China
Prior art keywords
wall
bathing room
decorating veneer
wall decorating
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621092811.XU
Other languages
Chinese (zh)
Inventor
俞大有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mingsheng Drawin Technology Investment Co Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201621092811.XU priority Critical patent/CN206189913U/en
Application granted granted Critical
Publication of CN206189913U publication Critical patent/CN206189913U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model provides a bathroom room, including bottom plate and wallboard, its characterized in that, the bottom plate includes bottom surface and side, bottom surface and side are mainly by concrete or the disposable whole machine -shaping of fibre concrete, the whole basin type that is of bottom plate, the wall decoration board on the wall body is fixed including the installation to the wallboard, be provided with a plurality of cavitys among the wall decoration board, wall decoration board's both sides are provided with recess and sand grip respectively. Like this, bathroom room's bottom plate can seamlessly be pour, can play rigid water -proofing's effect, can produce the prefabrication in the mill, and water -proof effects is good, and intensity is high, and the wallboard site operation is efficient.

Description

A kind of bathing room
Technical field
The utility model belongs to building field, specially a kind of bathing room.
Background technology
The base plate of traditional bathing room is constructed using concrete cast-in-situ, and waterproofing process is mainly by brush water-repellent paint, paving Protective layer reaches the effect of impervious waterproof.In order to the waterproof effect that has reached it is general firstly the need of ensure the ground of bathing room compared with For steady, but if necessary to change the floor tile of bathing room, after original floor tile chisel is gone, must first will with cement mortar Floor leveling, then does water-proofing treatment, complex process again.In addition, in order to prevent water percolation of wall, also to be done about on general metope 30 centimetres of water-repellent paints high, the metope in case ponding is spread and sunk in.It follows that existing bathing room waterproof slab workload is larger, apply Work efficiency rate is low, construction cost hardly results in control.And the metope of traditional bathing room decorates way using patch block, it is mainly logical Cross following steps completion, snap the line, labeling on schedule, select brick, row's brick, leaching brick (Imitation Rock Porcelain Tiles or high-grade brick do not allow immersion), edge patch logical Seam, jointing or the wiping seam effect attractive in appearance to reach wall decoration.It follows that existing wall tile decoration way efficiency of construction Low, construction cost hardly results in control.
The content of the invention
The technical problems to be solved in the utility model is:There is provided a kind of bathing room, the base plate of the bathing room can be with factory Production is prefabricated, and good water-proof effect, intensity is high, wallboard site operation efficiency high.
What solution of the present utility model was realized in:A kind of bathing room, including base plate and wallboard, wherein, it is described Base plate includes bottom surface and side, and the bottom surface and side are main by the disposable overall machine-shaping of concrete or fiber concrete, The base plate is in integrally basin type;The wallboard includes the wall decorating veneer being fixed on wall, in the wall decorating veneer Some cavitys are provided with, the both sides of the wall decorating veneer are respectively provided with fluted and raised line.So, the base plate of bathing room is used Concrete or fiber concrete disposable entirety machine-shaping, and overall is in basin type, whole base plate is seamless to be poured, and can be played just Property waterproof effect, and save the techniques such as installation stainless steel water-proof strip side, not only good water-proof effect, and efficiency of construction is high.It is special It is not, according to ultra-high performance concrete (Ultra-High Performance Concrete) or the superelevation of mixing of steel fiber Performance concrete fabricates the base plate of bathing room, can make full use of the high intensity of ultra-high performance concrete, high tenacity, low The strong high-durability of superelevation of porosity, improves cracking strength and the fatigue life of bathing room base plate, strengthens the resistance to of bathing room base plate Long property and rigidity.In addition, the bottom surface and the shaping of side overall processing, can use and instead beat casting craft so that bathing room The use face of base plate is located at the lower section of mould, so that it is guaranteed that using face smoother, flatness is good, saves levelling construction, directly Can be with decorative layers such as paving PVC floor, ceramic tiles, so as to further improve efficiency of construction.Further, can defend as needed Built-in fitting hole is set on the base plate in bathroom or built-in fitting is set, be easy to production line balance, can simultaneously carry out bottom surface and side The manufacture of engineering, further reduces subsequent machining technology, improves efficiency of construction.If in addition, being provided with the wall decorating veneer Dry cavity, the both sides of the wall decorating veneer are respectively provided with fluted and raised line.So, wall decorating veneer itself can be mitigated The material of weight and reduction processing and manufacturing wall decorating veneer, so as to reduce processing cost.And distinguish in the both sides of wall decorating veneer Fluted and raised line is set, and the groove and raised line match, and adjacent wall decorating veneer can be carried out by groove and raised line Fast Installation and fixation, so as to improve efficiency of construction.Until the connectors such as bolt, suspension member are used by wall decorating veneer and base in scene again Body wall or lightgage steel joist wall are connected, and such that it is able to greatly reduce the workload of site operation, it is to avoid situ wet operation, improve Efficiency of construction, facilitates in-site installation.Alternatively, it is also possible to set ripple type or saw-tooth-type structures, phase in the both sides of wall decorating veneer Adjacent wall decorating veneer can also carry out Fast Installation and fixation by the ripple type or saw-tooth-type structures that match.
Another technical scheme of the present utility model is that the bottom surface is provided with dry area and wet area on above-mentioned basis, The dry area and wet area are separated by projection, the projection overall machine-shaping disposable with bottom surface.So, area and wet area are done by convex Block separates, projection overall machine-shaping disposable with bottom surface, not only projection and bottom surface good forming effect, good appearance, Er Qiejia Work is easily manufactured, and efficiency of construction is high.
