CN206189908U - Bathroom room - Google Patents
Bathroom room Download PDFInfo
- Publication number
- CN206189908U CN206189908U CN201621092481.4U CN201621092481U CN206189908U CN 206189908 U CN206189908 U CN 206189908U CN 201621092481 U CN201621092481 U CN 201621092481U CN 206189908 U CN206189908 U CN 206189908U
- Authority
- CN
- China
- Prior art keywords
- bathing room
- wall
- base plate
- room according
- floor drain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Floor Finish (AREA)
- Residential Or Office Buildings (AREA)
Abstract
The utility model provides a bathroom room, including bottom plate and wallboard, the bottom plate includes bottom surface and side, bottom surface and side are mainly by concrete or the disposable whole machine -shaping of fibre concrete, be provided with the cascaded anti - bank of at least two -stage on the side, cascaded anti - bank and bottom surface integrated into one piece, the wall decoration board on the wall body is fixed including the installation to the wallboard, thus, support the concrete piece of fixed bed for adding slotted steel mesh piece, support the fixed bed setting between wall body and panel. Like this, bathroom room's bottom plate can seamlessly be pour, can play rigid water -proofing's effect, can produce the prefabrication in the mill, and water -proof effects is good, and intensity is high, and the wallboard site operation is efficient.
Description
Technical field
The utility model belongs to building field, specially a kind of bathing room.
Background technology
The base plate of traditional bathing room is constructed using concrete cast-in-situ, and waterproofing process is mainly by brush water-repellent paint, paving
Protective layer reaches the effect of impervious waterproof.In order to the waterproof effect that has reached it is general firstly the need of ensure the ground of bathing room compared with
For steady, but if necessary to change the floor tile of bathing room, after original floor tile chisel is gone, must first will with cement mortar
Floor leveling, then does water-proofing treatment, complex process again.In addition, in order to prevent water percolation of wall, also to be done about on general metope
30 centimetres of water-repellent paints high, the metope in case ponding is spread and sunk in.It follows that existing bathing room waterproof slab workload is larger, apply
Work efficiency rate is low, construction cost hardly results in control.And the metope of traditional bathing room decorates way using patch block, it is mainly logical
Cross following steps completion, snap the line, labeling on schedule, select brick, row's brick, leaching brick (Imitation Rock Porcelain Tiles or high-grade brick do not allow immersion), edge patch logical
Seam, jointing or the wiping seam effect attractive in appearance to reach wall decoration.It follows that existing wall tile decoration way efficiency of construction
Low, construction cost hardly results in control.
The content of the invention
The technical problems to be solved in the utility model is:There is provided a kind of bathing room, the base plate of the bathing room can be with factory
Production is prefabricated, and good water-proof effect, intensity is high, wallboard site operation efficiency high.
What solution of the present utility model was realized in:A kind of bathing room, including base plate and wallboard, wherein, it is described
Base plate includes bottom surface and side, and the bottom surface and side are main by the disposable overall machine-shaping of concrete or fiber concrete,
The anti-bank of staged of at least two-stage is provided with the side, the anti-bank of staged is integrally formed with bottom surface;The wallboard bag
The wall decorating veneer being fixed on wall is included, the wall decorating veneer includes panel and support fixed bed, and the support is consolidated
Given layer is the concrete block for being added with channel-section steel mesh sheet, and the support fixed bed is arranged between wall and panel.So, bathing room
Base plate using the disposable entirety machine-shaping of concrete or fiber concrete, can be in integrally basin type, whole base plate is seamless to be poured
Build, rigid waterproofing can be played a part of, and save the techniques such as installation stainless steel water-proof strip side, not only good water-proof effect, and
Efficiency of construction is high.Particularly, according to ultra-high performance concrete (Ultra-High Performance Concrete) or incorporation
The ultra-high performance concrete of steel fibre fabricates the base plate of bathing room, can make full use of the high-strength of ultra-high performance concrete
Degree, high tenacity, the strong high-durability of the superelevation of low porosity, improve cracking strength and the fatigue life of bathing room base plate, and enhancing is defended
The durability and rigidity of bathroom floor.In addition, the bottom surface and the shaping of side overall processing, can use and instead beat casting craft,
So that the use face of the base plate of bathing room is located at the lower section of mould, so that it is guaranteed that using face smoother, flatness is good, and province goes for
Flat construction, directly can be with decorative layers such as paving PVC floor, ceramic tiles, so as to further improve efficiency of construction.Further, according to
Needs can set built-in fitting hole on the base plate of bathing room or set built-in fitting, be easy to production line balance, can enter simultaneously
Row bottom surface and the manufacture of side engineering, further reduce subsequent machining technology, improve efficiency of construction.And, in bathing room base plate
Side on be provided with the anti-bank of staged of at least two-stage, the anti-bank of staged is integrally formed with the bottom surface of bathing room base plate.
