EP1184252B1 - Clear-track signalling device - Google Patents

Clear-track signalling device Download PDF

Info

Publication number
EP1184252B1
EP1184252B1 EP01440245A EP01440245A EP1184252B1 EP 1184252 B1 EP1184252 B1 EP 1184252B1 EP 01440245 A EP01440245 A EP 01440245A EP 01440245 A EP01440245 A EP 01440245A EP 1184252 B1 EP1184252 B1 EP 1184252B1
Authority
EP
European Patent Office
Prior art keywords
axle counter
counter sections
sections
clear
axle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP01440245A
Other languages
German (de)
French (fr)
Other versions
EP1184252A1 (en
Inventor
Alan Knight
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alcatel CIT SA
Alcatel Lucent SAS
Original Assignee
Alcatel CIT SA
Alcatel SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alcatel CIT SA, Alcatel SA filed Critical Alcatel CIT SA
Publication of EP1184252A1 publication Critical patent/EP1184252A1/en
Application granted granted Critical
Publication of EP1184252B1 publication Critical patent/EP1184252B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L21/00Station blocking between signal boxes in one yard
    • B61L21/06Vehicle-on-line indication; Monitoring locking and release of the route

Definitions

  • the invention relates to a Gleisokomelde worn according to the Preamble of claim 1.
  • Achsbeatenerabête be between Achs drunkigeen formed to the occupancy state of each Identify sections.
  • the document DE 197 06 021 A1 discloses such a system. Based on the occupancy state are within a signal box decisions about the control of the track system, for example, with regard to signal and switch positions taken. The Decision making and implementation in appropriate control signals are increasingly automatic. Such remotely controlled operation centers do not need any operating personnel. For security reasons must be guaranteed be that in the signal box or in the control center to processing information about the occupancy state of Axle counter sections are correct and complete at all times. It However, it may happen that an axle counter fails or faulty Signals.
  • an automatic error correcting device To solve the delay problem in case of axle counter failure, has already been proposed, an automatic error correcting device to develop. Such an error correcting device would have to be able be as many causes of malfunction as possible electromagnetic disturbances, or disturbances due to shunting, no doubt to dedicate.
  • the disadvantage of automatic error correction is in addition the complexity of the algorithms especially the realization that important Functions are not signal-technically feasible.
  • the invention is based on the object, a Gleisokomelde issued specify the above type, which is characterized by low cost both in terms of development and project planning or realization, with the highest possible Reliability is to be striven for.
  • the block axle counter sections are unique Achs drunken assigned, that is, there are none for the Opera-axle counter sections provided axle counts virtually used twice.
  • the block axle counter sections are so-called secure message picture displayed graphically.
  • the block axle counter sections become in addition to the already existing partial axle counter sections, Railway tracks and turnouts at the Monitor displayed safely.
  • the Dispatcher based on the display of the parent block axle counter sections Determine if the train is the entire block or has cleared the entire continuous railway siding, without looking for the completeness of the train to be instructed by local staff.
  • the station system illustrated in FIG. 1 comprises two continuous stations Tracks 1a and 1b and several branched tracks 2. At all Branching points are close to associated turnouts Counting points 3 provided for signaling to at least one interlocking. In addition, additional metering points are 4 for each continuous track 1a, 1b in front of the station entrance and behind the station exit arranged. These additional metering points 4 will not be used for turnouts. or Signalstell previouslye, that is to signal to the interlocking, but used to visualize a secure message picture.
  • the Figures 1 and 2 show various message images in a simplified form.
  • the dispatcher can, for example, by in the message picture by the coloring or by blinking the activation or Detect deactivation state signaling additional counting point 4, whether a rail vehicle has left the station area. It plays it does not matter which one within the station's topography possible tracks 1a, 1b, 2 the rail vehicle is driven.
  • Fig. 2 illustrates a secure message image for the route area between two stations, here block axle counter sections between additional metering points A and B and for a parallel track between additional counting points C and D are formed.
  • the invention according to claim 1 is not limited to those explained above Use cases.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Control Of Multiple Motors (AREA)
  • Length Measuring Devices With Unspecified Measuring Means (AREA)

Abstract

The device has elements to visualize axle counter sections. These are axle counter section blocks, with part sections, which charge several signal boxes. The blocks have associated axle counter points (4), which are axle counter points (3) for the part axle counter sections. The blocks correspond to tracks (2) between two stations and/or to continuous non-stop station tracks (1a,b). The device has a monitor for graphic presentation of a safe signal.

