合、通過対象の線材10の数に応じて複数の通過孔部33が形成されるのが望ましい。また、この場合、複数の通過孔部33は並列状に形成されていてもよい。   Similarly, since there is one wire 10 passing therethrough, there is only one passage hole 33. However, when wire drawing is performed on a plurality of bus wires 10a, the wire to be passed is used. It is desirable that a plurality of passage holes 33 are formed according to the number of ten. In this case, the plurality of passage hole portions 33 may be formed in parallel.

また、上記実施形態では、線材送りラインLが直線である場合で説明したが、必ずしもその必要はなく、各キャプスタン部分或いは他のガイドローラ部分で曲っているラインであってもよい。   Moreover, although the said embodiment demonstrated the case where the wire feed line L was a straight line, it is not necessarily required, and the line bent in each capstan part or another guide roller part may be sufficient.

なお、上記実施形態及び変形例で説明した各構成は、相互に矛盾しない限り適宜組み合わせることができる。   In addition, each structure demonstrated by the said embodiment and modification can be suitably combined unless it mutually contradicts.

以上のようにこの発明は詳細に説明されたが、上記した説明は、すべての局面において、例示であって、この発明がそれに限定されるものではない。例示されていない無数の変形例が、この発明の範囲から外れることなく想定され得るものと解される。   As described above, the present invention has been described in detail. However, the above description is illustrative in all aspects, and the present invention is not limited thereto. It is understood that countless variations that are not illustrated can be envisaged without departing from the scope of the present invention.

10 線材
20 伸線装置
21 線材供給部
22 線材引取部
23 キャプスタン
31、32 ガイドダイス
33、34 通過孔部
36 被覆部
41 伸線ダイス
43 加工孔部
DESCRIPTION OF SYMBOLS 10 Wire rod 20 Wire drawing apparatus 21 Wire rod supply part 22 Wire rod take-up part 23 Capstan 31, 32 Guide die 33, 34 Passing hole part 36 Covering part 41 Wire drawing die 43 Processing hole part

Claims (5)

線材を伸線する伸線装置であって、
線材を供給する線材供給部と線材を引取る線材引取部との間の線材送りラインに沿って配設され、通過する線材の線径より小さい最小径を有する加工孔部が形成された伸線ダイスと、
前記線材送りラインに沿って、前記伸線ダイスの上流側に配設され、通過する線材の線径より大きい最小径を有する通過孔部が形成されたガイドダイスと、
を備える伸線装置。
A wire drawing device for drawing a wire,
Wire drawing in which a processing hole having a minimum diameter smaller than the diameter of the wire passing therethrough is formed along the wire feed line between the wire supply part for supplying the wire and the wire take-up part for taking up the wire. With dice,
A guide die that is disposed on the upstream side of the wire drawing die along the wire feed line and has a passage hole portion having a minimum diameter larger than the wire diameter of the wire to pass through,
A wire drawing device comprising:
請求項1に記載の伸線装置であって、
前記伸線ダイスは、複数の伸線ダイスを備え、
少なくとも最上流に配設された前記伸線ダイスに対して前記ガイドダイスが設けられている伸線装置。
The wire drawing device according to claim 1,
The wire drawing die includes a plurality of wire drawing dies,
A wire drawing apparatus in which the guide die is provided at least with respect to the wire drawing die arranged at the most upstream.
請求項1又は請求項2に記載の伸線装置であって、
前記伸線ダイスは、複数の伸線ダイスを備え、
前記線材送りラインに沿った中間位置よりも上流側に配設された前記伸線ダイスに対してのみ前記ガイドダイスが設けられている、伸線装置。
The wire drawing device according to claim 1 or 2,
The wire drawing die includes a plurality of wire drawing dies,
The wire drawing apparatus, wherein the guide die is provided only for the wire drawing die disposed upstream of an intermediate position along the wire feed line.
請求項1〜請求項3のいずれか1項に記載の伸線装置であって、
前記ガイドダイスと前記伸線ダイスとが離れて配設される伸線装置。
It is a wire drawing apparatus of any one of Claims 1-3,
A wire drawing device in which the guide die and the wire drawing die are disposed apart from each other.
線材を伸線することによって、素線を製造する素線の製造方法であって、
(a)通過する線材の線径よりも大きい最小径を有する孔に線材を通す工程と、
前記工程(a)の後で、通過する線材の線径よりも小さい最小径を有する孔に線材を通す工程と、
を備える、素線の製造方法。
A wire manufacturing method for manufacturing a wire by drawing a wire,
(A) passing the wire through a hole having a minimum diameter larger than the wire diameter of the passing wire;
After the step (a), passing the wire through a hole having a minimum diameter smaller than the wire diameter of the wire passing therethrough;
The manufacturing method of a strand provided with.
JP2013167300A 2013-08-12 2013-08-12 Wire drawing device and method for manufacturing element wire Pending JP2015036149A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013167300A JP2015036149A (en) 2013-08-12 2013-08-12 Wire drawing device and method for manufacturing element wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013167300A JP2015036149A (en) 2013-08-12 2013-08-12 Wire drawing device and method for manufacturing element wire

