CN206385828U - A kind of bathing room - Google Patents

A kind of bathing room Download PDF

Info

Publication number
CN206385828U
CN206385828U CN201621094991.5U CN201621094991U CN206385828U CN 206385828 U CN206385828 U CN 206385828U CN 201621094991 U CN201621094991 U CN 201621094991U CN 206385828 U CN206385828 U CN 206385828U
Authority
CN
China
Prior art keywords
wall
bathing room
decorating veneer
wall decorating
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621094991.5U
Other languages
Chinese (zh)
Inventor
俞大有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mingsheng Drawin Technology Investment Co Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201621094991.5U priority Critical patent/CN206385828U/en
Application granted granted Critical
Publication of CN206385828U publication Critical patent/CN206385828U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model provides a kind of bathing room, including bottom plate and wallboard, it is characterized in that, the bottom plate includes bottom surface and side, the bottom surface and side are main by the disposable overall machine-shaping of concrete or fiber concrete, the bottom of the bottom surface is provided with supporting rib, the embedded bottom for being fixed on bottom surface of the supporting rib;The wallboard includes being provided with some cavitys in the wall decorating veneer being fixed on wall, the wall decorating veneer, and the both sides of the wall decorating veneer are respectively arranged with groove and raised line.So, the bottom plate of the bathing room can be poured with seamless, can play a part of rigid waterproofing, and prefabricated, good water-proof effect can be produced in factory, and intensity is high, wallboard site operation efficiency high.

