DE205755C - - Google Patents

Info

Publication number
DE205755C
DE205755C DENDAT205755D DE205755DA DE205755C DE 205755 C DE205755 C DE 205755C DE NDAT205755 D DENDAT205755 D DE NDAT205755D DE 205755D A DE205755D A DE 205755DA DE 205755 C DE205755 C DE 205755C
Authority
DE
Germany
Prior art keywords
conveyor
mining
conveying
track
during
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DENDAT205755D
Other languages
German (de)
Publication of DE205755C publication Critical patent/DE205755C/de
Active legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

ic; sJvtt'U ϊΠ bm ic; sJvtt'U ϊΠ bm

ei ιά\&&ά\ dei ιά \ && ά \ d

KAISERLICHESIMPERIAL

PATENTAMT.PATENT OFFICE.

PATENTSCHRIFTPATENT LETTERING

- JVe 205755 KLASSE 5 a. GRUPPE- JVe 205755 CLASS 5 a. GROUP

Patentiert im Deutschen Reiche vom 31. Oktober 1906 ab.Patented in the German Empire on October 31, 1906.

Den Gegenstand der Erfindung bildet ein für Bergbau u. dgl. Betriebe bestimmtes Verfahren zum stetigen Fördern mittels Seils, Kette o. dgl. ohne Ende unter Verwendung von Fördergefäßen irgendwelcher Art, die am Abbaustöße fortlaufend vorbeigehen und während dieses Vorbeigangs gefüllt und, entfernt vom Abbau, entleert werden.The subject of the invention is a method intended for mining and similar operations for continuous conveying by means of rope, chain or the like. Without end using conveying vessels of any kind, which on Mining impacts continuously pass by and filled and removed during this passage from dismantling, to be emptied.

Dieses Verfahren unterscheidet sich bekannten gegenüber dadurch, daß entsprechend dem Fortschreiten des Abbaues die Fördervorrichtung und die hierzu verwendeten Gleisanlagen o. dgl. schrittweise so verlegt werden, daß die Fördervorrichtung nur an einer Stelle getrennt zu werden braucht.This method differs from known in that according to the As the dismantling progresses, the conveyor device and the track systems used for this purpose o. The like. Relocated step by step so that the conveyor is only separated at one point needs to become.

Auf der Zeichnung sind in Fig. 1 ■ bis 4 einige Ausführungsbeispiele dargestellt.Some exemplary embodiments are shown in FIGS. 1 through 4 of the drawing.

Ausführungsbeispiel Fig. 1.Embodiment Fig. 1.

beispielsweise um 1 for example by 1

Wenn der Abbaustoß A pIf the working face A p

4 m Pfeilertiefe, d. h. von a, a1 nach b, b1 abgebaut und das Gut über das Gleis o. dgl. c in der Hauptsache abgefördert und bei B abgegeben ist, dann werden die erforderlichen Reserveführungen (Gleise o. dgl. c1 zwischen d und d1) in der Nähe des Stoßes b, b1· eingebaut (gestrichelt dargestellt).4 m pillar depth, i.e. from a, a 1 to b, b 1 dismantled and the goods are mainly conveyed away via the track or the like c and delivered to B , then the necessary reserve guides (tracks or the like c 1 between d and d 1 ) installed near the joint b, b 1 · (shown in dashed lines).