Description

Die Erfindung betrifft eine Gleisfreimeldeeinrichtung gemäß dem Oberbegriff des Anspruchs 1. Achszählerabschnitte werden zwischen Achszählpunkten gebildet, um den Belegungszustand der einzelnen Abschnitte zu ermitteln. Das Dokument DE 197 06 021 A1 offenbart ein derartiges System. Anhand des Belegungszustandes werden innerhalb eines Stellwerkes Entscheidungen über die Steuerung der Gleisanlage, beispielsweise bezüglich Signal- und Weichenstellungen, getroffen. Die Entscheidungsfindung und die Umsetzung in entsprechende Stellsignale erfolgen zunehmend automatisch. Derartig ferngesteuerte Betriebszentralen benötigen kein Bedienpersonal. Aus Sicherheitsgründen muss garantiert sein, dass die im Stellwerk beziehungsweise in der Betriebsleitzentrale zu verarbeitenden Informationen über den Belegungszustand von Achszählerabschnitten zu jedem Zeitpunkt korrekt und vollständig sind. Es kann jedoch vorkommen, dass ein Achszähler ausfällt oder fehlerhafte Signale liefert. Fehlzählungen, elektromagnetische Störungen, Sicherheitsreaktionen auf bestimmte Arten von Rangiervorgängen oder andere Einflussgrößen können die Funktionsfähigkeit des Stellwerkes und insbesondere der ferngesteuerten Betriebszentrale erheblich beeinträchtigen. Jegliche Art von Störungen führen ohne Zeitverzögerung zum Auslösen bestimmter Sicherheitsreaktionen. Alle auf der Strecke befindlichen Züge werden angewiesen zu stoppen, oder die Geschwindigkeit zu reduzieren, wenn nicht absolut sicher ist, dass ein vorausliegender Gleisabschnitt frei ist. Bei durchgehenden Bahnhofsgleisen kann die Fahrerlaubnis so lange nicht erteilt werden, wie nicht klar ist, ob ein vorausfahrender Zug den Bahnhof verlassen hat. Insbesondere bei sehr hohen Zugdichten, beispielsweise im S-Bahn-Verkehr, kommt es dadurch sehr häufig zu sicherheitsbedingten Verspätungen. Die Zugverspätungen könnten noch zunehmen, wenn die Strecken von Betriebszentralen aus ferngesteuert werden und nicht genügend Personal für eine augenscheinliche Prüfung des Belegungszustandes des Gleises zur Verfügung steht.The invention relates to a Gleisfreimeldeeinrichtung according to the Preamble of claim 1. Achszählerabschnitte be between Achszählpunkten formed to the occupancy state of each Identify sections. The document DE 197 06 021 A1 discloses such a system. Based on the occupancy state are within a signal box decisions about the control of the track system, for example, with regard to signal and switch positions taken. The Decision making and implementation in appropriate control signals are increasingly automatic. Such remotely controlled operation centers do not need any operating personnel. For security reasons must be guaranteed be that in the signal box or in the control center to processing information about the occupancy state of Axle counter sections are correct and complete at all times. It However, it may happen that an axle counter fails or faulty Signals. Miscounting, electromagnetic interference, Safety reactions to certain types of maneuvering or other influencing factors can be the functionality of the interlocking and especially the remote-controlled operation center considerably affect. Any kind of interference will result in no time delay to trigger certain safety reactions. All on the track located trains are instructed to stop, or the Reduce speed, if not absolutely sure that one preceding track section is free. At continuous railway tracks the license can not be issued as long as it is not clear if a preceding train has left the station. Especially at very high train densities, for example, in the S-Bahn traffic, it comes through very often for safety-related delays. The train delays could still increase if the routes from operations centers be remotely controlled and not enough staff for one apparent check of the condition of the track to the track Available.