Description

A kind of bathing room
Technical field
The utility model belongs to building field, specially a kind of bathing room.
Background technology
The bottom plate of traditional bathing room is constructed using concrete cast-in-situ, and waterproofing process mainly passes through brush water-repellent paint, paving Protective layer reaches the effect of impervious waterproof.In order to the waterproof effect that has reached it is general firstly the need of ensure the ground of bathing room compared with , must first will with cement mortar after original floor tile chisel is gone to be steady, but if necessary to change the floor tile of bathing room Floor leveling, then does water-proofing treatment, complex process again.In addition, in order to prevent from also doing about on water percolation of wall, general metope 30 centimetres of high water-repellent paints, spread and sink in metope to prevent ponding.It follows that existing bathing room waterproof slab workload is larger, apply Work efficiency rate is low, construction cost hardly results in control.And the metope of traditional bathing room decorates way using patch block, it is mainly logical Cross following steps completion, snap the line, label on schedule, select brick, row's brick, leaching brick (Imitation Rock Porcelain Tiles or high-grade brick do not allow immersion), edge patch logical Seam, jointing or wiping seam reach effect that wall decoration is attractive in appearance.It follows that existing wall tile decoration way efficiency of construction Low, construction cost hardly results in control.
The content of the invention
The technical problems to be solved in the utility model is:There is provided a kind of bathing room, the bottom plate of the bathing room can be with factory Prefabricated, good water-proof effect is produced, intensity is high, wallboard site operation efficiency high.
What solution of the present utility model was realized in:A kind of bathing room, including bottom plate and wallboard, wherein, it is described Bottom plate includes bottom surface and side, and the bottom surface and side are main by the disposable overall machine-shaping of concrete or fiber concrete, The bottom of the bottom surface is provided with supporting rib, the embedded bottom for being fixed on bottom surface of the supporting rib;The wallboard includes It is fixed in the wall decorating veneer on wall, the wall decorating veneer and is provided with some cavitys, the wall decorating veneer Both sides are respectively arranged with groove and raised line.So, the bottom plate of bathing room is disposably integrally added using concrete or fiber concrete Work is molded, and can is in integrally basin type, whole bottom plate is seamless to be poured, can be played a part of rigid waterproofing, and it is stainless to save installation The techniques such as steel water-proof strip side, not only good water-proof effect, and efficiency of construction is high.Particularly, according to ultra-high performance concrete (Ultra-High Performance Concrete) or the ultra-high performance concrete of mixing of steel fiber fabricate bathing room Bottom plate, the strong high-durability of superelevation of the high intensity, high tenacity, low porosity of ultra-high performance concrete can be made full use of, carried The cracking strength of high bathing room bottom plate and fatigue life, strengthen the durability and rigidity of bathing room bottom plate.In addition, the bottom surface and Side overall processing shaping, can use and instead beat casting craft so that the use face of the bottom plate of bathing room is located at the lower section of mould, So that it is guaranteed that using face smoother, flatness is good, saves levelling construction, it can directly be decorated with paving PVC floor, ceramic tile etc. Layer, so as to further improve efficiency of construction.Further, built-in fitting hole can be set on the bottom plate of bathing room as needed Or built-in fitting is set, it is easy to production line balance, the manufacture of bottom surface and side engineering can be carried out simultaneously, further reduces follow-up add Work technique, improves efficiency of construction.And supporting rib is provided with the bottom of bottom surface, the supporting rib is embedded to be fixed on bottom surface Bottom.The supporting rib can also be the structure such as support pier or supportive grid bar.So, it is provided with the bottom of bottom surface Supporting rib, can increase the height of bottom surface, reduction processing materials.Further, the supporting rib can be with bottom surface one Moulding by casting passes through the embedded bottom for being fixed on bottom surface of back-hand craft, reduction construction procedure, raising efficiency of construction.In addition, Some cavitys are provided with the wall decorating veneer, the both sides of the wall decorating veneer are respectively arranged with groove and raised line.So, The weight of wall decorating veneer itself can be mitigated and the material of processing and manufacturing wall decorating veneer is reduced, so as to reduce processing cost. And groove and raised line are respectively arranged with the both sides of wall decorating veneer, the groove and raised line match, adjacent wall body decoration Plate can carry out Fast Installation and fixation by groove and raised line, so as to improve efficiency of construction.Until bolt, suspension member are used in scene again Wall decorating veneer and matrix wall or lightgage steel joist wall are connected Deng connector, so as to greatly reduce the work of site operation Measure, it is to avoid situ wet operation, improve efficiency of construction, facilitate in-site installation.Set alternatively, it is also possible to the both sides in wall decorating veneer Ripple type or saw-tooth-type structures are put, adjacent wall decorating veneer can also be carried out by the ripple type or saw-tooth-type structures matched Fast Installation and fixation.
Another technical scheme of the present utility model is that on above-mentioned basis the bottom surface is provided with dry area and wet area, The dry area and wet area are separated by projection, the projection and the disposable overall machine-shaping in bottom surface.So, area and wet area are done by convex Block is separated, projection and the disposable overall machine-shaping in bottom surface, not only projection and bottom surface good forming effect, good appearance, Er Qiejia Work is easily manufactured, and efficiency of construction is high.
Another technical scheme of the present utility model is on above-mentioned basis, and floor drain installation is provided with the bottom surface Mouthful, it is provided with floor drain adapter at the floor drain installing port.So, the floor drain adapter can be together with the bottom plate of bathing room Prefabricated, during construction, floor uses laminated floor slab, and the part correspondence of floor drain adapter through bathing room bottom plate is positioned on floor A groove is reserved in position, and the bottom of floor drain adapter is placed in groove, the overlapping layers of laminated floor slab is then poured, will be defended The bottom plate and floor in bathroom are combined into entirety.The part of floor drain adapter in a groove is connected with horizontally-arranged water pipe, and sewage is arranged Go out.The bottom plate of bathing room installs floor drain again after installing.Common direct-drainage floor drain can be so converted into by floor drain adapter Floor drain is arranged in side, so that co-layer draining is realized, and without carrying out drop plate processing.It is of course also possible to which floor drain and the floor drain are transferred Device set be structure as a whole, during construction, installing port is set on bathing room bottom plate, installed again after bathing room is installed floor drain and Floor drain adapter.
Another technical scheme of the present utility model is on above-mentioned basis, and weathering is additionally provided with the bottom surface The gradient is relatively low at degree, the floor drain installing port.So, the sanitary wastewater of bathing room bottom surface smoothly can be led into floor drain to install Mouthful at floor drain adapter and drain into drainage equipment module, so as to keep the drying of bathing room bottom surface.
Another technical scheme of the present utility model is that on above-mentioned basis the junction of the bottom surface and side is set There is arc angling.So, the junction of bottom surface and side is provided with arc angling, the company of bottom surface and side can not only be reduced Meet place and the cracking risk of right-angle side is set, and be conducive to secondary decoration construction, without corner or spot as yet untouched by a clean-up campaign when using.
Another technical scheme of the present utility model is that on above-mentioned basis the upper end of the side is provided with waterproof knot Structure, the waterproof construction is sealing surface, groove or flanging.So, the upper end of side is provided with waterproof construction, bathing room Wallboard directly can be just stuck in above the bottom plate of bathing room vertically, then be sealed by breaking fluid sealant, simple in construction, installation side Just, good water-proof effect.
Another technical scheme of the present utility model is that on above-mentioned basis the side is made up of the anti-bank of staged, The anti-bank of staged at least includes top half and the latter half.So, it is made up of, can be formed many anti-bank of staged sideways Level waterproof construction, improves the water resistance of bottom plate.
Another technical scheme of the present utility model be it is above-mentioned basis on, the high 50mm of top half size, width 40mm, the high 50mm of the latter half size, width 75mm.So, even if the surface water is as deep as to 50mm, also 50mm in bathing room Anti- water depth, equivalent to double waterproof measure, improve the water resistance of bathing room bottom plate.
Another technical scheme of the present utility model is that on above-mentioned basis the bottom of the bottom surface is provided with grid layer Or supporting rib.So, the bottom of bottom surface is provided with grid layer or supporting rib, the height of bottom surface can be increased, reduction adds Work materials.Further, the grid layer or supporting rib can be installed with the integral moulding by casting in bottom surface or by back-hand craft It is fixed on the bottom of bottom surface.