So, multi-level waterproof construction can be formed, the water resistance of bathing room base plate is improved.In addition, being fixed including panel and support
Layer, the support fixed bed is the concrete block for being added with channel-section steel mesh sheet, the support fixed bed be arranged on wall and panel it
Between.So, by setting support fixed bed between wall and panel, first channel-section steel is welded with steel mesh piece, then pour coagulation
Soil or mixed with the concrete of haydite, forms concrete block, then panel is affixed to wall decorating veneer is formed on concrete block.Until
Be connected for wall decorating veneer and matrix wall or lightgage steel joist wall by the connectors such as scene bolt, suspension member.The wall body decoration
The processing of plate can use pipelining, such that it is able to greatly reduce the workload of site operation, it is to avoid situ wet operation, carry
Efficiency of construction high, facilitates in-site installation.
Another technical scheme of the present utility model is that the bottom surface is provided with dry area and wet area on above-mentioned basis,
The dry area and wet area are separated by projection, the projection overall machine-shaping disposable with bottom surface.So, area and wet area are done by convex
Block separates, projection overall machine-shaping disposable with bottom surface, not only projection and bottom surface good forming effect, good appearance, Er Qiejia
Work is easily manufactured, and efficiency of construction is high.
Another technical scheme of the present utility model is on above-mentioned basis, floor drain installation to be provided with the bottom surface
Mouthful, it is provided with floor drain adapter at the floor drain installing port.So, the floor drain adapter can be together with the base plate of bathing room
Prefabricated, during construction, floor uses laminated floor slab, floor drain adapter to be positioned on floor through the part correspondence of bathing room base plate
A groove is reserved in position, and the bottom of floor drain adapter is placed in groove, then pours the overlapping layers of laminated floor slab, will defend
The base plate and floor in bathroom are combined into entirety.Floor drain adapter part in a groove is connected with horizontally-arranged water pipe, and sewage is arranged
Go out.The base plate of bathing room installs floor drain again after installing.Common direct-drainage floor drain can be so converted into by floor drain adapter
Floor drain is arranged in side, so as to realize co-layer draining, and need not carry out drop plate treatment.It is of course also possible to floor drain is transferred with the floor drain
Device set be structure as a whole, during construction, installing port is set on bathing room base plate, installed again after bathing room is installed floor drain and
Floor drain adapter.
Another technical scheme of the present utility model is on above-mentioned basis, weathering to be additionally provided with the bottom surface
Degree, the gradient is relatively low at the floor drain installing port.So, the sanitary wastewater of bathing room bottom surface smoothly can be caused into floor drain to install
Floor drain adapter at mouthful simultaneously drains into drainage equipment module, so as to keep the drying of bathing room bottom surface.
Another technical scheme of the present utility model is that on above-mentioned basis, the junction of the bottom surface and side is set
There is arc angling.So, the junction of bottom surface and side is provided with arc angling, the company of bottom surface and side can not only be reduced
Meet place and the cracking risk of right-angle side is set, and be conducive to secondary decoration construction, without corner or spot as yet untouched by a clean-up campaign when using.
Another technical scheme of the present utility model is that the upper end of the side is provided with waterproof knot on above-mentioned basis
Structure, the waterproof construction is sealing surface, groove or flanging.So, the upper end in side is provided with waterproof construction, bathing room
Wallboard just directly can vertically be stuck in the base plate top of bathing room, then be sealed by breaking fluid sealant, simple structure, installation side
Just, good water-proof effect.
Another technical scheme of the present utility model is that the anti-bank of staged includes top half on above-mentioned basis
And the latter half.So, two-layer waterproof construction can be formed, the water resistance of bathroom base plate is improve.