Um das Verspätungsproblem im Falle einer Achszählerstörung zu lösen, wurde bereits vorgeschlagen, eine automatische Fehlerkorrektureinrichtung zu entwickeln. Eine solche Fehlerkorrektureinrichtung müsste in der Lage sein, möglichst viele Ursachen für Fehlfunktionen, wie beispielsweise elektromagnetische Störungen, oder rangierbedingte Störungen, zweifelsfrei zu dedektieren. Nachteilig bei der automatischen Fehlerkorrektur ist neben der Komplexität der Algorithmen vor allem die Erkenntnis, dass wichtige Funktionen nicht signaltechnisch realisierbar sind.To solve the delay problem in case of axle counter failure, has already been proposed, an automatic error correcting device to develop. Such an error correcting device would have to be able be as many causes of malfunction as possible electromagnetic disturbances, or disturbances due to shunting, no doubt to dedicate. The disadvantage of automatic error correction is in addition the complexity of the algorithms especially the realization that important Functions are not signal-technically feasible.

Der Erfindung liegt die Aufgabe zugrunde, eine Gleisfreimeldeeinrichtung der oben genannten Gattung anzugeben, die sich durch geringe Kosten sowohl hinsichtlich der Entwicklung, als auch der Projektierung beziehungsweise Realisierung auszeichnet, wobei eine möglichst hohe Zuverlässigkeit anzustreben ist.The invention is based on the object, a Gleisfreimeldeeinrichtung specify the above type, which is characterized by low cost both in terms of development and project planning or realization, with the highest possible Reliability is to be striven for.

Die Aufgabe wird mit den kennzeichnenden Merkmalen des Anspruchs 1 gelöst. Durch die Bildung übergeordneter Block-Achszählerabschnitte ergibt sich eine Verbesserung der betrieblichen Übersicht im Falle einer Achszählerstörung. Der Fahrdienstleiter ist nicht auf die Beobachtung der Teil-Achszählerabschnitte, deren Belegungszustand vom Stellwerk verarbeitet wird, angewiesen, um einen Gefahrenzustand zu erkennen. Wenn der Block-Achszählerabschnitt als frei erkannt wurde, kann mit sehr hoher Wahrscheinlichkeit davon ausgegangen werden, dass die untergeordneten Teil-Achszählerabschnitte, wie vorgesehen, durchfahren wurden, auch wenn ein Achszählpunkt eines Teil-Achszählerabschnittes keine oder fehlerhafte Signale an das Stellwerk übermittelt hat. Eine Störung oder eine Unterbrechung des ordnungsgemäßen Betriebes lässt sich somit in vielen Fällen vermeiden. Letztlich wird Verspätungen wirkungsvoller vorgebeugt.The object is achieved with the characterizing features of claim 1 solved. By forming parent block axle counter sections results an improvement of the operational overview in case of Achszählerstörung. The dispatcher is not on the observation of Part axle counter sections, their occupancy state of the signal box is instructed to recognize a hazardous condition. If the block axis counter section was recognized as free, can with very high probability can be assumed that the Subordinate sub-axle counter sections, as intended, drive through even if an axle counting point of a partial axle counter section has transmitted no or faulty signals to the interlocking. A Disruption or interruption of proper operation thus avoiding in many cases. Ultimately, delays more effectively prevented.

Gemäß Anspruch 2 sind den Block-Achszählerabschnitten eigene Achszählpunkte zugeordnet, das heißt, es werden keine für die Teil-Achszählerabschnitte vorgesehenen Achszählpunkte quasi doppelt genutzt. Eine Doppelnutzung wäre jedoch auch möglich, wobei in einer weiteren Ausbaustufe die Anzahl der den Block-Achszählerabschnitt bildenden Teil-Achszählerabschnitte variabel gehandhabt werden könnte. Letzteres hätte den Vorteil, dass insbesondere bei akuter Havariegefahr oder bei dem Ausfall mehrerer Achszählpunkte von Teil-Achszählerabschnitten eine schneller Beurteilung der Gefahrensituation möglich wäre. Allerdings bietet sich die Bildung der Block-Achszählerabschnitte auf der Basis zugeordneter Achszählpunkte zumindest für die Einführung bei der Deutschen Bundesbahn AG an, da teilweise bereits derzeit nicht genutzte Achszählpunkte vorhanden sind.According to claim 2, the block axle counter sections are unique Achszählpunkte assigned, that is, there are none for the Teil-axle counter sections provided axle counts virtually used twice. A double use, however, would also be possible, in another Expansion stage, the number of the partial axle counter sections forming the block axle counter section could be handled variably. The latter would have the advantage that in particular in acute Havariegefahr or in the Failure of several axle counting points of partial axle counter sections one faster assessment of the dangerous situation would be possible. However, offers the formation of the block axle counter sections associated with the base Axle counting points at least for the introduction at the German Bundesbahn AG, partly already unused Axes counting points are available.