Another technical scheme of the present utility model is on above-mentioned basis, floor drain installation to be provided with the bottom surface Mouthful, it is provided with floor drain adapter at the floor drain installing port.So, the floor drain adapter can be together with the base plate of bathing room Prefabricated, during construction, floor uses laminated floor slab, floor drain adapter to be positioned on floor through the part correspondence of bathing room base plate A groove is reserved in position, and the bottom of floor drain adapter is placed in groove, then pours the overlapping layers of laminated floor slab, will defend The base plate and floor in bathroom are combined into entirety.Floor drain adapter part in a groove is connected with horizontally-arranged water pipe, and sewage is arranged Go out.The base plate of bathing room installs floor drain again after installing.Common direct-drainage floor drain can be so converted into by floor drain adapter Floor drain is arranged in side, so as to realize co-layer draining, and need not carry out drop plate treatment.It is of course also possible to floor drain is transferred with the floor drain Device set be structure as a whole, during construction, installing port is set on bathing room base plate, installed again after bathing room is installed floor drain and Floor drain adapter.
Another technical scheme of the present utility model is on above-mentioned basis, weathering to be additionally provided with the bottom surface Degree, the gradient is relatively low at the floor drain installing port.So, the sanitary wastewater of bathing room bottom surface smoothly can be caused into floor drain to install Floor drain adapter at mouthful simultaneously drains into drainage equipment module, so as to keep the drying of bathing room bottom surface.
Another technical scheme of the present utility model is that on above-mentioned basis, the junction of the bottom surface and side is set There is arc angling.So, the junction of bottom surface and side is provided with arc angling, the company of bottom surface and side can not only be reduced Meet place and the cracking risk of right-angle side is set, and be conducive to secondary decoration construction, without corner or spot as yet untouched by a clean-up campaign when using.
Another technical scheme of the present utility model is that the upper end of the side is provided with waterproof knot on above-mentioned basis Structure, the waterproof construction is sealing surface, groove or flanging.So, the upper end in side is provided with waterproof construction, bathing room Wallboard just directly can vertically be stuck in the base plate top of bathing room, then be sealed by breaking fluid sealant, simple structure, installation side Just, good water-proof effect.
Another technical scheme of the present utility model is that the side is made up of the anti-bank of staged on above-mentioned basis, The anti-bank of staged at least includes top half and the latter half.So, side is made up of the anti-bank of staged, can be formed many Level waterproof construction, improves the water resistance of base plate.
Another technical scheme of the present utility model is the top half size 50mm high, width on above-mentioned basis 40mm, the latter half size 50mm high, width 75mm.So, even if the surface water is as deep as to 50mm, also 50mm in bathing room Anti- water depth, equivalent to double waterproof measure, improve the water resistance of bathing room base plate.
Another technical scheme of the present utility model is that the bottom of the bottom surface is provided with grid layer on above-mentioned basis Or supporting rib.So, the bottom in bottom surface is provided with grid layer or supporting rib, can increase the height of bottom surface, reduces and adds Work materials.Further, the grid layer or supporting rib can be installed with bottom surface one moulding by casting or by back-hand craft It is fixed on the bottom of bottom surface.
Another technical scheme of the present utility model be it is above-mentioned basis on, be provided with the base plate of the bathing room to Few two suspension centres, the suspension centre is that pre-buried hanging is followed closely or suspension ring.So, by default suspension centre, bathing room base plate can be facilitated Or movement, lifting and the transport of bathing room.Preferably, four suspension centres are respectively provided with four angles of bathing room base plate.
Another technical scheme of the present utility model is that on above-mentioned basis, the wall decorating veneer is stone-plastic plate or wood Mould plate.So, wall decorating veneer uses stone-plastic plate or wood-plastic board, not only fabricates low cost, and durability is good, the feature of environmental protection It is good.Wherein, stone-plastic plate is also referred to as stone modeling brick or " PVC sheet plate ", be a kind of high-quality, high-tech research develop it is new Type ornament materials, the solid base of high density, high microsteping network structure is constituted using natural marble powder, and surface is coated with superpower Wear-resisting macromolecule PVC wearing layers.Wood-plastic board is a kind of environment-friendly type wood-plastic composite material products, aborning, high-density fiber Produced wooden phenol during plate, adds regenerated plastics to make wood plastic composite by Granulation Equipments, then carries out extrusion life Product group makes wood-plastic board.Possess the processing characteristics as timber, using common instrument can sawing, drilling, upper nail, very It is convenient, can be used as common wood.There is the woodiness touch of timber and the Waterproof corrosion characteristic of plastics simultaneously.
Another technical scheme of the present utility model is that the front of the wall decorating veneer is provided with above-mentioned basis Thermal transfer figure layer.So, wall decorating veneer good appearance degree, and the different figure layer of hot stamping as needed can be improved, is met many Firstization demand.Thermal transfer is divided into transfer film print and transfer processing two large divisions, and using net-point printing, (resolution ratio reaches for transfer film printing 300dpi), pattern is pre-printed film surface, the pattern level of printing is abundant, bright in luster, and ever-changing, aberration is small, then Existing property is good, the requirement effect of the person that can reach layout, and is adapted to produce in enormous quantities;Transfer processing passes through heat transfer machine once Pattern exquisite on transfer film is transferred in product surface by processing (heating pressurization), and it is one that ink layer is molten with product surface after shaping Body, it is true to nature beautiful, greatly improve the class of product.
Another technical scheme of the present utility model is that on above-mentioned basis, the wall decorating veneer is square or L-shaped. Processing is so not only convenient for, it is also easy for installation.Certainly as needed, it is also possible to which wall decorating veneer is set into camber, triangle Etc. other shapes.Wherein, L-shaped wall decorating veneer can be applied in the corner of wall.
Another technical scheme of the present utility model is that the wall decorating veneer passes through L-shaped or T-shaped on above-mentioned basis Connector is connected with wall.So, connector is the various shapes structures such as L-shaped, T-shaped or isosceles triangle, can be with various different peaces Assembling structure requirement, is easy to the installation of wall decorating veneer.
Another technical scheme of the present utility model is that described connector one end is screwed on above-mentioned basis On the raised line of wall decorating veneer, the other end is fixed with wall.So, connector one end can be screwed in advance On the raised line of wall decorating veneer, until with matrix wall or lightgage steel joist wall be connected the other end of connector again by scene.Subtract Few site operation workload, improves efficiency of construction.