Another technical scheme of the present utility model is the top half size 50mm high, width on above-mentioned basis
40mm, the latter half size 50mm high, width 75mm.So, even if the surface water is as deep as to 50mm, also 50mm in bathing room
Anti- water depth, equivalent to double waterproof measure, improve the water resistance of bathing room base plate.
Another technical scheme of the present utility model is that the bottom of the bottom surface is provided with ribs on above-mentioned basis
Bar.So, the bottom of bottom surface is provided with supporting rib, the height of bottom surface can be increased, reduce processing materials.Further,
The supporting rib can be fixed on the bottom of bottom surface with bottom surface one moulding by casting or by back-hand craft.
Another technical scheme of the present utility model be it is above-mentioned basis on, be provided with the base plate of the bathing room to
Few two suspension centres, the suspension centre is that pre-buried hanging is followed closely or suspension ring.So, by default suspension centre, bathing room base plate can be facilitated
Or movement, lifting and the transport of bathing room.Preferably, four suspension centres are respectively provided with four angles of bathing room base plate.
The channel-section steel mesh sheet is that the skeleton that is formed by connecting by channel-section steel and steel mesh piece are welded to form.So, connected into by channel-section steel
Skeleton simultaneously welds steel mesh piece formation channel-section steel mesh sheet, with stronger resistance to compression, tension and impact resistance, so as to improve wall body decoration
The resistance to compression of plate, tension and shock resistance.
Another technical scheme of the present utility model is that the junction of the channel-section steel is provided with reinforcement on above-mentioned basis
Muscle or reinforcing plate.So, the junction of channel-section steel is provided with reinforcement or reinforcing plate, it is possible to reduce the deformation of channel-section steel, increases lattice
The intensity of screen, so as to increase the intensity of wall decorating veneer.
Another technical scheme of the present utility model is that on above-mentioned basis, the concrete block is haydite concrete block
Or foaming haydite concrete block.So, using haydite concrete block or foaming haydite concrete block, it is not only lightweight, and
Impervious good, fire resistance is good, is adapted to be used in bathing room or kitchen.
Another technical scheme of the present utility model is that the wall decorating veneer is pacified by connector on above-mentioned basis
Dress is fixed on wall.So, wall decorating veneer can be connected with matrix wall or lightgage steel joist wall by connector, is applied
Work is convenient.
Another technical scheme of the present utility model is on above-mentioned basis, to be set between the wall decorating veneer and wall
It is equipped with clearance layer.So, clearance layer is set between wall decorating veneer and wall, and wall decorating veneer is applied to bathing room or kitchen
It is that, even if water or vapor are immersed in wall decorating veneer by panel, also can down be drained by clearance layer, therefore clearance layer
Certain waterproof action can be played.It is also possible to enter the arrangement of row line and pipeline by clearance layer, facilitate the installation of electrical equipment
Or safeguard.
Another technical scheme of the present utility model is that on above-mentioned basis, the connector is L-shaped, T-shaped or product
Font.So, connector is the various shapes structures such as L-shaped, T-shaped or isosceles triangle, can be wanted with various different mounting structures
Ask, be easy to the installation of wall decorating veneer.
Another technical scheme of the present utility model is that described connector one end is by being welded and fixed on above-mentioned basis
On the channel-section steel of wall decorating veneer, the other end is fixed with wall.So, connector one end can be fixed by welding in advance
On the channel-section steel of wall decorating veneer, until scene is again with fixtures such as bolts by the other end of connector and matrix wall or lightgage steel joist
Wall is connected.Site operation workload is reduced, efficiency of construction is improved.
Brief description of the drawings
Fig. 1 is the sectional view of the base plate for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 2 is the sectional view of the production mould of the base plate for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 3 is the structure chart of the base plate for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 4 is the partial section of the base plate for representing the bathing room involved by this technology another embodiment;
Fig. 5 is the floor drain discharge structure figure for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 6 is the local structural graph for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 7 is the installation diagram of the wall decorating veneer for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 8 is the structure chart of the wall decorating veneer for representing the bathing room involved by a kind of implementation method of this technology;
Fig. 9 and Figure 10 are the local peace of the wall decorating veneer for representing the bathing room involved by this technology another embodiment
Assembling structure figure;
Figure 11 is the structure chart for representing the bathing room involved by a kind of implementation method of this technology;
Figure 12 is to represent the partial enlarged drawing in Figure 11 at A.