Another technical scheme of the present utility model be it is above-mentioned basis on, be provided with the bottom plate of the bathing room to Few two suspension centres, the suspension centre hangs nail or suspension ring for pre-buried.So, by default suspension centre, bathing room bottom plate can be facilitated Or movement, lifting and the transport of bathing room.Preferably, four suspension centres are set respectively on four angles of bathing room bottom plate.
Another technical scheme of the present utility model is that on above-mentioned basis the wall decorating veneer is stone-plastic plate or wood Mould plate.So, wall decorating veneer uses stone-plastic plate or wood-plastic board, and not only processing and manufacturing cost is low, and durability is good, the feature of environmental protection It is good.Wherein, stone-plastic plate is also referred to as stone modeling brick or " PVC sheet plate ", be a kind of high-quality, high-tech research develop it is new Type ornament materials, using natural marble powder composition high density, the solid base of high microsteping network structure, surface is coated with superpower Wear-resisting macromolecule PVC wearing layers.Wood-plastic board is a kind of environment-friendly type wood-plastic composite material products, in production, high-density fiber Wooden phenol produced by during plate, adds regenerated plastics and makes wood plastic composite by Granulation Equipments, then carry out extrusion life Production group makes wood-plastic board.Possess the processing characteristics as timber, using common instrument can sawing, drilling, upper nail, very It is convenient, it can be used as common wood.There is the woodiness touch of timber and the Waterproof corrosion characteristic of plastics simultaneously.
Another technical scheme of the present utility model is that on above-mentioned basis the front of the wall decorating veneer is provided with Thermal transfer figure layer.So, wall decorating veneer good appearance degree, and the different figure layer of hot stamping as needed can be improved, is met many Firstization demand.Thermal transfer is divided into transfer film print and transfer processing two large divisions, and using net-point printing, (resolution ratio reaches for transfer film printing 300dpi), film surface is pre-printed in pattern, the pattern level of printing is abundant, bright in luster, and ever-changing, aberration is small, then Existing property is good, the requirement effect for the person that can reach layout, and is adapted to produce in enormous quantities;Transfer processing passes through heat transfer machine once It is one that pattern exquisite on transfer film is transferred in after product surface, shaping that ink layer is molten with product surface by processing (heating pressurization) Body, it is true to nature beautiful, greatly improve the class of product.
Another technical scheme of the present utility model is that on above-mentioned basis the wall decorating veneer is square or L-shaped. Processing is so not only convenient for, it is also easy for installation.Certainly as needed, wall decorating veneer can also be set camber, triangle Etc. other shapes.Wherein, L-shaped wall decorating veneer can be applied in the corner of wall.
Another technical scheme of the present utility model is that on above-mentioned basis the wall decorating veneer passes through L-shaped or T Shape connector is connected with wall.So, connector is the various shapes structures such as L-shaped, T-shaped or isosceles triangle, can be with a variety of different Mounting structure requirement, is easy to the installation of wall decorating veneer.
Another technical scheme of the present utility model is that on above-mentioned basis described connector one end is screwed On the raised line of wall decorating veneer, the other end is fixed with wall.So, connector one end can be screwed in advance On the raised line of wall decorating veneer, until the other end of connector is connected by scene with matrix wall or lightgage steel joist wall again.Subtract Few site operation workload, improves efficiency of construction.
Another technical scheme of the present utility model is that on above-mentioned basis the wall decorating veneer passes through Z-shaped connection Part is connected with wall;Described Z-shaped connector one end is provided with fixing slot, and the groove or raised line of the wall decorating veneer pass through described Fixing slot is fixed, and the other end of the Z-shaped connector is fixed by anchoring piece with wall.The Z-shaped connector can use one The direct bending of block connecting plate is formed, and connecting plate and the middle connecting plate at Z-shaped connector two ends can be mutually perpendicular to, the fixing slot It can be formed by slotting, folding on connecting plate at one end.Certainly, the Z-shaped connector can also be spelled using polylith connecting plate Connect or be welded.So, during in-site installation, neighboring walls decorative panel can be spliced, then by the recessed of wall decorating veneer The other end of Z shape connectors then is passed through screw, bolt etc. and anchored by groove or raised line holding in the fixing slot of the Z-shaped connector Part is fixed with the keel on wall or wall, is realized that the Fast Installation of wall decorating veneer is fixed, is improved efficiency of construction.When Z-shaped When connector is fixed with wall body keel, the adjustment of wall body decoration plate flatness when can more easily realize installation, and due to dragon There is space between bone and wall decorating veneer, facilitate the arrangement of the pipelines such as electric wire and water pipe.
Brief description of the drawings
Fig. 1 is the sectional view for the bottom plate for representing the bathing room involved by a kind of embodiment of this technology;
Fig. 2 is the sectional view of the production mould for the bottom plate for representing the bathing room involved by a kind of embodiment of this technology;
Fig. 3 is the structure chart for the bottom plate for representing the bathing room involved by a kind of embodiment of this technology;
Fig. 4 is the partial section for the bottom plate for representing the bathing room involved by this technology another embodiment;
Fig. 5 is the floor drain discharge structure figure for representing the bathing room involved by a kind of embodiment of this technology;
Fig. 6 is the local structural graph for representing the bathing room involved by a kind of embodiment of this technology;
Fig. 7 is the structure chart for the wall decorating veneer for representing the bathing room involved by a kind of embodiment of this technology;
Fig. 8 to Figure 10 is the structure for the wall decorating veneer for representing the bathing room involved by the another several embodiments of this technology Figure;
Figure 11 is the structure chart for representing the bathing room involved by a kind of embodiment of this technology;
Figure 12 is the partial enlarged drawing at A in expression Figure 11;
Figure 13 is the structure chart for the plumbing integration module for representing the bathing room involved by a kind of embodiment of this technology;
Figure 14 is the structure chart for the plumbing integration module for representing the bathing room involved by this technology another embodiment
Applications of the Figure 15 to represent the plumbing integration module of the bathing room involved by a kind of embodiment of this technology is installed Figure;
Applications of the Figure 16 to represent the plumbing integration module of the bathing room involved by this technology another embodiment is pacified Dress figure;
Elastic socket joint in plumbing integration modules of the Figure 17 to represent the bathing room involved by a kind of embodiment of this technology The sectional view of part;
Figure 18 is the front view of the connection for the wall decorating veneer for representing the bathing room involved by a kind of embodiment of this technology;
Figure 19 is the stereogram of the connection for the wall decorating veneer for representing the bathing room involved by a kind of embodiment of this technology.
In figure:
13 waterproof constructions of the side of 10 production mould, 11 bottom surface 12
The dry wet projection of area 17 in area 16 of 14 arc angling 15
The import of 18 floor drain installing port, 19 supporting rib, 50 floor drain 51
The 52 outlet T-shaped flanks of the annulus of 53 reducing transfer tube 54
The top half of 55 ground leaking drainage pipe, 121 the latter half 122
The groove of 70 wall decorating veneer, 71 cavity, 72 raised line 73
The wall of 74 fixing groove, 75 fixed block, 76 connector 100
The VERTICAL TUBE of 41 soil stack, 42 dewatering horizontal tube, 421 horizontal tube, 422 elbow 423
The seal ring of 43 mixed zone, 44 balance pipe, 45 support chip 46
47 share the access hole of 471 spacer of water seal arrangement, 472 seepage mouth 473
The anti-elastic socket component in side 411 of 48 weeper 461
The fixing slot of 761 first 762 second the 3rd connecting plate of connecting plate 763 of connecting plate 764
Embodiment
The utility model is described in detail below in conjunction with the accompanying drawings, the description of this part be only it is exemplary and explanatory, There should not be any restriction effect to protection domain of the present utility model.In addition, those skilled in the art's retouching according to this document State, respective combination can be carried out to feature in embodiment in this document and not in be the same as Example.