Darauf wird aus der Fördervorrichtung ein Stück von 8 m = 2 X 4 m Länge entfernt, weil der Förderweg um die doppelte Pfeilertiefe verkürzt wurde. Sodann wird das in der Bewegungsrichtung vorn befindliche Ende der Fördereinrichtung bei d mit den angehängten Fördergefäßen auf den neuen Förderweg d, d1 hereingezogen, wobei. diese Fördergefäße beim Vorbeigehen am Abbaustoße bereits gefüllt werden, während das andere Ende der Fördervorrichtung noch über den alten Förderweg a, a1 geht bzw. gebremst wird, wobei auch deren Fördergefäße zur völligen Wegschaffung des daselbst noch vorhandenen Fördergutes gefüllt werden, so daß während der Verlegung der Fördervorrichtung von einer Bahn zur anderen die Förderung tatsächlich nicht unterbrochen zu werden braucht. Sobald dann die beiden Enden der Fördervorrichtung bei d1 angelangt sind, werden sie wieder miteinander verbunden.A piece of 8 m = 2 X 4 m in length is then removed from the conveying device, because the conveying path has been shortened by twice the pillar depth. Then the end of the conveying device located at the front in the direction of movement at d with the attached conveying vessels is drawn in onto the new conveying path d, d 1 , wherein. these conveying vessels are already filled when passing the mining impact, while the other end of the conveyor is still on the old conveying path a, a 1 or is braked, whereby their conveying vessels are also filled to completely remove the conveyed goods still present there, so that during the Relocation of the conveyor device from one track to another, the promotion actually does not need to be interrupted. As soon as the two ends of the conveyor device have reached d 1 , they are connected to one another again.

Wenn aber die Förderung beispielsweise beim Strebbau dem Abbau derart folgt, daß die Förderbahn sich verlängert, so wird beim Verlegen selbstverständlich ein entsprechendes Stück der Fördereinrichtung eingesetzt, im übrigen aber ebenso verfahren, wie oben beschrieben wurde.But if the promotion, for example in longwall mining, follows mining in such a way that the Conveyor track is lengthened, so of course a corresponding one is made when laying Piece of the conveyor used, but otherwise proceed in the same way as described above became.

Ausführungsbeispiele Fig. 2, 3 und 4.Exemplary embodiments FIGS. 2, 3 and 4.

Hier bedeuten M und m die beiden Antriebmaschinen für klie Fördereinrichtung, welche nach Art eines Baggerwerkes o. dgl. vor dem Abbaustoße angeordnet ist, so daß ihre dem Abbaustoße zugekehrte Seite möglichst nahe an dem Stoße vorbeigeht und während des Schrämens die niederbrechendenHere M and m mean the two drive machines for little conveyor, which is arranged in the manner of an excavator or the like in front of the excavation pile, so that the side facing the excavation pile passes the pile as closely as possible and the down-breaking one during the cutting

Kohlen selbsttätig oder, wo nötig, mit geringer Nachhilfe von Menschenkraft aufnimmt, in der Pfeilrichtung oder umgekehrt fortschafft und bei W oder W1 selbsttätig abgibt.
Wenn der Abbaustoß von a, άχ bis b, bx (Fig. 2) fortgerückt ist, dann findet die Verlegung der Fördereinrichtung statt. Zu diesem Zwecke werden nach Fig. 3 die Hilfsleitungen χ und X1 und die Leitung y eingebaut und die Maschinen M und m werden, wenn möglich, nach M1 und Ot1 verschoben; dies ist leicht ausführbar, wenn beide je auf einem mit Rädern versehenen Gestelle montiert sind und sich auf dem Gleise fortbewegen lassen. Die Eisenstempel S1 werden schon während des Betriebes in den kurzen Betriebspausen zur Unterstützung des Daches aufgestellt. Das Baggerwerk wird dann bei 0 auseinander gemacht, so daß nur noch der Teil 0, p, m auf der alten Bahn von der Maschine m angezogen wird, während der Teil 0, M, q über 0 hinaus in die neue Bahn y mit Hilfe eines von der Maschine m aus bewegten Zugseiles eingezogen wird, daß bei m und 0 einstweilen die Fördereinrichtung wieder in sich verbindet. Der Teil 0, p, m der letzteren geht auf der alten Bahn über m hinaus auf die Gleisstrecke n, q, M; während derselben Zeit kommt das Ende 0, M, q mit Hilfe eines zweiten über x, p, X1 gehenden von der Maschine M betriebenen Zugseils, das bei 0 angreift, sobald der Teil 0, M, q über m hinausgezogen ist, bei M an, um hier wieder mit dem anderen Ende der endlosen Förderkette verbunden zu werden. Hiermit ist die Verlegung der Fördereinrichtung vollendet, wozu nur einige wenige mit der Sache vertraute Leute benötigt werden.
Picks up coal automatically or, where necessary, with little tutoring from human strength, removes it in the direction of the arrow or vice versa and gives it off automatically at W or W 1.
When the working face has moved from a, ά χ to b, b x (Fig. 2), then the transfer of the conveyor takes place. For this purpose, the auxiliary lines χ and X 1 and the line y are installed according to FIG. 3 and the machines M and m are, if possible, moved to M 1 and Ot 1 ; this is easy to do if both are mounted on a wheeled frame and can be moved on the track. The iron stamps S 1 are already set up during operation in the short breaks in operation to support the roof. The dredger is then disassembled at 0 , so that only the part 0, p, m on the old path is attracted by the machine m , while the part 0, M, q beyond 0 into the new path y with the help of a is drawn in by the machine m from moving pull rope that at m and 0 for the time being the conveyor connects again. The part 0, p, m of the latter goes on the old railway beyond m to the track section n, q, M; During the same time, the end 0, M, q comes with the help of a second pulling rope, which goes through x, p, X 1 and is operated by the machine M , which engages at 0 as soon as the part 0, M, q is pulled beyond m , at M to be connected again to the other end of the endless conveyor chain. This completes the relocation of the conveyor, which only requires a few people who are familiar with the matter.

