Construction du type poteaux et poutres préfabriqués Download PDFInfo
- Publication number
- EP3310973B1 EP3310973B1 EP16728392.8A EP16728392A EP3310973B1 EP 3310973 B1 EP3310973 B1 EP 3310973B1 EP 16728392 A EP16728392 A EP 16728392A EP 3310973 B1 EP3310973 B1 EP 3310973B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- beams
- construction
- columns
- prefabricated
- technique
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/26—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
- E04B1/2604—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/66—Sealings
- E04B1/68—Sealings of joints, e.g. expansion joints
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G25/00—Shores or struts; Chocks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/021—Bearing, supporting or connecting constructions specially adapted for such buildings
- E04H9/0237—Structural braces with damping devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/024—Structures with steel columns and beams
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2406—Connection nodes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2418—Details of bolting
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2451—Connections between closed section profiles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B2001/2496—Shear bracing therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/26—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
- E04B2001/2696—Shear bracing
Definitions
- the present invention relates to a technique for constructing prefabricated post and beam type buildings, whether of wood, reinforced concrete or any other material.
- Reinforced concrete buildings of the post-beam type are rather rare, because it is more advantageous to make horizontal and vertical linkages, in one piece for each floor, as much as possible: reinforcement and concrete pouring.
- posts and beams are widely used. They are always prefabricated and brought to construction sites to be assembled using various points and / or fittings.
- the document FR 941.058 discloses a construction technique of the post and prefabricated beam type according to the preamble of claim 1.
- the present invention relates to a construction technique of wood, reinforced concrete or any other material, which consists in using posts and beams prefabricated in the factory, and in making their connection on the construction site, on the one hand by a system of vertical and horizontal bracing, and on the other hand by a reinforced concrete junction at their intersection.
- braces which securely hold the posts and beams in their final position as soon as their installation is completed. They make a connection that we describe here as peripheral, as opposed to the central connection made at the intersection of said posts and beams.
- Threaded rods are the most suitable means of joining braces to posts and beams.
- the central junction can itself be cast on site; we then speak of partial prefabrication, or prefabricated, and we then speak of total prefabrication.
- the contact surface between a brace and a post or beam can be simple, without any special arrangement. In this case, if there is a force which tends to open or close the angle formed by the column and the beam, the bracing will play its role by opposing it. But so that the bracing does not slide along the post or the beam, the connecting rod will be stressed in shear and must therefore be of large section. To remedy this problem, roughness is provided on said surfaces, a notch in the post or beam, a notch in which a wedge fits at the end of the bracing, etc. Such a system prevents any risk of the bracing slipping against the post or against the beam in the event of a force tending to modify the angle formed by the post and the beam.
- the external notch prevents the closing of said angle, and the internal notch prevents its opening.
- the internal notch is longer than the external notch, and can even form an acute angle with the axis of the post or beam.
- a joint is applied at their intersection. form of cement mortar for example.
- bracing pieces There is no limit in the number or inclination of the bracing pieces, nor in the number or type of their attachment to posts or beams: bolts, dowels, rivets, nails, etc. The same applies to the connection between the terminal blocks and the ends of the posts and beams described below.
- Partial prefabrication pouring the junction on site
- the beams are prefabricated in the factory, with bars or waiting bars which will enter the junctions.
- an area of around 20 cm is provided at the base which will be concreted on site at the time of their installation, with waiting bars.
- waiting bars are provided at the top of the posts to form part of the junction, and to serve as waiting bars for the subsequent assembly of the post of the upper floor.
- the reinforcement of the junction is prefabricated, either fully or partially. It can take the form of a metal frame, preferably welded.
- the posts and beams whose reinforcement entering the junction is prefabricated are provided with small pieces of waiting iron on which will be welded the prefabricated reinforcement of the junction.
- a complete terminal block with as many branches as there are posts and beams in this node will be connected to the ends of the posts and beams which enter the node.
- the area of assembly of a branch of the block with a post or a beam can be cut along an oblique line, i.e. bevel, along a straight line, along a broken line, ie staircase, etc. .
- terminal blocks as well as the ends of the posts and beams which form the junction, are manufactured in such a way as to provide them with high mechanical resistance: dense reinforcement and maximum dosage of concrete.
- the contact surfaces have deep grooves or other forms of roughness, intended to prevent the relative movement of the elements to be connected.
- Threaded rods are the most suitable means of joining posts and beams to terminal blocks.
- the ends of the posts and beams which enter this node then take the form of a T to correspond to the dimensions of the terminal block thus formed.
- the thickness of the different parts of the terminal block must take into account the thickness of the ends of the posts and beams to which it will be linked, so that the total thickness does not differ too much from the thickness of the posts and beams, for example 20 cm.