The utility model embodiment is as follows, refers to shown in Fig. 1 to 12, a kind of bathing room, including bottom plate and wallboard, its In, the bottom plate includes bottom surface 11 and side 12, the bottom surface 11 and side 12 it is main by concrete or fiber concrete once Property overall processing shaping, the bottom of the bottom surface 11 is provided with supporting rib 19, and the supporting rib 19 is embedded to be fixed on bottom The bottom in face 11;The wallboard is included in the wall decorating veneer 70 being fixed on wall 100, the wall decorating veneer 70 Some cavitys 71 are provided with, the both sides of the wall decorating veneer 70 can be respectively arranged with groove 73 and raised line 72.So, bathroom Bottom plate is using the disposable overall machine-shaping of concrete or fiber concrete, and overall is in basin type, and whole bottom plate is seamless to be poured, energy Enough play a part of rigid waterproofing, and save the techniques such as installation stainless steel water-proof strip side, not only good water-proof effect, and construction effect Rate is high.Particularly, according to ultra-high performance concrete (Ultra-High Performance Concrete) or mixing of steel fiber Ultra-high performance concrete fabricate the bottom plate of bathing room, can make full use of high intensity, the height of ultra-high performance concrete Toughness, the strong high-durability of the superelevation of low porosity, are improved cracking strength and the fatigue life of bathroom bottom plate, enhancing bathroom bottom plate Durability and rigidity.And supporting rib 19 is provided with the bottom of bottom surface 11, the supporting rib 19 is embedded to be fixed on bottom surface 11 bottom.The supporting rib can also be the structure such as support pier or supportive grid bar.So, set in the bottom of bottom surface 11 Supporting rib 19 is equipped with, the height of bottom surface, reduction processing materials can be increased.Further, the supporting rib 19 can be with The integral moulding by casting in bottom surface 11 passes through the embedded bottom for being fixed on bottom surface of back-hand craft, reduction construction procedure, raising construction Efficiency.In addition, the bottom surface 11 and side 12 overall processings shaping, as shown in Fig. 2 bathroom bottom plate can pour work using anti-beat Skill so that the use face of bathroom bottom plate is located at the lower section of production mould 10, so that it is guaranteed that using face smoother, flatness is good, Levelling construction is saved, directly can be with decorative layers such as paving PVC floor, ceramic tiles, so as to further improve efficiency of construction.Further Ground, built-in fitting hole can be set on bathroom bottom plate or built-in fitting is set, is easy to production line balance as needed, can be simultaneously The manufacture of bottom surface and side engineering is carried out, subsequent machining technology is further reduced, efficiency of construction is improved.In addition, the wall dress Some cavitys 71 are provided with plaque 70, the both sides of the wall decorating veneer 70 can be respectively arranged with groove 73 and raised line 72. So, some cavitys 71 are provided with wall decorating veneer 70, the weight of wall decorating veneer itself can be mitigated and reduced and processed The material of wall decorating veneer is manufactured, so as to reduce processing cost.And it is respectively arranged with groove 73 in the both sides of wall decorating veneer 70 With raised line 72, the groove 73 and raised line 72 match, and adjacent wall decorating veneer can be carried out quick by groove and raised line Install and fixed, so as to improve efficiency of construction.As is illustrated by figs. 11 and 12, until scene is again with connectors 76 such as bolt, suspension members Wall decorating veneer 70 is connected with matrix wall or lightgage steel joist wall, so as to greatly reduce the workload of site operation, Situ wet operation is avoided, efficiency of construction is improved, facilitates in-site installation.Alternatively, it is also possible to set ripple in the both sides of wall decorating veneer Line type or saw-tooth-type structures, adjacent wall decorating veneer can also be carried out quick by the ripple type or saw-tooth-type structures matched Install and fixed.Further, can be with the one or both sides of wall decorating veneer 70 as shown in Fig. 8, Fig. 9, Figure 11 and Figure 12 Fixed block 75 is set, and the thickness of fixed block 75 is preferably the half of wall decorating veneer, and the raised line 72 can be arranged on fixation One end of block 75, can be first with connector by the fixed block 75 of one piece of wall decorating veneer 70 and matrix wall or light during in-site installation Steel joist wall is connected, then by adjacent wall decorating veneer 70 by groove or raised line thereon quickly with it is fixed Wall decorating veneer splicing is fixed, then with connector by the fixed block 75 of the wall decorating veneer of splicing and matrix wall or lightgage steel joist Wall is connected, and installs successively.Certainly, those skilled in the art, can also be the two of wall decorating veneer 70 by reasonable speculation Side only sets the fixed block 75 being mutually matched, or sets fixed block 75 in the side of wall decorating veneer 70, and side is set in addition Raised line 72, should all belong to the protection domain of this patent.In addition, as shown in fig. 7, can also be set in the both sides of wall decorating veneer 70 Fixing groove 74 is put, during installation, by the holding of connector one end in fixing groove 74, the other end is connected with matrix wall or lightgage steel joist wall It is fixed.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 3 and Figure 4, the bottom surface can To be provided with dry area 15 and wet area 16, the dry area 15 and wet area 16 are separated by projection 17, and the projection 17 can be with bottom surface one Secondary property overall processing shaping.So, do area 15 and wet area 16 is separated by projection 17, projection 17 and the disposable overall processing in bottom surface It is molded, not only projection 17 and bottom surface good forming effect, good appearance, and convenient processing and manufacture, efficiency of construction is high.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 4 and Figure 5, the bottom surface 11 It is provided with floor drain installing port 18, the floor drain installing port 18 and is provided with floor drain adapter.So, the floor drain adapter can be with Prefabricated together with the bottom plate of bathing room, during construction, floor uses laminated floor slab, and floor drain adapter passes through the part of bathing room bottom plate A groove is reserved in the position that correspondence is positioned on floor, and the bottom of floor drain adapter is placed in groove, then poured folded The overlapping layers of floor is closed, the bottom plate and floor of bathing room are combined into entirety.Floor drain adapter lower part outlet and ground leaking drainage pipe 55 are connected, and sewage is discharged.The bottom plate of bathing room installs floor drain 50 again after installing.Common direct-drainage floor drain can so be led to Cross floor drain adapter and be converted into side row's floor drain, so that co-layer draining is realized, and without carrying out drop plate processing.It is of course also possible to will Floor drain 50 sets with the floor drain adapter and is structure as a whole, and during construction, installing port is set on bathroom bottom plate, by bathroom bottom plate Floor drain and floor drain adapter are installed again after installing.Further, the floor drain adapter includes an import 51 and one outlet 52, connected between the import 51 and outlet 52 by 90 ° of reducing transfer tubes 53, the reducing transfer tube 53 is at import 51 Outer wall on be provided with the T-shaped flank 54 of annulus.So, it is provided with circle on the outer wall at import 51 in reducing transfer tube 53 The T-shaped flank 54 of ring, the T-shaped flank 54 of annulus can be embedded in the bottom plate 11 of bathroom well to be merged one with concrete Rise, the installation sealing for later stage floor drain 50 plays a good role, and can improve floor drain 50 and being connected for floor drain adapter is close Seal effect.
On the basis of above-described embodiment, in another embodiment of the utility model, as described in Figure 4, also set on the bottom surface It is equipped with the gradient at drainage grade (not illustrating in figure), the floor drain installing port 18 relatively low.So, can be smoothly by bathing room bottom Floor drain adapter that the sanitary wastewater in face is led at floor drain installing port 18 is simultaneously drained into drainage equipment module, so as to keep bathing room The drying of bottom surface.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 1, the bottom surface 11 and side The junction in face 12 can be provided with arc angling 14.So, the junction of bottom surface 11 and side 12 is provided with arc angling 14, the junction that can not only reduce bottom surface 11 and side 12 sets the cracking risk of right-angle side, and is conducive to secondary decoration Construction, without corner or spot as yet untouched by a clean-up campaign when using.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figures 1 to 6, the side 12 Upper end be provided with waterproof construction 13, the waterproof construction 13 can be sealing surface, groove or flanging.So, in side 12 Upper end be provided with waterproof construction 13, the wallboard of bathing room directly can be just stuck in above the bottom plate of bathing room vertically, then be passed through Break fluid sealant to be sealed, simple in construction, easy for installation, good water-proof effect.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in fig. 6, the side 12 is by rank The anti-bank composition of ladder type, the anti-bank of staged at least includes top half 122 and the latter half 121.So, sideways by staged Anti- bank composition, can form multi-level waterproof construction 13, improve the water resistance of bathroom bottom plate.Preferably, the first half It is high 50mm, width 40mm to divide 122 sizes, and the size of the latter half 121 is high 50mm, width 75mm.So, even if in bathing room The surface water is as deep as to 50mm, and also 50mm anti-water depth, equivalent to double waterproof measure, improves the water proofing property of bathroom bottom plate Energy.
On the basis of above-described embodiment, in another embodiment of the utility model, it is provided with least on the bathroom bottom plate Two suspension centres, the suspension centre hangs nail or suspension ring (not indicated in figure) for pre-buried.So, by default suspension centre, it can facilitate Movement, lifting and the transport of the bottom plate or bathing room of bathing room.Preferably, set respectively on four angles of bathing room bottom plate Put four suspension centres.
On the basis of above-described embodiment, in another embodiment of the utility model, the wall decorating veneer 70 can be stone Mould plate or wood-plastic board.So, wall decorating veneer uses stone-plastic plate or wood-plastic board, and not only processing and manufacturing cost is low, and durability The good, feature of environmental protection is good.Wherein, stone-plastic plate is also referred to as stone modeling brick or " PVC sheet plate ", is that a kind of high-quality, high-tech research are opened The new decorative material issued, using natural marble powder composition high density, the solid base of high microsteping network structure, table Face coated with superpower wear-resistant macromolecule PVC wearing layers.Wood-plastic board is a kind of environment-friendly type wood-plastic composite material products, in production, Wooden phenol produced by during high density fiberboard, adds regenerated plastics and makes wood plastic composite by Granulation Equipments, then Carry out extrusion group and make wood-plastic board.Possess the processing characteristics as timber, can sawing, brill using common instrument Hole, upper nail, it is very convenient, it can be used as common wood.There is the woodiness touch of timber and the Waterproof corrosion of plastics simultaneously Characteristic.
