CN106320750A - Bathroom - Google Patents
Bathroom Download PDFInfo
- Publication number
- CN106320750A CN106320750A CN201610865348.6A CN201610865348A CN106320750A CN 106320750 A CN106320750 A CN 106320750A CN 201610865348 A CN201610865348 A CN 201610865348A CN 106320750 A CN106320750 A CN 106320750A
- Authority
- CN
- China
- Prior art keywords
- wall
- bathing room
- decorating veneer
- wall decorating
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/125—Small buildings, arranged in other buildings
- E04H1/1266—Cubicles for dressing; Toilets
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
- E03C1/122—Pipe-line systems for waste water in building
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03C—DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
- E03C1/00—Domestic plumbing installations for fresh water or waste water; Sinks
- E03C1/12—Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
- E03C1/28—Odour seals
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0407—Floor drains for indoor use
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0407—Floor drains for indoor use
- E03F5/0409—Devices for preventing seepage around the floor drain
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/072—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements
- E04F13/073—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements for particular building parts, e.g. corners or columns
- E04F13/0733—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements for particular building parts, e.g. corners or columns for corners
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0832—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
- E04F13/0833—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable
- E04F13/0846—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable the fastening elements engaging holes or grooves in the side faces of the covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0875—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements having a basic insulating layer and at least one covering layer
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0889—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements characterised by the joints between neighbouring elements, e.g. with joint fillings or with tongue and groove connections
- E04F13/0894—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements characterised by the joints between neighbouring elements, e.g. with joint fillings or with tongue and groove connections with tongue and groove connections
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2201/00—Joining sheets or plates or panels
- E04F2201/02—Non-undercut connections, e.g. tongue and groove connections
- E04F2201/025—Non-undercut connections, e.g. tongue and groove connections with tongue and grooves alternating transversally in the direction of the thickness of the panel, e.g. multiple tongue and grooves oriented parallel to each other
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2201/00—Joining sheets or plates or panels
- E04F2201/04—Other details of tongues or grooves
- E04F2201/043—Other details of tongues or grooves with tongues and grooves being formed by projecting or recessed parts of the panel layers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2203/00—Specially structured or shaped covering, lining or flooring elements not otherwise provided for
- E04F2203/02—Specially structured or shaped covering, lining or flooring elements not otherwise provided for having particular shapes, other than square or rectangular, e.g. triangular, hexagonal, circular, irregular
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2203/00—Specially structured or shaped covering, lining or flooring elements not otherwise provided for
- E04F2203/04—Specially structured or shaped covering, lining or flooring elements not otherwise provided for comprising a plurality of internal elongated cavities arranged in substantially parallel rows
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F2290/00—Specially adapted covering, lining or flooring elements not otherwise provided for
- E04F2290/04—Specially adapted covering, lining or flooring elements not otherwise provided for for insulation or surface protection, e.g. against noise, impact or fire
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Hydrology & Water Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Floor Finish (AREA)
Abstract
The invention provides a bathroom. The bathroom comprises base boards and wall boards and is characterized in that each base board comprises a bottom surface and side surfaces, the bottom surface and the side surfaces are mainly and integrally processed and formed by concrete and fiber concrete at a time, at least two stages of stepped waterproof sill is arranged on each side surface, and the stepped waterproof sills are integrally formed with the bottom surfaces. Each wall board comprises a wall decorating board installed and fixed to a wall, a plurality of cavities are formed in the wall decorating board, and a groove and a convex strip are arranged on two sides of the wall decorating board respectively. Therefore, seamless casting of the base boards of the bathroom can be achieved, a rigid water proofing effect can be played, the base boards can be produced and precast in a factory, the water proofing effect is good, the strength is high, and the efficiency of wall board site construction is high.
Description
Technical field
The invention belongs to building field, be specially a kind of bathing room.
Background technology
The base plate of traditional bathing room adopts concrete cast-in-situ construction, waterproofing process is mainly by brush water-repellent paint, paving protective layer reaches the effect of impervious waterproof. and the ground that generally first needs to guarantee bathing room for the waterproof effect having reached is for steadily, if but need to change the floor tile of bathing room, after original floor tile cutter is gone, must first incite somebody to action by cement mortar floor leveling, and then do water-proofing treatment, complex process. in addition, in order to prevent water percolation of wall, on general metope, also to do approximately 30 centimetres of high water-repellent paints, the metope in case ponding is spread and sunk in. hence one can see that, existing bathing room base plate waterproof workload is larger, execute work efficiency rate is low, construction cost is difficult to controlled. and the metope of traditional bathing room adopts patch block to decorate way, it is mainly logical crossing following steps completes, snap the line, labeling on schedule, select brick, row's brick, soak brick (Imitation Rock Porcelain Tiles or high-grade brick do not allow to soak), edge pastes logical seam, jointing or wiping seam reach wall decoration effect attractive in appearance. and hence one can see that, existing wall tile is decorated way efficiency of construction low, construction cost is difficult to controlled.
Summary of the invention
The technical problem to be solved in the present invention is: a kind of bathing room is provided, and the base plate of this bathing room can be produced prefabricated in factory, good water-proof effect, and intensity is high, and wallboard site operation efficiency is high.
Solution of the present invention is achieved in that a kind of bathing room, comprises base plate and wallboard, wherein, and described base plate Comprise bottom surface and side, described bottom surface and side be mainly by concrete or the machine-shaping of fiber concrete disposable integral, described in On side, be provided with at least anti-bank of staged of two-stage, the anti-bank of described staged and bottom surface are one-body molded; Described wallboard comprises peace Dress is fixed on the wall decorating veneer on body of wall, is provided with some cavitys, two of described wall decorating veneer in described wall decorating veneer Side is respectively arranged with groove and raised line. and like this, the base plate of bathing room adopts concrete or the processing of fiber concrete disposable integral Moulding, entirety can be basin type, and whole base plate is seamless builds, and can play the effect of rigid waterproofing, and saves installation stainless steel The techniques such as water-proof strip limit, not only good water-proof effect, and also efficiency of construction is high. particularly, if adopt ultra-high performance concrete (Ultra-High Performance Concrete) or the ultra-high performance concrete of mixing of steel fiber carry out processing and manufacturing bathing room Base plate, can make full use of high strength, the high tenacity of ultra-high performance concrete, the strong high-durability of superelevation of low porosity, carry The cracking strength of high bathing room base plate and fatigue life, strengthen durability and the rigidity of bathing room base plate. in addition, described bottom surface and Side overall processing molding, can use and instead beat casting craft so that the use face of the base plate of bathing room is positioned at the lower section of mould Thereby guarantee to use face smoother, flatness is good, save levelling construction, directly can paving PVC floor, the decoration such as ceramic tile Layer, thus improve efficiency of construction further.Further, built-in fitting hole can be set as required on the base plate of bathing room Or built-in fitting is set, it is simple to production line balance, bottom surface and the manufacture of side engineering can be carried out simultaneously, reduce follow-up adding further Work technique, improves efficiency of construction.And, the side of bathing room base plate is provided with the anti-bank of staged of at least two-stage, described The anti-bank of staged is one-body molded with the bottom surface of bathing room base plate.As such, it is possible to form multi-level waterproof construction, improve at the bottom of bathing room The water resistance of plate.It addition, be provided with some cavitys in described wall decorating veneer, the both sides of described wall decorating veneer are respectively provided with Fluted and raised line.As such, it is possible to alleviate the weight of wall decorating veneer self and reduce the material of processing and manufacturing wall decorating veneer Thus reduce processing cost.And fluted and raised line it is respectively provided with in the both sides of wall decorating veneer, described groove and raised line phase Joining, adjacent wall decorating veneer can carry out Fast Installation by groove and raised line and fix, thus improves efficiency of construction.Until Wall decorating veneer is connected fixing by scene again with the connector such as bolt, suspension member with matrix wall or lightgage steel joist wall, such that it is able to greatly The big workload reducing site operation, it is to avoid situ wet operation, improves efficiency of construction, facilitates in-site installation.Alternatively, it is also possible to The both sides of wall decorating veneer arrange ripple type or saw-tooth-type structures, and adjacent wall decorating veneer can also be by the ripple matched Type or saw-tooth-type structures carry out Fast Installation and fix.