In figure:
The waterproof construction of 10 production mould, 11 bottom surface, 12 side 13
The projection of 14 arc angling, 15 dry area, 16 wet area 17
The import of 18 floor drain installing port, 19 supporting rib, 50 floor drain 51
The 52 outlet T-shaped flanks of annulus of 53 reducing transfer tube 54
The top half of 55 ground leaking drainage pipe, 121 the latter half 122
The wall of 22 panel, 23 clearance layer 100
The 25 support connectors of fixed bed 26
Specific embodiment
The utility model is described in detail below in conjunction with the accompanying drawings, the description of this part be only it is exemplary and explanatory,
There should not be any restriction effect to protection domain of the present utility model.Additionally, those skilled in the art's retouching according to presents
State, respective combination can be carried out to the feature in embodiment in presents and in different embodiments.
The utility model embodiment is as follows, refers to shown in Fig. 1 to 12, a kind of bathing room, including base plate and wallboard, its
In, the base plate includes bottom surface 11 and side 12, the bottom surface 11 and side 12 it is main by concrete or fiber concrete once
Property overall processing shaping, be provided with the anti-bank of staged of at least two-stage on the side 12, the anti-bank of staged and bottom surface 11
It is integrally formed;The wallboard includes the wall decorating veneer being fixed on wall 100, and the wall decorating veneer includes face
Plate 22 and support fixed bed 25, the support fixed bed 25 is the concrete block for being added with channel-section steel mesh sheet, the support fixed bed
25 are arranged between wall 100 and panel 22.So, bathroom base plate uses concrete or the disposable overall processing of fiber concrete
Shaping, can be in integrally basin type, and whole base plate is seamless to be poured, and can play a part of rigid waterproofing, and save installation stainless steel
The techniques such as water-proof strip side, not only good water-proof effect, and also efficiency of construction is high.Particularly, according to ultra-high performance concrete
The ultra-high performance concrete of (Ultra-High Performance Concrete) or mixing of steel fiber fabricates bathing room
Base plate, high intensity, high tenacity, the strong high-durability of the superelevation of low porosity of ultra-high performance concrete can be made full use of, carry
The cracking strength of bathroom base plate high and fatigue life, strengthen the durability and rigidity of bathroom base plate.In addition, the bottom surface 11 and side
The overall processing shaping of face 12, as shown in Fig. 2 bathroom base plate can be used instead beats casting craft so that the use face of bathroom base plate
Positioned at the lower section of production mould 10, so that it is guaranteed that using face smoother, flatness is good, saves levelling construction, can directly spread
The decorative layers such as patch PVC floor, ceramic tile, so as to further improve efficiency of construction.Further, as needed can be in bathroom base plate
Upper setting built-in fitting hole sets built-in fitting, is easy to production line balance, can simultaneously carry out the manufacture of bottom surface and side engineering,
Subsequent machining technology is further reduced, efficiency of construction is improved.And, at least two-stage is provided with the side of bathing room base plate
The anti-bank of staged, the anti-bank of staged is integrally formed with the bottom surface of bathing room base plate.So, multi-level waterproof knot can be formed
Structure, improves the water resistance of bathing room base plate.In addition, the wall decorating veneer includes panel 22 and support fixed bed 25, it is described
Support fixed bed 25 is the concrete block for being added with channel-section steel mesh sheet, and the support fixed bed 25 is arranged on wall 100 and panel 22
Between.So, by setting support fixed bed 25 between wall 100 and panel 22, during construction, first channel-section steel and steel mesh piece are welded
Connect, then casting concrete or the concrete mixed with haydite, concrete block is formed, then panel 22 is affixed to shape on concrete block
Into wall decorating veneer.Until the connectors such as live bolt, suspension member 26 connect wall decorating veneer and matrix wall or lightgage steel joist wall
Fixation is connect, the processing of the wall decorating veneer can use pipelining, such that it is able to greatly reduce the work of site operation
Amount, it is to avoid situ wet operation, improves efficiency of construction, facilitates in-site installation.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 3 and Figure 4, the bottom surface can
To be provided with dry area 15 and wet area 16, the dry area 15 and wet area 16 are separated by projection 17, and the projection 17 can be with bottom surface one