Durch diese Anordnung wird außerdem erreicht, daß die Fördereinrichtung nicht um den ganzen Kohlen- oder Versatzpfeiler herumzugehen braucht und daher wesentlich kürzer sein kann; daß sie ferner weder verlängert noch verkürzt zu werden braucht und daß sie schließlich nicht nur zur Abförderung der Kohlen, sondern mit der dem Bergversatz zugekehrten Seite auch zur Zuförderung der Versatzberge benutzt werden kann.This arrangement also ensures that the conveyor does not turn around needs to go around the whole coal or backfill pillar and therefore essential can be shorter; that it neither needs to be lengthened nor shortened and that they are ultimately not only used to convey the coals, but also to move the mountain backfill facing side can also be used to convey the mountains of offset.

Diesem Verfahren bei der Verlegung der Fördervorrichtung bereiten auch die vorhandenen zahlreichen Stempel S1, welche zur Unter-Stützung des Daches dienen, keinerlei Schwierigkeiten, wie dies bei der Verlegung der jetzt fast allgemein gebräuchlichen Förderrinne oder Förderbänder in so hohem Maße der Fall ist.This process when laying the conveyor device also causes the existing numerous stamps S 1 , which are used to support the roof, no difficulties, as is the case with the laying of the now almost generally used conveyor troughs or conveyor belts to such a large extent.

Claims (1)

Patent-An spruch:Patent claim: Verfahren zum stetigen Fördern mittels endloser Seile, Ketten o. dgl. mit angehängten oder zwischengeschalteten Fördergefäßen irgendwelcher Art, die im Bergbau oder in ähnlichen Betrieben am Abbaustoße vorbeigehen und während dieses Vorbeiganges nach und nach gefüllt und, entfernt vom Abbau, stetig und selbsttätig entleert oder auch ausgewechselt werden, dadurch gekennzeichnet, daß die Fördervorrichtung beim Fortschreiten des Abbaues an einer Stelle getrennt und in ein vorgestrecktes neues Gleis übergeführt wird. . . 'Method for continuous conveying by means of endless ropes, chains or the like with attached or intermediate conveying vessels of any kind that are used in mining or similar operations at the mining site pass by and gradually filled up during this passage and, removed from the breakdown, steadily and automatically emptied or replaced, characterized in that the conveyor device as the degradation progresses, separated at one point and into one stretched new track is transferred. . . ' Hierzu 1 Blatt Zeichnungen.1 sheet of drawings.
DENDAT205755D Active DE205755C (en)

Publications (1)