Another technical scheme of the present invention is on above-mentioned basis, and described bottom surface is provided with dry district and wet district, described
Dry district and wet district are separated by projection, the disposably overall machine-shaping of described projection and bottom surface.So, dry district and wet district by projection every
Open, the disposably overall machine-shaping of projection and bottom surface, not only projection and bottom surface good forming effect, good looking appearance, and process system
Making conveniently, efficiency of construction is high.
Another technical scheme of the present invention is on above-mentioned basis, and described bottom surface is provided with floor drain installing port, institute
State and at floor drain installing port, be provided with floor drain adapter.So, described floor drain adapter can be prefabricated together with the base plate of bathing room,
During construction, floor uses laminated floor slab, and floor drain adapter passes the position that the part correspondence of bathing room base plate is positioned on floor
A reserved groove, is placed on the bottom of floor drain adapter in groove, then pours the overlapping layers of laminated floor slab, by bathing room
Base plate and floor be combined into entirety.Floor drain adapter part in a groove is connected with horizontally-arranged water pipe, is discharged by sewage.Defend
The base plate in bathroom installs floor drain after installing again.So common direct-drainage floor drain can be converted into row ground, side by floor drain adapter
Leakage, thus realize co-layer draining, and without carrying out dropping plate process.It is of course also possible to floor drain is arranged with described floor drain adapter
It is structure as a whole, during construction, bathing room base plate arranges installing port, after being installed by bathing room, floor drain is installed again and floor drain turns
Connect device.
Another technical scheme of the present invention is on above-mentioned basis, and described bottom surface is additionally provided with drainage grade, institute
State the gradient at floor drain installing port relatively low.As such, it is possible to smoothly the sanitary wastewater of bathing room bottom surface is caused at floor drain installing port
Floor drain adapter and drain in drainage equipment module, thus keep bathing room bottom surface be dried.
Another technical scheme of the present invention is that, on above-mentioned basis, the junction of described bottom surface and side is provided with arc
Shape chamfering.So, the junction of bottom surface and side is provided with arc angling, the junction of bottom surface and side can not only be reduced
The cracking risk of right-angle side is set, and beneficially secondary decoration construction, without corner or spot as yet untouched by a clean-up campaign during use.
Another technical scheme of the present invention is that, on above-mentioned basis, the upper end of described side is provided with waterproof construction,
Described waterproof construction is sealing surface, groove or flanging.So, the upper end of side is provided with waterproof construction, the wall of bathing room
Plate just can the most vertically be stuck in above the base plate of bathing room, then seals by breaking fluid sealant, simple in construction, installation side
Just, good water-proof effect.
Another technical scheme of the present invention is on above-mentioned basis, the anti-bank of described staged include top half and under
Half part.As such, it is possible to form two-layer waterproof construction, improve the water resistance of bathroom base plate.
Another technical scheme of the present invention is on above-mentioned basis, described top half size height 50mm, wide 40mm,
Described the latter half size height 50mm, wide 75mm.Such that the surface water is as deep as to 50mm in making bathing room, also 50mm's is anti-
Water depth, is equivalent to double waterproof measure, improves the water resistance of bathing room base plate.
Another technical scheme of the present invention is on above-mentioned basis, and the bottom of described bottom surface is provided with grid layer or props up
Stake rib bar.So, the bottom of bottom surface is provided with grid layer or supporting rib, the height of bottom surface can be increased, reduce processing and use
Material.Further, described grid layer or supporting rib can be with bottom surface one moulding by casting or fixing by back-hand craft installation
Bottom in bottom surface.
Another technical scheme of the present invention is, on above-mentioned basis, the base plate of described bathing room to be provided with at least two
Individual suspension centre, described suspension centre is that pre-buried hanging is followed closely or suspension ring.So, by default suspension centre, can facilitate bathing room base plate or
The movement of bathing room, lift and transport.Preferably, four angles of bathing room base plate are respectively provided with four suspension centres.
Another technical scheme of the present invention is on above-mentioned basis, and described wall decorating veneer is stone-plastic plate or wood is moulded
Plate.So, wall decorating veneer uses stone-plastic plate or wood-plastic board, not only processing and manufacturing low cost, and ruggedness is good, the feature of environmental protection
Good.Wherein, stone-plastic plate also referred to as stone moulds brick or " PVC sheet plate ", be a kind of high-quality, high-tech research develop new
Type ornament materials, uses natural marble powder to constitute high density, the cancellated solid base of high microsteping, and surface is coated with superpower
Wear-resisting macromolecule PVC wearing layer.Wood-plastic board is a kind of environment-friendly type wood-plastic composite material products, aborning, high-density fiber
During plate, produced wood phenol, adds regenerated plastics and makes wood plastic composite through Granulation Equipments, then carry out extrusion raw
Product group makes wood-plastic board.Have the processing characteristics the same with timber, use common instrument to get final product sawing, boring, upper nail, very
Convenient, can use as common wood.There is the woodiness touch of timber and the Waterproof corrosion characteristic of plastics simultaneously.
Another technical scheme of the present invention is on above-mentioned basis, and the front of described wall decorating veneer is provided with heat and turns
Impression layer.As such, it is possible to improve wall decorating veneer good looking appearance degree, and the figure layer that hot stamping is different as required, meet diversification
Demand.Thermal transfer is divided into transfer film print and transfer processing two large divisions, and transfer film printing uses net-point printing, and (resolution reaches
300dpi), pattern being pre-printed film surface, the pattern levels are rich of printing, bright in luster, ever-changing, aberration is little, then
Existing property is good, the requirement effect of the person that can reach layout, and is suitable for producing in enormous quantities;Transfer is processed by heat transfer machine once
Pattern exquisite on transfer film is transferred in product surface by processing (heating pressurization), and after molding, ink layer is molten with product surface is one
Body, true to nature beautiful, it is greatly improved the class of product.