Secondary property overall processing shaping.So, do area 15 and wet area 16 is separated by projection 17, projection 17 is disposably integrally processed into bottom surface
Type, not only projection 17 and bottom surface good forming effect, good appearance, and convenient processing and manufacture, efficiency of construction is high.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in Figure 4 and Figure 5, the bottom surface 11
Floor drain installing port 18 is provided with, floor drain adapter is provided with the floor drain installing port 18.So, the floor drain adapter can be with
Prefabricated together with the base plate of bathing room, during construction, floor uses laminated floor slab, floor drain adapter to pass through the part of bathing room base plate
A groove is reserved in the position that correspondence is positioned on floor, and the bottom of floor drain adapter is placed in groove, then pours folded
The overlapping layers of floor is closed, the base plate and floor of bathing room are combined into entirety.Floor drain adapter lower part outlet and ground leaking drainage pipe
55 are connected, and sewage is discharged.The base plate of bathing room installs floor drain 50 again after installing.Common direct-drainage floor drain can so be led to
Cross floor drain adapter and be converted into side row's floor drain, so as to realize co-layer draining, and drop plate treatment need not be carried out.It is of course also possible to will
Floor drain 50 sets with the floor drain adapter and is structure as a whole, and during construction, installing port is set on bathroom base plate, by bathroom base plate
Floor drain and floor drain adapter are installed again after installing.Further, the floor drain adapter includes an import 51 and one outlet
52, connected by 90 ° of reducing transfer tubes 53 between the import 51 and outlet 52, the reducing transfer tube 53 is at import 51
Outer wall on be provided with the T-shaped flank 54 of annulus.So, it is provided with circle on the outer wall at import 51 in reducing transfer tube 53
The T-shaped flank 54 of ring, the T-shaped flank 54 of annulus is merged one in being well embedded in the base plate 11 of bathroom with concrete
Rise, the installation sealing for later stage floor drain 50 plays a good role, and can improve floor drain 50 close with being connected for floor drain adapter
Envelope effect.
On the basis of above-described embodiment, in another embodiment of the utility model, as described in Figure 4, also set on the bottom surface
Drainage grade (not illustrating in figure) is equipped with, the gradient is relatively low at the floor drain installing port 18.So, can smoothly by bathing room bottom
During the sanitary wastewater in face causes the floor drain adapter at floor drain installing port 18 and drains into drainage equipment module, so as to keep bathing room
The drying of bottom surface.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 1, the bottom surface 11 and side
The junction in face 12 can be provided with arc angling 14.So, the junction of bottom surface 11 and side 12 is provided with arc angling
14, the junction that can not only reduce bottom surface 11 and side 12 sets the cracking risk of right-angle side, and is conducive to secondary decoration
Construction, without corner or spot as yet untouched by a clean-up campaign when using.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figures 1 to 6, the side 12
Upper end be provided with waterproof construction 13, the waterproof construction 13 can be sealing surface, groove or flanging.So, in side 12
Upper end be provided with waterproof construction 13, the wallboard of bathing room just directly can vertically be stuck in the base plate top of bathing room, then pass through
Break fluid sealant to be sealed, simple structure is easy for installation, good water-proof effect.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in fig. 6, the anti-bank of the staged
Including top half 122 and the latter half 121.So, two-layer waterproof construction can be formed, the waterproof of bathing room base plate is improve
Performance.Preferably, the size of the top half 122 be 50mm high, width 40mm, the size of the latter half 121 be 50mm high,
75mm wide.So, though in bathing room the surface water as deep as to 50mm, the anti-water depth of also 50mm is arranged equivalent to double waterproof
Apply, improve the water resistance of bathroom base plate.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in figure 5, the bottom of the bottom surface 11
Portion is also provided with supporting rib 19.So, the bottom in bottom surface 11 is provided with supporting rib 19, can increase bottom surface 11
Highly, processing materials are reduced.Further, the supporting rib 19 can be with the one moulding by casting of bottom surface 11 or by anti-manual labour
Skill is fixed on the bottom of bottom surface 11.