Publications (1)

Publication Number Publication Date
JP2015036149A true JP2015036149A (en) 2015-02-23

Family

ID=52686842

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013167300A Pending JP2015036149A (en) 2013-08-12 2013-08-12 Wire drawing device and method for manufacturing element wire

Country Status (1)

Country Link
JP (1) JP2015036149A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110508633A (en) * 2019-07-23 2019-11-29 铜陵顶科镀锡铜线有限公司 It is a kind of to wear mould equipment automatically and wear mould method using the equipment
CN113634611A (en) * 2021-10-14 2021-11-12 南通银龙钢绳有限公司 Steel wire rope drawing equipment suitable for multiple specifications
CN115027058A (en) * 2022-05-10 2022-09-09 江西省纳米技术研究院 3D printing wire, and continuous preparation method and preparation system thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110508633A (en) * 2019-07-23 2019-11-29 铜陵顶科镀锡铜线有限公司 It is a kind of to wear mould equipment automatically and wear mould method using the equipment
CN110508633B (en) * 2019-07-23 2020-09-18 铜陵顶科镀锡铜线有限公司 Automatic die penetrating equipment and die penetrating method applying same
CN113634611A (en) * 2021-10-14 2021-11-12 南通银龙钢绳有限公司 Steel wire rope drawing equipment suitable for multiple specifications
CN113634611B (en) * 2021-10-14 2021-12-10 南通银龙钢绳有限公司 Steel wire rope drawing equipment suitable for multiple specifications
CN115027058A (en) * 2022-05-10 2022-09-09 江西省纳米技术研究院 3D printing wire, and continuous preparation method and preparation system thereof

Similar Documents

Publication Publication Date Title
KR101566830B1 (en) The cable stranding apparatus
JP2015036149A (en) Wire drawing device and method for manufacturing element wire
JP2010005672A (en) Method of manufacturing superfine copper wire
KR101482405B1 (en) Apparatus and Method for manufacturing steel wire
CN106710725B (en) A kind of strand copper wire stranding device
US7322220B2 (en) Apparatus for manufacturing trapezoidal wire using two-set shaping rollers
JP5107520B2 (en) Drawing method
JP5259248B2 (en) Wire saw
CN102615730A (en) Automatic wire arrangement and balance device of multi-wire cutting machine
JP5105963B2 (en) Wet wire drawing machine
JP5463694B2 (en) Manufacturing method and manufacturing apparatus for grooved trolley wire
US9573174B2 (en) Installation and method for rolling a metal strip
JP4263076B2 (en) Method and apparatus for manufacturing steel wire rubber composite material
JP4605093B2 (en) Extra fine wire drawing method and extra fine wire drawing apparatus
WO2012026143A1 (en) Compressed twisted wire conductor manufacturing method
JP2014200872A (en) Discharge working electrode wire, and its manufacturing method thereof
JP2003053418A (en) Method and device for drawing extra fine gold wire
JP5282683B2 (en) Drawing device and method for manufacturing wire
JP5195633B2 (en) Copper wire manufacturing method and copper wire
JP2016039103A (en) Method for producing covered wire, and apparatus for producing covered wire
JP3755177B2 (en) Metal wire drawing machine
JP6203543B2 (en) Steel cord, rubber-steel cord composite and tire
JP5980718B2 (en) Shaving tools
JP2021517934A (en) Stranding machine
JP5868762B2 (en) Steel cord manufacturing method and steel cord obtained thereby