Another technical scheme of the present utility model is that the wall decorating veneer is by Z-shaped connection on above-mentioned basis Part is connected with wall;Described Z-shaped connector one end is provided with fixing slot, and the groove or raised line of the wall decorating veneer are by described Fixing slot is fixed, and the other end of the Z-shaped connector is fixed by anchoring piece with wall.The Z-shaped connector can use one The direct bending of block connecting plate is formed, and connecting plate and the middle connecting plate at Z-shaped connector two ends can be mutually perpendicular to, the fixing slot Can be formed by being slotted on connecting plate at one end, being folded.Certainly, the Z-shaped connector can also be spelled using polylith connecting plate Connect or be welded.So, during in-site installation, neighboring walls decorative panel can be spliced, then by the recessed of wall decorating veneer Groove or raised line holding the Z-shaped connector fixing slot, then by the other end of Z-shaped connector by the anchoring such as screw, bolt Part is fixed with the keel on wall or wall, realizes that the Fast Installation of wall decorating veneer is fixed, and improves efficiency of construction.When Z-shaped When connector is fixed with wall body keel, the adjustment of wall body decoration plate flatness when can more easily realize installing, and due to dragon There is space between bone and wall decorating veneer, facilitate the arrangement of the pipelines such as electric wire and water pipe.
Brief description of the drawings
Fig. 1 is the sectional view of the base plate for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 2 is the sectional view of the production mould of the base plate for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 3 is the structure chart of the base plate for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 4 is the partial section of the base plate for representing the bathing room involved by this technology another embodiment;
Fig. 5 is the floor drain discharge structure figure for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 6 is the local structural graph for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 7 is the structure chart of the wall decorating veneer for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 8 to Figure 10 is the structure of the wall decorating veneer for representing the bathing room involved by the another several embodiments of this technology Figure;
Figure 11 is the structure chart for representing the bathing room involved by a kind of implementation method of this technology;
Figure 12 is to represent the partial enlarged drawing in Figure 11 at A;
Figure 13 is the structure chart of the plumbing integration module for representing the bathing room involved by a kind of implementation method of this technology;
Figure 14 is the structure chart of the plumbing integration module for representing the bathing room involved by this technology another embodiment
Figure 15 is that the application of the plumbing integration module for representing the bathing room involved by a kind of implementation method of this technology is installed Figure;
Figure 16 is the application peace of the plumbing integration module for representing the bathing room involved by this technology another embodiment Dress figure;
Figure 17 is elastic socket joint in the plumbing integration module for represent the bathing room involved by a kind of implementation method of this technology The sectional view of part;
Figure 18 is the front view of the connection of the wall decorating veneer for representing the bathing room involved by a kind of implementation method of this technology;
Figure 19 is the stereogram of the connection of the wall decorating veneer for representing the bathing room involved by a kind of implementation method of this technology.
In figure:
The waterproof construction of 10 production mould, 11 bottom surface, 12 side 13
The projection of 14 arc angling, 15 dry area, 16 wet area 17
The import of 18 floor drain installing port, 19 supporting rib, 50 floor drain 51
The 52 outlet T-shaped flanks of annulus of 53 reducing transfer tube 54
The top half of 55 ground leaking drainage pipe, 121 the latter half 122
The groove of 70 wall decorating veneer, 71 cavity, 72 raised line 73
The wall of 74 fixing groove, 75 fixed block, 76 connector 100
The VERTICAL TUBE of 41 soil stack, 42 dewatering horizontal tube, 421 horizontal tube, 422 elbow 423
The seal ring of 43 mixed zone 44 balance pipe, 45 support chip 46
47 share the access hole of 471 spacer of water seal arrangement, 472 seepage mouth 473
The elastic socket component in 48 461 anti-side of weeper 411
The fixing slot of 761 first 762 second the 3rd connecting plate of connecting plate 763 of connecting plate 764
Specific embodiment
The utility model is described in detail below in conjunction with the accompanying drawings, the description of this part be only it is exemplary and explanatory, There should not be any restriction effect to protection domain of the present utility model.Additionally, those skilled in the art's retouching according to presents State, respective combination can be carried out to the feature in embodiment in presents and in different embodiments.
The utility model embodiment is as follows, refers to shown in Fig. 1 to 12, a kind of bathing room, including base plate and wallboard, its In, the base plate includes bottom surface 11 and side 12, the bottom surface 11 and side 12 it is main by concrete or fiber concrete once Property overall processing shaping, the base plate integrally be in basin type;The wallboard includes the wall decorating veneer being fixed on wall 100 70, it is provided with some cavitys 71 in the wall decorating veneer 70, the both sides of the wall decorating veneer 70 can be respectively arranged with recessed Groove 73 and raised line 72.So, bathroom base plate is using concrete or fiber concrete disposable entirety machine-shaping, and overall is in basin Type, whole base plate is seamless to be poured, and can play a part of rigid waterproofing, and saves the techniques such as installation stainless steel water-proof strip side, no Only good water-proof effect, and efficiency of construction is high.Particularly, according to ultra-high performance concrete (Ultra-High Performance Concrete) or the ultra-high performance concrete of mixing of steel fiber fabricate the base plate of bathing room, can be with High intensity, high tenacity, the strong high-durability of the superelevation of low porosity of ultra-high performance concrete are made full use of, bathroom base plate is improved Cracking strength and fatigue life, strengthen the durability and rigidity of bathroom base plate.In addition, the bottom surface 11 and the overall processing of side 12 Shaping, as shown in Fig. 2 bathroom base plate can be used instead beats casting craft so that the use face of bathroom base plate is located at production mould 10 lower section, so that it is guaranteed that using face smoother, flatness is good, saves levelling construction, directly can be with paving PVC floor, porcelain The decorative layers such as brick, so as to further improve efficiency of construction.Further, built-in fitting can be set on bathroom base plate as needed Hole sets built-in fitting, is easy to production line balance, the manufacture of bottom surface and side engineering can be simultaneously carried out, after further reducing Continuous processing technology, improves efficiency of construction.In addition, some cavitys 71 are provided with the wall decorating veneer 70, the wall body decoration The both sides of plate 70 can be respectively provided with fluted 73 and raised line 72.So, some cavitys 71 are provided with wall decorating veneer 70, The weight that wall