Another technical scheme of the present invention is on above-mentioned basis, and described wall decorating veneer is square or L-shaped.So
It is not only convenient for processing, the most easy for installation.Certainly the most as required, it is also possible to wall decorating veneer is arranged to arc, triangle etc. its
His shape.Wherein, L-shaped wall decorating veneer can apply the corner at body of wall.
Another technical scheme of the present invention is on above-mentioned basis, and described wall decorating veneer is connected by L-shaped or T-shaped
Part is connected with body of wall.So, connector is the various shape structures such as L-shaped, T-shaped or isosceles triangle, can be with multiple different installation knot
Structure requirement, it is simple to the installation of wall decorating veneer.
Another technical scheme of the present invention is on above-mentioned basis, and described connector one end is screwed in wall
On the raised line of body decorative panel, the other end is fixed with body of wall.As such, it is possible in advance connector one end is screwed in body of wall
On the raised line of decorative panel, until the other end of connector is connected fixing by scene again with matrix wall or lightgage steel joist wall.Reduce existing
Field construction workload, improves efficiency of construction.
Another technical scheme of the present invention is on above-mentioned basis, described wall decorating veneer by Z-shaped connector with
Body of wall is connected;Described Z-shaped connector one end is provided with fixing slot, and the groove of described wall decorating veneer or raised line are by described fixing
Groove is fixed, and the other end of described Z-shaped connector is fixed with body of wall by anchoring piece.Described Z-shaped connector can use one piece of company
The direct bending of fishplate bar forms, and the connecting plate at Z-shaped connector two ends can be mutually perpendicular to middle connecting plate, and described fixing slot is permissible
Form by slotting at one end connecting plate, folding.Certainly, described Z-shaped connector can also use polylith connecting plate splicing or
It is welded.So, during in-site installation, neighboring walls decorative panel can be spliced, then by the groove of wall decorating veneer or
Raised line holding at the fixing slot of described Z-shaped connector, then by the other end of Z-shaped connector by the anchoring piece such as screw, bolt with
Os Draconis on body of wall or body of wall are fixed, it is achieved the Fast Installation of wall decorating veneer is fixed, and improves efficiency of construction.When Z-shaped connection
When part and wall body keel are fixed, the adjustment of wall body decoration plate flatness when can more easily realize installing, and due to Os Draconis with
There is space between wall decorating veneer, facilitate the distribution of pipe such as electric wire and water pipe.
Accompanying drawing explanation
Fig. 1 is the sectional view of the base plate representing the bathing room involved by a kind of embodiment of this technology;
Fig. 2 is the sectional view of the production mould of the base plate representing the bathing room involved by a kind of embodiment of this technology;
Fig. 3 is the structure chart of the base plate representing the bathing room involved by a kind of embodiment of this technology;
Fig. 4 is the partial section of the base plate representing the bathing room involved by this technology another embodiment;
Fig. 5 is the floor drain discharge structure figure representing the bathing room involved by a kind of embodiment of this technology;
Fig. 6 is the local structural graph representing the bathing room involved by a kind of embodiment of this technology;
Fig. 7 is the structure chart of the wall decorating veneer representing the bathing room involved by a kind of embodiment of this technology;
Fig. 8 to Figure 10 is the structure of the wall decorating veneer representing the bathing room involved by the another several embodiments of this technology
Figure;
Figure 11 is the structure chart representing the bathing room involved by a kind of embodiment of this technology;
Figure 12 is the partial enlarged drawing in expression Figure 11 at A;
Figure 13 is the structure chart of the plumbing integration module representing the bathing room involved by a kind of embodiment of this technology;
Figure 14 is the structure chart of the plumbing integration module representing the bathing room involved by this technology another embodiment
Figure 15 is that the application of the plumbing integration module representing the bathing room involved by a kind of embodiment of this technology is installed
Figure;
Figure 16 is the application peace of the plumbing integration module representing the bathing room involved by this technology another embodiment
Dress figure;
Figure 17 is the plumbing integration module Elastic socket joint representing the bathing room involved by a kind of embodiment of this technology
The sectional view of part;
Figure 18 is the front view of the connection of the wall decorating veneer representing the bathing room involved by a kind of embodiment of this technology;
Figure 19 is the axonometric chart of the connection of the wall decorating veneer representing the bathing room involved by a kind of embodiment of this technology.
In figure:
10 side 13, production mould 11 bottom surface 12 waterproof constructions
14 wet district 17 of the dry district of arc angling 15 16 projections
18 floor drain installing port 19 supporting rib 50 floor drain 51 imports
The 52 outlet 53 reducing transfer tube 54 T-shaped flanks of annulus
55 ground leaking drainage pipe 121 the latter half 122 top half
70 wall decorating veneer 71 cavity 72 raised line 73 grooves
74 fix groove 75 fixed block 76 connector 100 body of wall
41 soil stack 42 dewatering horizontal tube 421 horizontal tube 422 elbow 423 VERTICAL TUBE
43 mixed zone 44 balance pipe 45 support chip 46 seal rings
47 share water seal arrangement 471 shaping piece 472 seepage mouth 473 access hole
The elastic socket component in 48 weeper 461 anti-limits 411
761 first connecting plate 762 second connecting plate 763 the 3rd connecting plate 764 fixing slots
Detailed description of the invention
Describing the present invention below in conjunction with the accompanying drawings, the description of this part is only exemplary and explanatory, should not
Protection scope of the present invention is had any restriction effect.Additionally, those skilled in the art are according to the description of presents, can be right
In presents, the feature in embodiment and in different embodiment carries out respective combination.