On the basis of above-described embodiment, in another embodiment of the utility model, the front of the wall decorating veneer 70 is also Thermal transfer figure layer can be provided with.So, wall decorating veneer good appearance degree, and the different figure of hot stamping as needed can be improved Layer, meets multiple demand.Thermal transfer is divided into transfer film print and transfer processing two large divisions, and transfer film printing uses net-point printing (resolution ratio reaches 300dpi), film surface is pre-printed by pattern, and the pattern level of printing is abundant, bright in luster, ever-changing, Aberration is small, and repeatability is good, the requirement effect for the person that can reach layout, and is adapted to produce in enormous quantities;Transfer processing passes through heat Pattern exquisite on transfer film is transferred in ink layer and product after product surface, shaping by transfer interpreter time processing (heating pressurization) Surface is molten to be integrated, true to nature beautiful, greatly improves the class of product.
On the basis of above-described embodiment, in another embodiment of the utility model, the wall decorating veneer 70 can be side Shape or L-shaped.Processing is so not only convenient for, it is also easy for installation.Certainly as needed, wall decorating veneer 70 can also be arranged to The other shapes such as arc, triangle.As shown in Fig. 9, Figure 10, Figure 11 and Figure 12, wherein, L-shaped wall decorating veneer 70 can be applied The corner of wall between bathroom.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Fig. 7 to Figure 12, the cavity 71 can be square opening or circular port, and longitudinal direction of the cavity 71 along wall decorating veneer 70 is evenly distributed in wall decorating veneer. So, it is not only convenient for processing and fabricating, it is also ensured that the uniformity of wall decorating veneer, improves its tension and compressive property.
On the basis of above-described embodiment, in another embodiment of the utility model, as is illustrated by figs. 11 and 12, the wall Decorative panel 70 can be connected by L-shaped or T-connecting piece 76 with wall.So, connector 76 is L-shaped, T-shaped or isosceles triangle etc. Various shapes structure, can be easy to the installation of wall decorating veneer 70 with a variety of different mounting structure requirements.Further, connect Part 76 can be made up of screw and connection hanging piece, and connection hanging piece can be zigzag, and one end of connection hanging piece is embedded into wall 100 In, the other end is connected by screw with wall decorating veneer 70.
On the basis of above-described embodiment, in another embodiment of the utility model, described one end of connector 76 passes through screw It is fixed on the raised line 72 of wall decorating veneer 70, the other end is fixed with wall 100.So, can be in advance by the one end of connector 76 It is screwed on the raised line 72 of wall decorating veneer 70, until scene is again by the other end of connector 76 and matrix wall or light Steel joist wall is connected.Site operation workload is reduced, efficiency of construction is improved.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figures 18 and 19, the wall dress Plaque is connected by Z-shaped connector with wall;Described Z-shaped connector one end is provided with fixing slot 764, the wall decorating veneer Groove 73 or raised line 72 can be fixed by the fixing slot 764, and the other end of the Z-shaped connector passes through anchoring piece and wall It is fixed.Specifically, the Z-shaped connector can be formed by one piece of direct bending of connecting plate, including the first connecting plate 761, Two connecting plates 762 and the 3rd connecting plate 763, first connecting plate 761, the second connecting plate 762 are connected by the 3rd connecting plate 763 Connect, the first connecting plate 761 and three connecting plates 763 are vertically arranged, the second connecting plate 762 and three connecting plates 763 are also vertically arranged, the One connecting plate 761 and the second connecting plate 762 can be arranged on the one or both sides of three connecting plate 763, the fixing slot 764 It can be arranged on the first connecting plate 761 or the second connecting plate 762, such as directly carry out cutting groove, refolding open on connecting plate Form fixing slot 764 afterwards, the openings of sizes or width of the fixing slot 764 can according to the thickness and weight of wall decorating veneer come Setting.Certainly, the Z-shaped connector can also be spliced or be welded using polylith connecting plate.So, can during in-site installation So that neighboring walls decorative panel to be spliced, then by the groove 73 of wall decorating veneer or the holding of raised line 72 in the Z-shaped connector Fixing slot 764 in, the other end of Z-shaped connector is provided with mounting hole (not identified in figure), then passes through screw, bolt etc. and anchor Z-shaped connector and wall are directly fixed or fixed with the keel on wall by part, realize that the Fast Installation of wall decorating veneer is fixed, Improve efficiency of construction.When Z-shaped connector and wall body keel are fixed, wall decorating veneer is put down when can more easily realize installation The adjustment of whole degree, and due to there is space between keel and wall decorating veneer, facilitate the arrangement of the pipelines such as electric wire and water pipe.
On the basis of above-described embodiment, in another embodiment of the utility model, the bathing room is also provided with plumbing Integration module, the plumbing integration module can be set at the equipment raise of bathing room or in bathing room, such as Figure 13 to Figure 16 institutes Show, the plumbing integration module includes soil stack 41 and dewatering horizontal tube 42, wherein, the soil stack 41 can be second Word pipe, the bottom of the soil stack 41 is connected to form mixed zone 43 with one end of dewatering horizontal tube 42, the soil stack 41 The balance pipe 44 connected is provided between top and dewatering horizontal tube 42.So, soil stack 41 uses offset, due to standpipe Current chamber deviate from former standpipe position of center line, can again have concurrently while soil stack current are linked up and slow down soil stack Water velocity, the function of energy dissipating so that the noise in soil stack 41 is greatly reduced.By the bottom of soil stack 41 and transverse drainage One end of pipe 42 connects to form mixed zone 43, in this way, can cause in the current of 43 dewatering horizontal tube of mixed zone 42 and soil stack 41 The water (flow) direction of current is consistent, prevents current disorderly.And between the top of soil stack 41 and dewatering horizontal tube 42 company of being provided with Logical balance pipe 44, in this way, the pressure between soil stack 41 and dewatering horizontal tube 42 can be balanced, prevents siphonage.Therefore, The plumbing integration module eliminates vent stack, reduces production cost, saves the peace of tubing and plumbing integration module Space is filled, it is easier for installation.Further, the dewatering horizontal tube can set certain angle, the dewatering horizontal tube and row The connection end of water standpipe is tilted down, and is so conducive to water to be discharged into mixed zone from the import of dewatering horizontal tube.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 13 to Figure 16, the draining Transverse tube 42 can be inverted L-shaped pipe, can include horizontal tube 421, elbow 422 and VERTICAL TUBE 423, the horizontal tube 421 and vertical Pipe 423 is connected by elbow 422;The bottom of the VERTICAL TUBE 423 is connected with the bottom of soil stack 41.So, dewatering horizontal tube Including horizontal tube, elbow and VERTICAL TUBE, using global formation or it can be held between horizontal tube 421, elbow 422 and VERTICAL TUBE 423 Plug-in connection, it is easy for installation;The horizontal tube 421 of dewatering horizontal tube 42 and the separation of the top of soil stack 41, thus transverse tube and standpipe it Between current be avoided that and interfere that the bottom of the VERTICAL TUBE 423 is connected with the bottom of soil stack 41, form mixed zone 43, in this way, can cause consistent with the water (flow) direction of the bottom of soil stack in the bottom of VERTICAL TUBE, prevent that current are disorderly.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 13 to Figure 16, the balance One end of pipe 44 at the elbow 422 of dewatering horizontal tube 42 with being connected, and the other end is connected with the turning of soil stack 41.So, no It can only avoid, because the position of balance pipe 44 sets too high, causing the water in soil stack 41 to be flowed into dewatering horizontal tube 42, and And can avoid, because the position of balance pipe 44 sets too low, causing the water in dewatering horizontal tube 42 to flow into soil stack 41.So that Balance pipe 44 has the pressure between balance soil stack 41 and dewatering horizontal tube 42 always, prevents the effect of siphon.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 13 to Figure 16, the balance Pipe 44 can be the curved pipe raised up.So, balance pipe 44 is the curved pipe raised up, can reduce soil stack 41 The possibility mutually flowed by balance pipe 44 with the water in dewatering horizontal tube 42, improves the anti-siphonage of balance pipe 44.