- the central part of the terminal block which is not attached to any end of post or beam keeps the thickness of the posts and beams, 20 cm in our example.
- the areas of the terminal block to which are attached only one end of a post or beam have a thickness of the order of 10 cm in our example, half the thickness of the structure of the construction. The same is true, mutatis mutandis, of the areas of the terminal block which are crossed by two ends.
- the thickness of one end of a post or beam must in turn take account of the thickness of the other ends and of the branch of the terminal block with which they will be in contact in the knot, to make a total thickness of 20 cm in our example.
- the assembly of posts and beams is usually done using various fittings.
- the junction is made of reinforced concrete. It is then a question of securely fixing steel bars to the ends of the posts and beams, so that they have waiting bars which will participate in the production of said junction.
- the present invention also takes advantage of cross nailing for good fixing of wooden braces, on posts and beams also in wood.
- the zones which are liable to crack or burst due to intensive nailing are surrounded by compression fittings, which at the same time increases the pressure exerted on the nails used and therefore improves the connection produced.
- the primary object of the invention is the most extensive prefabrication possible of the structure of buildings of the column and beam type, prefabrication which allows industrialization of this type of construction.
- the main development which makes it possible to achieve this objective under the same technical conditions, or even better than in the conventional system, is the massive use of bracing in both the vertical and horizontal directions. They constitute a peripheral and solid junction which connects the posts and the beams on the one hand and the beams between them on the other hand.
- the central junction which takes place at the intersection of posts and beams, can be carried out on site or prefabricated, and therefore industrialized, or at least highly standardized.
- this modular lattice structure is lighter than a conventional structure.
- the main constraint of the system is that the braces occupy the axis of the walls for more efficiency, which prevents or reduces the use of usual materials in the construction of walls such as bricks and blocks of all kinds. But this will push manufacturers to adopt more often the walls and walls suitable for this type of structure, for example the panels currently used in wooden construction.
- Such a construction system is of special interest for regions with high seismic risk, since the building is light, consisting of a set of structurally self-sufficient units, highly triangulated and therefore very little deformable, all this at a relatively modest cost. .
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Tents Or Canopies (AREA)
Applications Claiming Priority (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
BI32115 | 2015-05-28 | ||
BI32515 | 2015-07-23 | ||
BI32915 | 2015-09-10 | ||
BI33316 | 2016-05-19 | ||
PCT/IB2016/053064 WO2016189476A1 (fr) | 2015-05-28 | 2016-05-25 | Construction type poteaux et poutres préfabriqués |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3310973A1 EP3310973A1 (fr) | 2018-04-25 |
EP3310973B1 true EP3310973B1 (fr) | 2020-03-25 |
Family
ID=56117907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16728392.8A Active EP3310973B1 (fr) | 2015-05-28 | 2016-05-25 | Construction du type poteaux et poutres préfabriqués |
Country Status (13)
Country | Link |
---|---|
US (1) | US10494807B2 (zh) |
EP (1) | EP3310973B1 (zh) |
JP (1) | JP2018520285A (zh) |
KR (1) | KR20180012809A (zh) |
CN (1) | CN108138481B (zh) |
AU (1) | AU2016268484A1 (zh) |
BR (1) | BR112017025348A2 (zh) |
EA (1) | EA034805B1 (zh) |
MX (1) | MX2017014935A (zh) |
PE (1) | PE20171773A1 (zh) |
TN (1) | TN2017000477A1 (zh) |
WO (1) | WO2016189476A1 (zh) |
ZA (1) | ZA201800002B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110145029A (zh) * | 2019-06-18 | 2019-08-20 | 国网河北省电力有限公司经济技术研究院 | 非牛顿液体填充的抗冲击节点、抗冲击建筑物及构筑方法 |
CN111794373A (zh) * | 2020-06-18 | 2020-10-20 | 华南理工大学 | 高强钢柱-普通钢梁-低屈服点钢腋撑可复位结构 |
CN111927090B (zh) * | 2020-08-10 | 2021-10-22 | 湖南省第六工程有限公司 | 高层建筑梁式转换层钢管支撑施工结构及其施工方法 |
CN112832575B (zh) * | 2020-12-28 | 2022-07-12 | 浙江天然建筑设计有限公司 | 一种预制装配式混凝土建筑及其设计方法 |
CN113374245B (zh) * | 2021-06-29 | 2022-11-25 | 中冶建工集团有限公司 | 梁板后浇带临时支撑的施工方法 |