The embodiment of the present invention is as follows, refers to Fig. 1 to shown in 12, a kind of bathing room, including base plate and wallboard, wherein, and institute
State base plate and include that bottom surface 11 and side 12, described bottom surface 11 and side 12 are the most overall by concrete or fiber concrete
Machine-shaping, described side 12 is provided with the anti-bank of staged of at least two-stage, and the anti-bank of described staged becomes with bottom surface 11 one
Type;Described wallboard includes the wall decorating veneer 70 being fixed on body of wall 100, is provided with some in described wall decorating veneer 70
Cavity 71, the both sides of described wall decorating veneer 70 can be respectively provided with fluted 73 and raised line 72.So, bathroom base plate uses mixed
The disposably overall machine-shaping of solidifying soil or fiber concrete, entirety can be in basin type, and whole base plate is seamless to be poured, it is possible to play just
Property waterproof effect, and save the techniques such as installation rustless steel water-proof strip limit, not only good water-proof effect, and efficiency of construction is high.Special
Not, according to ultra-high performance concrete (Ultra-High Performance Concrete) or the superelevation of mixing of steel fiber
Performance concrete carrys out the base plate of processing and manufacturing bathing room, can make full use of the high intensity of ultra-high performance concrete, high tenacity, low
The strong high-durability of superelevation of porosity, improves cracking strength and the fatigue life of bathroom base plate, strengthens the durability of bathroom base plate
And rigidity.It addition, described bottom surface 11 and side 12 overall processing molding, pour as in figure 2 it is shown, bathroom base plate can use instead to beat
Technique so that the use face of bathroom base plate is positioned at the lower section of production mould 10, so that it is guaranteed that the face of use smoother, flatness
Good, save levelling construction, directly with decorative layers such as paving PVC floor, ceramic tiles, thus efficiency of construction can be improved further.Enter one
Step ground, can arrange built-in fitting hole on bathroom base plate or arrange built-in fitting as required, it is simple to production line balance, can be same
Shi Jinhang bottom surface and the manufacture of side engineering, reduce subsequent machining technology further, improves efficiency of construction.And, at bathing room
Being provided with the anti-bank of staged of at least two-stage on the side of base plate, the anti-bank of described staged becomes with the bottom surface one of bathing room base plate
Type.As such, it is possible to form multi-level waterproof construction, improve the water resistance of bathing room base plate.It addition, described wall decorating veneer 70
In be provided with some cavitys 71, the both sides of described wall decorating veneer 70 can be respectively provided with fluted 73 and raised line 72.So, exist
Wall decorating veneer 70 is provided with some cavitys 71, the weight of wall decorating veneer self can be alleviated and reduce processing and manufacturing body of wall
The material of decorative panel, thus reduce processing cost.And fluted 73 and raised line 72 it are respectively provided with in the both sides of wall decorating veneer 70,
Described groove 73 and raised line 72 match, and adjacent wall decorating veneer can carry out Fast Installation with solid by groove and raised line
Fixed, thus improve efficiency of construction.As is illustrated by figs. 11 and 12, until body of wall is filled by scene again with the connector such as bolt, suspension member 76
Plaque 70 is connected fixing with matrix wall or lightgage steel joist wall, such that it is able to greatly reduce the workload of site operation, it is to avoid on-the-spot
Wet trade, improves efficiency of construction, facilitates in-site installation.Alternatively, it is also possible to arrange ripple type or saw in the both sides of wall decorating veneer
Tooth type structures, adjacent wall decorating veneer can also carry out Fast Installation with solid by the ripple type matched or saw-tooth-type structures
Fixed.Further, as shown in Fig. 8, Fig. 9, Figure 11 and Figure 12, can also arrange fixing in the one or both sides of wall decorating veneer 70
Block 75, described fixed block 75 thickness is preferably the half of wall decorating veneer, and described raised line 72 can be arranged on the one of fixed block 75
End, during in-site installation, can first with connector by the fixed block 75 of one piece of wall decorating veneer 70 and matrix wall or lightgage steel joist wall
Connect fixing, then by adjacent wall decorating veneer 70 by groove thereon or raised line quickly with the wall body decoration fixed
Plate splicing is fixing, then with connector by the wall decorating veneer of splicing fixed block 75 be connected with matrix wall or lightgage steel joist wall and to consolidate
Fixed, install successively.Certainly, those skilled in the art pass through reasonable speculation, it is also possible to only set in the both sides of wall decorating veneer 70
The fixed block 75 being mutually matched, or fixed block 75 is set in the side of wall decorating veneer 70, side arranges other raised line 72, all
The protection domain of this patent should be belonged to.Additionally, as shown in Figure 7, it is also possible in the both sides at wall decorating veneer 70, fixing groove is set
74, during installation, by the holding of connector one end in fixing groove 74, the other end is connected fixing with matrix wall or lightgage steel joist wall.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 3 and Figure 4, described bottom surface can set
Being equipped with dry district 15 and wet district 16, described dry district 15 and wet district 16 are separated by projection 17, and described projection 17 can be disposable with bottom surface
Overall processing molding.So, dry district 15 and wet district 16 are separated by projection 17, the disposably overall machine-shaping of projection 17 and bottom surface,
Not only projection 17 and bottom surface good forming effect, good looking appearance, and convenient processing and manufacture, efficiency of construction is high.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 4 and Figure 5, described bottom surface 11 is arranged
There is floor drain installing port 18, at described floor drain installing port 18, be provided with floor drain adapter.So, described floor drain adapter can with defend
The base plate in bathroom is the most prefabricated, and during construction, floor uses laminated floor slab, and floor drain adapter is corresponding through the part of bathing room base plate
A groove is reserved in the position being positioned on floor, is placed in groove the bottom of floor drain adapter, then pours overlapping building
The overlapping layers of plate, is combined into entirety by base plate and the floor of bathing room.Floor drain adapter lower part outlet and ground leaking drainage pipe 55 phase
Connect, sewage is discharged.The base plate of bathing room installs floor drain 50 after installing again.So can be by common direct-drainage floor drain by ground
Leakage adapter is converted into side row's floor drain, thus realizes co-layer draining, and without carrying out dropping plate process.It is of course also possible to by floor drain
50 are set to integrative-structure with described floor drain adapter, during construction, arrange installing port on bathroom base plate, are installed by bathroom base plate
Floor drain and floor drain adapter are installed after Hao again.Further, described floor drain adapter includes an import 51 and an outlet 52, institute
State and connected, outside described reducing transfer tube 53 is at import 51 by 90 ° of reducing transfer tubes 53 between import 51 and outlet 52
The T-shaped flank of annulus 54 it is provided with on wall.So, the reducing transfer tube 53 outer wall at import 51 is provided with annulus T
Font flank 54, the T-shaped flank of described annulus 54 can well embed in the base plate 11 of bathroom and merge with concrete, right
Installation in later stage floor drain 50 seals and plays a good role, and can improve floor drain 50 and imitate with the sealing that is connected of floor drain adapter
Really.
On the basis of above-described embodiment, in another embodiment of the present invention, as described in Figure 4, described bottom surface is additionally provided with
Drainage grade (is not illustrated in figure), and at described floor drain installing port 18, the gradient is relatively low.As such, it is possible to smoothly by bathing room bottom surface
Sanitary wastewater causes the floor drain adapter at floor drain installing port 18 and drains in drainage equipment module, thus keeps bathing room bottom surface
Be dried.