On the basis of above-described embodiment, in another embodiment of the utility model, the balance pipe 44 can for S-shaped pipe or Z-type pipe.So, the balance pipe 44 is arranged to S-shaped pipe or Z-type pipe, can further reduce soil stack 41 and dewatering horizontal tube The possibility that water in 42 is mutually flowed by balance pipe 44, improves the anti-siphonage of balance pipe 44.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 13 to Figure 16, in the row Support chip 45 is also provided with the setting of balance pipe 44 of water standpipe 41 and dewatering horizontal tube 42.So, draining can be strengthened to stand Connection between pipe 41 and dewatering horizontal tube 42, prevents that the stress of balance pipe 44 is excessive and cracking or breaking, improves the integrated mould of plumbing The service life of block.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 13 to Figure 17, the draining Flexible socket component 411 can be set in the upper lumen of standpipe 41.As shown in figure 17, the elastic socket component 411 can be set More than two layers of elastic packing rubber ring is put, so described elastic socket component can replace telescopic joint of the prior art, be used for The length compensation that pipeline needs by mounting and adjusting, additionally it is possible to compensate the dilatation that pipeline is produced by temperature change, structure letter Single, cost is relatively low, and in-site installation is convenient.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 16 to Figure 17, the discharge Water integration module also includes seal ring 46, and the seal ring 46 is integrally formed with the soil stack 41 and dewatering horizontal tube 42.This Sample, plumbing integration module is provided with seal ring 46, when plumbing integration module is installed, can pass through seal ring 46 and floor In-situ layer, which is poured, together fixes plumbing integration module, in addition, the filling of piping shaft can be filled directly on seal ring 46, The process for eliminating the mould bases that fixes in addition.Further, anti-side 461, the anti-side can also be provided with seal ring 46 461 can be arranged on the edge of seal ring 46, play a part of preventing infiltration.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 13, the mixed zone 43 Side be provided with shared water seal arrangement 47;One end of the shared water seal arrangement 47 is connected with the side wall of dewatering horizontal tube 42, separately One end is connected with indoor floor drain, and the other end of the dewatering horizontal tube 42 is connected with washbowl and closestool.Share water seal arrangement 47 Moisture storage capacity is big, and water seal height can reach more than 100mm, save the trap of floor drain, can realize co-layer draining, can be used for Floor is relatively thin can not to set the situation of caisson of toilet, and maintenance when a jam does occur is got up also easily, and floor drain is installed and is also convenient for.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 13, the shared water seal dress It can be to be provided with spacer 471, institute in the deodorization case being arranged on outside the side wall of dewatering horizontal tube 42, the deodorization case to put 47 State and be provided with seepage mouth 472 on the side wall of dewatering horizontal tube 42, the bottom position of spacer 471 described in the vertical direction is less than described The position of seepage mouth 472.So, set due to being provided with the deodorization case on spacer 471, the side wall of dewatering horizontal tube 42 There is seepage mouth 472, the bottom position of spacer 471 described in the vertical direction is less than the position of the seepage mouth 472, works as ponding Flowed into from the water inlet of deodorization case after deodorization case, water seal is formed between the spacer 471 and the side wall of dewatering horizontal tube 42 of deodorization case, when Water in deodorization case gradually increases, when water level exceedes the seepage mouth 472 of dewatering horizontal tube 42, and ponding is oozing from dewatering horizontal tube 42 The mouth of a river 472 is drained into dewatering horizontal tube 42, so as in time discharge the ponding in the outside of dewatering horizontal tube 42 in time.
On the basis of above-described embodiment, in another embodiment of the utility model, the bottom of the deodorization case is provided with inspection Repair mouth 473.So, it is easy to the schedule of plumbing integration module to safeguard and overhaul.
It is described vertical as shown in Figure 14 to Figure 16 in another embodiment of the utility model on the basis of above-described embodiment The right side of pipe 423 is connected to form mixed zone with the bottom of the soil stack 41, the bottom of the soil stack 41 and VERTICAL TUBE 423 in angle of 45 degrees, and the left side of the VERTICAL TUBE 423 is provided with weeper 48, the weeper 48 and VERTICAL TUBE 423 into 45 degree of angles.So, the weeper 48 can be connected with the trap of two floor drains 50, can in floor drain trap shape Into higher water seal.The bottom of the soil stack 41 with VERTICAL TUBE 423 in angle of 45 degrees, the weeper 48 and VERTICAL TUBE 423 in angle of 45 degrees, and the bottom of soil stack 41 is set with the Relative vertical of weeper 48, when weeper 48 and VERTICAL TUBE 423 It is when the position of tie point and the bottom of soil stack 41 and the position of the tie point of VERTICAL TUBE 423 are arranged on zone of reasonableness, such as, small The position of drainpipe 48 and the tie point of VERTICAL TUBE 423 is arranged on the bottom of soil stack 41 with the connector of VERTICAL TUBE 423 perpendicular The position more than upward center line of Nogata, can cause soil stack 41 in the case of full packages water-carrying capacity, to be washed into small draining The highest current of pipe 48 and the tie point inwall of VERTICAL TUBE 423 will be less than the minimum point of weeper 48 and the tie point of VERTICAL TUBE 423. This way it is possible to avoid the flow backwardses in soil stack 41 enter weeper 48, and the sewage in trap is poured into floor drain Drainpipe, causes the problem of foul smell is returned to interior;Current and the current in weeper 48 in soil stack 41 can also be avoided After mixing, the hydraulic pressure formed in mixed zone is larger, and the water in trap is suctioned out, and causes the water seal in trap to be drained The problem of.Certainly, what the position of the weeper 48 and the tie point of VERTICAL TUBE 423 can not be set is too high, such as exceedes draining The bottom of standpipe 41 and the peak of the connector of VERTICAL TUBE 423, otherwise can cause the vertical drainage pipe of floor drain in bathing room Height step-down, causes bathroom indoor drainage to have some setbacks.
On the basis of above-described embodiment, in another embodiment of the utility model, the soil stack 41, dewatering horizontal tube 42 and balance pipe 44 be made up of metal or organic material.When soil stack 41, dewatering horizontal tube 42 and the material of balance pipe 44 are gold When category or organic material, the simple production process of plumbing integration module molds punching press or welding, is conducive to large quantities of Amount low cost production.
On the basis of above-described embodiment, in another embodiment of the utility model, the soil stack 41 and/or transverse drainage The top of pipe 42 or bottom are also associated with diameter changing device (not identified in figure).Set after diameter changing device, above and below convenience between floor Standpipe and the soil stack 41 in plumbing integration module and/or dewatering horizontal tube 42 are docked;In addition, being such as provided that big opening Reducer pipe, then can form high flow rate pass so that spot is not easy in plumbing integration module in plumbing integration module Middle deposition is blocked.Small opening reducer pipe can certainly be set, then multiple entrances can be set in plumbing integration module, side Just multiple position ponding are discharged into in soil stack 41 once.
On the basis of above-described embodiment, in another embodiment of the utility model, the top or bottom of the diameter changing device It is connected with pipeline eccentric (not identified in figure)., can when the top or bottom of diameter changing device are connected with pipeline eccentric With the installation question of pipeline above and below solution not on the same axis, it is only necessary to which adjusting eccentric smooth can dock, and reduce Pipe installing difficulty.
On the basis of above-described embodiment, in another embodiment of the utility model, the soil stack 41 and/or transverse drainage Expansion ring (not identified in figure) is additionally provided with pipe 42.After expansion ring being provided with soil stack 41 and/or dewatering horizontal tube 42, In the case of pipe built-in, expansion ring can solve the problem of pipeline is a small amount of short, it is not necessary to which changing pipeline can connect, together When, expansion ring can also do and offset the mouth of pipe by a small margin, its pipeline docked is not connected on the same axis.
On the basis of above-described embodiment, in another embodiment of the utility model, the soil stack 41 and/or transverse drainage Fire trapping ring or fireprotection layer (not identified in figure) are installed on pipe 42.It is provided with preset pipeline after fire trapping ring or fireprotection layer, when When bathroom meets with fire, fire trapping ring or fireprotection layer can be blocked above and below burning things which may cause a fire disaster and spread.
On the basis of above-described embodiment, in another embodiment of the utility model, the plumbing integration module integrated injection It is moulded into type or blow molding.When the shaping of plumbing integration module integral molded plastic or blow molding, its production technology being molded effect Rate is high, and steady quality is reliable, and production cost is relatively low, is conducive to large-scale promotion application.
On the basis of above-described embodiment, in another embodiment of the utility model, the plumbing integration module uses 3D Printing integrated shaping.When the planform of plumbing integration module is complicated, when production and extremely inconvenient construction and installation, beaten using 3D Print is integrally formed, and is conducive to manufacturing for plumbing integration module.
On the basis of above-described embodiment, in another embodiment of the utility model, the plumbing integration module is used UPVC materials.UPVC is the aggregated reaction of VCM and the amorphous thermoplastic resin that is made adds certain additive (such as Stabilizer, lubricant, filler etc.) composition, because it has the advantages that lightweight, corrosion-resistant, intensity is higher, thus in pipeline Extensive use in installation.UPVC pipe material inner walls are smooth, and fluid friction resistance is small, and overcome cast iron pipe influences because getting rusty, fouling The defect of flow.
Described above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (10)