decorating veneer itself can be mitigated and the material for reducing processing and manufacturing wall decorating veneer, so as to reduce processing cost. And fluted 73 and raised line 72 are respectively provided with the both sides of wall decorating veneer 70, the groove 73 and raised line 72 match, adjacent Wall decorating veneer Fast Installation and fixation can be carried out by groove and raised line, so as to improve efficiency of construction.Such as Figure 11 and Tu Shown in 12, until with matrix wall or lightgage steel joist wall be connected wall decorating veneer 70 with connectors 76 such as bolt, suspension members again by scene It is fixed, such that it is able to greatly reduce the workload of site operation, it is to avoid situ wet operation, improve efficiency of construction, convenient scene peace Dress.Alternatively, it is also possible to set ripple type or saw-tooth-type structures in the both sides of wall decorating veneer, adjacent wall decorating veneer can also Fast Installation and fixation are carried out by the ripple type or saw-tooth-type structures that match.Further, such as Fig. 8, Fig. 9, Figure 11 and Tu Shown in 12, fixed block 75 can also be set in the one or both sides of wall decorating veneer 70, the thickness of the fixed block 75 is preferably wall The half of body decorative panel, the raised line 72 can be arranged on one end of fixed block 75, during in-site installation, first can be incited somebody to action with connector One piece of fixed block of wall decorating veneer 70 75 is connected with matrix wall or lightgage steel joist wall, then by adjacent wall decorating veneer 70 quickly splice fixation by groove thereon or raised line with the wall decorating veneer fixed, then the wall that will be spliced with connector The fixed block 75 of body decorative panel is connected with matrix wall or lightgage steel joist wall, installs successively.Certainly, those skilled in the art By reasonable speculation, it is also possible to only set the fixed block 75 being mutually matched in the both sides of wall decorating veneer 70, or in wall dress The side of plaque 70 sets fixed block 75, and side sets other raised line 72, should all belong to the protection domain of this patent.Additionally, such as Shown in Fig. 7, it is also possible to fixing groove 74 is being set in the both sides of wall decorating veneer 70, during installation, by the holding of connector one end solid Determine in groove 74, the other end is connected with matrix wall or lightgage steel joist wall.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 3 and Figure 4, the bottom surface can To be provided with dry area 15 and wet area 16, the dry area 15 and wet area 16 are separated by projection 17, and the projection 17 can be with bottom surface one Secondary property overall processing shaping.So, do area 15 and wet area 16 is separated by projection 17, projection 17 is disposably integrally processed into bottom surface Type, not only projection 17 and bottom surface good forming effect, good appearance, and convenient processing and manufacture, efficiency of construction is high.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 4 and Figure 5, the bottom surface 11 Floor drain installing port 18 is provided with, floor drain adapter is provided with the floor drain installing port 18.So, the floor drain adapter can be with Prefabricated together with the base plate of bathing room, during construction, floor uses laminated floor slab, floor drain adapter to pass through the part of bathing room base plate A groove is reserved in the position that correspondence is positioned on floor, and the bottom of floor drain adapter is placed in groove, then pours folded The overlapping layers of floor is closed, the base plate and floor of bathing room are combined into entirety.Floor drain adapter lower part outlet and ground leaking drainage pipe 55 are connected, and sewage is discharged.The base plate of bathing room installs floor drain 50 again after installing.Common direct-drainage floor drain can so be led to Cross floor drain adapter and be converted into side row's floor drain, so as to realize co-layer draining, and drop plate treatment need not be carried out.It is of course also possible to will Floor drain 50 sets with the floor drain adapter and is structure as a whole, and during construction, installing port is set on bathroom base plate, by bathroom base plate Floor drain and floor drain adapter are installed again after installing.Further, the floor drain adapter includes an import 51 and one outlet 52, connected by 90 ° of reducing transfer tubes 53 between the import 51 and outlet 52, the reducing transfer tube 53 is at import 51 Outer wall on be provided with the T-shaped flank 54 of annulus.So, it is provided with circle on the outer wall at import 51 in reducing transfer tube 53 The T-shaped flank 54 of ring, the T-shaped flank 54 of annulus is merged one in being well embedded in the base plate 11 of bathroom with concrete Rise, the installation sealing for later stage floor drain 50 plays a good role, and can improve floor drain 50 close with being connected for floor drain adapter Envelope effect.
On the basis of above-described embodiment, in another embodiment of the utility model, as described in Figure 4, also set on the bottom surface Drainage grade (not illustrating in figure) is equipped with, the gradient is relatively low at the floor drain installing port 18.So, can smoothly by bathing room bottom During the sanitary wastewater in face causes the floor drain adapter at floor drain installing port 18 and drains into drainage equipment module, so as to keep bathing room The drying of bottom surface.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 1, the bottom surface 11 and side The junction in face 12 can be provided with arc angling 14.So, the junction of bottom surface 11 and side 12 is provided with arc angling 14, the junction that can not only reduce bottom surface 11 and side 12 sets the cracking risk of right-angle side, and is conducive to secondary decoration Construction, without corner or spot as yet untouched by a clean-up campaign when using.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figures 1 to 6, the side 12 Upper end be provided with waterproof construction 13, the waterproof construction 13 can be sealing surface, groove or flanging.So, in side 12 Upper end be provided with waterproof construction 13, the wallboard of bathing room just directly can vertically be stuck in the base plate top of bathing room, then pass through Break fluid sealant to be sealed, simple structure is easy for installation, good water-proof effect.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in fig. 6, the side 12 is by rank The anti-bank composition of ladder type, the anti-bank of staged at least includes top half 122 and the latter half 121.So, side is by staged Anti- bank composition, can form multi-level waterproof construction 13, improve the water resistance of bathroom base plate.Preferably, the first half 122 sizes are divided to be 50mm high, width 40mm, the size of the latter half 121 is 50mm high, width 75mm.So, even if in bathing room As deep as to 50mm, the anti-water depth of also 50mm, equivalent to double waterproof measure, improves the water proofing property of bathroom base plate to the surface water Energy.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 5, the bottom of the bottom surface 11 Portion is also provided with grid layer or supporting rib 19.So, the bottom in bottom surface 11 is provided with grid layer or supporting rib 19, The height of bottom surface 11 can be increased, processing materials are reduced.Further, the grid layer or supporting rib 19 can be with bottom surfaces 11 One moulding by casting is fixed on the bottom of bottom surface 11 by back-hand craft.