On the basis of above-described embodiment, in another embodiment of the present invention, as it is shown in figure 1, described bottom surface 11 and side 12
Junction can be provided with arc angling 14.So, arc angling 14 it is provided with in the junction of bottom surface 11 and side 12, no
It is only capable of and reduces the junction of bottom surface 11 and side 12 cracking risk of right-angle side is set, and beneficially secondary decoration construction,
Without corner or spot as yet untouched by a clean-up campaign during use.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in figures 1 to 6, described side 12 is upper
End is provided with waterproof construction 13, and described waterproof construction 13 can be sealing surface, groove or flanging.So, upper in side 12
End is provided with waterproof construction 13, and the wallboard of bathing room just can the most vertically be stuck in above the base plate of bathing room, closeer by beating
Sealing seals, simple in construction, easy for installation, good water-proof effect.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 6, the anti-bank of described staged includes
Top half 122 and the latter half 121.As such, it is possible to form two-layer waterproof construction, improve the water proofing property of bathing room base plate
Energy.Preferably, the described the highest 50mm of top half 122, wide 40mm, the described the highest 50mm in the latter half 121, width
75mm.Such that the surface water is as deep as to 50mm in making bathing room, also the anti-water depth of 50mm, is equivalent to double waterproof measure,
Improve the water resistance of bathroom base plate.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 1 and Figure 5, the end of described bottom surface 11
Portion is also provided with grid layer or supporting rib 19.So, it is provided with grid layer or supporting rib 19 in the bottom of bottom surface 11,
The height of bottom surface 11 can be increased, reduce processing materials.Further, described grid layer or supporting rib 19 can be with bottom surfaces 11
Integrally moulding by casting or be fixed on the bottom of bottom surface 11 by back-hand craft.
On the basis of above-described embodiment, in another embodiment of the present invention, described bathroom base plate is provided with at least two
Suspension centre, described suspension centre is that pre-buried hanging is followed closely or suspension ring (not indicating in figure).So, by default suspension centre, bathroom can be facilitated
The base plate of room or the movement of bathing room, lift and transport.Preferably, four angles of bathing room base plate are respectively provided with four
Individual suspension centre.
On the basis of above-described embodiment, in another embodiment of the present invention, described wall decorating veneer 70 can be stone-plastic plate
Or wood-plastic board.So, wall decorating veneer uses stone-plastic plate or wood-plastic board, not only processing and manufacturing low cost, and ruggedness is good, ring
Guarantor's property is good.Wherein, stone-plastic plate also referred to as stone moulds brick or " PVC sheet plate ", is that a kind of high-quality, high-tech research develop
New decorative material, use natural marble powder to constitute high density, the cancellated solid base of high microsteping, surface coated with
The macromolecule PVC wearing layer of superpower wear-resistant.Wood-plastic board is a kind of environment-friendly type wood-plastic composite material products, aborning, high density
During fibre board, produced wood phenol, adds regenerated plastics and makes wood plastic composite through Granulation Equipments, then squeeze
Go out production group and make wood-plastic board.Have the processing characteristics the same with timber, use common instrument to get final product sawing, boring, upper nail,
Very convenient, can use as common wood.There is the woodiness touch of timber and the Waterproof corrosion characteristic of plastics simultaneously.
On the basis of above-described embodiment, in another embodiment of the present invention, the front of described wall decorating veneer 70 is all right
It is provided with heat transfer layer.As such, it is possible to improve wall decorating veneer good looking appearance degree, and the figure layer that hot stamping is different as required,
Meet multiple demand.Thermal transfer is divided into transfer film print and transfer processing two large divisions, and transfer film printing uses net-point printing (to divide
Resolution reaches 300dpi), pattern is pre-printed film surface, the pattern levels are rich of printing, bright in luster, ever-changing, color
Difference is little, and repeatability is good, the requirement effect of the person that can reach layout, and is suitable for producing in enormous quantities;Transfer is processed by heat and turns
Pattern exquisite on transfer film is transferred in product surface by print machine time processing (heating pressurization), ink layer and product table after molding
Face is molten to be integrated, true to nature beautiful, is greatly improved the class of product.
On the basis of above-described embodiment, in another embodiment of the present invention, described wall decorating veneer 70 can be square or L Shape.So it is not only convenient for processing, the most easy for installation.Certainly the most as required, it is also possible to wall decorating veneer 70 is arranged to arc, three Other shapes such as dihedral.As shown in Fig. 9, Figure 10, Figure 11 and Figure 12, wherein, L-shaped wall decorating veneer 70 can be applied between bathroom the corner of body of wall.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Fig. 7 to Figure 12, described cavity 71 can
Think that square opening or circular port, described cavity 71 are evenly distributed in wall decorating veneer along the longitudinal direction of wall decorating veneer 70.So,
It is not only convenient for processing and fabricating, it is also ensured that the uniformity of wall decorating veneer, improves its tension and compressive property.
On the basis of above-described embodiment, in another embodiment of the present invention, as is illustrated by figs. 11 and 12, described wall body decoration
Plate 70 can be connected with body of wall by L-shaped or T-connecting piece 76.So, connector 76 is the multiple shapes such as L-shaped, T-shaped or isosceles triangle
Shape structure, can be with multiple different mounting structure requirement, it is simple to the installation of wall decorating veneer 70.Further, connector 76 can
To be made up of screw and connection hanging piece, connection hanging piece can be zigzag, and one end of connection hanging piece is embedded in body of wall 100, another
Hold and be connected with wall decorating veneer 70 fixing by screw.
On the basis of above-described embodiment, in another embodiment of the present invention, described connector 76 one end is screwed
On the raised line 72 of wall decorating veneer 70, the other end is fixed with body of wall 100.As such, it is possible in advance connector 76 one end is passed through
Screw is fixed on the raised line 72 of wall decorating veneer 70, until scene is again by the other end of connector 76 and matrix wall or light steel dragon
Bone Wall connects fixing.Reduce site operation workload, improve efficiency of construction.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figures 18 and 19, described wall decorating veneer
It is connected with body of wall by Z-shaped connector;Described Z-shaped connector one end is provided with fixing slot 764, the groove of described wall decorating veneer
73 or raised line 72 can be fixed by described fixing slot 764, the other end of described Z-shaped connector is solid with body of wall by anchoring piece
Fixed.Specifically, described Z-shaped connector can be formed by one piece of direct bending of connecting plate, including the first connecting plate 761, second
Connecting plate 762 and the 3rd connecting plate 763, described first connecting plate the 761, second connecting plate 762 is by the 3rd connecting plate 763 even
Connecing, the first connecting plate 761 and three connecting plates 763 are vertically arranged, and the second connecting plate 762 and three connecting plates 763 are also vertically arranged, the
A plate 761 and the second connecting plate 762 can be arranged on the one or both sides of described three connecting plates 763, described fixing slot 764
Can be arranged on the first connecting plate 761 or the second connecting plate 762, as directly carried out cutting groove, refolding open on connecting plate
Rear formation fixing slot 764, the openings of sizes of described fixing slot 764 or width can come according to the thickness of wall decorating veneer and weight
Set.Certainly, described Z-shaped connector can also use the splicing of polylith connecting plate or be welded.So, during in-site installation, can
So that neighboring walls decorative panel is spliced, then by the groove 73 of wall decorating veneer or raised line 72 holding at described Z-shaped connector
Fixing slot 764 in, the other end of Z-shaped connector is provided with mounting hole (not identifying in figure), then is anchored by screw, bolt etc.