CN113374082A (zh) * | 2021-07-27 | 2021-09-10 | 江西恒信检测集团有限公司 | 一种可拆卸连杆连接耗能摩擦型梁柱节点 |
CN114382169A (zh) * | 2021-12-21 | 2022-04-22 | 曹大燕 | 基于斜支撑体系的建筑上层施工方法 |
CN114382170B (zh) * | 2021-12-21 | 2024-01-30 | 曹大燕 | 一种上层预制竖向构件施工方法 |
Family Cites Families (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1872813A (en) * | 1930-06-30 | 1932-08-23 | Frank D Reiland | Adjustable shelf-angle support for building construction |
FR941058A (fr) | 1947-01-17 | 1948-12-31 | Procédé et dispositifs pour l'assemblage et le montage des éléments de construction | |
US3097730A (en) * | 1960-11-14 | 1963-07-16 | Roger J Halle | Connection of structural elements in the art of building |
DE1559023A1 (de) | 1964-05-13 | 1969-09-04 | Mario Landi | Vorgefertigte Bauelemente,wie Pfosten,Bodenbelagplatten aus Zement od.dgl.,und Bauverfahren zur Verwendung dieser Elemente |
US3977801A (en) * | 1974-11-22 | 1976-08-31 | Thomas Philip Murphy | Connector for structural members |
US4091594A (en) * | 1976-10-04 | 1978-05-30 | Yujiro Yamashita | Structure for convecting paralled spaced vertical supports |
US4237797A (en) * | 1977-03-02 | 1980-12-09 | Zapara Gerald A | Laminated wood warehouse support structure |
CA1303379C (en) * | 1987-04-07 | 1992-06-16 | Bjorn O. Thoresen | Building construction |
JP2766770B2 (ja) * | 1993-12-08 | 1998-06-18 | 五洋建設株式会社 | 鉄筋の継手方法及びプレキャスト鉄筋コンクリート梁と柱の接合方法 |
JPH08105114A (ja) * | 1994-10-04 | 1996-04-23 | Kumagai Gumi Co Ltd | 柱と梁の接合方法 |
JP3101163B2 (ja) * | 1994-10-04 | 2000-10-23 | 株式会社熊谷組 | 柱と梁の接合方法 |
CN2339648Y (zh) * | 1998-09-23 | 1999-09-22 | 高文利 | 工业化施工钢筋混凝土建筑结构框架的梁、柱连接器 |
WO2003069083A1 (en) * | 2002-02-18 | 2003-08-21 | Timberfix Limited | Construction system |
US6802169B2 (en) * | 2002-03-18 | 2004-10-12 | Robert J. Simmons | Building frame structure |
US20060165482A1 (en) * | 2005-01-11 | 2006-07-27 | Olberding David J | Novel enhanced apparatus and method connecting structural members |
KR100926140B1 (ko) * | 2007-08-21 | 2009-11-10 | 이완영 | Pc부재를 이용한 건축 구조물 및 그의 시공방법 |
US8365476B2 (en) * | 2007-12-28 | 2013-02-05 | Seismic Structural Design Associates, Inc. | Braced frame force distribution connection |
US8209924B2 (en) * | 2009-11-12 | 2012-07-03 | The Foley Group, LLC | Connector system for securing an end portion of a steel structural member to a vertical cast concrete member |
CN101787733A (zh) * | 2010-03-03 | 2010-07-28 | 管乃彦 | 一种预制立式构件 |
CN202012136U (zh) * | 2011-03-15 | 2011-10-19 | 东南大学 | 装配剪力墙结构水平缝u型闭合筋连接构造 |
US20140083042A1 (en) * | 2012-09-27 | 2014-03-27 | Best Nature Co., Ltd. | Junction structure between structures and beam junction method |
CN103074941B (zh) * | 2012-12-24 | 2015-11-04 | 北京工业大学 | 一种端部含有钢筋桁架梁的装配式再生混凝土节点及作法 |
CN103850350A (zh) * | 2014-03-14 | 2014-06-11 | 南京工业大学 | 一种预制装配整体式异形柱结构及其拼接施工方法 |
-
2016
- 2016-05-25 EA EA201700596A patent/EA034805B1/ru not_active IP Right Cessation
- 2016-05-25 AU AU2016268484A patent/AU2016268484A1/en not_active Abandoned
- 2016-05-25 EP EP16728392.8A patent/EP3310973B1/fr active Active
- 2016-05-25 MX MX2017014935A patent/MX2017014935A/es unknown
- 2016-05-25 CN CN201680043406.5A patent/CN108138481B/zh not_active Expired - Fee Related
- 2016-05-25 WO PCT/IB2016/053064 patent/WO2016189476A1/fr active Application Filing
- 2016-05-25 KR KR1020177037363A patent/KR20180012809A/ko unknown
- 2016-05-25 PE PE2017002457A patent/PE20171773A1/es not_active Application Discontinuation
- 2016-05-25 JP JP2018513933A patent/JP2018520285A/ja active Pending
- 2016-05-25 US US15/571,047 patent/US10494807B2/en active Active
- 2016-05-25 BR BR112017025348-8A patent/BR112017025348A2/pt not_active IP Right Cessation
- 2016-05-25 TN TNP/2017/000477A patent/TN2017000477A1/en unknown
-
2018
- 2018-01-02 ZA ZA2018/00002A patent/ZA201800002B/en unknown
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
KR20180012809A (ko) | 2018-02-06 |
ZA201800002B (en) | 2018-12-19 |
CN108138481B (zh) | 2021-02-05 |
JP2018520285A (ja) | 2018-07-26 |
CN108138481A (zh) | 2018-06-08 |
EA201700596A1 (ru) | 2018-05-31 |
US10494807B2 (en) | 2019-12-03 |
AU2016268484A1 (en) | 2018-01-25 |
BR112017025348A2 (pt) | 2018-07-31 |
EA034805B1 (ru) | 2020-03-24 |
EP3310973A1 (fr) | 2018-04-25 |
MX2017014935A (es) | 2018-11-09 |
US20180163389A1 (en) | 2018-06-14 |
WO2016189476A1 (fr) | 2016-12-01 |
TN2017000477A1 (en) | 2019-04-12 |
PE20171773A1 (es) | 2017-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3310973B1 (fr) | Construction du type poteaux et poutres préfabriqués | |
CA2496704A1 (fr) | Module de coffrage metallique prefabrique pour beton | |