On the basis of above-described embodiment, in another embodiment of the utility model, it is provided with least on the bathroom base plate Two suspension centres, the suspension centre is that pre-buried hanging is followed closely or suspension ring (not indicated in figure).So, by default suspension centre, can be conveniently Movement, lifting and the transport of the base plate or bathing room of bathing room.Preferably, set respectively on four angles of bathing room base plate Put four suspension centres.
On the basis of above-described embodiment, in another embodiment of the utility model, the wall decorating veneer 70 can be stone Mould plate or wood-plastic board.So, wall decorating veneer uses stone-plastic plate or wood-plastic board, not only fabricates low cost, and durability The good, feature of environmental protection is good.Wherein, stone-plastic plate is also referred to as stone modeling brick or " PVC sheet plate ", is that a kind of high-quality, high-tech research are opened The new decorative material for issuing, the solid base of high density, high microsteping network structure, table are constituted using natural marble powder Face coated with superpower wear-resistant macromolecule PVC wearing layers.Wood-plastic board is a kind of environment-friendly type wood-plastic composite material products, aborning, Produced wooden phenol during high density fiberboard, adds regenerated plastics to make wood plastic composite by Granulation Equipments, then Carry out extrusion group and make wood-plastic board.Possess the processing characteristics as timber, can sawing, brill using common instrument Hole, upper nail, it is very convenient, can be used as common wood.There is the woodiness touch of timber and the Waterproof corrosion of plastics simultaneously Characteristic.
On the basis of above-described embodiment, in another embodiment of the utility model, the front of the wall decorating veneer 70 is also Thermal transfer figure layer can be provided with.So, wall decorating veneer good appearance degree, and the different figure of hot stamping as needed can be improved Layer, meets multiple demand.Thermal transfer is divided into transfer film print and transfer processing two large divisions, and transfer film printing uses net-point printing (resolution ratio reaches 300dpi), film surface is pre-printed by pattern, and the pattern level of printing is abundant, bright in luster, ever-changing, Aberration is small, and repeatability is good, the requirement effect of the person that can reach layout, and is adapted to produce in enormous quantities;Transfer processing is by heat Pattern exquisite on transfer film is transferred in product surface by transfer interpreter time processing (heating pressurization), ink layer and product after shaping Surface is molten to be integrated, true to nature beautiful, greatly improves the class of product.
On the basis of above-described embodiment, in another embodiment of the utility model, the wall decorating veneer 70 can be side Shape or L-shaped.Processing is so not only convenient for, it is also easy for installation.Certainly as needed, it is also possible to which wall decorating veneer 70 is arranged to arc The other shapes such as shape, triangle.As shown in Fig. 9, Figure 10, Figure 11 and Figure 12, wherein, L-shaped wall decorating veneer 70 can be applied The corner of wall between bathroom.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Fig. 7 to Figure 12, the cavity 71 can be square opening or circular port, and the cavity 71 is evenly distributed in wall decorating veneer along the longitudinal direction of wall decorating veneer 70. So, it is not only convenient for processing and fabricating, it is also ensured that the uniformity of wall decorating veneer, improves its tension and compressive property.
On the basis of above-described embodiment, in another embodiment of the utility model, as is illustrated by figs. 11 and 12, the wall Decorative panel 70 can be connected by L-shaped or T-connecting piece 76 with wall.So, connector 76 is that L-shaped, T-shaped or isosceles triangle etc. are more Shape and structure is planted, the installation of wall decorating veneer 70 can be easy to various different mounting structures requirements.Further, connector 76 can be made up of screw and connection hanging piece, and connection hanging piece can be zigzag, and one end of connection hanging piece is embedded into wall 100, The other end is connected by screw with wall decorating veneer 70.
On the basis of above-described embodiment, in another embodiment of the utility model, the one end of the connector 76 passes through screw It is fixed on the raised line 72 of wall decorating veneer 70, the other end is fixed with wall 100.So, can in advance by the one end of connector 76 It is screwed on the raised line 72 of wall decorating veneer 70, until scene is again by the other end of connector 76 and matrix wall or light Steel joist wall is connected.Site operation workload is reduced, efficiency of construction is improved.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figures 18 and 19, the wall dress Plaque is connected by Z-shaped connector with wall;Described Z-shaped connector one end is provided with fixing slot 764, the wall decorating veneer Groove 73 or raised line 72 can be fixed by the fixing slot 764, and the other end of the Z-shaped connector passes through anchoring piece and wall It is fixed.Specifically, the Z-shaped connector can be formed by one piece of direct bending of connecting plate, including the first connecting plate 761, Two connecting plates 762 and the 3rd connecting plate 763, first connecting plate 761, the second connecting plate 762 are connected by the 3rd connecting plate 763 Connect, the first connecting plate 761 and three connecting plates 763 are vertically arranged, the second connecting plate 762 and three connecting plates 763 are also vertically arranged, the One connecting plate 761 and the second connecting plate 762 can be arranged on the one or both sides of three connecting plate 763, the fixing slot 764 Can be arranged on the first connecting plate 761 or the second connecting plate 762, such as directly carry out cutting groove, refolding open on connecting plate Form fixing slot 764 afterwards, the openings of sizes or width of the fixing slot 764 can according to the thickness of wall decorating veneer and weight come Setting.Certainly, the Z-shaped connector can also be spliced or be welded using polylith connecting plate.So, during in-site installation, can Splice with by neighboring walls decorative panel, then by the groove 73 of wall decorating veneer or the holding of raised line 72 in the Z-shaped connector Fixing slot 764 in, the other end of Z-shaped connector is provided with mounting hole (not identified in figure), then is anchored by screw, bolt etc. Part is directly fixed by Z-shaped connector and wall or is fixed with the keel on wall, realizes that the Fast Installation of wall decorating veneer is fixed, Improve efficiency of construction.When Z-shaped connector and wall body keel are fixed, wall decorating veneer is put down when can more easily realize installing The adjustment of whole degree, and due to there is space between keel and wall decorating veneer, facilitate the arrangement of the pipelines such as electric wire and water pipe.