Z-shaped connector and body of wall are directly fixed or fix with the Os Draconis on body of wall by part, it is achieved the Fast Installation of wall decorating veneer is fixed,
Improve efficiency of construction.When Z-shaped connector is fixed with wall body keel, when can more easily realize installing, wall decorating veneer is put down
The adjustment of whole degree, and owing to there is space between Os Draconis and wall decorating veneer, facilitate the distribution of pipe such as electric wire and water pipe.
On the basis of above-described embodiment, in another embodiment of the present invention, it is integrated that described bathing room is also provided with plumbing
Module, described plumbing integration module can arrange at the equipment raise of bathing room or in bathing room, as shown in Figure 13 to Figure 16, institute
Stating plumbing integration module and include soil stack 41 and dewatering horizontal tube 42, wherein, described soil stack 41 can be offset, institute
One end of the bottom and dewatering horizontal tube 42 of stating soil stack 41 is connected formation mixed zone 43, the top of described soil stack 41 and row
The balance pipe 44 of connection it is provided with between water transverse tube 42.So, soil stack 41 uses offset, owing to standpipe current chamber is deviateed
Former standpipe position of center line, can have concurrently again and slow down soil stack water velocity, disappear while linking up soil stack current
The function of energy so that the noise in soil stack 41 greatly reduces.One end by the bottom of soil stack 41 Yu dewatering horizontal tube 42
Connect and form mixed zone 43, so, so that at mixed zone 43 dewatering horizontal tube 42 current and the current of soil stack 41 current
Direction is consistent, prevents current disorderly.And between the top of soil stack 41 with dewatering horizontal tube 42, it is provided with the balance pipe connected
44, so, the pressure between soil stack 41 and dewatering horizontal tube 42 can be balanced, prevent siphonage.Therefore, described plumbing
Integration module eliminates vent stack, reduces production cost, saves tubing and the installing space of plumbing integration module, installs
Convenient.Further, described dewatering horizontal tube can arrange the connection of certain angle, described dewatering horizontal tube and soil stack
Hold downward-sloping, be so conducive to water to enter mixed zone from the import of dewatering horizontal tube.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 13 to Figure 16, described dewatering horizontal tube
42 can be inverted L-shaped pipe, can include horizontal tube 421, elbow 422 and VERTICAL TUBE 423, described horizontal tube 421 and VERTICAL TUBE 423
Connected by elbow 422;The bottom of described VERTICAL TUBE 423 is connected with the bottom of soil stack 41.So, dewatering horizontal tube includes water
Flat pipe, elbow and VERTICAL TUBE, can use global formation or spigot-and-socket even between horizontal tube 421, elbow 422 and VERTICAL TUBE 423
Connect, easy for installation;The horizontal tube 421 of dewatering horizontal tube 42 separates with soil stack 41 top, so the water between transverse tube and standpipe
Stream is avoided that and interferes, and the bottom of described VERTICAL TUBE 423 is connected with the bottom of soil stack 41, formation mixed zone 43, so,
So that consistent with the water (flow) direction of the bottom of soil stack in the bottom of VERTICAL TUBE, prevent current disorderly.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 13 to Figure 16, described balance pipe 44
One end be connected at the elbow 422 of dewatering horizontal tube 42, the other end is connected with the turning of soil stack 41.So, not only may be used
To avoid owing to the position of balance pipe 44 arranges the highest, the water in soil stack 41 is caused to be flowed into dewatering horizontal tube 42, Er Qieke
To avoid owing to the position of balance pipe 44 arranges the lowest, the water in dewatering horizontal tube 42 is caused to flow into soil stack 41.Make balance
Pipe 44 has the pressure between balance soil stack 41 and dewatering horizontal tube 42 always, prevents the effect of siphon.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 13 to Figure 16, described balance pipe 44
It can be the curved pipe raised up.So, balance pipe 44 is the curved pipe raised up, and can reduce soil stack 41 and row
The probability that water in water transverse tube 42 is mutually flowed by balance pipe 44, improves the anti-siphonage of balance pipe 44.
On the basis of above-described embodiment, in another embodiment of the present invention, described balance pipe 44 can be S-shaped pipe or Z-type
Pipe.So, described balance pipe 44 is arranged to S-shaped pipe or Z-type pipe, can reduce further in soil stack 41 and dewatering horizontal tube 42
The probability that mutually flowed by balance pipe 44 of water, improve the anti-siphonage of balance pipe 44.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 13 to Figure 16, stand in described draining
Balance pipe 44 place of setting of pipe 41 and dewatering horizontal tube 42 is also provided with support chip 45.As such, it is possible to strengthen soil stack 41
And the connection between dewatering horizontal tube 42, prevent balance pipe 44 stress excessive and cracking or breaking, improve plumbing integration module
Service life.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 13 to Figure 17, described soil stack
The upper lumen of 41 can be provided with elastic socket component 411.As shown in figure 17, described elastic socket component 411 can arrange two
The elastic packing rubber ring that layer is above, the most described elastic socket component can substitute for telescopic joint of the prior art, for pipeline
The length compensation needed because of mounting and adjusting, additionally it is possible to compensate the dilatation that pipeline produces because of variations in temperature, simple in construction, become
This is relatively low, and in-site installation is convenient.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 17 to Figure 16, described plumbing collectionBecoming module also to include seal ring 46, described seal ring 46 is one-body molded with described soil stack 41 and dewatering horizontal tube 42.So, giveDraining integration module is provided with seal ring 46, when plumbing integration module is installed, and can be cast-in-place with floor by seal ring 46Layer is cast in be fixed plumbing integration module together, it addition, the filling of piping shaft can directly be filled on seal ring 46, exemptsThe operation of the mould bases that additionally fixes.Further, it is also possible to being provided with anti-limit 461 on seal ring 46, described anti-limit 461 can are to be arranged on the edge of seal ring 46, play the effect that prevents infiltration.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in figure 13, the side of described mixed zone 43
It is provided with shared water seal arrangement 47;One end of described shared water seal arrangement 47 is connected with the sidewall of dewatering horizontal tube 42, the other end with
Indoor floor drain connects, and the other end of described dewatering horizontal tube 42 is connected with wash basin and toilet.Share water seal arrangement 47 moisture storage capacity
Greatly, water seal height can reach more than 100mm, saves the trap of floor drain, can realize co-layer draining, may be used for floor relatively
The thin situation that can not arrange caisson of toilet, maintenance is got up also very convenient when a jam does occur, and floor drain is installed and is also convenient for.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in figure 13, described shared water seal arrangement 47
Can be the deodorant case being arranged on outside described dewatering horizontal tube 42 sidewall, in described deodorant case, be provided with shaping piece 471, described draining
Being provided with seepage mouth 472 on transverse tube 42 sidewall, the bottom position of shaping piece 471 described in the vertical direction is less than described seepage mouth
The position of 472.So, owing to being provided with shaping piece 471 in described deodorant case, described dewatering horizontal tube 42 sidewall is provided with infiltration
Mouthfuls 472, the bottom position of shaping piece 471 described in the vertical direction is less than the position of described seepage mouth 472, when hydrops is from deodorant
After the water inlet of case flows into deodorant case, between the shaping piece 471 and dewatering horizontal tube 42 sidewall of deodorant case, form water seal, when deodorant case
In water gradually increase, when water level exceedes the seepage mouth 472 of dewatering horizontal tube 42, hydrops is i.e. from the seepage mouth 472 of dewatering horizontal tube 42
It is drained in dewatering horizontal tube 42, it is thus possible in time the hydrops outside dewatering horizontal tube 42 is discharged in time.