Vorzugsweise werden gemäß Anspruch 3 Streckenanfang und Streckenende der Block-Achszählerabschnitte von den topografischen Gegebenheiten bestimmt. Zur Überwachung der Zugfolge im Bahnhofsbereich sind dazu Block-Achszählerabschnitte über jedes durchgehende Bahnhofsgleis vorgesehen. Auch bei Verzweigungen innerhalb des Bahnhofsbereiches kann somit eindeutig beurteilt werden, ob das Schienenfahrzeug den Bahnhof - auf welchem Verzweigungsweg auch immer - verlassen hat, da dann der Zählpunkt am Ausfahrende des Block-Achszählerabschnittes ein Überfahren signalisiert hat.Preferably, according to claim 3 track start and end of the route the block axle counter sections from the topographic conditions certainly. To monitor the train sequence in the station area are to Block axle counter sections over each through-the-rail track intended. Also with branches within the station area Thus, it can be clearly assessed whether the rail vehicle the Station - on whatever branching way - has left, since then the point of delivery at the exit end of the block axle counter section Overrun signaled.

Gemäß Anspruch 4 sind die Block-Achszählerabschnitte als sogenanntes sicheres Meldebild grafisch dargestellt. Vorzugsweise werden die Block-Achszählerabschnitte zusätzlich zu den schon vorhandenen Teil-Achszählerabschnitten, Bahnhofsgleisen und Weichenabschnitten am Monitor sicher angezeigt. Im Falle einer Achszählerstörung kann der Fahrdienstleiter anhand der Anzeige der übergeordneten Block-Achszählerabschnitte feststellen, ob der Zug den gesamten Block beziehungsweise das gesamte durchgehende Bahnhofsgleis geräumt hat, ohne auf eine augenscheinliche Prüfung der Vollständigkeit des Zuges durch Personal vor Ort angewiesen zu sein.According to claim 4, the block axle counter sections are so-called secure message picture displayed graphically. Preferably, the block axle counter sections become in addition to the already existing partial axle counter sections, Railway tracks and turnouts at the Monitor displayed safely. In the case of an axle counter failure, the Dispatcher based on the display of the parent block axle counter sections Determine if the train is the entire block or has cleared the entire continuous railway siding, without looking for the completeness of the train to be instructed by local staff.

Die Erfindung wird nachfolgend anhand figürlicher Darstellungen näher erläutert. Es zeigen:

Fig. 1
eine schematische Darstellung einer Bahnhofstopografie und
Fig. 2
eine schematische Darstellung einer Streckentopgrafie.
The invention will be explained in more detail with reference to figurative representations. Show it:
Fig. 1
a schematic representation of a station topography and
Fig. 2
a schematic representation of a Traktentopgrafie.