On the basis of above-described embodiment, in another embodiment of the utility model, the bathing room is also provided with plumbing Integration module, the plumbing integration module can be set at the equipment raise of bathing room or in bathing room, such as Figure 13 to Figure 16 institutes Show, the plumbing integration module includes soil stack 41 and dewatering horizontal tube 42, wherein, the soil stack 41 can be second word Pipe, the bottom of the soil stack 41 is connected to form mixed zone 43 with one end of dewatering horizontal tube 42, the soil stack 41 it is upper The balance pipe 44 for connecting is provided between portion and dewatering horizontal tube 42.So, soil stack 41 uses offset, due to standpipe current Chamber deviate from former standpipe position of center line, can again have concurrently and slow down soil stack current while soil stack current are linked up Speed, the function of energy dissipating so that the noise in soil stack 41 is greatly reduced.By the bottom of soil stack 41 and dewatering horizontal tube 42 One end connect to form mixed zone 43, in this way, can cause in the current of 43 dewatering horizontal tube of mixed zone 42 and the current of soil stack 41 Water (flow) direction it is consistent, prevent current disorderly.And it is provided with what is connected between the top of soil stack 41 and dewatering horizontal tube 42 Balance pipe 44, in this way, the pressure between soil stack 41 and dewatering horizontal tube 42 can be balanced, prevents siphonage.Therefore, it is described Plumbing integration module eliminates vent stack, reduces production cost, and the installation for saving tubing and plumbing integration module is empty Between, it is easier for installation.Further, the dewatering horizontal tube can set certain angle, and the dewatering horizontal tube stands with draining The connection end of pipe is downward-sloping, is so conducive to water to enter mixed zone from the import of dewatering horizontal tube.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 13 to Figure 16, the draining Transverse tube 42 can be inverted L-shaped pipe, can include horizontal tube 421, elbow 422 and VERTICAL TUBE 423, the horizontal tube 421 and vertically Pipe 423 is connected by elbow 422;The bottom of the VERTICAL TUBE 423 is connected with the bottom of soil stack 41.So, dewatering horizontal tube Including horizontal tube, elbow and VERTICAL TUBE, using global formation or can be held between horizontal tube 421, elbow 422 and VERTICAL TUBE 423 Plug-in connection, it is easy for installation;The horizontal tube 421 of dewatering horizontal tube 42 and the top of soil stack 41 separate, thus transverse tube and standpipe it Between current be avoided that and interfere that the bottom of the VERTICAL TUBE 423 is connected with the bottom of soil stack 41, form mixed zone 43, in this way, can cause consistent with the water (flow) direction of the bottom of soil stack in the bottom of VERTICAL TUBE, prevent current disorderly.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 13 to Figure 16, the balance One end of pipe 44 is connected with the elbow 422 of dewatering horizontal tube 42, and the other end is connected with the turning of soil stack 41.So, no Can only avoid setting too high due to the position of balance pipe 44, cause the water in soil stack 41 to be flowed into dewatering horizontal tube 42, and And can avoid setting too low due to the position of balance pipe 44, cause the water in dewatering horizontal tube 42 to flow into soil stack 41.So that Balance pipe 44 has the pressure between balance soil stack 41 and dewatering horizontal tube 42 always, prevents the effect of siphon.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 13 to Figure 16, the balance Pipe 44 can be the curved pipe for raising up.So, balance pipe 44 is the curved pipe for raising up, and can reduce soil stack 41 With the water in dewatering horizontal tube 42 by the possibility of the mutually flowing of balance pipe 44, the anti-siphonage of balance pipe 44 is improved.