On the basis of above-described embodiment, in another embodiment of the present invention, the bottom of described deodorant case is provided with access hole
473.So, it is simple to the schedule of plumbing integration module is safeguarded and maintenance.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 14 to Figure 16, described VERTICAL TUBE
The right side of 423 is connected formation mixed zone, the bottom of described soil stack 41 and VERTICAL TUBE 423 with the bottom of described soil stack 41
In angle of 45 degrees, the left side of described VERTICAL TUBE 423 is provided with weeper 48, and described weeper 48 becomes 45 with VERTICAL TUBE 423
Degree angle.So, described weeper 48 can be connected with the trap of two floor drains 50, can be formed in floor drain trap
Higher water seal.The bottom of described soil stack 41 and VERTICAL TUBE 423 in angle of 45 degrees, described weeper 48 and VERTICAL TUBE
423 in angle of 45 degrees, and soil stack 41 bottom is arranged with weeper 48 Relative vertical, when weeper 48 and VERTICAL TUBE 423
When the position of the position of junction point and the bottom of soil stack 41 and VERTICAL TUBE 423 junction point is arranged on zone of reasonableness, such as, little
Drain pipe 48 and the position of VERTICAL TUBE 423 junction point are arranged on the bottom of soil stack 41 with the connector of VERTICAL TUBE 423 perpendicular
Position more than Nogata center line upwards, so that soil stack 41 is in the case of full packages discharge, is washed into little draining
The highest current weeper to be less than 48 of pipe 48 and VERTICAL TUBE 423 junction point inwall and the minimum point of VERTICAL TUBE 423 junction point.
This way it is possible to avoid the flow backwards in soil stack 41 enters weeper 48, and the sewage in trap is poured floor drain
Drain pipe, causes the problem that foul smell returns indoor;Current and the current in weeper 48 in soil stack 41 can also be avoided
After mixing, the hydraulic pressure formed in mixed zone is relatively big, and by the water sucking-off in trap, causes the water seal in trap to be drained
Problem.Certainly, described weeper 48 is too high with what the position of VERTICAL TUBE 423 junction point can not be arranged, as exceeded draining
The bottom of standpipe 41 and the peak of the connector of VERTICAL TUBE 423, otherwise can cause the vertical drainage pipe of floor drain in bathing room
Highly step-down, causes bathing room internal drainage to have some setbacks.
On the basis of above-described embodiment, in another embodiment of the present invention, described soil stack 41, dewatering horizontal tube 42 peace
Weighing apparatus pipe 44 is made for metal or organic material.When soil stack 41, dewatering horizontal tube 42 and balance pipe 44 material be metal or
During organic material, the production technology of plumbing integration module is simple, die sinking punching press or weld, and is conducive to the lowest one-tenth
This production.
On the basis of above-described embodiment, in another embodiment of the present invention, described soil stack 41 and/or dewatering horizontal tube 42
Top or bottom are also associated with diameter changing device (not identifying in figure).After diameter changing device is set, facilitate the standpipe between upper and lower floor
With docking of the soil stack 41 in plumbing integration module and/or dewatering horizontal tube 42;It addition, be such as provided that big opening reducing
Pipe, then can form high flow rate pass in plumbing integration module so that spot is not easy in plumbing integration module heavy
Long-pending blocking.Little opening reducer pipe can certainly be set, then multiple entrance can be set in plumbing integration module, convenient many
Individual position hydrops enters with in soil stack 41 once.
On the basis of above-described embodiment, in another embodiment of the present invention, the top of described diameter changing device or bottom connect
There is pipeline eccentric (not identifying in figure).When the top of diameter changing device or bottom connect and have pipeline eccentric, can solve
Certainly upper and lower pipeline installation question the most on the same axis, it is only necessary to adjust eccentric and get final product smooth and easy docking, reduce pipeline
Installation difficulty.
On the basis of above-described embodiment, in another embodiment of the present invention, described soil stack 41 and/or dewatering horizontal tube 42
On be additionally provided with expansion ring (not identifying in figure).After soil stack 41 and/or dewatering horizontal tube 42 are provided with expansion ring, at pipe
In the case of road is pre-buried, the problem that expansion ring can solve pipeline shortage on a small quantity, it is not necessary to changing pipeline can connect, and, stretches meanwhile
Contracting ring can also do and offset the mouth of pipe by a small margin so that it is the pipeline of docking can also connect the most on the same axis.
On the basis of above-described embodiment, in another embodiment of the present invention, described soil stack 41 and/or dewatering horizontal tube 42
On fire trapping ring or fireprotection layer (not identifying in figure) are installed.After preset pipeline is provided with fire trapping ring or fireprotection layer, work as bathroom
When meeting with fire, fire trapping ring or fireprotection layer can block burning things which may cause a fire disaster and spread up and down.
On the basis of above-described embodiment, in another embodiment of the present invention, described plumbing integration module integrated injection is moulded
Type or blow molding.When plumbing integration module integral molded plastic molding or blow molding, the production technology efficiency of its molding is high,
Steady quality is reliable, and production cost is relatively low, beneficially large-scale promotion application.
On the basis of above-described embodiment, in another embodiment of the present invention, described plumbing integration module uses 3D to print
One-body molded.When the planform of plumbing integration module is complicated, during production and construction and installation extremely inconvenience, 3D is used to print one
Body formed, beneficially the manufacturing of plumbing integration module.
On the basis of above-described embodiment, in another embodiment of the present invention, described plumbing integration module uses UPVC material Matter.UPVC be the aggregated reaction of Vinyl Chloride Monomer and the amorphous thermoplastic resin that makes add certain additive (as stabilizer, Lubricant, filler etc.) composition, owing to it has lightweight, corrosion-resistant, intensity relatively advantages of higher, thus in Pipe installing Extensively application.UPVC pipe material inner wall is smooth, fluid friction resistance is little, overcome cast iron pipe because getting rusty, fouling and affect flow Defect.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For Yuan, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications also should
It is considered as protection scope of the present invention.