1. a kind of bathing room, including bottom plate and wallboard, it is characterised in that the bottom plate includes bottom surface and side, the bottom surface and Side is main by the disposable overall machine-shaping of concrete or fiber concrete, and the bottom of the bottom surface is provided with supporting rib, The embedded bottom for being fixed on bottom surface of the supporting rib;The wallboard includes the wall decorating veneer being fixed on wall, Some cavitys are provided with the wall decorating veneer, the both sides of the wall decorating veneer are respectively arranged with groove and raised line.
2. bathing room according to claim 1, it is characterised in that the bottom surface is provided with dry area and wet area, the dry area Separated with wet area by projection, the projection and the disposable overall machine-shaping in bottom surface.
3. bathing room according to claim 1, it is characterised in that the bottom surface is provided with floor drain installing port, the floor drain Floor drain adapter is provided with installing port.
4. bathing room according to claim 3, it is characterised in that drainage grade is additionally provided with the bottom surface, describedly Leak the gradient at installing port relatively low.
5. bathing room according to claim 1, it is characterised in that the junction of the bottom surface and side is provided with arc and fallen Angle.
6. bathing room according to claim 1, it is characterised in that the upper end of the side is provided with waterproof construction, described Waterproof construction is sealing surface, groove or flanging.
7. bathing room according to claim 1, it is characterised in that the side is made up of the anti-bank of staged, the ladder The anti-bank of formula at least includes top half and the latter half;Or, the high 50mm of top half size, width 40mm, the lower half The high 50mm of portion size, width 75mm.
8. bathing room according to any one of claim 1 to 7, it is characterised in that set on the bottom plate of the bathing room There are at least two suspension centres, the suspension centre hangs nail or suspension ring for pre-buried.
9. bathing room according to any one of claim 1 to 7, it is characterised in that the wall decorating veneer is stone-plastic plate Or wood-plastic board;Or, the front of the wall decorating veneer is provided with thermal transfer figure layer.
10. bathing room according to any one of claim 1 to 7, it is characterised in that the wall decorating veneer passes through L-shaped Or T-connecting piece is connected with wall;Described connector one end is screwed on the raised line of wall decorating veneer, the other end with Wall is fixed;Or, the wall decorating veneer is connected by Z-shaped connector with wall;Described Z-shaped connector one end is provided with card Gu groove, the groove or raised line of the wall decorating veneer are fixed by the fixing slot, the other end of the Z-shaped connector passes through anchor Firmware is fixed with wall.
CN201621094991.5U 2016-09-29 2016-09-29 A kind of bathing room Active CN206385828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621094991.5U CN206385828U (en) 2016-09-29 2016-09-29 A kind of bathing room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621094991.5U CN206385828U (en) 2016-09-29 2016-09-29 A kind of bathing room