On the basis of above-described embodiment, in another embodiment of the utility model, it is provided with least on the bathroom base plate
Two suspension centres, the suspension centre is that pre-buried hanging is followed closely or suspension ring (not indicated in figure).So, by default suspension centre, can be conveniently
Movement, lifting and the transport of the base plate or bathing room of bathing room.Preferably, set respectively on four angles of bathing room base plate
Put four suspension centres.
On the basis of above-described embodiment, in another embodiment of the utility model, the panel 22 can be by the anti-side of beating
Method is fixed on support fixed bed 25.So, panel 22 is fixed on support fixed bed 25 by anti-printing method, during construction,
First panel 22 can be positioned with locator card, and be laid on platform mould, in the back side standing groove steel mesh piece of panel 22, then poured
Concrete or the concrete mixed with haydite, form wall decorating veneer.Such that it is able to using pipelining, batch production, improve
Production efficiency.
On the basis of above-described embodiment, in another embodiment of the utility model, the channel-section steel mesh sheet can be by channel-section steel
The skeleton and steel mesh piece being formed by connecting are welded to form.So, skeleton is connected into by channel-section steel and welds steel mesh piece and form channel-section steel mesh sheet,
With stronger resistance to compression, tension and impact resistance, so as to improve resistance to compression, tension and the shock resistance of wall decorating veneer.
On the basis of above-described embodiment, in another embodiment of the utility model, the junction of the channel-section steel can be set
There are reinforcement or reinforcing plate (not identified in figure).So, the junction of channel-section steel is provided with reinforcement or reinforcing plate, it is possible to reduce
The deformation of channel-section steel, increases the intensity of flase floor, so as to increase the intensity of wall decorating veneer.
On the basis of above-described embodiment, in another embodiment of the utility model, the concrete block can use haydite
Concrete block or foaming haydite concrete block.So, using haydite concrete block or foaming haydite concrete block, its not only weight
Gently, and impervious good, fire resistance is good, it is adapted to be used in bathing room or kitchen.
It is described as shown in Fig. 7, Fig. 9 and Figure 10 in another embodiment of the utility model on the basis of above-described embodiment
Wall decorating veneer is fixed on wall 100 by connector 26.So, can be by connector by wall decorating veneer and base
Body wall or lightgage steel joist wall are connected, easy construction.
On the basis of above-described embodiment, in another embodiment of the utility model, as shown in fig. 7, the wall decorating veneer
Clearance layer 23 is provided between wall 100.So, clearance layer 23, wall body decoration are set between wall decorating veneer and wall
Plate is applied to bathing room or kitchen, even if water or vapor are immersed in wall decorating veneer by panel 22, also can by
Gap layer 23 is down drained, therefore clearance layer 23 can play certain waterproof action, it is also possible to passing through clearance layer 23 enters line
Road and the arrangement of pipeline, facilitate the installation or maintenance of electrical equipment.
On the basis of above-described embodiment, in another embodiment of the utility model, the connector 26 is L-shaped, T-shaped
Or isosceles triangle.So, connector 26 is the various shapes structures such as L-shaped, T-shaped or isosceles triangle, can be with various different installation knots
Structure requirement, is easy to the installation of wall decorating veneer.
It is described as shown in Fig. 7, Fig. 9 and Figure 10 in another embodiment of the utility model on the basis of above-described embodiment
The one end of connector 26 is fixed by welding on the channel-section steel of wall decorating veneer, and the other end is fixed with wall 100.So, can be pre-
First the one end of connector 26 is fixed by welding on the channel-section steel of wall decorating veneer, until scene again will be even with fixtures such as bolts
The other end of fitting 26 is connected with matrix wall or lightgage steel joist wall.Site operation workload is reduced, efficiency of construction is improved.
The above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art
For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and
Retouching also should be regarded as protection domain of the present utility model.
Claims (10)
1. a kind of bathing room, including base plate and wallboard, it is characterised in that the base plate include bottom surface and side, the bottom surface and
Side is main by the disposable overall machine-shaping of concrete or fiber concrete, and the ladder of at least two-stage is provided with the side
The anti-bank of formula, the anti-bank of staged is integrally formed with bottom surface;The wallboard includes the wall decorating veneer being fixed on wall,
The wall decorating veneer includes panel and support fixed bed, and the support fixed bed is the concrete block for being added with channel-section steel mesh sheet,
The support fixed bed is arranged between wall and panel.