Claims (10)
1. a bathing room, including base plate and wallboard, it is characterised in that described base plate includes bottom surface and side, described bottom surface and
Side mainly by concrete or fiber concrete disposably overall machine-shaping, described side is provided with the ladder of at least two-stage
The anti-bank of formula, the anti-bank of described staged is one-body molded with bottom surface;Described wallboard includes the wall decorating veneer being fixed on body of wall,
Being provided with some cavitys in described wall decorating veneer, the both sides of described wall decorating veneer are respectively provided with fluted and raised line.
Bathing room the most according to claim 1, it is characterised in that described bottom surface is provided with dry district and wet district, described dry district
Separate by projection with wet district, the disposably overall machine-shaping of described projection and bottom surface.
Bathing room the most according to claim 1, it is characterised in that described bottom surface is provided with floor drain installing port, described floor drain
Floor drain adapter it is provided with at installing port.
Bathing room the most according to claim 3, it is characterised in that be additionally provided with drainage grade on described bottom surface, describedly
At leakage installing port, the gradient is relatively low.
Bathing room the most according to claim 1, it is characterised in that the junction of described bottom surface and side is provided with arc
Angle.
Bathing room the most according to claim 1, it is characterised in that the upper end of described side is provided with waterproof construction, described
Waterproof construction is sealing surface, groove or flanging.
Bathing room the most according to claim 1, it is characterised in that the anti-bank of described staged includes top half and lower half
Point;Described top half size height 50mm, wide 40mm, described the latter half size height 50mm, wide 75mm.
Bathing room the most according to any one of claim 1 to 7, it is characterised in that arrange on the base plate of described bathing room
Having at least two suspension centre, described suspension centre is that pre-buried hanging is followed closely or suspension ring.
Bathing room the most according to any one of claim 1 to 7, it is characterised in that described wall decorating veneer is stone-plastic plate
Or wood-plastic board;Or, the front of described wall decorating veneer is provided with heat transfer layer.
Bathing room the most according to any one of claim 1 to 7, it is characterised in that described wall decorating veneer passes through L-shaped
Or T-connecting piece is connected with body of wall;Described connector one end is screwed on the raised line of wall decorating veneer, the other end with
Body of wall is fixed;Or, described wall decorating veneer is connected with body of wall by Z-shaped connector;Described Z-shaped connector one end is provided with card
Gu groove, groove or the raised line of described wall decorating veneer fixed by described fixing slot, and the other end of described Z-shaped connector passes through anchor
Firmware is fixed with body of wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610865348.6A CN106320750A (en) | 2016-09-29 | 2016-09-29 | Bathroom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610865348.6A CN106320750A (en) | 2016-09-29 | 2016-09-29 | Bathroom |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106320750A true CN106320750A (en) | 2017-01-11 |
Family
ID=57820597
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610865348.6A Pending CN106320750A (en) | 2016-09-29 | 2016-09-29 | Bathroom |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106320750A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112431371A (en) * | 2020-11-26 | 2021-03-02 | 广州大学 | Water seepage prevention building structure and installation method thereof |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201021548Y (en) * | 2007-03-08 | 2008-02-13 | 陈地清 | A combined whole toilet |
CN201106264Y (en) * | 2007-09-13 | 2008-08-27 | 童明勇 | Wood plastic micro foaming wall plate |
CN203716534U (en) * | 2014-01-22 | 2014-07-16 | 辽宁渤海装饰材料有限公司 | Environment-friendly integral bathroom accessory |
CN203924308U (en) * | 2014-06-20 | 2014-11-05 | 三明兴业科技(天津)有限公司 | Steering-type floor drain |
CN104727395A (en) * | 2015-03-31 | 2015-06-24 | 中民筑友有限公司 | Integrated bathroom |
CN204491758U (en) * | 2015-03-31 | 2015-07-22 | 中民筑友有限公司 | A kind of drainage system of bathing room and bathing room |
CN205000425U (en) * | 2015-09-23 | 2016-01-27 | 常熟雅致模块化建筑有限公司 | Height -adjustable trap |
CN206329067U (en) * | 2016-09-29 | 2017-07-14 | 中民筑友科技投资有限公司 | A kind of bathing room |
-
2016
- 2016-09-29 CN CN201610865348.6A patent/CN106320750A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201021548Y (en) * | 2007-03-08 | 2008-02-13 | 陈地清 | A combined whole toilet |
CN201106264Y (en) * | 2007-09-13 | 2008-08-27 | 童明勇 | Wood plastic micro foaming wall plate |
CN203716534U (en) * | 2014-01-22 | 2014-07-16 | 辽宁渤海装饰材料有限公司 | Environment-friendly integral bathroom accessory |
CN203924308U (en) * | 2014-06-20 | 2014-11-05 | 三明兴业科技(天津)有限公司 | Steering-type floor drain |
CN104727395A (en) * | 2015-03-31 | 2015-06-24 | 中民筑友有限公司 | Integrated bathroom |
CN204491758U (en) * | 2015-03-31 | 2015-07-22 | 中民筑友有限公司 | A kind of drainage system of bathing room and bathing room |
CN205000425U (en) * | 2015-09-23 | 2016-01-27 | 常熟雅致模块化建筑有限公司 | Height -adjustable trap |
CN206329067U (en) * | 2016-09-29 | 2017-07-14 | 中民筑友科技投资有限公司 | A kind of bathing room |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112431371A (en) * | 2020-11-26 | 2021-03-02 | 广州大学 | Water seepage prevention building structure and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106958358A (en) | The industrialization commercial residential buildings of energy-conserving and environment-protective | |
CN106320749A (en) | Bathroom | |
CN206189912U (en) | Bathroom bottom plate | |
CN201388032Y (en) | Cable trench convenient for draining | |
CN206329067U (en) | A kind of bathing room | |
CN206385828U (en) | A kind of bathing room | |
CN106320750A (en) | Bathroom | |
CN206189906U (en) | Bathroom room | |
CN106351470A (en) | Bathroom | |
CN206189913U (en) | Bathroom room | |
CN206189910U (en) | Bathroom room | |
CN206681418U (en) | The industrialization commercial residential buildings of energy-conserving and environment-protective | |
CN106351471A (en) | Bathroom | |
CN104712152A (en) | Unit bathroom | |
CN206189905U (en) | Bathroom room | |
CN206189915U (en) | Bathroom room | |
CN206189914U (en) | Bathroom room | |
CN109760178B (en) | Method for manufacturing assembled integral floor slab | |
CN206189909U (en) | Bathroom room | |
CN206189916U (en) | Bathroom room | |
CN206189904U (en) | Bathroom room | |
CN206189908U (en) | Bathroom room | |
CN206329068U (en) | A kind of bathing room | |
CN209874098U (en) | Building wall waterproof structure with externally hung stairs | |
CN206530084U (en) | A kind of bathroom bottom plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170111 |