On the basis of above-described embodiment, in another embodiment of the utility model, the balance pipe 44 can for S-shaped pipe or Z-type pipe.So, the balance pipe 44 is arranged to S-shaped pipe or Z-type pipe, can further reduce soil stack 41 and dewatering horizontal tube Water in 42 improves the anti-siphonage of balance pipe 44 by the possibility of the mutually flowing of balance pipe 44.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 13 to Figure 16, in the row Support chip 45 is also provided with the setting of balance pipe 44 of water standpipe 41 and dewatering horizontal tube 42.So, draining can be strengthened to stand Connection between pipe 41 and dewatering horizontal tube 42, prevents the stress of balance pipe 44 excessive and cracking or breaking, improves the integrated mould of plumbing The service life of block.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 13 to Figure 17, the draining Flexible socket component 411 can be set in the upper lumen of standpipe 41.As shown in figure 17, the elastic socket component 411 can set Elastic packing rubber ring more than two-layer is put, so described elastic socket component can replace telescopic joint of the prior art, be used for The length compensation that pipeline needs by mounting and adjusting, additionally it is possible to compensate the dilatation that pipeline is produced by temperature change, structure letter Single, cost is relatively low, and in-site installation is convenient.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 17 to Figure 16, the discharge Water integration module also includes seal ring 46, and the seal ring 46 is integrally formed with the soil stack 41 and dewatering horizontal tube 42.This Sample, plumbing integration module is provided with seal ring 46, when plumbing integration module is installed, can be by seal ring 46 and floor In-situ layer is poured together fixes plumbing integration module, in addition, the filling of piping shaft can be filled directly on seal ring 46, Eliminate the operation of the mould bases that fixes in addition.Further, anti-side 461, the anti-side can also be provided with seal ring 46 461 edges that can be arranged on seal ring 46, play a part of to prevent infiltration.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 13, the mixed zone 43 Side is provided with shared water seal arrangement 47;One end of the shared water seal arrangement 47 is connected with the side wall of dewatering horizontal tube 42, another Hold and be connected with indoor floor drain, the other end of the dewatering horizontal tube 42 is connected with washbowl and toilet.Water seal arrangement 47 is shared to store up Water is big, and water seal height can reach more than 100mm, save the trap of floor drain, can realize co-layer draining, can be used for building The relatively thin situation that can not set caisson of toilet of plate, when a jam does occur maintenance is got up also easily, and floor drain is installed and is also convenient for.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 13, the shared water seal dress It can be the deodorization case being arranged on outside the side wall of the dewatering horizontal tube 42 to put 47, and spacer 471 is provided with the deodorization case, described Seepage mouth 472 is provided with the side wall of dewatering horizontal tube 42, the bottom position of spacer 471 described in the vertical direction oozes less than described The position at the mouth of a river 472.So, due to being provided with spacer 471 in the deodorization case, it is provided with the side wall of the dewatering horizontal tube 42 Seepage mouth 472, the bottom position of spacer 471 described in the vertical direction less than the seepage mouth 472 position, when ponding from After the water inlet of deodorization case flows into deodorization case, water seal is formed between the spacer 471 and the side wall of dewatering horizontal tube 42 of deodorization case, when anti- Water in smelly case gradually increases, and when water level exceedes the seepage mouth 472 of dewatering horizontal tube 42, ponding is the seepage mouth from dewatering horizontal tube 42 472 are drained into dewatering horizontal tube 42, so as in time discharge the ponding in the outside of dewatering horizontal tube 42 in time.
On the basis of above-described embodiment, in another embodiment of the utility model, the bottom of the deodorization case is provided with inspection Repair mouth 473.So, it is easy to the schedule of plumbing integration module to safeguard and overhaul.
It is described vertical as shown in Figure 14 to Figure 16 in another embodiment of the utility model on the basis of above-described embodiment The right side of pipe 423 is connected to form mixed zone with the bottom of the soil stack 41, the bottom of the soil stack 41 and VERTICAL TUBE 423 in angle of 45 degrees, and the left side of the VERTICAL TUBE 423 is provided with 423 one-tenth of weeper 48, the weeper 48 and VERTICAL TUBE 45 degree of angles.So, the weeper 48 can be connected with the trap of two floor drains 50, can in floor drain trap shape Into water seal higher.The bottom of the soil stack 41 with VERTICAL TUBE 423 in angle of 45 degrees, the weeper 48 and VERTICAL TUBE 423 in angle of 45 degrees, and the bottom of soil stack 41 is set with the Relative vertical of weeper 48, when weeper 48 and VERTICAL TUBE 423 It is when the position of tie point and the bottom of soil stack 41 are arranged on zone of reasonableness with the position of the tie point of VERTICAL TUBE 423, such as, small Drainpipe 48 is arranged on the bottom of soil stack 41 with the connector of VERTICAL TUBE 423 perpendicular with the position of the tie point of VERTICAL TUBE 423 The position more than upward center line of Nogata, can cause that soil stack 41 in the case of full packages water-carrying capacity, is washed into small draining Pipe 48 will be less than the minimum point of weeper 48 and the tie point of VERTICAL TUBE 423 with the highest current of the tie point inwall of VERTICAL TUBE 423. This way it is possible to avoid the flow backwardses in soil stack 41 enter weeper 48, and the sewage in trap is poured into floor drain Drainpipe, causes foul smell to return to indoor problem;The current in current and weeper 48 in soil stack 41 can also be avoided After mixing, the hydraulic pressure formed in mixed zone is larger, and the water in trap is suctioned out, and causes the water seal in trap to be drained Problem.Certainly, the weeper 48 is too high with what the position of the tie point of VERTICAL TUBE 423 can not be set, such as exceedes draining The bottom of standpipe 41 and the peak of the connector of VERTICAL TUBE 423, can otherwise cause the vertical drainage pipe of floor drain in bathing room Height step-down, causes bathroom indoor drainage to have some setbacks.
On the basis of above-described embodiment, in another embodiment of the utility model, the soil stack 41, dewatering horizontal tube 42 With balance pipe 44 by metal or organic material are made.When soil stack 41, dewatering horizontal tube 42 and the material of balance pipe 44 are metal Or during organic material, the simple production process of plumbing integration module molds punching press or welding, is conducive to high-volume Low cost production.
On the basis of above-described embodiment, in another embodiment of the utility model, the soil stack 41 and/or transverse drainage The top of pipe 42 or bottom are also associated with diameter changing device (not identified in figure).After diameter changing device is set, facilitate between upper and lower floor Standpipe and the soil stack 41 in plumbing integration module and/or dewatering horizontal tube 42 are docked;In addition, being such as provided that big opening Reducer pipe, then can form high flow rate pass so that spot is not easy in plumbing integration module in plumbing integration module Middle deposition is blocked.Small opening reducer pipe can certainly be set, then multiple entrances, side can be set in plumbing integration module Just multiple positions ponding is entered with soil stack 41 once.
On the basis of above-described embodiment, in another embodiment of the utility model, the top or bottom of the diameter changing device It is connected with pipeline eccentric (not identified in figure).When the top or bottom of diameter changing device are connected with pipeline eccentric, can To solve upper and lower pipeline installation question not on the same axis, it is only necessary to adjust smooth docking by eccentric, reduce Pipe installing difficulty.
On the basis of above-described embodiment, in another embodiment of the utility model, the soil stack 41 and/or transverse drainage Expansion ring (not identified in figure) is additionally provided with pipe 42.After expansion ring being provided with soil stack 41 and/or dewatering horizontal tube 42, In the case of pipe built-in, expansion ring can solve the problems, such as a small amount of shortage of pipeline, it is not necessary to be connected by changing pipeline, together When, expansion ring can also do and offset the mouth of pipe by a small margin, its pipeline for docking is not connected on the same axis.