2. bathing room according to claim 1, it is characterised in that the bottom surface is provided with dry area and wet area, the dry area
Separated by projection with wet area, the projection overall machine-shaping disposable with bottom surface.
3. bathing room according to claim 1, it is characterised in that the bottom surface is provided with floor drain installing port, the floor drain
Floor drain adapter is provided with installing port.
4. bathing room according to claim 3, it is characterised in that drainage grade is additionally provided with the bottom surface, describedly
The gradient is relatively low at leakage installing port.
5. bathing room according to claim 1, it is characterised in that the junction of the bottom surface and side is provided with arc and falls
Angle.
6. bathing room according to claim 1, it is characterised in that the upper end of the side is provided with waterproof construction, described
Waterproof construction is sealing surface, groove or flanging.
7. bathing room according to claim 1, it is characterised in that the anti-bank of staged includes top half and lower half
Point;The top half size 50mm high, width 40mm, the latter half size 50mm high, width 75mm.
8. bathing room according to any one of claim 1 to 7, it is characterised in that set on the base plate of the bathing room
There are at least two suspension centres, the suspension centre is that pre-buried hanging is followed closely or suspension ring.
9. bathing room according to any one of claim 1 to 7, it is characterised in that the channel-section steel mesh sheet is to be connected by channel-section steel
The skeleton and steel mesh piece for connecing are welded to form;The junction of the channel-section steel is provided with reinforcement or reinforcing plate;The concrete
Block is haydite concrete block or foaming haydite concrete block.
10. bathing room according to any one of claim 1 to 7, it is characterised in that the wall decorating veneer is by connection
Part is fixed on wall;The connector is L-shaped, T-shaped or isosceles triangle;Described connector one end is by being welded and fixed
On the channel-section steel of wall decorating veneer, the other end is fixed with wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621092481.4U CN206189908U (en) | 2016-09-29 | 2016-09-29 | Bathroom room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621092481.4U CN206189908U (en) | 2016-09-29 | 2016-09-29 | Bathroom room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206189908U true CN206189908U (en) | 2017-05-24 |
Family
ID=58731314
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621092481.4U Active CN206189908U (en) | 2016-09-29 | 2016-09-29 | Bathroom room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206189908U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442595A (en) * | 2018-04-03 | 2018-08-24 | 江苏南通三建集团股份有限公司 | Precast concrete entirety ground floor and installation method for kitchen and toilet |
-
2016
- 2016-09-29 CN CN201621092481.4U patent/CN206189908U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108442595A (en) * | 2018-04-03 | 2018-08-24 | 江苏南通三建集团股份有限公司 | Precast concrete entirety ground floor and installation method for kitchen and toilet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208777468U (en) | A kind of kitchen and bath's water-proofing anticracking structure | |
CN206189908U (en) | Bathroom room | |
CN206189912U (en) | Bathroom bottom plate | |
CN206189916U (en) | Bathroom room | |
CN206189906U (en) | Bathroom room | |
CN206189911U (en) | Bathroom room | |
CN206189914U (en) | Bathroom room | |
CN206189907U (en) | Bathroom room | |
CN206189909U (en) | Bathroom room | |
CN104746593A (en) | Integral bathroom | |
CN206616888U (en) | A kind of bathing room | |
CN206530084U (en) | A kind of bathroom bottom plate | |
CN206385828U (en) | A kind of bathing room | |
CN209585309U (en) | Subsided rest room waterproof construction | |
CN206530009U (en) | A kind of bathroom bottom plate | |
CN206329067U (en) | A kind of bathing room | |
CN106320749A (en) | Bathroom | |
CN206554180U (en) | A kind of integrated water-proof chassis of toilet pipeline | |
CN104763175A (en) | Integrated bathroom | |
CN204510912U (en) | A kind of integral bathroom | |
CN204645722U (en) | A kind of integral bathroom | |
CN204510911U (en) | A kind of integral bathroom | |
CN109779319A (en) | A kind of co-layer draining blank precast block toilet of outer wall provided pipe line groove hole | |
CN206189904U (en) | Bathroom room | |
CN204510907U (en) | A kind of integral bathroom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd. Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD. Contract record no.: 2018430000023 Denomination of utility model: Bathroom Granted publication date: 20170524 License type: Common License Record date: 20190102 |