Publication Number Publication Date
DE205755C true DE205755C (en)

Family

ID=467983

Family Applications (1)

Application Number Title Priority Date Filing Date
DENDAT205755D Active DE205755C (en)

Country Status (1)

Country Link
DE (1) DE205755C (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE958191C (en) * 1949-02-09 1957-02-14 Gewerkschaft Des Steinkohlenbe Schaelschrapperanlage with an endless pull rope
DE964764C (en) * 1942-11-21 1957-06-06 U Eisengiesserei A Beien Masch A planing device moved in the face direction by a traction device
DE1009576B (en) * 1953-06-03 1957-06-06 Steinkohlenbergbauver Method and device for backing up the face material in the peeling coal extraction
DE969861C (en) * 1953-06-03 1958-07-24 Eickhoff Geb Belt conveyor for longwall underground
DE1092418B (en) * 1955-01-28 1960-11-10 Eschweiler Bergwerksverein Process for moving long face lifting equipment and devices for carrying out the process
DE974669C (en) * 1952-06-14 1961-03-23 Konrad Grebe Method and device for the extraction of coal and other minerals
DE974679C (en) * 1942-03-25 1961-03-30 Bergwerksverband Ges Mit Besch Device for peeling extraction and removal of coal or other minerals

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE974679C (en) * 1942-03-25 1961-03-30 Bergwerksverband Ges Mit Besch Device for peeling extraction and removal of coal or other minerals
DE964764C (en) * 1942-11-21 1957-06-06 U Eisengiesserei A Beien Masch A planing device moved in the face direction by a traction device
DE958191C (en) * 1949-02-09 1957-02-14 Gewerkschaft Des Steinkohlenbe Schaelschrapperanlage with an endless pull rope
DE974669C (en) * 1952-06-14 1961-03-23 Konrad Grebe Method and device for the extraction of coal and other minerals
DE1009576B (en) * 1953-06-03 1957-06-06 Steinkohlenbergbauver Method and device for backing up the face material in the peeling coal extraction
DE969861C (en) * 1953-06-03 1958-07-24 Eickhoff Geb Belt conveyor for longwall underground
DE1092418B (en) * 1955-01-28 1960-11-10 Eschweiler Bergwerksverein Process for moving long face lifting equipment and devices for carrying out the process

Similar Documents

Publication Publication Date Title
DE2529135C2 (en) Track construction train for the renewal of a railway line
DE4237712C2 (en) Plant for the production of a formation protection layer
DE205755C (en)
DE2407584A1 (en) METHOD OF DRIVING TUNNELS
DE607429C (en) Dismantling device
DE2754381C2 (en) Extraction equipment, in particular for coal extraction in underground operations
DE3826961C3 (en) Line conveyor with brackets, guide rails and rear device
DE273437C (en)
DE803161C (en) Method and device for the longitudinal displacement of a mining conveyor with a rotating carrier belt
DE150197C (en)
DE409460C (en) Method and device for material movement in opencast mines
DE611157C (en) Method for opening up opencast mines using a waste extraction and conveyor system
DE2021839B2 (en) DEVICE FOR DRIVING PUSH FRAMEWORKS
DE2646800C3 (en) Device for the transport of striding support frames in mining and tunnel construction
DE317295C (en)
DE409612C (en) Process for clearing overburden in opencast mining of lignite or the like.
DE474793C (en) Abraumfoerderbruecke with intermediate conveyors between the excavator and the main conveyor belt
DE1241395B (en) Device for introducing backfill in the coaled area of longwall mining
DE404472C (en) Method for moving material to be conveyed, in particular the overburden in open-cast mines, using cable excavators
DE2742078A1 (en) Mine roadway take=up device - includes frame with roller or cutter chain tooling and conveyor
DE754116C (en) Schraem and loading equipment for underground longwall mining
DE1246644B (en) Device for lowering routes
DE2918473C2 (en)
DE511109C (en) Overburden conveyor system designed as a cableway
DE195651C (en)