Publications (1)

Publication Number Publication Date
CN206385828U true CN206385828U (en) 2017-08-08

Family

ID=59486438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621094991.5U Active CN206385828U (en) 2016-09-29 2016-09-29 A kind of bathing room

Country Status (1)

Country Link
CN (1) CN206385828U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320749A (en) * 2016-09-29 2017-01-11 中民筑友科技投资有限公司 Bathroom

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320749A (en) * 2016-09-29 2017-01-11 中民筑友科技投资有限公司 Bathroom

Similar Documents

Publication Publication Date Title
CN206189912U (en) Bathroom bottom plate
CN206385828U (en) A kind of bathing room
CN206329067U (en) A kind of bathing room
CN106320749A (en) Bathroom
CN206189906U (en) Bathroom room
CN206189913U (en) Bathroom room
CN206189910U (en) Bathroom room
CN106351470A (en) Bathroom
CN206189916U (en) Bathroom room
CN206408726U (en) A kind of drain structure
CN206189914U (en) Bathroom room
CN206189908U (en) Bathroom room
CN104790472B (en) Same floor drainage structure of toilet
CN206189909U (en) Bathroom room
CN104746902A (en) Integral bathroom
CN104746593A (en) Integral bathroom
CN206189905U (en) Bathroom room
CN206616888U (en) A kind of bathing room
CN206189915U (en) Bathroom room
CN206189904U (en) Bathroom room
CN206329068U (en) A kind of bathing room
CN206530084U (en) A kind of bathroom bottom plate
CN109763573B (en) Water stop ridge and construction method thereof
CN206530009U (en) A kind of bathroom bottom plate
CN106320750A (en) Bathroom

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of utility model: Bathroom

Granted publication date: 20170808

License type: Common License

Record date: 20190102

EE01 Entry into force of recordation of patent licensing contract