US10837167B2 (en) | Construction of the prefabricated column and beam type | |
FR2554479A1 (fr) | Systeme de blocs de construction pour eriger des edifices | |
FR2620153A1 (fr) | Panneau de construction, notamment panneau de bardage, a isolation thermique integree | |
WO1998054418A1 (fr) | Ossature de batiment | |
EP4194631A1 (fr) | Panneau de façade composite préfabriqué et procédé de construction d'une façade d'un bâtiment | |
FR2950910A1 (fr) | Panneau pour la realisation d'une construction et procede d'assemblage d'au moins deux panneaux | |
OA18497A (fr) | Construction type poteaux et poutres préfabriqués. | |
FR2885624A1 (fr) | Procede de construction d'un batiment prefabrique et element constitutif de ce batiment | |
FR3095823A1 (fr) | Élément et ensemble d’éléments de construction, procédé de fabrication, moule, mur comportant un tel élément et construction immobilière | |
FR2757889A1 (fr) | Planchers realises a partir de dalles prefabriquees permettant de transmettre des efforts horizontaux sans dalle de compression rapportee sur chantier | |
EP2489809A1 (fr) | Procédé de réalisation d'un élément de structure et éléments ainsi réalisés | |
FR2925083A1 (fr) | Systeme d'assemblage de structures de batiments | |
EP0229041A1 (fr) | Panneaux permettant de réaliser des constructions par assemblage sur le site même et procédé pour leur obtention | |
FR2639388A1 (fr) | Structure porteuse en beton arme, procede pour sa realisation ainsi qu'element prefabrique en beton arme, bati de coffrage et procede pour la fabrication d'elements prefabriques en beton arme et elements prefabriques en forme de caissons comportant des plaques jumelees | |
BE457752A (zh) | ||
WO2022034271A1 (fr) | Batiment a ossature bois et plancher beton | |
FR2775998A1 (fr) | Procede de construction de batiments prefabriques et ensemble d'elements de construction pour la mise en oeuvre d'un tel procede | |
FR2732990A1 (fr) | Systeme de construction de mur | |
BE478184A (zh) | ||
BE641315A (zh) | ||
FR2473589A1 (fr) | Procede pour la realisation d'ossature porteuse de batiment a partir d'elements metalliques prefabriques et elements pour la mise en oeuvre du procede | |
BE510180A (zh) | ||
BE521160A (zh) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20180102 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20190808 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1248713 Country of ref document: AT Kind code of ref document: T Effective date: 20200415 Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: FRENCH |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602016032512 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200625 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20200601 Year of fee payment: 6 Ref country code: DE Payment date: 20200601 Year of fee payment: 5 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200626 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200625 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20200601 Year of fee payment: 5 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20200325 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200725 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200818 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
VS25 | Lapsed in a validation state [announced via postgrant information from nat. office to epo] |
Ref country code: MD Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1248713 Country of ref document: AT Kind code of ref document: T Effective date: 20200325 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602016032512 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200531 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200531 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
26N | No opposition filed |
Effective date: 20210112 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20200531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200525 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200525 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200531 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
VS25 | Lapsed in a validation state [announced via postgrant information from nat. office to epo] |
Ref country code: MA Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602016032512 Country of ref document: DE |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20210525 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210525 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 |