On the basis of above-described embodiment, in another embodiment of the utility model, the soil stack 41 and/or transverse drainage Fire trapping ring or fireprotection layer (not identified in figure) are installed on pipe 42.After fire trapping ring or fireprotection layer are installed on preset pipeline, when When bathroom meets with fire, fire trapping ring or fireprotection layer can block burning things which may cause a fire disaster and spread up and down.
On the basis of above-described embodiment, in another embodiment of the utility model, the plumbing integration module integrated injection It is moulded type or blow molding.When the shaping of plumbing integration module integral molded plastic or blow molding, the production technology effect of its shaping Rate is high, and steady quality reliability, production cost is relatively low, is conducive to large-scale promotion application.
On the basis of above-described embodiment, in another embodiment of the utility model, the plumbing integration module uses 3D Printing integrated shaping.When the planform of plumbing integration module is complicated, when production and extremely inconvenient construction and installation, beaten using 3D Print is integrally formed, and is conducive to manufacturing for plumbing integration module.
On the basis of above-described embodiment, in another embodiment of the utility model, the plumbing integration module is used UPVC materials.UPVC is the aggregated reaction of VCM and the amorphous thermoplastic resin that is made adds certain additive (such as Stabilizer, lubricant, filler etc.) composition, because it has the advantages that lightweight, corrosion-resistant, intensity is higher, thus in pipeline Extensive use in installation.UPVC pipe material inner walls are smooth, and fluid friction resistance is small, and overcome cast iron pipe influences because getting rusty, fouling The defect of flow.
The above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (10)

1. a kind of bathing room, including base plate and wallboard, it is characterised in that the base plate include bottom surface and side, the bottom surface and Side is main by the disposable overall machine-shaping of concrete or fiber concrete, and the base plate is in integrally basin type;The wallboard bag The wall decorating veneer being fixed on wall is included, some cavitys, the wall decorating veneer are provided with the wall decorating veneer Both sides be respectively provided with fluted and raised line.
2. bathing room according to claim 1, it is characterised in that the bottom surface is provided with dry area and wet area, the dry area Separated by projection with wet area, the projection overall machine-shaping disposable with bottom surface.
3. bathing room according to claim 1, it is characterised in that the bottom surface is provided with floor drain installing port, the floor drain Floor drain adapter is provided with installing port.
4. bathing room according to claim 3, it is characterised in that drainage grade is additionally provided with the bottom surface, describedly The gradient is relatively low at leakage installing port.
5. bathing room according to claim 1, it is characterised in that the junction of the bottom surface and side is provided with arc and falls Angle.
6. bathing room according to claim 1, it is characterised in that the upper end of the side is provided with waterproof construction, described Waterproof construction is sealing surface, groove or flanging.
7. bathing room according to claim 1, it is characterised in that the side is made up of the anti-bank of staged, the ladder The anti-bank of formula at least includes top half and the latter half;Or, the top half size 50mm high, width 40mm, the lower half Portion size 50mm high, width 75mm.
8. bathing room according to any one of claim 1 to 7, it is characterised in that set on the base plate of the bathing room There are at least two suspension centres, the suspension centre is that pre-buried hanging is followed closely or suspension ring.
9. bathing room according to any one of claim 1 to 7, it is characterised in that the wall decorating veneer is stone-plastic plate Or wood-plastic board;Or, the front of the wall decorating veneer is provided with thermal transfer figure layer.
10. bathing room according to any one of claim 1 to 7, it is characterised in that the wall decorating veneer passes through L-shaped Or T-connecting piece is connected with wall;Described connector one end is screwed on the raised line of wall decorating veneer, the other end with Wall is fixed;Or, the wall decorating veneer is connected by Z-shaped connector with wall;Described Z-shaped connector one end is provided with card Gu groove, the groove or raised line of the wall decorating veneer are fixed by the fixing slot, the other end of the Z-shaped connector passes through anchor Firmware is fixed with wall.
CN201621092811.XU 2016-09-29 2016-09-29 Bathroom room Active CN206189913U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621092811.XU CN206189913U (en) 2016-09-29 2016-09-29 Bathroom room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621092811.XU CN206189913U (en) 2016-09-29 2016-09-29 Bathroom room

Publications (1)

Publication Number Publication Date
CN206189913U true CN206189913U (en) 2017-05-24

Family

ID=58730367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621092811.XU Active CN206189913U (en) 2016-09-29 2016-09-29 Bathroom room

Country Status (1)

Country Link
CN (1) CN206189913U (en)

Similar Documents

Publication Publication Date Title
CN206189912U (en) Bathroom bottom plate
CN206329067U (en) A kind of bathing room
CN206385828U (en) A kind of bathing room
CN106320749A (en) Bathroom
CN206189906U (en) Bathroom room
CN206189913U (en) Bathroom room
CN206189910U (en) Bathroom room
CN102900144A (en) Undermining floor drain automatic drainage structure capable of preventing leakage of toilet
CN106351470A (en) Bathroom
CN106320750A (en) Bathroom
CN202882098U (en) In-pit floor drain automatic drainage structure capable of preventing toilet from leaking
CN206189914U (en) Bathroom room
CN206189909U (en) Bathroom room
CN206189905U (en) Bathroom room
CN104746902A (en) Integral bathroom
CN104746593A (en) Integral bathroom
CN206189916U (en) Bathroom room
CN206189904U (en) Bathroom room
CN206616888U (en) A kind of bathing room
CN206189908U (en) Bathroom room
CN206189915U (en) Bathroom room
CN206530084U (en) A kind of bathroom bottom plate
CN206329068U (en) A kind of bathing room
CN106351471A (en) Bathroom
CN206530009U (en) A kind of bathroom bottom plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of utility model: Bathroom

Granted publication date: 20170524

License type: Common License

Record date: 20190102