Die in Fig. 1 veranschaulichte Bahnhofsanlage umfasst zwei durchgehende Gleise 1a und 1b und mehrere verzweigte Gleise 2. An allen Verzweigungsstellen sind in der Nähe von dazugehörigen Weichen Zählpunkte 3 zur Signalgebung an mindestens ein Stellwerk vorgesehen. Darüber hinaus sind zusätzliche Zählpunkte 4 für jedes durchgehende Gleis 1a, 1b vor der Bahnhofseinfahrt und hinter der Bahnhofsausfahrt angeordnet. Diese zusätzlichen Zählpunkte 4 werden nicht für Weichen- oder Signalstellzwecke, das heißt zur Signalgebung an das Stellwerk, sondern zur Visualisierung eines sicheren Meldebildes verwendet. Die Figuren 1 und 2 zeigen verschiedene Meldebilder in vereinfachter Form. Der Fahrdienstleiter kann anhand der im Meldebild beispielsweise durch die Farbgebung oder durch Blinkeffekte den Aktivierungs- oder Deaktivierungszustand signalisierenden zusätzlichen Zählpunkt 4 erkennen, ob ein Schienenfahrzeug den Bahnhofsbereich verlassen hat. Dabei spielt es keine Rolle, auf welchen der innerhalb der Bahnhofstopografie möglichen Gleisen 1a, 1b, 2 das Schienenfahrzeug gefahren ist.The station system illustrated in FIG. 1 comprises two continuous stations Tracks 1a and 1b and several branched tracks 2. At all Branching points are close to associated turnouts Counting points 3 provided for signaling to at least one interlocking. In addition, additional metering points are 4 for each continuous track 1a, 1b in front of the station entrance and behind the station exit arranged. These additional metering points 4 will not be used for turnouts. or Signalstellzwecke, that is to signal to the interlocking, but used to visualize a secure message picture. The Figures 1 and 2 show various message images in a simplified form. The dispatcher can, for example, by in the message picture by the coloring or by blinking the activation or Detect deactivation state signaling additional counting point 4, whether a rail vehicle has left the station area. It plays it does not matter which one within the station's topography possible tracks 1a, 1b, 2 the rail vehicle is driven.

Fig. 2 veranschaulicht ein sicheres Meldebild für den Streckenbereich zwischen zwei Bahnhöfen, wobei hier Block-Achszählerabschnitte zwischen zusätzlichen Zählpunkten A und B und für ein Parallelgleis zwischen zusätzlichen Zählpunkten C und D gebildet sind. Fig. 2 illustrates a secure message image for the route area between two stations, here block axle counter sections between additional metering points A and B and for a parallel track between additional counting points C and D are formed.

Die Erfindung gemäß Anspruch 1 beschränkt sich nicht auf die vorstehend erläuterten Anwendungsfälle.The invention according to claim 1 is not limited to those explained above Use cases.

Claims (4)

  1. Clear-track signalling device with means for visualizing axle counter sections, characterized in that the axle counter sections to be visualized are block axle counter sections, which comprise partial axle counter sections, the partial axle counter sections being assigned to several signal boxes.
  2. Clear-track signalling device according to claim 1, characterized in that axle counting points (4), which are not axle counting points (3) of the partial axle counter sections, are assigned to the covering block axle counter sections.
  3. Clear-track signalling device according to one of the preceding claims, characterized in that the covering block axle counter sections correspond to lines between two stations and/or through station lines.
  4. Clear-track signalling device according to one of the preceding claims, characterized in that the means for visualizing the covering block axle counter sections comprise a monitor for the graphic representation of a safe mimic diagram.
EP01440245A 2000-08-23 2001-07-31 Clear-track signalling device Expired - Lifetime EP1184252B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE10041173 2000-08-23
DE10041173A DE10041173A1 (en) 2000-08-23 2000-08-23 Train detection device

Publications (2)

Publication Number Publication Date
EP1184252A1 EP1184252A1 (en) 2002-03-06
EP1184252B1 true EP1184252B1 (en) 2005-09-07

Family

ID=7653380

Family Applications (1)

Application Number Title Priority Date Filing Date
EP01440245A Expired - Lifetime EP1184252B1 (en) 2000-08-23 2001-07-31 Clear-track signalling device

Country Status (3)

Country Link
EP (1) EP1184252B1 (en)
AT (1) ATE303928T1 (en)
DE (2) DE10041173A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102017208490A1 (en) * 2017-05-19 2018-11-22 Siemens Aktiengesellschaft Method for operating a track system and interlocking for a track system
CN109017865A (en) * 2018-07-27 2018-12-18 吴建国 Method and vehicle fitting based on the quick conveying articles/passenger of track

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3236367C2 (en) * 1982-10-01 1985-12-12 Standard Elektrik Lorenz Ag, 7000 Stuttgart Equipment for track vacancy detection, train location and speed measurement
DE3445115A1 (en) * 1984-12-11 1986-06-12 Verkehrsbetriebe Peine-Salzgitter Gmbh, 3320 Salzgitter Arrangement for simplifying and improving safety of running trains
DD260470A1 (en) * 1987-05-14 1988-09-28 Verkehrswesen Forsch Inst METHOD AND ARRANGEMENT FOR DIRECT CIRCULATION FOR AN AUTOMATIC TRACK BLOCK
DE19515345A1 (en) * 1995-04-26 1996-10-31 Sel Alcatel Ag Method for increasing the availability of multi-section axle counting devices
DE19706021C2 (en) * 1997-02-07 2002-11-07 Siemens Ag Track monitoring facility

Also Published As

Publication number Publication date
DE50107342D1 (en) 2005-10-13
EP1184252A1 (en) 2002-03-06
ATE303928T1 (en) 2005-09-15
DE10041173A1 (en) 2002-03-07

Similar Documents

Publication Publication Date Title
WO2016198231A1 (en) Method and device for ascertaining a driving authorization for a track-bound vehicle
EP0662898B1 (en) Device for correcting axle counting errors in railway layouts
WO2016146365A1 (en) Method and device for automatically influencing track-bound vehicles
DE102008045050A1 (en) Method for automatic train control in European train control system track, involves using identical procedures for formation of telegrams to control balises for point-like automatic train control and wireless-based automatic train control
EP2870047B1 (en) Operation of a rail vehicle
EP1097077A2 (en) Method for reducing data in railway operation
EP0739802B1 (en) Method for improving availability of multi-section axle counters
DE102019204135A1 (en) Method for the mixed operation of a track-bound route section with a switch as well as a route section and a switch
EP1184252B1 (en) Clear-track signalling device
DE102005038386B4 (en) Device for securing the train sequence in Zugleitbetrieb
DE102012206479A1 (en) Method for the auxiliary operation of a track element and operational control system
EP3075626A2 (en) Method and system for operating a railway system
EP0920391B1 (en) Process of controlling and monitoring a traffic control system
DE10240376B4 (en) Safe train log book
DE19749697A1 (en) Railway operations controller
DE102006029845A1 (en) Road sections securing device for rail-bound vehicle assembly, has data-processing system connected with imaging sensor for receiving image data of imaging sensor, where system detects road-sided mechanisms of railway construction
DE3445115A1 (en) Arrangement for simplifying and improving safety of running trains
EP1637427B2 (en) Train safety assembly and method
DE2543089C2 (en) Circuit arrangement for securing track vacancy detection information
EP3612429B1 (en) Method for operating a railway and interlocking for such a railway
DE19907466C1 (en) Train sequence safety method for rail network allows second train to enter occupied track section with safety distance between successive trains maintained to prevent collision
EP2117904B1 (en) Method for displaying relevant control status information about components in a manner incorporating all sections
EP3109127A1 (en) Method for signalling an expansion of a movement authority from a route control station to a positioning body
DE102016217913A1 (en) Monitoring a rail vehicle
DE4406721C2 (en) Procedure for the safe operation of a route

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 20020701

AKX Designation fees paid

Free format text: AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20050907

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REF Corresponds to:

Ref document number: 50107342

Country of ref document: DE

Date of ref document: 20051013

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051207

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051207

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051207

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20051218

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060207

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
ET Fr: translation filed
REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060731

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060731

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060731

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060731

26N No opposition filed

Effective date: 20060608

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

BERE Be: lapsed

Owner name: ALCATEL

Effective date: 20060731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20050907

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 16

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 17

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20200724

Year of fee payment: 20

Ref country code: DE

Payment date: 20200722

Year of fee payment: 20

Ref country code: GB

Payment date: 20200713

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20200728

Year of fee payment: 20

Ref country code: IT

Payment date: 20200728

Year of fee payment: 20

REG Reference to a national code

Ref country code: DE

Ref legal event code: R071

Ref document number: 50107342

Country of ref document: DE

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20210730

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK07

Ref document number: 303928

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20210730